Loading...
HomeMy WebLinkAbout51616-Z �oO�of SO�Tyo�o Town of Southold * P.O. Box 1179 0 53095 Main Rd Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 47280 Date: 08/12/2026 THIS CERTIFIES that the building ACCESSORY-NEW STRUCTURE Location of Property: 2006 Gull Pond Ln Greenport, NY 11944 Sec/Block/Lot: 35.-3-12.11 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 12/10/2024 Pursuant to which Building Permit No. 51616 and dated: 02/07/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Accessory roofed over structure with an outdoor kitchen, gas fireplace and basement storage as applied for. The certificate is issued to: KP Realty of Greenport Corp Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 115866 7/28/2026 PLUMBERS CERTIFICATION: Authoril Si ure fso°lyolo TOWN OF SOUTHOLD BUILDING DEPARTMENT • TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51616 Date: 02/07/2025 Permission is hereby granted to: KP Realty of Greenport Corp 1359 Hewlett Ln Hewlett Harbor, NY 11557 To: Construct a roofed over structure to include outdoor kitchen,gas fireplace and basement storage accessory to an existing single-family dwelling as applied for per Trustees and DEC approvals. Must maintain minimum side and rear setbacks of 15 feet. Premises Located at: 2006 Gull Pond Ln, Greenport, NY 11944 SCTM#35.-3-12.11 Pursuant to application dated 12/10/2024 and approved by the Building Inspector. To expire on 02/07/2027. Contractors: Required Inspections: Fees: Accessory-New Structure $548.00 CO Accessory Structure $100.00 Total $648.00 Building Inspector Imo• -_ _.__._._y. .___�___._._'� ._____._.—._._.____-._______.�__ _ ._._____..___—._..__— } + ' NASSAU ELECTRICAL . SUFFOLK INSPECTORS ! Ii ! 159 Route 25A,Building 1 Suite B Miller Place, NY 11764 .I Telephone:631 495 8136 • Fax:631 509 4538 • E-Mail:Info@SuffolkBEI.com CERTIFICATE OF ELECTRICAL COMPLIANCE 4 I 1 l { Applicant: GJS Electric,LLC Certificate No.: 115866 ; Rough In Inspection Date: Jan 20,2026 Final Inspection Date: Jul 28,2026 I Application No.: Building Permit No.: 51616 i County Tax Map No.: 35. 3 12.11 I This Certificate of Electrical Compliance is limited to the inspection and compliance of electrical equipment and/or work described _ below,installed on behalf of the applicant named above,located at the premise of and not after the final inspection date above: ! i - ' — - -- — - — '1 Owner: KP Realty of Greenport Corp Adler j Site Location: 2006 Gull Pond Lane,Greenport,NY 11944 I f { Owner's Address(if different): 1359 Hewlett Lane,Hewlett Harbor,NY 11557 12 Residential ❑Indoor ❑Basement ❑Service ❑Shed a � i ❑Commercial 12 Outdoor ❑First Floor ®Pool ❑Hottub Il I•{ ❑New ❑Renovation ❑Second Floor ❑Attic ❑Garage ! I ❑Addition ❑Survey ❑PV Solar ❑Generator ❑Conversion ❑Signs ❑Battery Storage ❑Safety Inspection Other: Pool house I I INVENTOR Single Phase L_.J Heat I_.J Duplex Recpt L"_•� Ceiling Fixture Dual Func Breaker Three Phase Water GFCI Recpt Wall Fixture Smoke 1 Main Panel F­771� AC Cond Single Recpt Recessed Fixture �� CO Detect I Sub Panel L`—.J AC Blower RangeRange Recpt I_—J LED Lighting L--J Smoke CO Combo "t �� —J Transformer �„ � Appliance Ckt � Dryer Recpt � EmergencyTime Clock ; I Disconnect L�_--�_� Switches zo Twist Lock II_�_J Exit Fixtures Pumps � r� t ' GFCI Breaker —J Heat Pump I_J Electric Heat L.—•� Pool Luminalre L—J Exhaust Fan Other Equipment;Pool bonding 1I20/26 C I 1 l,l The electrical work and/or equipment described above were inspected and was found to be in compliance with local, I .I I state and national electrical code requirements and this office. Applicant: GJS Electric, LLC License No.: 4839-ME Date Printed: Jul 28,2026 4i � 1 Inspected By:Joe Coppola Signature: E'I OF SOGlyolo --- - - -- —- --- "l ' `i # TOWN OF SOUTHOLD BUILDING DEPT. IOU 631-765-1802 INSPECTION [ FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: r--41-AAS ittJ" (-a, 4p �s G orb, A u:e.. DATE INSPECTOR SO(/Th°!o # . # TOWN OF SOUTHOLD BUILDING DEPT. 'oorm��`' 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ ] �9" DATION 2ND [ ] INSULATION/CAULKING FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: E04&m-,K ) DATE INSPECTOR %OFSOUTyoI# Y� TOWN OF SOUTHOLD BUILDING DEPT. °ycoum,�a� 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] I SULATTIOWCAULKING [ ] FRAMING /STRAPPING [ FINAL 74ccI [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: gl ec./;:A4 CZAR- cok �2 vs es �a C DATE INSPECTOR Steven Affelt, AIA PO Box 762 Architecture Great River,NY 11739 Intelligent Design (631) 553-6333 Sustainable Building January 13,2022 TOWN OF SOUTHOLD Department of Buildings 54375 NY Route-25 Southold,NY 11971 Regarding: 2006 Gull Pond Ln Greenpoint,NY 11944 Section 35,Block 3,Lot 12.11 To Whom It May Concern, This letter is written to certify that the storm water drainage for the proposed swimming pool,spa,and auxiliary structure installation has been reviewed and designed to retain a storm of up to 2"of rain. The existing system shall be modified as specified in the site drainage plan and supplemented as depicted.It is my professional opinion and with a reasonable degree of scientific certainty that the newly supplemented storm water drainage system will prevent from up to a 2"storm from running into the wetlands on and adjacent to the subject property. Respectfully, EDB. ARcy co .� 03761� DEC 1 1 2024 E :: �0 Nr-yN Steven Affelt,AIA Great River,NY 11739 PO Box 762 Tele:(631)553-6333 steve.affelt@gmail.com MELD INSPECTION REPORT DATE i; COMMENTS - S G� _�._ lee lDt/l�-- =` m FOUNDATION (IST) G ------------------------------------ FOUNDATION (2ND) , ROUGH FRAMING& - - — PLUMBING - - -- ^ W INSULATION PER N. Y. - r STATE ENERGY CODE a � � !TVs e s C' FINAL - ADDITIONAL COMMENTS -p -- ---- -- -- - 0 ------------ r PROPERTY INFORMATION Existing use of property: RESIDENTIAL Intended use of property:RESIDENTIAL Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to R_80 this property? ❑Yes BNo IF YES, PROVIDE A COPY. @ Check'Box,Aftei-Reading:"',The owner/contractor/design`piofessional is responsible for all drainage and storm water issues as provided by Chapter 236,of the Town Code:;APPLICATION IS HEREBY MADE to the'Building Department for",the Issuance of a Building Permit pursuant to.the:Building Zone Ordinance of the Town of Southold,Suffolk,County,New.York and other applicable Laws,Ordinances or Regulations,for the construcd6n`of buildings,' additions;,alterations or for removal"or demolition as.herein rib desced'The applicant agrees to comply wlth all applicableJ s aws,ordinance,building code, housing code and regulations.and toadmit authorized inspectors on premises and in buildings)for necessary Inspections False statements'made herein are punishable"as a Class Amisdemeanor.pursuant to Section 210 4S of the New York State`Penal Law. Application Submitted By(print name): �(..,o, AlAe., ❑Authorized Agent @Owner Signature of Applica ��1..�- — Date: (L—1 G^ZY STATE OF NEW YORK) SS: COUNTY - NT OF 111 ) /!4 A^ ���1- being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the / �e.;`,I. .. (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that ali statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therew' T ERIC MAY Sworn before me this NOTARY PUBLIC,State of New York //�� No.02MA5087205 day of /_9ecd'"4cr . 20% 7 oualffied in Nassau County i 5 My Commies ub is PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) I, residing at do hereby au ize to apply on my behalf to the Town of Southold Building Depa nt for a val as described herein. Owner's Signature t Owner's Name go. ro BOARD OF SOUTHOLD TOWN TRUSTEES EP" j: SOUTHOLD, NEW YORK PERMIT NO. 10695 DATE: OCTOBER 16,2024 ISSUED TO': KP REALTY OF GREENPORT CORP. PROPERTY ADDRESS: 2006 GULL POND LANE, GREENPORT SCTMH 1000-35-3-12.11 AUTHORIZATION f the Town of Southold and in Pursuant to the provisions of Chapter 27.5 of the Town Code o accordance'with the Resolution of the Board of Trustees adopted at the meeting held on November 13,2024 Ahe sum of$1,250.00 paid by KP REALTY OF GREENPORT CORP and in consideration of application fee in and subject to the Terms and Conditions as stated in the Resolution,the Southold Town Board of Trustees authorizes and permits the following: Wetland,Permit for removing 1,108sq.ft..,of existine arade-level masonry patio and io, 179sq.ft. area of landscape retaining walls; construct 736 sf of"upper" masonry patio, -level masonry 18.5' x.46' swimming poolwith.50 sf hot tub, 410 sf of"lower" grade Oil pool patio, And associated steps.,and planters; construct 18, x 23.5' roofed-over open accessory structure, consisting of unenclosed,"covered patio (to remain unenclosed), t stone wall for outdoor fireplace, outdoor kitchen, and 16.331 x 21.84' subfloor/basement X for pool equipment/storage; remove 34 If of existing stone retaining wall:and construct +31.5 If of new+2.7-ft high stone'retaining wall; and to establish and perpetually 'i i maintain a 50-foot wide non-distu'�bance/non-fertilization buffer adjacent to wetlands boundary replacing approximately 3,850'sf of existing lawn with native plantings and ed allowing for 4-foot wide cleared access path; all as depicted on the'site plan Orepar by Thomas Peter Domanico Architect, received on October 16,2024, and stamped approved on October 16,2024. IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, N6., and these presents to be subscribed by a majority of the said Board as of the day and year written above. F V C2 COD 4-j Glenn Goldsmith,President O``�QF Sa�jyof Town Hall Annex VV�� 54375 Route 26 Nicholas Krupski,Vice President O P.O.Box 1179 Eric Sepenoski 1 > Southold,New York 11971 Liz Gillooly G Q Telephone(631) 765-1892 Joseph Finora -AD Fax(631)766-6641 ��y00UNT1,�� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE #2400C Date: August 3,2026 S ,ERTIFIES*that the removal of 1,1 USS-C-1 o exis m gra e-eve masonry ratio and 179sq ft area of landscape retaining walls;construction of a 736 sf of"upper"masonry patio, 18.5'x 46' swimming pool with 50 sf hot tub 410 sf of"lower"grade-level masonry pool patio and associated steps and planters,•construction of a 18'x 23 5'roofed-over men accessory structure consisting of unenclosed covered patio(to remain unenclosed) stone wall for outdoor fireplace outdoor kitchen,and 16.33'x 21 84' subfloor/basement for pool equipment/storage,•removal of 341f of existing stone retaining wall and construction of 31.5 If of 2 7-ft high stone retaining wall• establishment of a 50-foot wide non- disturbance/non fertilization buffer adjacent to wetlands boundw.replacing approximately 3,850 sf of existing lawn with native plantings and allowing for 4-foot wide cleared access