Loading...
HomeMy WebLinkAboutTR-09/16/2026 Glenn Goldsmith,President *V sorry Town Hall Annex Nicholas Krupski,Vice President ��V� ��� 54375 Route 25 P.O. Box 1179 Eric Sepenoski l Southold, New York 11971 Liz Gillooly G Telephone(631) 765-1892 Joseph Finora • �O Fax(631) 765-6641 COU BOARD OF TOWN TRUSTEES RECEIVED TOWN OF SOUTHOLD OCT 1 5 203 Minutes Wednesday, September 16, 2026 SOS#h®�� 7'�Wn Clerk 5 : 30 PM Present Were: Glenn Goldsmith, President A. Nicholas Krupski, Trustee Eric Sepenoski, Trustee Liz Gillooly, Trustee Joseph Finora, Trustee Elizabeth Cantrell, Administrative Assistant Lori Hulse, Board Counsel CALL MEETING TO ORDER PLEDGE OF ALLEGIANCE TRUSTEE GOLDSMITH: Good evening, and welcome to our Wednesday, September 16, 2026 meeting. At this time I would like to call the meeting to order and ask that you please stand for the Pledge of Allegiance. (The Pledge of Allegiance is recited) . TRUSTEE GOLDSMITH: I ' ll start off the meeting by announcing the people to the dais . To my left we have Trustee Krupski, Trustee Sepenoski, Trustee Gillooly and Trustee Finora. To my right we have the attorney to the Trustees, the Honorable Lori Hulse; we have Administrative Assistant Elizabeth Cantrell; and with us tonight is Court Stenographer Wayne Galante. Agendas for tonight ' s meeting are out in the hallway and also posted on the Town' s website. We have one postponement tonight on the agenda, page nine, . number 12, JMO Environmental Consulting on behalf of LUCINDA J. HERRICK REVOCABLE TRUST requests a Wetland Permit to construct a 5, 280sq. ft. Two-story dwelling with gutters to leaders to two (2) 8x8 ' drywells and a French drain for roof runoff; install an I/A OWTS system with three (3) 81x8 ' leaching pools; construct a 201x28 ' detached dry garage; install water and electric service; construct approximately 200 ' of retaining wall; construct a Board of Trustees 2 September 16, 2026 driveway; and to regrade and stabilize all disturbed areas . Located: Ocean View Avenue, Fishers Island SCTM# 1000-9-11-7.. 16 is postponed. So that one won' t be heard this evening. Under Town Code Chapter 275-8 (c) files were officially closed seven days ago. Submission of any paperwork after that date may result in a delay of the processing of the application. I . NEXT FIELD INSPECTION: TRUSTEE GOLDSMITH: At this time I ' ll make a motion hold our next field inspection, Tuesday, October 6th, 2026, at 8 : 00 AM TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . II . NEXT TRUSTEE MEETING: TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next Trustee meeting Thursday, October 8th, 2026, at 5 : 30 PM in the Town Hall Main Meeting Hall . TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . III . WORK SESSIONS : TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next Work Session, Thursday, October 8th, 2026, at 5 : OOPM at the Town Hall Annex 2nd Floor Executive Board Room, and on Wednesday, October 14th, 2026 at 5 : OOPM in the Town Hall Main Meeting Hall. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . IV. MINUTES: TRUSTEE GOLDSMITH: Roman numeral IV, Minutes . I make a motion to approve the Minutes of the August 12th, 2026, Trustee meeting. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . V. MONTHLY REPORT: TRUSTEE GOLDSMITH: Roman numeral V, Monthly Report. The Trustees monthly report for August 2026. A check for $20, 755 . 00 was forwarded to the Supervisor' s office for the General Fund. Board of Trustees 3 September 16, 2026 VI . PUBLIC NOTICES: TRUSTEE GOLDSMITH: Public Notices are posted on the Town Clerk' s Bulletin Board for review. VII . STATE ENVIRONMENTAL QUALITY REVIEWS: Roman numeral VII, RESOLVED that the Board of Trustees of the Town of Southold hereby finds that the following applications more fully described in Section XI Public Hearings Section of the Trustee agenda dated Wednesday, September 16, 2026 are classified as Type II Actions pursuant to SEQRA Rules and Regulations, and are not subject to further review under SEQRA. As Written: Alexander Friedman & Erica Tennenbaum SCTM# 1000-145-4-.14 . 3 Thomas H. Patterson SCTM# 1000-9-3-6 Carroll M. Carpenter Revocable Trust SCTM# 1000-7-4-3 . 1 Andrew Shannon & Katherine O' Brien SCTM# 1000-9-6-4 Robert Patterson, c/o Diana Patterson SCTM# 1000-6-1-10 James Kaminsky SCTM# 1000-106-4-4 Koryn Gatta Estrada SCTM# 1000-123-4-7 Rodulfo David Cifuentes SCTM# 1000-121-4-21 North Fork Realty Holdings, LLC SCTM# 1000-57-1-8 James & Nancy Clous SCTM# 1000-53-6-18 Robert P. Auteri Living, Trust & Nannette M.. Auteri Living Trust SCTM# 1000-123-5-31 MILO BD, LLC SCTM# 1000-103-2-1 . 1 Rosemary & Sebastian Avolese SCTM# 1000-111-14-25 TRUSTEE GOLDSMITH: That is my motion. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . VIII . RESOLUTIONS - ADMINISTRATIVE PERMITS: TRUSTEE GOLDSMITH: In order to simplify our meetings the Trustees regularly group together actions that are minor or similar in nature. Accordingly, I ' ll make a motion to approve as a group items One through Seven, as follows : Number 1, Cole Environmental Services on behalf of NICHOLAS EDWARD & KATHERINE SHILLO BEARDSLEY requests an Administrative Permit to pump out and fill in existing cesspool with sand; remove existing trees in order to install a new Fuji Cen-5 I/A OWTS sanitary system; install silt fencing to be maintained throughout construction; and all disturbed areas to be loamed, Board of Trustees 4 September 16, 2026 seeded and stabilized. Located: 810 Equestrian Avenue, Fisher Island. SCTM# 1000-9-4-11. 5 Number 2, McCarthy Real Estate Management, Inc. On behalf of RICHARD & ALICE RUBINSTEIN requests an Administrative Permit to construct a 51x15 ' exterior basement egress stairway on west side of dwelling; construct a 14 'x8 ' ' roof dormer and 14 ' xl6 ' second story deck on north side of dwelling to accommodate new finished space within existing attic. Located: 470 Goose Creek Lane, Southold. SCTM# 1000-79-1-5 Number 3, KEG PROPERTIES NORTH FORK LLC requests an Administrative Permit to revegetate illegally cleared area with one (1) Sweet Gum, one (1) Swamp White Oak, one (1) Carpinus Caroliniana, one (1) Red Maple, twenty-four (24) Bayberry, six (6) Witch Hazel, twelve (12) Sweet Pepperbush, ten (10) Hollywood Juniper; as-built 2 ' x 44 ' retaining wall and gravel/sand fire pit area. Located: 495 Albo Drive, Laurel. SCTM# 1000-126-2-10 . 1 Number 4, CHARLES R. CUDDY requests an Administrative Permit to install two (2) basement egress windows and an I/A OWTS septic system. Located: 1500 Marratooka Lane, Mattituck. SCTM# 1000-115-3-19 Number 5, Patricia C. Moore, Esq. On behalf of NORMAN & IRENE VANDERSCHUYT requests an Administrative Permit to replace in-place and in-kind 12 'x10 ' wood deck on seaward side of dwelling with steps . Located: 975 Bayview Avenue, Southold. SCTM# 1000-52-5-17 Number 6, AMP Architecture on behalf of KAMAL EL HELOU & LAUREN HARTMAN requests an Administrative Permit to make changes to rear window and exterior door; remove existing stairs from west side of deck; construct 51x6' 8" wood entry steps; install 51x4 ' stoop;_ install 4 'x5 ' 8" outdoor shower; install two propane tanks . Located: 2055 Bay Shore Road, Greenport . SCTM# 1000-53-4-12 Number 7, HOWARD & LISA KOFF request an Administrative Permit to raise the permitted 4 ' high pool enclosure fencing along the eastern side of the property by two feet by adding extenders on the existing posts and using chain link fencing on the extended portion to achieve a 6 ' -6 ' 5" high chain link fence. Located: 1380 Oakwood Drive, Southold. SCTM# 1000-70-12-32 TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 8, Eligio Lopez on behalf of STEPHEN & NICOLE O'GRADY requests an Administrative Permit for the as-built 415" x 7" outdoor shower and 275sq. ft. Wood patio. Located: 315 Old Salt Road, Mattituck. SCTM# 1000-144-5-20 Trustee Goldsmith conducted a field _inspection September 9th, 2026, noting straightforward on the deck on side of the Board of Trustees . 5 September 16, 2026 house, no adverse environmental impact . The LWRP found this to be inconsistent. The inconsistency is the as-built outdoor shower and wood patio is inconsistent with Policy 6. 3 (a) because the structure was built without regulatory permits . I ' ll make a motion to approve this application as submitted, thereby granting it a permit will bring it into consistency with the LWRP. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . IX. RESOLUTIONS - OTHER: TRUSTEE GOLDSMITH: Roman numeral IX, Resolutions - Other. RESOLVED, that the Southold Town Board of Trustees RESCINDS Resolution Adopted on April 15, 2026 and APPROVES the request of EMILY & RAFAEL ROMECASTER for a Wetland Permit to install a 20 'x40 ' in-ground swimming pool with a 1, 125sq. ft . Permeable bluestone paver patio surround; install 4 ' high pool enclosure fencing with gates, a pool drywell, and pool equipment area; install a 500sq. ft. Lower deck off dwelling with a 12 . 2 ' x8 ' pergola; remove existing 8 'xll ' shed; existing 11 . 41x22 ' tool shed with entry platform to be maintained; perpetually maintain the existing 25 ' wide non-turf buffer area along the landward edge of the non-disturbance buffer, and to perpetually maintain the existing 50 ' wide non-disturbance area along the landward edge of wetlands; with the condition to reestablish the 25 ' wide non-turf buffer and plant native species; and as depicted on the site plan prepared by Kimberly Peck, Architect, received on November 25, 2025 and stamped approved on April 15, 2026. Located: 330 Shore Lane, Peconic. SCTM# 1000-86-1-4 . 12 Striking the word "permeable" from the description before the words "bluestone paver patio" . TRUSTEE SEPEN08KI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . X. APPLICATIONS FOR EXTENSIONS/TRANSFERS/ADMINISTRATIVE AMENDMENTS : TRUSTEE GOLDSMITH: Roman numeral X, again, in order to simplify the meeting, I ' ll make a motion to approve as a group items One through Nine, listed as follows : Number 1, Burger Construction, Inc. On behalf of SEAN & RANDI LALLY requests a Transfer of Wetland Permit #10451 from Veronica H. Nasary to Sean & Randi Lally, as issued August 16, 2023; and a One (1) Year Extension to Wetland Permit #10451, as issued August 16, 2023 . Board of Trustees 6 September 16, 2026 Located: 900 Fox Hollow Rd. , Mattituck. SCTM# 1000-113-6-222 Number 2, Patricia C. Moore, Esq. On behalf of CVJB LLC requests a Transfer of Wetland Permit #8349 & Coastal Erosion Permit #8349C from Parviz Lalezari to CVJB LLC, as issued December 11, 2013 . Located: 1390 Demarest Road, Orient . SCTM# 1000-13-2-7 . 7 Number 3, Finnegan Law, P.C. on behalf of RIPLEY SHORES LLC requests a Transfer of Wetland Permit #9504 from Lydia DeFeis to Ripley Shores LLC, as issued July 17, 2019 . Located: 1165 Cedar Point Road West, Southold. SCTM# 1000-90-1-3 Number 4, Finnegan Law, P.C. on behalf of RIPLEY SHORES LLC requests a Transfer of Wetland Permit #5188 from Douglas DeFeis to Ripley Shores LLC, as issued July 19, 2000 . Located: . 1165 Cedar Point Road West, Southold. SCTM# 1000-90-1-3 Number 5, David Snowdon-Jones on behalf of PETER STEIN & ALLISON KRONICK STEIN requests an Administrative Amendment to Wetland Permit #1.0891 to move previously approved structures landward; revise project description to: Demolish and remove the existing dwelling, foundation, wood decks, wood fence, low stone wall; and stone path; construct a new 3, 135sq. ft . Two-story dwelling that includes a 31 . 2 'x8 ' covered porch, 24 ' x10 ' at grade patio, 101x24 ' open wood-frame pergola, 15 . 3 ' x3 ' 10 ' and 10 ' x24 ' second story balconies; install a new permeable gravel driveway; install a new I/A sanitary system landward of dwelling; convert half of existing 23 ' 3"x25 ' 1" garage into an 11 ' 11"x25 ' 1" pool house with outdoor shower; rest of garage to remain; any excavated fill to be graded out on the landward side of the property; existing 15 ' wide non-turf buffer; and to remove three (3) trees and replace with three (3) native hardwood trees; with the condition to preserve all trees within Trustee jurisdiction. Located: 63417 County Road 48, Greenport. SCTM# 1000-40-1-18 Number 6, Frederick Weber on behalf of PETER SABAT requests an Administrative Amendment to Wetland Permit #10665 to lower screen porch floor and the two (2) open porch floors on seaward side of dwelling by 6"; lower patios and pool area 2 ' -6" with steps down off the lowered porches; increase non-turf buffer to 12 ' . Located: 3000 Beebe Drive, Cutchogue. SCTM# 1000-103-3-17 . 1 Number 7, THOMAS & JENNIFER SMITH request an Administrative Amendment to Wetland Permit #10906 to construct a ±9 ' wide shed dormer to attic. Located: 3121 Oaklawn Avenue, Southold. SCTM# 1000-70-6-10 Number 8, MAZI HOLDINGS LLC requests an Administrative Amendment to Administrative Permit #10892A for the as-built pool equipment area within Trustee jurisdiction and two retaining walls . Located: 530 Broadwaters Road, Cutchogue. SCTM# 1000-104-10-4 Number 9, North Fork Landscapes on behalf of EMILY & RAFAEL Board of Trustees 7 September 16, 2026 ROMECASTER requests an Administrative Amendment to Wetland Permit #10950 to install a maximum 20" high by 110 ' long retaining wall; reduce previously approved patio from 1, 125 sq. ft. To 830 sq. ft. , using natural blue stone; relocate pool fence and pool equipment area; existing deck to remain; install temporary irrigation system in non-turf buffer area; plant bayberry and native grass plugs throughout non-turf buffer area spaced approximately 24" on center; plant a privacy screen along southern property line near shed composed of Eastern Red Cedar. and White Pine; and to maintain a 4 ' wide access path consisting of either mulch or sand through the non-turf and non-disturbance buffers to provide access to the creek. Located: 330 Shore Lane, Peconic. SCTM# 1000-86-1-4 . 12 TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . XI . PUBLIC HEARINGS: TRUSTEE GOLDSMITH: Under Roman numeral XI, Public Hearings . At this time I ' ll make a motion to go off our regular meeting agenda and enter into the Public Hearings . TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . This is a public hearing in the matter of the following applications for permits under Chapter 275 and Chapter Ill of the Southold Town Code. I have an affidavit of publication from the Suffolk Times . Pertinent correspondence may be read prior to asking for comments from the public. Please keep your comments organized and brief, five minutes or less, if possible. AMENDMENTS: TRUSTEE GOLDSMITH: Under Amendments, number one, Zackery Nicholson on behalf of ALEXANDER FRIEDMAN & ERICA TENNENBAUM requests an Amendment to Wetland Permit #10976 to modify the proposed additions and alterations to the existing two-story dwelling to consist of a proposed 700sq. ft . Two-story addition to the dwelling; construct approximately 765sq. ft. Of decking and steps of which approximately 278sgf.t will be covered by a second-floor roof and/or balcony overhang; construct 85sq. ft. Uncovered front porch; construct a 172sq. ft. Open trellis adjacent to the north side of dwelling; construct a 247sq. ft. At-grade gravel seating/fire pit area; construct 850sq. ft. Green-roof system over portions of proposed for on-site infiltration; convert 800sq. ft . Of existing hip roof to a flat green roof with rainwater harvesting system for irrigation; and existing 576sq. ft. Deck to remain unchanged. Board of Trustees 8 September 16, 2026 Located: 350 Macdonalds Road, Laurel . SCTM# 1000-145-4-14 . 3 The Trustees conducted an in-house review September 14th, 2026. Notes concerns about proximity of the additional structures to wetlands . The LWRP found this to be inconsistent . The inconsistencies are: The proposed parcel contains a non-conforming existing residence located within 100 feet of the north and west wetland boundary of Brush' s Creek. The proposed action is inconsistent with Policy 1, which calls for the minimization of development to avoid adverse effects . The proposed additions to the dwelling expand the building footprint by 37 . 4%, and bringing the residence closer to the northern wetland boundary of Brush' s Creek, a designated fish and wildlife habitat. The proposed action is inconsistent with Policy 4 . 1 (a) , which encourages structures to be located away from flooding hazards . The proposed action is inconsistent with Policy 6. 3 (a) which states that actions must comply with the Southold Town Board of Trustees laws and regulations . The proposed dwelling additions are seaward and make the residence more non-conforming than it already is . The proposed installation of an IA system is inconsistent with Policy 5 . 1 (c) 3, and the proposed non-turf vegetated buffer is consistent with Policy 6. 