HomeMy WebLinkAboutTR-09/16/2026 Glenn Goldsmith,President *V sorry Town Hall Annex
Nicholas Krupski,Vice President ��V� ��� 54375 Route 25
P.O. Box 1179
Eric Sepenoski l Southold, New York 11971
Liz Gillooly G Telephone(631) 765-1892
Joseph Finora • �O Fax(631) 765-6641
COU
BOARD OF TOWN TRUSTEES RECEIVED
TOWN OF SOUTHOLD
OCT 1 5 203
Minutes
Wednesday, September 16, 2026 SOS#h®�� 7'�Wn Clerk
5 : 30 PM
Present Were: Glenn Goldsmith, President
A. Nicholas Krupski, Trustee
Eric Sepenoski, Trustee
Liz Gillooly, Trustee
Joseph Finora, Trustee
Elizabeth Cantrell, Administrative Assistant
Lori Hulse, Board Counsel
CALL MEETING TO ORDER
PLEDGE OF ALLEGIANCE
TRUSTEE GOLDSMITH: Good evening, and welcome to our Wednesday,
September 16, 2026 meeting. At this time I would like to call
the meeting to order and ask that you please stand for the
Pledge of Allegiance.
(The Pledge of Allegiance is recited) .
TRUSTEE GOLDSMITH: I ' ll start off the meeting by announcing the
people to the dais . To my left we have Trustee Krupski, Trustee
Sepenoski, Trustee Gillooly and Trustee Finora. To my right we
have the attorney to the Trustees, the Honorable Lori Hulse; we
have Administrative Assistant Elizabeth Cantrell; and with us
tonight is Court Stenographer Wayne Galante.
Agendas for tonight ' s meeting are out in the hallway and
also posted on the Town' s website.
We have one postponement tonight on the agenda, page nine, .
number 12, JMO Environmental Consulting on behalf of LUCINDA J.
HERRICK REVOCABLE TRUST requests a Wetland Permit to construct a
5, 280sq. ft. Two-story dwelling with gutters to leaders to two
(2) 8x8 ' drywells and a French drain for roof runoff; install an
I/A OWTS system with three (3) 81x8 ' leaching pools; construct a
201x28 ' detached dry garage; install water and electric service;
construct approximately 200 ' of retaining wall; construct a
Board of Trustees 2 September 16, 2026
driveway; and to regrade and stabilize all disturbed areas .
Located: Ocean View Avenue, Fishers Island SCTM# 1000-9-11-7.. 16
is postponed. So that one won' t be heard this evening.
Under Town Code Chapter 275-8 (c) files were officially
closed seven days ago. Submission of any paperwork after that
date may result in a delay of the processing of the application.
I . NEXT FIELD INSPECTION:
TRUSTEE GOLDSMITH: At this time I ' ll make a motion hold our
next field inspection, Tuesday, October 6th, 2026, at 8 : 00 AM
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
II . NEXT TRUSTEE MEETING:
TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next Trustee
meeting Thursday, October 8th, 2026, at 5 : 30 PM in the Town Hall
Main Meeting Hall .
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
III . WORK SESSIONS :
TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next Work
Session, Thursday, October 8th, 2026, at 5 : OOPM at the Town Hall
Annex 2nd Floor Executive Board Room, and on Wednesday, October
14th, 2026 at 5 : OOPM in the Town Hall Main Meeting Hall.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
IV. MINUTES:
TRUSTEE GOLDSMITH: Roman numeral IV, Minutes . I make a motion
to approve the Minutes of the August 12th, 2026, Trustee
meeting.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
V. MONTHLY REPORT:
TRUSTEE GOLDSMITH: Roman numeral V, Monthly Report.
The Trustees monthly report for August 2026. A check for
$20, 755 . 00 was forwarded to the Supervisor' s office for the
General Fund.
Board of Trustees 3 September 16, 2026
VI . PUBLIC NOTICES:
TRUSTEE GOLDSMITH: Public Notices are posted on the Town Clerk' s
Bulletin Board for review.
VII . STATE ENVIRONMENTAL QUALITY REVIEWS:
Roman numeral VII, RESOLVED that the Board of Trustees of the
Town of Southold hereby finds that the following applications
more fully described in Section XI Public Hearings Section of
the Trustee agenda dated Wednesday, September 16, 2026 are
classified as Type II Actions pursuant to SEQRA Rules and
Regulations, and are not subject to further review under SEQRA.
As Written:
Alexander Friedman & Erica Tennenbaum SCTM# 1000-145-4-.14 . 3
Thomas H. Patterson SCTM# 1000-9-3-6
Carroll M. Carpenter Revocable Trust SCTM# 1000-7-4-3 . 1
Andrew Shannon & Katherine O' Brien SCTM# 1000-9-6-4
Robert Patterson, c/o Diana Patterson SCTM# 1000-6-1-10
James Kaminsky SCTM# 1000-106-4-4
Koryn Gatta Estrada SCTM# 1000-123-4-7
Rodulfo David Cifuentes SCTM# 1000-121-4-21
North Fork Realty Holdings, LLC SCTM# 1000-57-1-8
James & Nancy Clous SCTM# 1000-53-6-18
Robert P. Auteri Living, Trust & Nannette M.. Auteri Living Trust
SCTM# 1000-123-5-31
MILO BD, LLC SCTM# 1000-103-2-1 . 1
Rosemary & Sebastian Avolese SCTM# 1000-111-14-25
TRUSTEE GOLDSMITH: That is my motion.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
VIII . RESOLUTIONS - ADMINISTRATIVE PERMITS:
TRUSTEE GOLDSMITH: In order to simplify our meetings the
Trustees regularly group together actions that are minor or
similar in nature. Accordingly, I ' ll make a motion to approve as
a group items One through Seven, as follows :
Number 1, Cole Environmental Services on behalf of NICHOLAS
EDWARD & KATHERINE SHILLO BEARDSLEY requests an Administrative
Permit to pump out and fill in existing cesspool with sand;
remove existing trees in order to install a new Fuji Cen-5 I/A
OWTS sanitary system; install silt fencing to be maintained
throughout construction; and all disturbed areas to be loamed,
Board of Trustees 4 September 16, 2026
seeded and stabilized.
Located: 810 Equestrian Avenue, Fisher Island. SCTM#
1000-9-4-11. 5
Number 2, McCarthy Real Estate Management, Inc. On behalf
of RICHARD & ALICE RUBINSTEIN requests an Administrative Permit
to construct a 51x15 ' exterior basement egress stairway on west
side of dwelling; construct a 14 'x8 ' ' roof dormer and 14 ' xl6 '
second story deck on north side of dwelling to accommodate new
finished space within existing attic.
Located: 470 Goose Creek Lane, Southold. SCTM# 1000-79-1-5
Number 3, KEG PROPERTIES NORTH FORK LLC requests an
Administrative Permit to revegetate illegally cleared area with
one (1) Sweet Gum, one (1) Swamp White Oak, one (1) Carpinus
Caroliniana, one (1) Red Maple, twenty-four (24) Bayberry, six
(6) Witch Hazel, twelve (12) Sweet Pepperbush, ten (10)
Hollywood Juniper; as-built 2 ' x 44 ' retaining wall and
gravel/sand fire pit area.
Located: 495 Albo Drive, Laurel. SCTM# 1000-126-2-10 . 1
Number 4, CHARLES R. CUDDY requests an Administrative
Permit to install two (2) basement egress windows and an I/A
OWTS septic system.
Located: 1500 Marratooka Lane, Mattituck. SCTM# 1000-115-3-19
Number 5, Patricia C. Moore, Esq. On behalf of NORMAN &
IRENE VANDERSCHUYT requests an Administrative Permit to replace
in-place and in-kind 12 'x10 ' wood deck on seaward side of
dwelling with steps .
Located: 975 Bayview Avenue, Southold. SCTM# 1000-52-5-17
Number 6, AMP Architecture on behalf of KAMAL EL HELOU &
LAUREN HARTMAN requests an Administrative Permit to make changes
to rear window and exterior door; remove existing stairs from
west side of deck; construct 51x6' 8" wood entry steps; install
51x4 ' stoop;_ install 4 'x5 ' 8" outdoor shower; install two propane
tanks .
Located: 2055 Bay Shore Road, Greenport . SCTM# 1000-53-4-12
Number 7, HOWARD & LISA KOFF request an Administrative
Permit to raise the permitted 4 ' high pool enclosure fencing
along the eastern side of the property by two feet by adding
extenders on the existing posts and using chain link fencing on
the extended portion to achieve a 6 ' -6 ' 5" high chain link fence.
Located: 1380 Oakwood Drive, Southold. SCTM# 1000-70-12-32
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: Number 8, Eligio Lopez on behalf of STEPHEN &
NICOLE O'GRADY requests an Administrative Permit for the
as-built 415" x 7" outdoor shower and 275sq. ft. Wood patio.
Located: 315 Old Salt Road, Mattituck. SCTM# 1000-144-5-20
Trustee Goldsmith conducted a field _inspection September
9th, 2026, noting straightforward on the deck on side of the
Board of Trustees . 5 September 16, 2026
house, no adverse environmental impact .
The LWRP found this to be inconsistent. The inconsistency
is the as-built outdoor shower and wood patio is inconsistent
with Policy 6. 3 (a) because the structure was built without
regulatory permits .
I ' ll make a motion to approve this application as
submitted, thereby granting it a permit will bring it into
consistency with the LWRP.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
IX. RESOLUTIONS - OTHER:
TRUSTEE GOLDSMITH: Roman numeral IX, Resolutions - Other.
RESOLVED, that the Southold Town Board of Trustees RESCINDS
Resolution Adopted on April 15, 2026 and APPROVES the request of
EMILY & RAFAEL ROMECASTER for a Wetland Permit to install a
20 'x40 ' in-ground swimming pool with a 1, 125sq. ft . Permeable
bluestone paver patio surround; install 4 ' high pool enclosure
fencing with gates, a pool drywell, and pool equipment area;
install a 500sq. ft. Lower deck off dwelling with a 12 . 2 ' x8 '
pergola; remove existing 8 'xll ' shed; existing 11 . 41x22 ' tool
shed with entry platform to be maintained; perpetually maintain
the existing 25 ' wide non-turf buffer area along the landward
edge of the non-disturbance buffer, and to perpetually maintain
the existing 50 ' wide non-disturbance area along the landward
edge of wetlands; with the condition to reestablish the 25 ' wide
non-turf buffer and plant native species; and as depicted on the
site plan prepared by Kimberly Peck, Architect, received on
November 25, 2025 and stamped approved on April 15, 2026.
Located: 330 Shore Lane, Peconic. SCTM# 1000-86-1-4 . 12
Striking the word "permeable" from the description before
the words "bluestone paver patio" .
TRUSTEE SEPEN08KI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
X. APPLICATIONS FOR EXTENSIONS/TRANSFERS/ADMINISTRATIVE
AMENDMENTS :
TRUSTEE GOLDSMITH: Roman numeral X, again, in order to simplify
the meeting, I ' ll make a motion to approve as a group items One
through Nine, listed as follows :
Number 1, Burger Construction, Inc. On behalf of SEAN &
RANDI LALLY requests a Transfer of Wetland Permit #10451 from
Veronica H. Nasary to Sean & Randi Lally, as issued August 16,
2023; and a One (1) Year Extension to Wetland Permit #10451, as
issued August 16, 2023 .
Board of Trustees 6 September 16, 2026
Located: 900 Fox Hollow Rd. , Mattituck. SCTM# 1000-113-6-222
Number 2, Patricia C. Moore, Esq. On behalf of CVJB LLC
requests a Transfer of Wetland Permit #8349 & Coastal Erosion
Permit #8349C from Parviz Lalezari to CVJB LLC, as issued
December 11, 2013 .
Located: 1390 Demarest Road, Orient . SCTM# 1000-13-2-7 . 7
Number 3, Finnegan Law, P.C. on behalf of RIPLEY SHORES LLC
requests a Transfer of Wetland Permit #9504 from Lydia DeFeis to
Ripley Shores LLC, as issued July 17, 2019 .
Located: 1165 Cedar Point Road West, Southold. SCTM# 1000-90-1-3
Number 4, Finnegan Law, P.C. on behalf of RIPLEY SHORES LLC
requests a Transfer of Wetland Permit #5188 from Douglas DeFeis
to Ripley Shores LLC, as issued July 19, 2000 .
Located: . 1165 Cedar Point Road West, Southold. SCTM# 1000-90-1-3
Number 5, David Snowdon-Jones on behalf of PETER STEIN &
ALLISON KRONICK STEIN requests an Administrative Amendment to
Wetland Permit #1.0891 to move previously approved structures
landward; revise project description to: Demolish and remove the
existing dwelling, foundation, wood decks, wood fence, low stone
wall; and stone path; construct a new 3, 135sq. ft . Two-story
dwelling that includes a 31 . 2 'x8 ' covered porch, 24 ' x10 ' at
grade patio, 101x24 ' open wood-frame pergola, 15 . 3 ' x3 ' 10 ' and
10 ' x24 ' second story balconies; install a new permeable gravel
driveway; install a new I/A sanitary system landward of
dwelling; convert half of existing 23 ' 3"x25 ' 1" garage into an
11 ' 11"x25 ' 1" pool house with outdoor shower; rest of garage to
remain; any excavated fill to be graded out on the landward side
of the property; existing 15 ' wide non-turf buffer; and to
remove three (3) trees and replace with three (3) native
hardwood trees; with the condition to preserve all trees within
Trustee jurisdiction.
Located: 63417 County Road 48, Greenport. SCTM# 1000-40-1-18
Number 6, Frederick Weber on behalf of PETER SABAT requests
an Administrative Amendment to Wetland Permit #10665 to lower
screen porch floor and the two (2) open porch floors on seaward
side of dwelling by 6"; lower patios and pool area 2 ' -6" with
steps down off the lowered porches; increase non-turf buffer to
12 ' .
Located: 3000 Beebe Drive, Cutchogue. SCTM# 1000-103-3-17 . 1
Number 7, THOMAS & JENNIFER SMITH request an Administrative
Amendment to Wetland Permit #10906 to construct a ±9 ' wide shed
dormer to attic.
Located: 3121 Oaklawn Avenue, Southold. SCTM# 1000-70-6-10
Number 8, MAZI HOLDINGS LLC requests an Administrative
Amendment to Administrative Permit #10892A for the as-built pool
equipment area within Trustee jurisdiction and two retaining
walls .
Located: 530 Broadwaters Road, Cutchogue. SCTM# 1000-104-10-4
Number 9, North Fork Landscapes on behalf of EMILY & RAFAEL
Board of Trustees 7 September 16, 2026
ROMECASTER requests an Administrative Amendment to Wetland
Permit #10950 to install a maximum 20" high by 110 ' long
retaining wall; reduce previously approved patio from 1, 125
sq. ft. To 830 sq. ft. , using natural blue stone; relocate pool
fence and pool equipment area; existing deck to remain; install
temporary irrigation system in non-turf buffer area; plant
bayberry and native grass plugs throughout non-turf buffer area
spaced approximately 24" on center; plant a privacy screen along
southern property line near shed composed of Eastern Red Cedar.
and White Pine; and to maintain a 4 ' wide access path consisting
of either mulch or sand through the non-turf and non-disturbance
buffers to provide access to the creek.
Located: 330 Shore Lane, Peconic. SCTM# 1000-86-1-4 . 12
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
XI . PUBLIC HEARINGS:
TRUSTEE GOLDSMITH: Under Roman numeral XI, Public Hearings . At
this time I ' ll make a motion to go off our regular meeting
agenda and enter into the Public Hearings .
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
This is a public hearing in the matter of the following
applications for permits under Chapter 275 and Chapter Ill of
the Southold Town Code. I have an affidavit of publication from
the Suffolk Times . Pertinent correspondence may be read prior to
asking for comments from the public. Please keep your comments
organized and brief, five minutes or less, if possible.
AMENDMENTS:
TRUSTEE GOLDSMITH: Under Amendments, number one,
Zackery Nicholson on behalf of ALEXANDER FRIEDMAN & ERICA
TENNENBAUM requests an Amendment to Wetland Permit #10976 to
modify the proposed additions and alterations to the existing
two-story dwelling to consist of a proposed 700sq. ft . Two-story
addition to the dwelling; construct approximately 765sq. ft. Of
decking and steps of which approximately 278sgf.t will be
covered by a second-floor roof and/or balcony overhang;
construct 85sq. ft. Uncovered front porch; construct a 172sq. ft.
Open trellis adjacent to the north side of dwelling; construct a
247sq. ft. At-grade gravel seating/fire pit area; construct
850sq. ft. Green-roof system over portions of proposed for
on-site infiltration; convert 800sq. ft . Of existing hip roof to
a flat green roof with rainwater harvesting system for
irrigation; and existing 576sq. ft. Deck to remain unchanged.