path, At 2006 Gull Pond Lane,Greenlort. Suffolk County Tax Map#1000-35-3-12.11 Conforms to the application for a Trustees Permit heretofore filed in this office Dated October 6.2023 pursuant to which Trustees Wetland Permit#10685 Dated October 16,2024,was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the removal of 1 108sa ft.of existing grade-level masonry patio and 179sq ft area of landscape retaining walls,• construction of a 736 sf of"upper" masonry patio 18 5'x 46'swimming pool with 50 sf hot tub 410 sf of"lower"grade-level masonry pool patio and associated steps and planters• construction of a 18'x 23 5'roofed-over open accessory structure consisting of unenclosed covered Ratio(to remain unenclosed) stone wall for outdoor fireplace outdoor kitchen and 16 33'x 21 84' subfloor/basement for pool gguipment/storage, removal of 341f of existing stone retaining wall and construction of 31 51f of 2 7-ft high stone retaining wall; establishment of a 50 foot wide non-disturbance/non-fertilization buffer adjacent to wetlands boundary, replacing approximately 3,850 sf of existing lawn with native plantings and allowing for 4-foot wide cleared access path. The certificate is issued to KP REALTY OF GREENPORT CORP owners of the aforesaid property. Authorized Signature OS%a¢Fpt/( BUILDING DEPARTMENT- Electrical Inspector Off' OGy TOWN OF SOUTHOLD o Town Hall Annex - 54375 Main Road - PO Box 1179 o • Southold, New York 11971-0959 y p� Telephone (631) 765-1802 - FAX (631) 765-9502 { jamesh southoldtownny.gov — seand@southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: Company Name: GJS Electric LLC Electrician's Name: Gary Salice License No.: ME-4839 Elec. email:Gary@NFAV.com Elec. Phone No: 631-298-4545 ❑I request an email copy of Certificate of Compliance Elec. Address.: 6615 Main Rd, Mattituck NY 11952 JOB SITE INFORMATION (All Information Required) Name: KP REALITY OF GREENPORT CORP. Address: 2006 GULL POND LANE,GREENPORT, NY 11944 Cross Street: MAIN ROAD Phone No.: (917)797-6253 Bldg.Permit#: 5 I P 16 email: KARENADLER814@GMAIL.COM Tax Map District: 1000 Section:35 Block: 3 Lot: 12.11 BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): ELECTRICAL WIRING TO POOL EQUIPMENT, GFCI OUTLETS FOR OUTDOOR KITCHEN, OUTDOOR FIREPLACE& TO THE AUXILIARY STRUCTURE Square Footage: Circle All I hatApply: Is job ready for inspection?: ❑ YES ❑ NO ❑Rough In ❑ Final Do you need a Temp Certificate?: ❑ YES ❑ NO Issued On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph Size: A # Meters Old Meter# ❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead # Underground Laterals 1 FJ2 H Frame Pole Work done on Service? DY nN Additional Information: PAYMENT DUE WITH APPLICATION NEW YORK STATE DEPARTMENT Or ENVIRONMENTAL CONSERVATION Facility DEC 1D 1-4738-04088 PERMIT Under the Environmental Conservation Law ECL Permittee and )Facility Information Permit Issued To: Facility: KAREN ADLER ADLER PROPERTY 2006 GULL POND LN 2006 GULL POND LNI1000-35-3-12.1 1 GREENPORT,NY 11944 GREENPORT,NY 11944 Facility Location: in SOUTHOLD in SUFFOLK COUNTY Village: Greenport Facility Principal Reference Point: NYTM-E: 722.328 NYTM-N: 4554.716 Latitude: 41°06'47.9" Longitude: 72°21'07.3" Project Location: 2006 Gull Pond Lane, Greenport,NY 11944 Authorized Activity: Construct a new 18 foot by 46 foot swimming pool with a surrounding patio and associated accessory structures including a 8 foot by 8 foot pool spa,planters, and various steps. All work shall be done in strict conformance with the attached plans prepared by Platinum Site Development Inc., last revised 06/01/2022,and stamped "NYSDEC Approved" on 07/05/2022. Mote: Based on the information you submitted,the New York State Department of Environmental Conservation has determined that the work shown on the above refrenced approved plans, is located more than 100 feet from DEC regulated freshwater wetlands.Therefore,no Freshwater Wetlands permit is required pursuant to the Freshwater Wetlands Act(Article 24)and its' implementing regulations (6NYCRR Part 663)to carry out this project. Permit Authorizations Tidal Wetlands-Under Article 25 Permit ID 1-4738-04088/00004 New Permit Effective Date: 7/5/2022 Expiration Date: 7/4/2027 NYSJfDJEC Approval By acceptance of this permit,the permittee agrees that the permit is contingent upon strict compliance with the ECL,all applicable regulations,and all conditions included as part of this permit. Permit Administrator:KEVIN A KISPERT, Deputy Permit Administrator Address: NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd Stony Brook,NY 117790 -3409 Authorized Signature: 'L5 Date / Page I of 6 ��sV¢FOL�,CO BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD 1 Town Hall Annex- 54375 Main Road - PO Box 1179 o ` Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 jamesh p(Dsoutholdtownny.goy - seand(cb-southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: Company Name: GJS Electric LLC Electrician's.Name: Gary Salice License No.: ME-4839 Elec. email:Gary@NFAV.com Elec. Phone No: 631-298-4545 ❑1 request an email copy of Certificate of Compliance Elec. Address.: 6615 Main Rd, Mattituck NY 11952 JOB SITE INFORMATION (All Information Required) Name: KP REALITY OF GREENPORT CORP. Address: 2006 GULL POND LANE,GREENPORT, NY 11944 Cross Street: MAIN ROAD Phone No.: (917)797-6253 Bldg.Permit#: 5 I(p 1 6; email: KARENADLER814@GMAIL.COM Tax Map District: 1000 Section:35 Block: 3 Lot: 12.11 BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): ELECTRICAL WIRING TO POOL EQUIPMENT,GFCI OUTLETS FOR OUTDOOR KITCHEN, OUTDOOR FIREPLACE& TO THE AUXILIARY STRUCTURE Square Footage: Irc e a pp y: Is job ready for inspection?: ❑ YES ❑ NO ❑Rough In ❑ Final Do you need a Temp Certificate?: ❑ YES ❑ NO Issued On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph Size: A . # Meters Old Meter# ❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead # Underground Laterals M 1 2 H Frame Pole Work done on Service? DY N Additional Information: PAYMENT DUE WITH APPLICATION .ram=='}a-� -yUFFOL,�� � Town Hall Annex y+� �y '; Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P. O. Box 1179 2 Southold, NY 11971-0959 BUILDING DEPARTMENT NOTICE OF UTILIZATION OF TRUSS TYPE-CONSTRUCTION, PRE-ENGINEERED WOOD CONSTRUCTION AND/OR TIMBER CONSTRUCTION Date: t� Owner: KAREN ADLER (PRESIDENT); PASQUALE VARDARO (VICE PRESIDENT) Location of Property: 2006 GULL POND LANE, GREENPORT, NY 11944 Please take notice that the (check applicable line): X New commercial or residential structure Addition to existing commercial or residential structure Rehabilitation to an existing commercial or residential structure to be constructed or performed at the subject property reference above will utilize (check applicable line): X Truss type construction (TT) Pre-engineered wood construction (PW) Timber construction (TC) in the following location(s) (check applicable line): Floor framing, including girders and beams (F) X Roof framing (R) Floor and roof framing (FR) Signature: Name (person submitting this form): Q6i , ^U GZ- Capacity(check applicable line): X Owner Owner representative TrussReg15.docx Effective 1/1/2015 At EN-CONSULTA E C E I V E OCT 9 UUt October 8,2024 Glenn Goldsmith,Chairman 2024 Board of Trustees Town of Southold P.O.Box 1179 NOWMTOM Southold,NY 11971 Re: KP Realty of Greenvort Corp.,2006 Gull Pond Lane,Greennort Dear Mr.Goldsmith: During the public hearing held on the above referenced application on November 15,2023,the Board required that we consult with the Building Department regarding the zoning compliance of the proposed covered patio/accessory structure;and requested that the width/seaward encroachment of the covered patio structure be reduced so that its seaward edge extends no farther seaward than the proposed swimming pool. The Building Department then indicated that to be zoning-compliant,the landward edge of the covered patio/accessory structure must be positioned no closer to the house than the seaward edge of the proposed "upper patio"(to place the accessory structure in the rear yard);and the upper patio and covered patio structures must be physically separated and not directly accessible from one another. Therefore,to simultaneously satisfy the requirements of both the Trustees and Building Department: 1) The width of the upper patio has been reduced'variably from 6 inches to 2 feet; 2) The covered patio/accessory structure begins roughly 4 inches farther from the house; 3) The upper patio and covered patio structures are physically separated with planters and steps;and 4) The width/seaward encroachment of the covered patio structure has been reduced by 7.5 feet, from 31 to 23.5 feet,thus aligning its seaward encroachment with the proposed pool. Other changes resulting from the modified design are: 1)the area of the covered patio/accessory structure is reduced by 135 sf from 558 to 423 sf,and its wetland setback increases by 7 feet from 65 to 72 feet;2)the upper patio area is reduced by 136 sf,3)the northerly lower patio area is reduced by 5 sf;4)the southerly lower patio area is reduced by 13 sf;and 5)the pool width is increased by roughly 6"on its landward side,as the landward edge of the pool-wall had to retreat landward with the seaward edge of the upper patio;the seaward limit of the pool and associated 67'wetland setback remains unchanged. All changes are depicted on the revised site plan prepared by Thomas Peter Domanico Architect,last dated October 7,2024,three(3)copies of which are attached hereto. As the design is now zoning-compliant and complies with the Board's requests,it is our hope the Board can 16ert ue a permit based on the revised plan. fully yours, . emnann Coastal Management Specialist Enclosures 1319 North Sea Road Southampton,New York 11968 p 631.283.63601 f 631.283.6136 wwwenconsultants.com environmental consulting project MAP OF FORDHAM ACRES- SECTION ONE D R A WING INDEX #3519 LOT 1 Sheet Des-pfion A-1 PLOT F%-4K 694ERAL NOTES,WNMG DATA PROPOSED POOL, PATIO, AND ROOFED OVER PATIO m roc ,rx Rev. Date DescnpUon {'� I IVI3lI3 UPDATE BI5FEI2 NOTE TO�PO tLlC 2 o o 6 GULL POND ROAD �� 2 121/24 REDUCE R�OVER PATIO ®®®®®®® 3 08/07R{ REDUCE ROOFED OVER PATIO GREENPORT ®®®®®®® m rz4 ®®®®®®® REDUCE POOL ®®®®®®® NEW YORK, 11944 W.X If- �� °� `A) AIN ELEVATION N n_. S CTM # l o 0 0 3 5'3'12.11• � (lS7'ORM DR IgEIZ-(A) NO mr nrwree emTmrrm f �OZ f UNDERGROUND REQUIRED VOLUMEACCESSORYSTRUCTURE 0 D.W.N. AREA I RAIN I-AI.1, AREA F CroR REQUIRED I DIDf..DfAxHIGH &�I�TI.s PROVIDED I 1 3l12 423 5F I-0 106 CF RINCs: 6'-0'x5'-0' RINCs: I-gllllo5 CF =111.65 CF 025 LAND N/F OF LAND N/F I I w _ HENRY R., JUDI A. &STEPHANIE QUINTIN OF 11 Z N WIWAM S. CLAUDIO JR. P. 