HomeMy WebLinkAboutTR-11026 Glenn Goldsmith,President yo"�p� COG, Town Hall Annex
A.Nicholas Krupski,Vice President ] 54375 Route 25
Eric Sepenoski rc z P.O.Box 1179
Liz Gillooly s ry Southold,NY 11971
Joseph Finora 'f' p�`.ay` Telephone(631)765-1892
Fax(631)765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES
72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN
APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO
SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE
PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt curtain
1 st day of construction
% constructed
Project complete, compliance inspection
Glenn Goldsmith,President O�QSVFFOC�'.00 Town Hall Annex
A.Nicholas Krupski,Vice President %, �. 54375 Route 25
Eric Sepenoski y P.O.Box 1179
Liz Gillooly 'J Southold,NY 11971
Joseph Finora 'f� �pl Telephone(631)765-1892
Fax(631)765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
En-Consultants on behalf of Southold Shores Boat Basin, Inc.
TO:
Please be advised that your application has been reviewed by this Board at the regular meeting
of October 14, 2026 and your application has been approved pending the
completion of the following items checked off below.
Revised Plans for proposed project
Pre-Construction Hay Bale Line Inspection Fee ($50.00)
1st Day of Construction ($50.00)
Y2 Constructed ($50.00)
X Final Inspection Fee ($50.00)
Dock Fees ($3.00 per sq. ft.)
The Permittee is required to provide evidence that the non-turf buffer condition of the
Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant
and deed restriction to the deed of the subject parcel. Such evidence shall be provided within
ninety (90) calendar days of issuance of this permit.
Permit fees are now due. Please make check or money order payable to Town of Southold.
The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the
Southold Town Code.
The following fee must be paid within 90 days or re-application fees will be necessary. You will
receive your permit upon completion of the above.
COMPUTATION OF PERMIT FEES: r�
Final Inspection Fee = $50.00
c K- 4-
TOTAL FEES DUE: $ 50.00
BY: Glenn Goldsmith, President
Board of Trustees
°otH° - v�'9°fi°i�"Pr' ...,n1 fit i°i0°P°�' - '' °+t1 i°pP/$rr °+ 1 58•0d r�°9°I 1°I°9 5 rV°•99 r' rf
° - .:t t 1 / PP"p °p { th p°OB i i0"S9C•• /. "9 0° �/ @ °� r
,r 4°pll ial0%j♦ - ° PP 1t AAn S 1 PIA . , � S�Q° P/�n ,11h P,per. � 1 YI o `{,r
M'��'�"'s, '✓'a�L���., ,+' n� �,j � �L✓J�'r' au+o,r..! � .✓a'��•�:,�..Y.,.Syyyy,� � J
'^'f ���a�,�!•'�1N7/...,.5.4',''"J.'8•�!?_G.:dt3iSY�1m�C°4;�e'..b' N?72i1,.,,".7RL,t8�.,5;,tM;.«:'vb :,.4aC fAE�:S� '4:r?'r,Sf'.�itt.,.ArLAS.,:t7b'.T`.IYtl5,4S.u:.�'f2,.:J;;1 �:„SS2S5".S.F NO
.:4�T1 rGp54.tif�,.•^:✓;12:T.t?,,,.L. wui`.;�84egT.'.'�'d139i ..
t .
BOARD OF SOUTHOLD TOWN TRUSTEES
:f °o11Q` � I"op�Dn
SOUTHOLD, NEW YORK
ffff„
PERMIT NO. 11026 DATE: OCTOBER 14,2026
a 3 ISSUED TO: SOUTHOLD SHORES BOAT BASIN,INC. y=
PROPERTY ADDRESS: END OF BLUE MARLIN DRIVE, SOUTHOLD i
SCTM# 1000-57-1-39.3 '.
AUTHORIZATION
Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in
accordance with the Resolution of the Board of Trustees adopted at the meeting held on October 14,2026,and
in consideration of application fee in the sum of$1,250.00 paid by Southold Shores Boat Basin,Inc. and
` ,0l subject to the Terms and Conditions as stated in the Resolution,the Southold Town Board of Trustees
authorizes and permits the following:
,
)(Wetland Permit for a Ten 10 Year Maintenance Permit to dredge a 7510 sq.ft. area
iP P' •
-, of private communal boat basin to a finished maximum depth of-4' MLW by dredging ,
7
an approximately 5,330 sq.ft. inshore area to a maximum depths of-4' MLW, and
dredging an approximately 2,180 sq.ft. offshore area to a depth of-4.5' MLW,which is
I to be backfilled with a 6 inch deep, approximately 40 cubic yards gravel cap; and
temporarily place approximately 315 cubic yards of resultant spoil inside geotextile ,
tubes located in 2,340 sq.ft. deposition area on adjacent parcel to south, prior to '0ps%
removal for offside disposal; with the condition that any disturbed areas, including the ,,, �`,•,.
� q de-watering site and pathway to the road be reve etated with natives species following
I
g P Y � g P g
conclusion of work; all as depicted on the site plan prepared by En-Consultants, ='+.
received on September 3,2026, and stamped approved on October 14,2026. <,
IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, .
i\ r
and these presents to be subscribed by a majority of the said Board as of the day and year written above.
' '� nir7J:l(fV;yn73:n.7"a°i°"'CiIY'Y'R3,RTiY;9�Yyfi37Ei.7n"fY��'i'�"',I'r'V`745iY .Nl lai^eY:iY.tt;ir"tYdCS.✓tiV?`i79�]E7'Y/'9i'3�Cia^.7'C3 u.(^i'P7Y:f7.nriiPiP✓:J�7ctai'7��°"r�ne nR9Adi"5�"7✓rhiSit✓�v"1 dr r:7, Y�i'k'�Y,'.ti+f'rC75'iXCR,i✓'h? �P(Ti'.fY7]PZ7,rn'n`iPY'!»Yr,
Ir ;. ...v�' ..iG..��n�y.v - f. R^f,^..'.Fm7f F'.•- `"n��JyG.t� 4�` A.I.
-.," `R- °°Sha°w9•°°° E•�J ;:?b;•.dap/v Adti'�. ;'' �,; rd,�d�°I�1:.. .:. ,.: Rrde epr,.�1... •ia !ro {o,rrdp �°lio°! y. °�:i��d,.:i°IL° <..
TERMS AND CONDITIONS
The Permittee Southold Shores Boat Basin,Inc., End of Blue Marlin Drive, Southold,New
York as part of the consideration for the issuance of the Permit does understand and prescribe
to the following:
1. That the said Board of Trustees and the Town of Southold are released from any and all
damages, or claims for damages, of suits arising directly or indirectly as a result of any
operation performed pursuant to this permit, and the said Permittee will, at his or her own
expense, defend any and all such suits initiated by third parties, and the said Permittee
assumes full liability with respect thereto,to the complete exclusion of the Board of
Trustees of the Town of Southold.
2. That this Permit is valid for a period of 120 months.
3. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to
maintain the structure or project involved,to provide evidence to anyone concerned that
authorization was originally obtained.
4. That the work involved will be subject to the inspection and approval of the Board or its
agents, and non-compliance with the provisions of the originating application may be cause
for revocation of this Permit by resolution of the said Board.
5. A permit issued for work not including a demolition as per the definition in the Town
Code, but subsequent to issuance,the work results in a demolition,the permit is voided and
a new application must be submitted.
6. That there will be no unreasonable interference with navigation as a result of the work
herein authorized.
7. That there shall be no interference with the right of the public to pass and repass along the
beach between high and low water marks.
8. That if future operations of the Town of Southold require the removal and/or alterations in
the location of the work herein authorized,or if, in the opinion of the Board of Trustees,
the work shall cause unreasonable obstruction to free navigation,the said Permittee will be
required, upon due notice,to remove or alter this work project herein stated without
expenses to the Town of Southold.
9. That the said Board will be notified by the Permittee of the completion of the work
authorized.
10. That the Permittee will obtain all other permits and consents that may be required
supplemental to this permit,which may be subject to revoke upon failure to obtain same.
11. No right to trespass or interfere with riparian rights. This permit does not convey to the
permittee any right to trespass upon the lands or interfere with the riparian rights of others
in order to perform the permitted work nor does it authorize the impairment of any rights,
title, or interest in real or personal property held or vested in a person not a party to the
permit.
Notes:
' 51uffolk County Haqrtrom Map 44 '
I. Purpose:fo maAam wTicimt water depths fa dadu and PPO" ,
nmqation within ex"nq prwabeI4 owned mama boat basin ARVED BY
+2000'
2. Vatm: 0'-0"or 1986 NAVV where indicabool
5. Water depths referenwel to WW)tra5crbed from BOARD OF 'i RUSTEES
5wve4 prepared 64 Nathan faft Crown III Laid 5xvqor,
dated Marc,25,2M,based in part on lv4droqaphic TOWN OF SOUTHOLD s
gxve4 ,4?Dbfft H.Fox,la5t,dated November 1,2021 % !&
4. Approximately 7,5710 5f area to 6e mainteraxe dredged via
DATE C)C�k—o\,c,
Suction Bred W to max,finished 6oVm elevation of-4'ALW,
�-o
Includinq approx.5,Mo 5f Inshore area to IV dredged to ma.
u IL
depth of 4AALW,and approx.2,160 5f offshore Tea to 6c S E P 3 2026
dredged to depth of A5'MLW&filled with 6"gavel cap
55. Approx,519 c4 of said/5&"1 to 6e pwWd into
6io bags"/qwbable hbas placed on filter cloth,located in SoLdhOld TO,Frn
approx. L-YW 2,540 5ffq daMition area landward of co 511E (AC VIA We 13A51N
%W aid beach fordewaterin%prior to brmq buied offsite LOGOS L. Board offrust as 9t TiP,19,ANt7 50UNP VIA 6AP,6e)
to an approved upland location for permanent disposal P-;Fn -
6. Protect location:Wavaber lad/6cA 6a5ln at encl of Nue STATIONS I & 2:A87* x A64' (MAX.). APPROX. 5.33 sr AREA TO BE
DREDGED TO A MAXIMUM DEPTH OF OM
MaiinL7rivc,5puWd.5CfM No.1000-5,1-1 59.5 MAINTENANCE -4- LW.
INCLUDING A9* WIDE, APPROX. 830 SF AREA CLOSEST TO SHORE
TO BE DREDGED ON 1:3 SIDE SLOPE TO MEET EXISTING BOTTOM (±-I'MLW)
STATION 3:A87' x ASS' (MAX.). APPROX. 2.180 SF AREA TO BE
MAINTENANCE DREDGED TO A MAXIMUM DEPTH OF -4.5' MLW, LOWEST 6"
(-SEGMENT C-) THEN TO BE FILLED WITH APPROX. 40 CY GRAVEL CAP
Iflolf 4`N�
0 IL & .1 N
EN-CONSUIUTA TS
A
1319 NORTH SEA ROAD
OF'
4W SOUTHAMPTON, NY 11968
cl
631-283-6360
NWN-
IL ---------!�,%------ ------A LL Lyr--,11,
IL
I:-IL IL IL 11—x
--D
k ILL
IL
N N
IWF SOUTHOLD SHORES ASSOCIATION rho. ————— —
B.C, UK No1000-W-01-M
d-DANfEL WaLM-
............ AL BEA
_LIMIT OP BEACH
-Zz-
157-
PPOF05W AAANSNANC� 19MI961%
1_5�
- ------- ----
POP 501,tfHOW 5HOM5130AT PA51N - Alzir --- ---
INC. ON 5ME 13A51N, 5OUTHOW, ------O"---APPi�OX. 2.340 SF AREA (LANDWARD OF SHW AND BEACH) TO BE USED FOR TEMPORARY DEPOSITION OF
APPROX. 315 CY OF SAND/SILT SPOIL PUMPED VIA SUCTION DREDGE INTO 'BIO-BAGS-/GEOTEXTILE TUBES ON
5UPFO�K COUNTY, NW YOPK FILTER CLOTH FOR FOR DEWATERING & SUBSEQUENT TRANSPORT TO APPROVED UPLAND SITE FOR PERMANENT DISPOSAL
(AREAS TO BE TEMPORALLY RETAINED WITH SILT FENCE & STAKED HAYBALES)
%af I or 3 7-11-2�, 6-10-26 SHELTER ISLAND SOUND
t'p FLl A-A: TWU PWP05�t) MAIMNANC� l2k PA(A - 5TAlION51 & 2 (APPPDX. 5,33O 5F IN5HOP,� Ak�A
I'' - 10' (WUM; WW - 0'-011)
——————————————————————————————————---———————————————— 5HW- L"—
MM- 01
-21
NM EX Porfom
Z_ Z_Z_Z_Z_
+91
— ?F,0P05N2 POMM- -4'WW
+ (var.)