3 (d) . Is there anyone here wishing to speak regarding this application? MR. NICHOLSON: Hi, Zack Nicholson, residing at 770 Wagon Wheel Lane in Cutchogue. I am the architect and agent for the owner. May I provide a handout, a copy of this presentation, Board; is that okay? TRUSTEE GOLDSMITH: Sure. MR. NICHOLSON: The printer quality issue there, so I wanted to give you all a copy. (Handing) . When we last met onsite and I had staked out the previously-approved design and the proposed alterations, and there was a bit of confusion that ' s kind of hard to visually represent. The .proposed design, in comparison to the previously-approved design with some stakes in the ground and also in only 2-D images, which is why I brought along some photos to show you, or images . The top being existing conditions, the middle being the previously-approved design, and the bottom being the newly proposed design. I just wanted to make a couple of quick points . The new design is 20% less lot coverage than the previously-approved design. We eliminated all of this decking on the north side of the property. The proposed second-floor addition does not project any closer to the water than the previously-proposed structure enclosed space did. In the previously-approved design we had a large covered area of decking with a green roof above. That has Board of Trustees 9 September 16, 2026 been replaced with an open trellis, and essentially all that covered decking is more or less removed, you know, and replaced with a very minor overhang on the first floor here by this bar seating area. The second-floor balcony to the second-floor bedroom, while it is slightly wider, it is no further towards the water on the north side of the property.. So it ' s really our goal -- the initial exercise, it took my client ' s desired program, presented it in front of you, wasn' t even sure if this would be agreeable, and after receiving approval, we tightened up the design. The new proposed design is a lot more cohesive compared to the old design, is very clunky. So, yes, overall, like I said, our desire was to reduce the overall impact and while some things have shuffled around, we are really not presenting any structures or any enclosed space that ' s any closer to the water than we previously had been approved for. TRUSTEE' GOLDSMITH: Can you comment on the, I think the previous iteration with the decks and everything, were at or near grade. This new proposal looks like everything is raised. What ' s the elevation of those raised lower platforms? MR. NICHOLSON: Well, the lowest one would be at the same height as the previous design, and they step up in seven-inch increments from there. So the highest point would be -- I think I have the elevation here. 21-inches above the existing average grade, which is going to need to be slightly raised. The new addition, we are raising up 18 inchesy ' the finished floor from the existing structure to be compliant with the FEMA regulations . TRUSTEE GOLDSMITH: And you also said that one structure that was previously a deck, part of that now is enclosed living space; is that correct? MR. NICHOLSON: Down here? Is that where you are referring to? TRUSTEE GOLDSMITH: Yes . MR. NICHOLSON: No, that ' s not enclosed. It ' s all open. TRUSTEE GOLDSMITH: The top part. MR. NICHOLSON: The top, that ' s just a handrail, a screened handrail for privacy on the second-floor balcony. TRUSTEE GOLDSMITH: Okay, how about the section closest facing Brush' s Creek? So to the middle more. MR. NICHOLSON: Here? TRUSTEE GOLDSMITH: Yes, sir. MR. NICHOLSON: I 'm sorry, can you repeat your question? TRUSTEE GOLDSMITH: Is that moving closer to Brush' s Creek than the previous iteration with living space? Because on the previous one and on that design there was a deck at one point, and- now it looks like it ' s enclosed in living space, going closer to the creek. Board of Trustees 10 September 16, 2026 MR. NICHOLSON: Right. So this previous design, this was a trellis . This is a coplanar, this glass wall here, that was a staircase. And this small little bump-out here where the dining room is, we are not projecting any further than this existing dining room was . So this second floor is now in the same plane as the previous dining room was . And the dining room itself and the new design is actually pushed back. In the plan you can see this small, little half-round bump-out, is really more of an esthetic thing and functions on the inside of the building. But the leading edge of that curved bump-out is as far as we were projecting in the previous design. TRUSTEE GOLDSMITH: And now there is also that patio area where you are depicting the firepit there, where there ' s a tree currently, correct? MR. NICHOLSON: Yes, and we talked about this onsite. My client and I would love to save the tree. It ' s in good health, and we are happy to try to prune it and keep it there. Technically, some of the limbs do interfere with either one of these designs and so, you know, we ' ll try to keep it. But if not, we are happy to replace, you know, multiple new trees on the property like we had presented in the planting plan on the previous amended site plan. TRUSTEE KRUPSKI : Debatably, the plan interferes with the tree ' s limbs, not the other way around. MR. NICHOLSON: I 'm sorry? TRUSTEE KRUPSKI : I said debatably, the plan interferes with the tree ' s limbs, not the other way around. MR. NICHOLSON: The plan -- TRUSTEE GOLDSMITH: Your design. MR. NICHOLSON: Well, the gravel area would be around the tree. But the decking and everything, does not interfere with- the tree. So, you know, like I said, if we trimmed, pruned the branches, probably would be okay, and I 'm certainly willing to try to do that. It ' s not a native species so, you know, per your approved planting variety, so, again -- TRUSTEE FINORA: When I look at this new proposal I see more volume in every dimension. I see an extended floor, forward projection of the second floor, removal of some decking, which I think you referred to as a lot coverage reduction, but I don' t see those as equals in terms of impact. The total volume here is a substantial increase in the structure already. This parcel is challenged and constrained by having water surrounding it, nearly making it a peninsula, and I think the first go-around with this, it was more latitude for your addition, even though it was approaching a different waterfront boundary, but we were giving respect to the project having water on multiple sides . This amendment here, I feel like is more volume towards a project that was already perhaps at its limits for what should Board of Trustees 11 September 16, 2026 have been considered given the site constraints . The elevated platforms, they feel like an addition of volume, not outside the footprint of the house. I don' t see that as like-for-like being exchanged for decking. I appreciate that you've included some gravel, but that ' s also an additional scope item now that was not increasing the disturbance area, and generally I think that adds to the overall footprint of the project. So I 'm not very pleased with the modifications here. I don' t blame you for seeking the additional space on the second floor but this feels it ' s growing beyond what I 'm comfortable with, particularly with the balconies and the patio areas . MR. NICHOLSON: So the previous design, you know, maximizes the GFA that is allowable on the site, and so does the new design. So in terms of volume, I mean from the image, it looks bigger because it ' s zoomed in, whereas this one was zoomed out to see the decking on the north. But, you know, this volume here is pushed in on the other one in order to project some of the second-floor volume out. It ' s a little bit of push and pull. I would be happy to share some other views with you but if you really study the plans, volumetrically this has a smaller footprint and actually the second-floor living space is, you know, it ' s out of site from this view here on top of the existing structure, which would really be here. You can see it in this view. TRUSTEE FINORA: I 'm just not buying this argument that this is the same or reduction, I mean, the images I think are clear that the volume is increased. Your second floor is now fully expanded, your balconies are projecting further and wider than they were before. And I think I 'm being -- I just don' t support this expansion. TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak regarding this application? (No response) . Any other questions or comments from the Board? (Negative response) . TRUSTEE GOLDSMITH: Hearing none, I make a motion to close this hearing. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Due to the extensive LWRP that is inconsistent with the structure moving closer to the wetlands, with the footprint going closer, with the loss of existing vegetation, this project is going to adversely affect the wetlands of the Town. It will also cause damage from erosion, turbidity or siltation. It will adversely affect fish, shellfish .or other beneficial marine organisms, aquatic wildlife and vegetation or natural habitat thereof, and will also increase Board of Trustees 12 September 16, 2026 the danger of flood and storm-tide damage. So because Chapter 275-12 (a) , (b) , (d) , (e) , and the extensive LWRP inconsistency, I will make a motion to deny this application as submitted. TRUSTEE FINORA: Second TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. NICHOLSON: Thank you, for your time. WETLAND & COASTAL EROSION PERMITS: TRUSTEE KRUPSKI : Under Wetlands & Coastal Erosion Permits, Number 1, Docko on behalf of THOMAS H. PATTERSON requests a Wetland Permit and a Coastal Erosion Permit to reconstruct existing pier consisting of a landward 6 ' wide by ±34 linear foot long pile supported pier to an 8 ' wide by ±50 linear foot long pier to a hinged ramp to a new 12 ' x14 ' floating dock with ladder secured by four restraint piles; four (4) existing tie-off piles; pier to include rails on both sides, and water/electric utilities; and to maintain the existing ±265 linear feet of stone armor shore protection, resetting stone that have been . displaced as necessary. Located: 84 Bell Hill Avenue, Fishers Island. SCTM# 1000-9-3-6 MR. BAYNE: Bill Bayne, from Docko, on behalf of Thomas Patterson. TRUSTEE KRUPSKI : I just have to read the review first. The Trustees most recently visited the site on the 28th of August, discussed the consideration for the rails . Also discussed memorializing the buffer, which was subsequently followed up at work session with the discussion on how many rocks were going to be moved, and if there was some reason to keep some within the water for habitat and/or a secondary layer. of protection. The LWRP coordinator found this to be consistent. Is there anyone here that wishes to speak to this application? MR. BAYNE: Bill Bayne, with Docko, on behalf of Thomas Patterson. It ' s a fairly straight-forward project to rebuild an .existing dock that ' s about 35-year old, that supports recreational boating in Hay Harbor part of Fishers Island. The new dock will be rebuilt with the same design, fully within the footprint of the existing structure, consists of 84-foot fixed pier and a 12x14 float with four tie-off piles . As you mentioned, part of this will also be retaining the shoreline protection stone which has, you know, just through the normal course of erosion, some of it is falling away. No new stone will be added and we are not looking to drastically change the shoreline protection in any way, it ' s really just resetting Board of Trustees 13 September 16, 2026 a few stones that have fallen away over the years . All work will be done by marine barge, and demolished materials will be removed by the contractor via barge, and new piles and decking will be brought in via barge, as well as a prefabricated float . And I 'm happy to answer any questions . TRUSTEE KRUPSKI : So I think the dock rebuild is fully functional, is pretty straightforward. There was the one comment from field inspection regarding memorializing the buffer. So they already have a pretty healthy non-turf vegetated buffer there, so we would just want to, see the plans indicating that. And I would say a minimum of 15 feet, so it if there is a small few areas where it ' s less than 15 feet, we would like to see a buffer added to that, and then where it ' s larger, if they want to keep that vegetation, they should. So if we can just get new plans on that. And then the question regarding the rock was not so much we were trying to determine is someone going to come in and really rip out some of that vegetation in the process of rebuilding this, or are you just talking about placing a handful of stones back? MR. BAYNE: Placing a handful of stones back. We are not looking to remove any vegetation, it ' s just a few spots where there are now voids in the overall protection where individual rocks have fallen over the years . So it ' s really just to reset those. TRUSTEE KRUPSKI : Okay. Is there anyone else here that wishes to speak regarding this application, or any additional comments from members of the Board? (Negative response) . TRUS.TEE. KRUPSKI : Hearing none, I make a motion to close the hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE KRUPSKI : I make a motion to approve both Wetland and Coastal Erosion permit with the stipulation of new plans depicting a minimum of 15-foot vegetated non-turf buffer with native species . TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Number 2, Docko on behalf of CARROLL M. CARPENTER REVOCABLE TRUST requests a Wetland Permit and a Coastal Erosion Permit to reconstruct the existing pier consisting of removing the existing landward wood ramps and construct a new landward 4 ' wide by ±42 linear foot long access ramp to pier with handrails and two beach access ship ladders/stairs; in-place reconstruction of existing 7 ' wide by ±112 linear foot long fixed pier with handrails; reconstruct existing 7 ' wide by 22 ' Board of Trustees 14 September 16, 2026 long fixed "L" pier with a ships ladder; existing tie-of pile to remain; and to install new water and electric to pier. Located: 2512 Brickyard Road, Fishers Island. SCTM# 1000-7-4-3 . 1 The Trustees visited the site on 8/28/26. Notes read confirm shower removal, inquire about eelgrass protection. The LWRP program coordinator found the project to be consistent. Is there anyone here wishing to speak regarding the application? MR. BAYNE: Bill Bayne, Docko, on behalf of The Carpenter Trust . This is a similar project, rebuilding an existing dock with the same footprint. The footprint remains the same, deck height remains the same. There was a comment about a shower head that was not included on the plans, that has since been added in. There is eelgrass surrounding this dock. It does grow pretty well right up to and under the dock due to the height and orientation, but further aid in its ability to expand. The only major difference will be replaced with thru-flow to allow the sunlight to pass through, so if it wants to go further toward the shoreline. Other than that, same as the last one, all work will be done from a marine construction barge, demolished materials will be removed via barge, and. all piles and decking will be brought in via barge. I 'm happy to answer any other questions . TRUSTEE SEPENOSKI : Any questions from the Board? (Negative response) . Is there anyone else wishing to speak regarding the application? (No response) . Hearing no further. comments, I make a motion to close the hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : I make a motion to approve this application with the removal of the outdoor shower in the wetland area. That ' s my motion. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . WETLAND PERMITS: TRUSTEE GILLOOLY: Number one, under Wetlands Permits, Sam Fitzgerald, Architect on behalf of ANDREW SHANNON & KATHERINE O'BRIEN requests a Wetland Permit for the existing 2, 229sq. ft. (Gross floor area) , two-story dwelling, construct additions and alterations for a 2, 503sq. ft. Two-story dwelling consisting of removing the existing two-story west wing and one-story sections, and construct a two-story addition with a slight Board of Trustees 15 September 16, 2026 footprint expansion; construct a 236sq. ft. Screened porch on west side of dwelling; construct a 36sq. ft. Covered front porch; existing 22 . 3 'x20 . 9 ' deck to remain; remove the existing seaward screened-in porch; and to abandon existing septic system and install an I/A OWTS sanitary system. Located: 1950 Equestrian Avenue, Fishers Island. SCTM# 1000-9-6-4 . The Trustees most recently visited the site on the 28th of August, noting the following: House and foundation should not extend the 12 to 18 inches seaward. Also, side porch should be pulled back to the same distance. Wetlands side of house should be non-turf vegetated natives. The existing deck should be dialed back in line with house. New plans and stipulate IA I will also note that this project appears to be out of compliance with a previous Wetland permit #6722, which did state a non-turf buffer should exist on the seaward side of the house. The LWRP reviewed this application and found it to be consistent . Is there anyone here wishing to speak regarding this application? MR. FITZGERALD: Yes . Good evening. My name is Sam Fitzgerald, appearing on behalf of the owners . Just a few comments, if I could, on the field notes . Just a clarification. So our, so the main mission of our application is to rebuild the west wing of the house on the same footprint, with a slight expansion. So we would be expanding on two sides . On the front side, that is the landward side, we would be expanding 18 inches, and on the west side, on the side of the house, 18 inches . We are not expanding on the south side, the water side at all . So there would be no new expansion of the house towards the pond. So we would be keeping the exact same setback that we have now currently. The owners would be happy to take the Board' s recommendation on a buffer. That ' s great. And we apologize for it not being implemented sooner but I guess, these are new owners . And just to comment on the deck. There was a comment I think you wanted to dial that deck back, the existing deck back to the edge of the building. You know, that deck is not part of this scope of work. It was not part of this application. That deck has been there for over 30 years . It did receive as-built permit from the Trustees in 2007, and a CO from the Building Department. So it ' s completely permitted. In the 20 or so years since this body gave the deck a permit, there has been no negative impact on the wetlands whatsoever. And if in fact that is the Board' s ask here, is to Board of Trustees 16 September 16, 2026 cut that deck back, it would be about a six feet would be lopping off that deck, and that ' s, I think the owners would be a bit flummoxed to sort of learn that they would have to incur tense of thousands of dollars more on a deck that does have a Trustee permit already, and also has no negative impact on the wetlands . Thank you. TRUSTEE GILLOOLY: Thank you, for your presentation. Having visited the site I think I would have to disagree with the assertion that there is no negative impact on the wetlands . It is extremely close to an area that would have vegetation related to the wetlands, and given the increase in scope and use of this house, I think this is the appropriate time to review all structures related to the residence. So I believe that overall reduction of that deck and pulling it in-line with the house is a very fair stipulation of the permit, considering the additional volume that is being considered here. MR. FITZGERALD: Okay, I think that we would, I think this is something that I would like to confer with the owners about, actually because it is a very significant construction cost, certainly that they are being asked to incur. If that ' s the feelings of the Board, I would like to see if we can table this until next month when I can confer with the owners . TRUSTEE GILLOOLY: If that is your