Loading...
HomeMy WebLinkAbout51674-Z �o'�pf SOUryo`o Town of Southold * * P.O. Box 1179 �d0 53095 Main Rd NT1,' Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 47295 Date: 08/18/2026 THIS CERTIFIES that the building SINGLE FAMILY DWELLING-ALTERATION Location of Property: 1490 Paradise Point Rd Southold, NY 11971 Sec/Block/Lot: 81.-3-20 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 01/10/2025 Pursuant to which Building Permit No. 51674 and dated: 02/24/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Alterations and repairs to an existing accessory shed with decking as applied for. The certificate is issued to: Ajit Kumar , Jennifer Ecclestone Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: PLUMBERS CERTIFICATION: kuthorizWignature ho�%%afSO&j,o�o TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51674 Date: 02/24/2025 Permission is hereby granted to: Ajit Kumar 29 Joralemon St Brooklyn, NY 11201 To: construct alterations and repairs to an existing accessory shed with decking as applied for per DEC& Trustees approvals. Premises Located at: 1490 Paradise Point Rd, Southold, NY 11971 SCTM#81.-3-20 Pursuant to application dated 01/10/2025 and approved by the Building Inspector. To expire on 02/24/2027. Contractors: Required Inspections: Fees: Accessory-Alteration $125.00 CO Accessory $100.00 Total $225.00 -- -------------------------- Building Inspector OF SOUTyo� # TOWN. OF SOUTHOLD BUILDING DEPT. io `ycouma 631-765-1802 . INSPECTION [wr FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. FOUNDATION 2ND [. ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE.-& CHIMNEY j ] -FIRE SAFETY INSPECTION [ ] FIRE.RESISTANT CONSTRUCTION- [ , ]._FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ]. ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ]. RENTAL REMARKS: OIL lA2 c,� d o d DATE INSPECTOR ��� ��OF SOUlyO # TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ INAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [096A REMARKS: 12U5 QL tl b DATE INSPECTOR oF so yOlo # . # TOWN OF SOUTHOLD BUILDING DEPT. ^ou�m,a 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [,,r'FRAMING / STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: k "koviole, eCce55 DATE c�-00 INSPECTOR A M P Arch i t e c t u re Address:70200 Main Road,Unit 3A,Mattituck NY 11952 Phone:(631)603-9092 Design + Build March 18`h,2026 Kumar Residence 1490 Paradise Point Rd Southold,NY 11971 Tax map# 1000-081.00-03.00-020.000 To Whom It May Concern. Based on my inspection at the above address the framing and strapping was completed per the architectural plans and meets NYS Building Code. Please contact our office if you have any questions. Thankyou, Anthony Portillo,RA,LEED AP FLED A C M. o y I 9j1 037405 p� '.` MAR 2 5 2026 ' FOF �A t. NE page 1 of 1 FIELD INSPECTION REPORT DATE COMMENTS ov )40-64Q rT3 FOUNDATION (1ST) it ---------------------------------- FOUNDATION (2ND) ROUGH FRAMING& PLUMBING O INSULATION PER N.Y. STATE ENERGY CODE FINAL ADDITIONAL COMMENTS -r GD re e- -it 9 A 0 z m -- --------- ---------- �4�st}ffRiK�pG �a TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 N �7 Telephone (631) 765-1802 Fax (631) 765-9502 https•//www.southoldtownny.gov Date Received APPLICATION FOR BUILDING PERMIT r: For Office Use Only PERMIT NO. Building Inspector: Applications and forms must be filled out in their entirety.Incomplete applications will not be accepted. Where the Applicant is not the owner;an 6wner's Authorization form.(Page 2)shall be completed. Date:November 23, 2024 OWNER(S)OF PROPERTY: Name:Aiit Kumar _ _ - -._---L_--�-j- -'scTM#Cs000-gl-3_f20 Project Address.I- --- ( '1_Pt(�1-------J(}�/l ---1,�— ---_ _ �_---------_-- Phone#:(631)603-9092 _ Email_ajitkumar@icloud.com Mailing Address: NY 11201 29 Joralemon_Street, Brookly_n CONTACT PERSON: Name:Anthony Portillo Mailing Address:PO Box 152, Mattituck, NY 11952 Phone#:631 603 9092 Email:aportillo@amparchitect.com_ _ _-_--_ DESIGN PROFESSIONAL INFORMATION: Name:Anthony Portillo Mailing Address:PO Box 152, Mattituck, N.Y. 11952 Phone#:631 603 9092 Email:aportillo@amparchitect.com CONTRACTOR INFORMATION: Name: Mailing Address: Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION []New Structure ❑Addition ❑Alteration ®Repair ❑Demolition Estimated Cost of Project: ❑Other $so,000 Will the lot be re-graded? ❑Yes El No Will excess fill be removed from premises? ❑Yes lR No 1 PROPERTY INFORMATION Existing use of property: Residential _ Intended use of property: Residential Zone or use district in which,premises is situated: Are there any covenants and restrictions with respect to R-80 NC this property? ❑Yes ®No IF YES,PROVIDE A COPY. ®Check Box After Reading: ,The owner/contractor/design peofessional is'respon4lble foraitdrainage and storm water issues as provided by Chapter 236 of the Town Code.APPLICATION IS HEREBY MADE to the Building Department for the.issuance of a Building Permit pursuant to the Building Zone Ordinance,of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings,- additions;alterations or for removal or demolition as herein described.The applicant agreesto comply.with;all applicable laws,ordinances,building code, housing code and regulations and to admitauthorized inspectors on premises and In building(s)for necessary Inspections.False statements made herein are punishable as a.Class A misdemeanor pursuant to Section U0.45 of the New York State Penal Law. Application Submitted By(print name):AM P chitecture ®Ruth riaed Agent ❑Owner Signature of Applicant: _ Date: I G 25 STATE OF NEcW-Y`ORRK) COUNTY OF oK ) Q---D being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Agent (Contractor,Agent,Corporate Officer,etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me n -thi /� ,"1 day of 20Qf) Cary Public PROPERTY OWNER AUTHORIZATION DARCEEAUTE OF N ER NOTARY PUBLIC,STAA TE OF NEW YO RK (Where the applicant is not the owner) Registration No. 01A0001964 Qualified in Suffolk County Commission Ex Tres January 9,2C 28 I Ajit Kumar residing at 1490 Paradise oint Road, Southold, NY do hereby authorize AMP ARCHITECTURE to apply on my behalf to the Town of Southold Building Department for approval as described herein. Aby21 2-0 IV Owner's Signature Date ALT I'T &" Print Owner's Name 2 L4° YI 1•••°r, _ �'�'i 4°�4f4. 'G. `1 Y�1°YIiVi&44R�/ � gV IY '� I/D a f (>- y.,l J A°OP BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK PERMIT NO. 10695 DATE: SEPTEMBER 18,2024 �. a ! A ISSUED TO: AJIT KUMAR& JENNIFER ECCLESTONE +rf�, e$�IY ' PROPERTY ADDRESS: 1490 PARADISE POINT ROAD, SOUTHOLD 1I SCTM# 1000-81-3-20 AUTHORIZATION,-. 3 Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in 3 l,sue 1` accordance with the Resolution of the Board of Trustees adopted at the meeting held on December 18,2024, C at. i4 and in consideration of application fee in the sum of$1 250.00 paid by AJIT KUMAR&JENNIFER ECCLESTONE and subject to the Terms and Conditions as stated in the Resolution,the Southold Town Board V of Trustees authorizes and permits the following: Fo. 9 Wetland Permit for the existing two-story dwelling with entry stoops; to restore the existing dry-storage +ri✓ shed with roof deck,dry-storage shed decking,steps with landings,and retaining wall landward of dry- y storage shed by replacing all footings under all structures with new,replace northerly wood walk to dry- storage storage shed deck,replace southerly top landing with steps down to dry-storage shed deck, replace dry- storage storage shed deck and steps down to a concrete slab at bottom of bank; repair roof of deck above dry- - � storage shed with new roof membrane; replace all railings with new; remove and replace in-place . retaining wall landward of dry-storage shed; replace siding on dry-storage shed; remove outdoor shower11 < c�lyl from dry-storage shed; existing steps to beach off bulkhead to remain; install stepping stones landward 057s ft. area ` of top of bank; install a drywell to contain roof runoff; revegetate an approximately 2, q. throughout the bank face using native species; and to establish and perpetually maintain a 623sq.ft. non- throughout turf buffer along the landward edge of the top of the bank;with the conditions that all decking associated . with the dry-storage shed be thru-flow decking; and no tree removal is permitted; and as depicted on the Iy.Y+Y site plan prepared by AMP Architure, received on December 11,2024,and stamped approved on January 7,2025. ° IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, ) and these presents to be subscribed by a majority of the said Board as of the day and year written above. QUFFQ( LJ POW "rig�, � -✓} �r" '�/ a`traiziitisal@a..'SS; r�;l'�eN�.iS.'dN`lSa�iYE?i''Ht '"3`:'dt2S�.Y.risi� 5ar93'ibei5in'L�Tni7v Yir✓,°pn�Xad"a\Kr 4t 'Y,Sf,ifis4ea+%Zra`tft��ba`)'S?3'Sie."3 f�'.