AF,�A TO P� PMZ�P
TO MAX, !?�FTH-4'WW
4-64' (var)
?pl0p05N9 — PP,�Pa MA
M, A TO P 19FW02 MOM�X.130ffOM
TO MAX, P FfH 4MM AT 1:3 51P 5,On
rplorU [3-t3: TWU FkOP05 P MAINT�NANC� PP,�126IN6 - 5fATION5 (APPPDX. 2,180 5F 0FF5HOP,� AFM
I 10' (19ATUM: WW= 0'-0'')
———————————
MM 01
�x 13orfom
L
6" 61MVEL CAP(TYPIW-T Pplop05rp t2p09cZ 12EM- A ww
PMZL96�AMA TO MAX. WTH 45'MLW AW FILL
KOPC)51�1:2 MANSNANC� t9M%AIN6 OM5f 6 51�OWW C") WITHCAPM�CAP SEp 3 2026
FOIZ 5OUTHO1,19 5HOM513OAf 13A51N EN-CONSULTANTS. --so—d-11--id—Toval
INC. ON 5Aa 13A51N, 5OUTHOW, 1319 NORTH-SEA ROAD Board
5UFFOLK COUNfY, NSW YOM SOUTHAMPTON, NY 11968
9f f 2 OF 5 7-11-25, 6-10-26 631-283-6360
Glenn Goldsmith,President so Town Hall Annex
Nicholas Krupski,Vice President ��V� Old 54375 Route 25
P.O. Box 1179
Eric Sepenoski J Southold, New York 11971
Liz Gillooly Telephone(631) 765-1892
Joseph Finora � y� Fax(631) 765-6641
C®Unm,�
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
October 15, 2026
En-Consultants
1319 North Sea Drive
Southampton, NY 11968
RE: SOUTHOLD SHORES BOAT BASIN, INC.
END OF BLUE MARLIN DRIVE, SOUTHOLD
SCTM# 1000-57-1-39.3
Dear Mr. Herrmann:
The Board of Town Trustees took the following action during its regular meeting held on
Wednesday, October 14, 2026 regarding the above matter:
WHEREAS, En-Consultants on behalf of SOUTHOLD SHORES BOAT BASIN, INC. applied to
the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold
Town Code, the Wetland Ordinance of the Town of Southold, application dated September 3,
2026, and,
WHEREAS, the LWRP Coordinator issued a recommendation that the application be found
Consistent with the Local Waterfront Revitalization Program policy standards, and,
WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on
October 14, 2026, at which time all interested persons were given an opportunity to be heard,
and,
WHEREAS, the Board members have personally viewed and are familiar with the premises in
question and the surrounding area, and,
WHEREAS, the Board has considered all the testimony and documentation submitted
concerning this application, and,
WHEREAS, the proposal complies with the standards set forth in Chapter 275 of the Southold
Town Code,
WHEREAS, the Board has determined that the project as proposed will not affect the health,
safety and general welfare of the people of the town,
2
NOW THEREFORE BE IT,
RESOLVED, that the Board of Trustees have found the application to be Consistent with the
Local Waterfront Revitalization Program; and,
RESOLVED, that the Board of Trustees APPROVE the application of SOUTHOLD SHORES
BOAT BASIN, INC, for a Ten (10) Year Maintenance Permit to dredge a 7,510 sq.ft. area of
private communal boat basin to a finished maximum depth of-4' MLW by dredging an
approximately 5,330 sq.ft. inshore area to a maximum depths of-4' MLW, and dredging an
approximately 2,180 sq.ft. offshore area to a depth of-4.5' MLW, which is to be backfilled with a
6 inch deep, approximately 40 cubic yards gravel cap; and temporarily place approximately 315
cubic yards of resultant spoil inside geotextile tubes located in 2,340 sq.ft. deposition area on
adjacent parcel to south, prior to removal for offside disposal; all as depicted on the site plan
prepared by En-Consultants, received on September 3, 2026, and stamped approved on
October 14, 2026.
Permit to construct and complete project will expire three years from the date the permit is
signed. Fees must be paid, if applicable, and permit issued within six months of the date of this
notification.
Inspections are required at a fee of$50.00 per inspection. (See attached schedule.)
Fees: $50.00
Very truly yours,
Glenn Goldsmith
President, Board of Trustees
S.OUTHOLD
TRUSTEES
No. 110 A(O
sokmo\a SIN ores
Issued Tft goa< sas:m _^C. Date 10/ 14 /a�
Ai�dl'@SS - - �1ue Aa� l: n Dr-;ve, ; Sou►'C�, ola
.THIS. NOTICE MUST BE DISPLAYED DURING CONSTRUCTION
.TOWN TRUSTEES OFFICE,TOWN OF SOUTHOLD
SOUTHOLD, N.Y. 11971
TEL.i 765-1892
Glenn Goldsmith, President �o�QSUFFO(�COG Town Hall Annex
A.Nicholas Krupski,Vice President �� 54375 Route 25
0
Eric Sepenoski ,? P.O.Box 1179
Liz Gillooly �y • o�� Southold,NY 11971
Joseph Finora ! '� �a Telephone(631)765-1892
Fax(631)765-6641
Southold Town Board of Trustees
Field Inspection Report
`
Date/Time:0 Completed in field by:
En-Consultants on behalf of SOUTHOLD SHORES BOAT BASIN, INC. requests a
Wetland Permit for a Ten (10) Year Maintenance Permit to dredge a 7,510 sq.ft. area of
private communal boat basin to a finished maximum depth of-4' MLW by dredging an
approximately 5,330 sq.ft. inshore area to a maximum depths of 4' MLW, and dredging
an approximately 2,180 sq.ft. offshore area to a depth of-4.5' MLW, which is to be
backfilled with a 6 inch deep, approximately 40 cubic yards gravel cap; and temporarily
place approximately 315 cubic yards of resultant spoil inside geotextile tubes located in
2,340 sq.ft. deposition area on adjacent parcel to south, prior to removal for offside
disposal. Located: Off End of Blue Marlin Drive, Southold. SCTM# 1000-57-1-39.3
Type of area to be impacted:
4-'Saltwater Wetland Freshwater Wetland Sound Bay
Part of Town Code proposed work falls under: �hapt. 275 Chapt. 111 other
Type of Application: Wetland Coastal Erosion Amendment
Administrative Emergency Pre-Submission Violation
Notice of Hearing card posted on property: /Yes No Not Applicable
Info needed/Modifications/Conditions/Etc.:
Present Were: G. Gol ith N. Kr s` i E. Sepenoski
L. Gillooly J. Finora
Notes: L
I. Purpose:To maAain sufficient water depths for dodmp aid 5uffolk CountyHaqtrom Map 44
navigation within exi-Ainq privately owned marina boat basin 111 2000'
2. Palm WW-U-10"or 198E NAV17 where indicated qo
5. Water depths(referenced to WW) trisabed from .1d
%IFv64 prepared 64 Nathan fift Crown III Laid Surveyor,
dated March 25,2025,based in part an h4drociraphic Spa W,
5WV64 b4 Robert H.Fox,last d"November I.2021
4, Approximata!4 7,510 5f area to 6e maintenance dredged via
suction dredge to ffm,finished bobtan elevation of-4'AILW,
D
indudinci approx,57,550 sf ire4we area to be dredged to ma,
depth of 4AM,aid approi,2.160 5f offshore area to 6e S E P 3 2026
dredged todepth of-4.57XW&filledwitii 6"cravu[cap
Approx,519 of of sand/silt"I to be pisnpad into
"610 bags"/qwLext4le t"5 placed on filter d&,located in jjTO? So southoldTown
51S ACCESS VIA 5A6� PA51N&
approit.2,540 5f tenporndeposition area ladwad of Cj "
5HW aid beach fordewaterin prior to 6rmq truckedoffsiteBoardoTrustees aANt?5OUNL9 VIA PAP,6E)
to an approved*and location for permanent disposal \% T/O/
6, Protect locaum:1.1nderwater lad/6vat basin at end of Plw STATIONS I & 2:.±87' x ±64' (MAX.). APPROX. 5.330 SF AREA TO BE
MAINTENANCE DREDGED TO A MAXIMUM DEPTH OF -4'MLW,
Marlin Prive,5mtkold,5CTM Nov,1000-97-1-59,5 INCLUDING ±9' WIDE. APPROX. 830 SF AREA CLOSEST TO SHORE
TO BE DREDGED ON 1:3 SIDE SLOPE TO MEET EXISTING BOTTOM (±-I'MLW)
STATION 3:.±87' x ±58' (MAX.). APPROX. 2.180 SF AREA TO BE
MAINTENANCE DREDGED TO A MAXIMUM DEPTH OF -4.5' MLW; LOWEST 6"
13 COILTO 7 (-SEGMENT C-) THEN TO BE FILLED WITH APPROX. 40 CY GRAVEL CAP
POP N 4
-A N�.0 GpAIE EN-CONSULTANTS
10 1b, 1319 NORTH SEA ROAD
sou THAMPTON, NY 11 968
631-283-6360
+
-----
ML LF
------
k. k.'
k IL IL
C.,
____N1&1F SOUTHOLD SHORES ASSOCIATION Inc_ %
&C WN06 10061-n-01-85
C
.7757-
1 50
...........
.................SIFAVEL WALK-- ————————— -<, Ile.
.................... �um LIMIT OF BEACH
IfI ————————
157'
PPOF05W AIANSNANC� VMCAIN C4
FOP 5011THO1,19 5HOM513OAf 13A51N ----------
INC. ON 5A61� PA51N, 5OUTHOI,19, APPROX. 2.340 SF AREA (LANDWARD OF SHW AND BEACH) TO BE USED FOR TEMPORARY DEPOSITION OF CJ
APPROX. 315 CY OF SAND/SILT SPOIL PUMPED VIA SUCTION DREDGE INTO -810-13AGS"/GEOTEXTILE TUBES ON
%FFOI,K COUNTY, NSW YOLK FILTER CLOTH FOR FOR DEWATERING & SUBSEQUENT TRANSPORT TO APPROVED UPLAND SITE FOR PERMANENT DISPOSAL
9f f I or 5 6-10-26 (AREAS TO BE TEMPORAILY RETAINED. WITH SILT FENCE & STAKED HAYBALES) SHELTER ISLAND SOUND
FWFU A-A: THPU FWP05�P MAIN�NANC� 19P,�126IN6 - 5fAfION51 & 2 (APPPDX. 5,33O 5F IN5HOF,� AP,�A
I" - 10' (PATUM: MM- 0'-0'')
——————————————————————————————————---————————————————-5HW
—im mLw- ol
-2'
HM
Ex Porfom
ROP05FP POMOM- 4AM
Z=Z
AF,EA TO 13� LX P6�[9 T MAX,[? M-4'ALW
64' (var.)
MOP05�19 PFf ZE MA
M, AT 61�12FWO?FPOM M PfffoM
T MAX, P M-4'MLW AT 1:5 5IM 5,On
PWFU 13-P: TWU PPOP05N2 MAINT�NANC� 121?�PCAIN6 - 5TATION � (APPPDX. 2,180 5F 0FF5H01?� AF,�A)
I" - 10' (12ATUM: WW= 0'-0")
---------—————— -MM ,-.2'
A/LW 0'
EX,L30rfoM
T� 5' 'r
_ I * - P PE5 -X.!(iLoM
6'' 6MM CM(TYPICAL) R01905N?IWWO�MPTH- 4�2'ACW
29' (var) au
PMZ7 M\ A TO MAX. MM1-4b'MLW AN12 FILL
LOM5f 6" ("51�CiMf C'') WTH6ML CAP
PIZOFO51�19 MAIWNANC� =906 r L nEp 3 2 0 2 J6 "
FOIZ 5OUTHOL19 5WM5 DOAf 6A51N EN-CONSULTANTS.
INC. ON 5Aa 6A51N, 50010W, 1319 NORTH-SEA ROAD Bsooard utfilc�oluTovi Trustee,
ll
5UFFOI,K COUNTY, NW YOM
SOUTHAMPTON, NY 11968
9ef 2 OF 5 1-11-25, 6-10-26
631-283-6360
SURVEY OF PROPERTY
SITUATED AT
SEP 3 2026
SOUTHOLD
0,
� TOWN OF SOUTHOLD
\Iro r
COUNTY, NEW YORK
�9 S.C. TAX No. 1000-57-01 -35
S.C. TAX No. 1000-57-01 -39.3
SCALE 1 "=20'
PILE
MARCH 23, 2023
\� 0
o
\�Iro �o AREA DA TA
30,249 sq. ft.
PILE S.C. TAX No.
\ 1000-57-01-35 0.694 cc.
\Iro
S.C. TAX No. 30,371 sq. ft.
1000-57-01-39.3 0.697 cc.
GO \o TOTAL 60,620 sq. ft.
PILE (TO TIE LINE) 1.391 cc.
14101pov"'FO
\�o 14 cog
13LA
X I
C NOTES:
�
NIOIP,51L'ro�' voN(
f vo
L 1. UPLAND SPOT ELEVATIONS ARE REFERENCED TO N.A.V.D. 1988 DATUM
14 cf,]F . WP PILE EXISTING ELEVATIONS ARE SHOWN THUS:Xx
13LA \0'
0 0 EXISTING CONTOUR LINES ARE SHOWN THUS: X
PILE--, ;$-- F.FL. - FIRST FLOOR
0 G.FL. - GARAGE FLOOR
o
T8 - TOP OF BULKHEAD
83 - BOTTOM OF BULKHEAD
1,0T TW - TOP OF WALL
0 BW - BOTTOM OF WALL
P`N ...................
2. WATER DEPTHS ARE REFERENCED TO MEAN LOW WATER 0.0ft.
S 37 1 o
./PIIF ...............