preference. I do think that the Board is prepared to move forward with this application, but if your strong preference is to delay this hearing for another month, we would -- MR. FITZGERALD: Yes, I think that is something that the owners would definitely, and maybe it is that we get there, but I think it ' s something the owners would definitely like to confer on and just understand before we commit. So if we could table to next month, that would be great. TRUSTEE KRUPSKI : I have a follow-up question. TRUSTEE SEPENOSKI : I just wanted to make sure we both understand each other as a Board and applicant what the recommendation is at this point . MR. FITZGERALD: Sure. TRUSTEE SEPENOSKI : And what the Board' s position is, to remove the deck flush with the face of the house. MR. FITZGERALD: Yup. TRUSTEE SEPENOSKI : And you are already doing, I think a great thing, by shifting that seaward projection -- MR. FITZGERALD: The screened portion, yes . TRUSTEE SEPENOSKI : (Continuing) body of the house to the side. Is that your understanding of what the Board' s -- MR. FITZGERALD: Right. So just to clarify further, we would be, it ' s about six feet, that we would be cutting the deck back, by the whole width of it, which is 25 feet. So it would be taking Board of Trustees 17 September 16, 2026 a 6 ' x25 ' swath of that deck out, we would be removing that. And you know, that would require us to put in new piers, to reframe that deck and, you know, it ' s a significant amount of work. So I just wanted to touch base with the owners before we fully commit to something. But yes, we are on the same page. . TRUSTEE SEPENOSKI : Okay. TRUSTEE KRUPSKI : Quick question for you, for the work on the, I think you said the west side of the house. MR. FITZGERALD: Yes . TRUSTEE KRUPSKI : Are you demoing the entire structure and powering a new foundation in there? MR. FITZGERALD: Yes . So. what it is, this all started because we wanted to add a second floor to that west wing, and the contractor was looking at the existing foundation and found it to be in pretty bad repair. So what we are doing is we are replacing that west wing on the same foundation, again, with just a little bit of bump out on two sides . But it will be a new foundation. And we have received a zoning variance for that work. But it would be a new rebuild west wing. TRUSTEE KRUPSKI : Because on the seaward most side of that wing, there is an overhang on what I would, I guess, call the first floor. So are you going back to where the existing foundation is and going up or -- MR. FITZGERALD: Yes . TRUSTEE KRUPSKI : (Continuing) . Or are you moving the foundation out underneath that overhang. MR. FITZGERALD: Yes . So to clarify, we would be keeping the foundation where it is on that water side. So it would just be going up at the existing location. TRUSTEE GOLDSMITH: Mr. Fitzgerald, if you' re going to table it and come back next month, for the plans come back with a 20-foot vegetated non-turf buffer planting plan for that as well. So we have everything for next month. MR. FITZGERALD: Got it. Happy to do that. That ' s great. Yup. TRUSTEE GILLOOLY: All right, anyone else here wishing to speak regarding this application? (No response) . Hearing no further comments, I make a motion to table this application at the applicant ' s request . TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. FITZGERALD: Thank you. MR. FINORA: Number 2, Bruce Kinlin on behalf of ROBERT PATTERSON, c/o DIANA PATTERSON requests a Wetland Permit to demolish existing dwelling, accessory structures, and abandon existing septic system; construct a new two-story dwelling (3, 605sq. ft. Footprint) with 950sq. ft . Of seaward decking and Board of Trustees 18 September 16, 2026 covered porches with steps, an 18 . 61xl9 ' partially covered raised terrace, a 7 . 6 ' x10 ..6 ' side bbq area with steps, a 6 'x20 . 6' side covered porch with steps, two 51x16 ' balconies, a 5 'x5 ' outdoor shower, a ±6' wide basement stair egress; install an I/A OWTS sanitary system; install a stormwater drainage system; regrade, loam, seed and stabilize disturbed areas, relocated existing underground elec/tele/data services; install new a/c units and generator, and modify existing driveway. Located: 4180 North Hill Road, Fishers Island. SCTM# 1000-6-1-10 The LWRP was found to be consistent for this project. The Trustees conducted a site inspection on August 28th, 2026, with following notes : Adding a 25-foot vegetated non-turf buffer, setbacks on plans must reflect house to top of bank, and to more clearly depict the limits of the pond to the eastern side of the property. Is there anybody here wishing to speak on behalf of the application? MR. KINLIN: Hi, Bruce Kinlin, Kinlin-Rutherford Architects . TRUSTEE FINORA: The notes here indicate the setbacks need to reflect the top of bank to top of house. Specifically on the survey, I think the most seaward edge is shown. I think that dimension is 108 feet . But it' s measured to the bottom. MR. KINLIN: I have a question. I have two new drawings that are really the same drawing that you have, our R-021 drawing, where we simply added more additional dimension lines that will show from top of bank. Can I submit those? TRUSTEE GOLDSMITH: Yes, sir. Just bring them to the clerk. Liz will stamp them in, please. MR. KINLIN: I have copies for each of you. (Handing) . Thank you. Should I wait for you to see those? (Affirmative response) . TRUSTEE FINORA: Unless you have any unrelated comments . MR. KINLIN: I think when you have those, I ' ll make a few points and just point out some of the information on those drawings . If I may. So there are two sheets there just to guide you through them. The first sheet labeled 021 . 0 is the same as your 021 drawing that we submitted, with just additional information added to it. We have shown the 75-foot -- these are still measured off of what we originally had shown, which was the edge of the approximate limit of tidal wetlands . The next sheet will show the data from top of bank. So, just to clarify kind of what was submitted. We 've also shown, so that 25-foot buffer zone, we 've also added just some dimensions from the same tidal wetland line to the existing- dwelling as well . Just as a frame of reference. And we have also shown some of the larger trees that are on the property, on the landward side of the house. And just added dimensional information from the wetlands to the east and west as well . Board of Trustees 19 September 16, 2026 So this just reflects exactly what we submitted before, but just with a little bit of additional kind of data. And then the second sheet, which we labeled A021 . 1, is again, it ' s the same drawing, house is in the same place. Obviously the same trees . And the difference in this drawing is the two setback lines are now drawn, they have been shifted to top of bank. So the dimensions on this drawing reflect where the house, same house, in the same proposed location, what those dimensions are from top of bank. TRUSTEE FINORA: Very helpful. Thank you. The other comment related to the acknowledgement of a 25-foot vegetated non-turf buffer becomes a little challenging to delineate on a property with so many different wetland influences here. I think generally what is lacking here is a demonstration of those buffers from those respective wetlands . Can you describe or help me understand what is being asked for there? TRUSTEE FINORA: Yes . So, typically, if you are thinking of this in a linear, like a bulkhead, it would just be a respective dimension all setback from there, of the buffer zone, not vegetated, non-turf. MR. KINLIN: From the wetland boundary. TRUSTEE FINORA: Exactly. Yes . So in this case -- MR. KINLIN: Correct. There is so much space there. I guess you are asking us to delineate that 25 foot zone from edge of wetlands, landward toward the house, and label it as to be -- TRUSTEE FINORA: Vegetated non-turf buffer. MR. KINLIN: Yes . TRUSTEE FINORA: And the reason why we are seeking that specifically to be delineated here is because there are so many varying wetland lines, it ' s not a simple straight line with an offset dimension, that buffer would need to follow the contour and the path of those respective wetland lines . MR. KINLIN: I understand that better now. I would be happy to make that designation. TRUSTEE FINORA: Okay, very good. Are there any other comments from the Board? (Negative response) . Any other comments from the public? (No response) . TRUSTEE FINORA: I would make a motion to close the hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: I ' ll make a motion to approve this application subject to plans depicting the 25-foot vegetated non-turf buffer, and following the orientation of the respective wetlands demonstrated on the survey received September 16th, 2026. Board of Trustees 20 September 16, 2026 TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 3, Glenn Graham on behalf of JAMES KAMINSKY requests a Wetland Permit for the replacement of the previously removed 3, 000-gallon above ground diesel tank with a 500-gallon double wall above ground diesel tank set on an 8" high concrete pad extending a minimum of 12" beyond all tank edges. Located: 100 East Mill Road, Mattituck. SCTM# 1000-106-4-4 The Trustees conducted a field inspection September 9th, 2026, notes it ' s a commercial application in a Marine II zone. No adverse environmental impact. The LWRP found this to be exempt. Is there anyone here wishing to speak regarding this application? MR. GRAHAM: Good evening. I 'm Glenn Graham, with Graham Associates, Brightwaters, New York. This application involves replacement of an existing" fuel tank to stay in compliance with Suffolk County Health Department Office of Pollution Control. We are essentially replacing an outdated three-thousand gallon diesel tank with a one-thousand gallon double-wall steel rube cube, they call it. It ' s a square/rectangular above-ground diesel fuel tank for the owner of the property who is a commercial fisherman, services his boats . We are reducing the onsite storage from three-thousand gallons to one-thousand. It has multiple levels of leak detection in this tank. It ' s a double-wall tank, it has an interstitial space with an alarm, a high-level alarm, other types of spill prevention. We 've used this similar tank at some of the other marinas out here: Orient Point, Goldsmith' s, I think Port of Egypt we used for that. A few different ones . So, any questions from the Board? TRUSTEE GOLDSMITH: Anyone else here wishing to speak regarding this application? (Negative response) . Any other questions or comments from the Board? (Negative response) . Hearing none, I make a motion to close this hearing. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: I make a motion to approve this application with the corrected project description, which should read as follows : Glenn Graham on behalf of James Kaminsky, requests a Board of Trustees 21 September 16, 2026 Wetland Permit for the replacement of the previously removed 3, 000-gallon above-ground diesel tank with a 1, 000-gallon double-wall above-ground diesel tank set on an 8" high concrete pad extending a minimum. of 12 inches beyond all tank edges . Located: East Mill Road, Mattituck. That is my motion. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. KAMINSKY: Thank you, very much. Good evening. TRUSTEE KRUPSKI : Number 4, Creative Environmental Design on behalf of KORYN GATTA ESTRADA requests a Wetland Permit to remove approximately 100 cubic yards of soil including existing phragmites roots within the wetland area to the east, replace soil with approximately 100 cubic yards of clean sandy loam while maintaining the existing grade, and revegetate this area using various native species of plants; along the border of the lawn area and the existing 20 ' wide non-disturbance buffer area place boulders (50 lbs. + each) set approximately 5 ' on-center. Located: 2350 Deep Hole Drive, Mattituck. SCTM# 1000-123-4-7 The LWRP coordinator found this to be consistent. The Trustees visited the property on the 14th of September, reviewed the new plans and just had a question as to what was being meant as a "bamboo barrier in this location, and subsequently what is the purpose. Is there anyone here wishing to speak regarding this application? MR. CICHANOWICZ : Dave Cichanowicz, Creative Environmental Design, representing the owner. On the bamboo barrier, what we are trying to do is to eliminate a growth of the phragmites in the non-turf area to the lawn area. And we found in the past putting something like this works very well with bamboo situations as well as phragmites . The material is a PVC material, approximately half-inch thick and about three-feet deep, and we trench it by hand along this barrier, install it. You don' t see any of it. It ' s just a sub-level growth inhibiter. So it ' s worked very well in the past and we thought this would be a good idea to help contain phragmites spreading throughout the area. TRUSTEE KRUPSKI : Thank you. MR. CICHANOWICZ : And I think from the plans that I showed, that one area that ' s closer to the house, we ' ll restore that back to a normal native area. On my. plan show the native plants we are putting in there. The owner argued with putting in bayberry, I said, no, the Trustees were very insistent that they wanted bayberry in there, so he finally let go on that, so we ' re all good to go. TRUSTEE KRUPSKI : Thank you. Is there anyone else here that Board of Trustees 22 September 16, 2026 wishes to speak regarding this application? (No response) . Any comments from the Board? (Negative response) . Hearing none, I make a motion to close the hearing. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE KRUPSKI : I make a motion to approve this application with the stipulation of new plans depicting the distance of the non-disturbances area drawn on the plans . TRUSTEE GOLDSMITH: Second. -All in favor? (ALL AYES) . MR. CICHANOWICZ : Thank you. TRUSTEE SEPENOSKI : Number 5, RODULFO DAVID CIFUENTES requests a Wetland Permit for the existing 1, 074sq. ft. One-story cottage that includes a 9 . 2 ' x24 . 5 ' enclosed porch with a 3 ' x4 . 2 ' entry and steps, a 215sq. ft. Deck with brick steps, 3 . 5 'x3 . 5 ' wood steps, and raised a/c unit; a 3 . 6 ' x4 . 3 ' outdoor shower; a 60sq. ft. Shed and a 3 . 31x5 ' generator on a concrete pad; existing 10 . 4 ' x15 . 9 ' seaward wood deck/dock; existing 345 . 47sq. ft. Wood dock consisting of a 16. 66sq. ft. Landward fixed ramp to a 48 . 45sq. ft. Fixed ramp to a 38 . 18sq. ft. Fixed walk to a 175 . 68sq. ft . Fixed platform with a 57sq. ft. Fixed access platform with 3 . 2 ' steps down. Located: 2035 Laurel Way, Mattituck. SCTM# 1000-121-4-21 The Trustees visited the site on 9/9/26. Notes from our visit read: Only one dock allowed; remove dock closest to house; remove excess fill and non-native species; revegetate with native species . The LWRP coordinator found the project inconsistent with Policy 6. 3, Protect and Restore Tidal and Freshwater Wetlands . It provides a lengthy background on the history of the parcel, dating back to 1957 . And recounts various additions and surveys of the property in 1988 and again in 2025 when work was done on the project without Trustee permits . Is there anyone here wishing to speak regarding the application? MR. CIFUENTES: Yes . I am Rodulfo David Cifuentes, I am the owner of the house. I live there. It is my home, . my hopefully retirement home. And I bought the house in 2020 . When I bought it, it was kind of like the end of or during COVID and all of that, and I bought it as is . You know, they sold it to be as is . I was never told, you know, you would need all these things, all these permits . And I figured everything was taken care of. And aside from, you know, yes, I did add the generator because the house had no heat, and, but the two docks that are there, the seaward one and the closest to the house, is, I spoke to the owners, previous owners, who sold me the house. They bought the Board of Trustees 23 September 16, 2026 house in 1989, and they said those docks. were there when they bought the house. And they said only one time they had to do repairs because a tree fell on one of them. I don' t know what year that was, but they, both docks were there. So it ' s not like I added them or I didn't -- TRUSTEE SEPENOSKI : No, we understand. We have a long history with this property as it is . I think the one challenge is now that coming before the Board, seeking to legalize all the structures on the property, there is town law prohibiting two docks on one single parcel. So in our field inspections we noticed, and in review of photographs from years ago, we notice the water levels come right up in that area, and that the vegetation is attempting to re-establish itself, almost at the edge of your lawn area. TRUSTEE KRUPSKI : There is no lawn area. TRUSTEE SEPENOSKI : Not anymore. It ' s trying to be a lawn, because he ' s mowing it. TRUSTEE KRUPSKI : Just to clarify the record, because I think it ' s important. There was a violation here where fill was added and a wall;, and not all that fill- was removed. Most of it was, but not all . So the wetland vegetation was even closer to the structure. This structure regularly used to have water flooding under it . It ' s a seasonal house. TRUSTEE SEPENOSKI : "Structure" meaning the house. TRUSTEE KRUPSKI : That ' s correct. MR. CIFUENTES : With regard to that, I feel the DEC, I don' t know, I know it ' s different entities, but they gave me an established amount, they put in the stakes to get to the ground, like right now, I was, I did all the native plantings, I did them myself, and it was extremely hard because there was maybe an inch or two inches of topsoil . Everything else underneath is sand. So, I don' t know, I don't think that was ever sandy. I think it was just this runoff, because even when I bought the house, I noticed underneath the house, the water never went over. It was, there is a big concrete pipe that allows, I guess filters the water. I believe I showed it to you guys when the Trustees, when you were there in the house, in the premises . So. It ' s not I didn' t add any of that. The house was lifted at some point, I don' t know when. The soil has been removed pretty much, it ' s pretty much level to the vernal pond there. I don' t know if you have been to the property recently. TRUSTEE SEPENOSKI : We went on the inspection, yes, and