Loading...
HomeMy WebLinkAboutTR-11028A Glenn Goldsmith,President �OUCOG Town Hall Annex A.Nicholas Krupski,Vice President ri: 54375 Route 25 Eric Sepenoski y P.O. Box 1179 Liz Gillooly Southold,NY 11971 Joseph Finora � G4, apt 0� Telephone(631)765-1892 Clzr �, Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION.SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1 st day of construction % constructed X Project complete, compliance inspection Glenn Goldsmith, President ``��F S0 Town Hall Annex Nicholas Krupski,Vice President �O� ®l0 54375 Route 25 P.O.Box 1179 Eric Sepenoski 4 Southold, New York 11971 Liz Gillooly G Q Telephone(631) 765-1892 Joseph Finora • �O Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Permit No.: 11028A Date of Receipt of Application: October 1, 2026 Applicant: Adam & Sari Simon SCTM#: 1000-74-1-35.54 Project Location: 4730 Blue Horizon Bluffs, Peconic Date of Resolution/Issuance: October 14, 2026 Date of Expiration: October 14, 2029 Reviewed by: Board of Trustees Project Description: Install code-compliant 4' pool fencing; trench water line from existing well to dwelling and trench electric line to dwelling; construction activity within Trustee jurisdiction. Findings: The project meets all the requirements for issuance of an Administrative Permit set forth in Chapter 275 of the Southold Town Code. The issuance of an Administrative Permit allows for the operations as indicated on the site plan prepared by Marshall Paetzel Landscape Architecture, received on October 21, 2026, and stamped approved on October 27, 2026. Special Conditions: Establish and perpetually maintain the area landward of the bluff and seaward of the fence as a vegetated non-turf buffer. Inspections: Final Inspection. If the proposed activities do not meet the requirements for issuance of an Administrative Permit set forth in Chapter 275 of the Southold Town Code, a Wetland Permit will be required. This is not a determination from any other agency. Glenn Goldsmith, President Board of Trustees SIMON-GOLDBERG 4730 Blue Horizon Bluffs Peconic, New York BOARD OF I RUSTEES TOWN OF SOUTHOLD PROPOSED VEGETATED � NON-TURF BUFFER DATE j FROM TOP OF BLUFF TO TE PROPOSED POOL FENCE / 10'-WIDE LIPA EASEMENT z,. / Marshall poetzel LANDSCAPE ARCHITECTURE �3• / ' EXISTING ...�__._....._.__ _,_.__.____ _ W W W 414.33' // // TRANSFORMER PROPOSED W W /'"�•-�.��•,� ELECTRIC SERVICE W W W W W/ W W W W y 1 PROPOSED PO Box 478 __E IIliil�}mn ELECTRIC METER oA OF RoM w /W W W F W W /W / / I N E-----E--- E--_ rT 5175 County Road 48 Mattituck, NY 11952 phone: (631)209-2410 Cl) — PROPOSED 8'W x 4'D --E---� Ilnulunmmnl�' lu�umlmnwlmll�p Iln� Imlmlwlmm"' Im�.�p fax: (631)315-5000 POOL BACKWASH e\ DRYWELL \ mnnmm�unlnm�,,,' ;mnluuln�,_ _ email m I studso @ p astudio com -- —� —� PROPOSED PROJECT LIMITING SILT FENCE PROPOSED 4'-8"x13'-4" mnunmm�unmlmumnunumwwummlnunnmmnunmm�mulmnmmuum�nl�lnI� �'Ao POOL EQUIPMENT PAD _ — -"`— — �r` AREA OF DISTURBANCE=38,870 SF OR 0.89 AC nmlallununuv-----' — O C) s �:.�° / LAWN 'PD` ---_---- BOO .— .—. .�_'-' -:.',,0. PROPOSED SEPTIC ''� S 40°4 50'E ARCHITECT: 162.52' Christopher Powers, RA HAY BALES i PROPERTY �-" LOCATION �'' —�� ............ _ S 44° �wunullana0°0001p0p1°a1°um nunualllalllllulllllullla"a10°°0°°°°°°1°°°°a°°°°uunuuuuunnnnnu unnnaanlallll u...... llunun a _ 40 20"E PROJECT LIMITING / l " Powers Hancock Design '^ / FENCING _ 11111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIII 1111111111111111111111111111111111111- - % 20'-0"MIN. `�_� — — — — R EL / T.H.IZI '-� — — — _ — 15'gCCESS PROPOSED GRAY 100'SETBACK FROM TOP OF ��6° ' o =-� .— —ORY STRUCTox 400 URE_SETBgCK_ DRIVEWAY LO BLUFF AS PER SURVEY 20_PRINCIPgL SETBg1CK -- GRAVEL CONSTRUCTION ACCESS o SouPO Bh Jamesport, NY 11970 O —_ I PREPARED BY KENN!ETH M. PROPOSED PROP. — — — — T Office: (631) 703-0800 PROPOSED DECK / W W WOYCHUK LAND SURVEYING, 16'X 37' ON- PROPOSED PLLCDATEDO�-16-26 , d — —'— —'— — — — — _ — — — —.—.—.—.—.—.— _ \ �l \�\ SURVEYOR: / POOL WITH GRADE GRAVEL PARKING —.—.— —._ — — - - — — Kenneth Wo chuk LS / W W PROPOSED RESIDENCE i o .y �� X'n Xf N.Y.S. Licensed Land Surveyor 5'-2"X 11' POOL i W W W W W W PROPOSED 4'HT.NYS , BUILT-IN SPA PATIO FFE =39.5 I ro ��� ~0"x y POOL CODE COMPLIANT LAWN PROPOSED TOPSOIL x P.O. Box 153 W W .� / ___o • . GARAGE STOCKPILE AREA � j y \ ���y \ Aquebogue, NY 11931 FENCE+GATE(TYP. 1 " W T Q91�0, „ WELL Office: (631) 298-1588 • • — — —'—'- -'—'— - - - -'—'— IIIIIIIIIIIIIIIIilllllllllllllllt —. — -::.... — — — —.—.—.—. '— — —-— —.—-— —.—._.—._.—._ �$ .IIIIIIIIIIIIIIIIIIIIIIIIIIIOIIIIIIIIIII. `'I IIV _ 7 ENGINEER: I W.W. STAIRWELL WW 15'PRINCIPAL AND ACCESSORY STRUCTURE SETBACK " % _ EXISTING FENCE ® HAY BALES(TYP.) _ DiLandro Andrews Engineering _•WWW�WW WWI WW moWW -W,,.