Board of Trustees 8 September 16, 2026
Located: 350 Macdonalds Road, Laurel . SCTM# 1000-145-4-14 . 3
The Trustees conducted an in-house review September 14th,
2026. Notes concerns about proximity of the additional
structures to wetlands .
The LWRP found this to be inconsistent . The inconsistencies
are: The proposed parcel contains a non-conforming existing
residence located within 100 feet of the north and west wetland
boundary of Brush' s Creek. The proposed action is inconsistent
with Policy 1, which calls for the minimization of development
to avoid adverse effects . The proposed additions to the dwelling
expand the building footprint by 37 . 4%, and bringing the
residence closer to the northern wetland boundary of Brush' s
Creek, a designated fish and wildlife habitat.
The proposed action is inconsistent with Policy 4 . 1 (a) ,
which encourages structures to be located away from flooding
hazards .
The proposed action is inconsistent with Policy 6. 3 (a)
which states that actions must comply with the Southold Town
Board of Trustees laws and regulations . The proposed dwelling
additions are seaward and make the residence more non-conforming
than it already is . The proposed installation of an IA system is
inconsistent with Policy 5 . 1 (c) 3, and the proposed non-turf
vegetated buffer is consistent with Policy 6. 3 (d) .
Is there anyone here wishing to speak regarding this
application?
MR. NICHOLSON: Hi, Zack Nicholson, residing at 770 Wagon Wheel
Lane in Cutchogue. I am the architect and agent for the owner.
May I provide a handout, a copy of this presentation, Board; is
that okay?
TRUSTEE GOLDSMITH: Sure.
MR. NICHOLSON: The printer quality issue there, so I wanted to
give you all a copy. (Handing) .
When we last met onsite and I had staked out the
previously-approved design and the proposed alterations, and
there was a bit of confusion that ' s kind of hard to visually
represent. The .proposed design, in comparison to the
previously-approved design with some stakes in the ground and
also in only 2-D images, which is why I brought along some
photos to show you, or images . The top being existing
conditions, the middle being the previously-approved design, and
the bottom being the newly proposed design.
I just wanted to make a couple of quick points . The new
design is 20% less lot coverage than the previously-approved
design. We eliminated all of this decking on the north side of
the property.
The proposed second-floor addition does not project any
closer to the water than the previously-proposed structure
enclosed space did. In the previously-approved design we had a
large covered area of decking with a green roof above. That has
Board of Trustees 9 September 16, 2026
been replaced with an open trellis, and essentially all that
covered decking is more or less removed, you know, and replaced
with a very minor overhang on the first floor here by this bar
seating area.
The second-floor balcony to the second-floor bedroom, while
it is slightly wider, it is no further towards the water on the
north side of the property..
So it ' s really our goal -- the initial exercise, it took my
client ' s desired program, presented it in front of you, wasn' t
even sure if this would be agreeable, and after receiving
approval, we tightened up the design. The new proposed design
is a lot more cohesive compared to the old design, is very
clunky.
So, yes, overall, like I said, our desire was to reduce the
overall impact and while some things have shuffled around, we
are really not presenting any structures or any enclosed space
that ' s any closer to the water than we previously had been
approved for.
TRUSTEE' GOLDSMITH: Can you comment on the, I think the previous
iteration with the decks and everything, were at or near grade.
This new proposal looks like everything is raised. What ' s the
elevation of those raised lower platforms?
MR. NICHOLSON: Well, the lowest one would be at the same height
as the previous design, and they step up in seven-inch
increments from there. So the highest point would be -- I think
I have the elevation here. 21-inches above the existing average
grade, which is going to need to be slightly raised. The new
addition, we are raising up 18 inchesy ' the finished floor from
the existing structure to be compliant with the FEMA
regulations .
TRUSTEE GOLDSMITH: And you also said that one structure that was
previously a deck, part of that now is enclosed living space; is
that correct?
MR. NICHOLSON: Down here? Is that where you are referring to?
TRUSTEE GOLDSMITH: Yes .
MR. NICHOLSON: No, that ' s not enclosed. It ' s all open.
TRUSTEE GOLDSMITH: The top part.
MR. NICHOLSON: The top, that ' s just a handrail, a screened
handrail for privacy on the second-floor balcony.
TRUSTEE GOLDSMITH: Okay, how about the section closest facing
Brush' s Creek? So to the middle more.
MR. NICHOLSON: Here?
TRUSTEE GOLDSMITH: Yes, sir.
MR. NICHOLSON: I 'm sorry, can you repeat your question?
TRUSTEE GOLDSMITH: Is that moving closer to Brush' s Creek than
the previous iteration with living space? Because on the
previous one and on that design there was a deck at one point,
and- now it looks like it ' s enclosed in living space, going
closer to the creek.
Board of Trustees 10 September 16, 2026
MR. NICHOLSON: Right. So this previous design, this was a
trellis . This is a coplanar, this glass wall here, that was a
staircase. And this small little bump-out here where the dining
room is, we are not projecting any further than this existing
dining room was . So this second floor is now in the same plane
as the previous dining room was . And the dining room itself and
the new design is actually pushed back.
In the plan you can see this small, little half-round
bump-out, is really more of an esthetic thing and functions on
the inside of the building. But the leading edge of that curved
bump-out is as far as we were projecting in the previous design.
TRUSTEE GOLDSMITH: And now there is also that patio area where
you are depicting the firepit there, where there ' s a tree
currently, correct?
MR. NICHOLSON: Yes, and we talked about this onsite. My client
and I would love to save the tree. It ' s in good health, and we
are happy to try to prune it and keep it there. Technically,
some of the limbs do interfere with either one of these designs
and so, you know, we ' ll try to keep it. But if not, we are
happy to replace, you know, multiple new trees on the property
like we had presented in the planting plan on the previous
amended site plan.
TRUSTEE KRUPSKI : Debatably, the plan interferes with the tree ' s
limbs, not the other way around.
MR. NICHOLSON: I 'm sorry?
TRUSTEE KRUPSKI : I said debatably, the plan interferes with the
tree ' s limbs, not the other way around.
MR. NICHOLSON: The plan --
TRUSTEE GOLDSMITH: Your design.
MR. NICHOLSON: Well, the gravel area would be around the tree.
But the decking and everything, does not interfere with- the
tree. So, you know, like I said, if we trimmed, pruned the
branches, probably would be okay, and I 'm certainly willing to
try to do that.
It ' s not a native species so, you know, per your approved
planting variety, so, again --
TRUSTEE FINORA: When I look at this new proposal I see more
volume in every dimension. I see an extended floor, forward
projection of the second floor, removal of some decking, which I
think you referred to as a lot coverage reduction, but I don' t
see those as equals in terms of impact. The total volume here is
a substantial increase in the structure already. This parcel is
challenged and constrained by having water surrounding it,
nearly making it a peninsula, and I think the first go-around
with this, it was more latitude for your addition, even though
it was approaching a different waterfront boundary, but we were
giving respect to the project having water on multiple sides .
This amendment here, I feel like is more volume towards a
project that was already perhaps at its limits for what should
Board of Trustees 11 September 16, 2026
have been considered given the site constraints .
The elevated platforms, they feel like an addition of
volume, not outside the footprint of the house. I don' t see
that as like-for-like being exchanged for decking. I appreciate
that you've included some gravel, but that ' s also an additional
scope item now that was not increasing the disturbance area, and
generally I think that adds to the overall footprint of the
project.
So I 'm not very pleased with the modifications here. I
don' t blame you for seeking the additional space on the second
floor but this feels it ' s growing beyond what I 'm comfortable
with, particularly with the balconies and the patio areas .
MR. NICHOLSON: So the previous design, you know, maximizes the
GFA that is allowable on the site, and so does the new design.
So in terms of volume, I mean from the image, it looks bigger
because it ' s zoomed in, whereas this one was zoomed out to see
the decking on the north.
But, you know, this volume here is pushed in on the other
one in order to project some of the second-floor volume out.
It ' s a little bit of push and pull. I would be happy to share
some other views with you but if you really study the plans,
volumetrically this has a smaller footprint and actually the
second-floor living space is, you know, it ' s out of site from
this view here on top of the existing structure, which would
really be here. You can see it in this view.
TRUSTEE FINORA: I 'm just not buying this argument that this is
the same or reduction, I mean, the images I think are clear that
the volume is increased. Your second floor is now fully
expanded, your balconies are projecting further and wider than
they were before. And I think I 'm being -- I just don' t support
this expansion.
TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak
regarding this application?
(No response) .
Any other questions or comments from the Board?
(Negative response) .
TRUSTEE GOLDSMITH: Hearing none, I make a motion to close this
hearing.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: Due to the extensive LWRP that is
inconsistent with the structure moving closer to the wetlands,
with the footprint going closer, with the loss of existing
vegetation, this project is going to adversely affect the
wetlands of the Town. It will also cause damage from erosion,
turbidity or siltation. It will adversely affect fish, shellfish
.or other beneficial marine organisms, aquatic wildlife and
vegetation or natural habitat thereof, and will also increase
Board of Trustees 12 September 16, 2026
the danger of flood and storm-tide damage.
So because Chapter 275-12 (a) , (b) , (d) , (e) , and the
extensive LWRP inconsistency, I will make a motion to deny this
application as submitted.
TRUSTEE FINORA: Second
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MR. NICHOLSON: Thank you, for your time.
WETLAND & COASTAL EROSION PERMITS:
TRUSTEE KRUPSKI : Under Wetlands & Coastal Erosion Permits,
Number 1, Docko on behalf of THOMAS H. PATTERSON requests a
Wetland Permit and a Coastal Erosion Permit to reconstruct
existing pier consisting of a landward 6 ' wide by ±34 linear
foot long pile supported pier to an 8 ' wide by ±50 linear foot
long pier to a hinged ramp to a new 12 ' x14 ' floating dock with
ladder secured by four restraint piles; four (4) existing
tie-off piles; pier to include rails on both sides, and
water/electric utilities; and to maintain the existing ±265
linear feet of stone armor shore protection, resetting stone
that have been . displaced as necessary.
Located: 84 Bell Hill Avenue, Fishers Island. SCTM# 1000-9-3-6
MR. BAYNE: Bill Bayne, from Docko, on behalf of Thomas
Patterson.
TRUSTEE KRUPSKI : I just have to read the review first.
The Trustees most recently visited the site on the 28th of
August, discussed the consideration for the rails . Also
discussed memorializing the buffer, which was subsequently
followed up at work session with the discussion on how many
rocks were going to be moved, and if there was some reason to
keep some within the water for habitat and/or a secondary layer.
of protection.
The LWRP coordinator found this to be consistent.
Is there anyone here that wishes to speak to this
application?
MR. BAYNE: Bill Bayne, with Docko, on behalf of Thomas
Patterson.
It ' s a fairly straight-forward project to rebuild an
.existing dock that ' s about 35-year old, that supports
recreational boating in Hay Harbor part of Fishers Island.
The new dock will be rebuilt with the same design, fully
within the footprint of the existing structure, consists of
84-foot fixed pier and a 12x14 float with four tie-off piles .
As you mentioned, part of this will also be retaining the
shoreline protection stone which has, you know, just through the
normal course of erosion, some of it is falling away. No new
stone will be added and we are not looking to drastically change
the shoreline protection in any way, it ' s really just resetting
Board of Trustees 13 September 16, 2026
a few stones that have fallen away over the years .
All work will be done by marine barge, and demolished
materials will be removed by the contractor via barge, and new
piles and decking will be brought in via barge, as well as a
prefabricated float . And I 'm happy to answer any questions .
TRUSTEE KRUPSKI : So I think the dock rebuild is fully
functional, is pretty straightforward.
There was the one comment from field inspection regarding
memorializing the buffer. So they already have a pretty healthy
non-turf vegetated buffer there, so we would just want to, see
the plans indicating that. And I would say a minimum of 15
feet, so it if there is a small few areas where it ' s less than
15 feet, we would like to see a buffer added to that, and then
where it ' s larger, if they want to keep that vegetation, they
should. So if we can just get new plans on that.
And then the question regarding the rock was not so much we were trying to determine is someone going to come in and
really rip out some of that vegetation in the process of
rebuilding this, or are you just talking about placing a handful
of stones back?
MR. BAYNE: Placing a handful of stones back. We are not looking
to remove any vegetation, it ' s just a few spots where there are
now voids in the overall protection where individual rocks have
fallen over the years . So it ' s really just to reset those.
TRUSTEE KRUPSKI : Okay. Is there anyone else here that wishes to
speak regarding this application, or any additional comments
from members of the Board?
(Negative response) .
TRUS.TEE. KRUPSKI : Hearing none, I make a motion to close the
hearing.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE KRUPSKI : I make a motion to approve both Wetland and
Coastal Erosion permit with the stipulation of new plans
depicting a minimum of 15-foot vegetated non-turf buffer with
native species .
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
Number 2, Docko on behalf of CARROLL M. CARPENTER REVOCABLE
TRUST requests a Wetland Permit and a Coastal Erosion Permit to
reconstruct the existing pier consisting of removing the
existing landward wood ramps and construct a new landward 4 '
wide by ±42 linear foot long access ramp to pier with handrails
and two beach access ship ladders/stairs; in-place
reconstruction of existing 7 ' wide by ±112 linear foot long
fixed pier with handrails; reconstruct existing 7 ' wide by 22 '
Board of Trustees 14 September 16, 2026
long fixed "L" pier with a ships ladder; existing tie-of pile to
remain; and to install new water and electric to pier.
Located: 2512 Brickyard Road, Fishers Island. SCTM# 1000-7-4-3 . 1
The Trustees visited the site on 8/28/26. Notes read
confirm shower removal, inquire about eelgrass protection.
The LWRP program coordinator found the project to be
consistent.
Is there anyone here wishing to speak regarding the
application?
MR. BAYNE: Bill Bayne, Docko, on behalf of The Carpenter Trust .
This is a similar project, rebuilding an existing dock with
the same footprint. The footprint remains the same, deck height
remains the same. There was a comment about a shower head that
was not included on the plans, that has since been added in.
There is eelgrass surrounding this dock. It does grow pretty
well right up to and under the dock due to the height and
orientation, but further aid in its ability to expand. The only
major difference will be replaced with thru-flow to allow the
sunlight to pass through, so if it wants to go further toward
the shoreline.
Other than that, same as the last one, all work will be
done from a marine construction barge, demolished materials will
be removed via barge, and. all piles and decking will be brought
in via barge. I 'm happy to answer any other questions .
TRUSTEE SEPENOSKI : Any questions from the Board?
(Negative response) .
Is there anyone else wishing to speak regarding the application?
(No response) .
Hearing no further. comments, I make a motion to close the
hearing.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : I make a motion to approve this application
with the removal of the outdoor shower in the wetland area.
That ' s my motion.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
WETLAND PERMITS:
TRUSTEE GILLOOLY: Number one, under Wetlands Permits, Sam
Fitzgerald, Architect on behalf of ANDREW SHANNON & KATHERINE
O'BRIEN requests a Wetland Permit for the existing 2, 229sq. ft.
(Gross floor area) , two-story dwelling, construct additions and
alterations for a 2, 503sq. ft. Two-story dwelling consisting of
removing the existing two-story west wing and one-story
sections, and construct a two-story addition with a slight
Board of Trustees 15 September 16, 2026
footprint expansion; construct a 236sq. ft. Screened porch on
west side of dwelling; construct a 36sq. ft. Covered front porch;
existing 22 . 3 'x20 . 9 ' deck to remain; remove the existing seaward
screened-in porch; and to abandon existing septic system and
install an I/A OWTS sanitary system.
Located: 1950 Equestrian Avenue, Fishers Island. SCTM#
1000-9-6-4 .
The Trustees most recently visited the site on the 28th of
August, noting the following: House and foundation should not
extend the 12 to 18 inches seaward. Also, side porch should be
pulled back to the same distance. Wetlands side of house should
be non-turf vegetated natives. The existing deck should be
dialed back in line with house. New plans and stipulate IA
I will also note that this project appears to be out of
compliance with a previous Wetland permit #6722, which did state
a non-turf buffer should exist on the seaward side of the house.
The LWRP reviewed this application and found it to be
consistent .
Is there anyone here wishing to speak regarding this
application?
MR. FITZGERALD: Yes . Good evening. My name is Sam Fitzgerald,
appearing on behalf of the owners .
Just a few comments, if I could, on the field notes . Just a
clarification.
So our, so the main mission of our application is to
rebuild the west wing of the house on the same footprint, with a
slight expansion. So we would be expanding on two sides . On the
front side, that is the landward side, we would be expanding 18
inches, and on the west side, on the side of the house, 18
inches .