[,�'�vaamv3G358K::�r't"'k•1'�i�.n,5A3S Y°\.e art c'"�'Yfi 7"Y it-,u,.r ,WYM`,i<i J\ � I t r%r � 0 ✓ o• �Ad 1dIR i��bl IYO�y�.. , t�Piff P(rYlal'a'_� °r0r>�.: re14� r�i - 4 e�2 3 164°Y $�9°{ aaleYr... .; r\ •;.fP i14o Y k Li :�r. .,;•;,, ,r -s E. 1 + J I �- 1c_.l Glenn Goldsmith,President t®F S®!/�� Town Hall Annex Nicholas Krupski,Vice President ®� ®�0 P.O. Route 25 P.O. Box 1179 Eric Sepenoski J Southold, New York 11971 Liz Gillooly G Q Telephone (631) 765-1892 JRsepfinora • a® Fax (631) 765 6641 AUG 1 7 2026 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Building Department Town of Southold CERTIFICATE OF COMPLIANCE #2408C Date: August 11, 2026 THIS CERTIFIES that the existing two-story dwelling with entry stoops; restoration of the dry- storage shed with roof deck dry-storage shed decking steps with landings and retaining wall landward of dry-storage shed by replacing all footings under all structures with new, replacement of northerly wood walk to dry-storage shed deck replacement of southerly top landing with steps down to dry-storage eg_shed deck replacement of dry storage shed deck and steps down to a concrete slab at bottom of bank;repair roof of deck above dry-storage shed with new roof membrane; replacement of all railings; removal and replacement in-place retaining wall landward of dry-storage shed; replacement of siding on dry-storage shed;removal of outdoor shower from dry-storage shed; existing steps to beach off bulkhead to remain; installation of stepping stones landward of top of bank; installation of a drywell to contain roof runoff; revegetation of an approximately 2 057sq.ft. area throughout the bank face using native species, At 1490 Paradise Point Road, Southold Suffolk County Tax Map#1000-81-3-20 Conforms to the application for a Trustees Permit heretofore filed in this office Dated June 28, 2024 pursuant to which Trustees Wetland Permit#10695 Dated September 18,2024,was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the existing two-story dwelling with entry stoops; restoration of the dry-storage shed with roof deck dry-storage shed decking steps with landings, and retaining wall landward of dr serge shed by replacing all footings under all structures with new, replacement of northerly wood walk to dry storage shed deck replacement of southerly top landing with steps down to dry-storage shed deck replacement of dry-storage shed deck and steps down to a concrete slab at bottom of bank; repair roof of deck above dry storage shed with new roof membrane; replacement of all railings; removal and replacement in-place retaining wall landward of dry-storage shed; replacement of siding on dry-storage shed; removal of outdoor shower from dry-storage shed; existing steps to beach off bulkhead to remain-, installation of stepping stones landward of top of bank; installation of a drywell to contain roof runoff, revegetation of an approximately 2 057sq ft area throughout the bank face using native species. The certificate is issued to ART KUMAR&JENNIFER ECCLESTONE owners of the aforesaid property. Authorized Signature a NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-04657 PERMIT Under the Environmental Conservation Law ECL Permittee and Facility Information Permit Issued To: Facility: ART KUMAR KUMAR PROPERTY 29 JORALEMON ST 1490 PARADISE POINT RDISetm 1000-81-3-20 BROOKLYN,NY 11201 Southold,NY 11971 Facility Application Contact: AMP ARCHITECTURE, PLLC PO Box 152 MATTITUCK,NY 11952 (631)603-9092 Facility Location: in SOUTHOLD in SUFFOLK COUNTY Facility Principal Reference Point: NYTM-E: 719.417 NYTM-N: 4546.591 Latitude: 41°02'27.6" Longitude: 72°23'22.4" Project Location: Water- Shelter Island Sound Authorized Activity: Restore cabana, replace retaining wall,install steps. All work shall be done in accordance with plans produced by Anthony M. Portillo of AMP Architecture, sheets WTL-01 - WTL- 03, dated 8/15/2024 and stamped'NYSDEC Approved'on 9/27/2024. HWL Permit Authorizations Tidal Wetlands- Under Article 25 Permit ID 1-4738-04657/00002 New Permit Effective Date: 9/27/2024 Expiration Date: 9/26/2029 NYSDEC Approval By acceptance of this permit,the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations,and all conditions included as part of this permit. Permit Administrator:SHERRI L AICHER,Regional Permit Administrator Address: NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd Stony Brook,NY 11790-3409 Authorized Signature: Date r1l A7/-2&a Page 1 of 7 AM NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-04657 Distribution List AMP ARCHITECTURE, PLLC Bureau of Marine Habitat Protection Heather Leonard File F— Permit Components NATURAL RESOURCE PERMIT CONDITIONS GENERAL CONDITIONS,APPLY TO ALL AUTHORIZED PERMITS NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS NATURAL RESOURCE PERMIT CONDITIONS -Apply to the Following Permits: TIDAL WETLANDS 1. Post Permit Sign The permit sign enclosed with this permit shall be posted in a conspicuous location on the worksite and adequately protected from the weather. 2. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or applicant's agent as part of the permit application. Such approved plans were prepared by Anthony M. Portillo of AMP Architecture, sheets WTL-01 - WTL-03,dated 8/15/2024 and stamped'NYSDEC Approved' on 9/27/2024. 3. Notice of Commencement At least 48 hours prior to commencement of the project,the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project,the bottom portion of the form must also be signed and returned, along with photographs of the completed work. 4. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids,sediments,fuels,solvents, lubricants,epoxy coatings,paints,concrete,leachate or any other environmentally deleterious materials associated with the project. 5. Maintain Erosion Controls All erosion control devices shall be maintained in good and functional condition until the project has been completed and the area has been stabilized. 6. No Construction Debris in Wetland or Adjacent Area Any debris or excess material from construction of this project shall be completely removed from the adjacent area(upland)and removed to an approved upland area for disposal. No debris is permitted in wetlands and/or protected buffer areas. Page 2 of 7. NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-04657 7. Materials Disposed at Upland Site Any demolition debris, excess construction materials, and/or excess excavated materials shall be immediately and completely disposed of in an authorized solid waste management facility. These materials shall be suitably stabilized as not to re-enter any water body, wetland or wetland adjacent area. 8. Storage of Equipment, Materials The storage of construction equipment and materials shall be confined within the project work area and/or upland areas greater than 100 linear feet from the tidal wetland boundary. 9. Equipment,Material Stored Away from Crest of Bluff The storage of construction equipment and materials shall be confined to upland areas landward of the crest of the bluff or hill. 10. Install, Maintain Erosion Controls Necessary erosion control measures, i.e., straw bales, silt fencing, etc.,are to be placed on the downslope edge of any disturbed area. This sediment barrier is to be put in place before any disturbance of the ground occurs and is to be maintained in good and functional condition until thick vegetative cover is established. 11. Contain Exposed, Stockpiled Soils All disturbed areas where soil will be temporarily exposed or stockpiled for longer than 48 hours shall be contained by a continuous line of staked haybales/silt curtains (or other NYSDEC approved devices)placed on the seaward side between the fill and the wetland or protected buffer area. Tarps are authorized to supplement these approved methods. 