= Ia Ilal IIIIIIII 111111 IIII I I 1 I IUhII II PJ . IIIIIII D wum� m moor ® �aannuuuunuuuwnnuuunnuw uuunmuuuuunnnuununnuuuuunnunnuuuunnunnnnunnnnnn I n I nu n 1 w CONCRETE O Na nCnnRmE nTn wETO BE REMOVED a uumw n 1111111111111 I I I I1111 11111111 1111111111111111 = tito 158 County R oad 39 WASHOUT AREA Suite 10 IIIIII-III mumIIII illlllll lII�IIII� — - 572.12' SouthampLion, NY 1 19 68 ROPOSED PROPOSED 4'HT.NYS EXISTING STAKE(TYP.) Office: (bl) 259-3959 WATER SERVICE POOL CODE COMPLIANT FENCE+GATE(TYP.) EXISTING TREE(TYP.) EXISTING POST(TYP.) SITE DATA: SCTM#: 1000-74-01-35.54 Zoning District: R-40 Lot Area:50,685.53 SF (or 1.16 acres) OCT 2 1 2026 NOTES: 1. Base map information based on survey prepared by Kenneth M.Woychuk Land Surveying, PLLC dated October 6,2025. 2. Unauthorized alteration of this plan is a violation of NYS Education Law. REGULATORY REQUIREMENTS: -ALL CONSTRUCTION, MATERIALS,AND EQUIPMENT SHALL BE IN STRICT ACCORDANCE WITH ALL FEDERAL, NEW YORK STATE, SUFFOLK COUNTY, AND SOUTHOLD TOWN ZONING AND BUILDING CODES, ORDINANCES, REGULATIONS, ETC. INCLUDING ANY RELEVANT REVISIONS ENVIRONMENTAL REGULATIONS. DATE DESCRIPTION 09.14.26 UPDATE POOL TO BE -THE ITEMS DEPICTED IN THIS PERMIT DRAWING ARE INTENDED TO BE CONSTRUCTED 12"COPING +REMOVE COVER ONLY AFTER RECEIVING ALL REQUIRED PERMITS/APPROVALS,AND SOLELY FOR THE VAULT. SPECIFIED OWNER AND AT THE PROJECT SITE LOCATION NOTED ON THE DRAWING. 10.21.26 ADD PROPOSED VEGETATED NON-TURF BUFFER AS PER -THE SCOPE OF WORK IN THE PLAN HAS BEEN DESIGNED IN ACCORDANCE TO THE 2020 TRUSTEES;MOVE PROJECT RESIDENTIAL CODE OF NYS. LIMITING SILT FENCE+ TEST HOLE HAYBALES TO BEYOND -THE SWIMMING POOL SHALL BE COMPLETELY AND CONTINUOUSLY SURROUNDED BY A APPROVED POOL FENCE. BORING BY McDONALD GEOSERVICES BARRIER AS REQUIRED AND IN ACCORDANCE TO SECTION R326.4. AUGUST 8,2025 S e a I EL:36'-0"' 0.01 -THE CONTRACTOR IS RESPONSIBLE TO EXECUTE ALL WORK IN COMPLIANCE WITH THE tapgCgp SPECIFICATIONS AND RECOMMENDATIONS OF ALL RELEVANT REGULATORY AGENCIES p Ka Afi.9'� oL MIXED SAND AND CONSTRUCTION SHALL MEET ALL FEDERAL, STATE AND LOCAL ZONING, ORDINANCES, AND LOAM 2 5, REGULATIONS, CODES, LAWS, ETC. -THE LANDSCAPE ARCHITECT IS NOT RESPONSIBLE FOR THE INSPECTION, SUPERVISION, � ;��ML BROWN SILT _ °' OR ADMINISTRATION OF THIS CONSTRUCTION PROJECT. IT SHALL BE THE RESPONSIBILITY BROWN SILTY SAND OF THE CONTRACTOR TO ARRANGE FOR ALL INSPECTIONS REQUIRED. 6,x 00271 o'h QQ� SM WITH GRAVEL -7 0' �rfi OF LIGHT BROWN FINE L E G E N D SP TO MEDIUM SAND -9.0' TITLE: SM LIGHT BROWN -- PROPERTY LINE — — — 2"PVC PIPE SILTY SAND _24.0' POOL FENCE / nuunaunnunnulllllllll PROJECT LIMITING SILT FENCE / \ GRAVEL CONSTRUCTION ACCESS SC BROWN CLAYEY U T I L I T I ES SAND NYS POOL COMPLIANT FENCE W.W. WINDOW WELL H.E.G.W. SITE PLAN EL:3.0' -33.0' — — SETBACK $T.H. TEST HOLE SC WATER IN BROWN __-__ 100'SETBACK FROM TOP OF BLUFF CLAYEY SAND ® EXISTING TREE TO REMAIN 0 10 20 -42.0' EXISTING STAKE X EXISTING TREE TO BE REMOVED ri=r==1 d� SCALE 1" = 20' ti WATER IN BROWN EXISTING POST VEGETATED NON-TURF BUFFER DRAWN BY: SP FINE TO v A.SCHEEL MEDIUM SAND CHECKED BY: J.PAETZEL,RLA L 1 . 1 -48.0' ` PDT PROPOSED POOL BACKWASH DRYWELL DATE:REVIS 2026.08.04 2026.10.21 SOUTHOLD TRUSTEES rro. 110 a8 A Issued To. Adam .� sa►r, s:�,o� Date ���►N/a6 Ad-dress.LI410 1�1%AC u�o� �o� �����s� ?ec. o�,� -- .THIS. NOTICE MUST BE DISPLAYED DURING CONSTRUCTION TOWN TRUSTEES OFFICE,TOWN OF SOUTHOLD SOUTHOLD, N.Y. 11971 TE L.: 765.1892 Glenn Goldsmith,President ��gUF O Town Hall Annex y��0 G A.Nicholas Krupski,Vice President a .e 54375 Route 25 Eric Sepenoski y , P.O.Box 1179 Liz Gillooly oy • ��� Southold,NY 11971 Joseph FinoraOl � Telephone(631)765-1892 Fax(631)765-6641 Southold Town Board of Trustees Field Inspection Report Date/Time: Completed in field by: I j4 J". - Sol Searcher Consulting on behalf of ADAM & SARI SIMON requests an Administrative Permit to install code-compliant 4' pool fencing; trench water line from existing well to dwelling and trench electric line to dwelling; construction activity within Trustee jurisdiction. Located: 4730 Blue Horizon Bluffs, Peconic. SCTM# 1000-74-1-35.54 Typ f area to be impacted: Saltwater Wetland Freshwater Wetland -Osound Bay Part of Town Code proposed work falls under: Chapt. 275 Chapt. 111 other Type of Application: Wetland Coastal Erosion Amendment �ministrative Emergency Pre-Submission Violation Notice of Hearing card posted on property: Yes No mot Applicable Info needed/Modifications/Conditions/Etc.: �'jr W,FA� Present Were: G. Goldsmith N. Krups i E. Sepenoski L. Gillooly J. Finora SIMON-GOLDBERG 4730 Blue Horizon Bluffs Peconic,New York 10'-WIDE LIPA EASEMENT marshall paetzel `�L3.z`rn41633 EXISTING SFORMER PROPOSED LANDSCAPE ARCHITECTURE TRAN ���� ELECTRIC SERVICE • PROPOSED Box 478 !p O'FRO ELECTRIC METER T PO5 Count W 5175County Road 119548 FBK .,-- - - ----- ---- --_ - r Mattituck,NY 11952 b` PROP,SED8'Wx4'D ---`---� ur mr � __ -' __ ,5 rr rr„ r�� C phone: (631)209-2410 _ _ POOL BACKWASH Q —_ faX: (631)315-6000 -- ---,-_--DRYWELL ` r —'I'_1111' r' �P=F email: Studio@mplastudlO.cam __ _ PROPOSE04'-B"x13'-0' / 1" N� -' - - -_ POOL EQUIPMENT PAD m j ' PROPOSED PROJECT LIMITING SILT FENCE ��wpr' "i° AREAOFDISTURBANCE=32,960 SF OR 0Y.AC ARCHITECT. LAWN ----- `y Yb -- -- PROPOSED SEPTIC nm nu""10 muu..... rrr nTrrr � S ( ) LOCATION • 40'4650 E 162.52' - 1 Christopher Powers,RA PD 1 - - _ nr-m ' 20'-O'MIN. _- --.-.- _-_-�rtr - .-.