Loading...
HomeMy WebLinkAbout53387-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 53387 Date: 10/12/2026 Permission is hereby granted to: Hobart Road PLC PO BOX 806 Southold, NY 11971 To: Legalize "as-built"finished basement as applied for per SCHD approval.Additional certification may be required. Premises Located at: 1750 Hobart Rd,Southold, NY 11971 SCTM# 64:3-3.1 Pursuant to application dated 09/28/2026 and approved by the Building Inspector.. To expire on 10/11/2028. Contractors: Required Inspections: Fees: As Built Addition/Alteration $2,507.00 CO Single Family Dwelling-Addition /Alteration $100.00 Total $2,607.00 �� Building Inspector offaz*� TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold, NY 11971-0959 • Telephone (631) 765-1802 Fax (631) 765-9502 1it1p�i:,//www.soLithtal t wnny"y Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only PERMIT NO. ��! Building Inspector, J- S P Applications and forms must be filled out in their entirety. Incomplete applications will not be accepted. Where the Applicant is not the owner,an Drwalladlr I pnr mont Owner's Authorization form(Page 2)shall be completed. 70M) 0 ;autha ld Date: L Y 4� OWNERS) F PRO ERTY: Name:�� ,� �I SCTM # 1000- �tl --3 - 1 Project Address: J� r��P►Q.`� - .$ �1-J Phone#: � Email: Mailing Address: 0 A)`' CONTACT PERSON: Name: 4,pFMPaokl,F, f1 2--0 Mailing Address: Phone#: Email:" ,,, DESIGN PROFESSIONAL INFORMATION: IJ y„ Name: I' OA) Mailing Address: Phone#: ,4 A6 Email: CONTRACTOR INFORMATION: Name: Mailing Address: Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition DAlteration ❑Repair ❑Demolition Estim Led Cos, of Project: Other — -Jr a $� Will the lot be re-graded? ❑Yes o Will excess fill be removed from premises? Oyes ❑No 1 Generated by REScheck-Web Software Compliance Certificate Project Hobart Road Energy Code: 2018 IECC Location: Southold, New York 'U�,T °° c Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 4,417 ft2 Glazing Area 29% L) Climate Zone: 4 (5572 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: Hobart Road Hobart Road ronzakary@gmail.com Southold, New York 11971 Southold, New York 11971 I NIMBI Compliance: 5.4%Better Than Code Maximum UA: 846 Your UA: 800 Maximum SHGC: 0.40 Your SHGC: 0.30 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in RESehecic. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelg e Assemblies Gross Area Cavity Cont. Prop. Req. Prop, Req. Perimeter Ceiling: Flat Ceiling or Scissor Truss 2,356 38.0 0.0 0.030 0.026 71 61 AGW Main: Wood Frame, 16" o.c. 4,513 21.0 0.0 0.057 0.060 184 194 Exterior Doors: Solid Door(under 50%glazing) 36 0.200 0.320 7 12 Windows: Vinyl Frame 1,247 0.300 0.320 374 399 SHGC: 0.30 AGW Garage: Wood Frame, 16" o.c. 159 21.0 0.0 0,057 0.060 8 8 Garage Door: Solid Door(under 50%glazing) 18 0.200 0.320 4 6 AGW Attic Knee: Wood Frame, 16" o.c. 69 15.0 0.0 0.077 0.060 5 4 Foundation Walls: Solid Concrete or Masonry Wall height: 9.5' 2,247 15.0 0.0 0.053 0.059 113 126 Depth below grade: 8.5' Insulation depth: 9.5' Windows:Vinyl Frame 113 0.300 0.320 34 36 SHGC: 0.30 _.._ ........... Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 1 of10 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Gerson Rubio, P.E. 2/22/2023 Name-Title fgn Ure Date Project Title Hob - ......-� ------.."...� _____..�.. Hobart Road Report date: 02/14/23 Data filename: Page 2 of10 - --dL REScheck Software Version : REScheck-Web Inspection Checklist rNrl Energy Code: 2018 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-inspection/Plan Review value Value C Comments/Assumptions Reg.11D. ------ 103.1, Construction drawings and E]Complies Requirement will be met. 103.2 'documentation demonstrate �7!Does Not energy code compliance for the [PR111 tNot Observable building envelope.Thermal �ElNot Applicable envelope represented on construction documents. 