We are not expanding on the south side, the water side at
all .
So there would be no new expansion of the house towards the
pond. So we would be keeping the exact same setback that we have
now currently.
The owners would be happy to take the Board' s
recommendation on a buffer. That ' s great. And we apologize for
it not being implemented sooner but I guess, these are new
owners .
And just to comment on the deck. There was a comment I
think you wanted to dial that deck back, the existing deck back
to the edge of the building. You know, that deck is not part of
this scope of work. It was not part of this application. That
deck has been there for over 30 years . It did receive as-built
permit from the Trustees in 2007, and a CO from the Building
Department. So it ' s completely permitted.
In the 20 or so years since this body gave the deck a
permit, there has been no negative impact on the wetlands
whatsoever. And if in fact that is the Board' s ask here, is to
Board of Trustees 16 September 16, 2026
cut that deck back, it would be about a six feet would be
lopping off that deck, and that ' s, I think the owners would be a
bit flummoxed to sort of learn that they would have to incur
tense of thousands of dollars more on a deck that does have a
Trustee permit already, and also has no negative impact on the
wetlands . Thank you.
TRUSTEE GILLOOLY: Thank you, for your presentation.
Having visited the site I think I would have to disagree
with the assertion that there is no negative impact on the
wetlands . It is extremely close to an area that would have
vegetation related to the wetlands, and given the increase in
scope and use of this house, I think this is the appropriate
time to review all structures related to the residence.
So I believe that overall reduction of that deck and
pulling it in-line with the house is a very fair stipulation of
the permit, considering the additional volume that is being
considered here.
MR. FITZGERALD: Okay, I think that we would, I think this is
something that I would like to confer with the owners about,
actually because it is a very significant construction cost,
certainly that they are being asked to incur.
If that ' s the feelings of the Board, I would like to see if
we can table this until next month when I can confer with the
owners .
TRUSTEE GILLOOLY: If that is your preference. I do think that
the Board is prepared to move forward with this application, but
if your strong preference is to delay this hearing for another
month, we would --
MR. FITZGERALD: Yes, I think that is something that the owners
would definitely, and maybe it is that we get there, but I think
it ' s something the owners would definitely like to confer on and
just understand before we commit.
So if we could table to next month, that would be great.
TRUSTEE KRUPSKI : I have a follow-up question.
TRUSTEE SEPENOSKI : I just wanted to make sure we both understand
each other as a Board and applicant what the recommendation is
at this point .
MR. FITZGERALD: Sure.
TRUSTEE SEPENOSKI : And what the Board' s position is, to remove
the deck flush with the face of the house.
MR. FITZGERALD: Yup.
TRUSTEE SEPENOSKI : And you are already doing, I think a great
thing, by shifting that seaward projection --
MR. FITZGERALD: The screened portion, yes .
TRUSTEE SEPENOSKI : (Continuing) body of the house to the side.
Is that your understanding of what the Board' s --
MR. FITZGERALD: Right. So just to clarify further, we would be,
it ' s about six feet, that we would be cutting the deck back, by
the whole width of it, which is 25 feet. So it would be taking
Board of Trustees 17 September 16, 2026
a 6 ' x25 ' swath of that deck out, we would be removing that. And
you know, that would require us to put in new piers, to reframe
that deck and, you know, it ' s a significant amount of work.
So I just wanted to touch base with the owners before we
fully commit to something. But yes, we are on the same page. .
TRUSTEE SEPENOSKI : Okay.
TRUSTEE KRUPSKI : Quick question for you, for the work on the, I
think you said the west side of the house.
MR. FITZGERALD: Yes .
TRUSTEE KRUPSKI : Are you demoing the entire structure and
powering a new foundation in there?
MR. FITZGERALD: Yes . So. what it is, this all started because we
wanted to add a second floor to that west wing, and the
contractor was looking at the existing foundation and found it
to be in pretty bad repair. So what we are doing is we are
replacing that west wing on the same foundation, again, with
just a little bit of bump out on two sides . But it will be a new
foundation. And we have received a zoning variance for that
work. But it would be a new rebuild west wing.
TRUSTEE KRUPSKI : Because on the seaward most side of that wing,
there is an overhang on what I would, I guess, call the first
floor. So are you going back to where the existing foundation is
and going up or --
MR. FITZGERALD: Yes .
TRUSTEE KRUPSKI : (Continuing) . Or are you moving the foundation
out underneath that overhang.
MR. FITZGERALD: Yes . So to clarify, we would be keeping the
foundation where it is on that water side. So it would just be
going up at the existing location.
TRUSTEE GOLDSMITH: Mr. Fitzgerald, if you' re going to table it
and come back next month, for the plans come back with a 20-foot
vegetated non-turf buffer planting plan for that as well. So we
have everything for next month.
MR. FITZGERALD: Got it. Happy to do that. That ' s great. Yup.
TRUSTEE GILLOOLY: All right, anyone else here wishing to speak
regarding this application?
(No response) .
Hearing no further comments, I make a motion to table this
application at the applicant ' s request .
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MR. FITZGERALD: Thank you.
MR. FINORA: Number 2, Bruce Kinlin on behalf of ROBERT
PATTERSON, c/o DIANA PATTERSON requests a Wetland Permit to
demolish existing dwelling, accessory structures, and abandon
existing septic system; construct a new two-story dwelling
(3, 605sq. ft. Footprint) with 950sq. ft . Of seaward decking and
Board of Trustees 18 September 16, 2026
covered porches with steps, an 18 . 61xl9 ' partially covered
raised terrace, a 7 . 6 ' x10 ..6 ' side bbq area with steps, a
6 'x20 . 6' side covered porch with steps, two 51x16 ' balconies, a
5 'x5 ' outdoor shower, a ±6' wide basement stair egress; install
an I/A OWTS sanitary system; install a stormwater drainage
system; regrade, loam, seed and stabilize disturbed areas,
relocated existing underground elec/tele/data services; install
new a/c units and generator, and modify existing driveway.
Located: 4180 North Hill Road, Fishers Island. SCTM#
1000-6-1-10
The LWRP was found to be consistent for this project.
The Trustees conducted a site inspection on August 28th,
2026, with following notes : Adding a 25-foot vegetated non-turf
buffer, setbacks on plans must reflect house to top of bank, and
to more clearly depict the limits of the pond to the eastern
side of the property.
Is there anybody here wishing to speak on behalf of the
application?
MR. KINLIN: Hi, Bruce Kinlin, Kinlin-Rutherford Architects .
TRUSTEE FINORA: The notes here indicate the setbacks need to
reflect the top of bank to top of house. Specifically on the
survey, I think the most seaward edge is shown. I think that
dimension is 108 feet . But it' s measured to the bottom.
MR. KINLIN: I have a question. I have two new drawings that are
really the same drawing that you have, our R-021 drawing, where
we simply added more additional dimension lines that will show
from top of bank. Can I submit those?
TRUSTEE GOLDSMITH: Yes, sir. Just bring them to the clerk. Liz
will stamp them in, please.
MR. KINLIN: I have copies for each of you. (Handing) . Thank you.
Should I wait for you to see those?
(Affirmative response) .
TRUSTEE FINORA: Unless you have any unrelated comments .
MR. KINLIN: I think when you have those, I ' ll make a few points
and just point out some of the information on those drawings .
If I may. So there are two sheets there just to guide you
through them. The first sheet labeled 021 . 0 is the same as your
021 drawing that we submitted, with just additional information
added to it. We have shown the 75-foot -- these are still
measured off of what we originally had shown, which was the edge
of the approximate limit of tidal wetlands . The next sheet will
show the data from top of bank.
So, just to clarify kind of what was submitted. We 've also
shown, so that 25-foot buffer zone, we 've also added just some
dimensions from the same tidal wetland line to the existing-
dwelling as well . Just as a frame of reference. And we have
also shown some of the larger trees that are on the property, on
the landward side of the house. And just added dimensional
information from the wetlands to the east and west as well .
Board of Trustees 19 September 16, 2026
So this just reflects exactly what we submitted before, but
just with a little bit of additional kind of data.
And then the second sheet, which we labeled A021 . 1, is
again, it ' s the same drawing, house is in the same place.
Obviously the same trees . And the difference in this drawing is
the two setback lines are now drawn, they have been shifted to
top of bank.
So the dimensions on this drawing reflect where the house,
same house, in the same proposed location, what those dimensions
are from top of bank.
TRUSTEE FINORA: Very helpful. Thank you.
The other comment related to the acknowledgement of a
25-foot vegetated non-turf buffer becomes a little challenging
to delineate on a property with so many different wetland
influences here. I think generally what is lacking here is a
demonstration of those buffers from those respective wetlands .
Can you describe or help me understand what is being asked
for there?
TRUSTEE FINORA: Yes . So, typically, if you are thinking of this
in a linear, like a bulkhead, it would just be a respective
dimension all setback from there, of the buffer zone, not
vegetated, non-turf.
MR. KINLIN: From the wetland boundary.
TRUSTEE FINORA: Exactly. Yes . So in this case --
MR. KINLIN: Correct. There is so much space there. I guess you
are asking us to delineate that 25 foot zone from edge of
wetlands, landward toward the house, and label it as to be --
TRUSTEE FINORA: Vegetated non-turf buffer.
MR. KINLIN: Yes .
TRUSTEE FINORA: And the reason why we are seeking that
specifically to be delineated here is because there are so many
varying wetland lines, it ' s not a simple straight line with an
offset dimension, that buffer would need to follow the contour
and the path of those respective wetland lines .
MR. KINLIN: I understand that better now. I would be happy to
make that designation.
TRUSTEE FINORA: Okay, very good. Are there any other comments
from the Board?
(Negative response) .
Any other comments from the public?
(No response) .
TRUSTEE FINORA: I would make a motion to close the hearing.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE FINORA: I ' ll make a motion to approve this application
subject to plans depicting the 25-foot vegetated non-turf
buffer, and following the orientation of the respective wetlands
demonstrated on the survey received September 16th, 2026.
Board of Trustees 20 September 16, 2026
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: Number 3, Glenn Graham on behalf of JAMES
KAMINSKY requests a Wetland Permit for the replacement of the
previously removed 3, 000-gallon above ground diesel tank with a
500-gallon double wall above ground diesel tank set on an 8"
high concrete pad extending a minimum of 12" beyond all tank
edges.
Located: 100 East Mill Road, Mattituck. SCTM# 1000-106-4-4
The Trustees conducted a field inspection September 9th,
2026, notes it ' s a commercial application in a Marine II zone.
No adverse environmental impact.
The LWRP found this to be exempt.
Is there anyone here wishing to speak regarding this
application?
MR. GRAHAM: Good evening. I 'm Glenn Graham, with Graham
Associates, Brightwaters, New York.
This application involves replacement of an existing" fuel
tank to stay in compliance with Suffolk County Health Department
Office of Pollution Control.
We are essentially replacing an outdated three-thousand
gallon diesel tank with a one-thousand gallon double-wall steel
rube cube, they call it. It ' s a square/rectangular above-ground
diesel fuel tank for the owner of the property who is a
commercial fisherman, services his boats .
We are reducing the onsite storage from three-thousand
gallons to one-thousand. It has multiple levels of leak
detection in this tank. It ' s a double-wall tank, it has an
interstitial space with an alarm, a high-level alarm, other
types of spill prevention.
We 've used this similar tank at some of the other marinas
out here: Orient Point, Goldsmith' s, I think Port of Egypt we
used for that. A few different ones .
So, any questions from the Board?
TRUSTEE GOLDSMITH: Anyone else here wishing to speak regarding
this application?
(Negative response) .
Any other questions or comments from the Board?
(Negative response) .
Hearing none, I make a motion to close this hearing.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: I make a motion to approve this application
with the corrected project description, which should read as
follows :
Glenn Graham on behalf of James Kaminsky, requests a
Board of Trustees 21 September 16, 2026
Wetland Permit for the replacement of the previously removed
3, 000-gallon above-ground diesel tank with a 1, 000-gallon
double-wall above-ground diesel tank set on an 8" high concrete
pad extending a minimum. of 12 inches beyond all tank edges .
Located: East Mill Road, Mattituck.
That is my motion.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MR. KAMINSKY: Thank you, very much. Good evening.
TRUSTEE KRUPSKI : Number 4, Creative Environmental Design on
behalf of KORYN GATTA ESTRADA requests a Wetland Permit to
remove approximately 100 cubic yards of soil including existing
phragmites roots within the wetland area to the east, replace
soil with approximately 100 cubic yards of clean sandy loam
while maintaining the existing grade, and revegetate this area
using various native species of plants; along the border of the
lawn area and the existing 20 ' wide non-disturbance buffer area
place boulders (50 lbs. + each) set approximately 5 ' on-center.
Located: 2350 Deep Hole Drive, Mattituck. SCTM# 1000-123-4-7
The LWRP coordinator found this to be consistent.
The Trustees visited the property on the 14th of September,
reviewed the new plans and just had a question as to what was
being meant as a "bamboo barrier in this location, and
subsequently what is the purpose.
Is there anyone here wishing to speak regarding this
application?
MR. CICHANOWICZ : Dave Cichanowicz, Creative Environmental
Design, representing the owner.
On the bamboo barrier, what we are trying to do is to
eliminate a growth of the phragmites in the non-turf area to the
lawn area. And we found in the past putting something like this
works very well with bamboo situations as well as phragmites .
The material is a PVC material, approximately half-inch
thick and about three-feet deep, and we trench it by hand along
this barrier, install it. You don' t see any of it. It ' s just a
sub-level growth inhibiter. So it ' s worked very well in the past
and we thought this would be a good idea to help contain
phragmites spreading throughout the area.
TRUSTEE KRUPSKI : Thank you.
MR. CICHANOWICZ : And I think from the plans that I showed, that
one area that ' s closer to the house, we ' ll restore that back to
a normal native area. On my. plan show the native plants we are
putting in there. The owner argued with putting in bayberry, I
said, no, the Trustees were very insistent that they wanted
bayberry in there, so he finally let go on that, so we ' re all
good to go.
TRUSTEE KRUPSKI : Thank you. Is there anyone else here that
Board of Trustees 22 September 16, 2026
wishes to speak regarding this application?
(No response) .
Any comments from the Board?
(Negative response) .
Hearing none, I make a motion to close the hearing.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE KRUPSKI : I make a motion to approve this application
with the stipulation of new plans depicting the distance of the
non-disturbances area drawn on the plans .
TRUSTEE GOLDSMITH: Second. -All in favor?
(ALL AYES) .
MR. CICHANOWICZ : Thank you.
TRUSTEE SEPENOSKI : Number 5, RODULFO DAVID CIFUENTES requests a
Wetland Permit for the existing 1, 074sq. ft. One-story cottage
that includes a 9 . 2 ' x24 . 5 ' enclosed porch with a 3 ' x4 . 2 ' entry
and steps, a 215sq. ft. Deck with brick steps, 3 . 5 'x3 . 5 ' wood
steps, and raised a/c unit; a 3 . 6 ' x4 . 3 ' outdoor shower; a
60sq. ft. Shed and a 3 . 31x5 ' generator on a concrete pad;
existing 10 . 4 ' x15 . 9 ' seaward wood deck/dock; existing
345 . 47sq. ft. Wood dock consisting of a 16. 66sq. ft. Landward
fixed ramp to a 48 . 45sq. ft. Fixed ramp to a 38 . 18sq. ft. Fixed
walk to a 175 . 68sq. ft . Fixed platform with a 57sq. ft. Fixed
access platform with 3 . 2 ' steps down.
Located: 2035 Laurel Way, Mattituck. SCTM# 1000-121-4-21
The Trustees visited the site on 9/9/26. Notes from our
visit read: Only one dock allowed; remove dock closest to house;
remove excess fill and non-native species; revegetate with
native species .
The LWRP coordinator found the project inconsistent with
Policy 6. 3, Protect and Restore Tidal and Freshwater Wetlands .
It provides a lengthy background on the history of the parcel,
dating back to 1957 . And recounts various additions and surveys
of the property in 1988 and again in 2025 when work was done on
the project without Trustee permits .
Is there anyone here wishing to speak regarding the
application?
MR. CIFUENTES: Yes . I am Rodulfo David Cifuentes, I am the owner
of the house. I live there. It is my home, . my hopefully
retirement home. And I bought the house in 2020 . When I bought
it, it was kind of like the end of or during COVID and all of
that, and I bought it as is . You know, they sold it to be as is .