069 WATER DEPTH ARE MEASURED IN FEET AND ARE SHOWN THUS:
'�A
6.�3 WATER DEPTH CONTOUR LINES ARE SHOWN THUS:
3. WATER DEPTHS ARE SCALED FROM HYDROGRAPHIC MAP BY
119 193
0000 1 ROBERT H. FOX LAND SURVEYOR LAST DATED NOVEMBER 1 , 2021
rk -1.4 -6 4. LOT NUMBERS SHOWN THUS: LOT(5D REFER TO
4 MAP OF SOUTHOLD SHORE
FILE IN THE OFFICE OF THE CLERK OF SUFFOLK COUNTY
0 ON AUGUST 29, 1963 AS FILE No. 3853
\�o
A_7
4
Q
''1...................
-2.9 40.
4
C9
\�o
.4
ASP"A_1 -1.4
�POLE
-1
..........
.......... -1.4
0'qD.
\0
T�o
?OSN "I \ . 6'.
� post E \ NSIGH I \ S �� ...........
?o-
-0.7 -1.4 -7.
PRIVATE _�!��WEANLOW WATER IE
'0 ::S, , - 20.0
0.5
011;'
BEACH SIGN
1.8 -0.2 -0.1 eB
IT EDGE OF MARSH VEGETATION 88*53'50" E
2.3 0.2
MEAN HIGH
WP�R j / 1.8_ -Z- ' / /j/ /8 i
ly 66'
OF 00I
.1 2 VOW-
39 <'13 W i6!z .3
.4 III-M 1 2 5.2X 0.
X26 t6' -vt'St' 0
`41'?S% b I--- '�lo ✓
2_2
41U
xl-_4_-
110. .......... X2-J
zz 'm 6 X .5 0
0 _-Z .3 ---X4.4 7.
0.
N101F
X 7-
0 )SOUTHOLD SHORES ASSOCIATION Inc. X22 22 _ - --- _-- __1
0- 6
0 6.0 S.C. TAX No. 1000-57-01-35
IX4_1 X52
X13
0 �z
1;-- 0
+.A'o C0. X2.6 - - -
-r, X218 0T -1.4
���
X-L 4k
-1 22 XA�i BENCH X52
21 5 RIVATE- - - - - - - - - - ___ ��4.1
XjL8- PIRTVATE::�
CID P EACH SIGN -4-
B BEINCH BEACH SIGN BENCH X3.7
\Y0
3.2 EDGE OFBEACH GRASS 4.1 o\
- 3
GRAVtL X2_2 2.7 -.4 EDGE OF BEACH GRASS
4.6 20 1_'1
3
11
8 .. .... 2.3
5 - - TIE LINE ALONG HIGH WATER ON NOVEMBE:R 2022 -2-
X5
2.4 N 8801494999 W 69.93' N 4' 177 2_3
MEAN HIGH WATER
655 X-52
0Gt: (3u HIGH 5 3q, "o 83.769 N 89*44'13" W UNAUTHORIZED ALTERATION OR. ADDITION
39.82' TO THIS SURVEY IS A VlOiAnc,N OF
-1.4 MEAN LOW WATER 7 SECTION 7209 OF THE NFt- YORK STATE
EDUCATION LAW.
S COPIES OF THIS SURVEY MAP NOT BEARING
N WATER 1 THE LAND SURVEYOR'S IN cP SEAL OR
WOOD FLAG EMBOSSED SEAL SHALL tq".T BE. CONSIDERED
S -1.4 ';�_POLE TO BE A VALID TRUE COr,
BULKHEA%D -1.4
........................ CERTIFICATIONS INDICATEF HEREON SHALL RUN
E313 1.1 ONLY TO THE PERSON WHOM THE SURVEY
IS PREPARED, AND ON S SEHALF TO THE
TITLE COMPANY, GOVERNMfrJAL AGENCY AND
X4_-9 ~ LENDING INSTITUTION LISIT' HEREON, AND
TO THE ASSIGNEES OF I'AF ;ENDING INSTI-
0*WASER TUTION. CERTIFICATIONS 4�W 'JO' TRANSFERABLE.
pc BAY THE EXISTENCE OF R�GH' Or WAYS
-ECONIAND/OR EASEMENTS )F RECORD, IF
-1.4 TER I SLANSOUND PREPARED IN ACCORDANCE WITH THE MINIMUM ANY, NOT SHOWN ARE NOT GUARANTEED.
STANDARDS FOR TITLE SURVEYS AS ESTABLISHED(SHELBY THE L.I.A.L.S. AND APPROVED AND ADOPTED Nathan Taf t Corwin III
FOR SUCH USE BY THE NEW YORK STATE LAND
TITLE ASSOCIATION.
Land Surveyo-r
Successor To: Stanley J. Isaksen, Jr. t
Joseph A. Ingegno L.S.
Title Surveys - Subdivisions - Site Plans )nstruction Layout
PHONE (631)727-2090 Fax (631)727-1727
OFFICES LOCATED AT MAI,INC; ADDRESS
1586 Main Road �1,0 Box 16
Jorneq'-t, New York 11947
Jamesport, New York 11947
N.Y.S. 0467 Y.S. Lic. No. E-Mail: NCorwin3@aol.com
it
4' -233
'NEW YORK STATE DEPART_, NT OF ENVIRONMENTAL CONSERVk, N
Facility DEC ID 1-4738-04018
PERMIT
Under the Environmental Conservation Law ECL
Permittee and Facility Information
Permit Issued To: Facility:
SOUTHOLD SHORES BOAT BASIN INC SOUTHOLD SHORES BOAT BASIN INC
C/O ERNEST JOCHEN BLUE MARLIN DR-EASTERN
TERMINUS1 1000-57-1-39.3
215 E 68TH ST APT 8N SOUTHOLD,NY 11971
NEW YORK,NY 10065-0220
Facility Application Contact:
EN-CONSULTANTS
1319N SEA RD
SOUTHAMPTON, NY 11968
(631) 283-6360
Facility Location: in SOUTHOLD in SUFFOLK COUNTY
Facility Principal Reference Point: NYTM-E: 719.357 NYTM-N: 4550.876
Latitude: 41°04'46.5" Longitude: 72°23'19.5"
Project Location: Water- Shelter Island Sound, Sage Basin
Authorized Activity: Approximately 7,510 sqft. of basin to be dredged to 4'MLW, approximately
2,180 sqft. of basin to be dredged to 4.5'MLW and placement of bio-begs/geotextile cubes landward of
MHW temporarily before removal of dredge spoil offsite. All work shall be done in accordance with
plans prepared by En-Consultants, last revised 6/10/2026 and stamped'NYSDEC Approved'on
8/10/2026. HWL
Permit Authorizations
Tidal Wetlands - Under Article 25
Permit ID 1-4738-04018/00003
New Permit Effective Date: 8/10/2026 Expiration Date: 8/9/2036
Excavation &Fill in Navigable Waters - Under Article 15,Title 5
Permit ID 1-4738-04018/00004
New Permit Effective Date: 8/10/2026 Expiration Date: 8/9/2036
Water Quality Certification - Under Section 401 -Clean Water Act
Permit ID 1-4738-04018/00005
New Permit Effective Date: 8/10/2026 Expiration Date: 8/9/2036
Page 1 of 8
'NEW YORK STATE DEPAR';_ .11T OF ENVIRONMENTAL CONSERVA, N
Facility DEC ID 1-4738-04018 `
NYSDEC Approval
By acceptance of this permit,the permittee agrees that the permit is contingent upon strict
compliance with the ECL, all applicable regulations,and all conditions included as part of this
permit.
Permit Administrator:ELYSSA E SCOTT, Deputy Regional Permit Administrator
Address: NYSDEC Region 1 Headquarters
SUNY @ Stony BrookJ50 Circle-Rd
Stony Ijrook,NY 11790 -3409
i
Authorized Signature: Date
Distribution List
EN-CONSULTANTS
Bureau of Marine Habitat Protection
Heather Leonard
File
Permit Components
NATURAL RESOURCE PERMIT CONDITIONS
WATER QUALITY CERTIFICATION SPECIFIC CONDITION
GENERAL CONDITIONS, APPLY TO ALL AUTHORIZED PERMITS
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
NATURAL RESOURCE PERMIT CONDITIONS - Apply to the Following
Permits: TIDAL WETLANDS; EXCAVATION & FILL IN NAVIGABLE
WATERS; WATER QUALITY CERTIFICATION
1. Post Permit Sign The permit sign enclosed with this permit shall be posted in a conspicuous
location on the worksite and adequately protected from the weather.
2. Conformance With Plans All activities authorized by this permit must be in strict conformance
with the approved plans submitted by the applicant or applicant's agent as part of the permit application.
Such approved plans were prepared by En-Consultants, last revised 6/10/2026 and stamped NYSDEC
Approved'on 8/10/2026.
Page 2 of 8
NEW YORK STATE DEPART, YT OF ENVIRONMENTAL CONSERVA, N Alm
Facility DEC ID 1-4738-04018
3. Notice of Commencement At least 48 hours prior to commencement of the project, the permittee
and contractor shall sign and return the top portion of the enclosed notification form certifying that they
are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion
of project, the bottom portion of the form must also be signed and returned, along with photographs of
the completed work.
4. Dredging Prohibition Period for Flounder,Finfish and Shellfish Dredging is specifically
prohibited from January 1 to September 30, inclusive, of each calendar year to protect spawning and the
early life stages of finfish, including the winter flounder, and shellfish.
s. Dredging Once Per Year Dredging shall be undertaken no more than once in any calendar year
unless specifically authorized by the department.
6. Notice of Maintenance Dredging For maintenance dredging projects,the permittee shall submit a
Notice of Commencement prior to each dredging occurrence, specifying the disposal site (including an
updated site plan). Upon completion,a Notice of Completion shall be submitted to the address indicated
on that notice form, including the amount of material dredged and deposited at the approved disposal
site.
7. No Interference With Navigation There shall be no unreasonable interference with navigation by
the work herein authorized.
8. Precautions Against Contamination of Waters All necessary precautions shall be taken to
preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents,
lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials
associated with the project.
9. Filter Fabric Curtain Around Dredging Area A filter fabric (turbidity)curtain weighted across
the bottom and suspended at the top by floats shall be positioned to enclose the work site before
commencing dredging. The curtain shall remain in place and in functional condition during all phases of
the dredging operations and remain in place for two hours after dredging termination and turbidity inside
the curtain no longer exceeds ambient levels.
10. Dragline Prohibited The use of a dragline for dredging is strictly prohibited.
11. No Prop Dredging Prop dredging,or the act of utilizing and/or directing the propeller or
propulsion system of a motorized vessel and/or the water-borne forces created by said propeller or
propulsion system, to excavate or displace existing bottom sediment and benthic habitat for the direct or
indirect purpose of establishing or increasing water depth, is a regulated activity and is not authorized by
this permit. Prop dredging is strictly prohibited without further written authorization(permit,
modification or amendment) from the department.
12. Dredged Depth Survey Within 30 days of completion of the dredging operation, an as-dredged
depth survey of the dredged area shall be submitted to
Page 3 of 8
'NEW YORK STATE DEPAI ' NT OF ENVIRONMENTAL CONSERV) N
Facility DEC ID 1-4738-04018 -
Marine Habitat Protection
NYSDEC Region 1 Headquarters
SUNY @ Stony BrookJ50 Circle Rd
Stony Brook,NY11790 -3409
Attn: Compliance
13. Dredge Area Cap The Permittee must over-dredge Station Area 3 to remove an additional 6-inch
thick layer of bottom sediment,then install post-dredge cap consisting of 6-inch thick layer of gravel
(approximately 40 cubic yards). This shall limit bioturbation from reaching potential contaminants that
may exist at deeper levels.
14. Grade Channel Side Slopes All side slopes of the dredge channel will have a maximum of 1:3
slope.
15. No Side-casting or Temporary Storage Excavated sediments shall be placed directly into the
approved disposal site/dewatering site or conveyance vehicle. No side-casting (double-dipping) or
temporary storage of excavated sediments is authorized.
16. No Floats,Ramps in Vegetated Tidal Wetlands Floats and ramps may not rest on or be stored in
any vegetated tidal wetland.
17. Seeding Disturbed Areas All areas of soil disturbance resulting from the approved project shall be
stabilized with appropriate vegetation(grasses, etc.) immediately following project completion or prior
to permit expiration,whichever comes first. If the project site remains inactive for more than 48 hours
or planting is impractical due to the season,then the area shall be stabilized with straw or hay mulch or
jute matting until weather conditions favor germination.
18. Vegetate All Disturbed Areas The permittee shall revegetate all exposed faces and disturbed areas
to prevent soil erosion prior to the project completion or expiration date of this permit, whichever comes
first.
19. Wood Preservatives
a. Pressure treated wood used for construction of in-water structures must have undergone a
treatment process approved(stamped or otherwise marked as certified)by the American Wood
Preservative Association.
b. Wood treated with Pentachlorophenol (PCP)must not be used in marine or brackish waters. Wood
treated with PCP must be aged in the open air for at least three months prior to in-water use. .
c. The use of creosote treated wood is prohibited both in the water and upland areas.
d. Chromated Copper Arsenate (CCA)pressure treated wood must be clean and free of CCA surface
deposits. Wood with surface deposits must be washed for at least 5 minutes under running water
prior to use. The washing must occur greater than 100 feet landward of any regulated wetland
and/or water body. (Note "E." below for handling wash water.)
e. Any wood debris such as sawdust or wash water must not enter any water body, including wetlands
or protected buffer areas.