we noticed there is a grade sloping downward from where the fill was brought in. So there is still quite a bit of fill in that area. MR. CIFUENTES : Are you talking about the back of the house? Because that ' s always been higher. But in the front, It ' s always, I mean, if you need more removal. Board of Trustees 24 September 16, 2026 TRUSTEE SEPENOSKI : Just so we are clear, there are boards that surround the footprint of the house now, basically attached to the footings of the house rest upon, and those boards are an indication of just how high the grade was raised in order to establish some kind of soil base there. MR. CIFUENTES: I understand. TRUSTEE SEPENOSKI : Whereas Trustee Krupski said the water used to flow underneath the structure, in a rain event . MR. CIFUENTES: Yes, that was put there, and I offered to take it off, and I was never indicated to take it off. I was just told to remove the soil, which I did, and do the native plantings . I mean I can take that off, that ' s not a problem. TRUSTEE KRUPSKI : If you look at the existing, at pictures prior to the violation, it ' s very clear that the ground level is much lower than where it is presently. MR. CIFUENTES : Okay. TRUSTEE SEPENOSKI : Okay, is there anyone else wishing to speak regarding the application, or Members of the Board, wish to comment? TRUSTEE GILLOOLY: Well, I do think that the offer to remove the boards is a good offer. I think that it will actually end up protecting your structure in the long run, rather than having water that can potentially go overtop the boards and be sitting underneath the house. So I think the removal of those boards would be a good step in the right direction. TRUSTEE SEPENOSKI : Mr. Cifuentes, we are, as a Board, charged with bringing this into conformity with the LWRP, and being that it ' s inconsistent, we have to address the two-dock situation on the property. MR. CIFUENTES: Okay. All right. Something you need to do later or -- TRUSTEE SEPENOSKI : We are going to vote in a moment. But I as one Trustee, . there is no other comment from yourself, Members of the Board, the public? MR. CIFUENTES: No, I 'm just, again, I 'm just saying they were there 50 years ago, almost. I don' t know when they were built . It ' s not like that, you know, why should I be punished for it. As I explained, I wrote a letter, I don' t know if you had a chance to read it. But I always wanted to have my dream house was something on the water. I couldn' t afford anything on The Sound or the bay. I bought this and always, I love to sit out there and look at nature, look at everything that grows around. It ' s like it ' s own eco-system there, and whether it ' s in the dock closest to the house or seaward, it ' s beautiful . TRUSTEE SEPENOSKI : Right. There is a dock closer to the house and there is a dock that is part of the walkway that extends out further, closer to the current lake edge. MR. CIFUENTES: Yes . If you would allow me to keep both, that would be great. I know you have your regulations, so I am at Board of Trustees 25 September 16, 2026 your mercy. TRUSTEE SEPENOSKI : Okay. We are also at the mercy of the Town codes . So, any other comments? (No response) . I make a motion to close the hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor.? (ALL AYES) . TRUSTEE SEPENOSKI : I make a motion to approve the application with the removal of the boards on the outside of the piles under the house; to move the platform; to acknowledge that when the other dock extends seaward gets rebuilt, that in that case it would need to be updated to the current standards in the Town Code. (Perusing) . So a non-disturbance buffer seaward of the current platform -- TRUSTEE KRUPSKI : No, that ' s thle house. TRUSTEE SEPENOSKI : A non-disturbance buffer seaward of the house, and a non-turf buffer landward of the house, thereby bringing it into consistency with the LWRP. TRUSTEE KRUPSKI : Landward of the seaward edge. (Perusing) . We should correct that motion. TRUSTEE SEPENOSKI : (Perusing) . Non-disturbance seaward of the house and non-turf buffer inclusive of the house, the remainder of the property. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : Thank you. TRUSTEE GILLOOLY: Number 6, En-Consultants on behalf of ROSEMARY & SEBASTIAN AVOLESE requests a Wetland Permit to construct a 17 'x36' swimming pool and 906sq. ft. Grade-level masonry pool patio; install 4 ' high pool enclosure fencing with gates; install a pool drywell and pool equipment area; and to establish and perpetually maintain a 10 ' wide vegetated non-turf buffer area north of the naturally vegetated wooded area. Located: 4270 Wunneweta Road, Cutchogue. SCTM# 1000-111-14-25. The Trustees most recently visited the site on the 9th of September, noting the following: Pool face to be no further out of the ground than 12 inches; change buffer; vegetated non-turf to 15 feet from wetlands line. The LWRP reviewed this application and found it to be consistent with its policies . Is there anyone here wishing to speak regarding this application? MR. ROSHAN: Yes . Good evening. Tyler Roshan, of En-Consultants, on behalf of the applicant. So this is an application to construct a grade-level Board of Trustees 26 September 16, 2026 swimming pool and patio, located 78 feet from wetlands . It ' s fully compliant with Zoning, out of DEC jurisdiction. There ' s no trees being removed, and the pool equipment and drywell are - outside of Trustee jurisdiction. To address the comments from the field, there was some . minor regrading. to ensure the patio projects no more than a foot above the finished grade. And with regard to the buffer, I have an updated site plan depicting the 15 feet, that I can bring up to you right now. TRUSTEE GILLOOLY: .Perfect. And I would just also note for the record, to remind the applicant that should there be a need to trim any trees within Trustee jurisdiction, that a tree letter should be requested. MR. ROSHAN: Of course. TRUSTEE GILLOOLY: So the proposed vegetated non-turf buffer line appears to extend only until the wooded section. If possible, I think we would like to see it inclusive of the wooded section, if that is going to be memorialized, or to extend all the way across the plan. TRUSTEE KRUPSKI : I agree with that comment. MR. ROSHAN: Okay, offset 15 feet from the wetlands line, obviously. TRUSTEE GILLOOLY: Right. MR. ROSHAN: Okay. TRUSTEE SEPENOSKI : Or around the wooded area in its entirety. TRUSTEE GILLOOLY: It could be inclusive of the wooded area if the applicant wishes to preserve that feature. That would be, you know, even more preferable to this Board. MR. ROSHAN: Okay. TRUSTEE GILLOOLY: Is there anyone else here wishing to speak regarding this application? (No response,) . Are there any other comments from the Board? (Negative response) . Hearing none, I make a motion to close this hearing. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GILLOOLY: I make a motion to approve this application subject to new plans depicting the vegetated buffer area to extend all the way across the plan, or inclusive of the wooded area. That is my motion. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE FINORA: Number Seven, Islandwide Engineering & Land Surveying on behalf of ROBERT P. AUTERI LIVING TRUST & NANNETTE M. AUTERI LIVING TRUST requests a Wetland Permit to remove existing sanitary system and replace it with a new I/A sanitary Board of Trustees 27 September 16, 2026 I system consisting of a Fuji Clean Cen 5 treatment tank, an inlet adapter 90, an Orenco pump and 52 '� of Quick 4 plus standard infiltrators designed as a combined system serving both the main house and the cottage; and to install and maintain silt fencing around the work area until the site is fully stabilized. Located: 3885 Camp Mineola Road, Mattituck. SCTM# 1000-123-5-31 . The project was found to be consistent with the LWRP, and a site inspection was conducted on September 9th, 2026, by the full Board of Trustees, noting that the project was a straightforward septic upgrade. Is there anyone here wishing to speak on behalf of the application? MR. PATANJO: Jeff Patanjo on behalf of Islandwide Engineering, on behalf of the client . Any questions, I 'm happy to answer. But straightforward septic system replacement further landward of the existing system. TRUSTEE FINORA: Any other comments from the Board? (Negative response) . Anybody else here wishing to speak on behalf of the application? (No response) . Hearing none, I make a motion to close the hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: I make a motion to approve this application. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 8, AMP Architecture ' on behalf of NORTH FORK REALTY HOLDINGS, LLC requests a Wetland Permit to construct a two-story dwelling with a 1, 793sq. ft. First floor and a 1, 704sq. ft. Second floor including an 88sq. ft. Front portico with steps, a 4 . 6 'x4 . 6 ' side entry with steps, 3 ' xl6 'x10 . 8 ' and 3 'x10 . 4 'x7 . 7 ' seaward entry stoops with steps to a raised (21" above grade) 482sq. ft. Porcelain pool patio with a 121x33 ' pool with 1 ' wide coping surround and a 1 ' wide catch basin along south and east sides of pool; install a raised 550sq. ft . Porcelain patio with a 9 'x10 ' raised hot tub; install 4 ' high pool enclosure fencing with gates, a pool drywell and pool equipment area; construct a 440sq. ft. 1 1,� story detached garage; install a buried propane tank, landward walkways, grass paver areas and a gravel driveway; in gutters to leaders to drywells to contain roof runoff; install an I/A sanitary system landward of dwelling; all excavation to be used for backfill and excess removed from. site; and to establish and perpetually maintain a 15 ' wide non-turf buffer along the landward edge of the bulkhead. Board of Trustees 28 September 16, 2026 Located: 730 Tarpon Drive, Southold. SCTM# 1000-57-1-8 The Trustees conducted a field inspection September 9th, 2026. Notes ask about the fill on the property, require a large non-disturbance buffer. The LWRP found this to be inconsistent. The inconsistency is the proposed action is on a nonconforming waterfront parcel within the wetland boundary of a canal . The proposed location of the single-family dwelling does not comply with the wetland setback set in Town Code Chapter 275-5 (d) . Is there anyone here wishing to speak regarding this application? MR. PORTILLO: Yes . Good evening, Board. Anthony Portillo, AMP Architecture. Regarding the fill, the fill would be removed from the site and disposal will not be kept onsite. I believe there was a note on our plans indicating that we can provide that in a mote, if you would like. Regarding the home, it ' s a new dwelling, no zoning issues . We are proposing an IA system. We did show the pier line, and the home is landward of the pier line. The proposed pool is 60 feet from the canal. It is a bulkheaded property. And we are proposing a 15-foot buffer, drywells are also provided for rain runoff. Otherwise, you know, if you have any questions, I can answer them. TRUSTEE GOLDSMITH: So, a couple. The proposed pool. What is the height; is it elevated? MR. PORTILLO: No, the pool patio where the pool is, is at grade. And the patio that is elevated two risers, so 16 inches . We are proposing a trough drain, or a basin to catch any rain off the patio into a drywell . TRUSTEE GOLDSMITH: Okay. And speaking of drywells, I see most of them are seaward of the pool. We are going to request that those are all pulled back landward as far as possible. MR. PORTILLO: Sure. I think we can probably adjust the location of the propane tank and pull those further toward the home. The proposed home. TRUSTEE GOLDSMITH: And the other thing we discussed was since this is a virgin, native lot, it has not been developed, the proposed 15-foot wide non-turf buffer is insufficient. We are looking for a 50 foot vegetated non-turf buffer, with at least five native hardwoods of minimum three-inch caliper. I know there are a couple beautiful old oaks on this property that are where the house is going to go, but other than that, there probably won' t be another tree left on this lot that is native right now. So we are going to look for a 50-foot vegetated non-turf buffer with a . planting plan, with at least five native hardwoods, in addition to moving those drywells landward. MR. PORTILLO: No concession on a 50-foot vegetated buffer, like Board of Trustees 29 September 16, 2026 closer to 40 feet . TRUSTEE GOLDSMITH: We can do .a concession to deny the whole thing, but I don' t think that ' s the concession you' re looking for. (All parties laughing) . TRUSTEE KRUPSKI : No, that ' s been pretty standard. MR. PORTILLO: That ' s almost a rear yard setback. Okay. TRUSTEE KRUPSKI : That ' s pretty standard practice for an undisturbed lot. MR. PORTILLO: You got it. I don' t think that ' s a problem. TRUSTEE KRUPSKI : There is precedence on this road, too, for a non-disturbance buffers along canals, so, that was sort of thought about. MR. PORTILLO: No problem. We would be allowed the four-foot walkway to the canal . TRUSTEE GOLDSMITH: Yes, with a four-foot path down. MR. PORTILLO: Okay. TRUSTEE KRUPSKI : And then I .guess a planting plan on that. MR. PORTILLO: Sure. And then, just to clarify, the pool and the proposed pool patio, the face that faces the canal on both how far out of the ground are they? MR. PORTILLO: The pool and patio around the pool that is landward of the pool is at grade. The pool patio is at two risers . So approximately, I think 14 inches . 'I think we actually provided -- if not, I can provide you the section. Yes, so if you look at the rear elevation, basically that patio that is raised is the longer portion in the rear elevation. TRUSTEE KRUPSKI : What, rear elevation -- MR. PORTILLO: I 'm sorry, it ' s SD-5, southwest elevation, rear. TRUSTEE KRUPSKI : Okay. MR. PORTILLO: The longer patio that you see is the raised part. And the only reason we show like two rise is because the grade kind of slopes a little bit, but again, it would only be like one level up from the pool patio, which is at grade. And then the stairs are going up to the landing. TRUSTEE KRUPSKI : I would say it would be helpful for SD-5 on the top, the northwest elevation, to have the pool on the side there. MR. PORTILLO: Sure, I can add that in. I can also give you a section if you' d like. I ' ll draw a section so it ' s clear. TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak regarding this application? Yes, ma' am? MS . WILLIAMS: Cathy Williams, 830 Tarpon. I.'m going to try to do my best because my husband couldn't come. So, try to bear with me, everybody, please. Considering, okay, buffer. Anyway, between our house and the proposed, we have sea grass on the buffer of our property, Board of Trustees 30 September 16, 2026 coming from the canal. And I just, I don' t know whether it ' s protected by the wetlands or the DEC, but I would like to see it preserved just as a natural buffer between the two homes . Don' t know if any of this is possible. There are two specimen Holly trees between our deck and their proposed pool, which is like 25 feet from my house. It ' s so close. But we would like for them to remain in place as a visual screen for privacy, and a sound-deadening device for the proposed pool . The pool is really close. And I would think they would want them to remain also, because, I don' t know. We would like as much natural vegetation saved and preserved, as possible. And not clearcut . But. We have a very narrow street, we want it cleaned, we want mud and debris taken off. We had problems with that before with people messing up, and not being able to address . And the holly by the telephone pole is definitely on our property, and we don' t want those mistakenly bulldozed. Coming to the pool. The pool is so close to the deck that we can probably jump off our deck and jump into the pool . I mean, it ' s, it ' s close. We have the holly between us . Let ' s see, what else do I have here. We also applied for a 7x14 pool a couple of years ago, and we were turned down, and so, on advice of our architect we settled for a hot tub. It' s hard to do laps in a hot tub. But, we' re good with it for now. I 'm sure they are probably shoehorning this pool next to us for the 60-foot setback. The length of the pool is 33 feet. It ' s, I feel way too big. 30x12 . It ' s sort of the house, the patio, the pool, the filter, are all sliding off the hill into our yard. It ' s very close if you could see it . Let ' s see what else. All three bedrooms are facing in the direction of the west, which is their property, so all three bedrooms are facing toward the pool and the buffer. And the proposed deck. The pump, the pool equipment, is proposed to be placed, I think it ' s '25-feet . Probably no more, off our. bedroom. Off our three bedrooms, actually. The pumps run eight to 24 hours a day. What are they, 45, 90 decibels . Pool cleaning equipment brings it to 55, 65 decibels . Spa running, 65 to 80 decibels of volume. Like a vacuum cleaner or a lawn mower. And I believe they also exceed the code after 7 : 00 p.m. , I 'm not sure. It' s really not conducive to quality of life, of any kind of sleep. It ' s just too close. 50 decibels is disruptive to sleep. 