I was never told, you know, you would need all these things, all
these permits . And I figured everything was taken care of. And
aside from, you know, yes, I did add the generator because the
house had no heat, and, but the two docks that are there, the
seaward one and the closest to the house, is, I spoke to the
owners, previous owners, who sold me the house. They bought the
Board of Trustees 23 September 16, 2026
house in 1989, and they said those docks. were there when they
bought the house. And they said only one time they had to do
repairs because a tree fell on one of them.
I don' t know what year that was, but they, both docks were
there. So it ' s not like I added them or I didn't --
TRUSTEE SEPENOSKI : No, we understand. We have a long history
with this property as it is . I think the one challenge is now
that coming before the Board, seeking to legalize all the
structures on the property, there is town law prohibiting two
docks on one single parcel.
So in our field inspections we noticed, and in review of
photographs from years ago, we notice the water levels come
right up in that area, and that the vegetation is attempting to
re-establish itself, almost at the edge of your lawn area.
TRUSTEE KRUPSKI : There is no lawn area.
TRUSTEE SEPENOSKI : Not anymore. It ' s trying to be a lawn,
because he ' s mowing it.
TRUSTEE KRUPSKI : Just to clarify the record, because I think
it ' s important. There was a violation here where fill was added
and a wall;, and not all that fill- was removed. Most of it was,
but not all . So the wetland vegetation was even closer to the
structure. This structure regularly used to have water flooding
under it . It ' s a seasonal house.
TRUSTEE SEPENOSKI : "Structure" meaning the house.
TRUSTEE KRUPSKI : That ' s correct.
MR. CIFUENTES : With regard to that, I feel the DEC, I don' t
know, I know it ' s different entities, but they gave me an
established amount, they put in the stakes to get to the ground,
like right now, I was, I did all the native plantings, I did
them myself, and it was extremely hard because there was maybe
an inch or two inches of topsoil . Everything else underneath is
sand.
So, I don' t know, I don't think that was ever sandy. I
think it was just this runoff, because even when I bought the
house, I noticed underneath the house, the water never went
over. It was, there is a big concrete pipe that allows, I guess
filters the water. I believe I showed it to you guys when the
Trustees, when you were there in the house, in the premises .
So. It ' s not I didn' t add any of that. The house was
lifted at some point, I don' t know when. The soil has been
removed pretty much, it ' s pretty much level to the vernal pond
there. I don' t know if you have been to the property recently.
TRUSTEE SEPENOSKI : We went on the inspection, yes, and we
noticed there is a grade sloping downward from where the fill
was brought in. So there is still quite a bit of fill in that
area.
MR. CIFUENTES : Are you talking about the back of the house?
Because that ' s always been higher. But in the front, It ' s
always, I mean, if you need more removal.
Board of Trustees 24 September 16, 2026
TRUSTEE SEPENOSKI : Just so we are clear, there are boards that
surround the footprint of the house now, basically attached to
the footings of the house rest upon, and those boards are an
indication of just how high the grade was raised in order to
establish some kind of soil base there.
MR. CIFUENTES: I understand.
TRUSTEE SEPENOSKI : Whereas Trustee Krupski said the water used
to flow underneath the structure, in a rain event .
MR. CIFUENTES: Yes, that was put there, and I offered to take it
off, and I was never indicated to take it off. I was just told
to remove the soil, which I did, and do the native plantings . I
mean I can take that off, that ' s not a problem.
TRUSTEE KRUPSKI : If you look at the existing, at pictures prior
to the violation, it ' s very clear that the ground level is much
lower than where it is presently.
MR. CIFUENTES : Okay.
TRUSTEE SEPENOSKI : Okay, is there anyone else wishing to speak
regarding the application, or Members of the Board, wish to
comment?
TRUSTEE GILLOOLY: Well, I do think that the offer to remove the
boards is a good offer. I think that it will actually end up
protecting your structure in the long run, rather than having
water that can potentially go overtop the boards and be sitting
underneath the house. So I think the removal of those boards
would be a good step in the right direction.
TRUSTEE SEPENOSKI : Mr. Cifuentes, we are, as a Board, charged
with bringing this into conformity with the LWRP, and being that
it ' s inconsistent, we have to address the two-dock situation on
the property.
MR. CIFUENTES: Okay. All right. Something you need to do later
or --
TRUSTEE SEPENOSKI : We are going to vote in a moment. But I as
one Trustee, . there is no other comment from yourself, Members of
the Board, the public?
MR. CIFUENTES: No, I 'm just, again, I 'm just saying they were
there 50 years ago, almost. I don' t know when they were built .
It ' s not like that, you know, why should I be punished for it.
As I explained, I wrote a letter, I don' t know if you had a
chance to read it. But I always wanted to have my dream house
was something on the water. I couldn' t afford anything on The
Sound or the bay. I bought this and always, I love to sit out
there and look at nature, look at everything that grows around.
It ' s like it ' s own eco-system there, and whether it ' s in the
dock closest to the house or seaward, it ' s beautiful .
TRUSTEE SEPENOSKI : Right. There is a dock closer to the house
and there is a dock that is part of the walkway that extends out
further, closer to the current lake edge.
MR. CIFUENTES: Yes . If you would allow me to keep both, that
would be great. I know you have your regulations, so I am at
Board of Trustees 25 September 16, 2026
your mercy.
TRUSTEE SEPENOSKI : Okay. We are also at the mercy of the Town
codes .
So, any other comments?
(No response) .
I make a motion to close the hearing.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor.?
(ALL AYES) .
TRUSTEE SEPENOSKI : I make a motion to approve the application
with the removal of the boards on the outside of the piles under
the house; to move the platform; to acknowledge that when the
other dock extends seaward gets rebuilt, that in that case it
would need to be updated to the current standards in the Town
Code.
(Perusing) . So a non-disturbance buffer seaward of the
current platform --
TRUSTEE KRUPSKI : No, that ' s thle house.
TRUSTEE SEPENOSKI : A non-disturbance buffer seaward of the
house, and a non-turf buffer landward of the house, thereby
bringing it into consistency with the LWRP.
TRUSTEE KRUPSKI : Landward of the seaward edge. (Perusing) . We
should correct that motion.
TRUSTEE SEPENOSKI : (Perusing) . Non-disturbance seaward of the
house and non-turf buffer inclusive of the house, the remainder
of the property.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : Thank you.
TRUSTEE GILLOOLY: Number 6, En-Consultants on behalf of ROSEMARY
& SEBASTIAN AVOLESE requests a Wetland Permit to construct a
17 'x36' swimming pool and 906sq. ft. Grade-level masonry pool
patio; install 4 ' high pool enclosure fencing with gates;
install a pool drywell and pool equipment area; and to establish
and perpetually maintain a 10 ' wide vegetated non-turf buffer
area north of the naturally vegetated wooded area.
Located: 4270 Wunneweta Road, Cutchogue. SCTM# 1000-111-14-25.
The Trustees most recently visited the site on the 9th of
September, noting the following: Pool face to be no further out
of the ground than 12 inches; change buffer; vegetated non-turf
to 15 feet from wetlands line.
The LWRP reviewed this application and found it to be
consistent with its policies .
Is there anyone here wishing to speak regarding this
application?
MR. ROSHAN: Yes . Good evening. Tyler Roshan, of En-Consultants,
on behalf of the applicant.
So this is an application to construct a grade-level
Board of Trustees 26 September 16, 2026
swimming pool and patio, located 78 feet from wetlands . It ' s
fully compliant with Zoning, out of DEC jurisdiction. There ' s
no trees being removed, and the pool equipment and drywell are -
outside of Trustee jurisdiction.
To address the comments from the field, there was some .
minor regrading. to ensure the patio projects no more than a foot
above the finished grade. And with regard to the buffer, I have
an updated site plan depicting the 15 feet, that I can bring up
to you right now.
TRUSTEE GILLOOLY: .Perfect. And I would just also note for the
record, to remind the applicant that should there be a need to
trim any trees within Trustee jurisdiction, that a tree letter
should be requested.
MR. ROSHAN: Of course.
TRUSTEE GILLOOLY: So the proposed vegetated non-turf buffer line
appears to extend only until the wooded section. If possible, I
think we would like to see it inclusive of the wooded section,
if that is going to be memorialized, or to extend all the way
across the plan.
TRUSTEE KRUPSKI : I agree with that comment.
MR. ROSHAN: Okay, offset 15 feet from the wetlands line,
obviously.
TRUSTEE GILLOOLY: Right.
MR. ROSHAN: Okay.
TRUSTEE SEPENOSKI : Or around the wooded area in its entirety.
TRUSTEE GILLOOLY: It could be inclusive of the wooded area if
the applicant wishes to preserve that feature. That would be,
you know, even more preferable to this Board.
MR. ROSHAN: Okay.
TRUSTEE GILLOOLY: Is there anyone else here wishing to speak
regarding this application?
(No response,) .
Are there any other comments from the Board?
(Negative response) .
Hearing none, I make a motion to close this hearing.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GILLOOLY: I make a motion to approve this application
subject to new plans depicting the vegetated buffer area to
extend all the way across the plan, or inclusive of the wooded
area. That is my motion.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE FINORA: Number Seven, Islandwide Engineering & Land
Surveying on behalf of ROBERT P. AUTERI LIVING TRUST & NANNETTE
M. AUTERI LIVING TRUST requests a Wetland Permit to remove
existing sanitary system and replace it with a new I/A sanitary
Board of Trustees 27 September 16, 2026
I
system consisting of a Fuji Clean Cen 5 treatment tank, an inlet
adapter 90, an Orenco pump and 52 '� of Quick 4 plus standard
infiltrators designed as a combined system serving both the main
house and the cottage; and to install and maintain silt fencing
around the work area until the site is fully stabilized.
Located: 3885 Camp Mineola Road, Mattituck. SCTM#
1000-123-5-31 .
The project was found to be consistent with the LWRP, and a
site inspection was conducted on September 9th, 2026, by the
full Board of Trustees, noting that the project was a
straightforward septic upgrade.
Is there anyone here wishing to speak on behalf of the
application?
MR. PATANJO: Jeff Patanjo on behalf of Islandwide Engineering,
on behalf of the client . Any questions, I 'm happy to answer.
But straightforward septic system replacement further landward
of the existing system.
TRUSTEE FINORA: Any other comments from the Board?
(Negative response) .
Anybody else here wishing to speak on behalf of the application?
(No response) .
Hearing none, I make a motion to close the hearing.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE FINORA: I make a motion to approve this application.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: Number 8, AMP Architecture ' on behalf of NORTH
FORK REALTY HOLDINGS, LLC requests a Wetland Permit to construct
a two-story dwelling with a 1, 793sq. ft. First floor and a
1, 704sq. ft. Second floor including an 88sq. ft. Front portico
with steps, a 4 . 6 'x4 . 6 ' side entry with steps, 3 ' xl6 'x10 . 8 ' and
3 'x10 . 4 'x7 . 7 ' seaward entry stoops with steps to a raised (21"
above grade) 482sq. ft. Porcelain pool patio with a 121x33 ' pool
with 1 ' wide coping surround and a 1 ' wide catch basin along
south and east sides of pool; install a raised 550sq. ft .
Porcelain patio with a 9 'x10 ' raised hot tub; install 4 ' high
pool enclosure fencing with gates, a pool drywell and pool
equipment area; construct a 440sq. ft. 1 1,� story detached garage;
install a buried propane tank, landward walkways, grass paver
areas and a gravel driveway; in gutters to leaders to
drywells to contain roof runoff; install an I/A sanitary system
landward of dwelling; all excavation to be used for backfill and
excess removed from. site; and to establish and perpetually
maintain a 15 ' wide non-turf buffer along the landward edge of
the bulkhead.
Board of Trustees 28 September 16, 2026
Located: 730 Tarpon Drive, Southold. SCTM# 1000-57-1-8
The Trustees conducted a field inspection September 9th,
2026. Notes ask about the fill on the property, require a large
non-disturbance buffer.
The LWRP found this to be inconsistent. The inconsistency
is the proposed action is on a nonconforming waterfront parcel
within the wetland boundary of a canal . The proposed location of
the single-family dwelling does not comply with the wetland
setback set in Town Code Chapter 275-5 (d) .
Is there anyone here wishing to speak regarding this
application?
MR. PORTILLO: Yes . Good evening, Board. Anthony Portillo, AMP
Architecture.
Regarding the fill, the fill would be removed from the site
and disposal will not be kept onsite.
I believe there was a note on our plans indicating that we
can provide that in a mote, if you would like.
Regarding the home, it ' s a new dwelling, no zoning issues .
We are proposing an IA system. We did show the pier line, and
the home is landward of the pier line. The proposed pool is 60
feet from the canal. It is a bulkheaded property. And we are
proposing a 15-foot buffer, drywells are also provided for rain
runoff.
Otherwise, you know, if you have any questions, I can
answer them.
TRUSTEE GOLDSMITH: So, a couple.
The proposed pool. What is the height; is it elevated?
MR. PORTILLO: No, the pool patio where the pool is, is at grade.
And the patio that is elevated two risers, so 16 inches .
We are proposing a trough drain, or a basin to catch any
rain off the patio into a drywell .
TRUSTEE GOLDSMITH: Okay. And speaking of drywells, I see most
of them are seaward of the pool. We are going to request that
those are all pulled back landward as far as possible.
MR. PORTILLO: Sure. I think we can probably adjust the location
of the propane tank and pull those further toward the home. The
proposed home.
TRUSTEE GOLDSMITH: And the other thing we discussed was since
this is a virgin, native lot, it has not been developed, the
proposed 15-foot wide non-turf buffer is insufficient. We are
looking for a 50 foot vegetated non-turf buffer, with at least
five native hardwoods of minimum three-inch caliper. I know
there are a couple beautiful old oaks on this property that are
where the house is going to go, but other than that, there
probably won' t be another tree left on this lot that is native
right now. So we are going to look for a 50-foot vegetated
non-turf buffer with a . planting plan, with at least five native
hardwoods, in addition to moving those drywells landward.
MR. PORTILLO: No concession on a 50-foot vegetated buffer, like
Board of Trustees 29 September 16, 2026
closer to 40 feet .
TRUSTEE GOLDSMITH: We can do .a concession to deny the whole
thing, but I don' t think that ' s the concession you' re looking
for.
(All parties laughing) .
TRUSTEE KRUPSKI : No, that ' s been pretty standard.
MR. PORTILLO: That ' s almost a rear yard setback. Okay.
TRUSTEE KRUPSKI : That ' s pretty standard practice for an
undisturbed lot.
MR. PORTILLO: You got it. I don' t think that ' s a problem.
TRUSTEE KRUPSKI : There is precedence on this road, too, for a
non-disturbance buffers along canals, so, that was sort of
thought about.
MR. PORTILLO: No problem. We would be allowed the four-foot
walkway to the canal .
TRUSTEE GOLDSMITH: Yes, with a four-foot path down.
MR. PORTILLO: Okay.
TRUSTEE KRUPSKI : And then I .guess a planting plan on that.
MR. PORTILLO: Sure.
And then, just to clarify, the pool and the proposed pool patio,
the face that faces the canal on both how far out of the ground
are they?
MR. PORTILLO: The pool and patio around the pool that is
landward of the pool is at grade. The pool patio is at two
risers . So approximately, I think 14 inches . 'I think we actually
provided -- if not, I can provide you the section.
Yes, so if you look at the rear elevation, basically that
patio that is raised is the longer portion in the rear
elevation.
TRUSTEE KRUPSKI : What, rear elevation --
MR. PORTILLO: I 'm sorry, it ' s SD-5, southwest elevation, rear.
TRUSTEE KRUPSKI : Okay.
MR. PORTILLO: The longer patio that you see is the raised part.
And the only reason we show like two rise is because the grade
kind of slopes a little bit, but again, it would only be like
one level up from the pool patio, which is at grade. And then
the stairs are going up to the landing.
TRUSTEE KRUPSKI : I would say it would be helpful for SD-5 on the
top, the northwest elevation, to have the pool on the side
there.
MR. PORTILLO: Sure, I can add that in. I can also give you a
section if you' d like. I ' ll draw a section so it ' s clear.
TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak
regarding this application? Yes, ma' am?
MS . WILLIAMS: Cathy Williams, 830 Tarpon. I.'m going to try to
do my best because my husband couldn't come. So, try to bear
with me, everybody, please.
Considering, okay, buffer. Anyway, between our house and
the proposed, we have sea grass on the buffer of our property,
Board of Trustees 30 September 16, 2026
coming from the canal. And I just, I don' t know whether it ' s
protected by the wetlands or the DEC, but I would like to see it
preserved just as a natural buffer between the two homes . Don' t
know if any of this is possible.
There are two specimen Holly trees between our deck and
their proposed pool, which is like 25 feet from my house. It ' s
so close. But we would like for them to remain in place as a
visual screen for privacy, and a sound-deadening device for the
proposed pool . The pool is really close. And I would think they
would want them to remain also, because, I don' t know.