'o, o APPROXIMATELY 3850 SO FT OF 1+ • wuNc EXISTING LAWN TO BE PLANTED j tO iD WITH NATIVE VEGATION o� ys E-'I PROJECT PROPOSED a4' POOL PATIO,AND 1�ti5o 3a awos EBB /'r,/ / / Z ROOFED OVER PATIO 20o6 GULL POND ROAD DIA x 4' DEE R ranax {'"" e' LAnNc oox GREENPORT RY WELL FOR J�� ,Pi o N FlRM ZONE X i �i )OL & SPA / o Q NEW YORK n944 r r /J/ O $CIT14# 1000-35-$-12.11. 2.3 E N A �. , t � / ,��� S.T. THOMAS „ E EXISTING VEGETATION TO REM IN a ,-� PETER w TIDAL WETLANDS BOUNDARY �D D OMANIC O ,' / a y/ ALONGTOE OF STONE ARMOR r Pi EXISTING 47)3 EDw •n�" ss '{o� C z:/ //j AS DETERMINED BY EN-CONSULTANTS ARCHITECT ffi FE 2{'E w k �� ��o„_.;,/ ��- SEPT. 7 2022 MON. ® LIMIT OF PROPOSED 50' WIDE 108 MERRICK ROAD N s3 FFL N NON-DISTURBANCE/NONFERTILIZATION BUFFER LYNBROOK. N.Y. 11563 Y/L El 105 � o OP(PR OSED EDGE OF LAWN) PHONE518 887-7147 4M CLIEIVT �g FIRM ONE X Q�� FIRM ZONE X 0.2%CHA CE ANNUAL 2 1 .�i o w //'/'�"� c � TIDAL WETLANDS BOUNDARY s L, y FL OD 78 B I a 7z Z w O AS DELINEATED BY EN-CONSULTANTS g^ � � � � o SEPT. 7, 2022 r• ^ p 2oo6 GULL POND ROAD FIRM ZONE a sq4 TREIIDLEp Wgty3 A '��' _ /j�'` LAND N/F BOUNDARY� FE,3Ti LINE ., — GREENPORT LY, NEWYORK u944 _ �A /~a aw°nc S # 1000-35-3-12.11. OF CI'M E�o _12,0 ONE ^d Ts.o FYNE INSTRUMENT CORP. W I"- c GTl•' il rr FlRM ZONE ' pox WA 0.411 NOTES, PLOT PLAN �0 0,2%CHANCE ,W,o. <" � /�., EXISTING EDGE OF LAWN TO BE LOCATED ZONING DATA F100 a.e f %" "/fi LANDWARD OF 50' BUFFER 32 " 6 W j FENCE & TABLES 47r0 r) CMAIN UNK FENC L10N 1.7'N. '1 ROPOSED 18'x23.5I ROOFED OVER 0 SPE" , O" OPEN PATIO ACCESSORY STRUCTURE FOUNDATIO 6' x 5' D EP 147.04' -- A CJ 5 WITH STONE WALL FOR OUTDOOR WALL D Y WELL FOR 1 `7 `Y FIREPLACE AND 16.33'x 21.84' CESSORY I„� -,� },i � LAND N SUBFLOOR / BASEMENT FOR POOL UCTURE I,, FIRM ZONE LOT PLAN _ Is'N OF EQUIPMENT/ STORAGE FIRM ZONE X BOUNDARY LINE OP ,'" OCT -9 2031 PATRICIA F. &THOMAS E. KRAUS 0.2%CHANCE ANNUAL FEMA AP 36103C0176H EFF, 09/25/2009 A-1 SCALE: P=20'-O' 'AREA OF L(7I'PROJECI'LIA'U'1'INO FENCE 9,728 SF FLOOD 41,000 S.F. OR 0.94 ACRES �- - NYSDEC LOT COVERAGE ZONING DATA R-80 CUT AND PILLCALCULA DONS ADJACENT AREA(WITHIN 300'OF WLrll_AND3 BOUNDARY):37,397 S.F.or 0.86 ACRES ITEM REQUIRED EmmmG PROMSEO 1'IPJ4 AMOUNT rl'E.N L') RNG I'ROPOSFD WTWE 41)Z00 SQF.T NO CHANCE CUT, LOVER PATIO 110 C181C FT 12YP SIlJi 41,000 BAST NO CHANGE USH ONE FAMILY RESIDENCE ONE FMILY RESIDENCE NO CF4ANO,E Pro:Arch: To Chk d b ADJACENT AREA 31j91 9F - ❑EIGITI'ACCI-ti RY 22 FT. U!FT. Date: 9s133 Drawn by.,JDM PILL. UPPER PATIO 310 CUBIC FT 1.OTCOVrMGE DUELLMG 4,194 OF. EXIST.DUELLMG• 4,194 OF. IDTCOVERAC:E MAX 20% DUELLNG• 4,1S4 OF. Scale: AS NOTED LOUER PATIO 310 CUBIC Fi EXIST.DUELLRYa• 4,104 OF. ROOF OVER FORCH9 ITS OF. EXIST.ROOF OVER PORGHS• ITS OF. OF ROOF OVER PORCi19• 179 OF. FETANMG UTALL 700 CUBIC FT EXIST.ROOF OVER PORCHB 119 OF. PrO 9CC P•2020-21 SECOND STY BALD• 128 OF. EXIST.SECOND P BT'r BALCONY• 22S OF. BUILDABLE LAND SECOND STY BALL.• 22H OF. EXIST.SECOND STY BALCONY- 228 OF. _ TOTAL BSS CUBIC FT PATIO 1J08 OF. PROPOSED POOL D2.1 OF. 38,124 8F PROPOSED POOL. 821 OF. PROPOSED HOT T1B. 50 OF. 1,144E OF. PROPOSED 140T TUB• 50 OF. A0=0RY ULDG I,b00 CUBIC FT PROPOSED UPPER PATIO• 1-16 OF. PROPOSED ROOF OVER PATIO. 423 OF. EXGWATION PROPOSED LOVER PATIOS• 410 SR PROPOSED UPPER PATIO• 136 SF. a)O'• 4J40 CUBIC FT PROPOSED ROOFED OVER PATIO. 423 OF. TOTAL• 5 �y -- TOTAL 1,641 SF.OR 20.W% 201 OF.OR%0.43 T 1:XCAVATION TOTAL• 6 uns SF.OR 1625% TOTAL. 112310 OF.OR 18b9 —1 OFF STFD 95 d,9 CUBIC FEET OR ISO Q1BIG YARDS ACCPSSOAY'S2RUCIURL' OFFSIIE _ QS- aH)H YAADS.P. EFT. - B.lS FT ACOS'ORY SIRUC,V0.f! 9C. c�16,0 RHARYAROAII. EFT. - 84.0 FT. OP NEY'I I STEVE AFFELT ARCHITECT � PHONE. (631)553-6333 PO BOX 762 s °• 6REAT RIVER,NEW YORK 11739 S• 3'-0" O s STORM WATER ANALYSIS -�o DRYWELL NOTES: I. CONCRETE MIN.5TRENGTH: S' s' DESCRIPTION EXISTING SQ.FT. PROPOSED SQ.FT. 2"FAIN CU. FT. CAPACITY CHECK 4EINF P51 AT DAYS 2. REINFORCEMENTT:: #4 •� DRYWELL#1 PARTIAL DWELLING NORTH EAST 1,011 (21%) 1,011 (21%) 167 8'-0"0 X 6' DEEP=253CUFT> 167 REBAR/A5TM A615 �, DRYWELL#2 PARTIAL DWELLING FRONT 8 GARAGE 1,770 (37%) 1,770 (37%) 294 8'-0"0 X C DEEP =253 CUFT 3. AIR ENTRAINMENT: 595 ,°� �'' 4. 51PEWALL AREA = 351 SQUARE FEET ,� 'pX STOOPS,CELLAR ENTRY,FRONT WALKWAY 349 349 58 FT<374, DRYWELLS #2 & #3 MUST BE 5. LOAD RATING: H2O 6. WEIGHT=4,400 LB5 PER PAVER DRIVEWAY 3,719 0 0 INTERCONNECTED REVISIONS ,�o� „�,,,, y� 0 5EGTION .c� �S 0' , FRONT COLUMNS,CURBS,CONC PADS 66 66 11 (2) 8'-0"0 X 6' DEEP = 506 DATE DESCRIPTION c�` J 0 �Q CUFT;374 + 132=506 01-13-22 ISSUED FOR INITIAL REVIEW TOP VIEW �0 �Q. TOTALS 5,970 2,251 374 CAP 506 = 506 REQ. GRADE ( kp DRYWELL#3 PARTIAL DWELLING REAR GARAGE 798 (17%) 798 (17%) 132 8'-0"0 X 6'DEEP=253CUFT> 132 '- - o FRENCH (25%) 1,191 (25%) 197 V-6"W X 4'-0"D X 300' L= 1,800 ' - G, H PARTIAL DWELLING SOUTH EAST 1 191 1,800 X 0.4 CAPACITY REDUC. CONGI,ET1= COVER DRAIN P'. 2 'O - . 4 O TY „ = p F� <��'v� Op ALL WALLS 401 388 65 - 720 CU. F.T CAPACITY IN 8 MIN �ti = O O.. - �<v p O REAR YARD STEPS 66 116 19 720 CU. FT. > 627 REQ L� O oh �<" •Op,O LANDWARD PORTION OF CATWALK 68 68 11 1P PITCH <� T Q - F--- ��� o REAR YARD PATIOS AND COPING 1,318 1,410 235 i d O a I I POOL AUXILIARY STRUCTURE - � 0 558 93 c. . a � -` 'MIN B (P P�� AUXILIARY STRUCTURE EGRESS STEPS 0 38 6 APPROVED ¢ a �y� G� a AG TOTALS 3,044 3,769 627 CLA55 2400 ® ® ® ® ® ® ® ® F o ��O PIPEd a ° DRYWELL#4 POOL AND SPA 0 869 145 8'-0"0 X 4'DEEP= 170CUFT> 145 ® ® ® ® ® ® 12111 o d a a � R • a J a P , O r' Q I a BACK PILLMATERIAL mm , r 0 GLEAN SAND A8D' ® ® ® ® ® ® ® ® a a Z 0 GRAVEL! ® ® ® ® ® ® ® ® , - 10 MIN..3 GOLL R r v2 3'-0 7YF 0 F� d F O d Off' - Gym e S d J Z0 � �' 1 I I a LID I I I Q I O QQ d Qi I I o i I � i ! 'II I II II I I I I II I IZ I d ARK I R M tip WATE i HIG a 20 ' I I OS - a O 2 N 09/ / � O 0 39 V1 , " , "Ea I I I I I 8—0 0 X 4—0 DEEP PIPE DRYWELL FOR POOL &�S RYWELL DETAIL d ; an EXISTING 8'-0"0 X kk o a " FLOATING 'z o 6-0 DEEP DRYWELLWOOD DOCK CALE = 1/2"—1 t—O" y < UNDERGROUND 4"0 = FIXED WOOD DOCK a DRAINAGE PIPE, TYP + Ma M < O I..t sa 1Ea lob, ' 03 N bo � b,4 L7`z 04 D.1 ( .W 1 nw p -u o J to toy Qp N Z clr 6.8' #� #4 62 ° O €,, 0 7•2. taa ,o J 5.01 L.P. S.T. 0 6 cP- ,�.a r2s off' C�J €c z 4.9' �€ O N 12.1' N o -n z Z -P Y cp S 4s ,`.7 Q W� `7 z o0 >> E STONE 3 N >o `� 0 0 a� z= -i O O E €r�PIER L.P. w o a ro f= �� cng m O •00' €, B OAK N Z4 L.P. k- o�.- 4.9' � ,� a3n rn v �> N 7J0 6 CUR taa ON 43 o D Z �o o� z c� N � .r z < m a y I€.o c� €�s a I zp z 5 ��L tz W tf33 N W D n (OOP t! GRAVEL is 5.0' Q � 4.0' cn --i Z >> o FENCE �, DRIVEWAY r .r Q C ''t mac" 0 � �v g 114,2' HOUSE � m Z €a Iae 010 W DRAWING NAME: o; g 92.3 PATIO ° �i DRAINAGE PLAN o Z � \ �t. STONE-0I ' 0' W o a a.a ar, sa n — c ° ta.4 lot PIER LO az t33 1 j (n co � rrl D co DER � N� _ �° cn � EXISTING 8'-0"0 X a O �t (V O 3.0' zs o —a :j A a, CIO 3 = D 0 C O 0 2 A, Cq 6'-0" DEEP DRYWELL `\I �_ z -9 o PROJECT NAME: O ST/C rsa N PROP. D z m Z z I, ,rF €t5 SWIMMING z� m �/ARDARO NcF sa.€ �� 23� •� � POOL -�'+v � D � S� � �� \ t2� N N �� Z cry 1' 0 7 4' Me �D � � s \11' r-z '4 1' ® 4 _ RESIDENCE UNDERGROUND 4"0 D.W. 12 m n.a Jp, DRAINAGE PIPE, TYP #2 � �j N 7 �,., f2 N UNDERGROUND 4"0 � p ADDRESS: 2006 GULL POND LANE �jl 7 S FSN �. DRAINAGE PIPE, TYP 40.6' TOWN: GREENPOINT � DRYWELL TO BE ➢ T O' 34•2 — REMOVED A D 7, —� STATE: NEW YORK 1� l�/ Y �OOG t+� 12 o Q� L CONC. STEPS na REPLACED E SEWHERE O � POSTAL CODE: 11944 s p EXISTING +.r& WALLS g$ Z 0 8'-0"0 X 6'-0" P\R ,�, 0 00 NCTM#: 1000-35-3-12.11 4,4� DEEP DRYWELL C. S , C6�tA\�S N�Rp(0R �_" -- cO ID NUM: a� O N ONO' GS FRENCH DRAIN b.4 a az o HEDGE ROW 01 SE ?' C � cr 55 D.W. �s C� &• SS0 � C �b AGAINST WALL �t1a D OVA #3 SSEp •- W O.L. FRENCH DRAI NGAINS WALL O V Aiyo ° .r O ,pROppNri ua s4 BLOCK WA L N �0, pP\1E1rJ1 jN.N FENCE a.a an FENCE • ►�A J FRENNS O`NP�g�OCK `Ir ' FOND S• PONDS N 8401 A ° 1 "0.3S. CHAIN LINK FENCE Tn es GATE M'N. v-,, O J �.•r 2�N art 5� PG P s.r F�t�Cs � �z.� 0 6 3� `t O O VI/ � ` * � �• o,e TA 2 1 `15. 44 , 037���, �o� OP N�� rf N/0/F S 7 GULL POND ESTATE RENTALS, INC. PROJECT NUMBER: 2022-0003 INITIATED DATE: 01/13/22 DRAWN BY: SBA CHECKED BY: BR DRAINAGE PLAN 20' 40' DRAWING NUMBER: 1 „ t „ 1» = 20'-0„ PL- 101s00 SCALE = I =20-0 PAGE: 1 OF 2 �i P S . C . T . M . # DISTRICT: 1000 SECTION: 35 BLOCK: 3 LOT: 12 . 11 MAP OF FORDHAM ACRES — SECTIOON ONE #3519 \ LOT 1 c � om F \ \ W.M. \ G / �0y m \ `UmNNDLImr:sROUND / O C � 1 LAND N/F LAND N,,/F w m �� OF z 100 HENRY R., JUDI A. & STEPHANIE QUINTIN / -1 ;—0 1 z 0 Z ' WILLIAM S. CLAUDIO JR. Z>- �0 � PILING 1 / o �z 4 1 / ci CalPO 1 MO 0 I m 4� o.s to Q a / 3$'7 .a \ I 8' CATWALK 4' RAMP 8' FLOATING DOCK m 0 I m N ' FIRM XONE X �, 0 10 i 8 N Dc Z 0.7'N V` 6.6' I� 2.3'N t° ,..n--6':::: ; '. �� 12LP ° io ao N �, v,•10. .,•::::::•:•:'::•:•::::•:•:::..::::::: o \ �0 2 ~ WETLANDS LINE BY NYSDEC v.:: :: I 2 !� y5 4.9 E::::::::::i:ti:::::a:i::::::v:::ar'' :_•;p OO : ONE 31A .:a: ::::.:i :i ::::.:::::: :0•T' 6 \ v \ o I Z CH LES HAMILTON ON 11/9/05 O' m COLUMN L /'':::::::::i"::::::..:.......... 6 i �i I o I _J �a �� L `t''• ^4$' I• ::::::::::::j i4 \ I o I TIDAL WETLANDS BOUNDARY :I::::::::::: ::::::•:::•::::•::•:•�• \ I:':::::' : '�' i x I I I �' ALONG TOE OF STONE ARMOR vi \1 I ^ ......... :; ;: :: I Z I 6 i AS DETERMINED BY EN—CONSULTANTS �) , :.::.I.. :::.:::::::::::::::::::::::4.0. _:I_ >� o I / I I I SEPT. 7, 2022 3\ BLUESTONE DRIVEWAY 'S•5' }•;; :: ::.::. ;.. 3 fV �' S ROOF ':1'.:::.:.:#2�006::: a``'Io 3.5 —. y� -� • __ q� 104.0' 0 I ^ LIMIT OF 50' FE. 2.4' O R ST E w _ VE ^:}:::: : YY a 10 o sLArE �;.: .,..... 101 NON—DISTURBANCE/NONFERTILIZATION BUFFER MOW. / `� :.: { D1"'�`LLING . z l� w l 7� AS SHOWN ON PREVIOUS SURVEY DATED JUNE 9 2006 STO E® \� ROOF ¢.5':' ':I ...FFL• 16.5 o z I d J 0 CO U?MN \\� OVERHANG ::C CRAVy� EL 2 W I , p I •� 10 IM 12 I ` ` 10.5....,s:i s.s' ► — 50 —`0 t� ................; I N ( BUFF ,I I w 1 FIRM ONE X \� 1::::::::::::::::::: :::::: I o, I �/I I „ j� o TIDAL WETLANDS BOUNDARY I FIRM ZONE X 1 0.2% CH A CE ANNUAL `^ " o: '� 3_�':::•::::w I ' A ( I I ¢ �^-1 AS DELINEATED BY EN—CONSULTANTS 2 .. �.::':. .':.::':.:':.•. ' N. 0 4. \ FL OD N ; :.:::::::::;::7.s': : : : :::::::;:::;:: :: : : :;: : I d 14 ( i I I z SEPT. 7, 2022 12 ` :GF............ I FIRM ZONE \ o::::: ::::::. ::::. :::. ::: : : : : : : : : : :' :;: : oi \ �-� 2 1s BO NDARY LINE :::::::::::::::. : ... :3s:s':::. :..:::::. ::::. ..... ....... . . ......... LAND N/F •e��, FE.t.2•E \ \ ....................................40:. ... ...: X 5 A .....................: may.: FYNE INSTRUMENT CORP. OXW I �Ic �N GEN 5.4' STONE LANDSCAPE , 6 coNo• N RET. WALLS � v` 5�o0P TW�yy 16090,.1Lg►� 4'N /10 FIR .. ._-- _ 8 Z 1 55� � M X �� — 6. ; 0.2% LOU NMC! ew 6.8 C. BLK WALE �/ 0 2. ;\ I 10 ;.