60 will prevent deep sleep. Very loud. And I 'm just very concerned about that part. I really am. I think it will affect our property value, and we really worked hard to maintain our property. I 'm sure, you know, I guess if you came over and stepped into my bedroom and looked out the window, you can see. But it ' s really close, and we would Board of Trustees 31 September 16, 2026 like the equipment to be moved to the other far side of the pool or behind the house, if at all possible. It looks like there is plenty of room on the site now to put equipment. And it looks like at least a quarter of the lot' has open space for pool equipment. I think it ' s creating a burden for both us and the property. It will not, excuse me, create a burden for the property on the other side of them or for us if it ' s put in the middle. We are not going to have that problem. So, pretty simple. I think the pool is too big. I think we would like to preserve as much natural division on the property as possible. And the pool equipment is absolutely way too close for sanity. I really feel it ' s going to be a problem. That ' s it. TRUSTEE GOLDSMITH: Thank you. Mr. Portillo, would you like to comment at all regarding the pool equipment? MR. PORTILLO: So no zoning issues there, but I don't think that ' s a problem, and I 'm okay with we can move it to the other side of the structure, then sort of tuck it. behind the house. That ' s fine. But regarding the pool, et cetera, we are within our zoning setbacks and lot coverage. That ' s actually really a modest house, in my opinion. We are not trying to build a monstrous home. And I think, unfortunately, the home that we are speaking about is, looks a little bit close to the lot line. So it might be existing/non-conforming. But I 'm not sure about that information. So, but no problem moving the pool equipment. I don' t think that ' s an issue. TRUSTEE GOLDSMITH: And just one other comment talking about the 50-foot vegetate the buffer, I think that would be appropriate to relocate your proposed pool fence to end at that 50-foot, so there is a delineation between where the proposed grass area would be and where that non-turf buffer will start. MR. PORTILLO: Sure, no problem. TRUSTEE GILLOOLY: I would also just say preservation of as many trees as possible is a positive thing and, you know, especially with the neighbor' s request of these specific Holly trees, it makes sense to try to preserve those. MR. PORTILLO: I think that ' s the case for us as well. I would say my client wants to preserve what we can. Replanting the site, I mean, I would imagine he is going to want the same privacy for his pool et cetera. So he would be replanting the site. I mean, if the board would like a landscape plan, I don' t mind providing that to you guys . It ' s not a problem. TRUSTEE GILLOOLY: And if you could just include what you' re able to save that is like a significant, that would be helpful on that landscaping plan. Board of Trustees 32 September 16, 2026 MR. PORTILLO: Sure, of course. MS . WILLIAMS : I don' t know whether my Holly' s are important but their like 30 feet high. They are really very old. And it' s right there. Right at the pool . We are going to be, I 'm going to be coming over to swim, I can tell you. MR. PORTILLO: Unfortunately, I don't own the property'. MS . WILLIAMS : I know you don' t. TRUSTEE GOLDSMITH: Is there anyone else wishing to speak regarding this application? (No response) . Any other questions or comments from the Board? (Negative response) . Hearing none, I make a motion to close the hearing. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: I make a motion to approve this application with the following conditions : A 50-foot vegetated non-turf buffer with a minimum of five native hardwood trees with a minimum of three-inch caliper; with a new landscape plan showing the proposed plantings as well as the existing vegetation, and what existing vegetation to remain'; that the drywells are all moved landward; that the pool equipment is relocated; and that there is screening for the pool equipment; that the height of the pool and the patio is no higher than 12 inches; and subject to new plans depicting all of these. And by, which will bring it into consistency with the LWRP. That is my motion. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. PORTILLO: Thank you, Board. TRUSTEE KRUPSKI : Number 9, AMP Architecture on behalf of JAMES & NANCY CLOUS requests a Wetland Permit to demolish and remove existing one-story dwelling, concrete stoops and steps, on-grade patios and walkways, and existing septic system; construct a new one-story, 2, 322sq. ft . Dwelling with a 6 'x17 . 3 ' front covered porch, a 4 . 5 ' x7 ' covered stoop, basement Bilco doors, a/c condensers, a buried propane tank, and gutters to leaders to drywells in rear yard; install an I/A OWTS sanitary system landward of dwelling; and to install at-grade 921sq. ft . Bluestone. patio with 4 ' wide bluestone walkways . Located: 3805 Bay Shore Road, Greenport . SCTM# 1000-53-6-18 . The LWRP found this to be inconsistent with Policy One, foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes sufficient use of infrastructure, minimizes adverse effects of development. Board of Trustees 33 September 16, 2026 Policy 6, protect and restore the quality and function of the town' s eco-system. 6. 1, protect and restore the ecological quality throughout the Town of Southold, reduce adverse impacts on ecological quality due tb development, reduce adverse effects of existing development . Citing that the proposed application is less than 100 feet. Discussing Police 6. 1 (c) (1) , 4 . 1 (a) . The LWRP coordinator did note that there will be an IA treatment system onsite, and it also pushes the building footprint out of the FEMA VE flood zone. The Trustees performed an inspection of the site September 9th, noted that some hardwood trees should be added. Three minimum. Potentially pull the structure back to 50 feet. Is there anyone here that wishes to speak regarding this application? MR. PORTILLO: Yes, hi, Board, Anthony Portillo, AMP Architecture, on behalf of the applicant. They are actually here, Mr. and Mrs . Clous . I would say, just to give the Board a little past knowledge, there was an application before you for this property, I would say a few years ago. That application was a lot larger of a home and also didn't have an IA system represented in the plans . I think it also passed the pier line. There were a couple issues with the design. So we are here back today, I think with a smaller plan. And just for the record we do have Zoning approval for what we are applying for. We are proposing this behind the pier line. We did take into account being outside of the VE zone and staying within the A zone so that the home was not going to have issues with any storm surging, or at least based on our FEMA maps . It ' s kind of a strange line over there. One of the reasons for the positioning of the home really was designing the IA system. As you can see, it takes up a large part of the front yard, which fortunately I had a chance to work on the two homes that are neighboring, and it ' s really the same situation with those homes . One of them I was here in front of the Board for. The IA system, fitting it in these lots, it' s difficult. So that ' s sort of how the positioning of the home came about. We are behind the pier line. You know, we ' re not right on it. So we are behind that, compared to the other two adjacent homes . And we, I just want to also mention we have a patio presented to the Board, and we provided you guys with a section to explain how that would be constructed. So gravel bed, gravel between the pavers, really want to make it a perforated patio. And, you know, trying to comply, as you can see, with the Town Board of Trustees 34 , September 16, 2026 Code here. So, moving the structure back, it ' s a very tricky situation. And probably not very possible. One other thing I want to mention, again, it ' s not a large home. It ' s a three-bedroom home, really to fit the family. It ' s not like they are requesting much larger than that. If I can answer any questions . TRUSTEE KRUPSKI : Is there anyone else here wishing to speak regarding this application, or any comments from the Board? (Negative response) . Regarding the comments about moving it back, I think it ' s another 3 . 8 feet, is that, do you not have that distance because of the septic system? MR. PORTILLO: I ' ll say this . I ' ll try to see if I can organize it a little bit differently and get as far back as possible. It is very shallow, if you look at where the groundwater is . So that ' s the reason why we have many leaching galleys and the leaching field is so large. Plus, obviously, the expansion areas that they require. And a low-lying system, we can' t make that work in the yard. But I think maybe I can maneuver the tank a little bit and gain afoot or two. I don' t know if I can get to 50 . I can try, though. I 'm willing to give that a shot, sure. Maybe, I 'm looking at it, maybe the tank can move a little bit. You know, obviously the distance from the structure is, um, I can give that a shot. But it is very tight, and I think groundwater is kind of the reasoning for that. Now, and also we are not grading, you know, we are not adding any fill. So obviously if that is something the Board would consider, that would help my scenario. I could get rid of the some of the leaching and then that would help me move the home back. So if the Board would be okay with me doing a foot or two, I don't know what that is, maybe get rid of one of the tanks . If that could help my scenario. TRUSTEE KRUPSKI : Are there any comments from the Board? TRUSTEE GILLOOLY: I would just note that, you know, the prospect of adding in fill, the concern for us is retaining walls on property lines, and so keeping that limited to no higher than two feet, per code. And, I mean, even lower would be preferable. TRUSTEE KRUPSKI : Can you say that again, please. TRUSTEE GILLOOLY: About the retaining walls . I 'm just saying, if the prospect of bringing fill in, we are concerned about the idea of retaining walls on property lines, and also the height of retaining walls . So keeping any proposed retaining wall and low and far enough away from the property line would be -- TRUSTEE GOLDSMITH: So, I like the design that you have, going back to the previous one, I remember that was a sticking point Board of Trustees 35 September 16, 2026 from the previous . So, you know, I wouldn' t like to see retaining walls . Like you said, I think that was one of the big sticking points from the previous iteration. So for you to be able to design one without it, I think is a huge leap forward. MR. PORTILLO: I took that from other projects I 've had in front of the Board to try to avoid that as much as possible. TRUSTEE GOLDSMITH: I wouldn' t want to see a step back just to see -- TRUSTEE KRUPSKI : I agree. MR. PORTILLO: I don't know, I 'm going off the top of my head here, there is no retaining, depending on that slope, Suffolk County has some requirement I have to stay within a certainly percentage. So I think it could work if I added maybe a foot, maybe I could get rid of, I would be doing math right now, I think I could maybe get .rid of something here and possibly that would help me move the home forward. TRUSTEE KRUPSKI : I would rather not go that route then, I would say. Are there any additional comments? TRUSTEE FINORA: I agree with you. I would rather not see that also. TRUSTEE KRUPSKI : Hearing no additional comments, I ' ll make a motion to close the hearing. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE KRUPSKI : I ' ll make a motion to approve this application subject to new plans depicting a minimum of two native hardwoods with a minimum of three-inch caliper; a minimum of ten-foot non-turf buffer; and based on the field inspections, noting the distance being pulled back, and noting the addition, no addition of fill, I find this to be consistent with the LWRP coordinator. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. PORTILLO: Thank you, Board. TRUSTEE SEPENOSKI : Number 10, Cole Environmental Services on behalf of MILO BD, LLC requests a Wetland Permit to remove existing 674sq. ft. Pool and 2, 024sq. ft . Patio and install a 19. 8 'x38 . 8 ' pool with coping and 1, 640sq. ft. On-grade pool Patio; install a 71x7 ' gunite spa a maximum of 24" above grade; construct a 37 linear foot long retaining wall along north side of pool patio to be a maximum of 24". above grade; install new 4 ' high pool enclosure fencing with gates; install a 44sq. ft. , 18" high planter; remove 238sq. ft. Of stoops and 11sq. ft . Steps and construct 12sq. ft . Steps leading to 330sq. ft . Pervious gravel pad; construct a 442sq. ft . Covered porch on south side of dwelling; install an 8 'x4 ' drywell for porch runoff; install ±20 Board of Trustees 36 September 16, 2026 linear foot stepping stone path with natural vegetated 6" joints; install a NDS EX-Flow stormwater container with open grate top; install 70sq. ft. Pervious on-grade wood walkway; remove existing 828 sq. ft. Masonry walkway and install 500sq. ft . On-grade masonry walkway and 45sq. ft. Masonry steps; relocate exiting septic control panel and electric meter closer to dwelling; remove 795sq. ft. Portion of driveway with addition of 16sq. ft. Gravel section and 250sq. ft. On-grade masonry apron at edge of driveway; construct a ±25 linear foot retaining wall along masonry patio, not to exceed 24" in height within Trustee jurisdiction, and to flush-cut existing dead spruce tree. Located: 1465 Harbor Lane, Cutchogue. SCTM# 1000-103-2-1. 1. The Trustees visited the site on the 9th. The notes read: Clearing violation along waterfront, to cut patio back and removal of deck. Patio is already failing. Include gutters to leaders to drywells for all of the area. Plans show all three AC units . Tree to be removed with a non-disturbance area should replace it . New vegetation plan along water, patio, on north side pool . Gravel, likely a no. Potential one time invasive removable and non-disturbance buffer. The LWRP found this proposal to be inconsistent with Policy 5, protect and improve water quality and supply in the Town of Southold. And Policy 6, protect and restore the quality and function of the Town' s eco-system. And then it goes on to speak about the importance of the bank and the non-disturbance buffer. Is there anyone here wishing to speak regarding the application? MS . RUMMEL: Kate Rummel, Cole Environmental. The Landscape Architect is also present. I do have updated plans that address all of the Board' s concerns . So the degrading patio is proposed to be removed, which was already on the plans that you have in your file. There is a proposed wood walkway at grade. The old deck that is seaward of the patio, that is being removed. And the gravel pad is still proposed, though it ' s been reduced by about 40o and then shifted landward. There is a small, still steel retaining edge and it ' s backward from where the land started to slope, just some area for the clients to have chairs and whatnot, to enjoy the view. There is a note on the plans that all gutters and leaders will be hooked up to drywells . The tree that was noted, that is dead at the bank, that ' s just to- be flush-cut so that the root system won' t actually be removed. And as we clarified in the work session, the covered porch is only on the rear of the house, and obviously the non-disturbance area will be replanted with native vegetation. TRUSTEE SEPENOSKI : Does the dock depicted on the plans you just Board of Trustees 37 September 16, 2026 submitted, does it match -- MS. RUMMEL: I have the previous permit and I have a photo that was taken the day, I believe it ' s the day of the site inspection that has it in "T" formation. It ' s just that I think the plan is based off the survey that was done in March. I believe that the float was just out of the water. That ' s why it ' s not reflected there. TRUSTEE KRUPSKI : I think one thing, and we didn' t discuss this in the field, but how the wetland comes in there, we should probably follow that with a buffer. Even if you were to transition there from non-disturbance to non-turf around that turn coming in. MS. RUMMEL: I 'm sorry, where exactly are you speaking of? TRUSTEE KRUPSKI : It ' s actually south. MS . RUMMEL: Can I approach? TRUSTEE KRUPSKI : Yes . You see where you are -- and when you respond, go back. But where. your buffer ends here and the wetland comes in, it would be nice no put something there. MS. RUMMEL: Okay. That should not be a problem. TRUSTEE KRUPSKI : We were just talking about how the property line ends in a rather rough spot there, that I missed, but it might make sense to just, and I don' t know if you want to approach again, but if you run it from the existing wood wall in the non-disturbance and tie in with a buffer somewhere around the landward most existing wood wall, where it says "existing remains of wood wall, " I think we would be happy to have something there, just controlling it. MS . RUMMEL: Right . Have it like run parallel to the property line, like in between, like if you are essentially extending the wood wall . TRUSTEE KRUPSKI : Yes . MS. RUMMEL: And about how far? TRUSTEE KRUPSKI : I think we are just talking about tying it into that wood wall there. Roughly into those, somewhere in the realm of -- MS . RUMMEL: Okay, sorry. I was looking at a different -- yes . So just extending it around -- understood. TRUSTEE KRUPSKI : What is the proposed NDS easy flow with open-grade? TRUSTEE GILLOOLY: No, this is just existing. TRUSTEE KRUPSKI : (Perusing) Oh, yes, thank you. I misread the label. It says "existing 24-square foot remains of wood steps . " Is that something that is removable or is it just natural wood and degrading and to be left alone? MS . RUMMEL: For access towards the dock? TRUSTEE KRUPSKI : No, it looks like there is an irregular shape there. Um, south. MS . RUMMEL: At the water, essentially? TRUSTEE KRUPSKI : Yes . It says "existing 24 square-foot remains Board of Trustees _ 38 September 16, 2026 of wood steps . " MS . RUMMEL: Yes, I mean those are not accessible. The buffer surrounds it. Those are just federal remains . TRUSTEE SEPENOSKI : Just rotting in the woods . TRUSTEE GILLOOLY: Maybe just put them back. I don' t know. TRUSTEE KRUPSKI : I mean, I 've never seen them, so. (Trustees perusing) . TRUSTEE KRUPSKI : Another discussion in the field was just about not putting any additional structure, and I know it ' s minimal, but the gravel pad on that side of the house. MS. RUMMEL: Right, we have reduced it . It is also taking the place of lawn. It ' s just an area for them to put like a couple of Adirondack chairs and just hang out. TRUSTEE KRUPSKI : Okay. MS. RUMMEL: It ' s pulled back from the water. TRUSTEE SEPENOSKI : I think that ' s a solid rework, based on field discussion notes . Thank you for meeting us there, and our work session notes, thank you for meeting us there. It really informs the process and makes it easier to move forward. Okay, does anyone else wish to speak regarding this application? (No response) . Members of the Board? TRUSTEE KRUPSKI : Just confirming, and I know you ran through this originally, but there' s drywells are added to everything now MS . RUMMEL: There is a note that there will be, that everything will be connected. TRUSTEE SEPENOSKI : Based on the updated plans received September 16th, stamped received September 16th, 2026, addressing all of the comments in our field inspection notes, and speaking to the LWRP concerns, I make a motion to close the hearing. TRUSTEE GILLOOLY: Second'. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : I make a motion to approve this application with new plans that build on the September 16th, 2026 plans stamped received to our office, that would add a vegetated non-turf buffer in the southern portion of the property, roughly connecting the existing remains of wood wall to existing wood wall, thereby bringing it into conformity with the LWRP. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: Number 11, CONTINUED FROM 7/15/26 AS PER REVISED PLANS AND PROJECT DESCRIPTION RECEIVED 7/29/26 Cole Environmental Services on behalf of PAMELA VALENTINE requests a Wetland Permit to construct a proposed 42 . 6 ' x 17 ' (793 S. F. ) two-story dwelling on piles, a 42 . 6 ' x 10 ' (425 S . F. ) rear Board of Trustees 39 September 16, 2026 first-story wood deck with stairs, a 373 S. F. irregular rear second-story deck, a 20 . 5 ' x 7 ' (145 S. F. ) front wood deck with a +/- 20 S . F. outdoor shower; an I/A sanitary system to be installed to the west of the dwelling; existing firepit to remain; install a well to establish water supply line; install two drywells; install a 500 gallon buried propane tank; construct an 80 ' x 12 ' timber bridge (bridge to be 12 ' in overall width with 10 ' 4" in width interior of guards) , over approximately 473 S . F. of wetlands consisting of five (5) 16' bents supported by a wooden pile substructure with a structural wooden deck; all bridge elements to be constructed of exterior-grade structural timber with no disturbance to occur below the bridge; install an approximately 35 ' x 12 ' driveway extending from the dwelling to the bridge approach with a 15 ' x 20 ' turnaround area, to be constructed of pervious material consisting of medium-compaction RCA or a pervious masonry/stone product; two (2) approximately 20 ' x 12 ' bridge approach areas, grade dependent, to be constructed of medium-compaction pervious RCA; install an approximately 140 ' x 12 ' private road accessway within the existing 30 ' right-of-way extending from the terminus of the bridge to Birdseye Road with existing vegetation within the accessway to be cleared and the roadbed leveled to match existing grade; accessway to be constructed of medium-compaction pervious RCA; silt fencing to be established and maintained during construction; all disturbed areas to be replanted with native, non-fertilizer dependent vegetation; all groundsel bushes (Baccharis halimifolia) within proposed areas of disturbance are to be transplanted elsewhere on the property. Located: 1675 Birds Eye Road, Orient. SCTM# 1000-17-2-1 . 4 . The LWRP found this project to be inconsistent with respect to Policy One, fostering a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of coastal location and minimizes adverse impacts of development. Policy Four, minimize loss of life, structures and natural resources from flooding and erosion. And Policy Six, protect and restore the quality and function of Town of Southold eco-systems . The Trustees visited the site several months back. Although we have a number of updated additional documents added to the file since that field inspection. We have, as of most recently, a report received September 14th from Cole Environmental Services, aerial photographs of the subject property, and updated wetlands, freshwater wetland line of demarcation. Is there anyone here wishing to speak on behalf of the applicant? MR. PORTILLO: Yes, thank you. Anthony Portillo, AMP_ Board of Trustees 40 September 16, 2026 Architecture. So, Board, we, Cole Environmental, attended your workshop on Monday, and we heard some of the comments, and I apologize that this wasn' t submitted earlier, but I just did it today. I just want to show you guys something we came up with. I would like the Board to see this . And I think it really does reduce the scope, and it sounds like that was one of the big comments, so if I can present this to the Board, I have a copy. Thank you. (Handing) . MR. PORTILLO: . So what we did, or what I, Cole Environmental and myself got together, and we really tried to think of how do we reduce the scope without touching the home. So we said, well, why don' t we try to get rid of this driveway. And since we did provide that letter to the Board two months ago in regards to the fire apparatus not needing to go up the driveway, we were thinking, well, how do we not disturb the wetlands and have a drive go in, and also this huge driveway in front of the home. So, we said, okay, why don' t we just park two cars basically at the base of. the lot, and just provide like a walking bridge. I say "bridge" lightly because I think it would just be more like something that is a catwalk, you know, four-foot, just so you are not walking on the mud, until you get to a point where it ' s dryer and we could put 'gravel. You would just have a gravel walkway up to the home, and eliminating having to drive up onto the property, et cetera, et cetera. This was presented to the applicant, to the clients, today, and they were in agreement with this approach, and I just thought this was a way to show the Board that we are listening. Besides this idea, after our, after the hearing, we did go back and we did work on the structure and reducing the scope of the structure. I just want to point those things out. We moved the building 2 . 5 feet west, we reduced the deck to ten feet instead of 12 feet, and it ' s cantilevered now. We are not proposing any structure underneath the deck. We are going to use steel and we will be able to cantilever that deck. We adjusted the roof pitch, which brought the pitch down, and we also adjusted the top plate on the second floor to nine feet, so we brought the roof down that way as well . And then we brought the IA system closer to the building, to try to reduce that disturbance and distance. So those things were done previously, and then the presentation on the site plan tonight. There was, one other thing that came up, Mr. Krupski was . speaking to us about the bluff, we did end up going out and getting a consultant to provide his interpretation of the bluff. I 'm not the expert. He is here today. If there are any questions, he did provide a report, that he can discuss that. And then Cole Environmental and John is here as well, are our representation, who did all the research on using the road, Board of Trustees 41 September 16, 2026 using Birds Eye to access the property. Just to recap that, or just to talk about that a little more. You know, when we approached this project, I just want to be clear to the Board, we really wanted to do our due diligence. You know, we hired John' s firm to research this area of the road. I think a letter was asked, that we did provide to the Board, it was signed, that we can use that road. And, you know, we wet with the Building Department, with Mr. Verity, and we got his basically approval on what we presented, and that it is, there is a right to use Birds Eye for this property. And John can probably explain that a little better than me. It is a single and separate lot. So, we feel that -- and also we had a site meeting, we asked a site meeting from the Board, to present our approach. I think at that site meeting there were some things that the Board asked, that we conformed to those, and then the last hearing we had there was some other comments that we tried to conform to that . So I think, I just want to say we are trying to work with the Board on this project. And I think if you look at our proposal on th& site plan today, you know, Cole Environmental had a big hand in talking about how do we reduce, you know, removing more trees and things like that, and getting rid of the driveway I thought was pretty ingenious . .I can' t take credit, but I just wanted to make that statement. And that we have other consultants if the Board has any questions for us . TRUSTEE GILLOOLY: Thank you, for your presentation. And just before you go, and since these are your plans, the pier line is a little bit confusing to me on this plan. It appears to go sort of through the adjacent dwelling and also through the proposed dwelling. Am I looking at that correctly? MR. PORTILLO: You know what, I think it might have gotten moved. It actually should be further out to the corner of that. That was one of the comments during the site visit because that is one of the reasons, too, I wanted the Board to see the site, at the site visit was, the other adjacent home is like all the way around on the other side of the bluff, so we, the Board seemed like determined to me that we can basically align the other adjacent home and use that as the pier line. I think the line got moved, I apologize, when I was doing my sketching quickly this morning. TRUSTEE GILLOOLY: Understood. Thank you. MR. PORTILLO: I think it ' s actually further seaward. TRUSTEE GILLOOLY: Thank you. TRUSTEE KRUPSKI : So, just to be clear, you are not attaching the pier line. It ' s not based off anything to the east of this project, it just goes straight across from the house to the west there. Board of Trustees 42 September 16, 2026 MR. PORTILLO: Again, that was a thought based on our conversation onsite, because of the other home being really not, I don' t want to say. "relevant, " but it ' s just not really in line. TRUSTEE FINORA: What are the dimensions of the house? Has it been changed, the actual footprint from the previous? MR. PORTILLO: No, sir. TRUSTEE FINORA: No. And what is the height of the structure? Is it a full two-story house? MR. PORTILLO: Yes . So originally we had a ten-foot top plate on the second floor, we lowered it to nine feet, and we reduced the angle, we reduced the pitch to bring the roof down. TRUSTEE FINORA: It ' s a flat roof now? MR. PORTILLO: No, it ' s just an angled roof, but it ' s six pitch instead of a seven originally. So the total height from like average grade, because it ' s kind of a slope there, is 28110" . TRUSTEE FINORA: What ' s the height of the structure, first floor to ridge? MR. PORTILLO: So the first floor is ten feet, and then one side is eight feet and one side is nine feet on the top. It ' s a salt box. So we were at originally at nine feet and ten feet on the salt box, and then the pitch was seven, and that came to six. TRUSTEE FINORA: Is 28 the top elevation relative to grade, or the building is 28 feet high from first floor to ridge? MR. PORTILLO: No. So the 28 ' 10" is from like an average grade, based on, you know, that being sort of sloped in that area. TRUSTEE FINORA: Considering the flood zone elevation requirements, the 28 is the top. MR. PORTILLO: Yes . Correct. TRUSTEE FINORA: Okay, MR. PORTILLO: If you go from like the lower adjacent grade you would obviously be closer to grade. TRUSTEE FINORA: Was there any consideration for locating the structure to the west, outside of the limit of moderate wave action? MR. PORTILLO: I think we -- further west, I think we are still in the AE zone . I don' t know if we get out of the VE zone. So we did push the structure west 2 . 5 feet. TRUSTEE FINORA: The area near the proposed septic -- MR. PORTILLO: Oh, that far away. TRUSTEE FINORA: (Continuing) in the plans you gave us .today, the September 16th plans, just generally speaking, that ' s outside the flood zone boundary. That is Zone X, with comparable elevations it ' s out of the limit of moderate wave action, potentially. I 'm not looking at the backyard setbacks, et cetera. But I would say that I am hesitant to support this design in the area as it ' s currently- proposed for the dwelling because Board of Trustees 43 September 16, 2026 it ' s, there are options here that are potentially beyond the flood zone boundary, or at least close to being out of the flood zone boundary, and certainly- out of the wave action area I 'm curious if you have any feedback on that particular component. MR. PORTILLO: No, so something that governed here was the distance from the well to the septic, and the septic sort of had to be where we located it . So I. think, you know, I think moving the home more west could be possible, but again, that, we are using the well that is there, which is at 'the bottom of the driveway there. TRUSTEE FINORA: Yes . Is that conforming as 'it is laid out? The well/septic separation, is that currently conforming? MR. PORTILLO: That ' s correct . Yes . So we sort of made our arc and then determined where the septic would work best. So if we sort of like mirrored the two, the septic would be too close to the well . But I think if we had to slide the building to the west, kind of keeping the septic in place, and staying in conformance, to the well,. that could be possibly -- I don' t know if we' d get out of the flood zone. I think the idea of the design, though, too, is sort of this structure being, you know, less disturbance doing helical piles and, you know, building it that way. And then not having to, you know, dig. So I don' t think we would get away from doing open foundation regardless . I think we would want to just keep that as how we build the home. Just to also give it that sort of feel . I think when you are onsite, too, we sort of pick, like I explained this when we were there, it seems like our location, where we are plotting it, is kind of the highest point of the lot. You know. So it sort of made sense in that regards, because, you know, you are kind of staying out of, you know, wave action and things like that, and being at the higher topo. So I think west we end up actually going down the hill a little bit. But if there was some number that the Board had in mind of shifting the home that way, I would like to present that to the owners . I mean, like I said, I think we are trying to find ways to make this work and to have the Board happy with the design. TRUSTEE FINORA: I can't say that I have a number in mind. But from an environmental standpoint I think that would represent a sizeable improvement if we could locate the structure as far away as possible from those wave action boundary lines, and also getting into that Zone X. You know, with respect to the well/septic separation distance, you know, I 'm never in favor of reducing those distances, but also recognizing you are already non-conforming on your sanitary approvals anyway .because of your proximity to wetlands and the dunal habitat. Board of Trustees 44 September 16, 2026 So it ' s just another item to consider, certainly not the singular item. MR. PORTILLO: Understood. TRUSTEE FINORA: Any other comments from the Board? TRUSTEE GOLDSMITH: I would echo Trustee Finora' s statement, and since Day 1, when we first went to the site, we were talking about potentially moving this house to the west. And here we are months later still discussing the same position. And looking at the distance on that plan of 42 . 9 feet, supposedly, from the crest of dune, when we were on field inspections out on the site, that number is drastically less than 42 . 9 feet. The unconsolidated soil. So the fact that we are still here months later, is alarming, in a sense. This is an extremely environmentally sensitive parcel, constrained by freshwater wetlands, tidal wetlands, as well as beach and dune system along Long Island Sound. These are not isolated environmental features, they are interconnected parts of the coastal system that provide habitat, avoid storm impacts, help control erosion, and protect water quality. The fact that somebody needs to build a bridge and/or, whether it ' s a driveway or a bridge, to get to a house on this parcel speaks to the environmental sensitivity of the parcel. So, you know, and again, we've had this discussion for months, and we are still here to try to shoehorn something in to a parcel that in my opinion is way too close to both tidal wetlands and freshwater wetlands . And we have been consistent in our messaging for that, and here we are again, months into it, still having the same discussion. You know, this is not just a house being built on wetlands . We are talking about introducing a permanent residence, driveway, bridge, utilities, and associated site disturbance, onto a very constrained coastal parcel surrounded by freshwater wetlands, dune and coastal resources . It runs contrary to the purpose .of Chapter 275, which is the minimization of new development. So in my opinion, this goes against Chapter 275-12 (a) , (b) , (d) , (g) , (h) , (i) and (j ) , and adversely affects the wetlands of the Town. It raises concern about erosion and siltation. It raises concern about habitat loss and fragmentation. It raises concerns about drainage and water quality. It raises concerns about increasing the danger of flood and storm tide damage. I know it ' s being brought up that there was a past permit on this, but we also have to recognize that the shoreline is dynamic. The coastline dune system and wetland conditions today are not necessarily what existed when the permit may have been issued more than 35 years, ago; if I 'm not mistaken, 1990 . The permit issued over 35 years ago was based on different circumstances . This project is not the same. The shoreline and Board of Trustees 45 September 16, 2026 wetland areas have changed over those decades . The Town regulations are more stringent and are reviewed more rigorously than it was in 1990 . This process reflects a better understanding of the result of development and environmentally sensitive areas . Additionally, the Trustee jurisdiction has changed since 1990 . The LWRP now exists . And the work must conform to particular standards that we have today. So I have serious concerns about this particular project. So in this iteration, . I do not support it. That ' s just what I wanted to say for the record. MR. PORTILLO: Just bringing up this past permit, that, or the permit that was granted 35 years ago, and I understand where you are coming from, I just, I think if you look at what that application was and what we are presenting, it ' s a way smaller footprint. I think that even had a pool in it. They were cutting right through the freshwater. I mean, we are really trying to stay -- and I think presenting what I did tonight, with, you know, a pathway, really not even a driveway anymore, it ' s showing that we are trying to conform or come, you know, or meet the standards of the Board. And the current Board, not going back 35 years ago. But that application, that home was a lot larger, I think it was on a foundation that cut through the