We would like as much natural vegetation saved and
preserved, as possible. And not clearcut . But.
We have a very narrow street, we want it cleaned, we want
mud and debris taken off. We had problems with that before with
people messing up, and not being able to address .
And the holly by the telephone pole is definitely on our
property, and we don' t want those mistakenly bulldozed.
Coming to the pool. The pool is so close to the deck that
we can probably jump off our deck and jump into the pool . I
mean, it ' s, it ' s close. We have the holly between us .
Let ' s see, what else do I have here. We also applied for a
7x14 pool a couple of years ago, and we were turned down, and
so, on advice of our architect we settled for a hot tub. It' s
hard to do laps in a hot tub. But, we' re good with it for now.
I 'm sure they are probably shoehorning this pool next to us
for the 60-foot setback. The length of the pool is 33 feet.
It ' s, I feel way too big. 30x12 . It ' s sort of the house, the
patio, the pool, the filter, are all sliding off the hill into
our yard. It ' s very close if you could see it .
Let ' s see what else. All three bedrooms are facing in the
direction of the west, which is their property, so all three
bedrooms are facing toward the pool and the buffer. And the
proposed deck.
The pump, the pool equipment, is proposed to be placed, I
think it ' s '25-feet . Probably no more, off our. bedroom. Off our
three bedrooms, actually. The pumps run eight to 24 hours a day.
What are they, 45, 90 decibels . Pool cleaning equipment brings
it to 55, 65 decibels . Spa running, 65 to 80 decibels of volume.
Like a vacuum cleaner or a lawn mower. And I believe they also
exceed the code after 7 : 00 p.m. , I 'm not sure.
It' s really not conducive to quality of life, of any kind
of sleep. It ' s just too close.
50 decibels is disruptive to sleep. 60 will prevent deep
sleep. Very loud. And I 'm just very concerned about that part. I
really am.
I think it will affect our property value, and we really
worked hard to maintain our property. I 'm sure, you know, I
guess if you came over and stepped into my bedroom and looked
out the window, you can see. But it ' s really close, and we would
Board of Trustees 31 September 16, 2026
like the equipment to be moved to the other far side of the pool
or behind the house, if at all possible. It looks like there is
plenty of room on the site now to put equipment. And it looks
like at least a quarter of the lot' has open space for pool
equipment.
I think it ' s creating a burden for both us and the
property. It will not, excuse me, create a burden for the
property on the other side of them or for us if it ' s put in the
middle. We are not going to have that problem.
So, pretty simple. I think the pool is too big. I think
we would like to preserve as much natural division on the
property as possible. And the pool equipment is absolutely way
too close for sanity. I really feel it ' s going to be a problem.
That ' s it.
TRUSTEE GOLDSMITH: Thank you.
Mr. Portillo, would you like to comment at all regarding the
pool equipment?
MR. PORTILLO: So no zoning issues there, but I don't think
that ' s a problem, and I 'm okay with we can move it to the other
side of the structure, then sort of tuck it. behind the house.
That ' s fine.
But regarding the pool, et cetera, we are within our zoning
setbacks and lot coverage. That ' s actually really a modest
house, in my opinion. We are not trying to build a monstrous
home. And I think, unfortunately, the home that we are speaking
about is, looks a little bit close to the lot line. So it might
be existing/non-conforming. But I 'm not sure about that
information. So, but no problem moving the pool equipment. I
don' t think that ' s an issue.
TRUSTEE GOLDSMITH: And just one other comment talking about the
50-foot vegetate the buffer, I think that would be appropriate
to relocate your proposed pool fence to end at that 50-foot, so
there is a delineation between where the proposed grass area
would be and where that non-turf buffer will start.
MR. PORTILLO: Sure, no problem.
TRUSTEE GILLOOLY: I would also just say preservation of as many
trees as possible is a positive thing and, you know, especially
with the neighbor' s request of these specific Holly trees, it
makes sense to try to preserve those.
MR. PORTILLO: I think that ' s the case for us as well. I would
say my client wants to preserve what we can.
Replanting the site, I mean, I would imagine he is going to
want the same privacy for his pool et cetera. So he would be
replanting the site.
I mean, if the board would like a landscape plan, I don' t
mind providing that to you guys . It ' s not a problem.
TRUSTEE GILLOOLY: And if you could just include what you' re able
to save that is like a significant, that would be helpful on
that landscaping plan.
Board of Trustees 32 September 16, 2026
MR. PORTILLO: Sure, of course.
MS . WILLIAMS : I don' t know whether my Holly' s are important but
their like 30 feet high. They are really very old. And it' s
right there. Right at the pool . We are going to be, I 'm going to
be coming over to swim, I can tell you.
MR. PORTILLO: Unfortunately, I don't own the property'.
MS . WILLIAMS : I know you don' t.
TRUSTEE GOLDSMITH: Is there anyone else wishing to speak
regarding this application?
(No response) .
Any other questions or comments from the Board?
(Negative response) .
Hearing none, I make a motion to close the hearing.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: I make a motion to approve this application
with the following conditions : A 50-foot vegetated non-turf
buffer with a minimum of five native hardwood trees with a
minimum of three-inch caliper; with a new landscape plan showing
the proposed plantings as well as the existing vegetation, and
what existing vegetation to remain'; that the drywells are all
moved landward; that the pool equipment is relocated; and that
there is screening for the pool equipment; that the height of
the pool and the patio is no higher than 12 inches; and subject
to new plans depicting all of these.
And by, which will bring it into consistency with the LWRP.
That is my motion.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MR. PORTILLO: Thank you, Board.
TRUSTEE KRUPSKI : Number 9, AMP Architecture on behalf of JAMES &
NANCY CLOUS requests a Wetland Permit to demolish and remove
existing one-story dwelling, concrete stoops and steps, on-grade
patios and walkways, and existing septic system; construct a new
one-story, 2, 322sq. ft . Dwelling with a 6 'x17 . 3 ' front covered
porch, a 4 . 5 ' x7 ' covered stoop, basement Bilco doors, a/c
condensers, a buried propane tank, and gutters to leaders to
drywells in rear yard; install an I/A OWTS sanitary system
landward of dwelling; and to install at-grade 921sq. ft .
Bluestone. patio with 4 ' wide bluestone walkways .
Located: 3805 Bay Shore Road, Greenport . SCTM# 1000-53-6-18 .
The LWRP found this to be inconsistent with Policy One,
foster a pattern of development in the Town of Southold that
enhances community character, preserves open space, makes
sufficient use of infrastructure, minimizes adverse effects of
development.
Board of Trustees 33 September 16, 2026
Policy 6, protect and restore the quality and function of
the town' s eco-system.
6. 1, protect and restore the ecological quality throughout
the Town of Southold, reduce adverse impacts on ecological
quality due tb development, reduce adverse effects of existing
development .
Citing that the proposed application is less than 100 feet.
Discussing Police 6. 1 (c) (1) , 4 . 1 (a) .
The LWRP coordinator did note that there will be an IA
treatment system onsite, and it also pushes the building
footprint out of the FEMA VE flood zone.
The Trustees performed an inspection of the site September
9th, noted that some hardwood trees should be added. Three
minimum.
Potentially pull the structure back to 50 feet.
Is there anyone here that wishes to speak regarding this
application?
MR. PORTILLO: Yes, hi, Board, Anthony Portillo, AMP
Architecture, on behalf of the applicant. They are actually
here, Mr. and Mrs . Clous .
I would say, just to give the Board a little past
knowledge, there was an application before you for this
property, I would say a few years ago. That application was a
lot larger of a home and also didn't have an IA system
represented in the plans . I think it also passed the pier line.
There were a couple issues with the design.
So we are here back today, I think with a smaller plan. And
just for the record we do have Zoning approval for what we are
applying for.
We are proposing this behind the pier line. We did take
into account being outside of the VE zone and staying within the
A zone so that the home was not going to have issues with any
storm surging, or at least based on our FEMA maps . It ' s kind of
a strange line over there.
One of the reasons for the positioning of the home really
was designing the IA system. As you can see, it takes up a
large part of the front yard, which fortunately I had a chance
to work on the two homes that are neighboring, and it ' s really
the same situation with those homes .
One of them I was here in front of the Board for. The IA
system, fitting it in these lots, it' s difficult. So that ' s sort
of how the positioning of the home came about.
We are behind the pier line. You know, we ' re not right on
it. So we are behind that, compared to the other two adjacent
homes . And we, I just want to also mention we have a patio
presented to the Board, and we provided you guys with a section
to explain how that would be constructed. So gravel bed, gravel
between the pavers, really want to make it a perforated patio.
And, you know, trying to comply, as you can see, with the Town
Board of Trustees 34 , September 16, 2026
Code here.
So, moving the structure back, it ' s a very tricky
situation. And probably not very possible.
One other thing I want to mention, again, it ' s not a large
home. It ' s a three-bedroom home, really to fit the family. It ' s
not like they are requesting much larger than that.
If I can answer any questions .
TRUSTEE KRUPSKI : Is there anyone else here wishing to speak
regarding this application, or any comments from the Board?
(Negative response) .
Regarding the comments about moving it back, I think it ' s
another 3 . 8 feet, is that, do you not have that distance because
of the septic system?
MR. PORTILLO: I ' ll say this . I ' ll try to see if I can organize
it a little bit differently and get as far back as possible.
It is very shallow, if you look at where the groundwater
is . So that ' s the reason why we have many leaching galleys and
the leaching field is so large. Plus, obviously, the expansion
areas that they require.
And a low-lying system, we can' t make that work in the
yard. But I think maybe I can maneuver the tank a little bit and
gain afoot or two. I don' t know if I can get to 50 . I can try,
though. I 'm willing to give that a shot, sure.
Maybe, I 'm looking at it, maybe the tank can move a little
bit. You know, obviously the distance from the structure is,
um, I can give that a shot. But it is very tight, and I think
groundwater is kind of the reasoning for that.
Now, and also we are not grading, you know, we are not
adding any fill. So obviously if that is something the Board
would consider, that would help my scenario. I could get rid of
the some of the leaching and then that would help me move the
home back.
So if the Board would be okay with me doing a foot or two,
I don't know what that is, maybe get rid of one of the tanks .
If that could help my scenario.
TRUSTEE KRUPSKI : Are there any comments from the Board?
TRUSTEE GILLOOLY: I would just note that, you know, the prospect
of adding in fill, the concern for us is retaining walls on
property lines, and so keeping that limited to no higher than
two feet, per code. And, I mean, even lower would be
preferable.
TRUSTEE KRUPSKI : Can you say that again, please.
TRUSTEE GILLOOLY: About the retaining walls . I 'm just saying, if
the prospect of bringing fill in, we are concerned about the
idea of retaining walls on property lines, and also the height
of retaining walls . So keeping any proposed retaining wall and
low and far enough away from the property line would be --
TRUSTEE GOLDSMITH: So, I like the design that you have, going
back to the previous one, I remember that was a sticking point
Board of Trustees 35 September 16, 2026
from the previous . So, you know, I wouldn' t like to see
retaining walls . Like you said, I think that was one of the big
sticking points from the previous iteration. So for you to be
able to design one without it, I think is a huge leap forward.
MR. PORTILLO: I took that from other projects I 've had in front
of the Board to try to avoid that as much as possible.
TRUSTEE GOLDSMITH: I wouldn' t want to see a step back just to
see --
TRUSTEE KRUPSKI : I agree.
MR. PORTILLO: I don't know, I 'm going off the top of my head
here, there is no retaining, depending on that slope, Suffolk
County has some requirement I have to stay within a certainly
percentage. So I think it could work if I added maybe a foot,
maybe I could get rid of, I would be doing math right now, I
think I could maybe get .rid of something here and possibly that
would help me move the home forward.
TRUSTEE KRUPSKI : I would rather not go that route then, I would
say.
Are there any additional comments?
TRUSTEE FINORA: I agree with you. I would rather not see that
also.
TRUSTEE KRUPSKI : Hearing no additional comments, I ' ll make a
motion to close the hearing.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE KRUPSKI : I ' ll make a motion to approve this application
subject to new plans depicting a minimum of two native hardwoods
with a minimum of three-inch caliper; a minimum of ten-foot
non-turf buffer; and based on the field inspections, noting the
distance being pulled back, and noting the addition, no addition
of fill, I find this to be consistent with the LWRP coordinator.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MR. PORTILLO: Thank you, Board.
TRUSTEE SEPENOSKI : Number 10, Cole Environmental Services on
behalf of MILO BD, LLC requests a Wetland Permit to remove
existing 674sq. ft. Pool and 2, 024sq. ft . Patio and install a
19. 8 'x38 . 8 ' pool with coping and 1, 640sq. ft. On-grade pool
Patio; install a 71x7 ' gunite spa a maximum of 24" above grade;
construct a 37 linear foot long retaining wall along north side
of pool patio to be a maximum of 24". above grade; install new 4 '
high pool enclosure fencing with gates; install a 44sq. ft. , 18"
high planter; remove 238sq. ft. Of stoops and 11sq. ft . Steps and
construct 12sq. ft . Steps leading to 330sq. ft . Pervious gravel
pad; construct a 442sq. ft . Covered porch on south side of
dwelling; install an 8 'x4 ' drywell for porch runoff; install ±20
Board of Trustees 36 September 16, 2026
linear foot stepping stone path with natural vegetated 6"
joints; install a NDS EX-Flow stormwater container with open
grate top; install 70sq. ft. Pervious on-grade wood walkway;
remove existing 828 sq. ft. Masonry walkway and install 500sq. ft .
On-grade masonry walkway and 45sq. ft. Masonry steps; relocate
exiting septic control panel and electric meter closer to
dwelling; remove 795sq. ft. Portion of driveway with addition of
16sq. ft. Gravel section and 250sq. ft. On-grade masonry apron at
edge of driveway; construct a ±25 linear foot retaining wall
along masonry patio, not to exceed 24" in height within Trustee
jurisdiction, and to flush-cut existing dead spruce tree.
Located: 1465 Harbor Lane, Cutchogue. SCTM# 1000-103-2-1. 1.
The Trustees visited the site on the 9th. The notes read:
Clearing violation along waterfront, to cut patio back and
removal of deck. Patio is already failing. Include gutters to
leaders to drywells for all of the area. Plans show all three AC
units . Tree to be removed with a non-disturbance area should
replace it . New vegetation plan along water, patio, on north
side pool . Gravel, likely a no. Potential one time invasive
removable and non-disturbance buffer.
The LWRP found this proposal to be inconsistent with Policy
5, protect and improve water quality and supply in the Town of
Southold. And Policy 6, protect and restore the quality and
function of the Town' s eco-system.
And then it goes on to speak about the importance of the bank
and the non-disturbance buffer.
Is there anyone here wishing to speak regarding the
application?
MS . RUMMEL: Kate Rummel, Cole Environmental. The Landscape
Architect is also present.
I do have updated plans that address all of the Board' s
concerns .
So the degrading patio is proposed to be removed, which was
already on the plans that you have in your file. There is a
proposed wood walkway at grade. The old deck that is seaward of
the patio, that is being removed. And the gravel pad is still
proposed, though it ' s been reduced by about 40o and then shifted
landward.
There is a small, still steel retaining edge and it ' s
backward from where the land started to slope, just some area
for the clients to have chairs and whatnot, to enjoy the view.
There is a note on the plans that all gutters and leaders
will be hooked up to drywells . The tree that was noted, that is
dead at the bank, that ' s just to- be flush-cut so that the root
system won' t actually be removed.
And as we clarified in the work session, the covered porch
is only on the rear of the house, and obviously the
non-disturbance area will be replanted with native vegetation.
TRUSTEE SEPENOSKI : Does the dock depicted on the plans you just
Board of Trustees 37 September 16, 2026
submitted, does it match --
MS. RUMMEL: I have the previous permit and I have a photo that
was taken the day, I believe it ' s the day of the site inspection
that has it in "T" formation.
It ' s just that I think the plan is based off the survey
that was done in March. I believe that the float was just out of
the water. That ' s why it ' s not reflected there.
TRUSTEE KRUPSKI : I think one thing, and we didn' t discuss this
in the field, but how the wetland comes in there, we should
probably follow that with a buffer. Even if you were to
transition there from non-disturbance to non-turf around that
turn coming in.
MS. RUMMEL: I 'm sorry, where exactly are you speaking of?
TRUSTEE KRUPSKI : It ' s actually south.
MS . RUMMEL: Can I approach?
TRUSTEE KRUPSKI : Yes . You see where you are -- and when you
respond, go back. But where. your buffer ends here and the
wetland comes in, it would be nice no put something there.
MS. RUMMEL: Okay. That should not be a problem.