� 1p6 •`3� N 84017'00�, W 6 N. 11 •� i��/ LAND NI/F FIRM ZONE X ���— 147•04 1 FE.O. N� OF 0.2% CHANCE ANNUAL/0.5' i ko 49 PATRICIA F. & 'THOMAS E. KRAUS FLOOD �\ FIRM ZONE �MON 1� �7 `/Y� \\ BOUNDARY LINE 1.5'N // \ ----------- \ THE WATER SUPPLY, WELLS, DRYWELLS AND CESSPOOL LOCA 77ONS SHOWN ARE FROM FIELD OBSERV,A 77ONS FEMA MAP#36103CO176H EFF. 09/25/2009 AND OR DATA OBTAINED FROM OVIERS, AREA:41 ,000 S.F. OR 0.94 ACRES ELEVA77ON DATUM: NAVD88 UNAUTHORIZED ALTERA77ON OR ADDITION TO THIS SURVEY 1S A 1IOLA77ON OF SECTION 7209 OF THE NEW YORK STAIF EDUCA77ON LAW. COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYOR'S EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VALID 7RUE COPY. GUARANTEES INDICATED HEREON SHAALL RUN NYSDEC LOT COVERAGE TOWN OF SOUTHOLD LOT COVERAGE ONLY TO THE PERSON FOR WHOM THE SURVEY IS PREPARED AND ON HIS BEHALF TO THE 777LE COMPANY, GOVERNMENTAL AGENCY AND LENDING INS77TU177ON LISTED HEREON, AND TO THE ASSIGNEES OF THE LENDING INST7TU770N, GUARANTEES ARE NOT TRANSFERABLE. THE OFFSETS OR DIMENSIONS SHOWN HEREON FROM THE PROPERTY LINES TO THE STRUCTURES ARE FOR A SPECIFIC PURPOSE AND USE THEREFORE THEY ARE ADJACENT AREA (WITHIN 300' OF WETLANDS BOUNDARY): 37,397 S.F. or 0.86 ACRES BUILDABLE LAND AREA: 38,754 S.F. or 0.89 ACRES NOT INTFNDED TO MONUMENT 7HE PROPERTY LINES OR TO GUIDE THE EREC77ON OF FENCES, ADD177ONAL STRUCTURES OR AND OTHER IMPROVEMENTS. EASEMENTS DWELLING W/ COVERED PORCHES & BALC.: 5201 S.F. DWELLING W/ COVERED PORCH & BALC.: 52011 S.F. or 13.4% AND/OR SUBSURFACE STRUCTURES RECORDED OR UNRECORDED ARE NOT GUARANTEED UNLESS PHYSICALLY EVIDENT ON 77-IE PREMISES AT THE 77ME OF SURVEY REAR PATIO: 1110 S.F. SURVEY OF: LOT 2 OF New CERTIFIED TO: KP REALTY OF GREENPORT CORP.; CONC. STOOP & SLATE WALK: 179 S.F. SUBDIVISION FOR GREGERSEN'S KEEP LLC '�� . MAP OF: AT GREENPORT '�P M �,�N w0j•y��P UPLAND PORTION OF CATWALK: 38 S.F. FILED:DECEMBER 28, 2005 AS #1 1343 ? *. TOTAL: 6528 S.F. or 17.5% SITUATED AT:GREENPORT r- Y 4. :y . 4 cr V-4 o TOWN OF:SOUTHOLD KENNETH M WOYCHUK LAND SURVEYING, PLLC UPDATED 02-16-23 SUFFOLK COUNTY, NEW YORK ykp 050882 SJQ- Professional Land Surveying and Design UPDATE 10-05-22 OKP.O. Box 153 Aquebogup, New York 11931 FINAL SURVEY 5-22-07 FILE #26-32 SCALE:1 "=30' DATE:JUNE 09, 2006 N. Y.S. LISC. N0. 050882 PHONE (631)298-1588 • FAX (631) 298-1588 Rood, APPROVED AS NOTED COMPLY WITH ALL CODES OF DATT,E:a- 7-as B.P# 5 I LP (° NEW YORK STATE&TOWN CODES AS REQUIRED AND CONDITIONS OF FEE (p bd BY: SOUTliOID TOWN ZBA NOTIFY BUILDING DEPARTMENT AT SOUTHOLD TOVW PLANNgNG BOARD 631-765-1802 8AM TO 4PM FOR THE FOLLOWING INSPECTIONS: r4 -�UrIs j d SOU Sp�CLpTCA,N,�BgTEES 10-l6-21 DEC 7`5-aa FOUNDATION-TWO REQUIRED FOR POURED CONCRETE ; SOUTHOLDHPC ROUGH-FRAMING&PLUMBING SCHD INSULATION FINAL-CONSTRUCTION MUST BE COMPLETE FOR C.O. ALL CONSTRUCTION SHALL MEET THE ELECTRICAL INSPECTION REQUIRED REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS TRUSS PLACARDING REQUIRED RETAIN STORM WATER RUNOFF PURSUANT TO CHAPTER 236 OF THE TOWN CODE OCCUPANCY O USE IS URLPMIL1=UL WITHOUT CERTIFICATE Or- OCCUPANCY All exterior lighting Instrralled,replaced or rcpalred shaU conform to Chaptcr 172 of the Tbvm Code r GENERAL CONSTRUCTION NOTES 1.2. Provide clearance to form face of concrete as follows: MAP OF FORDHAIvn ACRES - SECTION ONE �@ C PR6POSED I. AII work shalI be performed in accordance with alI state, Slabs 5/4" #3519 G) R A WING INDEX municipal and local zoning and building codes and ordinances Beams 1-112 Footings 3" LOT 1 POOhave Jurisdiction and best standards of construction practice. g faces L� PATIO AND Sheet Description All concrete Sur ROOFED OVERPA� 2. The builder shall verify call conditions and dimensions on which are to be exposed to IO A-1 PLGT PLAN, GENERAL N'°TES, ZGNING DATA these plans with those at the site. Any discireponcies must be weather �� 2006 GULL POND ROAD brought to the attention of the Architect prior to the 13. All principle footings shall bear on ground having minimum A-2 PART( L SITE PLAN commencement of construction. The contractor shall be allowable bearing capacity of 2 tons per 5q. ft. Elevations of GREENPORT ®"3 PARTIAL SITE PLAN responsible for corrections not reported once he, has started bottoms of footings shown on plan are for estimate purposes and O work, except for hidden Job conditions where applicable. shall be adjusted to the required bearing strata as found upon NEW Y®RK 11 BASEMENT,GRCUFdD FL. e RGGF PLANS 14. Shop connection to be 3/4" diameter machine bolts. Field �� 944 A-5 ELE�ATIGNS 3. The builder shall guarantee all materials .and workmanship connections to be 3/4" diameter A30-7 bolts, unless otherwise on the job for a period of one year from the date of completion. noted. All columns connections shall be made with minimum 3/4" SCTM#1000-35-3-12. 11. A-1 NASIE LI GNS t DETAILS diameter height strength bolts, unless otherwise noted or shown. hoc, o A-� NAILING SCHEDULE a DETAILS 4. Plot Plan data is as Indicated on survey provided by owner c" `� and shall prevall. Plot Plan by Architect is merely schematic. 15. Slabs shall be cast monolithically, and shall be finished as O •T> �c s�4e per specifications. �` 16. Exposed edges of concrete to have chamfer. 9� �iD CCNC /�`Lr�� 5. New construction Is to be staked out and all required set F� TOP � r 24•01A backs are to be field checked and approved by a licensed �2 TCIP surveyor prior to commencement of construcction. MEGHANIGAL/ELEGTRIGAL NOTES Vo D ccrdc I. Heating shall be designed to provide '10 degrees F with 6. Provide .25 aluminum termite shield at all perimeter sills on outdoor conditions of O degrees F and a 15 MPH wind. °� ®®®2M ®En® ° concrete foundation. 2. Air conditioning unit to be self contained and be designed as ®CEI®CE9® DED EEO®®®ff]® -7. All wood framing resting on steel shall be connected with follows: ®PQg ®®®C512]CEO ® ®E91®EEI Q G.I. anchors each one. A) Out door design temperatures shall be based on current A.S.H.R.A.E. temperatures at 2 1/2% frequency W.M. ®®®® ®®® o cl. All framing lumber shall be Douglas Fir No. 1 4 2 8) Indoor design shall be based on 70 D.S. and 5051; R.H. for PLAN OF - - - - - - - - - - - - - - - - - - - - - - �• °� O STORM DRAIN WELL,(A) construction grade, Fb = 825 s.i. minimum sand E = 1,400,000 ' 4 g p• summer and 13 for winter. ® o uuar�le �_, �-P_ �� ®� �� Rev. Date Description minimum. Unless otherwise specified by Architect. 3. All electrical work to be In accordance with the N.Y.B.F.U. F` ELEVATION OF STORM DRAINRING 6'DIA.x 4 HIGH-111.65CFT rules and re ulations and a N.Y.B.F.U. certificate is to be �'� NOTE: I 11/13/23 UPDATE BUFFER NOTE 10. Double_Jof5t under.all partitions parallel to framing. 9 0 �`;TORL'�L DRAIN WELL-(A) AOM r�M�rs�sussrirur�D NOTE. �' 7 TOP ELEVATION VARIES VERIFY WITH PLANS 2 1/21/24 REDUCE RCCFED G1/ER PATIC Provide double. header joists at all openings. presented to the owner at the compieticn of the Job. o UNDERGROUND �-� ��� � 11. Rafter heel cuts shall not exceed 4". Whiere jol5ts are 4. All bathrooms shown without windows to be mechanically �% oG� UTILITIES (REQUIRED VOLUME ACCESSORY STRUCTURE 3 ,2'8/02/24 REDUCE R''GFED G1eER PATIC notched to headers, as to reduce the deptlh of beam, only Urldle ventilated as per N.Y.S. Code. ® O Irons or metal connectors are to be used. 5. Fire places to have fresh air intake and tempered glass door v� DO RUNOF DRAIN WELL 4 110/1/24 REDUCE PCCL • D.W. No AREA RAINFALL AREA FACTOR REQUIRED DIM.DIAxHIGH PROVIDTD 12. All joists shall have a I" x 4" wood cross bridging 8'-0" on as per N.Y.S. code. &QUANTITY 5 112/14/24 ADD NGTES PER TRUSTEES 3/12 center maximum or solid bridging. IMPORTANT NOTES 1 1 �123 SF 1•0 10(o CF 1�INC : ��-���X�✓�-�s�� �INGC . 1-6111.65 CF = 111,65 CF - I. The builder Is responsible for all construction means S0.2 - e All exterior walls to be 2 x 4 or 2 x 6 studs at 16 o.c. methods techniques, sequences of procedure and for all safety except as noted. precautions 4 programs to connection with the work on this job. 14. All wall and roof sheathing shall be 1/2 GDX plywood unless 2. The builder 4/or owner agrees to assume 4 does hear by LAND N/F a otherwise noted. assume all liability for and shall and does here by agree to ��� / OF I L� �' o 15. Sub-flooring shall be 3/'4" "COX" plywood sheathing. Indemnify and save harmless the Architect against F Q� /' li Z pp 00 Finish flooring shall be any atai sustained all l ss hani, charge, or damage, arrising from persons �� �I `TP�`� z c!) WILLIAM S. CLAUDIO JR. �� W� 0)0 o 0 either tile, or car et or a_� specified on Inns U.O.N. PILING 16. (5 Sum board on walls and ceilings to be U.S. sum 1/2" what so ever whether employed In and about the sad work or P �� S�� APPROXIMATELY 3€i50 SQ FT OF �'. i0 Q 4° z yp 9 gyp �• o f; Z with all joints taped and sj?ackle, 3 coat Jolb. M.R. o baths. otherwise by reasons or any accidents damages or injuries P 1 EXISTING LAWN TO BE PLANTED Zi torts or trespassers happening in and about or in any way 0� �p WITH NATIVE VEGATION 1 C) � ) 1-7. New construction to comply with NY5 Energy Cons. code Incident to or by reason of the doing off said work including I Li ro I This site Ian is in no wa 18. Provide q" R-30 fill thick insulation in alll exposed floor cost, counselors and all expenses of defense. ¢�( .�+ p y PROJECT 3. The builder shall carry Workmen's Compensation, ��� ;�% %�� intended to establish, change or � PROPOSED ;` ,, : -MO ''; otherwise address the permit n IG. Insulation In roof Shall be 10" thick R-30 or as noted: In Disability and Public Liability Insurance. m / 0.5' i / = walls 5-1/2" R-21 or 3-1/2 R-15 and In floorrs 2" thick rigid Q 1 POOL, PATIO, AND g 3Ur� �$L // j/,. /;;' ��� status of the existing dock or any Insulation. All Insulation except rigid insulation shall be � /., other existing structures unrelated � o cE /'%/ '' '/ '� �� g o ROOFED OVER PATIO foil faced batt insulation, add or reln5ulate exposed existing -jr 1�- ----- - -_' o� ENC`OSv�E FEN / �; ;/'% ';;l to the proposed structures 71 areas as required to match new protection), unless otherwise 1 Po \ ;; / �j- / de icted hereon. 2006 GULL POND ROAD 20. All windows and doors shall have insulaCng glass and ��,`r� � ___�' P , 8 DIA OS X 4' DEE / � J �" � DRY WELL FOR �� � g' CATYJALK 4' RAMP s' FLOATING DOCK GREENPORT screens,tempered insulating glass In ail 511diing doors, tempered F� /' areas U.O.N. ����- CO �' i`' �� OOL & SPA Q NEW YORK, 11944 glass In all shower doors and all fixed glass adjacent to , rn %/' FIRM ZONE X I I 1Q D openings or to floor level, In accordance writh NY5 Code. r 0.7'N i . , _z Z � ,a ,_,� N I I t .,;, �� � � O SCTM # 1000-35-3-12.11. 