12. Stairway Design The stairs and landings shall be a maximum of 4 feet in width and constructed a minimum of 4 feet above grade over the dune/bluff face. 13. No Disturbance to Vegetated Tidal Wetlands There shall be no disturbance to vegetated tidal wetlands or protected buffer areas as a result of the permitted activities. 14. Incidental Disturbance to Vegetation It is the responsibility of the applicant to remedy any incidental disturbances resulting in damage or removal of wetland vegetation. Upon completion of construction activities,any disturbed areas shall be planted with the appropriate marsh vegetation. Please contact the Bureau of Marine Habitat at(631)444-0295 for more information. 15. Seeding Disturbed Areas All areas of soil disturbance resulting from the approved project shall be stabilized with appropriate vegetation(grasses, etc.)immediately following project completion or prior to permit expiration,whichever comes first. If the project site remains inactive for more than 48 hours or planting is impractical due to the season,then the area shall be stabilized with straw or hay mulch or jute matting until weather conditions favor germination. 16. Vegetate All Disturbed Areas The permittee shall revegetate all exposed faces and disturbed areas to prevent soil erosion prior to the project completion or expiration date of this permit,whichever comes first. Page 3 of 7 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC 1D 1-4738-04657 17. Long-term Plant Survival The bluff face shall be planted with native plantings and the permittee shall ensure a minimum of 85%survival of plantings by the end of five growing seasons. If this goal is not met, the permit holder shall re-evaluate the restoration project in order to determine how to meet the mitigation goal and submit plans to be approved by the office of Marine Habitat Protection NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd Stony Brook,NY11790 -3409 18. Concrete Leachate During construction,no wet or fresh concrete or leachate shall be allowed to escape into any wetlands or waters of New York State,nor shall washings from ready-mixed concrete trucks,mixers, or other devices be allowed to enter any wetland or waters. Only watertight or waterproof forms shall be used. Wet concrete shall not be poured to displace water within the forms. 19. No Unauthorized Fill No fill or backfill is authorized by this permit without further written approval from the department(permit,modification,amendment). 20. Wood Preservatives a. Pressure treated wood used for construction of in-water structures must have undergone a treatment process approved(stamped or otherwise marked as certified)by the American Wood Preservative Association. b. Wood treated with Pentachlorophenol (PCP)must not be used in marine or brackish waters. Wood treated with PCP must be aged in the open air for at least three months prior to in-water use. c. The use of creosote treated wood is prohibited both in the water and upland areas. d. Chromated Copper Arsenate (CCA)pressure treated wood must be clean and free of CCA surface deposits. Wood with surface deposits must be washed for at least 5 minutes under running water prior to use.The washing must occur greater than 100 feet landward of any regulated wetland and/or water body. (Note "E." below for handling wash water.) e. Any wood debris such as sawdust or wash water must not enter any water body, including wetlands or protected buffer areas. 21. No Runoff down Bluff or onto Beach There shall be no discharge of runoff or other effluent on, in or down the bluff face or onto the beach. 22. State May Require Site Restoration If upon the expiration or revocation of this permit,the project hereby authorized has not been completed,the applicant shall, without expense to the State, and to such extent and in such time,and manner as the Department of Environmental Conservation may lawfully require, remove all or any portion of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. Page 4 of 7 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-04657 23. State May Order Removal or Alteration of Work If future operations by the State of New York require an alteration in the position of the structure or work herein authorized, or if,in the opinion of the Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health,safety or welfare of the people of the State, or cause loss or destruction of the natural resources of the State,the owner may be ordered by the Department to remove or alter the structural work,obstructions, or hazards caused thereby without expense to the State, and if,upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed,the owners, shall, without expense to the State,and to such extent and in such time and manner as the Department of Environmental Conservation may require,remove all or any portion of the uncompleted structure or fill and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall be made against the State of New York on account of any such removal or alteration. 24. State Not Liable for Damage The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. GENERAL CONDITIONS - Apply to ALL Authorized Permits: 1. Facility Inspection by The Department The permitted site or facility, including relevant records,is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation(the Department)to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71-0301 and SAPA 401(3). The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department. A copy of this permit, including all referenced maps,drawings and special conditions,must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit. 2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms,conditions or requirements contained in such order or determination. Page 5 of 7 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-04657 3. Applications For Permit Renewals,Modifications or Transfers The permittee must submit a separate written application to the Department for permit renewal, modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires. Any renewal,modification or transfer granted by the Department must be in writing. Submission of applications for permit renewal,modification or transfer are to be submitted to: Regional Permit Administrator NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd Stony Brook,NY11790 -3409 4. Submission of Renewal Application The permittee must submit a renewal application at least 30 days before permit expiration for the following permit authorizations:Tidal Wetlands. 5. Permit Modifications, Suspensions and Revocations by the Department The Department reserves the right to exercise all available authority to modify, suspend or revoke this permit. The grounds for modification, suspension or revocation include; a. materially false or inaccurate statements in the permit application or supporting papers; b. failure by the permittee to comply with any terms or conditions of the permit; c. exceeding the scope of the project as described in the permit application; d. newly discovered material information or a material change in environmental conditions,relevant technology or applicable law or regulations since the issuance of the existing permit; e. noncompliance with previously issued permit conditions, orders of the commissioner, any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity. 6. Permit Transfer Permits are transferrable unless specifically prohibited by statute,regulation or another permit condition. Applications for permit transfer should be submitted prior to actual transfer of ownership. Page 6 of 7 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC 1D 1-4738-04657 NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee, excepting state or federal agencies, expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York,its representatives,employees, and agents("DEC")for all claims, suits, actions, and damages,to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities in connection with, or operation and maintenance of,the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item 13: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors,employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee. Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits,approvals,lands,easements and rights-of- way that may be required to carry out the activities that are authorized by this permit. Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights,title,or interest in real or personal property held or vested in a person not a party to the permit. Page 7 of 7 CT N1 08'16'40"W 7IT L"Jis g QL IP I'A K.4 t7 -55 qr' 11�i�l 01 Tr RT, OF NEI,, Co. 01 KENNETH \1 WO)THU11 Ll\D `11jPN*Ey1-N PLLC La d S.—Ying and • P.O. 13- 1-53 Aqn,-I-g—, "Irk 11031 P110INE(001296-1586 Fx\(631) o--: 21�2- j.,o, hOR°16'40"k' gg r�fy/e �y�.l 3 + 4 y 'v T F� } 1 U V U -. S A+_/ a i j L _ a-. ._ $�./ i i..q r� \ "W ID \ \ \ / 36j Kj �c 613 SO,` \ �r p„. i FS 3 5.. J. J• a4W oP f O hE'`•NE1'H M M'01'Clitih L1ND SURVEYING, PLLC tis Jp Professional Land f3.,e1ing and Design P.O. Dos 13 Ay-bog—, Nrw York 11331 eeons Iasi l2'.+a-Isao FAX lash M-I:Sas 3'x 2'-6"x 12" Concrete Sla to Grade / BOTTOM OF BANK - - Foundation Notes: z P z The contractor is to verify all measurements in the field and any } - _ RAILIii R EMFYT w discrepancies are to be brought to the Engineer prior to W W construction. cc c — — a 1 -All concrete 4,000 psi after 28 days minimum. 0 3.5 x 16 i a - - 0 Paralam Plus PSL _ _ 2-All rebar ASTM A-615 Grade 60. co v3-Footings are to be installed on undisturbed virgin soil.The - - CL o bottoms of all footings are to be installed a minimum of 3'below - - cograde unless indicated otherwise. ———— ————— ——————— — — -— W C3 4-Follow cold weather concrete treatment relative to add mixtures (3)2x8 MCQ RAILING PROPOSED 36' T2�-�� in accordance with ACI 212.3R. Use Air-Entraining admixtures r � RAILING REPLACEMENT 9 per ASTM C260,AASHTO M154 or Water Reducing and Set- Replace I Controlling Admixtures per ASTM C494,AASHTO M 194 only. Do Existing Beam 1 I EXISTING not use Calcium Chloride or other corrosive type admixtures. In Place DECK � o 145.2 S.F. 1 � LJL� Z V- LL (3) C LL ' w `�' PROP. EP.D.M. 04 ir MEMIBRANE) SLEEPERS —�I UO �i rn ! o F W/ DECKING ABOVE i X GO _ X CD O J D W X co W X io vi �' Notes: O � N H I I PROPOSED 36' "All measurements are to be verified in the field and I i 3 3 a RAILING REPLACEMENT Y any discrepancies are to be brought to the attention of I. ----- ' I (3) CQ Q the Engineer. -- --- ----- ------- - - W *Concrete used for footings is to be 3,500 psi after J 28 days minimum. — — — — — — — — — GUTTER HIGH GUTTER co 0 0 I ———— POINT, BELOW DOWNSPOUT t-Z ® m W WALLEADER TO DRY WELL pressure treated lumber is to be MCQ No.2 or Ica ( Existing I u o i 3.5 x 16 ----� m i X ST N better Southern Yellow Pine. am-Plus-PSI ----- D WALK o I Q. •All nails, bolts, nuts and washers are to be hot CD Q- I dipped galvanized. W D I I ~ �x X 0 'All bolted connections are to be made with I I wo A-325 bolts. ILL I EXISTING I C3 tJ TOP OF BANK LANDING Y I UO (3)2x8 MC �" 2 OP OF BANK S-1 I ao I cv � ��1—`—J b 2x8 MC � Design Loads: FramingR�t D t it Roofing Renovation Detail. 9 Deck Floor e OvateRoof-Live Load-40 psf Scale:l r1'=1-0' Scale:110=1'-0' -Dead Load-15 psf Deck Floor -Live Load-40 psf -Dead Load-15 psf • ackfill -Wind Loads- 130 mph-ASCE-7 MWFRS-Method 2 3" 3" Design Criteria- :.� =- 12„ *2020 NYS Residential Code R301.1.1 and utilized the -' "' methods and procedures stipulated in Chapter 2 Engineered New 2 x 8 MCQ o. 5 Rebar 12"OC Design and Chapter 3 Prescriptive Design in the 2018 :,. FJ Blistered to Existing �:- impson PC6Z American Forest and Paper Association Wood Frame >. New(3)2 x 8 MCQ - • - - - - - - • - - - '• 6" Construction Manual(2018 WFCM)for One and Two Family Re lacement of Existin • - • • - • - Dwelling Units and ASCE 7• p 9 impson PC6Z . . . . . . . . . . . . . . . . . k..,= . . - . . - . .�. . . . - . -----••--.•-•- . . . . . .----••--•• •.... . •�':? Grade P� OF NE{��y O Grade ;� �:- - �e� �. CO* - - - - - - - - • �o `r o^ '-'-' '-'-'-'-' •�w New(3)2 x 8 MCcY � ✓ - . - -� "- 8' .. impson ABW66Z c� 2• • - - - - > 4" i Plans are prepared by Condon Engineering,P.C. it is a violation of the New Yak State Education 4 �G =, Law,Article 145,Section 7M,for any person unless acting under the direction d a licensed A Simpson ABW66Z •,.: .;. t -;. .:.--. Professional Erg'meer,Architect,a Land surveyor,to att�any item in arty way.ff an item bearing FES S14NA N r. : ?•.. :. = the seal of an Engineer,Architect,or Land Surveyor is altered,the altering Engineer,Architector " := Land Surveyor shall affix to the item h'Mw seal and the notation'Altered by followed by hisltner signature and the date of such alterations,and a specific description of the afteration. 3" 5' ,2"Sonotube Footing Scale: 1/4" = 1'-ot Condon Engineering, P.C. • No. Kumar Deck/Shed Section Detail Drawn b A scale:l/2' -0' Replaced Retaining Wall Section Detail Y JJc 1755 Sigsbee Road 1490 Paradise Road F B Scale:lrr-,-0• Mattftuck, New York 11952 Southhold, New York Date : 12-9-2024 (631)298-1986 M1 . I I I 6x6 Pressure Treated Colum $0 Bolt Simpson ABW66Z 3.5 x 16 Paralam Plus PSL 3.5 x 16 Paralam Plus PSL 3'x 2'-6"x 12" Concrete Sla to Grade NE K,yO c on,'oo�y A, ROFESS�0 Scale: 1/4" = 1'-0' Condon Engineering, P.C. Plans are prepared by Condon Engineering,P.C. It is a violation of the New York State Education Kumar D e c k/S h e d Law,Article 145,Section 7209,for any person unless acting under the direction of licensed Drawn by : JJC 1755 Si sbee Road 1490 Paradise Road Professional Engineer,Architect,or Land Surveyor,to after any item in any way.If an item bearing 9 the seal of an Engineer,Architect,or Land Surveyor is altered,the aft'.erirg Engineer,Anchitect,or Mattituck, New York 11952 South h old New York Land Surveyor shall affix to the item His/her seal and the notation*Altered by followed by hisRrer Date : 12-9-2024 ' signature and the date of such alterations,and a specific description of the alteration. (631) 298-1986 i 51TE PLAN HATCH KEY: FIR PROPOSED '-r 4 DECK RESDTORATI ONAGE SHED 5 H L T F= �. ,. � � i -r ' �` - LAND SOUND I �' n r Lai aPROPOSED WALK d STEPS _ 52-i°I6'12"W \ { c�1T111 REPLACEMENT - ---- ---- ' Lu %1Lu PROPOSED NON-TURF BUFFER TIE LINE ALONG APPARENTLi T' 1 g J O PROPOSED NATIVE HIGH WATER MARK 11/6/195 1 (NON-FERTILIZER DEPENDENT) 2J __ Q - N REVEGETATION I ------------- ----- -- - I- 77 L0 I �BEAGFi^ P�F,. I� : . ��. r '~ a a `►.",� ,a O I PROP. 590 NATIVE REVEGETATION - I f �`' `" , °, s' ;`�,:' ' ::. r,h 4� . . "� ;;� ti '- z I ® BANK m ' (�j ': fjjj m^° T ,-;,.ram . � I ,'�^awl, - .�° w Y r rt 5 r a 1 `. I r• j §1C. „,; a • t� ' , g ,.,' .' 8`�•6� co G I WOOD ✓ I ..; a _�? .; ` G X U CV q }^I ULKHEAD I v ..+ Q O a-+ OOD n PIER LINE ® �'P r ,h ,, ° 4 a .}s, O Eq BULKHEAD ,f ? ON�XL3-6- --------- -- ---_ - T_�a_ -- --- ACCESSORY STRUCTURES „• �' + h� r '" Q FLOOD cc ZONE - - -- �r x`. I - v ' BOUNPRY PROP. RESTORATION OF �; , `' 10 1 - . -- - - FRAME DRY STORAGE ,BOTTOM OF BANK -- -- - _ - SHED 12- - -- - `tY 3 w/ DECK OVER :Ik .� " t `6• �.. , , A, , •:q : / 1 RE AINING HALL PORTION OF SLOPE - -- _ -- T L n , ;•, .'PROF. IN SUBJECT PROPERTY EXCEEDS 2555 - REPLACEMENT �+'? y� t " .d °* ,,. r "'""'r..� j PROPOSED y, 1f; s ,:R.,�„ S .R.. i I w =ti•` 4 8 20 -.-- -- _ - XCm REPLACEMENT ' y i ha TOP OF BANK 22 ` 'I :yl2.l OF WOODh ��, �: I.. 4.. ✓ a` % ` 3\4 WALK 8 STEPS _ ` j PROP. 50,10 BUFFER 1 GONG. O. u� [ {< p p• -cr°,:_ ,t,r . TREE ;, . , COVER r µ ml 19.8 100' FROM HIGH WATER MARK cVl ` STEPPING STONES W/ ern I � " y" "" *" gR•* " yam_ -_ - - - �� .{` i - - 1 C 4090 OPEN SPACE ( "^p�, I a -.,,. � .., ,wt M -�- �'Y •1 fd -y„ 4s kW r !F h'l J 9 ` C.' .•'et"pF k i 3 * N @' `N , .p.,u„ ,,;� r1``° �� *� +�5 F .w p; i' ,err#` � ,I" '-' %� ,. I �kb �� ;';, ,r i`� r � � d.,`,,. • PIER LINE ® ' 1 2 STORY ,o, ��� 3 f* , I P�1 - PRINCIPAL BUILDINGS FRAME Mi�-� rnr+.-I •.",, • '.,wg04 a.-„ }- GONG. HOUSE DAP. 1 , ` m ►<.r " � �1s4 a.4r.� T ' � COVER �P �... .« ' 1.4' 4'.= ,2A. 5.al N � LOCATION MAP • - 10.6 �- Q SCALE: N75 • ets PROF'OSE1D RESTORTI ON OF DRY STOR?