-15_ACCESSOR ffi 'PROPOSED GRAVEL"o ,uminnnnnnnmr......... nr minuet in-n, .....mSnnunn...............Trnnu�r,m r nn Tunnin„ nn mS44140'20'E O Powers Hancock Design T.H. �'�-< 20'PRINCIP 1'STRUCTURE SETBACK DRIVEWAY PO BOX 400 100'SETBACK FROM TOP OF �'-6. tl - AL SETBACK GRAVEL CONSTRUCTION ACCESS South Jamesport,NY 11970 BLUFF AS PER SURVEY -- __ --__ PREPARED BY KENNETH M. PROPOSED PROP. PROPOSED DECK A -'-' _ _ -'-------------._._.-. ......__ Otfice:1631)703-0800 WOYCHUK LAND SURVEYING.16-26 OL 3T ON- ]T PROPOSED II --------...... ------ PLLCOATED07-16-2fi POOL WITH GRADE GRAVEL PARKING I^ -----.-.-.- SURVEYOR: 5'-2"X IV POOL PROPOSED RESIDENCE -( ro Kenneth Woychuk LS PROPOSED 4'HT.NYS BUILT-IN SPA PATIO FFE=39.5 '� i O N.Y.S.Licensed Land Surveyor POOL CODE COMPLIANT / /_ 6 P.O.Box 153 1 PROPOSED TOPSOIL FENCE*GATE(TwJ ---- I / GARAGE STOCKPILE AREA ( /J Apuebogue, 11931 WELL LAWN �-� ( (i Office:(631)29898-1588 r0g1O� _ -. ni nrr oT _ -.-.-.- ---.-.-.-.- -. .-.- I W.W. STAIRWELL W.W. 15'PRINCIPAL AND ACCESSORY STRUCTURE SETBACK ® mmmnmm .-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-. mn net =3 �A ENGINEER: �- EXISTING FENCE • • 'may HAV BALES(TYP-) Dil andro Andrews Engineering CONCRETE _ 158 Count Road 39 �TO BE REMOVED cD = � Y WASHOUT AREA Suite 10 nnMnn 77:_'S­TIN­G_'�annn_nr_nn_n���nnn_n_�nr_n,n n"""�n�_�r_n,u __ _____�w °un,,,nr_err_r���rr���rr_���,_��_��r�„�,��,_,,,_ru_rm ______ yqySoulham fion NY 11968 5T2.12' G P Offce:(631)259-3959 HAYBALES+PROPERTY PROPOSER' PROPOSED COO NYS TIG STAKE(TYP.) PLUFF SELIMITING WATER SERVICE POOL CODE COMPLIANTFENCING(+1')FROM FENCE i GATE(TYP.) BLUFFSETBACK IXISTNG TREE(TYP.) POST(TYP.) N SITE DATA: SCTMN:1000-74-01,35.54 -1 -s OCT 1 2026 Zoning District: .53 ( ) -L�IJ• IL Lot Area:50,685.53 SF or 1.16 acres NOTES: 1. Base map information based on survey, Southold Town I prepared by Kenneth M.Woychuk Land' 1 Board of Trustees I Surveying,PLLC dated October 6,2025. 2.Unauthorized alteration of this plan is a violation of NYS Education Law. REGULATORY REQUIREMENTS: REVISIONS -ALL CONSTRUCTION,MATERIALS,AND EQUIPMENT SHALL BE IN STRICT ACCORDANCE DATE DESCRIPTION WITH ALL FEDERAL,NEW YORK STATE,SUFFOLK COUNTY,AND SOUTHOLD TOWN ZONING 09.14.26 UPDATE POOL TO BE AND BUILDING CODES,ORDINANCES,REGULATIONS,ETC.INCLUDING ANY RELEVANT 12'COPING+REMOVE COVER ENVIRONMENTAL REGULATIONS. VAULT. THE ITEMS DEPICTED IN THIS PERMIT DRAWING ARE INTENDED TO BE CONSTRUCTED ONLY AFTER RECEIVING ALL REQUIRED PERMITS/APPROVALS,AND SOLELY FOR THE SPECIFIED OWNER AND AT THE PROJECT SITE LOCATION NOTED ON THE DRAWING. TEST HOLE -THE SCOPE OF WORK IN THE PLAN HAS BEEN DESIGNED IN ACCORDANCE TO THE 2020 BORING BY McDONALD GEOSERVICES RESIDENTIAL CODE OF NYS. AUGUST 8,2025 S e R I EL:36-0- 0.0' -THE SWIMMING POOL SHALL BE COMPLETELY AND CONTINUOUSLY SURROUNDED BY DSCAP BARRIER AS REQUIRED AND IN ACCORDANCE TO SECTION R326.4. p OL MIXED SAND AND LOAM 2.5' -THE CONTRACTOR IS RESPONSIBLE TO EXECUTE ALL WORK IN COMPLIANCE WITH THE — SPECIFICATIONS AND RECOMMENDATIONS OF ALL RELEVANT REGULATORY AGENCIES - ML BROWN SILT AND CONSTRUCTION SHALL MEET ALL FEDERAL,STATE AND LOCAL ZONING,ORDINANCES, -5.0' REGULATIONS,CODES,LAWS,ETC. SM GRAVEL BROWN N D -THE LANDSCAPE ARCHITECT IS NOT RESPONSIBLE FOR THE INSPECTION,SUPERVISION, �TyT 0p275o, w y0!`� rOI GRAVE -7_0• OR ADMINISTRATION OF THIS CONSTRUCTION PROJECT.IT SHALL BE THE RESPONSIBILITY FOFN SP UGM BROWNFINE OF THE CONTRACTOR TO ARRANGE FOR ALL INSPECTIONS REQUIRED. TO MEDIUM SAND -90' TITLE: SM LIGHT BROWN L E G E N D SILTY SAND -24.a' _ POOL FENCE / PROPERTY LINE `P0� PROPOSED ROPED POOL BACKWASH DRY WELL 5C BROWN CLAYEY _ UTILITIES SAND PROJECTUMITINGSILTFENCE 7'PVCPIPE H.E.G.W. SITE PLAN EL, 33.9 NYS POOL COMPLIANT FENCE ® GRAVEL CONSTRUCTION ACCESS WATER IN BROWN SC CLAYEYSAND SETBACK W.W. WINDOW WELL 00' SCALE 1F0�0' TSETBACKFR TEST HOLE OMTOPOFBLUFF I F-I I OT.H. SCALE 1"=2 WATER IN BROWN EXISTING STAKE EXISTING TREE TO REMAIN DRAWN BY: SP FINE TO ASCHEEL MEDIUM SAND CHECKED BY: J.PAETZEL.RLA EXISTING POST E%ISTING TREE TO BE REMOVED DATE: 6.64 -4B,a• REVISED:D:2D2 2038.69.14 S.C.T.M.# DISTRICT 1000 SECTION 74 BLOCK 1 LOT 35.54 N / 6 / / B 4 20 20 � 44 42 � 40 F cHER 60 E '8pJ 6 42 CH Rv / a 3 SM s� v6so.F a DWELLING .• 'r�P�q� s VACANT LOT qF P M s sgFo F POST DWELLING LOT 3 SM. POST WELLAND SANITARYAS SHOWN 3z °ad 4 f OCT 1 2026 J =i C ry t' Q O �r3 VACANT 0, -aEE°H Southold Town \ \ r_1 i \ Ga � Board ofTrustelrs �„aSS°H s{ter OG q.F Pos� 2B ®sv'°ac 28 sT,c 5M ®,�'OM SIC POST FND LOC. 09-09-26 POST REVISE TOPO 07-16-26 POST REV SED 03-17-26 ze REVISED 01-08-26 2a y THE WATER SUPPLY, WELLS, DRYWELLS AND CESSPOOL POST LOCATIONS SHOWN ARE FROM FIELD OBSERVATIONS si+. 26 AND OR DATA OBTAINED FROM OTHERS A9 ® 0 48,320 S.F. or 1.11 ACRES (TOP OF BLUFF) P°, /� AREA:58,178 S.F. or 1.34 ACRES MHW LINE ELEVATION DATUM.