21. All habitable space to have 8% floor areea in glass area, and /2.3'N ,a ''�` !' '' 4�b of floor area as operable sash as per Code r*r LP CT 0'.: ;:::; •::::::; ��_�� / /,j.,�f ?j o � H•i-� ,(� noted. N ................................ ,�/;/; i,/ T IV 22. A single station smoke; detector alarm device, shall be a s::;: :•:::•::; .:::;:::;•::;:;•:::::•::::;::•:::::;::::::::•:•:::::..:;:.:•::.:: ,. o OW w o �� ;/,'_ ?% �, ry _ - TONE PATIO ' - LX�STING VEGETATION TO REM IN g m. N O < TONE @� o �o I e in spaces in o. these nt to ::n ' MAS n the coiling ad ace Qw �� •installed o � :.::::•::•;.�::::::::::::::•::�::•:;;�:•:�:•::•:::•:;•::;•::c;;�::••:•::�:•::•�:•:c•: g j p g p O � COL 7 GRADE f, z z o \ :/ o W M t- 1 � o ,N / F 1 O I 0 a to Z with Gode. Q @ accordance LP (+ 8 L '•9 1g 3 o - R ��� PETER W cA � � E� O ao a r Splash a- dr wells o ;::;•::::::: ::::::.:.:::.;•:::•:::.:::.;•::.;•::::::•:.::::•:..:: 23. All storm water leaders and utters to ' g y �-J .•. � '' I/. . • i.;,/,'; �i � w �(DAL WETLANDS BOUNDARY ;. • / U •'ul� W N � C i 2 '_ /0 47 E•- 4/ c ::•::.::::::::::::::::::::::........................: �• I N a x /,;,';;' ALONG TOE OF STONE ARMOR D O.MAl� li O EXISTING PERMEABLE ::•::PtANrFA i "v / . ,, : /r 24. Provide 16 oz. Copper or Aluminum flashing where required at � � � � J w, I •' , �?r AS DETERMINED BY EN-CONSULTANTS pp g q o m //': �i, 5 J GRAVEL DRIVEWAY - W 2 Z windows, doors, roofs, chimneys, etc. ! �, / U _ a I $ I Q o io j /, . 7, 2022 1" `' " O y FE. 2.4E \ W ROOF 200$i ::?`.;t::.'•:::: Ni J PT o r OVER ram:`:`.'::'2 S .:: I ? i 25. Provide positive ventilation of all roof and attic area ON, \ } "' SLATE :: :` ::: ' FRAME.;::;::.'.:>:::'::::::; o: - c� �;> /;/�% , whether 5 eGificall Indicated on the Architect's drawings or \ z � i ::.:.:;:.:. ;;. ::.:.::�VVELLING:::; ::::>':'.;::?::;: �?J/ m o ,, I � z 10 Q„J � ///� � � LIMIT OF PROPOSED 50 WIDE 108 1'N[�EIRIRICK ROAD p y g STO E not s ecificall indicated. o / ROOF s.5'. :::.::::::::::::::';` FFL 16 5:•:,,,:;:; ;;;::;,;;:: •/ I o %W j/% � !` ; NON-DISTURBANCE NONFERTILIZATION BUFFER LYNBROO p y �} o COL MN OVERHANG / �, DRAW N.Y. 11563 o I turer's .:i:;�;:t?�::•'..:" :... ... ..:.......... � a i r3,• F;, p L EL 10.5;`:; `` ':N Q o PROPOSED EDGE OF LAWN) PHONE 516 887-71�47 26. All wood tru55e5 ,hall I be install ,d as pier manufac 1 J O .1 specifications and in5tructl'ons. `a-:?�:�:�:� :�i`.�:� '�:?�::?�:�:�:�:?�:���:.:`??:::`:;`: �::�:;<:�.�:::... h �-�o• cci 5 eGifiG .I / ............... ................. .......:.:.................... s.s' :� �N � , ,,, , I(� CLIENT blocks. �: .:•::::::::::•::::•ii:::: :i:: :f:??:i:::``.:`.::`:`.::: :a 0.�., ' �� FIRM ONE X `I:::::::: :::'::::::::::::•::;•::•::: •:::::•::::•:•::::::..::•::;:::;.:.. w``' a- I yr o o I nstolled a-s per manufacturer's '� «.: z o Q o o W cn UFFER i W 2�. All micro lam beams shall bet • � � :.;..�::::.;::.:;:•::.::.:;�:::.;•.�:.�:.;�:.;:•..:;::::•.: � �. �; p FI 0_ o / / '', .� M ZONE N ::;:: •. ::;: 'v:. o a 0 T E X 0.2� ::..:• :::..:: ::..::::::..:::.:::::::..:::.:::.:::.:...: CHA CE ANNUAL �o W > / UA L �� o I AL WE. z T N LAN� • DS/ BO UNDARY tons. ARY Ions and Instruct tp 0. ................. ............................................. FL OD :.! ;:::::::'."::::;:;;:;;::::;::;::::;:< ::::: cr a� . . a �- z ///, . /I AS DELINEATED BY EN-CONSULTANTS .. .....-..................................::::::::::•:::::•. Q 0. I , 28. Architect has not been retained to supervise this ...o.:•;;:�::::•::;• :�:;:�::;::•:•;::•;:;�:: :;:;::::�;:::::::.:;::::::•:,:::.:: .............:::::::::::•;::::::.:::::::::•::::::•::::: a o o P 0 SEPT. 7, 2022 construction F \ �. 179 SF:`: ::: ::': :•::: o Q -� Rq41 /, -/ /i ., !-i O 0 :.......:................ .. AREA OF S a �¢ 3S �, _ z - i N ::: 2......................... GE': :; :€:`.'. ?`::::; LATE :.....:i.:`;.:` :;:: ,3. / ;/ ,/, / i � 2q. Do not scale the drawings. �. E RET. •�••••��`���• EL ,s/3 ,/,, ;, I : 2006 GULL POND ROAD / a /:::. .:.:::.::.::•.:::::. 1 .::::::::.:::•::::•::•:::::•::;::•:•: TO gE ALES r- R N //, G EENPORT 30. The builder is responsible to locate all utilities prior ?; :; :.:::::.........:•:::•:::GF ...:::::::::::::::::.:•:::.::::•:::::.................:..::.::.:::::::......?REMOVE :..::::..:..:...:::::::- . _ - I l FIRM ZONE N ::::::::::::::::::::::.:::::::.:::::::: :.,..::::.:.:::•::::::::•:::::::::::::.:-:.::::•:::::::•:: ........: h j jr' ,/�// .A 1 to commencement of work. o•:.::..............................:.............::::•:::.::::.:::::.:::::::..............:.................... :;:•;; :<; :::::::::::;:•: �• u�ntaa , �j _ i E � , �,,/ NEW YORK, 119 . .............. :::::3 44 B O l 1 DARY LINE o::::.....:::.:::.:.::.:..::..::....:::.:::::::::::.::.::.-:::::............ ::::::::•:::::....s.s?. :: :;•:;.::......•::.;:.....:•:;•;::•;:::..,: � � L �. / . . LAND N/F ::::::::.::::•:.:•;:::::;•:•;;:•;:;:: ::• ti::. __�• i ./// �; 31. All micro-tarn beams sh<ali be Installed a56 per manufacturers � � FE.1.2'E �•'��•"�•��•�'�•��•��•���<•��•�����•��•��•:�:���::�:::•:::•::::::•:���••' ^:•::;•:�:::•:•:'��>•'��• F STONE '::;.::`:.:;.:.:•::�•.�:.::;•::•:::•::�•:•:•::::•:•::•::�:•::•::::••:. ...P... .� a"e' � ,ETAINING W � j\ �� / /, specifications and instructions. OF MON. :.:12.Q;;:;::::;.�'::•:::;::;.. Q I. qz R __ _ - o ,. / ;. :I; SCTM # 1000-35-3-12.11. p ....... .... � Plc UN �E''• " I 0.1'W ... . .... � , E STIEEL/GOhIGRETE NOTES FYNE INSTRUMENT CORP. s 4' �'• Ci ' I. Assumed loll bearing capacity, 1.5 ton perr square foot subject N CO�p4' / o yr S\ _ �' TW f 110.0 MON �, -- p er- y , , to Inspection and verification. N �0�'Fl- P �5a FIR X1•e' _ W ,/`';.; /' ,1 11 EXis ! NOTES, PLOT PLAN 2. All footings to be carried down to undi5tturbed soil, no M ZO / T NG EDGE OF LAWN TO 8E LOCATED p 0.2% C-P9ANCE A - ,o.o _� �/ �; 'i ZONING DATA footing shall be height or lower than a 30 ,degree angle form �''�L00 SW 6.8 LANDWARD OF 50 BUFFER 32 FENCE LK WALL / // f �2" p� any other footing. Step footings a maximum of 30 degrees. `� �' I 0 3NSE /j�,/�; 0 ;�,;' FENCE OC TABLE �/' ., l O 84-d� �'0 �� CHAIN LINK FEN:C- _ /'' , ON' ;,, 1.1'N. Footing to be 3-O minimum below adjacentt grade. 3. All concrete to be a 1:2:4:mix 5500 lb. concrete unless PROPOSIED 1 B x23.5 ROOFED OVER 0 -- °� FE.0.5� '' OPEN PIATIO ACCESSORY STRUCTURE FOUNDATION �r 6' x 5' DEEP 7. 0 otherwise noted. Foundation wall shall extend a minimum of 6" CS, O J o.5'1 pJ �jO WITH STONE WALL FOR OUTDOOR WALL D Y WELL FO' 4 above finished grade. All work to be: done, 1n accordance with FIREPLACE AND 16.33 x 21 .II4 A CESSORY ;• A.G.I. standards. �° ' r�v 10-9�j SUBFLOCDR / BASEMENT FOR POOL S UCTURE '; FIRM ZONE M5 N. W s' EQUIPMENT / STORAGE BOUNDARY LINE LOT PLAN 4. Anchor bolts to be 5/8," dia. x 18" long with hooked ends, LAND N/F FIRM ZONE X TO REMAaIN UNENCLOSED with maximum spacing 3'-0" o.c. doubled at corners. OF 0.2% CHANCE ANNUAL FEMA AP 36O103C0176H EFF. 09 25 2000 5. All steel columns to have top and base (plates and be, set with PATRICIA F. & THOMAS E. KRAUS FLOOD � � � A-1 St��1�E- I71=2�7-�I' high strength grout for leveling purposes. AREA Oh LOTPROJECT LIMITING FENCE 9,728 SF 41 ,000 S.F. OR 0.94 ACRES b. All columns (unless otherwise noted or shown) shall be, NYSDEC LOT COVERAGE ZONING DATA R- 80 furnished with two 3/4" anchor bolt settings. CUT AND FILL CALCULATIONS ADJACENT AREA (WITHIN 300' OF WETLANDS BOUNDARY): 37,397 S.F. or 0.136 ACRES ITI',1\I REQUIRED EXISTING PROPOSED -7. All reinforcing bars shall be deformed burs of new billet LOT SIZE 41,C00 SGF.T NC CHANGE I�IuoPOSED Pro: Arc;h: 7 Chk'd by: TFQ steel conforming to A5TN1 A615 grade 60. 1'I'ED1 AAfOI1NT ITEM EXISTING USE NE FAMILY RESIDENCE CNE FAMILY RESIDENCE NC CHANGE Date: c3,21,23 Drawn by: jDM CUT CUJI=R PAT(^ 11�° CUBIC FT Lc�'I'StlE 41,CCC SCF.T Nc �CWANGE 8. The builder shall verify dimensions and location of all ADJACENT AREA 31391 SF I iEIGIIT ACCESSORY 22 FT. 18 FT. openings, pipe sleeves, anchor bolts, etc. as required by all Seale: AS NOTED LO I'COVERAGE MAX. 20% DWELLING = 4,1134 S.F. 11 trades before all concrete 15 poured. I/iI.L PPER PATIC 345 CUBIC FT LOTCOVERAGE DWELLING = 4,194 S.F. EXIST. DWELLING 4,1134 S.F. XIST. DWELLING 4,194 S.F. CWER PATIC 31C` CUBIC FT �. ° 119 SF. GF R:�CF CAR PGRCHS = 119 S.F.S EXIST. RCCF C1/ER PGRGHS = Project. P� 2�L'2�-21 RCCF OVER PCRCHS = 119 S.F.S EXIST. RCCF OVER P RCH9S = SECCND STY BALC. = 119 SF. G. concrete work shall conform to the Building Code. RETAINING WALL 200 CUBIC FTUILDABLE LAND 228 SF. EXIb". SECCND STY BALCONY- 228 S.F. SECGND STY BALC. = 228 S.F.S EXIST. SECGND STY BALCt^NY= 228 S.F.S 38,124 SF .,..•^•^""-"' '� . re ulrements for reinforced concrete of the American Concrete 1,105 S.F. PRGPCSED PCCL = 521 S.F. PRCPCSED PCCL = 821 S.F. q GTAL 855 CUBIC FT PATIC = 1,1445 S.F. Institute (AGI 318). latest edition. PRC'Fill HCT TUB 50 S.F. PR�PGSED HGT TUB 5G PRCRCSED UPPER PATIC R ' foGG CUBIC FT 136 SF. PRCPP`SED RGGF G1fER PATIC= 423 S.F. ACCI:SSORl'BCD(' 10. The builder shall install (and give other trades ample PRGPGSED LCWER PATICS = 410 S.F. PRCPCSED UPPER PATIC = 136 S.F. opportunity to install) all anchors, bolts, plates, nailers, PRGPCSED RCCFED C1E1RPATIG = 423 SF. ,1 TOTAL = 5,201 S.F. CR 9-13.43 a :=., - slots, chases, pipe sleeves, etc, as required by other trades. POOL ,140 CUBIC FT TOTAL = 1fo41 S.F. CR 20.45% TOTAL = 1,231.0 S.F. CR 18.69re it_' :.f r•l A- 1 EXCAVATION TOTAL = 6,32'9 SF. CR Ill �' a Y- x II. The builder shall verify all dimensions before setting r;� :• �'{�� ' screen and forms. Reinforcing Shall be. seourely tied in Its TRUCILED g95 CUBIC FEET CR 185 CUBIC YARDS ACCESSORY STRUCTURE OFF SITI? SIDE YARD S.B. 15 FT. 15.15 FT proper place before and during casting o�caeratlon, using approved chairs and spacers as required. =RE,-6t STRUCTURE _ S.B. 15 Ft. 64Z FT. 2 I I I I I I I I PATIO COVERED PATIO PATIO I I I I I I I I I I I PROJECTION OF2nd. STY. DECK L--------------------------------------------------------------------------------------------------------, 2 Rev. Date Description Q1 05.2.24 PROJECT ROOFED STRUCTURE 196o GULL POND ROAD GREENPORT NEW YORK, 11944 THOMAS ,.t `4! I n+ LEGEND D ®MANICO LLL Q REMGvE EXIST. RETAINING WALLS ARCHITECT © REM^vE EXIST. STEPS 108 ibl[]ERRICK ROAD ® REMcvE EXIST. PATIO LYNBROOK, N.Y. 11563 PHONE (516) 887-7147 Y' thomasdomanicora®aol cope CLIENT DEMO SITE PLAN UARDARO RESIDENCE scALE: 1/4'=1'-O' 196oG ULL POND ROAD NEW YORK, 11944 DEMOLITION PLAN Proj. Arch: TD Chk'd by: TD Date: 12.14.20 Drawn by: JDM Scale: AS NOTED Project 020-21 Sheet No. w I I � y O' S'—�s'n I I I I 41 LE 41 oll I I N 1"" I I .