Loading...
HomeMy WebLinkAbout53415-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 53415 Date: 10/19/2026 Permission is hereby granted to: Randi Lally 9 Andover Rd Rockville Centre, NY 11570 To: construct an accessory in-ground swimming pool with spa as applied for per DEC Non-Jurisdiction letter and Trustees approvals. Premises Located at: 900 Fox Hollow Rd, Mattituck, NY 11952 SCTM# 113.-6-22 Pursuant to application dated 10/16/2026 and approved by the Building Inspector. To expire on 10/18/2028. Contractors: Required Inspections: Fees: SWIMMING POOLS-IN-GROUND WITH FENCE ENCLOSURE $300.00 CO Swimming Pool $100.00 Total $400.00 �� ding Inspector ���� �4 " F ° TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 y Telephone(631) 765-1802 Fax(631) 765-9502 liLti2s://www.sotitholdtowntiy.gov Date Received PERMITAPPLICATION FOR BUILDING E C E gV E —. For Office Use Only PERMIT NO. Building Inspectors " 1 6 r 02('1 Applications and forms must be filled out in their entirety.Incomplete Building Department applications will not be accepted. Where the Applicant is not the owner,an 'Town of Southold Owner's Authorization form(Page 2)shall be completed. Date:05/13/2026 OWNER(S)OF PROPERTY: Name:Randi Lally I SCTM#1000-113-6-22 Project Address:900 Fox Hollow Road, Mattituck, NY 11952 Phone#:516-413-9036 Email:randi.lally@freidfrank.com Mailing Address:900 Fox Hollow Road, Mattituck, NY 11952 CONTACT PERSON: Name:Jonathan Paetzel MailingAddress:PO Box 478 Mattituck, NY 11952 Phone#:631-209-2410 Ext. 2# 1Email:jonathan@mplastudio.com DESIGN PROFESSIONAL INFORMATION: Name:Jonathan Paetzel Mailing Address:PO Box 478 Mattituck, NY 11952 Phone#:631-209-2410 Ext. 2# =mail-jonathan@mplastudio.com CONTRACTOR INFORMATION: Name:Burger Construction Mailing Address:PO Box 934 Cutchogue, NY 11935 Phone#:631-734-5217 1Email:burgerconstruct@aol.com DESCRIPTION OF PROPOSED CONSTRUCTION iONew Structure ❑Addition ❑Alteration ❑Repair BDemolition Estimated Cost of Project: 00therRemove existing pool and install new Swimming Pool+Attached Spa $95,000 Will the lot be re-graded? El Yes W No Will excess fill be removed from premises? ❑Yes W No 1 PROPERTY INFORMATION Existing use of property:Resldentlal Intended use of property:Resldential Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to R40 this property? ❑Yes 8 No IF YES, PROVIDE A COPY. M Check BoxAfter Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code.APPLICATION IS HEREBY MADE to the Building Department for the Issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or,Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. Application Submitted By(print name):E u g e n e Burger @@Authorized Agent ❑Owner Signature of Applicant: Date: 5/13/2026 STATE OF NEW YORK) S • COUNTY OF ) being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the (Contract r,Agent,C irporate Officer,etc.) of said owner or owners,and is duly authorized to r have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this t0 day of 0 r-�jKP,_ , 20 94, otary Public TRACEY L. DWYER PROPERTY OWNER AUTHORIZATION NOTARY PUBLIC,STATE OF NEW YORK NO.OIDW6306900 (Where the applicant is not the owner) QUALIFIED IN SUFFOLK COUNTY COMMISSION 0XPIRES JUNE 30, I, residing at do hereby authorize to apply on my behalf to the Town of Southold Building Department for approval as described herein, Owner's Signature Date Print Owner's Name 2 rp"F-w Department of KATHY HOCHUL YO RK Governor LT T A E Environmental AMANDA LEPTON Conservation Commissioner LETTER OF NO JURISDICTION TIDAL WETLANDS ACT & NOTIFICATION OF ENDANGERED SPECIES JURISDICTION February 18, 2026 Randi and Sean Lally 9 Andover Road Rockville Centre, NY, 11570 Re: Application# 1-4738-05101/00001 Lally Property —900 Fox Hollow Road Mattituck NY 11952 SCTM# 1000-113-6-22 Dear Applicant: Based on the information you submitted, the New York State Department of Environmental Conservation (DEC) has determined that the portion of the referenced property located landward of the 16' contour, which exceeds ten feet above mean sea level in elevation and is on a gradual slope, as shown on the attached survey prepared by Gerard D. Lenze L.S., dated 8/17/2022 and last revised on 10/29/2025, is beyond the jurisdiction of the Article 25 Tidal Wetlands Act. Therefore, in accordance with the current Tidal Wetlands Land Use Regulations (6NYCRR Part 661), no permit is required to conduct regulated activities landward of that contour. Be advised, no construction, sedimentation, or disturbance of any kind may take place seaward of the tidal wetlands jurisdictional boundary, as indicated above, without a permit. It is your responsibility to ensure that all precautions are