TRUSTEE KRUPSKI : We were just talking about how the property
line ends in a rather rough spot there, that I missed, but it
might make sense to just, and I don' t know if you want to
approach again, but if you run it from the existing wood wall in
the non-disturbance and tie in with a buffer somewhere around
the landward most existing wood wall, where it says "existing
remains of wood wall, " I think we would be happy to have
something there, just controlling it.
MS . RUMMEL: Right . Have it like run parallel to the property
line, like in between, like if you are essentially extending the
wood wall .
TRUSTEE KRUPSKI : Yes .
MS. RUMMEL: And about how far?
TRUSTEE KRUPSKI : I think we are just talking about tying it into
that wood wall there. Roughly into those, somewhere in the realm
of --
MS . RUMMEL: Okay, sorry. I was looking at a different -- yes . So
just extending it around -- understood.
TRUSTEE KRUPSKI : What is the proposed NDS easy flow with
open-grade?
TRUSTEE GILLOOLY: No, this is just existing.
TRUSTEE KRUPSKI : (Perusing) Oh, yes, thank you. I misread the
label. It says "existing 24-square foot remains of wood steps . "
Is that something that is removable or is it just natural wood
and degrading and to be left alone?
MS . RUMMEL: For access towards the dock?
TRUSTEE KRUPSKI : No, it looks like there is an irregular shape
there. Um, south.
MS . RUMMEL: At the water, essentially?
TRUSTEE KRUPSKI : Yes . It says "existing 24 square-foot remains
Board of Trustees _ 38 September 16, 2026
of wood steps . "
MS . RUMMEL: Yes, I mean those are not accessible. The buffer
surrounds it. Those are just federal remains .
TRUSTEE SEPENOSKI : Just rotting in the woods .
TRUSTEE GILLOOLY: Maybe just put them back. I don' t know.
TRUSTEE KRUPSKI : I mean, I 've never seen them, so.
(Trustees perusing) .
TRUSTEE KRUPSKI : Another discussion in the field was just about
not putting any additional structure, and I know it ' s minimal,
but the gravel pad on that side of the house.
MS. RUMMEL: Right, we have reduced it . It is also taking the
place of lawn. It ' s just an area for them to put like a couple
of Adirondack chairs and just hang out.
TRUSTEE KRUPSKI : Okay.
MS. RUMMEL: It ' s pulled back from the water.
TRUSTEE SEPENOSKI : I think that ' s a solid rework, based on field
discussion notes . Thank you for meeting us there, and our work
session notes, thank you for meeting us there. It really informs
the process and makes it easier to move forward.
Okay, does anyone else wish to speak regarding this application?
(No response) .
Members of the Board?
TRUSTEE KRUPSKI : Just confirming, and I know you ran through
this originally, but there' s drywells are added to everything
now
MS . RUMMEL: There is a note that there will be, that everything
will be connected.
TRUSTEE SEPENOSKI : Based on the updated plans received September
16th, stamped received September 16th, 2026, addressing all of
the comments in our field inspection notes, and speaking to the
LWRP concerns, I make a motion to close the hearing.
TRUSTEE GILLOOLY: Second'.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : I make a motion to approve this application
with new plans that build on the September 16th, 2026 plans
stamped received to our office, that would add a vegetated
non-turf buffer in the southern portion of the property, roughly
connecting the existing remains of wood wall to existing wood
wall, thereby bringing it into conformity with the LWRP.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE FINORA: Number 11, CONTINUED FROM 7/15/26 AS PER REVISED
PLANS AND PROJECT DESCRIPTION RECEIVED 7/29/26 Cole
Environmental Services on behalf of PAMELA VALENTINE requests a
Wetland Permit to construct a proposed 42 . 6 ' x 17 ' (793 S. F. )
two-story dwelling on piles, a 42 . 6 ' x 10 ' (425 S . F. ) rear
Board of Trustees 39 September 16, 2026
first-story wood deck with stairs, a 373 S. F. irregular rear
second-story deck, a 20 . 5 ' x 7 ' (145 S. F. ) front wood deck with
a +/- 20 S . F. outdoor shower; an I/A sanitary system to be
installed to the west of the dwelling; existing firepit to
remain; install a well to establish water supply line; install
two drywells; install a 500 gallon buried propane tank;
construct an 80 ' x 12 ' timber bridge (bridge to be 12 ' in
overall width with 10 ' 4" in width interior of guards) , over
approximately 473 S . F. of wetlands consisting of five (5) 16'
bents supported by a wooden pile substructure with a structural
wooden deck; all bridge elements to be constructed of
exterior-grade structural timber with no disturbance to occur
below the bridge; install an approximately 35 ' x 12 ' driveway
extending from the dwelling to the bridge approach with a 15 ' x
20 ' turnaround area, to be constructed of pervious material
consisting of medium-compaction RCA or a pervious masonry/stone
product; two (2) approximately 20 ' x 12 ' bridge approach areas,
grade dependent, to be constructed of medium-compaction pervious
RCA; install an approximately 140 ' x 12 ' private road accessway
within the existing 30 ' right-of-way extending from the terminus
of the bridge to Birdseye Road with existing vegetation within
the accessway to be cleared and the roadbed leveled to match
existing grade; accessway to be constructed of medium-compaction
pervious RCA; silt fencing to be established and maintained
during construction; all disturbed areas to be replanted with
native, non-fertilizer dependent vegetation; all groundsel
bushes (Baccharis halimifolia) within proposed areas of
disturbance are to be transplanted elsewhere on the property.
Located: 1675 Birds Eye Road, Orient. SCTM# 1000-17-2-1 . 4 .
The LWRP found this project to be inconsistent with respect
to Policy One, fostering a pattern of development in the Town of
Southold that enhances community character, preserves open
space, makes efficient use of infrastructure, makes beneficial
use of coastal location and minimizes adverse impacts of
development.
Policy Four, minimize loss of life, structures and natural
resources from flooding and erosion.
And Policy Six, protect and restore the quality and
function of Town of Southold eco-systems .
The Trustees visited the site several months back.
Although we have a number of updated additional documents added
to the file since that field inspection. We have, as of most
recently, a report received September 14th from Cole
Environmental Services, aerial photographs of the subject
property, and updated wetlands, freshwater wetland line of
demarcation.
Is there anyone here wishing to speak on behalf of the
applicant?
MR. PORTILLO: Yes, thank you. Anthony Portillo, AMP_
Board of Trustees 40 September 16, 2026
Architecture.
So, Board, we, Cole Environmental, attended your workshop
on Monday, and we heard some of the comments, and I apologize
that this wasn' t submitted earlier, but I just did it today. I
just want to show you guys something we came up with. I would
like the Board to see this . And I think it really does reduce
the scope, and it sounds like that was one of the big comments,
so if I can present this to the Board, I have a copy. Thank you.
(Handing) .
MR. PORTILLO: . So what we did, or what I, Cole Environmental and
myself got together, and we really tried to think of how do we
reduce the scope without touching the home. So we said, well,
why don' t we try to get rid of this driveway. And since we did
provide that letter to the Board two months ago in regards to
the fire apparatus not needing to go up the driveway, we were
thinking, well, how do we not disturb the wetlands and have a
drive go in, and also this huge driveway in front of the home.
So, we said, okay, why don' t we just park two cars basically at
the base of. the lot, and just provide like a walking bridge.
I say "bridge" lightly because I think it would just be
more like something that is a catwalk, you know, four-foot, just
so you are not walking on the mud, until you get to a point
where it ' s dryer and we could put 'gravel. You would just have a
gravel walkway up to the home, and eliminating having to drive
up onto the property, et cetera, et cetera.
This was presented to the applicant, to the clients, today,
and they were in agreement with this approach, and I just
thought this was a way to show the Board that we are listening.
Besides this idea, after our, after the hearing, we did go
back and we did work on the structure and reducing the scope of
the structure. I just want to point those things out.
We moved the building 2 . 5 feet west, we reduced the deck to
ten feet instead of 12 feet, and it ' s cantilevered now. We are
not proposing any structure underneath the deck. We are going
to use steel and we will be able to cantilever that deck.
We adjusted the roof pitch, which brought the pitch down,
and we also adjusted the top plate on the second floor to nine
feet, so we brought the roof down that way as well .
And then we brought the IA system closer to the building,
to try to reduce that disturbance and distance.
So those things were done previously, and then the
presentation on the site plan tonight.
There was, one other thing that came up, Mr. Krupski was
. speaking to us about the bluff, we did end up going out and
getting a consultant to provide his interpretation of the bluff.
I 'm not the expert. He is here today. If there are any
questions, he did provide a report, that he can discuss that.
And then Cole Environmental and John is here as well, are our
representation, who did all the research on using the road,
Board of Trustees 41 September 16, 2026
using Birds Eye to access the property.
Just to recap that, or just to talk about that a little
more. You know, when we approached this project, I just want to
be clear to the Board, we really wanted to do our due diligence.
You know, we hired John' s firm to research this area of the
road. I think a letter was asked, that we did provide to the
Board, it was signed, that we can use that road. And, you know,
we wet with the Building Department, with Mr. Verity, and we got
his basically approval on what we presented, and that it is,
there is a right to use Birds Eye for this property. And John
can probably explain that a little better than me. It is a
single and separate lot.
So, we feel that -- and also we had a site meeting, we
asked a site meeting from the Board, to present our approach. I
think at that site meeting there were some things that the Board
asked, that we conformed to those, and then the last hearing we
had there was some other comments that we tried to conform to
that .
So I think, I just want to say we are trying to work with
the Board on this project. And I think if you look at our
proposal on th& site plan today, you know, Cole Environmental
had a big hand in talking about how do we reduce, you know,
removing more trees and things like that, and getting rid of the
driveway I thought was pretty ingenious . .I can' t take credit,
but I just wanted to make that statement.
And that we have other consultants if the Board has any
questions for us .
TRUSTEE GILLOOLY: Thank you, for your presentation. And just
before you go, and since these are your plans, the pier line is
a little bit confusing to me on this plan. It appears to go sort
of through the adjacent dwelling and also through the proposed
dwelling. Am I looking at that correctly?
MR. PORTILLO: You know what, I think it might have gotten moved.
It actually should be further out to the corner of that.
That was one of the comments during the site visit because
that is one of the reasons, too, I wanted the Board to see the
site, at the site visit was, the other adjacent home is like all
the way around on the other side of the bluff, so we, the Board
seemed like determined to me that we can basically align the
other adjacent home and use that as the pier line. I think the
line got moved, I apologize, when I was doing my sketching
quickly this morning.
TRUSTEE GILLOOLY: Understood. Thank you.
MR. PORTILLO: I think it ' s actually further seaward.
TRUSTEE GILLOOLY: Thank you.
TRUSTEE KRUPSKI : So, just to be clear, you are not attaching the
pier line. It ' s not based off anything to the east of this
project, it just goes straight across from the house to the west
there.
Board of Trustees 42 September 16, 2026
MR. PORTILLO: Again, that was a thought based on our
conversation onsite, because of the other home being really not,
I don' t want to say. "relevant, " but it ' s just not really in
line.
TRUSTEE FINORA: What are the dimensions of the house? Has it
been changed, the actual footprint from the previous?
MR. PORTILLO: No, sir.
TRUSTEE FINORA: No. And what is the height of the structure? Is
it a full two-story house?
MR. PORTILLO: Yes . So originally we had a ten-foot top plate on
the second floor, we lowered it to nine feet, and we reduced the
angle, we reduced the pitch to bring the roof down.
TRUSTEE FINORA: It ' s a flat roof now?
MR. PORTILLO: No, it ' s just an angled roof, but it ' s six pitch
instead of a seven originally.
So the total height from like average grade, because it ' s
kind of a slope there, is 28110" .
TRUSTEE FINORA: What ' s the height of the structure, first floor
to ridge?
MR. PORTILLO: So the first floor is ten feet, and then one side
is eight feet and one side is nine feet on the top. It ' s a salt
box. So we were at originally at nine feet and ten feet on the
salt box, and then the pitch was seven, and that came to six.
TRUSTEE FINORA: Is 28 the top elevation relative to grade, or
the building is 28 feet high from first floor to ridge?
MR. PORTILLO: No. So the 28 ' 10" is from like an average grade,
based on, you know, that being sort of sloped in that area.
TRUSTEE FINORA: Considering the flood zone elevation
requirements, the 28 is the top.
MR. PORTILLO: Yes . Correct.
TRUSTEE FINORA: Okay,
MR. PORTILLO: If you go from like the lower adjacent grade you
would obviously be closer to grade.
TRUSTEE FINORA: Was there any consideration for locating the
structure to the west, outside of the limit of moderate wave
action?
MR. PORTILLO: I think we -- further west, I think we are still
in the AE zone . I don' t know if we get out of the VE zone.
So we did push the structure west 2 . 5 feet.
TRUSTEE FINORA: The area near the proposed septic --
MR. PORTILLO: Oh, that far away.
TRUSTEE FINORA: (Continuing) in the plans you gave us .today, the
September 16th plans, just generally speaking, that ' s outside
the flood zone boundary. That is Zone X, with comparable
elevations it ' s out of the limit of moderate wave action,
potentially. I 'm not looking at the backyard setbacks, et
cetera.
But I would say that I am hesitant to support this design
in the area as it ' s currently- proposed for the dwelling because
Board of Trustees 43 September 16, 2026
it ' s, there are options here that are potentially beyond the
flood zone boundary, or at least close to being out of the flood
zone boundary, and certainly- out of the wave action area
I 'm curious if you have any feedback on that particular
component.
MR. PORTILLO: No, so something that governed here was the
distance from the well to the septic, and the septic sort of had
to be where we located it . So I. think, you know, I think moving
the home more west could be possible, but again, that, we are
using the well that is there, which is at 'the bottom of the
driveway there.
TRUSTEE FINORA: Yes . Is that conforming as 'it is laid out? The
well/septic separation, is that currently conforming?
MR. PORTILLO: That ' s correct . Yes . So we sort of made our arc
and then determined where the septic would work best.
So if we sort of like mirrored the two, the septic would be
too close to the well . But I think if we had to slide the
building to the west, kind of keeping the septic in place, and
staying in conformance, to the well,. that could be possibly -- I
don' t know if we' d get out of the flood zone.
I think the idea of the design, though, too, is sort of
this structure being, you know, less disturbance doing helical
piles and, you know, building it that way. And then not having
to, you know, dig.
So I don' t think we would get away from doing open
foundation regardless . I think we would want to just keep that
as how we build the home. Just to also give it that sort of
feel .
I think when you are onsite, too, we sort of pick, like I
explained this when we were there, it seems like our location,
where we are plotting it, is kind of the highest point of the
lot. You know. So it sort of made sense in that regards,
because, you know, you are kind of staying out of, you know,
wave action and things like that, and being at the higher topo.
So I think west we end up actually going down the hill a
little bit. But if there was some number that the Board had in
mind of shifting the home that way, I would like to present that
to the owners . I mean, like I said, I think we are trying to
find ways to make this work and to have the Board happy with the
design.
TRUSTEE FINORA: I can't say that I have a number in mind. But
from an environmental standpoint I think that would represent a
sizeable improvement if we could locate the structure as far
away as possible from those wave action boundary lines, and also
getting into that Zone X. You know, with respect to the
well/septic separation distance, you know, I 'm never in favor of
reducing those distances, but also recognizing you are already
non-conforming on your sanitary approvals anyway .because of your
proximity to wetlands and the dunal habitat.
Board of Trustees 44 September 16, 2026
So it ' s just another item to consider, certainly not the
singular item.
MR. PORTILLO: Understood.
TRUSTEE FINORA: Any other comments from the Board?
TRUSTEE GOLDSMITH: I would echo Trustee Finora' s statement, and
since Day 1, when we first went to the site, we were talking
about potentially moving this house to the west. And here we are
months later still discussing the same position.
And looking at the distance on that plan of 42 . 9 feet,
supposedly, from the crest of dune, when we were on field
inspections out on the site, that number is drastically less
than 42 . 9 feet. The unconsolidated soil.
So the fact that we are still here months later, is
alarming, in a sense. This is an extremely environmentally
sensitive parcel, constrained by freshwater wetlands, tidal
wetlands, as well as beach and dune system along Long Island
Sound.
These are not isolated environmental features, they are
interconnected parts of the coastal system that provide habitat,
avoid storm impacts, help control erosion, and protect water
quality. The fact that somebody needs to build a bridge and/or,
whether it ' s a driveway or a bridge, to get to a house on this
parcel speaks to the environmental sensitivity of the parcel.
So, you know, and again, we've had this discussion for
months, and we are still here to try to shoehorn something in to
a parcel that in my opinion is way too close to both tidal
wetlands and freshwater wetlands . And we have been consistent in
our messaging for that, and here we are again, months into it,
still having the same discussion.
