HomeMy WebLinkAbout53387-Z TOWN OF SOUTHOLD
BUILDING DEPARTMENT
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 53387 Date: 10/12/2026
Permission is hereby granted to:
Hobart Road PLC
PO BOX 806
Southold, NY 11971
To:
Legalize "as-built"finished basement as applied for per SCHD approval.Additional certification may
be required.
Premises Located at:
1750 Hobart Rd,Southold, NY 11971
SCTM# 64:3-3.1
Pursuant to application dated 09/28/2026 and approved by the Building Inspector..
To expire on 10/11/2028.
Contractors:
Required Inspections:
Fees:
As Built Addition/Alteration $2,507.00
CO Single Family Dwelling-Addition /Alteration $100.00
Total $2,607.00
�� Building Inspector
offaz*� TOWN OF SOUTHOLD—BUILDING DEPARTMENT
Town Hall Annex 54375 Main Road P. O. Box 1179 Southold, NY 11971-0959
• Telephone (631) 765-1802 Fax (631) 765-9502 1it1p�i:,//www.soLithtal t wnny"y
Date Received
APPLICATION FOR BUILDING PERMIT
For Office Use Only
PERMIT NO. ��! Building Inspector, J-
S P
Applications and forms must be filled out in their entirety. Incomplete
applications will not be accepted. Where the Applicant is not the owner,an Drwalladlr I pnr mont
Owner's Authorization form(Page 2)shall be completed. 70M) 0 ;autha ld
Date: L
Y 4�
OWNERS) F PRO ERTY:
Name:�� ,� �I SCTM # 1000- �tl --3 - 1
Project Address: J� r��P►Q.`� - .$ �1-J
Phone#: � Email:
Mailing Address: 0 A)`'
CONTACT PERSON:
Name: 4,pFMPaokl,F, f1 2--0
Mailing Address:
Phone#: Email:" ,,,
DESIGN PROFESSIONAL INFORMATION: IJ
y„
Name: I' OA)
Mailing Address:
Phone#: ,4 A6 Email:
CONTRACTOR INFORMATION:
Name:
Mailing Address:
Phone#: Email:
DESCRIPTION OF PROPOSED CONSTRUCTION
❑New Structure ❑Addition DAlteration ❑Repair ❑Demolition Estim Led Cos, of Project:
Other — -Jr a $�
Will the lot be re-graded? ❑Yes o Will excess fill be removed from premises? Oyes ❑No
1
Generated by REScheck-Web Software
Compliance Certificate
Project Hobart Road
Energy Code: 2018 IECC
Location: Southold, New York 'U�,T °° c
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 4,417 ft2
Glazing Area 29% L)
Climate Zone: 4 (5572 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
Hobart Road Hobart Road ronzakary@gmail.com
Southold, New York 11971 Southold, New York 11971
I NIMBI
Compliance: 5.4%Better Than Code Maximum UA: 846 Your UA: 800 Maximum SHGC: 0.40 Your SHGC: 0.30
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in RESehecic. Each slab-on-grade
assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements.
Envelg e Assemblies
Gross Area Cavity Cont. Prop. Req. Prop, Req.
Perimeter
Ceiling: Flat Ceiling or Scissor Truss 2,356 38.0 0.0 0.030 0.026 71 61
AGW Main: Wood Frame, 16" o.c. 4,513 21.0 0.0 0.057 0.060 184 194
Exterior Doors: Solid Door(under 50%glazing) 36 0.200 0.320 7 12
Windows: Vinyl Frame 1,247 0.300 0.320 374 399
SHGC: 0.30
AGW Garage: Wood Frame, 16" o.c. 159 21.0 0.0 0,057 0.060 8 8
Garage Door: Solid Door(under 50%glazing) 18 0.200 0.320 4 6
AGW Attic Knee: Wood Frame, 16" o.c. 69 15.0 0.0 0.077 0.060 5 4
Foundation Walls: Solid Concrete or Masonry
Wall height: 9.5' 2,247 15.0 0.0 0.053 0.059 113 126
Depth below grade: 8.5'
Insulation depth: 9.5'
Windows:Vinyl Frame 113 0.300 0.320 34 36
SHGC: 0.30
_.._ ...........
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 1 of10
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Gerson Rubio, P.E. 2/22/2023
Name-Title fgn Ure Date
Project Title Hob - ......-� ------.."...� _____..�..