Page 4 of 8
NEW YORK STATE DEPAR`_ ;IVT OF ENVIRONMENTAL CONSERVE, N
Facility DEC ID 1-4738-04018
20. No Permanent Structures on Dock No permanent structures shall be installed on
dock/catwalk/float without first obtaining written Department approval (permit, modification,or
amendment).
21. No Structures on Pilings No structures, other than structures specifically authorized by this
permit, shall be constructed on pilings without further authorization from the department(permit,
modification or amendment).
22. No Structures on Bulkhead No permanent structures shall be installed on the authorized bulkhead
without first obtaining written department approval (permit, modification, amendment).
23. Materials Disposed at Upland Site Any demolition debris, excess construction materials, and/or
excess excavated materials shall be immediately and completely disposed of in an authorized solid waste
management facility. These materials shall be suitably stabilized as not to re-enter any water body,
wetland or wetland adjacent area.
24. Dredgings to Remain On-Site/Within Wetland Dredge material approved to remain on-site
and/or within the NYSDEC Tidal Wetlands jurisdiction shall be retained so as not to enter any water
body,tidal wetlands, or protected buffer areas. Off-site,upland disposal of dredged material beyond
NYSDEC Tidal Wetland jurisdiction requires the additional guidance of the Division of Materials
Management (631)444-0375 and is not covered by this permit.
25. Dredged Materials above AHW All material shall be placed landward of apparent high water.
26. State May Require Site Restoration If upon the expiration or revocation of this permit,the
project hereby authorized has not been completed,the applicant shall, without expense to the State, and
to such extent and in such time and manner as the Department of Environmental Conservation may
lawfully require,remove all or any portion of the uncompleted structure or fill and restore the site to its
former condition. No claim shall be made against the State of New York on account of any such
removal or alteration.
27. State May Order Removal or Alteration of Work If future operations by the State of New York
require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the
Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation
of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause
loss or destruction of the natural resources of the State,the owner may be ordered by the Department to
remove or alter the structural work,obstructions, or hazards caused thereby without expense to the State,
and if, upon the expiration or revocation of this permit, the structure, fill,excavation, or other
modification of the watercourse hereby authorized shall not be completed, the owners, shall, without
expense to the State, and to such extent and in such time and manner as the Department of
Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill
and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall
be made against the State of New York on account of any such removal or alteration.
28. State Not Liable for Damage The State of New York shall in no case be liable for any damage or
injury to the structure or work herein authorized which may be caused by or result from future operations
undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no
claim or right to compensation shall accrue from any such damage.
Page 5 of 8
'NEW YORK STATE DEPAk NT OF ENVIRONMENTAL CONSERV,+_ �N C
Facility DEC ID 1-4738-04018
WATER QUALITY CERTIFICATION SPECIFIC CONDITIONS
1.. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate,
complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as
amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory
requirements set forth in 6 NYCRR Section 608.9(a). The authorized project,as conditioned, will also
comply with applicable New York State water quality standards, including but not limited to effluent
limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701,
702, 703,and 704.
GENERAL CONDITIONS - Apply to ALL Authorized Permits:
1. Facility Inspection by The Department The permitted site or facility,including relevant records, is
subject to inspection at reasonable hours and intervals by an authorized representative of the Department
of Environmental Conservation(the Department) to determine whether the permittee is complying with
this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71- 0301
and SAPA 401(3).
The permittee shall provide a person to accompany the Department's representative during an inspection
to the permit area when requested by the Department.
A copy of this permit, including all referenced maps, drawings and special conditions, must be available
for inspection by the Department at all times at the project site or facility. Failure to produce a copy of
the permit upon request by a Department representative is a violation of this permit.
2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly
provided for by the Department, issuance of this permit does not modify,supersede or rescind any order
or determination previously issued by the Department or any of the terms, conditions or requirements
contained in such order or determination.
3. Applications For Permit Renewals, Modifications or Transfers The permittee must submit a
separate written application to the Department for permit renewal,modification or transfer of this
permit. Such application must include any forms or supplemental information the Department requires.
Any renewal, modification or transfer granted by the Department must be in writing. Submission of
applications for permit renewal,modification or transfer are to be submitted to:
Regional Permit Administrator
NYSDEC Region 1 Headquarters
SUNY @ Stony BrookJ50 Circle Rd
Stony Brook, NY11790 -3409
4. Submission of Renewal Application The permittee must submit a renewal application at least 30
days before permit expiration for the following permit authorizations: Excavation &Fill in Navigable
Waters,Tidal.Wetlands, Water Quality Certification.
Page 6 of 8
'NEW YORK STATE DEPAR' `NT OF ENVIRONMENTAL CONSERV2 IN 'Row
Facility DEC ID 1-4738-04018
s. Permit Modifications, Suspensions and Revocations by the Department The Department
reserves the right to exercise all available authority to modify, suspend or revoke this permit. The
grounds for modification, suspension or revocation include:
a. materially false.or inaccurate statements in the permit application or supporting papers;
b. failure by the permittee to comply with any terms or conditions of the permit;
c. exceeding the scope of the project as described in the permit application;
d. newly discovered material information or a material change in environmental conditions,relevant
technology or applicable law or regulations since the issuance of the existing permit;
e. noncompliance with previously issued permit conditions, orders of the commissioner, any
provisions of the Environmental Conservation Law or regulations of the Department related to
the permitted activity.
6. Permit Transfer Permits are transferrable unless specifically prohibited by statute,regulation or
another permit condition. Applications for permit.transfer should be submitted prior to actual transfer of
ownership.
Page 7 of 8
Am
'NEW YORK STATE DEPAR', IKT OF ENVIRONMENTAL CONSERVE N
Facility DEC ID 1-4738-04018
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification
The permittee, excepting state or federal agencies, expressly agrees to indemnify and hold harmless the
Department of Environmental Conservation of the State of New York,its representatives, employees,
and agents ("DEC") for all claims, suits, actions, and damages,to the extent attributable to the
permittee's acts or omissions in connection with the permittee's undertaking of activities in connection
with, or operation and maintenance of,the facility or facilities authorized by the permit whether in
compliance or not in compliance with the terms and conditions of the permit. This indemnification does
not extend to any claims, suits,actions, or damages to the extent attributable to DEC's own negligent or
intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under
Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision
under federal or state laws.
Item B: Permittee's Contractors to Comply with Permit
The permittee is responsible for informing its independent contractors,employees,agents and assigns of
their responsibility to comply with this permit, including all special conditions while acting as the
permittee's agent with respect to the permitted activities, and such persons shall be subject to the same
sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee.
Item C: Permittee Responsible for Obtaining Other Required Permits
The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-
way that may be required to carry out the activities that are authorized by this permit.
Item D: No Right to Trespass or Interfere with Riparian Rights
This permit does not convey to the permittee any right to trespass upon the lands or interfere with the
riparian rights of others in order to perform the permitted work nor does it authorize the impairment of
any rights,title, or interest in real or personal property held or vested in a person not a party to the
permit.
Page 8 of 8
oR Department of
STATE Environrnenta!
Conservation
NOTICE
The Department of Environmental Conservation (DEC) has issued permit(s) pursuant
to the Environmental Conservation Law for work being conducted at this site. For further
information regarding the nature and extent of work approved and any Departmental
conditions on it, contact the Regional Permit Administrator listed below. Please
refer to the permit number shown when contacting the DEC.
Regional Permit Administrator
SHERRI AICHER ,
Permit Number: 1-4738-04018/00003
NYSDEC Region 1 Environmental Permits
50 Circle Road
Stony Brook, NY 11790-3409
Expiration Date: 08/09/2036 Email: dep.rl@dec.ny.gov
Note: This notice is NOT a permit
I. rwposeo fa ma*am WITIclent water depths for dockage aid I 7vtTolk( 0 YlagstrnNn Map't'1 � � t
" m 2000' ,..
navK�itbn withinetUstinq prNatety owned marina beat basin —
2, Datum:ALW-0'-0"or 198E NAW where trdtcated µ ''
3, Water depths(referenced to MM transcribed from 40� -
swvey prepared 64 Nathan Taft,cram III Lad 5urve4ar. NYSDEC '
dated Mach 23,2025.based in part on hydroq•aphic APPROVED AS PER TERMS
sreveq 64 Fdoert,H.Foy:,last dated Naember 1,2021 AND CONDITIONS OF 4. Apprommatekl 7,510 sf area tD 6e maintananee dredged ova fi
wctton dredge to ma,fwehed 6ottam elevation of-4'MLW. PERMIT# I-
Incia,drrq approL 5,330 sf Inshore area to be dredged to ma, DATE
depth of-4'M.W,and approL 2.160 sf offshore area to be �
dredWd to depth of-4.9'WW&Fdled with 6"gravel cap
5. Appr-,V 55 M of sad/sdt spod to W pumped Vito
"6ro bags"/geotentde tubes placed cn fdier doth.located in
aMoa.2,540 sf temporary depositJon area landward of cg[t'eoN �� �J.� 511t(ACCE55 VIA 5A69 PA51N&
5HW ad bead,fordewaternq,prmr to 6 vq trucked of 1�E,1 yANCKc L• `� 5 k I%ANV 5MN12 VIA(3A )
to an approved uplan loca d tion for pema�ent dispose ��'' -— ----- —— '-- "
6. Project locat m,1lyderwater land/6m basin at end of flue n \♦� �� STATIONS 1 dr 2:f87' x t84' (MAX.), APPROX. 5.330 SF AREA TO Or, -
M$im Dew 5art}rdd;5CTM No.1000-57-I-39.5 % '2� ♦ i,. MAINTENANCE DREDGED TO A MAXIMUM DEPTH OF -4'MLW.
0'� ♦ y �p INCLUDING&S' WIDE, APPROX, 830 SF AREA CLOSEST TO SHORE
TO BE DREDGED ON 1:3 SIDE SLOPE TO MEET EXISTING BOTTOM (t-1`niLwj
STATION 3:_tB7' x�±58' (MAX.). APPROX. 2,180 SF AREA TO BE
[LTON t ¢q �� ♦ �, s MAINTENANCE DREDGED TO A MAXIMUM DEPTH OF -4.5' MLW; LOWEST
CHeob a
}a/0/F O L• � , �- � ��a ♦ ('SEGMENT C") THEN TO BE FILLED WITH APPROX. 40 CY GRAVEL CAP
I - ' � ' � ��2� q� E N - CONSULTANTS
._
1319 NORTH SEA RD.
�E MARL�� D�'`�„ -a.-� �; �` , ♦ �� ���, SOUTHAMPTON, NY 1196E
4�.♦`� ,.� b�� �� , � "o������ 631-283-6360
�' + �
— _ N/OyF° SOUTHOLD SHORES ASSOCIATION Ina.
\ s.0 rAr ea woo-ar-oe-aa
p _�_ \\�^� / �r - JJ,, -err-___�__•K-��+ �•.
i.. = 50 r �`_==; --.--�� — ,,,,-r.s-'a•:3t''•:it.cl•i'.''.rrS`�� *'�♦•..!:. •.,M1. 'N SNp
I41MVEL ovalA-' • ' wT F BsacH
! ` ------ --+-I„._,._$Hp - UMff OF BEACH
----
KOP05W MAINSNANa 12MVCAIN6i
FOR 5OUTHOW SNOM5/1(3OAf 13A51N J yip'--------
INC, ON 5AG� PA51N, 50UTHOW, APPROX 2,340 SF AREA (LANDWARD OF SHW AND BEACH) TO BE USED FOR TEMPORARY DEPOSITION OF
APPROX. 315 CY OF SAND/SILT SPOIL PUMPED VIA SUCTION DREDGE INTO "BIO-BAGS"/GEOTEXTILE TUBES ON
SU��Oi,K COUNTY, NSW YOLK FILTER CLOTH FOR FOR DEWATERING & SUBSEQUENT TRANSPORT TO APPROVED UPLAND SITE FOR PERMANENT DISPOSAL
SHMT I OF 3 1-I I-23, 6-10-26 - (AREAS TO BE TEMPORAILY RETAINED WITH SILT FENCE & STAKED HAYBALES)
SHELTER ISLAND SOUND
pp0�ll.� A--A: TNPU MOP05N2 MAINJ�NANC� nMnGING - 5TATION51 & 2 (APPP\OX, 5,300 5� INSHOF� AF�A
I" - 10' (DATUM: WW- 0'-0'')
-------- 5HW63.7'
lM-- MLW d 0'
HM EX,DOrtOM
g RM05W POKOM- --f't&W —
I C� MA TO PE gMEgGEq 55' C var,)t0 MAX.VcM-''MLW
+64' (varJ
PMOP05ED -' M196f MA
MA TO IX IM26W MOM EX,(OrTOM
TO MAX.R M-4'MLW AT 1:5 51M 51.OPE
MOFU 13-6: THP\U PPOP05�P MAIWNANC� npNnGING - 5TA110N 3 (APMOX, 2,180 5F 0FF5HRE AAA)
W - 10' (PATUM, MI.W¢ 0'-0")
--------------- 5-1-3.T-MAY-z 2'
NYSDEC
MLW- o' APPROVED AS PER TE
RW
AND CONDMONS OF
-2,7' -3' 4' 5' PERMIT# /-
-3.3' EX.►30ftOM ' DATE j/ 3 8-
-a,6" GRAVEL CAP(TYPICAL) pROP05Eq q�EgGE RPM- 5 A&W
+25' Gar,) t
MI26E AMA TO MAX.WEPT"-4.5'MLW AND FILL E N - CONSULTANTS
LOWE5T 6" ("5EGMENT C") WITH GRAVEL CAP
PPOF05W MAINTENANCE 17Mn6IN6 1319 NORTH SEA RD.