taken to prevent any sedimentation or disturbance within Article 25 jurisdiction which may result from your project. Such precautions may include maintaining adequate work area between the jurisdictional boundary and your project (i.e. a 15' wide construction area) or erecting a temporary fence, barrier, or hay bale berm. Please also be advised, the proposed project is in the 3-mile buffer from an acoustically detected summer occurrence of Northern long-eared myotis. To avoid the possibility of an Endangered Species "take", no cutting of trees should be conducted between March 1 st and November 30th. Tree cutting may be allowed to occur within the prohibited window by obtaining written authorization from a Regional Wildlife Biologist (email: wildlife.rl @dec.nyx gov with the subject line 'Bat Authorization Request'). Authorization may be provided if it can be determined that the area proposed for clearing is not suitable habitat or is not occupied at the time of cutting. Page 1 of 2 Division of Environmental Permits, Region 1 50 Circle Road, Stony Brook NY 11790 1 www.dec.ny.gov I P: (631) 444-0365 1 F: (631)444-0360 I This letter shall remain valid unless site conditions change. Please note that this letter does not relieve you of the responsibility of obtaining any necessary permits or approvals from other agencies or local municipalities. Sincerely, Kevin A. Kispert Permit Administrator cc: BMHP En-Consultants File Page 2 of 2 SCREDTiLE B a {. r"�°. k , "'",�. w a x arorxFu+✓':'r� ev sew «v,.,""a.:+xr"m a+4..,r rW..a.�n.ea>�nr rn.rr.� u+u»r uw.gw .5y y.• �F. " "iF wY�*'n a,a, ma w�ror r�r'"y J''dj»;,�4A., A�, rvnI"u AAA, °i � .: BOARD OF SOUTHOLD TOWN TRUSTEES ,r SOUTHOLD, NEW YO.RK � r " PERMIT NO. M15 DATE: FEBR[l 'liY 11,202 ISSUED TO: SEAN& RANDT LALLY a J PROPERTY ADDRESS: 99 0 LLOW- ROAD MATTITUAC1C SCTM# 1200-113-6-22 � � * AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in ` N i accordance with the Resolution of the Board of Trustees adopted at the meeting held on February l 1,2026 and in consideration of application fee in the sum of 1 250.00 paid by Senn&RAndi Lally and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits i 1 ; the following: gllt : r ' Wetland Permit to demolish existing one-story dwelling and appurtenant deck,shed,coop,hot tub,steps,and retaining walls,and construct a new two-story,2,248 sf single-family dwelling with 62 sf covered entry porch and steps,383 sf covered porch and steps,and 880 sf raised + uncovered masonry patio with associated bbq,steps,planters,2' high (max.) planter retaining . ; walls and 8" high landscape steps; install outdoor shower piped to d ell; replace existing ' cA with new 849 sf grade-level mason p p (in-place) g 1 g masonry pool patio; remove and replaceexisting 17.7 x 35.5' swimming pool with gunite swimming pool and 7'x 7'spa; install 3' wide stone paver path l to 11' x 14' pervious gravel lire-pit seating area with 1,8' high stack-stone seating walls; a a> ' abandon existing septic system and install a new IIA OWTS sanitary system landward of d dwelling; install stormwater drainage system,including pool drywell; truck in from upland w�h source approximately 125 cy of clean fill,60 cy to be compacted beneath proposed raised patio =: iand 65 cy to be utilized fur site grading proposed more than 100 feet from top of bank; replace ",r and relocate pool enclosure fencing further landward; and establish and perpetually maintain tl v area between relocated pool fence and top of bank as an approximately 3,317 sf vegetated non- ' t turf buffer area;with the condition that any retaining walls'do not exceed 2' in height,and that l; the project be dark sky compliant; and as depicted on the site plan prepared by S.L.Maresca Associates, received on February 11,2026,and stamped approved on February 11,2026. IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of the day and year written above, A/"r.A' 'C ......� ............ A �'oi"R47..` ' t APR 2 8 2026 1 a t'„ � ' � -� ' — � '�t � p �� A ` ""�.�" " ;oufltt�tt&Ta►rrrn ��r"r` Pw °r"' .� n A rw a` 'a uz.0 � r.A.„ rruos r a ' t• Ig Q l iwieeeauwra>f�a awW"sc y 'ti�,.� --; � w O' -at - ;C? 4€OI^^ c' c rL „y, <� `^ yB �� PAv1o5FY STw.ES-a1tWYlALtb � ��{ � y� O' - '._.�-s�®�asF sm ,..sme+.vro F,w„�.•n TEST HOLE " O �J i.s,rraeo .<ns�uerow. s —�— M aUso UxcarE uoxav vam _ / s YT-= --y - .wexnw,erhn,w,�,�tFs.ee,„us��ff �� p„ -:,- Gross FtsorPuea 8 La€Coverage Oa3�. U ------. .�._-.._.__.m,,-_ wovom+wa�cenv.,-,€a / r je_^`�' .« .,• .a, f1} c' d p 4 ttRf � uLa3t9mt.t¢a.tic..4'+£'HY-ffi�m.aFaeLLI ,7 - � xe,19tti:Y YR�'ABn9J i!<NptiiCi3e$.�HI �> �� � '+� l@i d V E>s ewxe ' R cc El a+°sewmvr r y v� mm m,�� M 4