� •� � w w - _1 1 �. i 4 41 y y y y 41 y 41 y y y y � y y y 4 y 41 41 y 41 y 41 y I i � 41 � 11'0' o" I I cv 1 n 12 0 I I I I I I ' � I � I t— i 23'-0" I I � lo I I y -l'-1 1/2 12'-7" I I � I I I I I I I II ! Rev. Date Description 0 OS.02.24 REDUCE STRUCTURE I I TO.W I EL 12.2' I I II PROJECT ' . • . � ROOFED STRUCTURE I NEW 12' RE INFCRCED 6o GULL I I RETAINING WALL 1 9 POND ROAD GREENPORT NEW YORK, 11944 I I TO.W EL 12.2' I I T OMAS PFFE . I I DOMANICO ARCHITECT 108 MERRICK ROAD LYNBROOK, N.Y. 11563 PHONE (516) 887-7147 Ithomasdom.anicora®aol.coan >,. CLIENT PARTIAL SITE PLAN VARDARO RESIDENCE SCA : I/4'=1'-O' 9 6o GULL POND ROAD LE GREENPORT I I NEW YORK, 11944 I I PARTIAL SITE PLAN I I w I ( Pro: .Arch: TD Chk'd by. T I I 1 y D , Date:, 12.14.20 Drawn by: JDM Scale': AS NOTED Pro%ecCt. 2020-21 Sheet No. o ' M � I I /FINISHED I GRADE 3 I I I ( I I I EL. 1133 it I , DN �R �'tS TCW EL. 1 .5 TCW EL. I5.6 BEFCRE CCNC BEFCRE CC IN I i I t I I ()� EL. 16.0 STAIR -- i TCW EL. 15fo' z BEFCRE CCPING I I I I TCW EL. 11.15' I ---J 36" HIGH GGUARq RAI BEr-CRE COPING PLANTER io EL. 1I(o� EL. 1.1(000 C� 1 I I x 0STRONG-TIE 'STHD1 CE RCclF C.N. -------------------------------- 10' WIDE C.M.U. x18 EL. I6.0 41 FCUNDATICN WALL ________ ----------- _---- ca ' \ / TCW EL. 15.5' I i -------------- ---- =-—-�}_- —= _= - I TCW EL. 15.5' I (- lAT2x�6 -1 IO 61" EL. 1.5 ( 61" i 6' 2'-ems' I I N 15'-9' I I X ( I +i EEW I I I i i Rev. Date Description I I W12x26 I I I I I EL. 1(1 00.02.24 REDUCE STRUCTURE I'-&' WIDE x I'-C' DEEP ' I ! ..�_---------- -- .- --- I P.C. FCCTINCa W/. 3-#5 CCNTINUCS BARS I / 3'CCVERAGE MIN. I I I 2'x6' TAI 2'xe' R.R. YC 2'xa' R.R. "x6" TAIL I I I I �a �16" C.C. 6](01, C.C. I 616, C.C. �16' C.C. PROJECT A 3 I I I I A- A- I 2"xe' G. ST.-Sl6" C.C. _ w _ 2'x6' C LL R JST �16' C. - T-3 2'x6' CEII_m JST 616" C.C. I I 1 -------- W12x26 - ---U -- 1--I I C)1 - - - - 0 ''� - 1 - r U! ROOFED STRUCTURE ' I I u I I N �� GAS N � �` � ' � �' � 196o GULL POND ROAD I I 1 �,I FIREPLACE - x I IL I GREENPORT 01 m . cQ 01 i D N NEW YORK, 11944 CL I I --- W12x26 - ---- --- I I I 1 A I COL ECUIPTMENT `r I I A i IS 0 X w I ,� \ PETER A�-3 I � I ill � ( ,q�3 �i � � � � � � _� / X�4 `\ N \ DOMANICO I I L--------W2x26 ---- ---I A I -—-—-—-—-—- - ------- I ; --- - - W axle - - MC A�/ \ CTE C T I I ----- - ==iUWI �I \ I------------------� ------ - I i i ,/ 108 MERRICK ROAD L--------------------- \Ij LYN10ROOK, N.Y. 1.1563 J PRCJ. CF f�CC1= C. . . I PHONE (516) 887-7147 ` -_� thorasdomanicora®ao)l.com U CLIENT VARDARO RESIDENCE I � Ir 196o GREENPOR ROAD NEW YORK 11 I � 944 BASEMENT, GROUND FL. ROOF PLAN & ROOF PLANS SCALE: 114'=1'-O' I I I I I . I Proj. Arch: TD Chk'd by: TD I , I Date: 12.14.20 Drawn by: JDM - Scale: AS NOTED ' BASEMENT PLAN GROUND FL. PLAN Project: M220: 21 , r_ ,� Sheet No. SCALE: 1/4 =1 -O %:��:�..,-�..�._�, :.C,;� i I 6�� ] 12' Q 6 iv I I I I i I I I I I I I 1 I 1 I I I I I 1 I ' I ' EL. l(oZ I EL, 16.I0 EL. 16.0 Ir————————————— I an I , , I r-------- EL. 1333 i I i------------i -------------L.4 I I I I ' ' '-------------- LOWERI I I GRADE_ 3 EL. -�✓'-3�, i I I I I I I----------------- I ------ ---� 1 EL, 11133 ---- BASEMENT I 5 1/2" 9'--1' �'-5 1/2' 6� —1 , I I BOTI'oDlor �� 23 -6 i r--j -�--, I STAIRS TO BSMTEL. --------- --- - -—-—- - - I r '------ ----- ------------------- --- -- -- -- -- ------------------ J-EL. 7.16 I ' 1 I ' L.------------------------------------------------------------------------------- L___--____---___________--__-____----_-____---___-____--___--_-----______---___- NORTH ELEVATION SCALE: 1/4'=1'-C SOUTH ELEVATION SCALE: 1/4'=1'-01 Rev. Date Description (1 05.02.24 REDUCE STRUCTURE I PROJECT I . I I 1 ROOFED STR UCTURE 1 6o GULL POND ROAD g GREENPORT I TCP CF RIDGE I NE W YORK, 11944 z�� ;II _z� I I q T110MAS �/ PETER 7 D 101VJ_i NT C O 1-41 ARCHITECT 108 MERRICK ROAD j LYN]BROOK, N.Y. 11563 ; P�YOIN]E (516) 887-71�7 ,, x tho�nas o�naa�ico>ra®aoIl.coan ,;'� CLIENT --------------------- --- VARDARO RESIDENCE iii0i J ------------------------------ ---------------------tIiI--- ---�--�---------------- --IIi—-----------------III—_--�—III—----------------J—�— ------------- --- , `d, N ----------------------------- — 196o GULL POND R OA Allk D>norGxADr I L________________ CL. —1333' - I r-J GREENPORT -j NEW YORK ------------- 11944 I I I'iLA RR I I I I I I C;R_A_U_H_ � _ I I I I I ♦\ � � I I I EL. 1133 1 r L-- 1 ---------------- 4 ----------------------------------- - I-----------------------------------------1. I L-----------------------J I I III �II I ELEVATIONS I I III //III I I I I I I I III / III I I I � I I I ' I I III // III I I 18 —sC I II Lie __ , r � L rl----------- rJ r i I I i I I I I '----------------------------L--------------J '----------------'-----------------------'----J I I -------- I 1 -------J WEST ELEVATION EAST ELEVATION `- SCALE: 1/4'=1'—C' 1 , SCALE: /4 —1 C Proj. Arch: TD Chk'd by.- TD Date:: 12.14.20 Drawn by: JDM Scale: AS jiiTED Projoct: 20 0-21 Sheet No. A-5 ca ;1. i SIMPSCN RIDGE STRAP W/BAFFELST IsIro, Cr_ I RCCF CONSTRUCTION ASPHALT SHINGLES 6 NAILS PER SHINGLE 30'0 SAT FELT 2'x1C ICE4 WATER SHELD's RIDGE BEAM LOW END OF RCCFS RIDGE Vxb' COLLAR TIE 2 CCF RAFTERS 632 C.C. 12" 12" 12' ICE 4 WATER SHIELD ! 6'� Q 6' �o'� 1Q 6' 2'-C' I I' -- -- - 12' 2 41; n Ali I � PLATE LEVEL. '- ' T.L.. +25.0' \ cn 1'xV AZAK TRIM 5' BAKED ENAMI=L \ 5 1 m I oll - GUTTER 4 LEADER SYSTEM 2'XIC' CLG. JST, 616' C.C. — R-30 INSULATION I I 1/2' GYPSUM BCARD t. VINYL CLAD SIMPSCN H2.5 . ✓ - I ' VENTED SCFFIT HURRICANE TIES 616" cC CONST UGTIf'N (2) 2'x4' TOP PLATE ------------ WALL R CHANGING ROOM SIDfNG MATCH EXISTING ! i---------------------� i' RR SI T T ; f --------------------- 1/4' RIGID INSULATION WAL1 9RD - I i___________________� ! I I BOARD (TREK) (MAX) 4 CD ;----------------y-� ! ; TYVEC HCUSE WIRAP ASE CLDING ---� j I------------------------ H7 5/S COX EXTERIOR PLYWC,CD N^N-SLIP T71Sl_-C' I I ./ /� �q R-------------------------- ---� I . . L✓ ' I 1 ah x1'Z 19 2 x6 WOOD STUDS �16 C.C. PCRCELAIN FL. TILE I I i----------------------------- -- R-15 INSULATION - i i EXTRA STRONG I I 1/2' EXTERIOR GYPSUM BCARD "'S 6 12, CC (T45 FINISH) 4x4/W2,9xW2.9 WWF TEFL PIPE CCL F-----------------------�-i---- I SIMPSCN FCUNDATION STRAP (o" CCNC. DECK PP gg GG �16' OC F�rRSTFL.LEVEL. SEE DETAILTFci�AK•i I --- TCP Cr- SLAB 1(o.0 lFfl W,OD SILL PLATE � � • . :°:••- : . I I "' . '' CONC DECK BOTT"(�MLEVEL `; I ------------- 4' POURED CONCRETE FLOOR E1_- -15.5 _ ,. . �' 1 r-_j_ -L-T ACC SILL PLATES WITH TEFRMITE I I SLAB W/ IL. POLYETHYLENE TH SHIELD AND SILL_ GASKET OVER 6 MIL. POLYETHYLENE REINFCRCEMENT: FDTN. WALL/DECK 5 `------- VAPOR 5ARRIER 5/8' ANCHOR DOLTS 040' CC - 05 9 24'O.C. 05 im 24'C.C. ' SECTION A-A SECTION S-S Rev, Date Description L. 1 00.C2.24 REDUCE STRUCTURE GRADE LEVE POOL E UIPMENT/ 10' C.M.U. BL K:OC , .;. 7; _. STORAGE '151- SOLID OUR-WALL BASEMENT 4 DUR-WALL TRIRCD TRUSS OR LADDER TYPE REINFORCING W/INSUL. GRIP DRIP EVERY OTHER CC1l 6 24'O,C, HEAVY DUTY 3/I45'LONGITUDINAL FILL CELL SOLID PROJECT 4 9-GAUGE CROSS WIRE 1 ' ON CENTER (TYP-) ' POURED CONCRETE FLOCK MASTIC DAMPRCCFING SLAB W/ (ox4;-1.4xI.4 WWF R FED TR U TURF VA POLYETHYLENE E E HYLENECR ECUAL fiOR MIL. RIR BASEIVTENT _T_F_VfLjk 196o GULL POND ROAD GREENPORT NEW YORK, 11944 1'-10' WIDE x i'-C' DEEP P.C. FCC1 ING W/. 3-S C:CNTINUCS BARS PRE-MOLDED � 3 CCvERAGE MIN. EXPANSION JOINT IL T O�dl/� /'�t�- S I N CRUSHED STC14E I PETER SET ON COMPACT FILL 12 5/8' COMPACTED TO e5% DOMANICO ARCHITECT WALL SECTION (TYR) 2" 4 /2" 2' C : i = -C I 108, MERRICK ROAD i I /2 LYN BROOK, N.Y. 11563 j PHONE (516) 887-7147 thomasdoBnanicora®aol.com. ' I -- CLIENT VARDAR O RESIDENCE I 3/4' A306 BOLT I 196o GULL POND ROAD 1 05 BARS 6 12" CC GREENPORT i � i I 3/4' 1" 4000 PSI CCNCRETE � i j i S" � ,� .• NEW YORK, 11944 e M x4/2.9x2.9 WWF 4 U,JU i ! I `� ` •' . 0 ° SECTIONS & DETAILS yr \ � � � i I I — N � .• . 2' i(o -GAUGE J SLAB DEPTH CCIMIPCSITE DECK N I ':. . ;Q; O LLS UD TYP, I I 5 STUpI PER BEAM I 1 j 1 1 CUT BLUE STCNE r DURC-WALL •` EVERY OTHER - - - - 2' 4 1/2" 2' F n1kCOURSE °' A G x. a e X BA1i 24' CC . . • . . d'; . .. F-1 L A N ri. I 2 COMPOSITE DECK Proj- Arch: TD Chk'dby: TD c _6 CALIE: /a"=1'-0' Date: 12.14.2,Z Drawn by: JDM STEEL PLATE & COLUMN Scale: AS N� T 3 WOOD COLUMN3 Iip Project-, _2 21 A-5 SCALE: 3/4'_1'-V A- SCALE: 2id'=11-O' j,. �.. .. F.. .. SheetNo. 2020 YS SHEAR WALL NCHCR BELT U1/. LBP - TABLE R301.5 (LOADS"IN POUNDSTISQ CODE ) MINIMUN UNIFORMLY DISTRIBUTED LIVE WOOD FRAME CONSTRUCTION MANUAL) 2018 HIGH WIND EDITION DGUBLE 2X STUD 4 -C C°C ( D M N U T•I N MANUAL) RAFTHF 2MN%8 CAI IN 0 S TO TOP EX 7 U 7DRAL LIVE LOAD 2018 HIGH WIND EDITION T WFCM TABLE 3. A S NEC71 TENTS SIMPSCN HDU � HOI'D-DOWNS BP SEARING � - G USE � ft�QUI EM USE ATTICS WITHOUT STORAGE H'°CKED ANCHCR B T SCALE: N.T.S 7 O PLATE gCLT o 0 10 AN ,� o UNINHABITABLE ATTICS WITH LIMITED STORAGE 20 12 24 35 700-YR. WIND SPEED 3-SECOND GUST (MPH) 115 120 130 140 MIN. 12' PENETRATICN DIAMETER ° HABITABLE ATTICS AND ATTICS SERVED WITH A FIXED STAIR 30 AFT N 1. Lp I 4 d B 2N�A� ER HE L J IN RAFTER/CEILING JOIST OX NAILS 70ENAILED REQUIRED IN EA. INTO FCUNDATIGN T-- I1 + BALCONIES (EXTERIOR) AND DECKS 40 WALL HEIGHT (FT) 12 3 6 9 SPACING (IN) RAFTER AND OR CEILING TQ JOIST &' MINIMUM o. � �, 2' O FIRE ESCAPES 40 3:12 16 4 8 12 8 2 2 2 3 EMBEDMENT� O GUARDS & HANDRAILS 200 124 6 12 18 12 10 2 2 2 3 c` GUARD IN-FILL COMPONENTS 50 a.' \ PASSENGER VEHICLE GARAGES i c 50 4:12 19.2 4 7 11 10 2 2 3 3 o ROOMS OTHER THAN SLEEPING ROOMS 40 24 5 9 13 24 8 3 3 4 5 SLEEPING ROOMS 30 12 3 4 6 10 3 3 4 5 II DETAIL OF STAIRS 5:12 16 3 5 7 II N C H O R BOLT 40 1S•2 3 6 9 2. WHEN CEILNG JOISTS ARE INSTALLED PARALLEL TO RAFTERS THE SUM OF THE 24 4 7 11 TOENAILS IN THE RAFTER & CEILING JOIST SHALL EQUAL 0 EXCEED THE TABULATED II •' .' �. TABLE R301.7 (2020 NYSBLE RESIDENTIAL CODE 12 3 3 4 3. TO AVOID SPLITTINGNUMBER OF NAILS , OUIMORE THAN 2 TOENAILS SHALL BE INSTALLED IN EACH SIDE • SCAT-Es N•T•S ALLOWABLE DEFLECTION OF STRUCTURAL MEMBERS • 7:12 15 2 3 4 5 OF A RAFTER OR CEILING JOIST WHEN FASTENED TO A 2x4 TOP PLATE OR 3 TOENAILS I ALLOWABLE 3 4 6 • °• '• . A • ' 2 DEFLECTION 3 5 8 4. WHERE TOP PLATE-TO-RIDGE HEIGHTS EXCEED 10', THEY SHALL SE ADJUSTED AS • � � STRUCTURAL MEMBERS 24 IN EACH SIDE WHEN FASTENED TO A 2xS TOP PLATE • S I M P S O N S I M P S O N RAFTERS HAVING SLOPES GREATER THAN 3/12 WITH 12 3 3 3 FOLLOWS: L/1II0 S I M P S O N O N G FINISHED CEILING NOT ATTACHED TO RAFTERS 9:12 16 3 3 4 WALL HEIGHT (FT) II' 10, .. . 