1`01;501MW 5HOM5 60AT PA51N SOUTHAMPTON, NY 11968
INC.ON 5Aa 13A51N, 5OUTHOW,
51,11'POLK COUNTYY, NSW YORK 631-283-6360
SHaf 2 OF 3 1-II-25. 6-10-26
PPULF C-C: THPU PWP05ft? TWOM W051TION AP\�A FOP 5POL MWAVIN6
W - 10' WATUM - 1988 WAV19)
AMOK Z 40 5F AMAfOM U5EI9 FOB WOMYWO5111ON a +515 Cy
5AN[9/5II,f SPOIL PUMM?VIA 5UC-fl0N 1 [99 INFO"1310-13A65"/6f—mT1Le
TWE5 ON PIMP POP,PEWAlUNCA&%135EQLf W MWOPT POIZ UPLAND t?15PO5&
%Wt?RAYIW 5& 51Lf PENCIN6(TYP.)
9-W 2
-————————————— -—————————————*-- NAV17 0'
-——————— ———————--
m'W- -1.41
NYSDEC
APPROVED AS PER TERMS
AND CONDITIONS OF
PERMIT# /-Y7-
DATE C)
E N - CONSULTANTS
PPOPO%P MAINTENANCE PM126W 1319 NORTH SEA RD,
FOR 5OUaa[9 5HO95 POAf 13A51N SOUTHAMPTON, NY 11968
INC. ON WE PA51N, 50ML12,'
5UFfOLK COUNTY, NEW YORK 631-283-6360
9-fff 3 OF 3 7-11-23, 6-10-26
� .Z��II ?�a' ,. a iF�YP' f�1 y' {-%•.-,.. .� i • tea. �•` ' � i- .�� ,p{{��.:
��Z.W7 " ..^ `� 4S�,Ca3•i„':�^^-�;,. -. ` ;;,SRa�4!59I� �.30.\'§S'Jl�dEZk�S� j J) _
R:
9i'm
BOARD'OPS�OUTHOLD TOWN TRUSTEES .-SOUTHOLD,.NEW YORK
F �`YF•_r�� a
w PERIVIIT' TO '1484, " DATEi jFEBRUARY.16:201y1'
. :�,•„ ISSUED T.O::.SOUTHOLD SHORES,BOAT BASIN
PROPERTY ADDRESS: BLUE MARLIN DR.,SOUTHOLD
kTM#57-Dw3'9 3: . ..
•a�� AUTH-OR.IZATION
� Pursiiant to'the provisions of Cliaptet 275 and/or`Chapter l l-t of the Town Code of.the.Town of 1
Southold and in accordance witli.the Resolution of the Board-of Trustees adopted at the-meetingfheld
February 16;2011 in consideration of application fee in the sum of$250.00 paid by Southold Shores Boat Basiri '
and subj"ect'to'the Terms and Conditions as:stated•in the Resolution,the SoutholdTown Board of:TOstees
a' authorizes'and+oermits,the.. F
�folldwing�;;: .. :•. _. ....
�k Wetland Permit-to disconnect existing water and-electric ony dock, remove existing3';G"
r. ti
t� 14.'wooden'access rainp,`exishng:51X 93•1,°main floating dock•section.and;tliree Ip::. anchor:
7 ' pilings;instali new 51X.93' main,floating dock section,new 32"X 14'aluminum access,'ramp and
three new 110"dia.anchor pilings; reconnect existing water and electrical services on the dock;
with'the condition the lightiug'complies wiih the Town lighting code,and as depicted on the plan
x.
prepared b. Costello Marine Contracting Corp.. ated January.6 2.011:
"' P P y, g P• ry
IN WITNESS•WHEREOF,thesaid.B.oatd;of Trustees hereby'causes.itsC.orporate Seal to be affixed;; �J
�� ^ l and these presents to,b'esubscribed by.amajority of the•said Board'as:of this;date •,. • , •,. ' �'
'y _`1�•; J tin.BredemeyPr ABSENT•
i
'1 t..1♦: � T 4.
TOWN
-_—'� .i�5'=o �• yaw a
,l o. A
* leifo
tv
ji
sycc 7 /(/ i"' �: 'J6" 8",�RJDT/�r+7�. w.i7C7Z/17.1T�a*ceeTR)e
57 ac:ia�• szx�vyt��—.y.Za.awov�ra,c)3rviv.� .
/ --3- G K`7� r�vebr�aay.tacd35 9i.t�J� •.
•{ „ S'�C93' 3rv�JI, �.rnJ:�2a�r7nvi,,
V-/.
j �°. ::: � • .- /_/XE�� 4TtR/JL(G �avG�4gs T-�/js'Ss�ia/STILL lril NG
SS1G7Jw�r?,i elw
R1 / / /• ��,INT A.v=>.5 Mew:ONGNoR yov4j" ,S.
i �r • `. RCCouvNECT Wi17"�IQdN/7C'.L� '
�i . Ses�r,T�Tel� S�aras��a.��-,�.$3r�►ItvG. 7�t' .�1/\1 . . .. :-
61 ox 220 �• _
-8LC/8� /1vl.4rR�)�/�!4lV� \• 0 20fr: i
SOuTf,IOL•?�,,nos.y{ /79�,J � rRat�w,�rA•ee►
SCTM lDoo-�-/-39.'� G�rszo�s.�tr �i•
�O.�or Z/Z4iA�10�lr,K_yC�/�,F
Zo y lam_ .R77+/1
` SOUTHOLD SHORES 1 --T BASIN INC..END OF BLUE MAR DRIVE,SOUTHOLD
v ' 1
n _ ,Y
- � 1
r
�Q.
Figure 1. Looking north at private marina dockage facility and approximately 7,510 sf area of basin to be maintenance dredged.
J IL
r
ti
Figure 2. Looking southeast at private marina dockage facilittir and approximately 7,510 sf area of basin to be maintenance dredged.
SOUTHOLD SHORES] T BASIN INC..END OF BLUE MAR DRIVE,SOUTHOLD
I
0
... �r :x :; x.� 1. ;..�. � • ��a��� , ��`�'�i;g K
i. !'
ll
J Sl
Figure 3. Looking west at lathed-out location of proposed 2,340 sf temporary spoil deposition area on adjacent beach to south.
14
� r, �' � }` `t..do �,y. ... ,1'`. `� •'
Y Z3y t' Yi
Figure 4. Looking east over lathed-out location of proposed 2,340 sf temporary spoil deposition area on adjacent beach to south.
SOUTHOLD SHORES T BASIN INC.,END OF BLUE MAR DRIVE,SOUTHOLD
q;
•l� 1
Figure 5. Aerial view of marina basin to be dredged and adjacent beach to south to be used for temporary spoil deposition.
Image ky Google Earth.
oe se-�w � s.. uEe stcwn.oss - t
s
hF trvc
D r
oe w R
osatzr ;c� 'a,�rt z a d� x.a YY�L NO. s��ifo
w r ;
u � CC)RE Dq
Oc
y ' Q
SouND
xN��T�R
," A
sa x`\ +
\�F �Will
'� "��` «w. '� — ••' COUNTY OF SUFFOLK N NOME
.n — •�•••� — •• «,•r Rul I'r � T n 1g y = w,e wF revn«a suE ax y
OO o00
M
«w
E
N ww __ a _—v__ •• '• •." ua� u . • r..vr,. 2 .�.�'1 � $IFfQKtawry iNt wvsew'nr&&iEo M
A � vuYO
057
aso
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex P.O. Box 1179
54375 State Route 25 Southold, NY 11971
(cor. Main Rd. &Youngs Ave.)
Southold, NY 11971 Telephone: 631 765-1938
LOCAL WATERFRONT REVITALIZATION PROGRAM
TOWN OF SOUTHOLD
To: Glenn Goldsmith, President
Town of Southold Board of Trustees
Cc: Honorable Lori Hulse, Attorney
From: Heather Lanza, AICP, Planning Director
LWRP Coordinator
Date: October 4, 2026
Re: LWRP Coastal Consistency Review
SOUTHOLD SHORES BOAT BASIN, INC., SCTM# 1000-57.-1-39.3
This application proposes a ten-year maintenance permit to dredge approximately 7,510
sq. ft. of the private boat basin on Sage Basin to a maximum depth of-4' MLW,
including approximately 5,330 sq. ft. inshore dredged to -4' MLW and approximately
2,180 sq. ft. offshore dredged to -4.5' MLW and backfilled with a 6-inch gravel cap
(approximately 40 cubic yards); and to temporarily place approximately 315 cubic yards
of spoil in geotextile tubes within a 2,340 sq. ft. deposition area on the adjacent beach
parcel (SCTM# 1000-57.-1-35) to the south for dewatering, prior to removal offsite for
upland disposal.
The proposed action has been reviewed to Chapter §268, Waterfront Consistency
Review of the Town of Southold Town Code and the Local Waterfront Revitalization
Program (LWRP) Policy Standards. Based upon the information provided on the LWRP
Consistency Assessment Form submitted to this department, as well as the records
available to me, it is my recommendation that the proposed action is CONSISTENT with
the policies of the LWRP as follows:
Southold Shores Boat Basin LWRP
Policy 5. Protect and improve water quality and supply in the Town of Southold.
5.3 Protect and enhance quality of coastal waters.
C. Protect water quality of coastal waters from adverse impacts associated with
excavation, fill, dredging, and disposal of dredged material.
Policy 6. Protect and restore the quality and function of the Town of Southold's
ecosystem.
6.3. Protect and restore tidal and freshwater wetlands.
A. Comply with statutory and regulatory requirements of the Southold Town
Board of Trustees laws and regulations for all Andros Patent and other lands
under their jurisdiction.
Policy 8. Minimize environmental degradation in the Town of Southold from solid waste
and hazardous substances and wastes.
8.3 Protect the environment from degradation due to toxic pollutants and substances
hazardous to the environment and public health.
A. ... the dredging of toxic material from underwater lands and the deposition of
such material shall be conducted in the most mitigative manner possible so as
not to endanger fish and wildlife resources, in either the short or long term.
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-
dependent uses in suitable locations.
10.5 Provide sufficient infrastructure for water-dependent uses.
A. 2. Maintain necessary public and private channels and basins at depths
consistent with the needs of water-dependent uses.
The proposed action is to dredge a private communal boat basin whose current
configuration was permitted in 1989. The boat basin is a water-dependent use, and the
proposed depth of-4' MLW is modest and consistent with the needs of recreational
vessels (Policy 10.5 A 2). The spoil will be removed to an approved upland site rather
than placed in open water.
The application states that contaminants were identified in a portion of the bottom
sediments. To contain them, approximately 30% of the dredge area (the 2,180 sq. ft.
offshore area) will be over-dredged to -4.5' MLW and capped with 6 inches of gravel,
pursuant to New York State Department of Environmental Conservation guidance. A silt
curtain will be deployed to keep suspended sediment within the boat basin and out of
Sage Basin, and the dewatering area will be retained with silt fence and staked hay
bales. These measures further Policies 5.3 C and 8.3 A.
2
Southold Shores Boat Basin LWRP
The temporary deposition area is landward of spring high water on the adjacent
Southold Shores Association beach. The site photographs show the area currently
vegetated and used for benches and beach access.
Conditions to consider:
1. Provide the sediment sampling results and the New York State Department of
Environmental Conservation determination for the contaminated portion of the
basin. Identify the contaminants, the approved upland disposal site for the spoil,
and the source of the gravel used for the cap.
3. Deploy a silt boom (silt curtain) around the immediate project area prior to and
during all dredging, as proposed, and keep it in place until suspended sediments
settle. §275-11 A(2) requires that all intertidal construction and excavation
include a silt boom that will retain all suspended sediments within the immediate
project area; at this site it also limits the spread of contaminants.
4. Conduct dredging outside the seasonal restricted periods set by the New York
State Department of Environmental Conservation to protect fish and shellfish
spawning, and conduct all work on the beach deposition area outside the
shorebird breeding, nesting and fledging period (March 15 through August 1).
5. Intertidal marsh borders the basin to the south and west, and the inshore dredge
limit near the existing catwalk and ramp scales to within approximately 10 to 15
feet of the marsh on the project plan. Under §275-12 A and D, a permit may be
issued only if the operations will not substantially adversely affect the wetlands of
the Town or fish, shellfish and vegetation or their natural habitat, and LWRP
Policy 6.3 C seeks to prevent the net loss of vegetated wetlands. The plans
should show the distance between the dredge limits and the edge of the marsh
vegetation, and the dredge limits and side slopes should be pulled back as
needed so the marsh is not disturbed. (Although Sage Basin is not a listed creek,
§275-11 C(3)(a)[3] prohibits dredging in or in close proximity to salt marsh
vegetation in the Town's creeks, which is a useful standard here.)