Hobart Road Report date: 02/14/23
Data filename: Page 2 of10
- --dL REScheck Software Version : REScheck-Web
Inspection Checklist
rNrl Energy Code: 2018 IECC
Requirements: 100.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-inspection/Plan Review value Value C Comments/Assumptions
Reg.11D. ------
103.1, Construction drawings and E]Complies Requirement will be met.
103.2 'documentation demonstrate �7!Does Not
energy code compliance for the
[PR111 tNot Observable
building envelope.Thermal
�ElNot Applicable
envelope represented on
construction documents.
103.1, ,Construction drawings and '; Complies Requirement will be met.
1 103.2, nclocumentation demonstrate E]Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical syste
ms. []Not Observable
1,
�Systems serving multiple E]Not Applicable
;dwelling units must demonstrate
�;compliance with the IECC
Commercial Provisions.
............... .... ....................
3021,
Heating and cooling equipment is Heating: Heating: ElComplies Requirement will be met.
40133 sized per ACCA Manual S based Btu/hr Btu/hr 'E]Does Not
[PR212 on loads calculated per ACCA Cooling: Cooling: E]Not Observable
Manual J or other methods Btu/hr j Btu/hr 'E]Not Applicable
approved by the code official.
Additional Comments/Assumptions:
............-........... ...
11 High Impact 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
............... ...... ... ..........
...- ------
.. ------
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 3 of10
e tion PN ns t rifled Field Verified
Foundation Inspection Value "Value Complies? Comments/Assumptions
& Iteq.lo _......_
402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies
[FO411 insulation R-value. Where interior R_ R_ ❑Does Not table for values.
;insulation is used, verification ❑Not Observable
may need to occur during
'Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations:
i'in Climate Zone 3.
303.2 :Conditioned basement wall incomplies ;Requirement will be met.
(FO511 :insulation installed per Does Not
:manufacturer's instructions. �❑Not observable
f❑Not Applicable
402.2.9 Conditioned basement wall ft ft ;❑Complies see the Envelope Assemblies
[FO6)1 insulation depth of burial or ❑Does Not table for values.
distance from top of wall. ;❑Not Observable
❑Not Applicable
3012.1 1A protective coveringis installed ElComplies Requirement willbe met.
[FO11[2 »to protect exposed exterior ❑Daes Not
;insulation and extends a
minimum of 6 in, below grade. ti❑Not observable
X❑Not Applicable
401 ;Snow-and ice-melting system ,❑Complies Exception. Requirement is
(FO1212 controls installed. T Does Not not applicable.
-]Not Observable
❑Not Applicable
Additional Comments/Assumptions:
_ ......
j1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
1........ �...... ..........wwm.. ......
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 4 of10
section Plans Verified Field Verified
# Framing /Rough-In Inspection Value Value Complies? Comments/Assumptions
Ale .ID
402.1.1, IDoorUfactor, U I U- ._ ❑Complies See the Envelope Assemblies
402.3.4 i I ❑Does Not table for values.
[FR1]1 ❑Not Observable
❑Not Applicable
402.1.1, Clazin U-factor .__..._._........_ __....._..___. _ .. ..._...._ ._.—,�.�.......-._............._ ,.�....
g actor(area-weighted U-�a U I❑Complies See the Envelope Assemblies
402.3.1, average). []Does Not table for values.
402.3.3, ❑Not Observable
402.5
❑
[FR2]1 Not Applicable
30 1,3. 3 7 U-factors of fenestration products ,❑Camplies Requirement will be met.
[FR4]1 are determined in accordance ,DDoes Not
with the NFRC test procedure or
!taken from the default table. ❑Not Observable
❑Not Applicablew.. _..----------
402.4.1.1 ;Air barrier and thermalµ barrier '❑Complies Requirement will be met.
[FR23]1 installed per manufacturer's ❑Does Not
;instructions. y'❑Not Observable
Nat Applicable
402.4 3 Fenestration that is not site built lies Requirementq . �
mm.�. p will be met„
[FR20]1 is listed and labeled as meeting Does Not
FAAMA/WDMA/CSA 101/I.S.2/A440
�❑Not Observable
or has infiltration rates per NFRC
�
F400 that do not exceed code ❑Not Applicable
limits.
.......... n ...__........ _....
-402.4.5 IC-ratedh
recessed lighting fixtures 10Complies iRequirement will be met.
[FR16]2 :sealed at housing/interior finish HDDoes Not
:and labeled to indicate <_2.0 cfm
;leakage at 75 Pa. �❑Not Observable '
,❑Not Applicable
_.._.._..ww_.......... .......... ._ _............