-NAVD88 R' UNAUTHORIZED ALIERARON OR ADDITION TO THIS SURVEY IS A VIOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. COPIES OF THIS SURVEY \LAND NIF OF MAP NOT BEARIN THE LAND SURVEYOR' S S EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VAUD TRUE COPY. GUARANTEES INDICATED HEREON SHALL RUN 'Ll ONLY TO THE PERSON FOR WHOM THE SURVEY IS PREPARED AND ON HIS BEHALF TO THE RILE COMPANY,GOVERNMENTAL AGENCY AND LENDING INSTITUTION KENNETH HOMAN LISTED HEREON.AND TO THE ASSIGNEES OF THE LENDING INSTITUTION. GUARANTEES ARE NOT TRANSFERABLE. THE OFFSETS OR DIMENSIONS SHOWN HEREON FROM THE PROPERTY LINES TO THE STRUCTURES ARE FOR A SPEGFlC PURPOSE AND USE THEREFORE THEY ARE NOT INTENDED TO MONUMENT THE PROPERTY LINES OR TO GUIDE THE ERECTION OF FENCES ADDITIONAL STRUCTURES OR AND OTHER IMPROVEMENTS. EASEMENTS / AND/OR SUBSURFACE STRUCTURES RECORDED OR UNRECORDED ARE NOT GUARANTEED UNLESS PHYSICALLY EVIDENT ON THE PREMISES AT THE TIME OF SURVEY SURVEY OF.-LOT 4 of NEI,I,I- CERTIFIED To: SIMON GOLDBERG; MAP OF:BLUE HORIZONS yPz�sN ^" woc0,�� FILED:SEP. 30 1985, No. 7974 x x SITUATED AT:PECONIC r o Tom OF.SOUTHOLD F _% KENNETH M WOYCHUK LAND SURVEYING, PLLC SUFFOLK COUNTY, NEW YORK �sF 050882 JQ Professional Land Surveying and Design N P.O. Boa 153 Aquebogue, New York 11931 FlLE g225-201 SCALE.1„=40� DATE:OCT. 6, 2025 PHONE(831)298-1688 FAX(631)298-1588 N.Y.S LISC. N0. 0508B2 n rl-c> Y) J TPgra��j'4�j nr�ye 6 � k Y mni-w ,rc;.•,,. a s r sec xo 3e3 zzom eu.a+ � e � rnPrex xF e y P az �.q 0 L ma oo f e � 1 yy y +S o 3 o a��u o •e d + n°°r'ao° a "e ,\2, asr. ; .. er ate.+v^Os ; '9 r a /%' %'w ^ter ,e 4 a •.� ^^ .ti� ro � 3^ Y 6 ��4 _J(•� �' a rf, .Q•�/ �'`4 rovn,of aouTHaLo F',� - Al t 8 Awl" r oil not a 00 Y Al ', ✓' d' _e y '�+n+ 1 _ Cyoti F� as a. :�' � •�: ,�., V` "°, see sec xa �� '� � \,�. sec sec-xa sc� . .u.:>• ,� z NKS � �% ^ .' J m5D1.0p \ \ \ 0&4 P200c 2 u5B„J,s LK U _ E .......0 ,. ,. Rcd PrUNTY OPSUFFO Ig—y N - oo sFc:r a r E wn _ — ,� ,�, 1 nr•.,Ar.4y(N IriW W maw M xmr vuus SOUTHOLO O74 rr p5 0/xY q M x..x _. w __ _ • wsa.x oa,nv ru nrr5 0 P ---- 8 Hobson, Thomas From: Goldsmith, Glenn Sent: Wednesday, October 21, 2026 9:46 AM To: Hobson,Thomas Cc: Cantrell, Elizabeth Subject: Re: Simon Admin Permit -4730 Blue Horizon Bluffs, Peconic Sorry about that. I meant landward of the bluff and seaward of the fence. From: Hobson,Thomas Sent:Wednesday,October 21, 2026 9:36:29 AM To:Goldsmith,Glenn Cc: Cantrell, Elizabeth Subject:Simon Admin Permit-4730 Blue Horizon Bluffs, Peconic Hi Glenn, For this Admin Permit application,you requested revised plans. We wanted to confirm what you said in the resolution. According to the recording,you conditioned that"the area landward of the pool fence be a vegetated non-turf buffer." Did you by chance mean to say"seaward?" or is the entire backyard supposed to be a non-turf buffer? Thomas Hobson Administrative Assistant Town of Southold Board of Trustees Phone: (631) 765-1892 Fax: (631) 765-6641 1 OFFICE LOCATION: ��0� SO!/T�,� MAILING ADDRESS: Town Hall Annex ho l0 P.O. Box 1179 54375 State Route 25 Southold,NY 11971 (cor.Main Rd. &Youngs Ave.) H Telephone: 631 765-1938 Southold, NY 11971 e* • Q C4UNTY,� LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD To: Glenn Goldsmith, President Town of Southold Board of Trustees Cc: Honorable Lori Hulse, Attorney From: Heather Lanza, AICP, Planning Director LWRP Coordinator Date: October 8, 2026 Re: LWRP Coastal Consistency Review SIMON, SCTM# 1000-74.-1-35.54 This application proposes to install a pool enclosure fence and to trench an electric line from an existing transformer and a water line from an existing well to the dwelling, within 100' of the top of the bluff. The proposed action has been reviewed to Chapter§268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is INCONSISTENT with the policies of the LWRP as follows: Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. 4.1 Minimize losses of human life and structures from flooding and erosion hazards. B. Use vegetative non-structural measures to manage flooding and erosion hazards. Simon LWRP 2. Use vegetative measures to increase protective capabilities of natural protective features. Discourage clearing of existing, particularly indigenous vegetation during siting, design, construction and regrading phases of any development project. 4.2 Protect and restore natural protective features. B. Maximize the protective capabilities of natural protective features by. 1. avoiding alteration or interference with shorelines in a natural condition 2. enhancing existing natural protective features Policy 6. Protect and restore the quality and function of the Town of Southold's ecosystem. 6.3. Protect and restore tidal and freshwater wetlands. A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction. The 1.34-acre parcel (1.11 acres landward of the top of the bluff) is on a bluff overlooking Long Island Sound. The top of the bluff is at approximately EL 40' to 44', and the Coastal Erosion Hazard Area boundary runs just landward of it. The existing well and transformer are landward of the Coastal Erosion Hazard Area but within 100' of the top of the bluff. Town Code §275-3 "Findings; purpose; jurisdiction; setbacks" states the following: D. Setbacks. (1) The following minimum setbacks apply to any and all operations proposed on residential property within the jurisdiction of the Board of Trustees: (b) Top of bluff. [41 Swimming pool and related structures: 100 feet. The proposed action is recommended as INCONSISTENT for the following reasons: 1. The pool enclosure fence is a structure related to the pool and is proposed approximately 54' to 90' from the top of the bluff, where 100' is required. The pool is approximately 7' landward of the 100' setback line, leaving room to enclose it landward of the 100' setback. 