�CE r - - ---- --- __ -- - -- --- v100 FROM BULKHEAD • - PROJECT LOCATION -00 I I I (5001 .00 & SCOPE SHED, DECK, NALK, $ STEPS. SITE PLAN & ZONING DATA e PROPOSED RETA I N I NC NALL REPLACEMENT NOTE. I PROPOSED NON-TURF SUFFER FLOOD MAP DATA FROM SURVEY p�u I • FROFOSED RE\/ECET�4TION AT SANiG. S®OO2 .00 GENERAL NOTES MAP#:36103G016'fH I I } : MAP DATE: a/25/200a z IY � ' - • PROPOSED DRY WELL STRUCTURAL DESIGN CHARTS FLOOD ZONE X $ VE 13 I uQj I O in I. SITE PROTECTION/SILT FENCING TO BE 0n F�0,J E G 7 �A TA : INSTALLED AS REQUIRED BY SOUTHOLD TOWN. I I N I z ®QQ�j,QQ HOLDOWN, ANCHOR BOLT, 2. SURFACE ER HATERS ARE LOCATED WITHIN 500' I 1 -- - � �w - �� - FASTENING SCHEDULE I PROJECT / ZONING DATA 3. ELEVATIONS REFERENCE NAVD88 _ - _ _ _ _ TI ---- ----- FRAMING GRAPHICS --- TAX MAP #f: I 1000-81-3-20 I ' - -._ I � zoN1NG DISTRICT --- _-�----- __- -�--- --=R-Bo NG=-==�__ j ' ��OO� .Oo FIREBLOCKING DETAILS 'I I EXGA�/ATION CALCULATIONS 1 I - -- ------�--_ _----=I 18.3 EXCAVATION ® RETAINING WALL d WALK FOOTINGS; I - - 60 S.F. ® V-O" DEPTH = APPROX. 150 GUBIG FEET I ' FRAME I STONE DRIVEWA'� I I. TH15 IS AN ARCHITECT'S 51TE PLAN $ IS LOT AREA O.5 ACRES SITE LAYOUT NOTES: GARAGE `� - -- ___ SURVEYOR. THE INFORMATION _-_ _ _-_ --__ ___ _ _-__- _ J� -__ ___- - --EM DRYWELL EXCAVATION; 1 GofO - ADIDITION Z-32222; 3/6/07 13 S.F. ® 4'-0" DEPTH = APPROX. 52 CUBIC FEET I=---- REPRESENTED ON THIS SITE PLAN 15 TO THE I � �- I � 1 .00 PROPOSED DEMOLITION PLANS SUBJECT TO VERIFICATION B LICENSED � ' q-2ARCHI\ 5 BEST OF KNOHLED&E. GofO - ONE FAMILY DWELLING Z-32223; ONE FAMILY DWELLING NOTE: MINIMAL DISTURBANCE TO THE BLUFF WILL BE DONE. HAND I BIN ' 2. SURVEY INFORMATION WAS OBTAINED I FEMA FLOOD ZONE X � VE 13 WOOD=-� PULLING OF INVASIVE SPECIES: ENOLISH IVY (HEDERA HELIX) AI`ND COMMON PERIWINKLE (VINGA MINOR). ANY AREAS WHERE INVASIVE ' N I FROM A SURVEY DATED MAY, 10 2022 = N E IGT 647�iA OGT. 25 2006 I AND PREPARED BY: w TLANDS DISTRICT - ! - ®� ,®® PROPOSED STORAGE SHED & DECK PLANS SPECIES ARE REMOVED, NATIVE NON FERTILIZATION DEPENDENTf � � Lu VEGETATION WILL BE PLANTED AND A SUITABLE SEED MIX WILL. BE -i I � ADDED TO ANY DISTURBED AREAS. I KENNETH M. WOYGHUK -- - - _- -- ---� -- --- - - - _ --- - -- -� 0 AREA OF DISTURBANCE ON BLUFF TO BE APROX 590 OF THE 50RUARE I LAND SURVEYING, PLLG WETLANDS DISTRICT g425 APRIL 17 2019 _ ------ ------ -- ----- ------ -1-1 - - - -__ _- _ =----_--_- -_ -- -- - --- - - FOOTA6E OF THE BLUFF. I PO BOX 153 ---- -- - - ------ ---- U N22 0320E N.Y. IM51 DEC D15TR:IGT -- --- #I-4738-04675/00002 Q/23/24 �u ° �� �44.56' AQUEBOGUE, NOTE: NO TREE REMOVAL 15 PERMITTED WITH THI5 PERMIT. ANY' TREE I TELEPHONE: (631) 2Q8 1588 °- - -- - _ - ------ -- --� - _--= --- --- - - -� -- -- - - TRIMMING OR REMOVAL ASSOCIATED WITH THI5 PROJECT WOULID ®Zo I ,OO PROPOSED EXTERIOR ELEVATIONS REQUIRE A SEPARATE TREE LETTER AND INSPECTION FROM A - --- MEMBER OF THE BOARD OF TRUSTEES. 1 Lu LOT COVERAGE - _- DRAINAGE SYSTEM INSTALLATION NOTES: I a SOUTHOLDTTOWN GODS 280-4 --- ---- -- ---- -- - -- ----- • A MINIMUM 10' SEPARATION IS REc�UIRED BETWEEN PRYWELLS 8 I 1 WATER SERVICE LINE, _ - COVERAGE ----- -- 1 DESCRIPTION (FOOTPRINT)------- - -- --AREA ---�- --- --- -- - ----... - - - UNDERGROUND UTILITY LINES SEPTIC I - - - - - - LL - - - - �j- ( PROPOSED STRUCTURAL PLANS PROJECT: COMPONENTS, LEACHING FIELDS, SEWER COMPONENTS, OTHER I � II DRYWELLS, AND THE EDGE OF ALL FOUNDATION WALLS m r (BY OTHERS) • A MINIMUM 5' SEPARATION IS REQUIRED BETWEEN DRYWELLS 4 I I TOTAL L077 AREA 20,412.0 S.F. �,( �/� PROPERTY LINES I =-- --------- ------- - ----- __ - _��- i\U 1 r 1 A R • A MINIMUM 20' SEPARATION 15 REQUIRED BETWEEN DRYWELLS AND BURIED PROPANE FUEL TANKS. AREA LANIDWARD OF BULKHEAD-- n 541 3 S F. 1' - - - DECK SHED • CONNECT ALL GUTTER LEADERS 1'O NEAREST DRYWIELL -- - S-2 PROPOSED STRUCTURAL ELEVATION EXISTING 2 STORY FRAME HOUSE I� 1,150.1 S.F 6.6Y (BY OTHERS) A ------- ---- - - - - EXISTING GARAGE- - - -- ---- - 353.2 S.F. -- 2.0`Yo ---- DRAINAGE SYSTEM CALCULATIONS: __ _ 1490 PARADISE POINT ROAD EXISTING (RESTORED) ROOF DECK= 145.2 Sq,. Ft. 145.2 Sq,. Ft. X 0.17- 25 EXISTING ROOF DECK (DRY ( _____.-.__-! ___ _______ 25/8.72= 5 VERTICAL FT. OF 4' DIA POOL REQUIRED ' I STORAGE !SHED BELOW) 145.2 S.F. 0.890- - l SOUTHOL.D, NY 11971 PROVIDE (1) 4 > X 3 DEEP DRYWELL - I L EXISTING STOOPS 55.0 S.F. �r - 0.29b - - EXISTING FRAME STEPS 4 4 OCCUP' i A' �` DRAWING TITLE: ANCY OR 155.7 S.F. O.�I o - - APPRO ED AS DOTED � LANDINGS wl I j�/ EXISTING I^�OOD BIN 13.& S.F. 0.190 PROJECT LOCATION & SCOPE 1 USE IS UNLAWFUL � � - ---- ��-�-_ --- � --_---_-_-.--�_, • SB.P.#� WITHOUT CERTIFICA� �1 0L 1 R � _-_--_ _ _ _--- ==-_ _ _ =- -- �. -�I' -- -=-__ _---= SITE PLAN & ZONING DATA DA TOTAL ARIEA OF ALL STRUCTURES 1851.0 S.F. 10.690 l FEE _�. D BY t�' V u'I NOTIFY BUILDING DEPARTMENTAT OF OCCUPANCY �1 � I � < T - - -� -MAXIMUM LOT GOVERAOE ALLOWED: 2090 -�j 631-765-1802 8AM TO 4PM FOR THE `� "' FOLLOWING iNSPECTtONS: T' (� IMPERVIOUSS 5URFAGES < 8" FROM GRADE _EXISTING CONC. APRON -- 25_Ci-S.F.-- _-l; === 0.19b=: _ -==I; PAGE: 1. FOUNDATION-TWO REOUtRE-D _ -r --- -- -FOR POURED CONCRETE ' "`'" ' IAdftk TOTAL LOp GI OVERAGE No LUDING 205.0 S.F. -_ _ _- _ _-_- --1.290 2. ROUGH-FRAMING&PLUMBING RETA%IN STORM WATER RUNOFF Aowo, „ 2081.Q S.F. -_- = 11.�i90 3. 1f� UL�tiriON I STRUCTURES <8 FROM GRADE0Is Pi)R,SUANT TO CHAPTER 236 ' I � � --_- _____ _ -_�- _==-�---___- _ _�� _- - �=___-=--__-----_- _--I FINAL- UCTION 4. BE COMPOLETEROR c.o.MUST OF TfHE TOWN CODE. I I �I N24°53'20"E I ---- -- 1,406.03' ALL CONSTRUCTION SHALL MEET THE AGGESSORIY STRUCTURE REQUIREMENTS _-- - - - - DATE: 12/09/24 1 OF 9 REQUIREMENTS OF THE CODES OFNE:IN � ' c - I YORK STATE. NOT RESPONSIBLE FOR i SOUTHOLD SOWN GODS 280-15 DESIGN OR CONSTRUCTON ERRORS 1 ��g� �-�_------- -^ ------ ---- ---------------_- ---- � - 1 ��. EXIST. PROPOSED COMPLIES COMPLY WITH ALL CODES OF 1 ) -- --- 1 �- MAXIMUM H9EIGHT IS 11.4 11.4 NEW YORK STATE &TOWN CODES AS REQUIRED AND CONDITIC)NS OF MINIMUM SIIDE YARD 10.0' 13.4' 13.4' YES eni 'NING BOARD O\ MINIMUM REAR YARD 10.0' II 21.2' 21.2' YES t 1200 14s 2 ; SOMOLD TO�%TRUSIEES �L� MAX. SOUAIRE FOOTAGE S.F. S.F 145.2 S.F. YES N.YS.DEC --- --- _ - ° ! 10 90 DO A° /O rD PROPOSED 51 TE PLAN SCALE: I" - 20'-0" - ------,------ ......-- ----- --- - NOTES � 5i=EG I F I GAT I ON5 CARPENTRY # - WOOD FRAMING MATERIAL STANDARDS FOUNDATION, CONCRETE, AND MASONRY - A55RE Y I AT I ONS 1. ALL LUMBER SHALL BE DOUGLAS FIR LARCH 2 BETTER (Flo 815) UNLE55 THE PROVISIONS OF THIS STANDARD ARE NOT INTENDED TO PREVENT THE USE I. CONTRACTORS TO VERIFY ALL DIMENSIONS OF EXISTING FOUNDATION A5 IT L- --- ____ __-_----__--__-- IT I5 THE CONTRACTOR'S RESPONSIBILITY TO KEEP THI5 CONSTRUCTION DOCA)MENT BINDER __--_ _'--_ -- T06ETHER AT ALL TIMES. IT I5 AL50 THE CONTRACTORS RESPONSIBILITY TO READ ALL NOTES, OTHERWISE NOTED. OF ANY MATERIAL OR METHOD OF CONSTRUCTION NOT SPECIFICALLY APPLIES TO THE NEW WORK BEING, PERFORMED AND SHALL COORDINATE THE BD. BOARD INSUL. 1 INSULATION J PRESCRIBED HEREIN. WHEN IT CAN BE SHOWN, AND THE AUTHORITY HAVING 5UB-CONTRAGTOR5 IN SUCH A MANNER TO ASSURE THAT THE CONDITIONS OF -_ -- -_ -__-- _---- _-_-__-_ -- --__ __ __ BFE J,BASE FLOOD ELEVATION - - -- f - - --__ - tZ - -- - - ---- -- ---- ----- -- --- -- ___ 1 Q SPECIFICATIONS,AND BE FAMILIARIZED WI fH THE PLANS PRIOR TO WORK „ 2. ALL LUMBER IN CRAWL SPACES TO BE 18 ABOVE SCRATCH GOAT. MAINTAIN JURISDICTION FINDS BY EXPERIENCE, MODELING, OR TESTING BY AN APPROVED THE FIRST AND SECOND FLOORS ARE TAKEN INTO ACCOUNT. "INT. ll INTERIOR 8 MIN. FOUNDATION EXPOSURE. AGENCY, THAT A PRODUCT OR PROCEDURE PROVIDES EQUIVALENT OR - ___ --___ _ ---____._---__ _ GREATER STRUCTURAL SAFETY OR DURABILITY, SUCH PRODUCT OR PROCEDURE 2. ALL FOOTINGS TO BEAR ON FIRM,VIRGIN, UNDISTURBED SOIL BLDG. �i BUILDING - - K -- ��IPS (1000 LBS) - - - �I' 0 GENERAL 3. SILLS TO BE P.T. AND SECURELY FLASHED WITH A TERMITE SHIELD, ALSO SHALL BE DEEMED TO CONFORM TO THE REQUIREMENTS OF THIS DOCUMENT _ W I. NO WORK TO START UNTIL APPROVED PLANS ARE OBTAINED FROM THE PROVIDE SILL SEAL/INSULATION. SIZE OF SILL TO BE (2) Vxb", UNLE55 (1) 2"x6" (THIS DOCUMENT 15 TO MEAN A REFERENCE TO THE CURRENT AMERIGAN WOOD 5. SOIL TO HAVE MIN. BEARING CAPACITY OF (1) TON/50. FT., U.O.N. BM - _ BEAM MANU. 5PEG.'S MANUFACTURER'S SPEGIFIGATIONS I'i Lu N APPLICABLE BUILDING DEPARTMENT. I5 NECESSARY TO MATCH FLOOR HEIGHTS WITH THE EXISTING STRUCTURE. COUNCIL'S WOOD FRAME CONSTRUCTION MANUAL AND THI5 PS FORMAT, AS --_ ___ - - - --_- --_--__-___ _ I____-__ �- --__ __ -_ J- _-- 2. ALL CONSTRUCTION SHALL SE PERFORMED IN A WORKMAN LIKE MANNER. APPLICABLE AS A DERIVED WORK). 