6. The deposition area is on the beach facing Shelter Island Sound, so water
draining from the geotextile tubes would flow toward the Sound rather than back
into the boat basin. Geotextile tubes retain sand well, but fine silts and dissolved
contaminants can pass through the fabric, particularly when filling begins. The
applicant should state whether a flocculant will be used (if so, only a non-toxic
product approved by the New York State Department of Environmental
Conservation), show how drainage water will be contained on the filter cloth and
kept from reaching the Sound, and meet any DEC water quality limits for the
return water.
7. After removal of the dredge spoil, the area should be restored with native beach
grass and other native coastal vegetation.
7. No open water disposal of dredged material (Policy 5.3 C).
3
Southold Shores Boat Basin LWRP
8. For each future maintenance event under the ten-year permit, require the same
containment measures and confirmation that the gravel cap remains in place.
Pursuant to Chapter §268, the Board of Trustees shall consider this recommendation in
preparing its written determination regarding the consistency of the proposed action.
4
1 �
Glenn Goldsmith,President r '*�� Town Hall Annex.
A.Nicholas Krupski,Vice President A!�' 54375 Route 25
P.O.Box 1179
Eric Sepenoski * I* I Southold,New York 11971
Liz Gillooly G Telephone(631) 765-1892
Elizabeth Peeples Fax(631)765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Office Use Only
Coastal Erosion Permit Application
Wetland Permit Application Administrative PermitLE
_Amendment/Tran fer/Extension
eceived Application:
eceived Fee:
ompleted Application 9 1,4a S E P 3 2026
_Incomplete
_SEQRA Classification:
Type I Type II Unlisted Southold Town
Boartl of Trustees j
_Coordination:(date sent)4 /_
LWRP Consistency Assessment Form /d oZ e1.w
_CAC Referral Sent: N PS I
-Date of Inspection: 10 ja(a
_ NaReceipt of CAC Report: 1 l 1
_Lead Agency Determination: T—
_Technical Review:
Public Hearing Held: 0 14 XW
Resolution:
Name of Applicant Southold Shores Boat Basin,Inc.
• c/o Ernest Jochen,President
Address 215 East 68th Street#8N,New York,NY 10065
Phone Number: M 7474937
Suffolk County Tax Map Number: 1000 - 57- 1 -39.3
Property Location:End of Blue Marlin Drive,Southold
(Boat Basin at east end of Blue Marlin Drive,east of 1360 Blue Marlin Drive)
(provide LILCO Pole #, distance to cross streets, and location)
AGENT: En-Consultants
(If applicable)
Address: 1319 North Sea Road,Southampton,NY 11968
Phone:631-283-6360
c�d56-P
C
Board of Trustees Appl tiorl
GENERAL DATA
Land Area(in square feet): 30,371 sf
Area Zoning: R-80
Previous use of property: Private communal boat basin for boat dockage
Intended use of property: No Change
Covenants and Restrictions: Yes X No
If"Yes", please provide copy.
Does this project require a variance from the Zoning Board of Appeals Yes X No
If"Yes",please provide copy of decision.
Will this project require any demolition as per Town Code or as determined by Building
Dept. Yes X No
Does the structure(s)on property have a valid Certificate of Occupancy NSA Yes No
Prior permits/approvals for site improvements:
Agency Date y
Southold Trustees#7484 February 16,2011
No prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a governmental agency?
X No Yes
If yes, provide explanation:
Project Description(use attachments if necessary):
Dredge(with 10 years maintenance)a 7,510 sf area of private communal boat basin to a finished maximum depth of
-4'MLW by dredging an approximately 5,330 sf inshore area to a maximum depth of-4'MLW,and dredging an
approximately 2,180 sf offshore area to a depth of-4.5'MLW,which is to be backfilled with a 6-inch deep,approx.40
cy gravel cap;and temporarily place approximately 315 cy of resultant spoil inside geotextile tubes located in 2,340 sf
deposition area on adjacent parcel to south,prior to removal for offsite disposal,all as depicted on the project plan
prepared by En-Consultants,last dated June 10,2026.
l
3oard of Trustees Applica, n
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purpose of the proposed operations:
Maintenance of historically established navigable water depths for boat dockage in a private communal boat basin,whose
current configuration was permitted in 1989.
Area of wetlands on lot: 30,371 sf square feet
Percent coverage of lot; 100 *io
Closest distance between nearest existing structure and upland
edge of wetlands: N/A feet
Closest distance between nearest proposed structure and upland
edge of wetlands: N/A feet
Does the project involve excavation or filling?
No X Yes
If yes, how much material will be excavated? +/-315 cubic yards (dredge spoil)
How much material will be filled? +/-40 cubic yards (gravel cap over 2,180 sfportion of dredge area)
Depth of which material will be removed or-depegited: -4 feet MLW
Proposed slope throughout the area of operations: 1 : 3 (max.)
Manner in which material will be removed or deposited:
Approximately 315 cubic yards of spoil is to be dredged via suction dredge and pumped into geotextile tubes located in
a temporary deposition site for dewatering before being removed for permanent offsite disposal.
Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by
reason of such proposed operations (use attachments if appropriate):
The project proposes maintenance dredging to restore historically established navigable water depths for boat dockage in a
private communal boat basin whose current configuration was permitted in 1989.The spoil material will be dredged via
suction dredge and pumped into geotextile bags placed in a temporary spoil deposition site situated landward of the
adjacent beach to the south,where the material will be allowed to dewater prior to being removed for permanent offsite
disposal.To prevent the leakage of buried contaminants identified in a portion of the bottom area to be dredged,
approximately 30%of the dredge area will be initially overdredged and then capped with gravel,pursuant to regulatory
guidance and requirements from the New York State Dept.of Environmental Conservation.And to minimize potential
impacts associated with ephemeral turbidity created by the dredging activity,a silt curtain will be deployed to prevent
temporarily suspended sediment from extending outside the boat basin and into Sage Basin.The project will therefore
maintain the use and navigability of the boat basin without significantly adversely affecting the surrounding the surface
waters or wetland ecosystem.
617.20
Appendix B
Short Environmental Assessment Form
Instructions for Completing
Part I-Project Information.The applicant or project sponsor is responsible for the completion of Part 1.Responses
become part of the application for approval or funding,are subject to public review,and may be subject to further verification.
Complete Part I based on information currently available.If additional research or investigation would be needed to fully
respond to any item,please answer as thoroughly as possible based on current information.
Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful
to the lead agency;attach additional pages as necessary to supplement any item.
Part I-Project and Sponsor Information
Name of Action or Project:
Southold Shores Boat Basin Property
Project Location(describe,and attach a location map):
End of Blue Marlin Drive,Southold, SCTM# 1000-57-1-39.3;boat basin at east end of Blue Marlin Drive,east of 1360
Blue Marlin Drive(map provided)
Brief Description of Proposed Action:
Dredge(with 10 years maintenance)a 7,510 sf area of private communal boat basin to a finished maximum depth of
-4'MLW by dredging an approximately 5,330 sf inshore area to a maximum depth of-4'MLW,and dredging an
approximately 2,180 sf offshore area to a depth of-4.5'ML W,which is to be backfilled with a 6-inch deep,approx.40
cy gravel cap;and temporarily place approximately 315 cy of resultant spoil inside geotextile tubes located in 2,340 sf
deposition area on adjacent parcel to south,prior to removal for offsite disposal,all as depicted on the project plan
prepared by En-Consultants,last dated June 10,2026.
Name of Applicant or Sponsor: Telephone: 917-747-4937
Southold Shores Boat Basin,Inc. E-Mail: ecjochen@aol.com
Address:c/o Ernest Jochen,President
215 East 68th Street#8N
City/PO: State: Zip Code:
New York New York 10065
1.Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES
administrative rule,or regulation?
If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that
may be affected in the municipality and proceed to Part 2.If no,continue to question 2. X
2.Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES
If Yes, list agency(s)name and permit or approval:
NYS DEC,USA COE,NYS DOS X
3.a.Total acreage of the site of the proposed action? 30,371 sf
b.Total acreage to be physically disturbed? +/-8,000 sf
c.Total acreage(project site and any contiguous properties)owned
or controlled by the applicant or project sponsor? 30,371 sf
4.Check all land uses that occur on,adjoining and near the proposed action.
❑Urban ❑Rural(non-agriculture) ❑Industrial ❑Commercial ®Residential(suburban)
❑Forest ❑Agriculture ®Aquatic ❑ Other(specify):
❑Parkland
Page 1 of 4
5. Is the proposed action, NO YES N/A
a.A permitted use under the zoning regulations? X
b. Consistent with the adopted comprehensive plan? X
6.Is the proposed action consistent with the predominant character of the existing built or natural NO YES
landscape?
X
7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES
If Yes,identify: Name: Peconic Bay and Environs,Reason:Protect public health,water,vegetation&
scenic beauty,Agency: Suffolk County,Date:7-12-88
X
8. a. Will the proposed action result in a substantial increase in traffic above present levels? NO YES
X
b.Are public transportation service(s)available at or near the site of the proposed action? X
c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? X
9.Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements,describe design features and technologies:
N/A X
10.Will the proposed action connect to an existing public/private water supply? NO YES
If No,describe method for providing potable water: N/A X
11.Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment: N/A X
12.a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES
Places?
b.Is the proposed action located in an archeological sensitive area?
X
X
13.a.Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES
wetlands or other waterbodies regulated by a federal,state or local agency? X
b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody?
If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres: Approximately X
7,510 sf area below MHW is to be dredged to a maximum depth of-4'MLW.
14.Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply.
® Shoreline ❑Forest ❑Agricultural/grasslands ❑Early mid-successional
® Wetland ❑Urban ®Suburban
15.Does the site of the proposed action contain any species of animal,or associated habitats,listed NO YES
by the State or Federal government as threatened or endangered? X
16. Is the project site located in the 100 year flood plain? NO YES
X
17.Will the proposed action create storm water discharge,either from point or non-point sources? YES
If Yes,
a.Will storm water discharges flow to adjacent properties? ❑NO❑YES
b.Will storm water discharges be directed to established conveyance systems(runoff and storm drains)?
If Yes,briefly describe: ❑NO❑YES
Page 2 of 4
18.Does the proposed action include construction or other activities that result in the impoundment of NO YES
water or other liquids(e.g.retention pond,waste lagoon,dam)?
If Yes,explain purpose and size: X
19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES
solid waste management facility?
If Yes,describe: X
20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES
completed)for hazardous waste?
If Yes,describe:
X
I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY
KNOWLEDGE
Applicant/sponsor name: o E.Herrmann,Coastal Management Specialist Date: August 31,2026
Signature:
Part 2-Impact Assessment.The Lead Agency is responsible for the completion of Part 2.Answer all of the following
questions in Part 2 using the information contained in Part I and other materials submitted by the project sponsor or
otherwise available to the reviewer.When answering the questions the reviewer should be guided by the concept"Have my
responses been reasonable considering the scale and context of the proposed action?"
No,or Moderate
small to large
impact impact
may may
occur occur
1. Will the proposed action create a material conflict with an adopted land use plan or zoning
regulations?
2. Will the proposed action result in a change in the use or intensity of use of land?
3. Will the proposed action impair the character or quality of the existing community?
4. Will the proposed action have an impact on the environmental characteristics that caused the
establishment of a Critical Environmental Area(CEA)?
5. Will the proposed action result in an adverse change in the existing level of traffic or
affect existing infrastructure for mass transit,biking or walkway?
6.Will the proposed action cause an increase in the use of energy and it fails to incorporate
reasonably available energy conservation or renewable energy opportunities?
7. Will the proposed action impact existing:
a.public/private water supplies?
b.public/private wastewater treatment utilities?
8. Will the proposed action impair the character or quality of important historic,archaeological,
architectural or aesthetic resources?
9. Will the proposed action result in an adverse change to natural resources(e.g., wetlands,
waterbodies,groundwater,air quality,flora and fauna)?
Page 3 of 4
No,or Moderate
small to large
impact impact
may may
occur
10.Will the proposed action result in an increase in the potential for erosion,flooding or drainage
problems?
11.Will the proposed action create a hazard to environmental resources or human health?
Part 3-Determination of significance.The Lead Agency is responsible for the completion of Part 3.For every
question in Part 2 that was answered"moderate to large impact may occur", or if there is a need to explain why a particular
element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part I
Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that have been included by
the project sponsor to avoid or reduce impacts.Part 3 should also explain how the lead agency determined that the impact
may or will not be significant.Each potential impact should be assessed considering its setting,probability of occurring,
duration,irreversibility,geographic scope and magnitude.Also consider the potential for short-term,long-term and
cumulative impacts.
❑ Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action may result in one or more potentially large or significant adverse impacts and an
environmental impact statement is required.
❑ Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action will not result in any significant adverse environmental impacts.