2. The site plan appears to label the area seaward of the 100' setback as lawn. The photographs show this area as natural meadow vegetation. Converting it to lawn would remove indigenous vegetation that protects the bluff(Policy 4.1 B 2 and 4.2 B). 2 Simon LWRP The trenching connects the dwelling to the existing transformer and well, which are already within the setback, and the work is landward of the Coastal Erosion Hazard Area. Hay bales and a project-limiting fence are proposed along the 100' setback line. To further the policies and find this proposal consistent, the following are recommended: 1. Relocate the pool enclosure fence landward of the 100' top-of-bluff setback. 2. Maintain the area between the top of the bluff and the 100' setback in natural, indigenous vegetation, with no lawn. 3. Limit the width of the utility trenches, keep equipment and stockpiles out of the area seaward of the setback, and backfill and stabilize the trenches promptly. Restore the trench corridors with native vegetation. 4. Install the hay bales and project-limiting fence before work begins and maintain them until the disturbed areas are revegetated. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. 3 Glenn Goldsmith,President Town Hall Annex A_Nicholas Krupski,We President ',� 54375 Route 25 P.O.Box 1179 Eric Sapenoski Southold,New York 11971 Liz Gillooly ., Telephone(631)765-1892 Elizabeth Peeples Fax(631)765-6641 u . BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD This Section For Office Use Only Coastal Erosion Permit Application Wetland Permit Application W... Administrative Permit Amendment(Transfer/Extension Received Application: Received Fee:S _. Completed Application:_ Incomplete: ..... . SEQRA Classification: Type I_ Type ll Unlisted Negative Dec. Positive Dec. Lead Agency Determination Date: CoordinationVate sent): LWRP Consistency Assessment Form Sent: �� G"° E? ``` ' ' CAC Referral Sent: `' k Date of inspection: � Receipt of CAC Report: OCT 1 2026 __Technical Review: Public Hearing Held:. _ - SOUI Q A TOW11 • .Resolution• 6c� rLl TIU,In—___________ . Owner(s)Legal Name of Property (as shown on Deed): Adam and Sari Simon Mailing Address: 70 Charlton St VD, NY,NY 10014 Phone Number: 973-879-5899 Suffolk County Tax Map Number: l 000-74-1-35.54 .. . .... Property Location: 4730 Blue Horizon Bluffs, Peconic NY 11958 (If necessary,provide LILCO Pole 11,distance to cross streets,and location) AGENT(If applicable):David Bergen, Sol Searcher Consulting Mailing Address.Box i008, Cutchogue,NY 11935 Phone Number: 516-848-6438 Email:davebergen78@gmail.com Board of Trustees Application GENERAL DATA Land Area(in square feet): 54,014 Area Zoning:13740 Previous use of property: Intended use of property: residential Covenants and Restrictions onPe1'tY ro Yes ✓ No property? If"Yes",please provide a copy. Will this project require a Building Permit as per Town Code? aYes ]allo If"Yes",be advised this application will be reviewed by the Building Dept.prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals? , Yes _Z_No If"Yes",please provide copy of decision. s project reqn=i any demolition as per Town Code or as determined by the Building Dept.? Yes ✓ No Does the structure(s)on property have a valid Certificate of Occupancy? Yes 13_No Prior permits/approvals for site improvements: Agency Date Trustee NJ letter 11/8/23. . Build. 52966 TR 9060,7356 8117;7/10 No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? No__�K Yes If yes,provide explanation: Building 35875 issued 9/10 revoked as exceeding scope of permit and no TR permit Project Description(use attachments if necessary): Install code compliant pool fence;trench electrical line from existing transformer to house;trench water line from existing well to house and construction related activites at 100 ft jurisdiction line. Board of Trustees Application WETLANDfMUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: connect water and electric to the house. Install code compliant pool fence Area of wetlands on lot: 0 square feet Percent coverage of lot: 0 / a Closest distance between nearest existing structure and upland edge of wetlands: 4 feet Closest distance between nearest proposed structure and upland edge of wetlands: _feet Does the project involve excavation or filling? ❑ No ✓ Yes If yes,how much material will be excavated?0 cubic yards How much material will be filled?.0. cubic yards Depth of which material will be removed or deposited: feet Proposed slope throughout the area of operations: Manner in which material will be removed or deposited: utility lines will either be trenched or misseled Statement of the effect,if any,on the wetlands and tidal waters of the town that may result by reason of such proposed operations(use attachments if appropriate): none 61 Z20 Appendix B Short Environmental Assessment Form Instructions ior.ComnletinE Part I-Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part I based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part l-Project and Sponsor Information Adam and Sari Simon Name of Action or Project Simon Pool Fence and Utildes Connection Project location(describe,and attach a location map). 