4. FOOTINGS TO REST A MIN. OF 4'-O" BELOW GRADE, UNLESS B.O. [BOTTOM OF MAX. MAXIMUM " 4. AT FLUSH FRAMING USE Ib GAGE METAL JOISTS HANGERS BY "TEGO" OR OTHERWISE NOTED -- -__.___ _ --- - __--_ _- �-_- _-_____ __ _ ___ _- -__- .._ Q ;4�' N _-- - - ,- - -- --- -- - ALL DIMENSIONS, CONDITIONS, AND APPLICABLE INFORMATION OF EXISTING - I BOTTOM MEGH. - I�EGHANIGAL STRUCTURE/SITE SHALL BE FIELD VERIFIED' BY GENERAL CONTRACTOR. --- ___- EQUAL I. IDENTIFICATION: ALL SOLID-SAWN LUMBER, 6LUED LAMINATED TIMBER, BOT. PREFABRICATED WOOD ]-,JOISTS, STRUCTURAL COMPOSITE LUMBER, 5. WALLS TO BE POURED CONCRETE OF SIZE SHOWN ON DRAWINGS, U.O.N. _----.: . _.______.____-_ ___ __ ________ � r- A D TRIMMERS AROUND ALL OPENINGS IN 3. ALL WORK SHALL CONFORM TO NATIONAL, STATE, AND LOCAL GORES 5 MINIMUM DOUBLE HEADERS AN PREFABRICATED WOOD TRUSSES, GYPSUM, HARDBOARD, AND STRUCTURAL B.O.W. I BOTTOM OF WALL I MIN. MINIMUM FLOORS, ROOFS, AND WALL5. PANELS, SHALL CONFORM TO THE APPLICABLE STANDARDS OR GRADING Co. NO BACK FILL SHALL BE PLACED AGAINST FOUNDATION WALLS ------- _- ---- -----_ -.- _ ___- ____ __-___ __--_ -_ _ -_- - _-____ __- --- _-___ -- _ ,..O _ 0 AND AUTHORITIES HAVING JURISDICTION. f 11 } 0 G.J. GEILINC� JOIST - NAVD88 - NORTH AMERIGAN VERTICAL DATUM OF Iti88 � •+� ry 4. ALL UNNOTED OR NON-VISIBLE EASEMENTS ARE THE RESPONSIBILITY b. DOUBLE ALL JOISTS UNDER PARALLEL PARTITIONS, POSTS, AND BATH TUBS, - - L z O RULES SPECIFIED IN I.I THROUGH L8. UNTIL I TIER OF FRAMING 15 IN PLACE. --- - _----_-_ -_ . - N w r OF THE OWNER/BUILDER U.O.N. H. LUMBER: ALL WOOD MEMBERS USED FOR LOAD-BEARING PURPOSES, ?. FOOTINGS TO BE POURED CONCRETE OF SIZE SHOWN ON DRAWINGS. COL. [COLUMN NYG BG NEW PORK CITY BUILDING GORE INCLUDING END-JOINTED AND EDGE-GLUED LUMBER, SHALL BE IDENTIFIED -" _ ------- --------_____-----___________:_-:____-__-___- -- ,-- ----�I'i------ _____ -_-------- --_-- _-_- ----__-__-___-__-.- -___-J Ln � � _ a -I. ALL BEAMS, GIRDERS, ETC. TO HAVE MIN. OF 3-1/2" BEARING BY THE ORADEMARK OF A LUMBER GRADING OR INSPECTION AGENCY 8. ALL OPENINGS FOR BEAM POCKETS, UTILITIES, ETC. TO BE FILLED - - -- - --- _- - --- 5. ANY OMISSIONS OR DISCREPANCIES OF PLANS AND/OR JOB CONDITIONS I CONT. I CONTINUOUS O C. ON CENTER WHICH PARTICIPATES IN AN ACCREDITATION PROGRAM, SUCH AS THE 50LID WITH CONCRETE. � __ I- __ _ _ _ __ __ __ _ _ _ __ _ __ _ __ _ ___�__ X N SHALL BE CLARIFIED WITH THE ARGRITEGT/ENGINEER BEFORE }PROCEEDING 8. MIN. HEADER TO BE (2) 2"xl0" UNLE55 OTHERWISE NOTED. AMERIGAN LUMBER STANDARDS COMMITTEE OR EQUIVALENT. THE Q 0 {-- WITH THE WORK. - OCCUPANCY m 0 6RADEMARK SHALL INCLUDE AN EASILY DISTINGUISHABLE MARK OR q. ANCHOR BOLTS SHALL BE IN ACCORDANCE WITH PAGE 6-003, �BL_- DOUBLE OCG. q. ALL WOOD SILLS AND WOOD IN CONTACT WITH MASONRY/GONGRETE TO BE INSIGNIA OF THE GRADING AGENCY WHICH COMPLIES WITH THE i 4-J 0 4-' L!) - ------- -- _- -- ----- - --- V - - -------- --- --- ---- Co. NO DEVIATIONS OR GRANGES TO THE STRUCTURAL SYSTEM SHALL BE MADE I DFE DESIGN FLOOD ELEVATION O.H. OVERHANG N co .. DAYS OF 4,000 P.S.I., U.O.N. '- ----- --- -__------------- UNLE55 APPROVED BY THE ARGHITEGT/ENGINEER. P.T. REQUIREMENTS OF U.S. DEPARTMENT OF COMMERCE P520-qq. 10. ALL CONCRETE TO HAVE AN (ULTIMATE COMPRESSIVE STRENGTR AT 28 I -- _ ___- - - =__- - - -- - - -I, __ ___ - ______--____-----J Q a O M. DIMENSION PBFE PRELIMINARY BASE FLOOD ELEVATION 10. ALL EXTERIOR SHEATHING SHALL BE NAILED AS PER FASTENING SCHEDULE 1.2. GLUED LAMINATED TIMBERS: GLUED LAMINATED TIMBERS SHALL MEET -__ ___ �____ _.___ - _ -- -_-_ IL_ ___ -- J 1. CONTRACTOR TO VERIFY DIMENSIONS OF FOUNDATION WITH FLOOR PLANS ON PAGE G-003. GENERALLY, 5HEATHING I5 OF I/2" THICKNESS ON WALLS AND THE PROVISIONS OF ANSI/ALTO A I q0.1 STRUCTURAL GLUED LAMINATED 11. GONG. SLABS TO REST ON MINI. OF 6" FINE GRAVEL OR SAND WITH ----- -_- - - - -- ---E -- -- ---- -__--- BEFORE THE START OF FRAMING ;�.J. j DECK JOISTS P. GONG. POURED CONCRETE ROOF AND IS OF GDX GRADE, UNLESS OTHERWISE NOTED. SEE FLOOR PLANS TIMBERS. 6 MIL. POLYETHYLENE VAPOR BARRIER UNDER __-:-_ �. --- ---___________----_-_-_ -___--._:._ _ --- FOR ADDITIONAL NAILING OR DIFFERENT NAILING REQUIREMENTS WHEN -- -- - - ____ 5. DRY WELLS AS REQUIRED BY STATE AND LOCAL CODES. EA. EACH PL. PLATE f __ __ ______ APPLICABLE. 1,3. PREFABRICATED WOOD I-JOISTS: ASSEMBLIES U51NG PREFABRICATED 12. COPPER FLASK ALL JOINTS WHERE SLAB ABUTS FRAMING, i`__-_ __-� ��_ - --_ _-__ - - _ __ - - J n WOOD I-JOISTS SHALL MEET THE PROVISIONS OF ASTM D5055 - - - uJ q. DO NOT SCALE DRAWIN05, WRITTEN DIMENSIONS TAKE PRECEDENCE ; ELEV. ELEVATION PLYWD. PLYWOOD 11. SUB FLOORING, GENERALLY, TO BE OF 3/4' THIGKNE55 AND OF GDX GRADE. STANDARD 5FE01FICA71ON FOR ESTABLISHING AND MONITORING 15. BRICK VENEER TO BE ANCHORED WITH CORROSION RESISTANT TIES - ,�-_-_ --- - - _� -- --- -- -- -- -_ -- - �[_ _ 10. OWNER/BUILDER ARE RESPONSIBLE FOR ALL INSPECTIONS, APPROVALS, NAILING AS PER FASTENING SCHEDULE ON PAGE 6-003 AND GLUED, U.O.N. STRUCTURAL CAPACITIES OF PREFABRICATED WOOD I-JOISTS, THIS (U WALL TIE PER (3) SQ. FT. EQUIP. EQUIPMENT P.T. PRESSURE TREATED 1 CERTIFICATES, GERT. OF OCCUPANCY OR COMPLETION AND U.L. APPROVAL DOCUMENT, THE GOVERNING BUILDING CODE AND ANY ADDITIONAL _ _ -- __- "_ �� - - - 12. EXTERIOR SHEATHING TO BE COVERED WITH 'TYVEK' HOUSE WRAP OR REQUIREMENT5 AS SET FORTH IN THE MANUFACTURER'S CODE 14. FLASH JOINT AT BRICK LEDGEE AND PROVIDE WEEP HOLES, II. THESE SET OF DRAWINGS ARE THE PROPERTY OF ANTHONY iPORTILLO, RA APPROVED EQUAL. EVALUATION REPORT. MAX. 32'-O" O.G., TO DIRECT ANIY CONDENSATION TO THE EXTERIOR. _ REQUIRED - - -- ------- -- �'__-___---__-_-- ------- ---- .� EXIST. EXISTING REQ D _ - AND SHALL NOT BE ALTERED OR BE REPRODUCED WITHOUT WPZITTEN 15. BLOCK EXTERIOR STUD WALL5 AT HALF STORY HEIGHT5 AND AT 1.4. STRUCTURAL COMPOSITE LUMBER: 51NGLE MEMBERS OR ASSEMBLIES I5. APPLY (1) GOAT OF TAR BASED WATERPROOFING TO EXTERIOR OF FOUND. EXT. EXTERIOR Rl RISER � I -- -- - - -_-:-_----- -_ ____ ---__ - -PERMI5510N FROM THE ARCHITECT. ----------- _____-- -- ---- UNSUPPORTED EDGE SEAMS OF EXTERIOR SHEATHING. USING STRUCTURAL COMPOSITE LUMBER SHALL MEET THE PROVISIONS OF FROM FOOTING TO 2 ABOVE FIN115H GRADE. - _ ------ - ASTM D5456 STANDARD SPECIFICATION FOR EVALUATION OF F.A.I. FRESH AIR INTAKE RM. ROOM 12. THE ARCHITECT 15 NOT RETAINED FOR SUPERVISION OF THE WORK AND IS P I LUMBER PRODUCTS THIS DOGUMEN THE - --- - - -"-- -- "-" -- -- - �� - - _ -- 14. PROVIDE X GR055 BRACING AT JOISTS, STUDS, AND RAFTERS WHEN SPANS STRUCTURAL COM OS TE L B I(6. NO CONCRETE OR MASONRY MORK IS TO BE PERFORMED IN TEMPERATURES - RESPONSIBLE FOR DESIGN INTENT ONLY. FAR _11FLOOR AREA RATIO J R.R. ROOF RAFTER O RN i LNG CODE AND ANY ADDITIONAL REQUIREMENTS AS o 6 VE LNG BU LD N EXCEED 8 O AND AT EVERY 8 O . OF 40 F AND FALLING UNLESS APPROVED BY ARGHITEGT/E GINEER. NO SET FORTH IN THE MANUFACTURER'S CODE EVALUATION REPORT. CONCRETE SHALL BE PLACED OPN FROZEN SURFACES. ---_-- --` - -- 13. THE CONTRACTOR SHALL OBTAIN CERTIFICATE OF OGGUPA1h1GY. L F.A.V. FRESH AIR VENT STL. STEEL ""'I� W 15. TOP PLATES TO BE DOUBLED AND LAPPED AT CORNERS, SEE ALSO PAGE ALL 5-004. 1.5. PREFABRICATED WOOD TRUSSES: ASSEMBLIES USING PREFABRICATED 11. NO ADDITIVES SHALL BE PLACED IN CONCRETE UNLE55 SPECIFIED BY FF FINISHED -r WOOD TRUSSES SHALL MEET THE PROVISIONS OF THIS DOCUMENT,THE ARCHITECT/ENGINEER. IF 5.V. J SMART VENT H FLOOR TIMES. AT THE COMPLETION OF WORK, THE CONTRACTOR SHALL REMOVE ALL p CONDITIONS ADDRESSED IN FASTENING SCHEDULE A5 GOVERNING BUILDING GORE AND ANY ADDITIONAL REQUIREMENTS AS '-_ __ - - - - _-- "- _ -_-_ -- ._-___ , ---_ -----__ ' 14. THE CONTRACTOR SHALL KEEP PREMISE-5 REASONABLY CLEAN T RUBBISH, WASTE MATERIALS, TOOLS, ETC., CLEAN GLASS AND LEAVE WORK I6. APPLY ALL - ' TBD FF ELEV. [FIRST FLOOR ELEVATION - -- -�!TO BE DETERMINED ] I. BROOM GLEAN. - --- - I, r 11. PROVIDE ALL NAILING AND STRAPPING ADDRESSED ON PAGES G 003. OR THE MCONNECTEANUFACTURERS ER RS CODE EVALUATION REPORT.S5 CONSTRUCTION, THE TRU55 DESIGN DRAWINGS, WHERE EVER APPLICABLE. ! F.J. FLOOR JOISTS TEMP GL. �i TEMPERED GLA55 I I5. THE CONTRACTOR SHALL CARRY WORKMAN'S COMPENSATION AND GENERAL NECESSARY. T T HOOD _ I8. PROVIDE BITUMINOUS JOINTS EBETWEEN SLABS AND FOUNDATION HALLS AND --1 FLOOR _____ - --- -- _ -__ -__.