19.2 3 4 5 TIE BP TIE BP TRONG-TIE TRONG-TIE RR °"a a s• INTERIOR WALLS & PARTITIONS H/180 24 3 4 6 TOP HJpATF 7 IDGE ADJUSTMENT FACTOR SCALE: N.T.S SCALE: N.T.S LUs28 SCALE: N.T.S FLOORS L/360 12.12T112 3 3 3 t 1 1.00 1.00 TYPICAL IN ALLATICN U11Ti-i ,c�T EACH RAFTER CEILINGS WITH BRITTLE FINISHES L/360 5 2 3 3 4 20' 1.40 1.50 MUDSILL ANCHOR Br'LT SCALE: N.T.S 24 3 3 b FIGURE 3.2f CEILINGS WITH FLEXIBLE FINISHES L/240 LSTAIS WFCM TABLE 3.10 (WOOD F2ooi H°cH��INOTIoolTiMor�UAL) 11N. , e �"11N• ALL OTHER STRUCTURAL MEMBERS L/240 1. HEEL JOINT CONNECTIONS ARE NOT REQUIRED WHEN THE RIDGE C 16 PANEL ATTACHMENT 2 �S 2 -S oo �F 8Yp ��gA $$ ING WALL, HEADER OR RIDGE BEAM DESIGN 700-Yft.ROOF SHEATHING 2HMENT..REQUIREMFNTS EPR WIND WADS FXQO,5uRF' R WIND SPEED NAIL SPACING INTERMEDIATE SHEATHING EDGE 6 BCTTCM PLATE EXTERIOR WALLS WIND LOADS WITH PLASTER OR STUCCO FINISH H/360 2, Fi l ' RMEDP7 SUA OF THE RAFTER IS PROVIDED BY VERTICAL 3 SECOND GUST WIND SPEED MPH 115 120 130 MT.r16 FRAMING 12 C.C. STRUTS OR PURLINS TO A LOADBEARING WALL, THE TABULATED (SINGLE RCUJ DGUBLE RCU1 CF FASTENERS) EXTERIOR WALLS- WIND LOADS WITH OTHER BRITTLE FINISHES L/240 HEEL JOINT CONNECTION REQUIREMENTS SHALL BE PERMITTED STRUCTURAL SHEATHING d ° ° ° ° ° ° ° • EXTERIOR WALLS- WIND LOADS WITH FLEXIBLE FINISHES L/120 EETO BE REDUCED NPROPORTIONALLY 70 THE REDUCTION IN SPAN. 3• TO CEILING JO�ST ELAPOSPLICES REQUIRED FOR CEILING JOIST E F E F E F t r I LINTLES SUPPORTING MASONRY VENEER WALLS L/500 Tq® �,a,T�� �{EE pIT � REU�RE��y�g SHEATHING LOCATION' RA E /TRUSS AXIMUU NAIIL gg,pACING F0 II C M 4. THEUADDITIONAELWjI41& S� NNEC7FEILINGQASSEMBLY DO NOT INCLUDE SPACI G INCHES O.0 0 l OD 80X NAILS INCO�ES,O.0 ° •' I ' R602.36 WFCM TABLE 3.1 (WOOD FRAME CONSTRUCTION MANUAL) 2018 HIGH WIND EDITION 5. H8I ' l` Sj �TTF�ICEL10 { r` AE 'ISSL S C JQJSTS 12 6 12 6 12 6 12 6 1STRUCTURAL MEMBERS HALING SCHEDUNO. OFLCOMMON NAILS ND. OF BOX NAILS NAIL SPACINGI�� S � O G FA OR �Gt YON 01.49 19.2 6 12 6 12 6 12 6 12 HEEL JOINT CONNECTION A(ION INTERIOR ZONE ° 1 4 6 12 6 12 6 12 6 12 ROOF FRAMING 4HERROOF IGHT _ _ 12 6 12 6 12 6 12 6 12 RIDrJCJP '• ' ° I I RAFTER TO TOP PLATE (TOE-NAILED) (SEE TABLE 3.4A) (SEE TABLE 3.4A) PER RAFTER D.42 16 5 12 6 12 6 12 8 12 1/2 2.00 19.2 6 12 6 12 6 12 6 12 I I CEILING JOIST TO TOP PLATE (TOE-NAILED) (SEE TABLE 3.4A) (SEE TABLE 3.4A) PER JOIST 4 6 12 6 12 6 12 6 12 ° ' I 3/ ' STRUCTURAL 1/3 1.50 CJCJP �� e 8 CEILING JOIST TO PARALLEL RAFTER (TOE-NAILED) (SEE TABLE 3.SA) (SEE TABLE 3.9A) EACH LAP 1 12 6 12 S 12 6 12 6 12 SHEATHING /4 1.33 0.49 16 6 12 5 12 6 12 5 - 12 BOTH SIDES CEILING JOIST LAPS OVER PARTITION (FACE-NAILE (SEE TABLE 3.9A) (SEE TABLE 3.9A) EACH LAP 1/5 1.25 �DEEMETER 19.2 6 12 6 12 6 12 6 6 Z 1 1 COLLAR TIE TO RAFTER FACE-NAILED E ZONE 24 6 12 6 6 6 6 6 6 SSP ( ) (SEE TABLE 3.SA) (SEE TABLE 3.SA) PER TIE I I I 1/6 1.20 12 S 12 6 12 6 12 S 6 • BLOCKING TO RAFTER TOE-NAILED 2-8d 2-10d EACH END 1/10 1.11 O.42 16 5 12 6 12 6 6 6 6 H O L C�- OWN .I (� RIM BOARD TO RAFTER END-NAILED 2-16d 3-16d EACH END 5 6 6 6 6 6 S 6 AL.TfE`IRNATDE/'1DIESIGN ° ° ° ° 24 6 6 6 6 6 6 4 4 WALL FRAMING WFCM TABLE 3.6 cAB DwA O1.49 6 6 6 6 6 6 6 6 SPACING I I 2015 HIGH WIND EDITION T A RP'tO • t 1 RIDGE CONNECTION R Ulft M NTS FOR WIND V G Oi'42 - S 6 S 6 S S 4 4 SCALE: N.T.S TOP PLATE TO TOP PLACE FACE-NAILED 2-16d 2-16d PER FOOT _.° ConsLult with � I ' � ' ( ) �EXP � � g p _____________________�1 TOP PLATES AT INTERSECTIONS FACE-NAILED 4-16d 5-16d JOISTS - EACH SIDE DEAD LOAD ASS M TIO UR F ASSEMBLY D = sf STA12 deis net prior to Z -=-Z-- °-------------- BOARD SHEATHING 51�14 (C iro simil<�r) driellibga�hrough STUD TO STUD FACE-NAILED 2-16d 2-1Sd 24"O.C. 3 SECONDWGUSi5PEMEPDI SHEATHING SIZE RAFTER TRUSS MINIMUM NUMBER OF ad COMMON Simi! r° ( ) 115 Ep12C0 C�y130 140 SPACIN INCHES NAILS PER SUPPORT ReqNo uire HTTI w/l P cn e PANEL EDGE HEADER TO HEADER (FACE-NAILED 16d 16d 5"O.C. ALONG EDGES ROOF PITCH ROOF )PAN REOCa IINECTIONP�PLF)' •'F4RIDGE xS OR lx3 SHEATHING HEATHIMI 12-19.2 3 3 3 3 g HTT2 similar) W SINGLE ROW OF FASTENERS TOP OR BOTTOM PLATE TO STUD (END-NAILED) (SEE TABLE 3.5A) (SEE TABLE 3.5A) PER STUD Q BOTTOM PLATE TO FLOOR JOIST, BANDJOIST, 1.2 1,2 12 1 1 1 S 16S EE. NAIL g AS IN Al ppqqyy L GS I e ENDJOIST OR BLOCKING FACE-NAILED 2-16d 2-16d PER FOOT is 121 141 162 226 F. NAIL S AIN AINTE M IA U PORTS IN THE PANEL FIELD ((IN)) t FOR ROOF SHEATHING WITHIN 4 FEET OF THE PERIMETER EDGE OF THE RODF INCLUDING MT81� -1 • • 20 152 176 227 2II2 4 FEET ON EACH SIDE OF THE ROOF PEAK THE 4 FOOT PERIMETER EDGE ZONE (LTS, HTS q e 1 CC POUND 3 CCC PCU�t�D 3:12 24 182 211 272 339 ATTACHMENT REQUIREMENTS SHALL BE USED. FLOOR FRAMING 28 212 245 318 395 n7". similar � CAPACITY N4PACITY 32 243 2II1 363 452 2FOR WIND D SPEE TWO GREA7ERIONALNJ130 MPH, BLOCKING 1 REQUIRED WHICH TRANSFERS HCs DCUJNS HCLDCWN5 JOIST TO SILL, TOP PLATE OR GIRDER TOE-NAILE 4-8d 4-10d PER JOIST \ (X Fail e • 3/8, BRIDGING TO JOIST TOE-NAILED 2-8d 2-10d EACH END 1 11 139 Nails W ST CTURAL BLOCKING TO JOIST TOE-NAILED 2-8d 2-10d EACH END is 102 118 150 186 �Ottom •SHEUATHING y 20 128 147 188 232 WOOD F A� TR TI¢� ANUAL ace Nails II 0 I BLOCKING TO SILL OR TOP PLATE (TOE-NAILED) 3-1Sd 4-16d EACH BLOCK 4;12 24 153 176 22S 279 WFCM TABLE 3.'11 ( A Wj��j 61 ) FBI�o ° • ° BCTI-1 SIDES LEDGER STRIP TO BEAM (FACE-NAILED) 3-15d 4-16d EACH JOIST 28 179 206 263 325 WALL SHEATHING & CLADDING ATTACHMENT RE E FORINI TLOADS-EXPOSURE 8 JOIST ON LEDGER TO BEAM (TOE-NAILED 3-8d 3-10d PER JOIST 16 32 230 264 301 372 THREE SECOND GUST WIND SPEED(MPH) V/ I BAND JOIST TO JOIST END-NAILED 3-16d 4-15d PER JOIST 12 60 69 88 109 700-YR. WIND SPEED 3-'SECOND GUST (MPH) 110 120 130 °;.140 / BAND JOIST TO SILL OR TOP PLATE TOE-NAILED 2-1Sdt 3-16d PER FOOT 16 80 92 118 145 STRUCTURAL SHEATHING ' BP 5:12 24 1119 138 177 2119 E F E F E F E F 0 o e BP5 P$72C 2 N CR N CR ROOF SHEATHING 28 139 161 206 255 t AXIMUM NAIL PACING 0 Rd OM WOOD STRUCTURAL PANELS 8d 10d (SEE TABLE 3.8) 32 159 184 236 2992 SHEATHING LOCATION C Q haPdLuS�n �af�it, 1PS218, PS41 � l B LT B LT INCHES,O.0 OR 10d OX NAIL IN HEC,O.0 throu h bearl"? arin 'Of HST2, HSTS Y m [' 36 179 207 265 328 12 6 12 6 12 6 12 5 12 g 'X SPACING DIAGONAL BOARD SHEATHING the ate, a laf ggar 12 55 63 81 99 B'1 mustb�e u,S :`o similar) 1"x6" OR 1"x8" 2-8d 2-10d PER SUPPORT 1S 74 85 108 133 INTERIOR ZONE 16 S 12 S 12 S 12 •*S 12 n Gom nation 4- % 1"x10" OR WIDER 3-IId 3-10d PER SUPPORT 20 92 106 135 165 24 6 12 6 12 6 12 S 12 with a 5P5/0 NAIL SPACING a TGP BOTTOM °SPACING 6:12 24 111 127 152 199 12 6 12 6 12 6 12 s 12 CF PANEL PER TABLE 3.4.5 PANEL EDGEJ DOUBLE ROW OF FASTENERS 32 148 169 15 232 PERIMETER EDGE ZONE 16 6 12 6 12 6 12 �+ CEILING SHEATHING 32 148 169 215 2S5 24 6 12 S 12 6 12 6 12 SINGLE-STY. ALTERNATE LOWER OF TWO-STY., GYPSUM WALLBOARD 5d COOLERS 5d COOLERS 7" EDGE 10" FIELD HOLD-DOWNS BEAMS HURRICANE ANCHC'RS (6 EACH STUD, MIN. 16'C.C) BRACE WALL METHOD ALTERNATE is 73 82 102 125 SHEATHING SIZE RAFT R_/TRUSS MINIMUM jJAII$SPACING FPO Bd COMMON MANUFACTURED BY I WALL SHEATHING 20 92 103 127 156 SPACING I CHES O.0 0 t d OX NAILS PE SUPPORT SCALE: N.T.S „ n BRACE WALL METHOD 7:12 - 12:12 24 110 123 153 187 1x6 OR 1x8 SHEATHING 12-24 2 2 2 2 SIMPSCN STRCN T CCNN CT.,�}�S M.DEL No. H2 5A W000 STRUCTURAL PANELS 8d 10d (SEE TABLE 3.11) 2II 129 144 17II 21II (ALTERNATE GCNNECTC% CRC � V D OVALL N AT EVER Y R) RA TCA CCN1�1C ION BOTH SIDES U1HE WALL STUD STRUCTURAL FIBERBOARD PANELS 32 147 164 204 250 x10 OR LARGER SHEATHING12-24 3 3 3 3 SIMPSCN STRONG-TIE CCNNECTCR RAFT RS D NCT ALIGN UJITuu STUDS 1/2 11 GA. GALV. ROOFING NAIL - 3" EDGE/ 6" FIELD 36 155 185 229 281 E NAIL gpACING Aff pDL � ,S�I g 1' a BCsTTCsM PLATE F. NAIL SPACING All PN PN I It U PORTS IN THE PANEL FIELD (IN) MDL. HIZ TC BE USED IUHEN 4- Sd NAIL END CF 1/4 x2C GA STRA 0.120"x1 1 2"LONGx7 16"HEAD 1.TABULATED CONNECTION REQUIREMENTS SHALL BE PERMITTED TO BE MULTIPLIED RAFTER ALIGNS WITH STUD ANCHOR B✓LT 25/32" 11 GA. GALV. ROOFING NAIL - 3" EDGE/ 6" FIELD BY 0.70 FOR FRAMING NOT LOCATED W IN 8 FT. OF BUILDING CORNERS. 1-FOR WALL SHEATHING WITHIN 4 FEET OF THE CORNERS, THE 4 FOOT EDGE ZONE • 0.120"x1 3 4"LONGx3 8"HEAD 2. TTTABBEURLLAp0TpoED pCONN�EBC�TIIOpN�gREQUIgRpEMEENT A�RREF ASED ON TOTLAA UPLIFT MINUS ATTACHMENT REQUIREMENITS SHALL BE USED. LBP AT 4'-0' C.0 GYPSUM WALLBOARD 5d COOLERS 5d COOLERS 7" EDGE/ 10" FIELD 3. TASULAA7ED CON0 10PV REHIIREMENTE ARE A56E OONFA 612 F6 RIDGE CONNECTION SPACING FOR DIFFERENT RIDGE CONNECTION SPACING MULTIPLY 2.TASULATED 1 INCH O.C..NAIL SPACING ASSUMES SHEATHING ATTACHED TO STUD FRAMING CCR JOIST HARDBOARD 8d ad (SEE TABLE 3.11) THE TABULATED VALUtS BY THE APPROPRIATE MULTIPLIER BELOW: ' MEMBERS W .0.42�Gz0.•4s. USE A MINIMUN CF TU1C Sd RIMGJ�ISTCUR PARTICLEBOARD PANELS ad ad (SEE MANUFACTURER) RIDGE CONNECTION SPACING (IN.) 12 16 19.2 24 4II 3.FOR EXTERIOR PANEL SIDING, GALVANIZED BOX NAILS SHALL BE PERMITTED TO 8E NAILS THIS SIDE WITH A TOTAL CF FCUR INTC RAFTER INSTALLATICN DIAGONAL BOARD SHEATHING SUBSTITUTED FOR COMMON NAILS. 2 MULTIPLIER 1.00 1.33 1.60 2.00 4.00 1"x6" OR 1"x8" 2-8d 2-10d PER SUPPORT FOR JACK RAFTER UPLIFT CONNECTIONS, USE A ROOF SPAN EQUAL TO TWICE 1"x10" OR WIDER 3-8d 3-10d PER SUPPORT THE JACK RAFTER LENGTH. THE JACK RAFTER LENGTH INCLUDES THE OVEHAN WF TABL „t} (WOOD FRAME HIGH DUCTION MANUAL) RCCF 'o' LENGTH & THE JACK SPAN. RAFTERS ° 00-Yft. WIND SPEED 115 120 130 140 3 SECOND GUFLOOR SHEATHING • • SHEATHING LOCATIMON SUCTION PRESSUREDUAL SLOPE D PSF NAILED WOOD STRUCTURAL PANELS TU1C Sd NAILS ` SILL PLATE ° e PCRTICN 1" OR LESS 8d 10d 6 EDGE/ 12" FIELD ZONE 1 14.7 16.0 18.7 21.7 INTC PLATES \ o ZONE 2 24.6 26.8 31.5 36.5 STEEL ST P LAp PED • GREATER THAN 1" 10d 15d 6 EDGE/ 6" FIELD ZONE 3 37.0 40.3 47.3 54.9 UNDER SILL PLA1 E DIAGONAL BOARD SHEATHING DGUBLE TC'P PLAT ,s EACH STUD, MIN. 16 C.C. . • ZONE 3 OVERHANG 45.0 50.1 58.8 63.2 1"x5" OR 1"x8" 2-8d 2-10d PER SUPPORT :,... 15.9 17.3 20.3 23.6 4- ad NAILS -8 EA. END CF ° e 1"x10" OR WIDER 3-8d 3-10d PER SUPPORT =>:. ® . m ZONE 5 19.6 21.4 25.1 29.1 11/4' x2C' GA STRAP o :.. :;.;;; m 1 THE DIMENSION, A, IS MEASURE AS 10% OF THE MINIMUM BUILDING DIMENSION, BUT >A NOT LESS THAN 3 FEET. .° 1.NAILING ® �a� BE USED �� WHERE RRWALL SHEATHING! NAILING IS REDUCED. FOR EXAMPLE, IF WALL SHEATHING IS NAILED 3 INCHES O.C. ® THE PANEL EDGE TO ® 2 TABULATED FRAMING LOOADS ASSUME A BUILDING LOCATED IN EXPOSURE B WITH A M N 13 1/2' SIOHA�LTaI U IGHE70SAHN AR7ACFIAPAICPEOAD PATH REQUIREMENTS FOR STRUCTURAL MEMBERS SHALL BE DOUBLED, OR ALTERNATE CONNECTORS ® ROOF A EIGHT OF 33 FEET. FOR BUILDINGS LOCATED IN OTHER EXPOSURES THE TABULATED VALUES SHALL STUDS 16"d"•C, o' SEE OTE 2,WHEN WALL SHEATHING IS CONTINUOUS OVER CONNECTED MEMBERS, THE TABULATED NUMBER OF NAILS SHALL BE PERMITTED TO BE REDUCED IN SECTION 2.1.3.1. ALL 8E MULTIPLIED BY THE APPROPIATE ADJUSTMENT FACTOR FON0N5 I TO CONNECTORS DNAIL PER FOOT. PER FOOT. �';� C ILL .92s - -- - - - - - - - - 'A' IS MEASURED EIGHT STUDS NAILS NOTE: ON THE BUILDING AS &RWALLSAL PROJECTION REV. Date Description INTC STUDS .a STUD fiPLATE TIES MANUFACTURED BY SIMPSCN a -!