4730 Blue Horizons Bluff, Peconic, NY Brief Description of Proposed Action: Install code compliant pool fence and connect power line from existing electrical transformer to house and connect water from existing well to house;plus incidental construction related activies at 100 ft setback line area Name of Applicant or Sponsor. Telephone:973-879-W99 Adam and Sari Simon E-l� I:ad _corn _ gmal! Address: 70 Charlton St 71) City/Po: state_ zip Code. NY NY 10014 1.Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO . .YES. administrative ruk,or . If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. 1f no,continue to question 2. 2. Does the proposed action require a permit,approval or holding from any other governmental Agency Q NO YES If Yes,list agency(s)name and permit or approval: building permit 52966Z El R1 3.a.Total acreage ofthe site of the proposed action? 1.24 acms b.Total acreage to be physically disturbed? <1:.. ...:.: acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor'. 1.24 asses 4. Cho I land occur on,adjoining andnear the pro action. llrbanRura1(non- 'culture) lrrdustrialCommercia! gItesiderrtial(suburban) Forest Agriculture ( y): . . . Parkland Page I of 4 5. Is the proposed action, NO YES MA a.A permitted use under the zoning regulations? ✓ b.Consistent withthe adopted comprehensive plan? ✓ 6. Is the proposed action consistent with the predominant diaracta of the existing built or rural NO.. YES landscape? LL ✓ 7. Is the site of the proposed action located m,or does it adjoin,a state listed Critical Environmental Area? NO. :..YES.. If Yes,identify... ... n t- r 8. a.Will the proposed action result in a substantial increase in traffic above present levels? NO YES one In I: b.Are public taansportatkm se vices)available at or nearthe site of the proposed action? ✓ c.Are any pedcstriaii accommodationsorbicyde routes available on ornear site ofthe actim? ofLi 9.Doessthe proposed action meetor exceed the state energy code requirements? NO. ., :YES Ifthe proposed action will exceed requirements,describe design features and technologies. r I& Will the proposed action connect to an existing publiclprivate water supply? No If No,describe method forprovidmng potable water: 11.Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater tnuLnent:... �,�,,..... .- .. _ M a.Does the site contain s structure that is,listed on either the State or National Register of Historic NO . YES Places? ✓ b.Is the proposed action located in an archeological sensitive area? 13.a.Does any portion ofthe site of the proposed action,or lands adjoining the proposed action,contain NO...: .YES wetlands or other waterbodies regulated by a federal, or Local agency? ✓ b.Would the proposed action physically alter,or enamch into,any existing wetland or ✓ if Yes,identify the wetland or waterbody and extent of alterations in square feet or acres:... l 4. pritify the typi itat types that o or are likely to be found ion ject site. Check all that apply., Shoreline HForest TFAIggicultur;aYgrasslands EadyWetland Urban burban 15.Does the site of the proposed action contain any species of animal,or associated habitats,lisped NO._ YES by the State or Federal government as threatened or endangered? ✓ 16.Is the project site located in the 100 yens fkK)d plain? NO YES 17.Will the proposed action create su mr water discharge,either from point or nonspoinit sources? NO If Yes, [1 W El a Will storm water discharges flow to adjacent properties? O b.Will storm water discharges be directed to established conveyance systems an,0j:aires). ifYes,briefly describe: Wage 2 of 4 IS_Hoes the proposed action idchWe construction or othher aitiyities that result in the impoundment of NO YES. water or other liquids(e g.retention pond,waste lagoon,dam)/ if Yes,explam purpose and siw. 19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES. solid waste management facility? If Yes,describe_ 20.Has the sift of the proposed action or an adjoining property beenthe subject of remediation(ongoingor NO YES. completed)for hazardous waste? If Yes,describe: I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE ApplicantlWonsornarne•. a _ ..�erVe(l, Sol.S rcher.Cons.. Hate: ..i® (...L 5 store.:.......... �..,....._..... .....,_...... Part 2-Impact Assessment. The Lead Agency is responsible for the completion of Part 2. Answer all of the-following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the state and context of the proposed action?" No,or Moderate. small to large impact impact may may ateur occur 1_ Will the proposed action create a material conflict with an adopted land use plan or zoning regulation ? a a 2. Will the proposed action result in a change in the arse or intensity of rise of laid? (� 3. Will the proposed action impair the character or quality of the existing community? ❑ ❑. 