freshwater that was right at the corner. So I think there is a sensitivity and this team and this applicant that we are trying to show the Board, and we are trying to present something, and like I said, I think we are trying to hear what you are saying and present things that make sense. So if it ' s. more about moving the home, then that is something that I think we can discuss . But if it ' s not about that, I don't want to have to table something, it doesn' t make sense to go back and do this again, I don' t thin, right. But we do have other people here to speak, and they can at least tell the Board what we have provided and presented. I mean, if we can go from there. TRUSTEE KRUPSKI : Sure MR. PORTILLO: Thank you. TRUSTEE KRUPSKI : Thank you. MR. BOURQUIN: Good afternoon, Members of the Board. John Bourquin of Greenburg Traurig LLP, 2317 Main Street, Bridgehampton, on behalf of the applicants . I just have some legal observations about this project and its scope. I know we 've all had a very long night, so I ' ll endeavor to keep it high level. First of all, back in August, the Board raised some questions as to my client ' s rights to use the easterly spur of Birds Eye Road. At the Board' s request I obtained a written, Board of Trustees 46 September 16, 2026 notarized consent to use and improve the road from the road' s owners Interwellen Property Partners LLC, a copy of which has already been submitted to Ms . Hulse and also Ms . Cantrell. I have additional copies 'to hand up, if you would so like. Just for that background, the road 'is privately owned by Interwellen, but my client has an express easement by way of their deed. I have a certified copy of that to hand up as well, if you would like, which provides us access down to Main Road to Rt. 25 . So that is the status, that we have a signed and notarized endorsement from the owner of the road. What is more, it ' s well-settled law in New York that a landowner' s right to access a public highway cannot be removed without compensation unless an alternative means of access exists . As you can see from the map there is no other means of access, aside from Birds Eye Road. There this case law to that effect, and I won' t bore you with the full citation, but that ' s Merritt Manor Estates versus Elmsford. There is just no other means of access aside from using birds . Further still, a landowner can only be deprived of access to a public highway if two things are true. First, there has to be a suitable alternative means of access to the public highway, which we 've established doesn' t exist. And second, the municipality bears the burden to show that denial of access to that road is in the best interest in public safety or welfare. That case is Bali Two v Pascal & Town of Brookhaven. That ' s a local case that came out of Manorville. My hometown, actually. There is also case law to the effect that a municipality' s interpretation of its own laws in a way that would deprive a landowner of their road access would be also an unconstitutional taking, which would require compensation from the Town. That ' s Whitman v Haman (sic) ; and Passucci v Town of West Seneca, among others . So. I know we 've heard some things back and forth at the last meeting and I think the meeting before that, about some potential easement between these two lots . So Suffolk County Supreme Court has opined, and the 2nd Department upheld, that demanding across-access easement between two parcels is an arbitrary and capricious demand if it ' s. not supported by .a specific, fact specific, context-specific evidence as to the need for this easement. That is In-Towne Shopping Centers v. Planning Board of the Town of Brookhaven. That ' s 2nd Department, . so that controls on us here in Suffolk, and that case originated -out of Suffolk. And just as note from a practicing attorney, cross access easements are almost exclusively seen on busy commercial properties, and I 've never seen them on residential properties . So that is our concept on why the cross-access easement wouldn' t work from a legal standpoint. Also from a title Board of Trustees 47 September 16, 2026 standpoint, to put it frankly, would just be messy. As I 've mentioned, the access to this lot is by a deeded easement, express easement recorded in the deed, and to have yet another recorded easement between these properties would mean 1675 Birds Eye would have an easement on an easement to access Main Road. From a title company or title report standpoint, that is just messy. So, moving towards the other merits of this application, you know, I 've heard various different kinds of amorphus objections, which we can' t seem to dial in on. I 've heard the phrases "raises concern" about certain things, and what "may be the best, " and "what effects this might have. " As I 'm sure you are all aware, and you have phenomenal counsel who can explain this to you, your determination must have a rational basis based on substantial evidence. It can' t can surmise, conjecture or speculation. There .is a ton of case law on that, the one that I ' ll read out now is - Matter of Association v Friends of Sagaponack -- I 'm sorry, Matter of Association of Friends of Sagaponack v. ZBA Town of Southampton. That actually arose out of Ira Rennert' s now infamous house down on the beach in Sagaponack. So where we are going with this, is the Board has to take into account substantial, quantifiable data. And my colleagues here, we have a phenomenal; we have PW Grosser, Cole Environmental, we have Anthony Portillo, who have put into the record reasons that this is a very well engineered, very well designed plan that is far more sensitive to the wetlands than the 1992 approval, which I know we discussed a moment ago. Another thing that I have to bring up, as we can see, the lot right next door, which is just as environmentally sensitive and just as -- is similarly situated, how does a beautiful house improved already. There is plenty of case law, Knight v. Amelkin, being a Suffolk County one that I can think of off the top of my head that different, or that similarly situated applicants have to be treated in a similar way. So we keep hearing things like we have doubts or we have concerns over this . We would like to hear these concerns because, as I 've said, we have an environmental analyst, we have a dune expert, we have Mr. Portillo, all of whom can address these. So my colleagues have done, in my opinion, an excellent job on explaining why this is a very well-designed plan. As you have heard, there are wetlands here. This is a very unique piece of property, and that ' s why we 've gone through multiple, at least two iterations of trying to get this right. Of trying to do justice by this piece of property. We 've gone through concepts of building a bridge, we 've gone through different orientations of the house, all to be Board of Trustees 48 September 16, 2026 respectful an honor how this piece of land flows . So all that we are pointing out in this regard is that we have quantifiable data, we've provided you have with surveys, with dune experts, with all kinds of different data, and that we can' t rely, this Board cannot rely on surmise, conjecture or speculation. Finally, before I sit down and let my other colleagues speak on this, an outright denial of this project or even further scaling back of the project would run the risk of being a regulatory taking. The application of the law in a matter which would eliminate or even substantially reduce the value of this property would amount to a taking. And a taking would require a payment of monetary compensation to my client. That ' s,. I 'm saying see generally Friedenburg v. New York State DEC. There ' s other examples out there. This project has seen my client shrink this house, do various different incarnations of the driveway and the bridge, and I will just leave with the concept that we have been very sensitive and this is a very well designed, well-engineered plan for this piece of land. I 'm here, I ' ll stay up if there are any questions . If not, I can yield to my colleagues . TRUSTEE FINORA: Mr. Bourquin, I just want to make the point and clarify here that, you know, the adjacent property does not have a freshwater wetland occupying approximately one-third of the lot. And if that property was subject to a new permit today, it would be subject to the same kind of environmental constraints we ' re dealing with. I take issue with your point that these are like properties or that there is an obligation to offer what this particular property next door has, and I think you've got a lot of constructive feedback from the Board over the past few months, and frankly I don' t think there' s been a lot of changes that reflect the feedback. MR. BOURQUIN: So I can speak to the wetlands aspect, that the lot to the west, if it didn' t have freshwater wetlands, it still does have the dune system, it still does have the Long Island Sound. TRUSTEE FINORA: But that ' s precisely the problem here, you are bounded on both sides of this parcel, and it ' s totally unique to this parcel . Yes, there are setbacks and freshwater wetland implications to the adjacent property, but it ' s not nearly the same. Not even remotely the same. MR. BOURQUIN: What you do have, and the very good point that you made, this is a unique parcel, and there are obviously wetlands here. And I go back to what I said, this has been a very well Board of Trustees 49 September 16, 2026 designed plan, sensitive and responsive to those wetlands . We are not aiming to clearcut the whole thing and- build a Levittown track test here. This is a plan that has been designed very creatively -- no, you can' t say yet . Conjecture is not an appropriate consideration. I ' ll go back to the Ira Rennert case. TRUSTEE SEPENOSKI : Trustee Finora established that this is a very unique parcel, but all we've heard tonight is case law applying to all sorts of other parcels around Suffolk County. MR. BOURQUIN: Well, unique parcels require unique solutions, and what we have done with our various different aspects of this, is create something that is a unique response to a unique situation. I would like to hear, and the Board, if you would like to go down the line, what are the quantifiable, I 'm not sure if you have an environmental analyst or what reports you have. What are the quantifiable concerns? TRUSTEE SEPENOSKI : Well, the quantifiable begins with proximity to freshwater wetlands, which is in Chapter 275; we have Coastal Erosion, Chapter 111; we have proximity to dunal systems and proximity to beach. And Trustee Finora rightly pointed out that moderate wave action, and Zone X, and flooding, those are delineated. Those are quantifiable on the plans you submitted this evening. So those are real numbers that our code speaks to. MR. BOURQUIN: And that is why we brought in PW Grosser, and brought in Cole, to show that this project can be accomplished in a responsive way. TRUSTEE GOLDSMITH: So I would like to further state that Chapter 275-12 states the Trustees may adopt a resolution directing the issuance of a permit to perform operations applied for only if it determines that such operations will not: So, adversely effect the wetlands . Yes . You' re building a bridge. You' re destroying wetlands to build a house. Cause damage from erosion, turbidity or siltation. Yes . You' re building it right in a moderate wave action. It ' s going to be damage from erosion. MR. BOURQUIN: Well, there ' s two things, and not to cut you off there. But how would building a bridge over wetlands impact the wetlands? Would you rather us just put a driveway right through the thing? TRUSTEE GOLDSMITH: Because you are doing construction in a protected freshwater wetland. Construction within a pond or fresh water wetland obviously has an adverse environmental impact to it . The fact that you have to build a bridge or a driveway through a pond, over a pond, around a pond, to get to a property speaks to the environmental sensitivity of this parcel . We 've been on this Board ten-plus years . I 've never had an application where somebody needs to build a bridge to get to Board of Trustees 50 September 16, 2026 part of their property. We have had plenty of other applications with greater distance to a freshwater wetland and/or tidal wetland, that this Board did not look favorably upon due to the circumstances . You talked about each and every property is inherently unique. Just because somebody has a house next door does not mean that the one gets one next to it when the conditions on the neighboring property are entirely different than the neighboring property. I spoke in length about what the objections were and, again, it ' s if we can' t say that it will not do one of those things, then we are compelled as a Board not to support that application. It ' s not conjecture, it ' s not surmising. It is based on fact, it is based on Town Code and it is based on a record and site visits and environment impacts that we have been dealing with in thousands of applications over the course of our tenure on this Board, collectively. MR. BOURQUIN: Okay, so I would like to go back to what I said earlier, is that this is a unique property. And unique properties require unique solutions . And we brought in a phenomenal team -- PW Grosser, Cole, to engineer a very good solution that is sensitive to these wetlands . I would like to ask, what do you think should become of this property? MS . HULSE: They are not answering that . MR. BOURQUIN: Well, we are going down .the conjecture road. Let ' s conjecture. TRUSTEE KRUPSKI : No one went down the conjecture road. MS . HULSE: Counsel, if you have anything else that you would like to add, you are not going to require a certain response from the Board. I think they have articulated very clearly over the course of many hearings, field inspections . We had a work session last night. They've considered all the documentation that' s previously been provided, and now you are standing here in the llth hour making demands that they respond specifically to what you brought up? I don't think it ' s appropriate. I 'm going to counsel them not to answer. And they've articulated throughout this entire process, not just tonight, Counsel, what their concerns were, from the very beginning. You keep saying that the project is a good project, it ' s a responsible project . Well, that ' s your opinion. This Board is charged with making that assessment based on, as Trustee Goldsmith said, everything in front of them, their experience, their expertise, and they are constrained by what the code allows and doesn' t allow. I appreciate case law as much as the next person, but the case law that you are citing is specific to that property, as you well know. And I appreciate the legal issues that you are Board of Trustees 51 September 16, 2026 presenting. However, you are standing here saying you've got people that have presented something that is responsible. Well, that is for them to decide. I appreciate that that is your opinion and what you are urging us to adopt, but the fact of the matter is, is that this property, and I have been here, and I was here before as an Assistant Town Attorney, this property is probably one of the most sensitive properties that I have ever seen in my 20-plus years doing this . Honestly. I mean there is basically nothing about that property that isn' t sensitive. And what you are suggesting is an enormous amount of building on it . So you have to appreciate what this Board is charged with doing, what they are elected to do. They are looking at this responsibly. They didn' t give you a hard no right out of the gate. They have been working with your client from day one. From day one. And now you come in here at the llth hour and say what have you guys done? I mean, come on. MR. BOURQUIN: If it came across as a demand, that was not the intention. MS . HULSE: It certainly did. MR. BOURQUIN: That was not the intention. But before I yield the floor, I will say that we are just trying to understand to the best degree, if this isn' t a sensitive approach, what would the Board look at . TRUSTEE KRUPSKI : If you brought in this team of such well-educated and, well, phenomenal well-backed engineers and environmental professionals, and after all this testimony they can' t figure out what is wrong with this application, I think you might need a new team. MR. PORTILLO: I have to disagree with that. So, building within a flood zone happens all over the place. And the way we presented the building, it ' s allowed to be built in a flood zone. So, that is not fair to say. On top of that, we are not presenting a bridge any further. We are presenting a walkway. We are presenting you a driveway with a walkway to the house. How much more sensitive can we be? We are not presenting this 12-foot bridge that we originally were thinking. And we thought about that. So I don' t like that remark, I don't think that ' s fair. Then you are saying I 'm not a professional and the people here are not professionals . So, we work hard at this and we tried to present an application that made sense. Apologizing is a sensitive subject from the attorney, but I took the time today to try to give you guys another look at a possible situation, to get to be two parking spaces, what is required, and then walking up to the home. The home is not designed incorrectly in regards to being a flood zone. You are allowed to build in a flood zone. If the Board of Trustees 52 September 16, 2026 Board doesn' t want a home built in the flood zone, I think that ' s impossible if you have a wetlands -- MS. HULSE: You know it ' s not just the flood zone. You know it ' s not just the flood zone. That ' s not the only issue here. MR. PORTILLO: And also Cole Environmental provided a revegetation plan, ways to look at how do we -- you know, I don' t want to get in, I 'm not an expert on the freshwater, but the freshwater is next to the other home. I mean, let ' s be honest. What they present, they will present you guys with how to revegetate, remove invasive species that are there, and things along those lines . If it ' s not agreeable, that ' s fine. But I don' t think it ' s fair to say that we are not the right professionals . That ' s all I 'm saying. TRUSTEE KRUPSKI : To be clear, I didn't say you are not professionals . I said you are professionals, but it seems like after hours and hours of testimony that no one seems