-- J INSTRUCTIONS FOR THE INSTALLER A. A L SPECIFIED FASTENERS UINSTALLED ACCORDING TO THE INSTRUCTIONS IN THE RESIDENTIAL CODE OF NEW YORK STATE 5TRCMG-TIE CCNNECTCRS MCDEL No. RSP4 - 1N, SIMPSON WOOD CONSTRUCTION CATALOG - C-2003 . INCORRECT FASTENER QUALITY, SIZE CR APPRCVED EQUIVALENT AT EVERY STUD o. 2 . M TYPE MA ftIAL, OR FINISH MAY CAUSE THE CONNECION TO FAIL 16D SINKERS ARE R301.1 APPLICATION: TC PLATE CCNNECTICN WHEN RAFTERS DC NCT a. �� TABLE R301.2(1) COMMON NAILS (II GA x 3 1/2 ) AND CANNOT BE REPLACED WITH 16D SINKERS d a _FROM (s GA x3 1/47UNLESS OTHERWISE SPECIFIED. BUILDINGS AND STRUCTURES, AND ALL PARTS OF THEREOF, SHALL BE CONSTRUCTED TO ALIGN WITH STUDS SEE ALTERNATE DESIGN DWG A-"1 a. BORNE& B. BOLT HOLES SHALL BE AT LEAST A MINIMUM OF 1 32" AND NO MORE THAN A MAXIMUM OF SAFELY SUPPORT ALL LOADS, INCLUDING DEAD LOADS, LIVE LOADS, ROOF LOADS, FLOOR NDS, SECTION LOADS, SNOW LOADS, WIND LOADS AND SEISMIC LOADS AS PRESCRIBED BY THIS CODE. THE CLIENT 4- Sd iN'�'I]-S E'4• END Cs 11/4' X2�Ii GA STRAP Ground Snow 0 PSI C. INSTALL ALLESPECIFIED HFAS ENERS BEFORE PL LOADING THE 7CONNECTION. 812 1 ) CONSTRUCTION OF BUILDINGS AND STRUCTURES SHALL RESULT IN A SYSTEM THAT PROVIDES WALL TO RAFTER CONNECTION Load D. USE PROPER SAFETY EQUIPMENT. A COMPLETE LOAD PATH CAPABLE OF TRANSFERRING ALL LOADS FROM THEIR POINT OF SILL PLATE ANCHORAGE w ORIGIN THROUGH THE LOAD RESISTING ELEMENTS TO THE FOUNDATION. ac EACH STUD 1 6 V I O.C. Z E. WELDING GALVANIZED STEEL MAY PRODUCE HARMFUL FUMES; FOLLOW PROPER WELDING TO CONC. FOUNDATION WALL SIMPSON PROCEDURES AND SAFETY PRECAUTIONS. WELDING SHOULD BE IN ACCORDANCE WITH A.W.S R301.2.1.1 WIND DESIGN CRITERIA: DE Speed MPH (d) "140 ult STANDARDS. pD EE E �M9 LL CCTT pD NN,F�UU �� E pE q�pR CONSTRUCTION IN REGIONS WHERE WIND DESIGN IS REQUIRED IN ACCORDANCE WITH FIGURES VARDARO RESIDENCE SCALE: N.T.S STRONG-TIE STH D`I 4 w Topographic h(k) ** F. ORE07FiERS�NAILOTs00LS�YAYABEDUSED TO RIfVS7ALL ONNECTOftS, !PROVIDED THE CORRECT ONW OR MORE0 DESIGN THEF OF OLLOWINGI METHODS WIND LOADS SHALL BE IN ACCORDANCE WITH 1 6 SCALE: N.T.S C V) QUANTITY AND TYPE OF NAILS ARE PROPERLY INSTALLED IN THE NAIL HOLES. TOOLS WITH 9 o GULL POND ROAD o Special Wind No NAIL HOLE-LOCATING MECHANISMS SHOULD BE USED. FOLLOW THE MANUFACTURER'S 1) AMERICAN FOREST AND PAPER ASSOCIATION (AF & PA) WOOD FRAME CONSTRUCTION GREENPORT to Region (1) INSTRUCTIONS AND USE THE APPROPRIATE SAFETY EQUIPMENT. MANUAL FOR ONE AND TWO FAMILY DWELLINGS (WFCM) NEWYORK INTRNATIONAL RESIDENTIAL CODE 2015 L11/ NYC PROVISIONS R9o5.2.5 FASTENERS: R311.7 -STAIRWAYS: x z G. OIST SHALL BEAR COMPLETELY ON T}{ECpNNECTOR S�qT qND TH SAP SHALL BE DESIGNED IN ACCORDANCE WITH: s 11944 FASTENERS FOR ASPHALT SHINGLES SHALL BE R311.7.1 -WIDTH: of 9ETWEEN THE JOIST END AND THE HEADER SHALL NOT EXCEED 1/8 PER ASTM 2 ICC STANDARD FOR RESIDENTIAL CONSTRUCTIONIN HIGH-WIND REGIONS (ICC 600). PROPOSED PROJECT SHALL COMPLY WITH THE FOLLOWING: SECTION R609.6: GALVANIZED STEEL, STAINLESS STEEL, ALUMINUM Q Ind-some 1 mile from coast TEST STANDARDS STAIRWAYS SHALL NOT BE LESS THAN 36 INCHES IN CLEAR > Debris Zone (m 3 ASCE MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURE (ASCE 7) TABLE R602.3.(1): R310.2.1 MINIMUM OPENING WIDTH: WIND-BORNE DEBRIS OR COPPER ROOFING NAILS, MIN. 12 GAGE SHANK WIDTH AT ALL POINTS ABOVE THE PERMITTED HANDRAIL HEIGHT � Seismic Design H. TTF�O�RR'V Hy�yOy�}}L-'�D�{{OAWNyWS� ANCHOR BOLT OLT NUTS SHODULG�yBEEry FINGER-TIGHT PLUS 1/U3NOOD 1/2 4) AISI FOR COLD-FORMEN STEEL FRAMMING NAILING FASTENERS SCHEDULE FOR STRUCTURAL MEMBERS SECTION R406 W/ A MIN. 3/II" HEAD ASTMF 1567, OF LENGTH TO AND BELOW THE REQUIRED HEADROOM HEIGHT. HANDRAILS a 9 B IH�IN!{AGE CAR S>10ULD SE TAKEN 70 N07 OVER-TORQUE THE NUT. 5) INTRENATIONAL BUILDING CODE SCHEDULE THE MINIMUM NET CLEAR OPENING WIDTH SHALL BE 20 INCHES. � & PENETRATE THROUGH THE ROOFING MATERIAL & A SHALL NOT PROJECT MORE THAN 4.5 INCHES ON EITHER! Category (f) TABLE R301.2.0 : DA�� MIN. OF 3/4" INTO THE ROOF SHEATHING. WHERE OF THE STAIRWAY; MINIMUM CLEAR WIDTH•OF THE STAIRWAY z r- Weathed, R403.1.6 FOUNDATION ANCHORAGE & D E T�,. LS CLIMATIC & GEOGRAPHIC DESIGN CRITERIA ft310.1.1 OPERATIONAL CONSTRAINTS: SECTION R406.3.2: THE ROOF SHEATHING IS LESS THAN 3 a" THICK, 3 w 9 (a) Severe / AT & BELOW THE HANDRAIL HEIGHT, INCLUDING TREADS & TABLE R301.5: EMERGENCY ESCAPE & RESCUE OPENINGS SHALL BE VAPOR BARRIER THE FASTENERS SHALL PENETRATE THROUGH THE LANDINGS, SHALL NOT BE LESS THAN 31.5 INCHES WHERE w o w0 Frost Lin 3S inch THE WOOD SOLE PLATE AT EXTERIOR WALLS ON MONOHOLCTHIC SLABS AND WOOD SILL PLATE o Depth (b� SHALL BE ANCHORED TO THE FOUNDATION WITH ANCHOR BOLTS SPACED A MAXIMUM OF MINIMUM UNIFORMLY DISTRIBUTED LIVE LOADS OPERATIONAL FROM THE INSIDE OF THE ROOM W/OUT THE USE SHEATHING. FASTENERS SHALL COMPLY W/ ASTM F 1657. A HANDRAIL IS INSTALLED ON ONE SIDE & 27 INCHES a Proj. Arch: TD Chk'd b TPD OF KEYS OR TOOLS. SECTION R408-3: U �0 5'-0' O.0 . A NUT AND WASHER SHALL BE TIGHTENED ON EACH BOLT TO THE PLATE. y' WHERE HANDRAILS ARE PROVIDED ON BOTH SIDES. Termite (c) Moderate to Heavy Date: 11/2'1/24 Drawn by: TG TABLE R905.2.5: CRAWL SPACE AccEss x R502.9: FASTENING: FIRE BLOCKING: SECTION N1101.2.1: R905.2.6 ATTACHMENT: o- a FASTENERS F Winter Desi n 11 de tees WHERE POST OR BEAM OR GIRDER CONSTRUCTION IS USED TO SUPPORT FLOOR FRAMING, ASPHALT ROOF SHINGLES SHALL HAVE A MIN. FASTENERS REQUIRED R311.7.2 -HEADROOM: 4o z Temp. (eJ 9 SECTION R301.1.1: FIRE BLOCKING SHALL BE PROVIDED TO CUT OFF ALL CONCEALED PROFESSIONAL SEAL BY THE MANUFACTURE, BUT NOT LESS THAN 4 FASTENERS PER STRIP THE MINIMUM HEADROOM IN STAIRWAY SHALL BE NOT LESS 0 w POSITIVE CONNECTIONS SHALL BE PROVIDED TO ENSURE AGAINST UPLIFT AND LATERAL DESIGN CRITERIA: CONSTRUCTION DESIGNED IN ACCORDANCE WITH DRAFT OPENINGS (BOTH VERTICAL & HORIZONTAL) & TO FORM SECTION R308-GLAZING: SHINGLE. WHERE ROOF SLOPE EXCEEDS 21 UNITS VERTICAL IN 12 UNITS 8E LESS THAN 6 FT., 8 INCHES MEASURED VERTICALLY (FROM w N Ica Barrier DEISPLACEMENT. Scale: AS NOTED AMERICAN FOREST & PAPER ASSOCIATION (AF&PA) WOOD FRAME AN EFFECTIVE FIRE BARRIER BETWEEN STORIES, & BETWEEN A HORIZONTAL 21:12)SHINGLES SHALL BE INSTALLED AS REQUIRED THE SLOPED LINE ADJOINING THE TREAD NOISING OR FROM THE a Underlaym nt Yes ( R601.2: REQUIREMENTS: CONSTRUCTION MANUAL FOR ONE & TWO FAMILY DWELLINGS (WFCM). TOP STORY & THE ROOF SPACE. REFER TO SECTION R502.8 OF R308.1 -IDENTIFICATION BY THE MANUFACTURE. FLOOR SURFACE OF THE LANDING OR PLATFORM ON THAN PORTIO Ad U Required th) WALL CONSTRUCTION SHALL BE CAPABLE OF SUPPORTING ALL LOADS IMPOSED ACCORDING Project. P* 2 C-21 THE ICC RESIDENTIAL CODE. ..EA. PANEL OF GLAZING INSTALLED IN HAZARDOUS R905.1.1 UNDERLAYMENT APPLICATION: OF THE STAIRWAY. w _ SMOKE DETECTORS: SECTION R301.2 LOCATIONS AS DEFINED IN SECTION R308.4 SHALL BE I- Flood Hazards (g) E - 9 TO SECTION R301 AND OF TRANSMITTING THE RESULTING LOADS TO THE SUPPORTING SMOKE DETECTORS SHALL BE INSTALLED AS PER THE ICC: FOR ROOF SLOPES FROM TWO UNITS VERTICAL a STRUCTURAL ELEMENTS SHEAR WALLS PROVIDED W/ A MANUFACTURER'S OR INSTALLERS R311.7.5 -TREAD & RISERS: - w Sheet NO. RESIDENTIAL CODE SECTION 314. LABEL, DESIGNATING THE TYPE & THICKNESS OF GLASS IN 12 UNITS HORIZ. (2:12) THE MAXIMUM RISER HEIGHT SHALL BE 7 3/4" INCHES N Air Freezing Index S1II R602.6: DRILLING AND NOTCHING - STUDS: y '< \ SECTION 303.1: UP TO FOUR UNITS VERT. IN 12 UNITS HORIZ. ll BEARING: & THE SAFETY GLAZING STANDARDS W/ WHICH IT & THE MINIMUM TREAD DEPTH SHALL BE 10 INCHES. SEE FIGURE R502.6 1 AND R502.6 2 ��` °` -,J/ A. ALL ENDS OF EA. JOIST, BEAM OR GIRDER, FLOOR SYSTEMS & LIGHT, VENTILATION & HEATING COMPLIES, WHICH IS VISIBLE IN THE FINAL INSTALLATION.(4:12), UNDERLAYMENT SHALL BE TWO LAYERS. NOSING NOT LESS THAN 3 4" AND NOT MORE THAN Mean Ann al �fr'F_ / 52.1 degrees `,,.� JOIST FRAMING SHALL COMPLY WITH SECTION R502.6 OF THE SECTION R318.3: THE LABEL SHALL BE ACID ETCHED, SANDBLASTED, R905.1.2 ICE BARRIERS: 1}" SHALL BE PROVIDED. THE WALKING SURFACE OF Tamp' �� R801.2 REQUIREMENTS: (ROOF-CEILING) //� ICC RESIDENTIAL CODE. TERMITE SHIELD CERAMIC-FIRED EMBOSSED MARK, OR SHALL BE OF BE PROVIDED TREADS & LANDINGS OF A STAIRWAY SHALL BE ROOF AND CEILING CONSTRUCTION SHALL BE CAPABLE OF SUPPORTING ALL l,CrV Ve i EGRESS WINDOWS: A TYPE WHICH ONCE APPLIED CANNOT BE REMOVED LOADS IMPOSED ACCORDING TO SECTION R301 AND OF TRANSMITTING THE t` W/ ICE BARRIER MEMBRANE FROM SLOPED NO STEEPER THAN ONE UNIT VERTICAL IN a . SECTION R312-GUARDS: W/OUT BEING DESTROYED. RESULTING LOADS TO THE SUPPORTING STRUCTURAL ELEMENTS. R310.2.1 MINIMUM OPENING AREA EDGE TO 24" PAST INSIDE WALL. 48 UNITS HORIZONTAL. R312.1.1-GUARDS REQUIRED R308.4 - HAZARDOUS LOCATIONS ALL EMERGENCY ESCAPE & RESCUE OPENINGS SHALL HAVE A RAISED FLOOR SURFACES...SHALL HAVE GUARDS NOT R311.7.8.2 -CONTINUITY R311.7.8 -HANDRAILS: R802.11: ROOF TIE DOWN: GLAZING IN WALLS, ENCLOSURES OR FENCES 802.11.1: UPLIFT I A CE MINIMUM NET CLEAR OPENING OF 5.7 SQ.FT. EXCEPTION, GRADE LESS THAN 35 INCHES IN HEIGHT. HOT TUBS, WHIRLPOOLS, SAUNAS, STEAM ROOMS, HANDRAILS SHALL BE CONTINUOUS FQR THE FULL LENGTH OF THE FLIGHT, FROM R311.7.8.1 -HEIGHT: ROOF ASSEMBLIES SHALL HAVE UPLIFT RESISTANCE IN ACCORDANCE WITH SECTIONS FLOOR OPENINGS SHALL HAVE A MINIMUM NET CLEAR OPENING BATHTUBS & SHOWERS. AND INDOOR OR OUT DOOR A POINT DIRECTLY ABOVE THE TOP RISER OF THE FLIGHT TO A POINT DIRECTLY HANDRAILS L OVIDED ON ® LEAST ONE SIDE OF EA. STAIRWAY W/. R802.11.1.1 AND R302.11.1.2. OF 5.0 SO.FT. SECTION R312.1.3: GUARD OPENING LIMITATIONS SWIMMING POOLS WHERE THE BOTTOM EXPOSED ABOVE THE LOWEST RISER OF THE FLIGHT. ENDS SHALL FOUR OR MORE RISERS. HANDRAIL HEIGHT, MEASURED ABOVE STAIR TREAD R310.2.1 MINIMUM OPENING AREA: REQUIRED GUARDS ON OPEN SIDES OF STAIRWAYS, RAISED EDGE OF GLAZING LESS THAN 60 INCHES BE RETURNED OR SHALL TERMINATE IN NEWEL POSTS NOSINGS, SHALL BE NOT LESS THAN 34 INCHES & NOT !MORE THAN 38 INCHES. -�� C".,:: �� '- .• - 7 FLOOR AREAS....SHALL HAVE INTERMEDIATE RAILS...THAT DO MEASURED VERTICALLY ABOVE THE STANDING OR OR SAFETY TERMINALS. HANDRAILS ADJACENT TO A WALL SHALL 'w,' ___.. .; ''' THE MINIMUM NET CLEAR OPENING HEIGHT SHALL BE 24• INCHES. NOT ALLOW PASSAGE OF A SPHERE 6 INCHES OR MORE WALKING SURFACE SHALL BE CONSIDERED TO BE HAVE A SPACE OF NOT LESS THAN 1 1/2 INCHES .,., IN DIAMETER. A HAZARDOUS LOCATION. BETWEEN THE WALL AND THE HANDRAILS.