Name of Lead Agency Date
Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer
Signature of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer)
Page 4 of 4
po Snr rct�uiry ;- c1 x- .I c{uLr 2 000 3 000 4,000, 5 BOG-Feet w
r` y x, Y 4 ficalE 1 24 0QQ L r
4100. .._�600 80p 7,17Q0 '1 200. 'Ilft00�Meters <v ,n�^
48
I 00 7RK O S� O P 'n e� Id
9 _
---- —.L_ Na Ro
v W n q`O 9°fMOHo IHasi7°,nnn::nh' Bh, 5uffolk County Hag5trotn Map 44
I Pond III = +2000'
w BURGUNDY CW+DB NN Y G9 C9o
3
LA ``1\ �I \ \ I �,° E•�.i;. �•'B�� '4riS�
B
O RO
Q 39
9rX
F y
ONG
N L 51T1 (ACC�55 VIA 5Aa PA511,`1 I
/ I OLD C! _ I
f\� 5HFVT p I5LANP 50UNP VIA 13AP\a)
0
c OP\0 MOCKING IROLA
..+' #., '.4 S :.i4S\ 9 °9 yWhLOP'Di't? i '� Campdst) -
L r ' pe
(Methohodist
0 aid
vineV 9p
Jennings Pt
ROC Y POINT
a�Ns�P ro FJippn-onle oe°mac Q ego i f h19
SouthStd �y Pond
y L\S� t Fo � r �P� o o er nioyq I iv
Ais Soc o Go�O °a ST S BI EDON I r 1
_ I
S��UT OT ;
O —`
' Southold HILL y y v° o
i.Landin Founders
iLandin
EPN aa, 9 F� i
LA
q C W WarperPt
JOCKEY CREEK DR OC`L`h JS�� / B<
I
I E NEC
'�yIL 3 �O tN �CNP�� 9 y Rq I _T •�,;?;�.ty. :.
1 u�i CUSTER S\ SO�thold
CLFAflVI o YC
�s
Custefgg G y N. ARISK�D
Inst IUi2 EW�
AV W. 3 S1.&EPY
S y HOCI�a 0 BFACNWO 00 P SCHOON OR
R; w•:'
�� � ANCR° DR QAr ¢ 1Paradise _°:�,;•.:'
'capeQ GLENN 3R0 l QY L/ R e o¢ Sy0'9F I PGlnt '..2..'. ...
P C C x p c. �, BASIN R Q0
'IN {Ales!" N•c" 1 CJ� , e LAKE OR 3 e0
V
Ltt �°�o Pq C�� °K° a W GREAT HOG ya s°°RE y D� ROBIN y ;:,`- i`''•:5 ::
4 Q RY � a NECK RIGGER
5 AVM o W g
�� yF S Dq cQi a �
w su MIr� s ry' Ga BAYVIEWff
a AYy a¢o o FAY "� a;�>'?`7•.:;;,,.3�.}
To Whom It May Concern:
Southold Shores Association, Inc., is the owner of property known as 1360 Blue Marlin Drive (SCTM
1000-57-1-35), which is located southeast of and adjacent to property owned by Southold Shores Boat
Basin,Inc.,known as SCTM 1000-57-1-39.3. As the President of Southold Shores Association,Inc., I
hereby grant Southold Shores Boat Basin,Inc.(and any party acting on behalf of Southold Shores Boat
Basin, Inc.)permission to access 1360 Blue Marlin Drive for the purpose of temporarily depositing
approximately 315 cubic yards of dredged spoil resulting from a proposed maintenance dredging project
sponsored by Southold Shores Boat Basin,Inc.,based on the understanding that the spoil material will be
pumped into geotextile bags located above spring high water along the beach, as depicted and described
on the project plans prepared by En-Consultants,dated July 11,2023,and last revised June 10,2026.
De&A',Meagher,Pfesident, Southold Shores Association,Inc.
AdZ-al2p, - /'�
Date
Sworn to before me this 15""
day of OC-bhR-,Y' 2026
Notary BRITTANY A CONRAO
Pu� Notary Public,State of New York
Reg.No.0IC06245154
Qualified in Suffolk County
Commission Expires July 18,20AI
� •-ram..�=,�,�� ��` �i�,
SEP 3 __.
2026
Sfluthold Town
Board of Trustees
To Whom It May Concern:
Southold Shores Association,Inc.,is the owner of property known as 1360 Bhw Muft Jxwe(9MM
1fl00-57-1 35),which is low southeast of aad adjac ,to peter ov Sq�oldShores Boat
Basm,Inc.,known as SCTM 1000-57-1 39.3. As the Pir ddwt of S�ut6`l�:�,d Shores Asmciation,'Inc:,I
hereby grant Southold Shores Boat Basin,Inc.(and any party acting on behalf of Southold Sh9j"..Boat
Basin,Inc.)permission to access 1360 Blue Malin Drive for the Purpose of depositing along the beach,
aboyo : 8 oly 275 cubic yar�ds.of .spoil resulting,finmp�crposecl .
.t_.
maui<te nce 000d gyred by Southold Shares Boat Basin,hic,as depi6QV d iescn'bed
onthe project plans prepared by dated Jury 11,2023.
'dent,Southold Shores Association,Iuc.
Sworn to before me this
day do ai 2023
4Public
JENNA KOCKENMEISTER
Notary Public,State of New Yo*
Reg.No.01 KOB402096
Qualified in Suffoik County
Commission Expires December 23,2M
Board of Trustees Applicat.::_._-,
AFFIDAVIT
Ernest Jochen,President,Southold Shores Boat Basin,Inc. BEING DULY SWORN
DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR.THE ABOVE
DESCRIBED PERMIT(S)AND THAT ALL STATEMENTS CONTAINED HEREIN
ARE TRUE TO THE BEST.OF HIS/HER KNOWLEDGE AND BELIEF,AND THAT
ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION
AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES.
THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE
BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES
AND CLAIMS ARISING UNDER OR BY VIRTUE OF STAID PERMIT(S), IF
GRANTED. IN COMPLETING THIS APPLICATION, .I HEREBY AUTHORIZE THE-
TRUSTEES,THEIR AGENT(S) OR REPRESENTATIVES, INCLUDING THE
CONSERVATION ADVISORY COUNCIL,TO ENTER ONTO MY PROPERTY TO
INSPECT THE PREMISES IN CONJUNCTION WITI-I THIS APPLIC:ATION,
INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF
TRUSTEES TO ENTER ONTO MY PROPERTY AND AS RE,QI IRED TO INSURE
COMPLIANCE WITH ANY CONDITION OF ANY WETLAND OR COASTAL
EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM
OF THE PERMIT.
N/A
Signat re f Property Owner Signature:of Property Owner
Ernest Joc , resident,Southold Shores Boat Basin,Inc.
SWORN TO BEFORE ME THIS L DAY OF__e Q �.20�
CANDACE HALL
_ _ Notary Public,State of New York
Notary Pt tic No.OIHAO043374
Qualified In Suffolk County
Commisslon Expire October 29,20 2R
Board of Trustees Application
AUTHORIZATION
(Where the.applicant is not the ovnier)
Uwe, Emest Jochen,President,Southold Shores Boat Basin,Inc.
owners of the property identified as SCTM# 1000- 57-1-39.3 in the town of
Southold .New York, hereby authorizes
En-consultants to act as my ap-ent and handle all
necessary work involved with the application process for permit(s) from the Southold 'Town
Board of Trustees for this property.
NIA
Property Ni ner's Signature Property Owner's Signature
Ernest Jochen,President,Southold Shores Boat Basin,Inc.
SWORN TO BEFORE ME TI11S � G- DAY OF : �,20��.
CANDAQE HALL
Notary Public
O.State of
w Yori
HA�043374
Suftik Cot
Ni otary 1' QualfRed 1}res October 29,20�
Commission P
APPLICANT/AGENT/REPRESENTATI
TRANSACTIONAL DISCLOSURE FORM
The Tovvm of Sauthold'a iwad a Ethics nrohibits conflicts of interest on the n trt of ta�vn officers anA emnlovec� The nurpos 2
this form's to mc' otntatian which can alert the towm of ssi le conflicts o mtcre a d allow it to i<�ke wlratevcr nets is
necassary to avoid same. Ernest Jochem President
YOURNAME: Southold Shores Boat Basin,Inc.
(Last name,fast name,Middle initial,unless you are,applying in the name of
someone else or other entity,such as a company.if so,indicate;the other
person's or company's name.)
NAME OF APPLICATION; (Check.all that apply_)
Tax grievance Building
Variance Trustee X
Change of Zone Coastal Erosion.
Approval of plat Mooring
Exemption from plat or official neap ._ Planning
Other
(If"Other'.name the activity.)
Do you personally for through your company,gvuse,sibling,.parcuL or Child)have a telationshiP«ith:inY officer or emp)avee
of the Town ol'tivutlu+ld? "Relationship"includes by block marriage.or husiuess iiit�re�t.."At+sin�: inrcrc�t"means a husincss,
including a partnership,in which the towel officer or employ,e..has even a partial ownershi1)of(or cmploylncm by)a corporation
in which the lawn oTtcer or employee t5vvns more than 590 of the shares.
YES _ '10
If you answered"YES",complete the balance of this form and date and sign wherc indicated.
Name of person employed by the Town of Southold
Title or position of that person
Describe the relationship between yourself(the,applicant/agentlrcprescntative)and ale town officer or employee:)either check
the appropriate line A)through D)andlor describe in the space provided.
The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply):
A}the owner of greater than 540 of the shares of the corporate stock of the applicant
(when the applicant is a corporation);
_i13)the legal or beneficial owner of any,interest in a non-corporate entity(when the
applicant is not a corporation);
G)an officer,director,partner.or employee of the applicant;or
D).the actual applicant.
DESCRIPTION OF RELATIONSHIP
elf
Submitted t day of •�(`✓ 0
Signature: _
Print Name Ern s Jochen,Firesldent
ou ald�s Boat Basin,Ina�
Form TS 1
CANDACE HALL
Notary Public,State of New York .
No.OIHAO043374
Oualitied In Stlifc)k'County
Cornm)t IM Explroe October 29,20p
APPLICANT/OWNER
TRANSACTIONAL DISCLOSURE FORM
The Town of Southold's Code of Ethics prohibits conflicts of interest on the part of town officers and emplovees The purpose of this
form is to provide information which can alert the town of possible conflicts of interest and allow it to take whatever action is
necessary to avoid same.
YOUR NAME• Herrmann, Robert E_
.(Last name,first name,middle initial,unless you are applying in the name of someone else or other entity,such as a
company.If so,indicate the other person's or company's name.)
TYPE OF APPLICATION:(Check all that apply)
Tax grievance Building Permit
Variance Trustee Permit XXX
Change of Zone Coastal Erosion
Approval of Plat Mooring
Other(activity) Planning
Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or
employee of the Town of Southold?"Relationship"includes by blood,marriage,or business interest."Business interest"
means a business,including a partnership,in which the town officer or employee has even a partial ownership of(or
employment by)a corporation in which the town officer or employee owns more than 5%of the shares.
YES. NO X
If you answered"YES",complete the balance of this form and date and sign where indicated.
Name of person employed by the Town of Southold
Title or position of that person
Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either
check the appropriate line A)through D) and/or describe in the space provided.
The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply)
A)the owner of greater that 5%of the shares of the corporate stock of the applicant(when the applicant is a
corporation)
B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation)
C)an officer,director,partner,or employee of the applicant;or
D)the actual applicant
DESCRIPTION OF RELATIONSHIP
Submitted this 1 s.t ay of September ,2a 26
Signature.
Print Name Robert E. Herrmann
NOTICE TO ADJACENT PROPERTY OWNER
BOARD OF TRUSTEES, TOWN OF SOUTHOLD i J 611'
In the matter of applicant:
Southold Shores Boat Basin,Inc. SCTM#1000-57-1-39.3
YOU ARE HEREBY GIVEN NOTICE:
1. That it is the intention of the undersigned to request a Permit from the Board of
Trustees to:
Dredge(with 10 years maintenance)a 7,510 sf area of private communal boat basin to a finished maximum
depth of-4'MLW by dredging an approximately 5,330 sf inshore area to a maximum depth of-4'MLW,
and dredging an approximately 2,180 sf offshore area to a depth of-4.5'MLW,which is to be backfilled
with a 6-inch deep,approx.40 cy gravel cap;and temporarily place approximately 315 cy of resultant spoil
inside geotextile tubes located in 2,340 sf deposition area on adjacent parcel to south,prior to removal for
offsite disposal,all as depicted on the project plan prepared by En-Consultants,last dated June 10,2026.
2. That the property which is the subject of Environmental Review is located
adjacent to your property and is described as follows:
End of Blue Marlin Drive, Southold
3. That the project which is subject to Environmental Review under Chapters
96,111 and/or 275 of the Town Code is open to public comment on:
DATE: Wed.Oct. 14,2026 @5:30PM,Southold Town Hall Meeting Rm,53095 Main Rd.,Southold
You may contact the Trustees Office at 765-1892 or in writing. g
The above-referenced proposal is under review of the Board of Trustees of the Town of
Southold and does not reference any other agency that might have to review same
proposal.
Southold Shores Boat Basin,Inc.
PROPERTY OWNERS NAME: c/o Ernest Jochen,President
MAILING ADDRESS: 215 East 68th Street,#8N
PHONE #: New York,NY 10065
AGENT: En-Consultants
MAILING ADDRESS: 1319 North Sea Road, Southampton,NY 11968
PHONE #: 631-283-6360
Enc: Copy of sketch or plan showing proposal for your convenience.