to be willing to expose themselves that they know what we are talking about, and instead are representing something that they know is untrue. MR. PORTILLO: I mean, I actually, I 'm not really clear on what the Board is asking. Because, again, we are taking a bridge out . So we are not disrupting the freshwater. The footbridge, like I said, would not even be a bridge. It would essentially be a deck across a muddy area that is between the two freshwater areas . TRUSTEE KRUPSKI : Downplaying the wetlands is the same as -- MR. PORTILLO: I 'm not downplaying. TRUSTEE KRUPSKI : It ' s not really -- (Both parties speaking over each other) . MR. PORTILLO: But before we were presenting a driveway going up to a huge parking space. So I think to say we were not listening is not fair. We are listening. If you don' t agree with our approach, that ' s different, and I can understand that. I didn' t design a home that' s incorrect in that location. That would be an allowable home in that location. The Trustees ' opinion on if it should be located there, or the location, I understand. But it ' s a VE zone, it ' s an open foundation. It meets the code requirements . It ' s the finished floor height is correct . So all those things are consistent with what is required. MS. HULSE: So let me, can I just interject one thing. MR. PORTILLO: Sure. MS. HULSE: You are referencing the Trustees ' opinion. You do understand, and I just want to make this clear, that the application that came before the Board could have been voted up or down. Right? MR. PORTILLO: Sure. MS. HULSE: That. could have happened. Board of Trustees 53 September 16, 2026 MR. PORTILLO: Understood. MS . HULSE: So that didn' t happen. So this Board has been actively working with your team, where they don' t have to. There is no requirement they do that. They could have made a record, closed hearing and voted on it right out of the gate. MR. PORTILLO: I appreciate that. MS. HULSE: (Continuing) . They chose not to do that. So now you are coming in .here saying, essentially, well, it looks like you are just making an arbitrary opinion and everything is amorphus . MR. PORTILLO: I didn't suggest -- MS. HULSE: Excuse me. Just let me finish. MR. PORTILLO: Sure. MS. HULSE: And what you' re saying is there' s amorphus reasons and all this . That ' s not true. That is not true. MR. PORTILLO: Sure. MS . . HULSE: That has been articulated to the applicant, the individuals involved, your team, whoever has been at field inspection, if anybody wanted to come to the work session, all along this entire process during the hearings this has been articulated to you. So, when Trustee Finora says, well, hey, what about moving it west, this is not the first time that ' s .come up. This has been something that the Board has articulated with other issues, with the walkway and other items, because they are making an effort to see if there is something that they can approve that would be workable. That is what they are trying to do. This is my point. My point is that they didn' t have to do any of that . MR. PORTILLO: Understood. MS. HULSE: And it would be much easier sometimes to just say right out of the gate, no. I 'm sure you can appreciate that. MR. PORTILLO: I can, but I will say, when we did the site visit, the original design is a lot smaller than what we presented. I would have told my clients to not move forward. I mean, I understand how the Board works . That was the reason for the site visit originally, I didn't present an .application and that was where I go back and do due diligence. MS . HULSE: The Board doesn' t have to work that way. MR. PORTILLO: I understand. MS. HULSE: I would sit up here and tell them just vote on it, up or down. That ' s what they've submitted. Vote on it . MR. PORTILLO: I understand. I think at the end of the day our colleagues should at least present the professional opinion that they have, and the Board is trying to vote on it, that ' s -- MS. HULSE: Because this Board has been bending over backwards to work with you and your team. Would you at least concede that? Would you acknowledge that? MR. PORTILLO: I 've never said that the Board has not work with us -- Board of Trustees 54 September 16, 2026 MS. HULSE: Would you acknowledge that? MR. PORTILLO: I 've never said that the Board did not work with us on this project. MS . HULSE: Considerably. In depth. MR. PORTILLO: As I 've said -- MS. HULSE: Many hours . MR. PORTILLO: We had the site visit. I think we were at like 850 square-foot footprint at that time. It ' s now down to 790 square foot footprint. So we did reduce the footprint after the site visit based on what we received back from the Trustees . We brought the septic tank and the house closer. Listening further, that we need to move the building, I 'm not against doing that or going back to my client and discussing that. We are talking about a 790 square-foot footprint . This is not an enormous house we are presenting to the Board. That ' s all I think we are all trying to say. And then we took into consideration not to pull the driveway up the wetlands . And this solution I think is a very good one. Which I don' t know what the Board' s opinion is on that. But it ' s, to not drive up through the wetlands, which is the original approval in the ' 92 . I think we just came up with a plan not to do that to still access the home. So I 'm just stating those facts . I 'm not saying that they are right, wrong or indifferent. I 'm just stating the fact that we are trying to change our design and our approach to this, as we hear it. And that is my opinion. So that ' s all I 'm getting at. I 'm not saying the Board has -- this is also our second public hearing. We only had one, and then we made these changes . So we have not heard that these changes didn' t meet the requirements of the Board from the last. And I don' t have the record with me, but the big topic of last time was about the dune and it being a second dune, et cetera. And that ' s where we said, okay, let ' s respond to that, let ' s get another expert to talk about the dune. Because I 'm not the person to speak to that. So we did that. I would like the Board to at least hear what he has to say. I think that ' s fair. Thank you. MR. YOUNGMAN: Good evening, Board. Zeb Youngman, PW Grosser, Bohemia, New York, for the applicant. I was brought in recently, you know, a few days before the last scheduled hearing, to respond to your comments regarding the dune system at this property. I want to first read the definition of a dune, taken from the Town of Southold Coastal Erosion Hazard Area law, Chapter 111. A "dune" is a ridge or hill of loose, windblown or other artificially placed earth, the principal component of which is sand. Board of Trustees 55 September 16, 2026 A few days before the last scheduled hearing we did a site inspection, and that included an inspection of the property, the wetland area and the coastal area. We also performed four soil borings in the area and what was found was the beach area is largely composed of larger rocks, stones and pebbles. Coastal vegetation in that area, um, not grasses, which are typically found in dune systems, and soil types that are not indicative of dune systems . This property is incredibly unique, with the interior freshwater wetlands and the coastal areas, and the topography as well . But these are not typical. dune systems . I did submit a package with some photos of the property, along with the soil boring logs so we could look at the soils in these areas . In addition, I want to point out there was a comment made regarding the, you know, how the property changes over time, and we had submitted aerials dating back to 2004, and the property is exactly the same . There is no significant erosion on this property. And the shoreline and vegetation line has remained the same in the past 22 years . There are, you know, we do have some older aerial photographs, but they are not clear. So we have 22 years of aerial photographs showing the shoreline has remained the same. Do you guide guys have any questions? TRUSTEE KRUPSKI : I 'm curious, what, and I read the core samples in the report that you put forward there. What would you characterize the area as between the beach and the proposed structure. MR. YOUNGMAN: Between the beach and the proposed structure. So what was, maybe previously referred to as a potential secondary dune, I think that is more of a glacial till material. If you look at it, it ' s brownish, yellow, loamy sands and gravels, rather than a well-sorted sand material that is, you know, a common dune. So this property is very unique because it has that glacial till ridge in that area. And that ' s really the high topo area on the project where the house is proposed. But it ' s not dune system. It ' s a glacial till kind of system. TRUSTEE KRUPSKI : So would you then make the argument then based on, and I don' t know your exact background, but would you make the argument that it ' s not an environmental sensitive area because you are arguing it ' s not a dune? MR. YOUNGMAN: Absolutely not. TRUSTEE KRUPSKI : Right. MR. YOUNGMAN: So my background, I sat on the Southampton Town Conservation Board in your seat for over 20 years . I 've reviewed thousands of these applications, as you have. So I know where you are coming from. This is a very sensitive area. It ' s a very unique area as Board of Trustees 56 September 16, 2026 well, you know. You have not seen many of these type of properties because there ' s not many that exist. There' s very few. TRUSTEE GOLDSMITH: Thank you. MR. YOUNGMAN: You' re right. TRUSTEE GOLDSMITH: Yes . MR. YOUNGMAN: And it is a challenging property. But I do feel that what the team has proposed is really the best we can get. Especially by replacing the bridge, the driveway bridge, to an elevated catwalk that is light penetrable, it ' s going to minimally impact the wetlands . TRUSTEE KRUPSKI : I know -- that ' s a great background, too. And you can appreciate this Board' s concern. This is such -- and we have seen quite a few amazing properties, and this certainly is one. But I don' t think I ever had a property that is, I mean someone said a third wetlands, but it also includes The Sound. But the access, proposed access is pinched between a freshwater wetland that is slightly divided, like it almost looks like two lungs in a body cavity. And it' s so narrow and so tight. And then you get into this super-environmentally unique, to your point, area, that it ' s such a diverse habitat, and so rarely occurring in nature as it exists out here today. So whether or not it ' s a dune or a transitional upland habitat, it ' s just that, environmentally, this is a huge lift and a huge ask of somebody. MR. YOUNGMAN: It is, and you' re right. But we have to look at the reduction in size. We minimized the size of the footprint. We eliminated the driveway access . And I think that portion through the freshwater wetlands is a big thing. You know, it ' s no longer a driveway. There are no cars going over it . There is no excavation. It ' s driving a couple of piles, light penetrable walkway, four feet wide . I think that ' s a big benefit as compared to the previous application. You know, as Anthony said, perhaps we can shift the house to the west . The footprint really can' t get any smaller: The decks are cantilevered. You know, we look at practical alternatives when we evaluate these applications . There ' s no accessory structures . So, you know, I really, personally believe, I don't know what else can be done. Maybe we can shift the house. I don' t think there is an opportunity to reduce the size. We need to. get access to the property. We proposed the most minimal-sized catwalk rather than a driveway. So, you know, I don' t know what else we can do other than shit it slightly, and I don' t know how much that can be done because I have just been brought in to evaluate the dune system. Thank you. TRUSTEE GOLDSMITH: Thank you. TRUSTEE FINORA: Thank you. Board of Trustees 57 September 16, 2026 MR. COLE; Chris Cole, Cole Environmental. I just wanted to say thank you for the Board working with us, giving us feedback and trying to find a workable solution for the site. My colleagues have discussed a lot of different context of this site, and what I want to mention is, yes, Anthony and I worked together to eliminate the bridge, and to eliminate about a thousand square-foot of what was proposed to be RCA driveway. On that site where the cursor is, approximately, maybe a little further north, that was the area of the driveway, and that was the area that has significant mature trees, so we are saving, by removing the driveway, we are saving significant trees . We propose to replace one-to-one with at least two-inch minimum caliper for hardwood, an ecologically appropriate tree for the site. In the area that the building and the septic system is going to go, there ' s numerous Baccharus . We were there, we saw them. The proposal is to flag, tag, dig out and burlap, and transplant the Baccharus to other areas on the site, mainly the areas on the edge of the phragmites that would support Baccharus . And our other proposal is to cut, maintenance cut, and with the intention of restoring the freshwater wetlands, which is about 5, 800 square feet, that is almost purely monoculture. We would not touch any trees, we would not touch any of the native plants in there. On the southeast side there is some large Viburnums, they would be maintained. And I just want to note that removing phragmites is, it ' s in the LWRP Policy 6 to improve the diversity of the wetlands . And Southold is working to remove phragmites . I know Skip Horton' s pond, they are removing phragmites, and also Downs Farm is removing them. And I also have an article here that Great Pond, the Town received $80, 000 to remove the phragmites from the pond. So what would be doing is, the clients would be spending their money with the intention of restoring that pond, and we could replant that if the Board wanted, with ecologically appropriate species, red Maples, Tupelos,. blueberries, Arrowwood, Viburnum, Button Bush, that would make the freshwater wetlands that we are seeking to protect much more than just a monoculture of phragmites . Phragmites reduce bio-diversity, they reduce the impact of drainage. I 'm currently working on a seven-acre phragmites removal project. We are on our third cut, and I 'm already seeing native plants coming back. So it does work. And what is standard with the DEC is four times a year. So intention being to cut the phragmites, reduce the biomass, truck them offsite to an approved location, and plant Board of Trustees 58 September 16, 2026 and let the native species that are supposed to be there in that, you know, hydric soils, come back and provide the habitat that that area is naturally supposed to. So that ' s, in a way we are proposing to bring the site closer to its historical, what this would have been before the introduction of phragmites hundreds of years ago, which dominate our shoreline and reduce biodiversity, and reduce plant life. . So, those are the things that we have looked at, reduction of the bridge, reduction of a thousand square feet of parking lot, and essentially paved surface, keeping the trees in the area, replanting new trees,. and attempting to restore, to bring the freshwater wetlands back into a bio-diverse eco-system, as opposed to a monoculture of phragmites . TRUSTEE GOLDSMITH: Mr. Cole, you mentioned DEC. Do you have DEC for this proposed project? MR. COLE: .This is a no-jurisdiction from the freshwater wetlands . TRUSTEE GOLDSMITH: How about tidal wetlands? MR. COLE: Tidal wetlands we' re in, but a majority of the structure is behind the ten-foot contour. TRUSTEE GOLDSMITH: And how do you propose construction on this lot? MR. COLE: Through the neighboring property on the side, and we have the builder here . He can, we are intending to hand dig and they have screw helical piles, and they are going to do it as minimally as possible. TRUSTEE GOLDSMITH: Would you require an easement for that construction through a neighboring property? MR. COLE: I don' t believe so. MS. HULSE: Did you provide the DEC the information you . just provided, because it ' s not updated on their website in that manner. Do you have that? MR. COLE: I 'm sorry, the new plans? MS. HULSE: The information on the DEC website, it appears it is incomplete, so I 'm just wondering if you have anything that you just referenced regarding the DEC application. MR. COLE: We have a letter back from them stating the things they need. I can provide it to Liz . We have not responded. We are working to make sure the plans are good with your Board before we resubmitted them. TRUSTEE FINORA: Thank you. Any other comments from the Board? TRUSTEE KRUPSKI : Just to summarize my feelings on this project and the back and forth, I do appreciate the effort that you guys have put forward in trying to remediate this . I just really struggle with the sensitivity of this and the unique nature of the property. And just to be very clear, as to not be providing conjecture, there ' s freshwater wetland, saltwater wetland, dunal habitat, glacial till habitat, it ' s very unique and very little Board of Trustees 59 September 16, 2026 remaining throughout Long Island, and it ' s just, it ' s a very heavy lift of a property. MR. COLE: If the applicants were willing to shift the building west, is there a number or a specific location that we can bring back to them to present? TRUSTEE GOLDSMITH: I 'm prepared to vote on what is submitted. That ' s my thought on it . TRUSTEE FINORA: All right. Any other comments from the public? (No response) . Hearing none, I make a motion to close this hearing. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE FINORA: I make a motion to deny this permit for the plans before us with respect to and considering the testimony that has been heard here tonight, and also in consideration that this Board finds the proposal not satisfactory to Chapter 275, Section 12, sections (a) , (b) , (c) , (d) , (e) , (h) and (j ) , and the inability to bring the LWRP into consistency. That is my motion. TRUSTEE . KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. PORTILLO: Thank you, Board, have a good night. TRUSTEE GOLDSMITH: Motion for adjournment. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Respectfully submitted by, Glenn Goldsmith, President Board of Trustees