103.1, ,Construction drawings and '; Complies Requirement will be met. 1 103.2, nclocumentation demonstrate E]Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical syste ms. []Not Observable 1, �Systems serving multiple E]Not Applicable ;dwelling units must demonstrate �;compliance with the IECC Commercial Provisions. ............... .... .................... 3021, Heating and cooling equipment is Heating: Heating: ElComplies Requirement will be met. 40133 sized per ACCA Manual S based Btu/hr Btu/hr 'E]Does Not [PR212 on loads calculated per ACCA Cooling: Cooling: E]Not Observable Manual J or other methods Btu/hr j Btu/hr 'E]Not Applicable approved by the code official. Additional Comments/Assumptions: ............-........... ... 11 High Impact 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ............... ...... ... .......... ...- ------ .. ------ Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 3 of10 e tion PN ns t rifled Field Verified Foundation Inspection Value "Value Complies? Comments/Assumptions & Iteq.lo _......_ 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [FO411 insulation R-value. Where interior R_ R_ ❑Does Not table for values. ;insulation is used, verification ❑Not Observable may need to occur during 'Insulation Inspection. Not ❑Not Applicable required in warm-humid locations: i'in Climate Zone 3. 303.2 :Conditioned basement wall incomplies ;Requirement will be met. (FO511 :insulation installed per Does Not :manufacturer's instructions. �❑Not observable f❑Not Applicable 402.2.9 Conditioned basement wall ft ft ;❑Complies see the Envelope Assemblies [FO6)1 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ;❑Not Observable ❑Not Applicable 3012.1 1A protective coveringis installed ElComplies Requirement willbe met. [FO11[2 »to protect exposed exterior ❑Daes Not ;insulation and extends a minimum of 6 in, below grade. ti❑Not observable X❑Not Applicable 401 ;Snow-and ice-melting system ,❑Complies Exception. Requirement is (FO1212 controls installed. T Does Not not applicable. -]Not Observable ❑Not Applicable Additional Comments/Assumptions: _ ...... j1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1........ �...... ..........wwm.. ...... Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 4 of10 section Plans Verified Field Verified # Framing /Rough-In Inspection Value Value Complies? Comments/Assumptions Ale .ID 402.1.1, IDoorUfactor, U I U- ._ ❑Complies See the Envelope Assemblies 402.3.4 i I ❑Does Not table for values. [FR1]1 ❑Not Observable ❑Not Applicable 402.1.1, Clazin U-factor .__..._._........_ __....._..___. _ .. ..._...._ ._.—,�.�.......-._............._ ,.�.... g actor(area-weighted U-�a U I❑Complies See the Envelope Assemblies 402.3.1, average). []Does Not table for values. 402.3.3, ❑Not Observable 402.5 ❑ [FR2]1 Not Applicable 30 1,3. 3 7 U-factors of fenestration products ,❑Camplies Requirement will be met. [FR4]1 are determined in accordance ,DDoes Not with the NFRC test procedure or !taken from the default table. ❑Not Observable ❑Not Applicablew.. _..---------- 402.4.1.1 ;Air barrier and thermalµ barrier '❑Complies Requirement will be met. [FR23]1 installed per manufacturer's ❑Does Not ;instructions. y'❑Not Observable Nat Applicable 402.4 3 Fenestration that is not site built lies Requirementq . � mm.�. p will be met„ [FR20]1 is listed and labeled as meeting Does Not FAAMA/WDMA/CSA 101/I.S.2/A440 �❑Not Observable or has infiltration rates per NFRC � F400 that do not exceed code ❑Not Applicable limits. .......... n ...__........ _.... -402.4.5 IC-ratedh recessed lighting fixtures 10Complies iRequirement will be met. [FR16]2 :sealed at housing/interior finish HDDoes Not :and labeled to indicate <_2.0 cfm ;leakage at 75 Pa. �❑Not Observable ' ,❑Not Applicable _.._.._..ww_.......... .......... ._ _............ 