PROOF OF MAILING OF NOTICE
ATTACH CERTIFIED MAIL RECEIPTS
Name: Address:
#1000-57-1-39.4Ϩ-57-1-12 1305 Blue Marlin Drive
Blanche Chilton Southold,NY 11971
#1000-57-1-35 PO Box 1185
Southold Shores Assoc. Inc. Southold,NY 11971
#1000-53-5-12.6 PO Box 925
Breezy Shores Community,Inc. Mattituck,NY 11952
) +;?r;
STATE OF NEW YORK
COUNTY OF SUFFOLK
Robert E. Herrmann doing business at En-Consultants
u
1319 North Sea Road
Southampton,NY 11968 , being duly sworn, deposes and says that on the
5th day of October ,20 26 , deponent mailed a true copy of the Notice
set forth in the Board of Trustees Application, directed to each of the above named
persons at the addresses set opposite their respective names; that the addresses set
opposite the names of said persons are the address of said persons as shown on the current
assessment roll of the Town of Southold; that said Notices were mailed at the United States Post
Office at Southampton , that said Notices were Mailed to each of said persons by
(certified)(regisoenx� mail.
Robert E.Herrmann
Coastal Managment Specialist
Sworn to before me this 5th
day of October ,20 26 KIM H. STEPHENS
Notary Public-State of New York
1' No.01 ST5015931
Qualified in Suffolk County
Nota blic My Commission Expires August 02,20_�
ra ® ® °
o a .
nj o
m , .
rn
fY I 7'stage
Mail Fee
CI
rvices&Fees(check box,add fee as appropriate)
111n Receipt(hard PostMarlf
n Receipt(electronic) $ Here
(� []Certified Mail Restricted Delivery $
r'- Signature Required $(Ut Signature Restricted Delivery$ —
Ln
co $
ra Total Post
o sent To Blanche Chilton
�
Streetani 1305 Blue Marlin Drive
Southold,NY 11971
Q- crry,stare,
:10 e A Ln
A 1l-•e .
(J
` e fr
ra
..d
1771
ni
Certified Mail Fee
cc
fU Extra Services&Fees(check box,add fee as appropriate)
M ❑Return Receipt(hardcopy) $
❑Return Receipt(electronic) $ Postl ark `
ED ❑Certified Mail Restricted Delivery $ ';Here
r` ❑Adult Signature Required $
[]Adult Signature Restricted Delivery$
Postage
CI $
r-q Total Posta,,
1:7 Sent To Southold Shores Association, Inc.
Cr ,Street and% PO Box 1185
Ln Southold,NY 11971
Cr City,State,
:00 1 e 0 AIB°B
All
0
®. e
C=1
ru
CO Certified Mail Fee
CO $
ru Extra Services&Fees(check box,add fee as appropriate)
M ❑Return Receipt(hardcopy) $
❑Return Receipt(electronic) $ Postmark
El Certified Mall Restricted Delivery $ Here
❑Adult Signature Required $
NI—]Adult Signature Restricted Delivery$
Postage
C] $
ra Total r
Sent 7 Breezy Shores Community,Inc.
------------
CO Street PO Box 925
Ln
Mattituck,NY 11952
CI-' City,-S
J ri -
Glenn Goldsmith, President ll �dL .� Town Hall Annex
A.Nicholas Krupski, Vice President �� 54375 Route 25
Eric Sepenoski ? P.O. Box 1179
j
Liz Gillooly ;�p ! Southold,NY 11971
Joseph Finora ��� Telephone(631)765-1892
Fax(631)765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
BOARD OF TRUSTEES: TOWN OF SOUTHOLD
---------------------------------------------------------------
In the Matter of the Application of
SOUTHOLD SHORES BOAT BASIN, INC.
COUNTY OF SUFFOLK
STATE OF NEW YORK
AFFIDAVIT OF POSTING
DO NOT COMPLETE THIS FORM UNTIL THE POSTING HAS REMAINED
IN PLACE FOR AT LEAST SEVENDAYS PRIOR TO THE PUBLIC
HEARING DATE- COMPLETE THIS FORM ON EIGHTH DAY OR LATER
I Robert E. Herrmann , residing at/dba En-Consultants,
1319 North Sea Road, Southampton, NY 11968
being duly sworn, depose and say:
That on the 6th day of October , 20 26 , I personally posted the property known as
End of Blue Marlin Drive, Southold; SCTM #1000-57-1-39.3
by placing the Board of Trustees official noticing poster where it can easily be seen from the
street, and that I have checked to be sure the noticing poster has remained in place for a full
seven days immediately preceding the date of the public hear'ng.10Date of hearing noted thereon
to be held Wednesday, October 14, 2026.
Dated:
(signature)
Sworn to before me this
day of 20 (�
J KIM H. STEPHENS
Notary Public-State of New York
No.01 ST5015931
�r = Qualified in Suffolk County
NOtaT Public / My Commission Expires August 02,20
,NOTICE OF HEARING
NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the
Town Hall, 53095 Main Road, Southold, New York, concerning this property.
OWNER(S) OF RECORD: SOUTHOLD SHORES BOAT BASIN, INC.
SUBJECT OF PUBLIC HEARING: For a Wetland Permit for a Ten (10) Year
Maintenance Permit to dredge a 7,510 sq.ft. area of private communal boat basin to a
finished maximum depth of -4' MLW by dredging an approximately 5,330 sq.ft.
inshore area to a maximum depths of -4' MLW, and dredging an approximately 2,180
sq.ft. offshore area to a depth of -4.5' MLW, which is to be backfilled with a 6 inch
deep, approximately 40 cubic yards gravel cap; and temporarily place approximately
315 cubic yards of resultant spoil inside geotextile tubes located in 2,340 sq.ft.
deposition area on adjacent parcel to south, prior to removal for offside disposal.
Located: Off End of Blue Marlin Drive, Southold. SCTM# 1000-57-1-39.3
TIME & DATE OF PUBLIC HEARING: Wednesday, October 14, 2026 — at
or about 5:30P.M. If you have an interest in this project, you are invited to view the Town file(s)
which are available online at www.southoldtownny.gov and/or in the Trustee Office until to the day of the
hearing during normal business days between the hours of 8 a.m. and 4 p.m.
BOARD OF TRUSTEES *TOWN OF SOUTHOLD * (631) 765-1892
f
f
Town of Southold
LWRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
2. Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated as to its si nig ficant
beneficial and adverse effects upon the coastal area(which includes all of Southold Townl.
If any question in Section C on this form is answered "yes" or "no", then the proposed action-will
affect the achievement of the LWRP policy standards and conditions contained in the consistency
review law. Thus, each answer must be explained,in detail, listing both supporting and non-
supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and
conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold's website
(southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local
libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION
SCTM# 57 - 1 - 39.3
PROJECT NAME Southold Shores Boat Basin,Inc.
The Application has been submitted to (check appropriate response):
Town Board ❑ Planning Board❑ Building Dept. ❑ Board of TrusteesLefN
Category of Town of Southold agency action (check appropriate response):
(a) Action undertaken directly by Town agency (e.g. capital ❑
construction, planning activity, agency regulation, land transaction) ❑
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification: ❑
Nature and extent of action:
Dredge(with 10 years maintenance)a 7,510 sf area of private boat basin to a finished maximum depth of-4'MLW by dredging an
approximately 5,330 sf inshore area to a maximum depth of-4'MLW,and dredging an approximately 2,180 sf offshore area to a depth
of-4.5'MLW,which is to be backfilled with a 6-inch deep,approx.40 cy gravel cap;and temporarily place approximately 315 cy of
resultant spoil inside geotextile tubes located in 2,340 sf deposition area on adjacent parcel to south,prior to removal for offsite
disposal,all as depicted on the project plan prepared by En-Consultants,last dated June 10,2026.
Location of action: End of Blue Marlin Drive,Southold
Site acreage: 30,371 sf
Present land use: Private boat basin for boat dockage
Present zoning classification: R-80
2. If an application for the proposed action has been filed with the Town of Southold agency, the following
information shall be provided:
(a) Name of applicant: Southold Shores Boat Basin Inc.
(b) Mailing address: c/o Ernest Jochen,President
215 East 68th Street HN,New York,NY 10065
(c)Telephone number: Area Code 917-747-4937
(d) Application number, if any:
Will the action be directly undertaken, require funding, or approval by a state or federal agency?
Yes ® No❑ If yes, which state or federal agency? NYSDEC,USACOE&NYSDOS
C. Evaluate the project to the following policies by analyzing how the project will further support or not
support the policies. Provide all proposed Best Management Practices that will further each policy.
Incomplete answers will require that the form be returned for completion.
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation
criteria.
Yes ❑ No ® Not Applicable
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP
Section III -Policies Pages 3 through 6 for evaluation criteria
❑ Yes ❑ No ® Not Applicable
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Section III - Policies Pages 6 through 7 for evaluation criteria
❑ Yes ❑ No ® Not Applicable
Attach additional sheets if necessary
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III- Policies Pages:8 through 16 for evaluation criteria
❑Yes ❑ No ® Not Applicable
Attach additional sheets if necessary
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III
- Policies Pages 16 through 21 for evaluation criteria
®Yes ❑ No ❑ Not Applicable
To prevent the leakage of buried contaminants identified in a portion of the bottom area to be dredged,approximately 30%of the dredge
area will be initially overdredged and then capped with gravel,pursuant to regulatory guidance and requirements from the New York
State Dept.of Environmental Conservation. And to minimize potential impacts associated with ephemeral turbidity created by the
dredging activity,a silt curtain will be deployed to prevent temporarily suspended sediment from extending outside the boat basin and
into Sage Basin Sage Basin.
Attach additional sheets if necessary
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22
through 32 for evaluation criteria.
®Yes ❑ No ❑ Not Applicable
The project proposes maintenance dredging to rests, °irically established navigable water depths for boat dockage in i ;communal boat basin whose current configuration was permitted
in 1989.The spoil material will be dredged via suction dredge and pumped into geotextile bags placed in a temporary spoil deposition site situated landward of the adjacent beach to the south,
where the material will be allowed to dewater prior to being removed for permanent offsite disposal.To prevent the leakage of buried contaminants identified in a portion of the bottom area to be
dredged,approximately 30%of the dredge area will be initially overdredged and then capped with gravel,pursuant to regulatory guidance and requirements from the New York State Dept.of
Environmental Conservation.And to minimize potential impacts associated with ephemeral turbidity created by the dredging activity,a silt curtain will be deployed to prevent temporarily
suspended sediment from extending outside the boat basin and into Sage Basin.The project will therefore maintain the use and navigability of the boat basin without significantly adversely
affecting the surrounding the surface waters or wetland ecosystem.
Attach additional sheets if necessary
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies
Pages 32 through 34 for evaluation criteria.
❑ Yes ❑ No® Not Applicable
Attach additional sheets if necessary
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria.
❑ Yes ❑ No ® Not Applicable
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation
criteria.
® Yes ❑ No❑ Not Applicable
Because the proposed dredging would restore and maintain historically established navigable water depths in the subject boat basin,the
project directly provides and encourages access to,and recreational use of,the adjacent coastal waters.
Attach additional sheets if necessary
WORKING COAST POLICIES
. . a
Policy 10. Protect Southold: -::ater-dependent uses and promote �=-__ng of new water-dependent uses in
suitable locations. See LWRP Section III - Policies; Pages 47 through 56 for evaluation criteria.
® Yes ❑ No ❑ Not Applicable
The project directly proposes the maintenance of a water dependent use provided by a longstanding,legally established private
communal boat basin.
Attach additional sheets if necessary
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary
and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria.
❑Yes ❑ No® Not Applicable
Attach additional sheets if necessary
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages 62
through 65 for evaluation criteria.
ElYes ❑ No � Not Applicable
Attach additional sheets if necessary
Policy 13. Promote appropriate use and development of energy and mineral resources..See LWRP
Section III - Policies; Pages 65 through 68 for evaluation criteria.
❑ Yes ❑ No ® Not Applicable
PREPARED BY TITLE coastal Management specialist DATE 8/31/2026
Robert E. e n
Amended on 811105
r
I
EN-CONSULTANTS
August 31,2026 C E V E
Town of Southold SEP - 3 2026
Board of Trustees
54375 Main Road
Post Office Box 1179 .. Southold Town
Southold,New York 11971 Board of Trustees "
Re: Southold Shores Boat Basin,Inc.
End of Blue Marlin Drive, Southold
SCTM#1000-51-1-39.3 4.3
Dear Board of Trustees:
In regard to the above referenced property,enclosed are the following for the Board of Trustees review:
1. Four(4)Wetland Permit Applications including:
a) Authorization&Disclosure Forms;
b) Copy of Deed,Liber 9436 Page 531;
c) Authorization letter from Southold Shores Association for temporary spoil placement on adjacent
beach;
d) Short Environmental Assessment Form;
e) LWRP Consistency Assessment Form.
2. Project plan prepared by En-Consultants, last dated June 10,2026.
3. Survey prepared by Nathan Taft Corwin III Land Surveyor,dated March 23,2023.
4. Three(3)sets of Photographs.
5. Copy of NYS DEC Permit#1-4738-04018/00003.
6. Application fee of$1250.00.
I hope this information shall allow you to process our permit request. Should any additional information be
required,please do not hesitate to contact our office.
Sincerely,
Robert E.Herrmann
Coastal Management Specialist
/khs
Enc.
1319 North Sea Road Southampton,New York 11968 p 631.283.6360 f 631.283.6136 www.enconsultants.com
environmental consulting