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Emrmonmental Area(CEA)? S. Will the proposed action result in an adverse change in the existing level of traffic or affect existing mfaastructure for mass transit,biking orwalkway? 5. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? ❑ ❑ 7. Will the proposed action impact existing. a public/private water supplies? ❑ ❑ b.public/private wastewater treatment utilities? ❑ ❑ 8. Will the proposed action impair the character or quality of important historic,archaeological, [� Elarchitectural or acsth�ic resources'? I�1 9_ Will the proposed action result in an adverse changeto natural rmurces(eg:, ❑. waterbodies,groundwater,air quality,flora and faunae► Page 3 of 4 So,or Moderate swan to large impact impact may may occur occur 16. 'Will the proposed action result in an increase in the potential for erosion,flooding or drainage problems? l I- *ill the proposed action create a hazard to environmental resources or human health. Part 3-Determination of significance. The Lead Agency is responsible for the completion of Part 3. For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part 3. Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting,probability of occurring, duration,irreversibility,geographic scope and magnitude. Also consider the potential for short-term,long-term and cumulative impacts. ]-' Check this box if you have determined,based on the information aril above,and air " g documentation, L.! analysis ve, gr srrpportrrr� that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required_ ElCheck this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Town of Southntd-Board of Trustees Name of Lead Agency.. ... _.... ..... .. Date... President Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in lead Agency Signature of Preparer(if different from Responsible Officer) PRINT Page 4 of 4 Board of Trustees Application AFFIDAVIT A-V 64►-!l IIJ S ,� ���-td�y BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER'KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S),IF GRANTED. IN COMPLETING THIS APPLICATION,I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENT(S) OR REPRESENTATIVES,INCLUDING THE CONSERVATION ADVISORY COUNCIL, TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH THIS APPLICATION, INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED TO INSURE COMPLIANCE WITH ANY CONDITION OF ANY WETLAND OR COASTAL EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF THE PERMIT. Sig e o Property Owner Sign t e o ro riy Owner SWORN TO BEFORE ME THIS _DAY OF 56P'FS I�4LP — ,20 2( GAIL ALEXANDER Pubic- te of New York otary Public Notary NO'01AL66441445 Qualified in Kings County My Commission Expires Sep 26,2030 Board of Trustees Appli^,p ion AUTHORIZATION (Where the applicant is not the owner) I/We, 14 ja-r\ a nj S Q.r. Is fw%a n , owners of the property identified as SCTM# 1000- -7 Y, — 3S T�l in the town of New York, hereby authorizes —�a�•c9 ��'I e•� to act as my agent and handle all necessary work involved with the application process for permit(s) from the Southold Town Board of Trustees for thispr�perty. Prope ignature Prowdy Own ' Signature SWORN TO BEFORE ME THIS I1 DAY OF 20_2 Notary Public GAIL ALEXANDER Notary Public-state of New York NO.01AL6"1445 Qualified in Kings County My Commission Expires Sep 26,2030 APPLICANUAGENUREPRESENTATIVE TRANSACTIONAL DISCLOSUR9 FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the cart of town officers and employees.The purpose of ,this form is to provide information which can alert the town of possible conflicts of interest and allow it'to take whatever action is necessary to avoid same, n YOUR NAME: (Last name,first hame,jpiddle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee " Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other`,name the activity.) e Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest."Business interese'means a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares. YES NO F— If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply): _nA)the owner of greater than 5%of the shares of the corporate stock of the applicant _n (when the applicant is a corporation);. B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted this I Z day of S f 5� 20 Z IC Signature Print Name AoQoM S.,•,..•� S� S y, �d Form TS 1 r l APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM e The Town of Soutlioldts Code.of Ethics nriohibirs coirflicts ofinterest on the not nF60h officers and emnlovnes:The Om"se of ft Iona is to mevide information which can alertdW MM of triusibie inflicts of iyrteiest and allow It to takewhabeveractiQr,�+is necessary`to Vim same: YouR NAME: David Bergen, Sol Searcher Consulting.. (Last nam first narne,.gi me initial,unleas you are applying in the rm w of someone else or other endly,such as a company-If so,fim icatetr-other person's or company's mmne.) NAME OF APPLICATION: (Check all that apply.) Tar grievsmae Bw'Wiog Yadance Tra tee Change omone Coastal Erosion Approvalofplat Mooring Exemption fman plat or maP Planing Other (IOVm a rame the ac,.v,}y) . Doyou Im—Hyforftough y=w s pmmnt.QrdODhma .SflyOffieElQi ofdreTommofSbuthalff. "RckgQirWJnC Wblood. Or -Ovs�fflmt 6i'`Ummma`h , inhi ttgn In which thetowaidfficeroren+ploymbasemnpardal of(erObymeotby)acorpxmfion in which the town olfieff orempioyee a m mm than:ims6fthe shares. YES FA.. NO .. If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Towp of Southold S e 1 Title or position of that person o.r EM 14 s Describe the relationship between yourself(the applicant/agmit/mpresentative)and the town officer or employee.Either check the appropriate tine A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling parent,or chiM is(check all that apply): �A)the owrrcr of than 5�f.