403.3.1 Supply and return ducts in attics q❑Complies Requirement will be met. [FR12]1 insulated >= R-8 where duct is �❑Does Not I>= 3 inches in diameter and >_ R-6 where < 3 inches. Supply and ❑Not Observable return ducts in other portions of ❑Not Applicable ,the building insulated >= R-6 for diameter>= 3 inches and R-4.2 ifor< 3 inches in diameter. 403.3.2 :Ducts, air handlers and filter �❑Complies Requirement will be met. [FR13]1 boxes are sealed with ❑Does Not !joints/seams compliant with International Mechanical Code or "❑Not Observable International Residential Code, as ❑Not Applicable e _ _ _ .. _._ ..�........ `applicable. 403.3.5 �Buildingcavities are not used as N❑Complies Requirement will be met. [FR15]3 �ducts or plenums. ;❑Does Not „❑Nat Observable .......... _...._. a_.m _ t❑Not Applicable .I 403.4 aHVAC piping conveying fluids R R ;❑Complies ;Requirement will be met. [FR1712 above 105 °F or chilled fluids ODoes Not "tolg below 55 °F are insulated to >R ��E]Nat Observable 3' ❑Not Applicable _ 403.4.1 Protection of insulation on HVAC J❑Complies � �Requirement will be met. [FR24]1 piping. '❑Does Not ;❑Not Observable ;❑Not Applicable _..........._m.m. __._... _.w_.. 403.5.3 Hot water pipes are insulated to R R '❑Complies Requirement will be met. [FR1812 >R-3. ❑Does Not ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 'Low Impact (Tier 3) ....��.....m ...... ... Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 5 of10 section Plans Verlified' Field"verified # gaming/Rough-in Inspection Value Value Complies? Comments/Assumptions tws Req.1D ..... 403.6 ,Automatic or gravity dampers are` a❑Complies ;Requirement will be met. (FR1912 installed on all outdoor air �❑Does Not i-intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 6 of10 Section Plain verified Field Verified _.. '�arN�e Va�iue p Comments/Assumptions � Insulation Inspection Complies?p p 6R Re ICE 303.1 1All installed insulation is labeled ❑Com lies ;Requirement will be met. [IN 312 or the installed R-values ❑Does Not ;provided. ❑Not Observable -- ------- 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies MmmSee the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the Wood ❑ Wood ,FlDoes Not table for values. 402.2.6 ,wall insulation on the wall Mass Mass ONot Observable [I1\13]1 exterior,the exterior insulation requirement applies(FR10). Steel ❑ Steel ;ONat Applicable —71' 303.2 ;Wall insulation is installed per omplies ;Requirement will be met. [IN4]1 manufacturer's instructions. v❑Does Not ❑Not Observable /❑Not Applicable Additional Comments/Assumptions: Medium 1 Hi h Imp mm m Impact(Tier 2) 3 Low Impact(Tier 3) g � act(Tier 1) 2 Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 7 of10 section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req Ip 402.1.1, Ceiling insulation R value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ;❑ Wood ❑Does Not table for values. 402.2.2, -❑ Steel ❑ Steel ❑Not Observable 402.2.E [FI1]1 ❑Not Applicable I ..._._WW...._ ........._........... 303.1.1.1, Ceiling insulation installed per Complies Requirement will be met. 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every ❑Not Observable 1300 ft2. ❑Not Applicable 402.2 3 Vented attics with air permeable n❑Complies �iRequirement will be met. [F122]2insulation include baffle adjacent E]Does Not Ito soffit and eave vents that extends over insulation. Not Observable ; Not Applicable - 402.2.4 Attic access hatch and door R- R- _; Complies Requirement will be met. [F13]1 =insulation >R-value of the {EIDoes Not adjacent assembly. ❑Nat Observable ❑Nat Applicable 402.4..1.2 Blower in d mate t @ 50 Pa <=5 -ACH 50 = ACH50 — ❑Complies - Requirement wi�� ����q ill be met. [F117] ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable j 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Requirement will be met. [F127]1 determine air leakage with ft2 ft2 '❑Does Not ;either: Rough-in test:Total leakage measured with a `❑Not Observable r pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including ;the manufacturer's air handler enclosure if installed at time of ;test. Postconstruction test:Total leakage measured with a ipressure differential of 0.1 inch w.g. across the entire system ;including the manufacturer's air handler enclosure. ... _ .. ....... ---- ......... __- _._........ _. 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies Requirement will be met. [F14]1 cfm/100 ft2 across the system or ft2 ft2 ;❑Does Not <=3 cfm/100 ft2 without air 'handler @ 25 Pa. For rough-in '[:]Not Observable ',tests, verification may need to :❑Not Applicable occur during Framing Inspection, 403.3.2.1 Air handler leakage designated B❑Complies ;Requirement will be met. [F124]1 by manufacturer at<=2% of r❑Does Not design air flow. ❑Not Observable tlNot Applicable 403.1 1 Programmable thermostats ❑Complies Requirement will be met. [F19]2 installed for control of primary ,❑Does Not heating and cooling systems and g�Not Observable initially set by manufacturer to code specifications. Not Applicable 403.1.2 ,Heat pump thermostat installed fiC]Complies Exception: Requirement is [FI10]2 on heat pumps. a❑Does Not not applicable. ° Not Observable ❑Not Applicable 1 m � ❑Cam lies Requirement 403.5.1 Circulating service hot water p i q will be met. [FI11]2 systems have automatic or E❑Does Not ,accessible manual controls. ❑Not Observable ❑Not Applicable _...Til. ...rv..... ... a 1 High Impa ct(Tier 1 i Low Im) 2 Medium Impact(Tier 2) 3 p ct(Tier 3) Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions . & e , _4 _._. �..v . .a..a..a..a....�.... _ .......� 403.6.1 ,All mechanical ventilation system y stem ❑Complies WlRequirement will be met. [F125]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy ❑Not Observable and air flow limits per Table R403.6.1. 1❑Not Applicable 403.2 Hot water boilers supplying heat „ ❑Com :Requirementill �throu �� r❑Doe plies will be met. [F126]� gh one-or two-pipe heating y s Not ;systems have outdoor setback } ,control to lower boiler water ❑Not Observable E]Not Applicable temperature based on outdoor 4emperature, .......__ _._= n _.. 403.5.1.1 Heated water circulation systems ' '" 7❑Complies Exception: Requirement is [FI28]2 have a circulation pump.The ❑Does Not not applicable. isystem return pipe is a dedicated & ;return pipe or a cold water supply` []Not Observable i pipe. Gravity and thermos- (syphon circulation systems are not present. Controls for 1; circulating hot water system j I pumps start the pump with signal j ,for hot water demand within the j occupancy. Controls automatically turn off the pump when water is in circulation loop r l 'is at set-point temperature and ;no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is [F129]2 comply with IEEE 515.1 or UL []Does Not not applicable. 515. Controls automatically adjust the energy input to the ❑Not Observable ; heat tracing to maintain the ❑Not Applicable desired water temperature in the j piping. - w .......... _ ®�_ _._. ........... _ 403.5.2 ;Demand recirculation water ❑Complies (Exception: Requirement is [F130]2 ;systems have controls that ` u❑Does Not not applicable. manage operation of the pump and limit the temperature of the 3❑Not Observable water entering the cold water ]❑Not Applicable I piping to <= 1049F. �...._........ �_ ..;�. .. .. M -_......... ._... 403.5.4 Drain water heat recovery units k❑Complies ;Requirement will be met. [F131]2 (tested in accordance with CSA E]Does Not B55.1. Potable water-side pressure loss of drain water heat []Not Observable recovery units < 3 psi for P❑Not Applicable individual units connected to one or two showers. Potable water- k side pressure loss of drain water j heat recovery units < 2 psi for ;individual units connected to i three or more showers. 