______...___- _-____..__ -__..__-_.__-_-______-_-_� LESS OTHERH15E N FOCTIN55 ARE il LIABILITY INSURANCE. ALL SHALL COMPEL' WITH STATE AND LOCAL GORES Ia. AT "WET WALL" PARALLEL TO JOISTS FRAME DOUBLE JOIST AS PER CODE. 1.6. GYPSUM: GYPSUM MATERIAL USED IN A STRUCTURAL APPLICATION SHALL MIN.N10" DEEP PRO ECTINO b" O� EACH SIDE OF THE FOUNDATION WA,L . A I FOUND. FOUNDATION THK. THICK � k AND ORDINANCES. _ _ _ _ _ _ _ GENERALLY, SEPARATE DOUBLE JOIST THE TRIGKNE55 OF WALL ABOVE. SUB MEET THE PROVISIONS OF ASTM 036 SPECIFICATION FOR GYPSUM PROVIDE TWO #4 DEFORMED BAlRS CONTINUOUS IN THE FOOTING. ALL 4 TRICK - - FRGE FLOOD RESISTANT GONSTRUGTION ELEVATION T.O.N. OP OF WALL ib. THE CONTRACTOR SHOULD FULLY GUARANTEE HI5 WORK AMID THE WORK OF FLOOR SHALL NEVER EXCEED A 16" SPAN. WALLBOARD, ASTM 051 SPECIFICATION FOR GYPSUM LATH, OR ASTM G1q CONCRETE SLABS TO HAVE 6xb 10/10 WELDED WIRE REINFORCING, _ ___: _ ---_JL_ -- -- - - �� - -- �� ---- __- - - _- __ /� -- -- - - ---- ------- ---- --- V J THE COMPLETION O APRO EG OR A PERIOD OF AT LEAST ONE YEAR AFTER Iq. AT ROUGH OPENINGS PROVIDE ALL APPLICABLE NAILING AND STRAPPING SPECIFICATION FOR GYPSUM SHEATHING BOARD. 20. FOR SECOND STORY ADDITIONS, EXIST. FOUNDATIONS ARE TO BE VERIFIED FR. - - _ J[FRAME Tr' _ J TREAD - l AS PER PAGE 0-005. 1.1. HARDBOARD: HARDBOARD USED IN A STRUCTURAL APPLICATION SHALL AS IN SOLID B SOUND CONDTTIOM WITH AN EXIST. FOOTING OF MIN. lb" WIDE x 8" - -_ ---- - -- - -- - -- .___ - -______ _-- _- - --_ -- --- - J n 1 ---- - -- - - -- -- --- - -- - __ -- W MEET THE PROVISIONS OF ANSI/AHA AI35.4 BA510 HARDBOARD OF DEEP 6 3'-O" BELOW GRADE. FRPR. ll FIREPROOF TYP. TYPICAL l LAS 11. THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLE55 THE OWNER, „ „ - ----_------_.__--J1- ==-------_------- _ -- --__-_-.__ ___-___--_-:___._-___ __-_____.- __-_-_____j --- ------ -_=__ ] 20. P.T. SPECIFIES PRESSURE PRESERVATIVELY TREATED LUMBER IN ANSI/AHA AL35.6 HARDBOARD SIDING. --- Q ARGHITE ALL CLAIMS, AND THEIR AGENTS .AND EMPLOYEES FROM AND ACCORDANCE w/AWPA G22; WHERE DRILLING AND/OR GUTTING OCCURS, FIELD FTC. FOOTING U.O.N. UNLE55 OTHERWISE NOTED l AGAINST ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, INCLUDING TREAT LUMBER w/ COPPER NAPTHENATE WHICH SHALL CONTAIN 2% COPPER Ia STRUCTURAL PANELS: - --_ -- - J ---_---- ��_ - _- - __ _ __- _-_ __J ATTORNEYS FEES ARISING OUT OF OR RE_-ULTING FROM THE PERFORMANCE OF GYPSUM BOARD -�[VERT. YERTIGAL THE WORK PROVIDED THAT ANY SUCH CLAIM, DAMAGE, LOSS OR EXPENSE (A) Ar;"m METAL BY REPEATED BRUSHING,DIPPING, OR SOAKING UNTIL THE WOOD GYP. BD. IS ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR DEATH OR TO ABSORBS NO MORE. ALSO, FOR HARDWARE USED WITH P.T. LUMBER, I.8.1. PLYWOOD. PLYWOOD USED IN STRUCTURAL APPLICATIONS SHALL -_ -_ ---- ------ - INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY (OTHER THAN THE WORK CONTRACTOR IS TO INSTALL HARDWARE THAT 15 SPECIFIED BY P.T. LUMBER MEET THE PROVISIONS OF U.S. DEPARTMENT OF COMMERCE H.D. HOLD DOWN l V.I.F. VERIFY IN FIELD FLASHING, ANCHOR BOLTS, VOLUNTARY PRODUCT STANDARD 1 (P5 1) CONSTRUCTION AND it 7-- --- --_--_- --_ _ _ _-__ --_- �-- - - -�� ITSELF INCLUDING THE LOSS OR USE RESULTING THEREFROM). (EB) I5 CAUSED IN MANUFACTURER SUCH SUCH HANGERS, ERNAILS, SCREWS, INDUSTRIAL PLYWOOD, U.S. DEPARTMENT OF COMMERCE VOLUNTARY DP- - - HEADER _ [ _ - WHOLE OR IN PART BY ANY NEGLIGENT AGT OR OMISSION OF 'THE ETC. ANY REFERENCES TO GGA ARE TO REPLACED WITH P.T. PRODUCT STANDARD 2 (PS2) PERFORMANCE STANDARD FOR J-_=_ - Vd� -� WITH-_ - - ---- - -- - _-11, ETC. FOR LOCATIONS SUCH A5: LEDGER BD., SILL PLATE, DECK CONSTRUCTION, ii - ------------- --------_-_-----_ --_ --_---_-:-_-__ _ _ =_ _ WD. WOOD CONTRACTOR, ANY SUBCONTRACTOR, ANYONE DIRECTLY OR INIDIREGTLY 21. LVL (LAMINATED VENEER LUMBER) DENOTES EITHER OF THE FOLLOWING. EVALUATION REPORTS.RAL- USE PANELS, APPLICABLE CODE - [ - - _- A. WEYERHAEU5ER TRUS JOIST 2.OE MIGROLLAM LVL I H RR HORI ONTAL EMPLOYED BY ANY OF THEM OR ANYONE FOR WHOSE ACTS A1NY OF THEM MAY ____ _____ _ ___ __ __ _ __ ___ BE LIABLE REGARDLE55 OF WHETHER OR NOT IT 15 CAUSED IN PART BY A ZR - -- -1�ONINO RESOLUTION PARTY INDEMNIFIED HEREUNDER. B. GEORGIA PACIFIC 2.OE G-P LAM LVL 1.8.2. ORIENTED-STRAND BOARD (05B), WAFERBOARD ORIENTED-STRAND L= = __..... = - - - -- -- -- - --- ---- -- - - 15. ALL MATERIALS, ASSEMBLIES, AND METHOD OF CONSTRUGT'ION INCLUDING P5L (PARALLEL STRAND LUMBER) DENOTES: BOARD OR WAFERBOARD USED IN STRUCTURAL IONS SHALL MEET BUT NOT LIMITED TO FORM-WORK, BLOCK-WORK, FRAMING, NAIILING, PLACING A. WEYERHAEUSER TRUS JOIST 2.2E PARALLAM P5L THE PROVISIONS OF U.S. DEPARTMENT OF COMMERCE VOLUNTARY OF CONCRETE, ETC. ARE TO BE CAREFULLY SUPERVISED BY THE CONTRACTOR ALL TO BE INSTALLED AS PER MANU. 5PEG.'s PRODUCT STANDARD 2 (P52) PERFORMANCE VOLUNTARY PRODUCT TO BE SURE THEY ARE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, STANDARD FOR WOOD-BASED STRUCTURAL- USE PANELS OR APPLICABLE CODES AND GOOD PRACTICE::. DEVIATIONS FROM[ THE DRAWING5 22. I-J015T FLOOR SYSTEMS SHALL BE IN ACCORDANCE WITH THE WOOD APPLICABLE CODE EVALUATION REPORTS. I AND SPECIFICATIONS WILL NOT BE PERMITTED WITHOUT WRITTEN FRAMING MATERIAL STANDARDS SECTION, THE GOVERNING BUILDING CODE, AUTHORIZATION OF THE ARGHITEGT/ENGINE;ER. AND ANY ADDITIONAL REQUIREMENTS SET FORTH IN THE MANUFACTURER'S 1.5.5. PARTICLE BOARD: PARTICLE BOARD USED IN STRUCTURAL CODE EVALUATION REPORT. APPLICATIONS SHALL CONFORM TO AN51 A205.1 AND ANY Iq. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SHOP IDRANINC75 REQUIREMENT5 AS SET FORTH IN THE MANUFACTURER'S CODE NEEDED, UNLESS OTHERWISE SPECIFIED. ALL DIMENSIONS AND CONDITIONS 25. NOTCHES IN THE TOP OR BOTTOM EDGE OF SOLID SAWN RAFTERS SHALL EVALUATION REPORT. PERTAINING ARE TO BE FIELD VERIFIED. NOT BE OUT IN THE MIDDLE ONE-THIRD OF THE RAFTER SPAN. NOTCHES IN THE I OUTER THIRDS OF THE SPAN SHALL NOT EXCEED ONE-51XTH OF THE ACTUAL 1.6.4. FIBERBOARD: FIBERBOARD USED IN STRUCTURAL APPLICATIONS 20. CONTRACTOR TO REMOVE # RELOCATE AS REQUIRED ALL EXISTING WORK RAFTER DEPTH. WHERE NOTCHES ARE MADE AT SUPPORTS THEY SHALL NOT SHALL MEET THE PROV151ONS OF AN51/AHA AIg4.1 CELLULOSIC WHICH INTERFERES WITH NEW CONSTRUCTION IN A WORKMAN LINKE MANNER. EXCEED ONE-FORTH THE ACTUAL RAFTER DEPTH. BORED HOLES ARE LIMITED FIBERBOARD OR ASTM C205 STANDARD SPECIFICATION FOR IN DIAMETER TO ONE-THIRD THE ACTUAL RAFTER DEPTH AND THE EDGE OF THE CELLULOSIC FIBER INSULATING BOARD. 21. ALL MATERIALS ARE TO BE INSTALLED AS PER MANUFACTL)RER'S HOLE SHALL NOT BE CLOSER THAN 2 INCHES TO THE TOP OR BOTTOM EDGES. SPECIFICATIONS, UNLESS NOTED OTHERWISE=. 1.8.5. STRUCTURAL PANEL SIDING STRUCTURAL PANEL SIDING USED IN 24. NOTCHES IN EITHER EDGE OF STUDS SHALL NOT BE LOCATED IN THE STRUCTURAL APPLICATIONS SHALL MEET THE REQUIREMENT5 OF U.S. 22. PROVIDE FIREBLOCKINIG AS PER NEW'PORK ACGE551BILIT`Y STANDARDS. MIDDLE ONE-THIRD OF THE STUD LENGTH. NOTCHES IN THE OUTER THIRDS OF DEPARTMENT OF COMMERCE VOLUNTARY PRODUCT STANDARD I THE STUD LENGTH SHALL NOT EXCEED 25% OF THE ACTUAL DEPTH. BORED (PS- 1), THE GOVERNING BUILDING CODE, AND ANY ADDITIONAL 23. PLEASE NOTE THAT THESE PLANS ARE PROTECTED AGAINST ANY HOLES SHALL NOT EXCEED 40% OF THE ACTUAL STUD DEPTH AND THE EDGE REQUIREMENTS AS SET FORTH IN APPLICABLE CODE EVALUATION i UNAUTHORIZED USE UNDER FEDERAL LAW BY THE ARCHITECTURAL WORKS OF THE HOLE SHALL NOT BE CLOSER THAN 5/8" TO THE EDGE OF THE STUD. REPORTS. COPYRIGHT PROTECTION ACT OF IggO (ANIGPA), WHICH HAS SEVERE PENALTIES. NOTCHES AND HOLES SHALL NOT OCCUR IN THE SAME GROSS-SECTION. I 2.2. FASTENERS AND CONNECTORS: ALL FASTENERS AND CONNECTORS SHALL 25. FOR NEW WALL5, A PERFORATED SHEARWALL SYSTEM 15 USED. THE CONFORM TO THE STANDARDS SPECIFIED IN M 2.2.1 THROUGH M 2.2.1. GENERAL WIND PROTECTION CONNECTION NOTES: CONTRACTORS ATTENTION 15 DIRECTED TO THE APPLICABLE DETAILS, ADAPTED FROM STANDARD FOR HURRIGANi- RESISTANT RESIDENTIAL NOTES, AND TABLES ON PAGE G-003 $ G-004. THE FASTENING SCHEDULE 2.2.1. BOLTS: BOLTS SHALL COMPLY WITH AN51/A5ME B 15.2.1 SQUARE AND to CONSTRUCTION;55TD ID-qq AND 2018 SSG HIGH WIND EDITION HOOD FRAME SPECIFIES THE REOV NAILING FOR THE SHEATHING(ANY NAILING HEX BOLTS AND SCREWS (INCH SERIES). z CONSTRUCTION SPECIFICATIONS ON THE FLOOR PLANS SHALL SUPERSEDE THE FASTENING w 1. A CONTINUOUS LOAD PATH BETWEEN FOOTINGS, FOUNDATION WALLS, SCHEDULE). HOLDOWN5 OPERATE IN CONJUNCTION WITH THE PERFORATED 2.2.2. LAG SCREWS: LAG SCREWS OR LAG BOLTS SHALL COMPLY WITH ANSI/ 2 FLOORS, STUDS AND ROOF FRAMING SHALL BE PROVIDED.. 