�tlie simres of the ootpa�s's of the applicant whenthe isa �„l��elegatarbeme6eiad arrarQofarryiiaa�s�otlmr�+e�t9r(slrew8re applicant is not a corpordion), EC) ane icm pazme�or offt or D)the anal appliemtL DESCRIPTION OF RELATIONSHIP Submitted this 30 aay of Sept 2026 Signature Printwame—Uavi i` n Form IS I Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A.nronosed. action..WWI be evaluated.. as to .its si nificanf beneficial and adverse effects:upon the coastal:area twhch includes mall.of Southold Town).. 3. If any question in Section C on this form is answered "yes" or"no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus6 each answer must.be explained in detail,:listing both suaportins and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places:online at the Town of Southold's website(southoldtown.northfork.net),the Board of Trustees Office,the Planning Department,all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 1000 J4.-1- .-, 5.54 PROJECT NAME Simon Utilities Connection and Pool Fence The Application has been submitted to(check appropriate response): Town Board Q Planning Board❑_ Building Dept. ❑ Board of Trustees 1. Category of Town of Southold agency action(check appropriate response): (a) Action undertaken directly by Town agency(e.g.capital ❑ construction,planning activity,agency regulation,land transaction) ❑ (b) Financial assistance(e.g.grant,loan,subsidy) (c) Permit,approval,license,certification: ❑y Nature and extent of action: ' Install.code compliant.pool fence;trench.electical.line from existing,transformer . _. and water.line from.existing well to.house;construction related activities at 100 ft jurisdiction line Location of action: 4730 Blue Horizon Bluffs, Peconic NY 11958 Site acreage: 1.24 pit land usr vacant;former residential Present zoning classification:R-40. 2. H an application for the proposed action has been filed with the Town of Southold agency,the following information shall be provided: (a) Name of applicant:_Adam and Sari Simon (b) Mailing address: 70 Charlton St#71), NY, NY 10014 (c) Telephone number: 973-879-5899 Will the action be directly undertaken,require funding,or approval by a state or federal agency? Yes El No Q if yes,which state or federal agency? C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space,makes efficient use of infrastructure,makes beneficial use of a coastal location,and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. lYes F1 No Not Applicable will attach PSEG transformer powerL to house:will attach water from existing well.to house Aitach adddi and sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III—Policies Pages 3 through 6 for evaluation criteria Yes❑ No Z Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria ❑ Yes ❑ No❑✓ Not Applicable Attach additional sheets' necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria Yes No Q Not Applicable Attach addmonal sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold.See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria Yes ❑ No Zot Applicable Afta onal necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation.criteria. ❑ Yes ❑No a Not Applicable Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III—Policies Pages 32 through 34 for evaluation criteria ❑ Yes [—]No Not Applicable Attach additional sheets ifn ► Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies;Pages 34 through 38 for evaluatiop criteria. ❑Yes ❑ No Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of,coastal waters,public lands, and public resources of the Town of Southold. See LWRP Section III Policies;Pages 38 through 46 for evaluation criteria.YeD No R1 Not Applicable Attach adMond sheets ifnecessary - WORMNG COAST POLICIES Policy 10. Protect Southold`s water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III--Policies; Pages 47 through 56 for evaluation criteria. []Yes ❑ No ✓❑Not Applicable Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long?Island Sound, the Peconic Estuary and Town waters. See LWRP Section III—Policies; Pages 57 through 62 for evaluation criteria ❑Yes ❑ No 0 Not Applicable Attach additional sheets ifnecessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III—Policies; Pages 62 through 65 for evaluation criteria. ❑Yes ❑ No Not Applicable Attach additional sheets if necessary Policy .13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies;Pages 65 through 68 for evaluation criteria. Fv]U Yes ❑ No❑ Not Applicable Appropriate use of PSEG suppliedpower to house.. PREPARED By David Bergen, Sol Searcher Con. TITLE Agent DATE 1412