You know, this is not just a house being built on wetlands .
We are talking about introducing a permanent residence,
driveway, bridge, utilities, and associated site disturbance,
onto a very constrained coastal parcel surrounded by freshwater
wetlands, dune and coastal resources .
It runs contrary to the purpose .of Chapter 275, which is
the minimization of new development.
So in my opinion, this goes against Chapter 275-12 (a) , (b) ,
(d) , (g) , (h) , (i) and (j ) , and adversely affects the wetlands
of the Town. It raises concern about erosion and siltation. It
raises concern about habitat loss and fragmentation. It raises
concerns about drainage and water quality. It raises concerns
about increasing the danger of flood and storm tide damage.
I know it ' s being brought up that there was a past permit
on this, but we also have to recognize that the shoreline is
dynamic. The coastline dune system and wetland conditions today
are not necessarily what existed when the permit may have been
issued more than 35 years, ago; if I 'm not mistaken, 1990 .
The permit issued over 35 years ago was based on different
circumstances . This project is not the same. The shoreline and
Board of Trustees 45 September 16, 2026
wetland areas have changed over those decades . The Town
regulations are more stringent and are reviewed more rigorously
than it was in 1990 .
This process reflects a better understanding of the result
of development and environmentally sensitive areas .
Additionally, the Trustee jurisdiction has changed since 1990 .
The LWRP now exists . And the work must conform to particular
standards that we have today.
So I have serious concerns about this particular project.
So in this iteration, . I do not support it. That ' s just what
I wanted to say for the record.
MR. PORTILLO: Just bringing up this past permit, that, or the
permit that was granted 35 years ago, and I understand where you
are coming from, I just, I think if you look at what that
application was and what we are presenting, it ' s a way smaller
footprint. I think that even had a pool in it. They were
cutting right through the freshwater. I mean, we are really
trying to stay -- and I think presenting what I did tonight,
with, you know, a pathway, really not even a driveway anymore,
it ' s showing that we are trying to conform or come, you know, or
meet the standards of the Board. And the current Board, not
going back 35 years ago.
But that application, that home was a lot larger, I think
it was on a foundation that cut through the freshwater that was
right at the corner.
So I think there is a sensitivity and this team and this
applicant that we are trying to show the Board, and we are
trying to present something, and like I said, I think we are
trying to hear what you are saying and present things that make
sense.
So if it ' s. more about moving the home, then that is
something that I think we can discuss . But if it ' s not about
that, I don't want to have to table something, it doesn' t make
sense to go back and do this again, I don' t thin, right.
But we do have other people here to speak, and they can at
least tell the Board what we have provided and presented. I
mean, if we can go from there.
TRUSTEE KRUPSKI : Sure
MR. PORTILLO: Thank you.
TRUSTEE KRUPSKI : Thank you.
MR. BOURQUIN: Good afternoon, Members of the Board. John
Bourquin of Greenburg Traurig LLP, 2317 Main Street,
Bridgehampton, on behalf of the applicants .
I just have some legal observations about this project and
its scope. I know we 've all had a very long night, so I ' ll
endeavor to keep it high level.
First of all, back in August, the Board raised some
questions as to my client ' s rights to use the easterly spur of
Birds Eye Road. At the Board' s request I obtained a written,
Board of Trustees 46 September 16, 2026
notarized consent to use and improve the road from the road' s
owners Interwellen Property Partners LLC, a copy of which has
already been submitted to Ms . Hulse and also Ms . Cantrell. I
have additional copies 'to hand up, if you would so like.
Just for that background, the road 'is privately owned by
Interwellen, but my client has an express easement by way of
their deed. I have a certified copy of that to hand up as well,
if you would like, which provides us access down to Main Road to
Rt. 25 . So that is the status, that we have a signed and
notarized endorsement from the owner of the road.
What is more, it ' s well-settled law in New York that a
landowner' s right to access a public highway cannot be removed
without compensation unless an alternative means of access
exists . As you can see from the map there is no other means of
access, aside from Birds Eye Road. There this case law to that
effect, and I won' t bore you with the full citation, but that ' s
Merritt Manor Estates versus Elmsford. There is just no other
means of access aside from using birds .
Further still, a landowner can only be deprived of access
to a public highway if two things are true. First, there has to
be a suitable alternative means of access to the public highway,
which we 've established doesn' t exist. And second, the
municipality bears the burden to show that denial of access to
that road is in the best interest in public safety or welfare.
That case is Bali Two v Pascal & Town of Brookhaven. That ' s
a local case that came out of Manorville. My hometown,
actually.
There is also case law to the effect that a municipality' s
interpretation of its own laws in a way that would deprive a
landowner of their road access would be also an unconstitutional
taking, which would require compensation from the Town.
That ' s Whitman v Haman (sic) ; and Passucci v Town of West
Seneca, among others .
So. I know we 've heard some things back and forth at the
last meeting and I think the meeting before that, about some
potential easement between these two lots .
So Suffolk County Supreme Court has opined, and the 2nd
Department upheld, that demanding across-access easement between
two parcels is an arbitrary and capricious demand if it ' s. not
supported by .a specific, fact specific, context-specific
evidence as to the need for this easement. That is In-Towne
Shopping Centers v. Planning Board of the Town of Brookhaven.
That ' s 2nd Department, . so that controls on us here in Suffolk,
and that case originated -out of Suffolk.
And just as note from a practicing attorney, cross access
easements are almost exclusively seen on busy commercial
properties, and I 've never seen them on residential properties .
So that is our concept on why the cross-access easement
wouldn' t work from a legal standpoint. Also from a title
Board of Trustees 47 September 16, 2026
standpoint, to put it frankly, would just be messy.
As I 've mentioned, the access to this lot is by a deeded
easement, express easement recorded in the deed, and to have yet
another recorded easement between these properties would mean
1675 Birds Eye would have an easement on an easement to access
Main Road.
From a title company or title report standpoint, that is
just messy.
So, moving towards the other merits of this application,
you know, I 've heard various different kinds of amorphus
objections, which we can' t seem to dial in on. I 've heard the
phrases "raises concern" about certain things, and what "may be
the best, " and "what effects this might have. "
As I 'm sure you are all aware, and you have phenomenal
counsel who can explain this to you, your determination must
have a rational basis based on substantial evidence. It can' t
can surmise, conjecture or speculation.
There .is a ton of case law on that, the one that I ' ll read
out now is - Matter of Association v Friends of Sagaponack -- I 'm
sorry, Matter of Association of Friends of Sagaponack v. ZBA
Town of Southampton. That actually arose out of Ira Rennert' s
now infamous house down on the beach in Sagaponack.
So where we are going with this, is the Board has to take
into account substantial, quantifiable data. And my colleagues
here, we have a phenomenal; we have PW Grosser, Cole
Environmental, we have Anthony Portillo, who have put into the
record reasons that this is a very well engineered, very well
designed plan that is far more sensitive to the wetlands than
the 1992 approval, which I know we discussed a moment ago.
Another thing that I have to bring up, as we can see, the
lot right next door, which is just as environmentally sensitive
and just as -- is similarly situated, how does a beautiful house
improved already. There is plenty of case law, Knight v.
Amelkin, being a Suffolk County one that I can think of off the
top of my head that different, or that similarly situated
applicants have to be treated in a similar way.
So we keep hearing things like we have doubts or we have
concerns over this . We would like to hear these concerns
because, as I 've said, we have an environmental analyst, we have
a dune expert, we have Mr. Portillo, all of whom can address
these.
So my colleagues have done, in my opinion, an excellent job
on explaining why this is a very well-designed plan. As you have
heard, there are wetlands here. This is a very unique piece of
property, and that ' s why we 've gone through multiple, at least
two iterations of trying to get this right. Of trying to do
justice by this piece of property.
We 've gone through concepts of building a bridge, we 've
gone through different orientations of the house, all to be
Board of Trustees 48 September 16, 2026
respectful an honor how this piece of land flows .
So all that we are pointing out in this regard is that we
have quantifiable data, we've provided you have with surveys,
with dune experts, with all kinds of different data, and that we
can' t rely, this Board cannot rely on surmise, conjecture or
speculation.
Finally, before I sit down and let my other colleagues
speak on this, an outright denial of this project or even
further scaling back of the project would run the risk of being
a regulatory taking.
The application of the law in a matter which would
eliminate or even substantially reduce the value of this
property would amount to a taking. And a taking would require a
payment of monetary compensation to my client. That ' s,. I 'm
saying see generally Friedenburg v. New York State DEC. There ' s
other examples out there.
This project has seen my client shrink this house, do
various different incarnations of the driveway and the bridge,
and I will just leave with the concept that we have been very
sensitive and this is a very well designed, well-engineered plan
for this piece of land.
I 'm here, I ' ll stay up if there are any questions . If not,
I can yield to my colleagues .
TRUSTEE FINORA: Mr. Bourquin, I just want to make the point and
clarify here that, you know, the adjacent property does not have
a freshwater wetland occupying approximately one-third of the
lot.
And if that property was subject to a new permit today, it
would be subject to the same kind of environmental constraints
we ' re dealing with.
I take issue with your point that these are like properties
or that there is an obligation to offer what this particular
property next door has, and I think you've got a lot of
constructive feedback from the Board over the past few months,
and frankly I don' t think there' s been a lot of changes that
reflect the feedback.
MR. BOURQUIN: So I can speak to the wetlands aspect, that the
lot to the west, if it didn' t have freshwater wetlands, it still
does have the dune system, it still does have the Long Island
Sound.
TRUSTEE FINORA: But that ' s precisely the problem here, you are
bounded on both sides of this parcel, and it ' s totally unique to
this parcel .
Yes, there are setbacks and freshwater wetland implications
to the adjacent property, but it ' s not nearly the same. Not even
remotely the same.
MR. BOURQUIN: What you do have, and the very good point that you
made, this is a unique parcel, and there are obviously wetlands
here. And I go back to what I said, this has been a very well
Board of Trustees 49 September 16, 2026
designed plan, sensitive and responsive to those wetlands .
We are not aiming to clearcut the whole thing and- build a
Levittown track test here. This is a plan that has been designed
very creatively -- no, you can' t say yet . Conjecture is not an
appropriate consideration. I ' ll go back to the Ira Rennert case.
TRUSTEE SEPENOSKI : Trustee Finora established that this is a
very unique parcel, but all we've heard tonight is case law
applying to all sorts of other parcels around Suffolk County.
MR. BOURQUIN: Well, unique parcels require unique solutions, and
what we have done with our various different aspects of this, is
create something that is a unique response to a unique
situation.
I would like to hear, and the Board, if you would like to
go down the line, what are the quantifiable, I 'm not sure if you
have an environmental analyst or what reports you have. What are
the quantifiable concerns?
TRUSTEE SEPENOSKI : Well, the quantifiable begins with proximity
to freshwater wetlands, which is in Chapter 275; we have Coastal
Erosion, Chapter 111; we have proximity to dunal systems and
proximity to beach. And Trustee Finora rightly pointed out that
moderate wave action, and Zone X, and flooding, those are
delineated. Those are quantifiable on the plans you submitted
this evening. So those are real numbers that our code speaks to.
MR. BOURQUIN: And that is why we brought in PW Grosser, and
brought in Cole, to show that this project can be accomplished
in a responsive way.
TRUSTEE GOLDSMITH: So I would like to further state that Chapter
275-12 states the Trustees may adopt a resolution directing the
issuance of a permit to perform operations applied for only if
it determines that such operations will not:
So, adversely effect the wetlands . Yes .
You' re building a bridge. You' re destroying wetlands to
build a house.
Cause damage from erosion, turbidity or siltation. Yes .
You' re building it right in a moderate wave action. It ' s
going to be damage from erosion.
MR. BOURQUIN: Well, there ' s two things, and not to cut you off
there. But how would building a bridge over wetlands impact the
wetlands? Would you rather us just put a driveway right through
the thing?
TRUSTEE GOLDSMITH: Because you are doing construction in a
protected freshwater wetland. Construction within a pond or
fresh water wetland obviously has an adverse environmental
impact to it .
The fact that you have to build a bridge or a driveway
through a pond, over a pond, around a pond, to get to a property
speaks to the environmental sensitivity of this parcel .
We 've been on this Board ten-plus years . I 've never had an
application where somebody needs to build a bridge to get to
Board of Trustees 50 September 16, 2026
part of their property.
We have had plenty of other applications with greater
distance to a freshwater wetland and/or tidal wetland, that this
Board did not look favorably upon due to the circumstances .
You talked about each and every property is inherently
unique. Just because somebody has a house next door does not
mean that the one gets one next to it when the conditions on the
neighboring property are entirely different than the neighboring
property.
I spoke in length about what the objections were and,
again, it ' s if we can' t say that it will not do one of those
things, then we are compelled as a Board not to support that
application. It ' s not conjecture, it ' s not surmising. It is
based on fact, it is based on Town Code and it is based on a
record and site visits and environment impacts that we have been
dealing with in thousands of applications over the course of our
tenure on this Board, collectively.
MR. BOURQUIN: Okay, so I would like to go back to what I said
earlier, is that this is a unique property. And unique
properties require unique solutions . And we brought in a
phenomenal team -- PW Grosser, Cole, to engineer a very good
solution that is sensitive to these wetlands .
I would like to ask, what do you think should become of
this property?
MS . HULSE: They are not answering that .
MR. BOURQUIN: Well, we are going down .the conjecture road. Let ' s
conjecture.
TRUSTEE KRUPSKI : No one went down the conjecture road.
MS . HULSE: Counsel, if you have anything else that you would
like to add, you are not going to require a certain response
from the Board. I think they have articulated very clearly over
the course of many hearings, field inspections . We had a work
session last night. They've considered all the documentation
that' s previously been provided, and now you are standing here
in the llth hour making demands that they respond specifically
to what you brought up? I don't think it ' s appropriate. I 'm
going to counsel them not to answer.
And they've articulated throughout this entire process, not
just tonight, Counsel, what their concerns were, from the very
beginning.
You keep saying that the project is a good project, it ' s a
responsible project . Well, that ' s your opinion. This Board is
charged with making that assessment based on, as Trustee
Goldsmith said, everything in front of them, their experience,
their expertise, and they are constrained by what the code
allows and doesn' t allow.
I appreciate case law as much as the next person, but the
case law that you are citing is specific to that property, as
you well know. And I appreciate the legal issues that you are
Board of Trustees 51 September 16, 2026
presenting. However, you are standing here saying you've got
people that have presented something that is responsible.
Well, that is for them to decide. I appreciate that that is
your opinion and what you are urging us to adopt, but the fact
of the matter is, is that this property, and I have been here,
and I was here before as an Assistant Town Attorney, this
property is probably one of the most sensitive properties that I
have ever seen in my 20-plus years doing this . Honestly.
I mean there is basically nothing about that property that
isn' t sensitive. And what you are suggesting is an enormous
amount of building on it .
So you have to appreciate what this Board is charged with
doing, what they are elected to do. They are looking at this
responsibly. They didn' t give you a hard no right out of the
gate. They have been working with your client from day one. From
day one. And now you come in here at the llth hour and say what
have you guys done? I mean, come on.
MR. BOURQUIN: If it came across as a demand, that was not the
intention.
MS . HULSE: It certainly did.
MR. BOURQUIN: That was not the intention. But before I yield the
floor, I will say that we are just trying to understand to the
best degree, if this isn' t a sensitive approach, what would the
Board look at .
TRUSTEE KRUPSKI : If you brought in this team of such
well-educated and, well, phenomenal well-backed engineers and
environmental professionals, and after all this testimony they
can' t figure out what is wrong with this application, I think
you might need a new team.
MR. PORTILLO: I have to disagree with that.
So, building within a flood zone happens all over the
place. And the way we presented the building, it ' s allowed to be
built in a flood zone. So, that is not fair to say.
On top of that, we are not presenting a bridge any further.
We are presenting a walkway. We are presenting you a driveway
with a walkway to the house. How much more sensitive can we be?
We are not presenting this 12-foot bridge that we
originally were thinking. And we thought about that.
So I don' t like that remark, I don't think that ' s fair.
Then you are saying I 'm not a professional and the people here
are not professionals .
So, we work hard at this and we tried to present an
application that made sense.
Apologizing is a sensitive subject from the attorney, but I
took the time today to try to give you guys another look at a
possible situation, to get to be two parking spaces, what is
required, and then walking up to the home.
The home is not designed incorrectly in regards to being a
flood zone. You are allowed to build in a flood zone. If the
Board of Trustees 52 September 16, 2026
Board doesn' t want a home built in the flood zone, I think
that ' s impossible if you have a wetlands --
MS. HULSE: You know it ' s not just the flood zone. You know it ' s
not just the flood zone. That ' s not the only issue here.