403.3.1 Supply and return ducts in attics q❑Complies Requirement will be met.
[FR12]1 insulated >= R-8 where duct is �❑Does Not
I>= 3 inches in diameter and >_
R-6 where < 3 inches. Supply and ❑Not Observable
return ducts in other portions of ❑Not Applicable
,the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
ifor< 3 inches in diameter.
403.3.2 :Ducts, air handlers and filter �❑Complies Requirement will be met.
[FR13]1 boxes are sealed with ❑Does Not
!joints/seams compliant with
International Mechanical Code or "❑Not Observable
International Residential Code, as ❑Not Applicable
e _ _ _ .. _._ ..�........
`applicable.
403.3.5 �Buildingcavities are not used as N❑Complies Requirement will be met.
[FR15]3 �ducts or plenums. ;❑Does Not
„❑Nat Observable
.......... _...._. a_.m _ t❑Not Applicable .I
403.4 aHVAC piping conveying fluids R R ;❑Complies ;Requirement will be met.
[FR1712 above 105 °F or chilled fluids ODoes Not
"tolg below 55 °F are insulated to >R ��E]Nat Observable
3' ❑Not Applicable _
403.4.1 Protection of insulation on HVAC J❑Complies � �Requirement will be met.
[FR24]1 piping. '❑Does Not
;❑Not Observable
;❑Not Applicable _..........._m.m. __._... _.w_..
403.5.3 Hot water pipes are insulated to R R '❑Complies Requirement will be met.
[FR1812 >R-3. ❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 'Low Impact (Tier 3)
....��.....m ...... ...
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 5 of10
section Plans Verlified' Field"verified
# gaming/Rough-in Inspection Value Value Complies? Comments/Assumptions
tws Req.1D .....
403.6 ,Automatic or gravity dampers are` a❑Complies ;Requirement will be met.
(FR1912 installed on all outdoor air �❑Does Not
i-intakes and exhausts. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 6 of10
Section Plain verified Field Verified
_..
'�arN�e Va�iue p Comments/Assumptions
� Insulation Inspection Complies?p p
6R Re ICE
303.1 1All installed insulation is labeled ❑Com lies ;Requirement will be met.
[IN 312 or the installed R-values ❑Does Not
;provided. ❑Not Observable
-- -------
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies MmmSee the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the Wood ❑ Wood ,FlDoes Not table for values.
402.2.6 ,wall insulation on the wall Mass Mass ONot Observable
[I1\13]1 exterior,the exterior insulation
requirement applies(FR10). Steel ❑ Steel ;ONat Applicable
—71'
303.2 ;Wall insulation is installed per omplies ;Requirement will be met.
[IN4]1 manufacturer's instructions. v❑Does Not
❑Not Observable
/❑Not Applicable
Additional Comments/Assumptions:
Medium
1 Hi h Imp mm m Impact(Tier 2) 3 Low Impact(Tier 3)
g � act(Tier 1) 2
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 7 of10
section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req Ip
402.1.1, Ceiling insulation R value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ;❑ Wood ❑Does Not table for values.
402.2.2, -❑ Steel ❑ Steel ❑Not Observable
402.2.E
[FI1]1 ❑Not Applicable
I
..._._WW...._ ........._...........
303.1.1.1, Ceiling insulation installed per Complies Requirement will be met.
303.2 manufacturer's instructions. ❑Does Not
[F12]1 Blown insulation marked every ❑Not Observable
1300 ft2.
❑Not Applicable
402.2 3 Vented attics with air permeable n❑Complies �iRequirement will be met.
[F122]2insulation include baffle adjacent E]Does Not
Ito soffit and eave vents that
extends over insulation. Not Observable
; Not Applicable -
402.2.4 Attic access hatch and door R- R- _; Complies Requirement will be met.
[F13]1 =insulation >R-value of the {EIDoes Not
adjacent assembly.
❑Nat Observable
❑Nat Applicable
402.4..1.2 Blower
in d mate t @ 50 Pa <=5 -ACH 50 = ACH50 — ❑Complies - Requirement wi�� ����q ill be met.
[F117] ❑Does Not
<=3 ach in Climate Zones 3-8.
❑Not Observable
❑Not Applicable j
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Requirement will be met.