404.1 90/o or more of permanent -]complies Requirement will be met. [F16]1 ''fixtures have high efficacy lamps.; Does Not I ; Not Observable f H]Not Applicable 404.1.1 i Fuel gas lighting systems have „" Complies ,Requirement will be met. [F123]3 no continuous pilot light ❑Does Not DNot Observable "❑Not Applicable 401.3 Compliance certificate pasted. 9❑Complies Requirement will be met. [F17]2 EIDoes Not ❑Not Observable j❑Not Applicable ........... ......... ..F... 1 iHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact{Tier 3} ............. ........... Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 9 of10 ect Provisions ion Value Plans Verified Field VerifiedFinal Inspection Complies? Commentsl Usumptions 1�& � Value [FI1 J3 mechanical and water heating ❑Does Not provided. UComplies Requirement will be met. 30 .3 Manufacturer manuals for ;systems have b y❑Not Observable ❑Not Applicable Additional Comments/Assumptions: pp� High Impact(Tier 1) 2 Medium Impact(Tier.2) 3 Low Impact (Tier 3) L�. ....I 1.__ .ww.._.. _ ) ........ ......... Project Title: Hobart Road Report date: 02/14/23 Data filename: Page 10 of10 CertificateU�r Efficiency Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.30 0.30 Door 0.20 CoolingHeating & Heating System: Cooling System: Water Heater: Name: Date: Comments SITE DATA m m tati s v u FEfO D(tfNl4fln,?Dii ASFiEE Ne ti84J 0 4 9 TDTALLOT AF€ai i18Ct SO FT(0WXD ) c ?+ EA Ui'I2JFO,W ' i0,432 SOFT{09C0ACMSf SANITARY_CALCU CALCULATIONS _ c UGITINEbS PNIDA TO AAHMNB 6ANiAiW OSE FTATVSE➢SINQEFtJ4iY AF50FtKEai VACANikOt C}NZ(mp dD,. t.OYS'fftUCTNEW MFIi H(W$E �� _ 4Y#;AS'FS if�FfE 1; . NSTALLER 3iF.R'.E-#tA RTfff # RSINTHSCDHS.TNEENCMSM wKL iNiEID10aA ANSi�t t8EOR00FAS �*C;},. AEWN+EO BV SCONS {5(f 6KS SIDE TAO[E Ol IfENTHf MMNTENANCEM0'MEN E♦fNMIUtEAti9iG:116.n SDEWAIL, LLi i F90MOE0 TO SCONS THESENNCE - - t1a05(iFi.UP 106�.76 SO Ff fm EACH SEUHODN INEA fx� d URLTI6[ # FTACI_tlYL?i R4 tts m HIiwt-. ILL BE MLVSEHpA PAOPfATY 11NF �� � � � y manseAwxnaEEanAu:oesxaFFtavmllorso m rr �' ONE{F)FwLROAc(pN AF$pp{app$pp MiED TiHAiRRN(CAPACitp a' fp - � OfR III POSF-11tEATAHXi OdiPE01gN 80x m� AOfOO65xar xr 0)8W 475XG N.tEYS{53a Sfa90EWAtLAgCAPiiP'aiD7i p +OfauTESPAGE(-0N Fa)asx4;6xr9WEWAN92Y 6A:1FTS top r1 =V € a c "A v =L cn W00 N } his n EL( a F F 3 - i6Til01C - CO > 1 t Cz C/3 f T, T d,��t, . � CA A T .;a N N N � — _ me snow cFnm t->�-��7 - N Site Plan - N o o O can a SITE PLAN BASED FROM SURVEY PREPARED BY NATRAN TAFF CORWTµ LS, ELEVATIONS BASED ON VERTICAL DATUM NAVDBB r �7 C!3 October 9, 2.026 R Z ARCHITECTURE Town of Southold & 13uildivig Departmevit DESIGN 54375 NY-25 Southold, NY 11g71 � Re: Residence of: Joseph Battaglia 1750 Hobart Road Southold, New York Section 64, Block 03, Lot 3.1- To whoKn it May concern, This is to certify that to the best of my knowledge, the construction of the finished basement at the above referenced residence was substantially completed by November 21., 2025. My , office measured the existing conditions that month and prepared the "As Built" floor plan on November 22, 2025 and i believe the construction had started approximately the third week in September 2025. It is my understanding that there may have been remedial work such as cabinetry and painting that were completed more recently as the home is on the market. These plans were completed in accordance with the 2020 Residential Code of New York State and all recognized standards that were in place at the time of the construction. There were no structural changes to the building as part of this interior alteration. I STEWART AVE. Please feel free to contact my office with any questions. HUNTINGTON, N. Y. 11743 Very Trul ours, 516-922-5680 F ron(a rzarchitecture.coiai Ro d Zakary Architect