MR. PORTILLO: And also Cole Environmental provided a
revegetation plan, ways to look at how do we -- you know, I
don' t want to get in, I 'm not an expert on the freshwater, but
the freshwater is next to the other home. I mean, let ' s be
honest.
What they present, they will present you guys with how to
revegetate, remove invasive species that are there, and things
along those lines . If it ' s not agreeable, that ' s fine. But I
don' t think it ' s fair to say that we are not the right
professionals . That ' s all I 'm saying.
TRUSTEE KRUPSKI : To be clear, I didn't say you are not
professionals . I said you are professionals, but it seems like
after hours and hours of testimony that no one seems to be
willing to expose themselves that they know what we are talking
about, and instead are representing something that they know is
untrue.
MR. PORTILLO: I mean, I actually, I 'm not really clear on what
the Board is asking. Because, again, we are taking a bridge
out . So we are not disrupting the freshwater. The footbridge,
like I said, would not even be a bridge. It would essentially be
a deck across a muddy area that is between the two freshwater
areas .
TRUSTEE KRUPSKI : Downplaying the wetlands is the same as --
MR. PORTILLO: I 'm not downplaying.
TRUSTEE KRUPSKI : It ' s not really --
(Both parties speaking over each other) .
MR. PORTILLO: But before we were presenting a driveway going up
to a huge parking space. So I think to say we were not
listening is not fair. We are listening. If you don' t agree with
our approach, that ' s different, and I can understand that.
I didn' t design a home that' s incorrect in that location.
That would be an allowable home in that location.
The Trustees ' opinion on if it should be located there, or
the location, I understand. But it ' s a VE zone, it ' s an open
foundation. It meets the code requirements . It ' s the finished
floor height is correct . So all those things are consistent with
what is required.
MS. HULSE: So let me, can I just interject one thing.
MR. PORTILLO: Sure.
MS. HULSE: You are referencing the Trustees ' opinion. You do
understand, and I just want to make this clear, that the
application that came before the Board could have been voted up
or down. Right?
MR. PORTILLO: Sure.
MS. HULSE: That. could have happened.
Board of Trustees 53 September 16, 2026
MR. PORTILLO: Understood.
MS . HULSE: So that didn' t happen. So this Board has been
actively working with your team, where they don' t have to. There
is no requirement they do that. They could have made a record,
closed hearing and voted on it right out of the gate.
MR. PORTILLO: I appreciate that.
MS. HULSE: (Continuing) . They chose not to do that. So now you
are coming in .here saying, essentially, well, it looks like you
are just making an arbitrary opinion and everything is amorphus .
MR. PORTILLO: I didn't suggest --
MS. HULSE: Excuse me. Just let me finish.
MR. PORTILLO: Sure.
MS. HULSE: And what you' re saying is there' s amorphus reasons
and all this . That ' s not true. That is not true.
MR. PORTILLO: Sure.
MS . . HULSE: That has been articulated to the applicant, the
individuals involved, your team, whoever has been at field
inspection, if anybody wanted to come to the work session, all
along this entire process during the hearings this has been
articulated to you.
So, when Trustee Finora says, well, hey, what about moving
it west, this is not the first time that ' s .come up. This has
been something that the Board has articulated with other issues,
with the walkway and other items, because they are making an
effort to see if there is something that they can approve that
would be workable. That is what they are trying to do.
This is my point. My point is that they didn' t have to do
any of that .
MR. PORTILLO: Understood.
MS. HULSE: And it would be much easier sometimes to just say
right out of the gate, no. I 'm sure you can appreciate that.
MR. PORTILLO: I can, but I will say, when we did the site visit,
the original design is a lot smaller than what we presented.
I would have told my clients to not move forward. I mean, I
understand how the Board works . That was the reason for the site
visit originally, I didn't present an .application and that was
where I go back and do due diligence.
MS . HULSE: The Board doesn' t have to work that way.
MR. PORTILLO: I understand.
MS. HULSE: I would sit up here and tell them just vote on it,
up or down. That ' s what they've submitted. Vote on it .
MR. PORTILLO: I understand. I think at the end of the day our
colleagues should at least present the professional opinion that
they have, and the Board is trying to vote on it, that ' s --
MS. HULSE: Because this Board has been bending over backwards to
work with you and your team. Would you at least concede that?
Would you acknowledge that?
MR. PORTILLO: I 've never said that the Board has not work with
us --
Board of Trustees 54 September 16, 2026
MS. HULSE: Would you acknowledge that?
MR. PORTILLO: I 've never said that the Board did not work with
us on this project.
MS . HULSE: Considerably. In depth.
MR. PORTILLO: As I 've said --
MS. HULSE: Many hours .
MR. PORTILLO: We had the site visit. I think we were at like 850
square-foot footprint at that time. It ' s now down to 790 square
foot footprint.
So we did reduce the footprint after the site visit based
on what we received back from the Trustees . We brought the
septic tank and the house closer.
Listening further, that we need to move the building, I 'm
not against doing that or going back to my client and discussing
that. We are talking about a 790 square-foot footprint . This is
not an enormous house we are presenting to the Board. That ' s
all I think we are all trying to say. And then we took into
consideration not to pull the driveway up the wetlands . And this
solution I think is a very good one. Which I don' t know what
the Board' s opinion is on that.
But it ' s, to not drive up through the wetlands, which is
the original approval in the ' 92 . I think we just came up with
a plan not to do that to still access the home.
So I 'm just stating those facts . I 'm not saying that they
are right, wrong or indifferent. I 'm just stating the fact that
we are trying to change our design and our approach to this, as
we hear it. And that is my opinion.
So that ' s all I 'm getting at. I 'm not saying the Board has
-- this is also our second public hearing. We only had one, and
then we made these changes . So we have not heard that these
changes didn' t meet the requirements of the Board from the last.
And I don' t have the record with me, but the big topic of last
time was about the dune and it being a second dune, et cetera.
And that ' s where we said, okay, let ' s respond to that, let ' s get
another expert to talk about the dune. Because I 'm not the
person to speak to that. So we did that. I would like the Board
to at least hear what he has to say. I think that ' s fair.
Thank you.
MR. YOUNGMAN: Good evening, Board. Zeb Youngman, PW Grosser,
Bohemia, New York, for the applicant.
I was brought in recently, you know, a few days before the
last scheduled hearing, to respond to your comments regarding
the dune system at this property.
I want to first read the definition of a dune, taken from
the Town of Southold Coastal Erosion Hazard Area law, Chapter
111.
A "dune" is a ridge or hill of loose, windblown or other
artificially placed earth, the principal component of which is
sand.
Board of Trustees 55 September 16, 2026
A few days before the last scheduled hearing we did a site
inspection, and that included an inspection of the property, the
wetland area and the coastal area.
We also performed four soil borings in the area and what
was found was the beach area is largely composed of larger
rocks, stones and pebbles. Coastal vegetation in that area, um,
not grasses, which are typically found in dune systems, and soil
types that are not indicative of dune systems .
This property is incredibly unique, with the interior
freshwater wetlands and the coastal areas, and the topography as
well . But these are not typical. dune systems .
I did submit a package with some photos of the property,
along with the soil boring logs so we could look at the soils in
these areas .
In addition, I want to point out there was a comment made
regarding the, you know, how the property changes over time, and
we had submitted aerials dating back to 2004, and the property
is exactly the same . There is no significant erosion on this
property. And the shoreline and vegetation line has remained
the same in the past 22 years .
There are, you know, we do have some older aerial
photographs, but they are not clear. So we have 22 years of
aerial photographs showing the shoreline has remained the same.
Do you guide guys have any questions?
TRUSTEE KRUPSKI : I 'm curious, what, and I read the core samples
in the report that you put forward there.
What would you characterize the area as between the beach
and the proposed structure.
MR. YOUNGMAN: Between the beach and the proposed structure.
So what was, maybe previously referred to as a potential
secondary dune, I think that is more of a glacial till material.
If you look at it, it ' s brownish, yellow, loamy sands and
gravels, rather than a well-sorted sand material that is, you
know, a common dune. So this property is very unique because it
has that glacial till ridge in that area. And that ' s really the
high topo area on the project where the house is proposed.
But it ' s not dune system. It ' s a glacial till kind of
system.
TRUSTEE KRUPSKI : So would you then make the argument then based
on, and I don' t know your exact background, but would you make
the argument that it ' s not an environmental sensitive area
because you are arguing it ' s not a dune?
MR. YOUNGMAN: Absolutely not.
TRUSTEE KRUPSKI : Right.
MR. YOUNGMAN: So my background, I sat on the Southampton Town
Conservation Board in your seat for over 20 years . I 've
reviewed thousands of these applications, as you have. So I know
where you are coming from.
This is a very sensitive area. It ' s a very unique area as
Board of Trustees 56 September 16, 2026
well, you know. You have not seen many of these type of
properties because there ' s not many that exist. There' s very
few.
TRUSTEE GOLDSMITH: Thank you.
MR. YOUNGMAN: You' re right.
TRUSTEE GOLDSMITH: Yes .
MR. YOUNGMAN: And it is a challenging property. But I do feel
that what the team has proposed is really the best we can get.
Especially by replacing the bridge, the driveway bridge, to an
elevated catwalk that is light penetrable, it ' s going to
minimally impact the wetlands .
TRUSTEE KRUPSKI : I know -- that ' s a great background, too. And
you can appreciate this Board' s concern. This is such -- and we
have seen quite a few amazing properties, and this certainly is
one. But I don' t think I ever had a property that is, I mean
someone said a third wetlands, but it also includes The Sound.
But the access, proposed access is pinched between a freshwater
wetland that is slightly divided, like it almost looks like two
lungs in a body cavity. And it' s so narrow and so tight. And
then you get into this super-environmentally unique, to your
point, area, that it ' s such a diverse habitat, and so rarely
occurring in nature as it exists out here today.
So whether or not it ' s a dune or a transitional upland
habitat, it ' s just that, environmentally, this is a huge lift
and a huge ask of somebody.
MR. YOUNGMAN: It is, and you' re right. But we have to look at
the reduction in size. We minimized the size of the footprint.
We eliminated the driveway access . And I think that portion
through the freshwater wetlands is a big thing.
You know, it ' s no longer a driveway. There are no cars
going over it . There is no excavation. It ' s driving a couple of
piles, light penetrable walkway, four feet wide . I think that ' s
a big benefit as compared to the previous application.
You know, as Anthony said, perhaps we can shift the house
to the west .
The footprint really can' t get any smaller: The decks are
cantilevered. You know, we look at practical alternatives when
we evaluate these applications . There ' s no accessory
structures . So, you know, I really, personally believe, I don't
know what else can be done. Maybe we can shift the house. I
don' t think there is an opportunity to reduce the size. We need
to. get access to the property. We proposed the most
minimal-sized catwalk rather than a driveway.
So, you know, I don' t know what else we can do other than
shit it slightly, and I don' t know how much that can be done
because I have just been brought in to evaluate the dune system.
Thank you.
TRUSTEE GOLDSMITH: Thank you.
TRUSTEE FINORA: Thank you.
Board of Trustees 57 September 16, 2026
MR. COLE; Chris Cole, Cole Environmental.
I just wanted to say thank you for the Board working with
us, giving us feedback and trying to find a workable solution
for the site.
My colleagues have discussed a lot of different context of
this site, and what I want to mention is, yes, Anthony and I
worked together to eliminate the bridge, and to eliminate about
a thousand square-foot of what was proposed to be RCA driveway.
On that site where the cursor is, approximately, maybe a
little further north, that was the area of the driveway, and
that was the area that has significant mature trees, so we are
saving, by removing the driveway, we are saving significant
trees .
We propose to replace one-to-one with at least two-inch
minimum caliper for hardwood, an ecologically appropriate tree
for the site.
In the area that the building and the septic system is
going to go, there ' s numerous Baccharus . We were there, we saw
them. The proposal is to flag, tag, dig out and burlap, and
transplant the Baccharus to other areas on the site, mainly the
areas on the edge of the phragmites that would support
Baccharus .
And our other proposal is to cut, maintenance cut, and with
the intention of restoring the freshwater wetlands, which is
about 5, 800 square feet, that is almost purely monoculture. We
would not touch any trees, we would not touch any of the native
plants in there.
On the southeast side there is some large Viburnums, they
would be maintained. And I just want to note that removing
phragmites is, it ' s in the LWRP Policy 6 to improve the
diversity of the wetlands . And Southold is working to remove
phragmites . I know Skip Horton' s pond, they are removing
phragmites, and also Downs Farm is removing them.
And I also have an article here that Great Pond, the Town
received $80, 000 to remove the phragmites from the pond.
So what would be doing is, the clients would be spending
their money with the intention of restoring that pond, and we
could replant that if the Board wanted, with ecologically
appropriate species, red Maples, Tupelos,. blueberries,
Arrowwood, Viburnum, Button Bush, that would make the freshwater
wetlands that we are seeking to protect much more than just a
monoculture of phragmites .
Phragmites reduce bio-diversity, they reduce the impact of
drainage. I 'm currently working on a seven-acre phragmites
removal project. We are on our third cut, and I 'm already seeing
native plants coming back. So it does work. And what is standard
with the DEC is four times a year.
So intention being to cut the phragmites, reduce the
biomass, truck them offsite to an approved location, and plant
Board of Trustees 58 September 16, 2026
and let the native species that are supposed to be there in
that, you know, hydric soils, come back and provide the habitat
that that area is naturally supposed to.
So that ' s, in a way we are proposing to bring the site
closer to its historical, what this would have been before the
introduction of phragmites hundreds of years ago, which dominate
our shoreline and reduce biodiversity, and reduce plant life. .
So, those are the things that we have looked at, reduction
of the bridge, reduction of a thousand square feet of parking
lot, and essentially paved surface, keeping the trees in the
area, replanting new trees,. and attempting to restore, to bring
the freshwater wetlands back into a bio-diverse eco-system, as
opposed to a monoculture of phragmites .
TRUSTEE GOLDSMITH: Mr. Cole, you mentioned DEC.
Do you have DEC for this proposed project?
MR. COLE: .This is a no-jurisdiction from the freshwater
wetlands .
TRUSTEE GOLDSMITH: How about tidal wetlands?
MR. COLE: Tidal wetlands we' re in, but a majority of the
structure is behind the ten-foot contour.
TRUSTEE GOLDSMITH: And how do you propose construction on this
lot?
MR. COLE: Through the neighboring property on the side, and we
have the builder here . He can, we are intending to hand dig and
they have screw helical piles, and they are going to do it as
minimally as possible.
TRUSTEE GOLDSMITH: Would you require an easement for that
construction through a neighboring property?
MR. COLE: I don' t believe so.
MS. HULSE: Did you provide the DEC the information you . just
provided, because it ' s not updated on their website in that
manner. Do you have that?
MR. COLE: I 'm sorry, the new plans?
MS. HULSE: The information on the DEC website, it appears it is
incomplete, so I 'm just wondering if you have anything that you
just referenced regarding the DEC application.
MR. COLE: We have a letter back from them stating the things
they need. I can provide it to Liz . We have not responded. We
are working to make sure the plans are good with your Board
before we resubmitted them.
TRUSTEE FINORA: Thank you. Any other comments from the Board?
TRUSTEE KRUPSKI : Just to summarize my feelings on this project
and the back and forth, I do appreciate the effort that you guys
have put forward in trying to remediate this . I just really
struggle with the sensitivity of this and the unique nature of
the property.
And just to be very clear, as to not be providing
conjecture, there ' s freshwater wetland, saltwater wetland, dunal
habitat, glacial till habitat, it ' s very unique and very little
Board of Trustees 59 September 16, 2026
remaining throughout Long Island, and it ' s just, it ' s a very
heavy lift of a property.
MR. COLE: If the applicants were willing to shift the building
west, is there a number or a specific location that we can bring
back to them to present?
TRUSTEE GOLDSMITH: I 'm prepared to vote on what is submitted.
That ' s my thought on it .
TRUSTEE FINORA: All right. Any other comments from the public?
(No response) .
Hearing none, I make a motion to close this hearing.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE FINORA: I make a motion to deny this permit for the
plans before us with respect to and considering the testimony
that has been heard here tonight, and also in consideration that
this Board finds the proposal not satisfactory to Chapter 275,
Section 12, sections (a) , (b) , (c) , (d) , (e) , (h) and (j ) , and
the inability to bring the LWRP into consistency.
That is my motion.
TRUSTEE . KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MR. PORTILLO: Thank you, Board, have a good night.
TRUSTEE GOLDSMITH: Motion for adjournment.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
Respectfully submitted by,
Glenn Goldsmith, President
Board of Trustees