[F127]1 determine air leakage with ft2 ft2 '❑Does Not
;either: Rough-in test:Total
leakage measured with a `❑Not Observable
r pressure differential of 0.1 inch ❑Not Applicable
w.g. across the system including
;the manufacturer's air handler
enclosure if installed at time of
;test. Postconstruction test:Total
leakage measured with a
ipressure differential of 0.1 inch
w.g. across the entire system
;including the manufacturer's air
handler enclosure.
... _ .. ....... ---- ......... __- _._........
_.
403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies Requirement will be met.
[F14]1 cfm/100 ft2 across the system or ft2 ft2 ;❑Does Not
<=3 cfm/100 ft2 without air
'handler @ 25 Pa. For rough-in '[:]Not Observable
',tests, verification may need to :❑Not Applicable
occur during Framing Inspection,
403.3.2.1 Air handler leakage designated B❑Complies ;Requirement will be met.
[F124]1 by manufacturer at<=2% of r❑Does Not
design air flow.
❑Not Observable
tlNot Applicable
403.1 1 Programmable thermostats ❑Complies Requirement will be met.
[F19]2 installed for control of primary ,❑Does Not
heating and cooling systems and g�Not Observable
initially set by manufacturer to
code specifications. Not Applicable
403.1.2 ,Heat pump thermostat installed fiC]Complies Exception: Requirement is
[FI10]2 on heat pumps. a❑Does Not not applicable.
° Not Observable
❑Not Applicable
1 m � ❑Cam lies Requirement 403.5.1 Circulating service hot water p i q will be met.
[FI11]2 systems have automatic or E❑Does Not
,accessible manual controls.
❑Not Observable
❑Not Applicable
_...Til. ...rv..... ... a
1 High Impa ct(Tier 1
i Low Im) 2 Medium Impact(Tier 2) 3 p ct(Tier 3)
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 8 of10
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
.
& e ,
_4 _._.
�..v . .a..a..a..a....�.... _ .......�
403.6.1 ,All mechanical ventilation system
y stem ❑Complies WlRequirement will be met.
[F125]2 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy ❑Not Observable
and air flow limits per Table
R403.6.1. 1❑Not Applicable
403.2 Hot water boilers supplying heat „ ❑Com :Requirementill
�throu �� r❑Doe plies will be met.
[F126]� gh one-or two-pipe heating y s Not
;systems have outdoor setback }
,control to lower boiler water ❑Not Observable
E]Not Applicable
temperature based on outdoor
4emperature,
.......__ _._= n _..
403.5.1.1 Heated water circulation systems ' '" 7❑Complies Exception: Requirement is
[FI28]2 have a circulation pump.The ❑Does Not not applicable.
isystem return pipe is a dedicated &
;return pipe or a cold water supply` []Not Observable
i pipe. Gravity and thermos-
(syphon circulation systems are
not present. Controls for 1;
circulating hot water system j
I pumps start the pump with signal j
,for hot water demand within the j
occupancy. Controls
automatically turn off the pump
when water is in circulation loop r l
'is at set-point temperature and
;no demand for hot water exists.
403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is
[F129]2 comply with IEEE 515.1 or UL []Does Not not applicable.
515. Controls automatically
adjust the energy input to the ❑Not Observable ;
heat tracing to maintain the ❑Not Applicable
desired water temperature in the j
piping. -
w .......... _ ®�_ _._. ........... _
403.5.2 ;Demand recirculation water ❑Complies (Exception: Requirement is
[F130]2 ;systems have controls that ` u❑Does Not not applicable.
manage operation of the pump
and limit the temperature of the 3❑Not Observable
water entering the cold water ]❑Not Applicable
I piping to <= 1049F. �...._........ �_ ..;�. .. ..
M -_.........
._...
403.5.4 Drain water heat recovery units k❑Complies ;Requirement will be met.
[F131]2 (tested in accordance with CSA E]Does Not
B55.1. Potable water-side
pressure loss of drain water heat []Not Observable
recovery units < 3 psi for P❑Not Applicable
individual units connected to one
or two showers. Potable water- k
side pressure loss of drain water
j heat recovery units < 2 psi for
;individual units connected to
i
three or more showers.
404.1 90/o or more of permanent -]complies Requirement will be met.
[F16]1 ''fixtures have high efficacy lamps.; Does Not
I
; Not Observable f
H]Not Applicable
404.1.1 i Fuel gas lighting systems have „" Complies ,Requirement will be met.
[F123]3 no continuous pilot light ❑Does Not
DNot Observable
"❑Not Applicable
401.3 Compliance certificate pasted. 9❑Complies Requirement will be met.
[F17]2 EIDoes Not
❑Not Observable
j❑Not Applicable
........... .........
..F...
1 iHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact{Tier 3}
............. ...........
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 9 of10
ect Provisions
ion Value
Plans Verified Field VerifiedFinal Inspection Complies? Commentsl Usumptions
1�& � Value
[FI1 J3 mechanical and water heating ❑Does Not
provided.
UComplies Requirement will be met.
30 .3 Manufacturer manuals for
;systems have b
y❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
pp� High Impact(Tier 1) 2 Medium Impact(Tier.2) 3 Low Impact (Tier 3)
L�. ....I 1.__ .ww.._.. _ )
........ .........
Project Title: Hobart Road Report date: 02/14/23
Data filename: Page 10 of10
CertificateU�r Efficiency
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 15.00
Floor 0.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass & Door Rating U-Factor SHGC
Window 0.30 0.30
Door 0.20
CoolingHeating &
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
SITE DATA m
m
tati s v u
FEfO D(tfNl4fln,?Dii ASFiEE Ne ti84J
0 4 9
TDTALLOT AF€ai i18Ct SO FT(0WXD ) c ?+
EA
Ui'I2JFO,W ' i0,432 SOFT{09C0ACMSf
SANITARY_CALCU CALCULATIONS
_
c
UGITINEbS PNIDA TO AAHMNB 6ANiAiW OSE FTATVSE➢SINQEFtJ4iY AF50FtKEai VACANikOt C}NZ(mp
dD,. t.OYS'fftUCTNEW MFIi H(W$E �� _
4Y#;AS'FS if�FfE 1; .
NSTALLER 3iF.R'.E-#tA RTfff #
RSINTHSCDHS.TNEENCMSM wKL
iNiEID10aA ANSi�t t8EOR00FAS �*C;},.
AEWN+EO BV SCONS {5(f 6KS SIDE TAO[E Ol
IfENTHf MMNTENANCEM0'MEN E♦fNMIUtEAti9iG:116.n SDEWAIL, LLi i
F90MOE0 TO SCONS THESENNCE - - t1a05(iFi.UP 106�.76 SO Ff fm EACH SEUHODN INEA fx� d
URLTI6[ # FTACI_tlYL?i R4 tts m HIiwt-.
ILL BE MLVSEHpA PAOPfATY 11NF �� � � �
y
manseAwxnaEEanAu:oesxaFFtavmllorso m rr
�' ONE{F)FwLROAc(pN AF$pp{app$pp MiED TiHAiRRN(CAPACitp a' fp
- � OfR III POSF-11tEATAHXi OdiPE01gN 80x m�
AOfOO65xar xr 0)8W 475XG N.tEYS{53a Sfa90EWAtLAgCAPiiP'aiD7i p
+OfauTESPAGE(-0N Fa)asx4;6xr9WEWAN92Y 6A:1FTS
top r1
=V
€ a c "A v =L
cn
W00
N
} his
n EL( a
F F 3 - i6Til01C - CO
> 1 t Cz
C/3
f T,
T d,��t, .
� CA A
T
.;a
N N
N �
—
_ me snow cFnm t->�-��7
- N
Site Plan - N o
o O can a
SITE PLAN BASED FROM SURVEY PREPARED BY NATRAN TAFF CORWTµ LS,
ELEVATIONS BASED ON VERTICAL DATUM NAVDBB
r
�7 C!3
October 9, 2.026
R Z ARCHITECTURE
Town of Southold &
13uildivig Departmevit
DESIGN
54375 NY-25
Southold, NY 11g71 �
Re: Residence of:
Joseph Battaglia
1750 Hobart Road
Southold, New York
Section 64, Block 03, Lot 3.1-
To whoKn it May concern,
This is to certify that to the best of my knowledge, the
construction of the finished basement at the above referenced
residence was substantially completed by November 21., 2025. My ,
office measured the existing conditions that month and prepared
the "As Built" floor plan on November 22, 2025 and i believe the
construction had started approximately the third week in
September 2025. It is my understanding that there may have
been remedial work such as cabinetry and painting that were
completed more recently as the home is on the market.
These plans were completed in accordance with the 2020
Residential Code of New York State and all recognized standards
that were in place at the time of the construction. There were no
structural changes to the building as part of this interior alteration.
I STEWART AVE.
Please feel free to contact my office with any questions. HUNTINGTON, N. Y.
11743
Very Trul ours, 516-922-5680
F
ron(a rzarchitecture.coiai
Ro d Zakary Architect