5HEARWALL SYSTEM (INSTALL AS PER APPLICABLE DETAILS b MANU. SPEC.'S). ASME B18.2.1 SQUARE AND HEX BOLTS AND 5GREW5 (INCH SERIES). p I 2. APPROVED CONNECTORS, ANCHORS AND OTHER FASTENINGS DEVICES NOT HOEDOWN LOCATIONS ARE SPECIFIED ON THE FOUND./FLOOR PLANS. _ -_ - - 2.2.3. TRUSS METAL CONNECTOR PLATES: 7RU55 METAL CONNECTOR PLATES v INCLUDED IN THE STANDARD BUILDING CODE, SECTION 2306 OF IBC SHALL 26. COLUMN BEARING AS FOLLOWS: SHALL MEET THE REQUIREMENTS OF AN5l/TPI I NATIONAL DESIGN BE USED IN ACCORDANCE WITH MANUFACTURER'S REGOMMEENDATIONS. WOOD POSTING TO BE BLOCKED SOLID TO FOUND. WALL w/ END GRAIN, STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION, TREATED WOOD f FLASHING. STEEL COLUMNS ARE TO BEAR UPON FOUND. THE GOVERNING BUILDING GORE, AND ANY ADDITIONAL REQUIREMENTS - - _ - _ - - - ---- - - 3. METAL PLATES, CONNECTORS, SCREWS,, BOLTS AND NAILS EXPOSED HALL w/STEEL SHIMS 4 A MIN. 5/4" OF NON-SHRINK GROUT. AS SET FORTH IN THE MANUFACTURER'S CODE EVALUATION REPORTS. TABLE R501 .� DIRECTLY TO THE WEATHER OR 5UBJECT TO SALT CORROSION IN COASTAL SECURE w/ (2) I/2" ANGROR BOLTS (4" LONG EXPANSION BOLTS CLIMATIC $ REOORAPHIC DE51ON CRITERIA w AREAS SHALL BE STAINLESS STEEL OR HOT DIPPED GALVANIZED. EXIST. HALLS 8 12" LONG HOOKED BOLTS ® NEW FOUND. WALLS). FOR ANY 2.2.4. METAL CONNECTORS WHERE METAL PLATE OR STRAPPING SIZE AND ALLOWABLE DEFLECTION OF STRUCTURAL MEMBERS -- --- --------- - --- Q 4. WHERE WINDOWS AND DOORS INTERRUPT WOOD STRUCTURAL PANEL POSTING ® G.M.U. WALL SEE PLAN FOR REQUIRED REINFORCING (® MIN. 16" GAGE ARE SPECIFIED, MINIMUM ASTM A653, STRUCTURAL QUALITY, - --___.___--_ --_- SHEATHING AND SIDING, FRAMING ANCHORS OR CONNECTORS SHALL BE WIDE 3 COURSES OF SOLID BRICK MASONRY CENTERED ® P05TING, U.O.N.). GRADE 53 STEEL SHALL BE USED. OTHER METAL CONNECTORS 5HALL _______________ _-__--------- .______--..___.__ __- _ __- - _ __ . GROUND SNOW LOAD 25 LB5 PROVIDED AT THE TOP AND BOTTOM OF CRIPPLE 5TUD5, HEADER STUD5 HOWEVER, WHEN COLUMN OR P05TING IS PART OF THE LOAD PATH FOR USE MEET THE REQUIREMENTS OF THE GOVERNING BUILDING CODE AND ANY r I[ ALLOWABLE PROJECT: AND AT LEAST ONE STUD AT EACH 51G>E OF OPENING. IN A 5HEARWALL, ALL ANCHORS MAKING AN ATTACHMENT ARE TO BE w/ ADDITIONAL REQUIREMENTS A5 SET FORTH IN THE MANUFACTURER'S STRUCTURAL MEMBER CODE EVALUATION REPORTS. J'i DEFLECTION BA51G WIND SPEED 130 MPH 5TANDARD 5HEARWALL HARDWARE (w/NOTED VALUES) # ANCHOR BOLTS, _ -_ _-_ ___.__-.___- ---_--_.__-___!,-__ - LUMNS TO 5. RIDG5 EXGEPTPS SHALL WHERE COLLAR TIES O EACH I'xb'QOR 2"x4AIR OF �(LUMBER IS w�b" RISE 6 TOP w/ (2)CAPS %"� BOLTS TROUGH CENTER MIN. LINE OF BENT VERTIGALSLEGS G 2.2.5. NAILS: NAILS SHALL COMPLY WITH ASTM F 1661 STANDARD RAFTERS HAVING SLOPES GREATER THEN 3/12 EXPOSURE CATEGORY B �,(' I RAFTERSSPECIFICATION FOR DRIVEN FASTENERS: NAILS, SPIKES, AND STAPLES. L/180 _ 1 \V MAR LOCATED IN UPPER THIRD OF ATTIC SPACE AND ATTACH 70 EACH PAIR OF SET b DIST., U.O.N. - ADDITIONAL INFO. 15 FOUND ON PAGE G-003. - ----- ---- - GLA55 WINDOWS AND DOORS W/ NO FINISHED _FILING ATTACHED TO RAFTERS ; RAFTERS. 2.2.6. PNEUMATIC NAILS AND STAPLES: PNEUMATIC NAILS AND STAPLES SEISMIC DESIGN CATEGORY B SHALL MEET THE REQUIREMENTS OF THE GOVERNING BUILDING CODE i INTERIOR WALLS E PARTITIONS � H/150 l DECK / SHED b. UPLIFT CONNECTORS SHALL BE PROVIDED AT EACH RAFTER BEARING. I. ALL GLASS TO BE INSULATED LOW-E, UNLESS OTHERWISE SPECIFIED. AND ANY ADDITIONAL REQUIREMENTS AS SET FORTH IN THE I ______ _-_.__--___-_ I ______._ i WEATHERING -� SEVERE 1. FLOOR TO FLOOR HOLD-DOWN5 TO BE:: PROVIDED EVERY .4B" AND EVERY 2. GLAS5 DOORS AND WINDOWS SHALL NOT BE INSTALLED UNTIL PROPER MANUFACTURER'S GORE EVALUATION REPORTS. ---- ---- - -- ---- ------ 16" WITHIN 4' OF EXTERIOR CORNERS. CLEARANCES ARE PROVIDED. 2.2.1. SCREWS: SCREWS SHALL COMPLY WITH ANSI/A5ME B I8.6.1 FLOORS d PLASTERED CEILINGS L/360 I FROST LINE DEPTH ' 3'-0" _ 8. SILL PLATE TO FOUNDATION ANCHORAGE;SILL PLATE SHALL BE ANCHORED 3. ALL SLIDING GLASS DOORS, SKYLIGHTS, AND ANY GLASS UNIT INSTALLED WOODSGREWS (INCH SERIES). ALL OTHER STRUCTURAL MEMBERS L/240 --" - - ---" ----` -- -- --- -~I 1490 PARADISE POINT ROAD TO THE FOUNDATION WITH ANCHOR BOl_T5 HAVING A MIN. BOLT DIAMETER WITHIN IS" OF FINISHED FLOOR SHALL BE OF INSULATED TEMPERED GLASS, _ __ TERMITE MODERATE TO HEAVY OF " AND 3"x3"xj" WASHERS. A MINIMUM OF ONE ANCHOR BOLT SHALL BE UNLESS OTHERWISE NOTED. --- --" --" ------- "- - SOUTHOLD, NY 11971 PROVIDED WITHIN b TO 12 INCHES OF EACH END OF EACH !'LATE. ANCHOR __- ___-__________._____-________________-___-__-__ _-__ -_- __ ------_ _ _ ICE BARRIER REQUIRED YES EXTERIOR WALL5 W/ PLASTER OR STUCCO FINISH H/360 i- ___-- _----__--I ED - - - --_--_---- BOLTS SHALL OUNDATONS. ANCHOR OOLT5 SHALL BE LOCATEDEDMENT OF T' NWGONNIRE E/MA50NRY 4. ALL CLASS UNITS OR CORNERS MANUFACTURERS SPECII�GATIONSL BE TALLED IN STRICT ACCORDANCE WITH MECHANICAL CONNECTIONS: EXTERIOR WALLS - WIND LOADS Vy/ BRITTLE FINISHES _-L/240 J, DRAWING TITLE: AND AT SPACING NOT EXCEEDING 4' ON CENTER. I. ALL MECHANICAL CONNECTIONS SPECIFIED AS "SIMPSON" MAY BE --" ----- 5. ALL WINDOWS TO BE CAULKED AND SEALED AS PER NEW YORK STATE SUBSTITUTED WITH AN APPROVED EOUAL PRODUCT. I EXTERIOR HALLS - WIND LOADS W/ FLEXIBLE FINISHES L/120 GENERAL NOTES ENERGY CONSERVATION CONSTRUCTION CODE. --------- - - -- - -- ---- - =_-- ------ -------- CODES AND REFERENCE STANDARD: 2. THE "SIMPSON"5TITUTION SHALL MEET ALL OF THE MINIMUM CRITERIA SPECIFIED STRUCTURAL DESIGN CHARTS I. ALL NEW WORK PERFORMED SHALL CONFORM TO THE 2020 iNEW YORK 6. PROVIDE FLASHING PANS UNDER ALL SLIDING GLA55 DOORS, WINDOWS, . STATE BUILDING CODE, 2020 NEW YORK 5TATE RESIDENTIAL CODE, 2020 ANY OTHER TYPE OF CLASS UNIT WHEN WITHIN b OF AN EXTERIOR SURFACE. NEW YORK STATE PROPERTY MAINTENANCE: CODE, AND 2020 MEW YORK 3. ALL LOADING CAPACITIES SHALL MATCH EXACTLY OR EXCEED VALUES ------ ----- -------- -- __ _. --- STATE ENERGY CONSERVATION CONSTRUCTION CODE. 1. ALL EXTERIOR DOORS ARE TO BE WEATHERED STRIPPED AND PROVIDE ALL INDICATED IN "SIMPSON" PRODUCT LITERATURE. THERE MAY BE SEVERAL l� SCREENS AND HARDWARE NECESSARY FOR PROPER FUNCTION OF SUCH UNITS. LOADING VALUES, CONTRACTOR SHALL CONTACT ARCHITECT IF ANY I STRUCTURAL 1DE51 CAN LOADS 2. REFERENCE STANDARD USED FOR ALL WOOD FRAMING, CONINEGTION5 OF LOADING VALUES ARE LESS THAN WHAT 15 SPECIFIED BY "SIMPSON" WOOD FRAMING, AND CONNECTION TO FOUNDATION - 2015 WOOD FRAME 8. ALL GLA55 IS TO BE FREE OF SCRATCHES AND IMPERFECTIONS. GLA55 SHOULD BE GUARANTEED BY THE MANUFACTURER FOR A PERIOD OF 5 YEARS. �--- --- ---_ ----=- --- _----- ----- -- ---- - --- - -1Lr -----� PAGE:(AF$PA) AMERIGAN WOOD COUNCIL (AWC). q. ALL WINDOWS TO BE ANDERSEN. IF CONTRACTOR IS TO SUBSTITUTE WITH 5. INSTALLATION PROCEDURES 5HALL ALWAYS BE CARRIED OUT AS PER -USE ------- LI1/E LOAD EAD LOAD CONSTRUCTION MANUAL BY THE AMERIGAN FOREST 4 PAPER Al550G TIO MECHANICAL GO GT O HOT DIPPED G D i 3. ALL PLUMBING WORK SHALL CONFORM TO THE 2020 NEW YORK STATE ANOTHER WINDOW MANUFACTURER, IT IS THE RESPONSIBILITY OF THE MANUFACTURER 5PEGIFICATION5 OF THE PRODUCT BEING INSTALLED. EXTERIOR BALCONIES � 40 psf 15 psf I PLUMBING GORE. CONTRACTOR TO VERIFY THAT THE CHARACTERISTICS OF THE WINDOW MATCH _ - _- _ __ _- _ _ THE CHARACTERISTICS OF THE ANDERSEN WINDOW SPECIFIED. THE 6. ALL FASTENING CRITERIA SHALL BE CARRIED OUT AS PER MANUFACTURER I U-0012m, . 00 : 4. ALL MECHANICAL WORK SHALL CONFORM TO THE 2020 NEWT YORK STATE CHARACTERISTICS ARE AS FOLLOWS, BUT NOT LIMITED TO: DESIGN PRESSURE, SPECIFICATIONS OF THE PRODUCT BEING INSTALLED DECKS 40 psf 15 psf MECHANICAL GORE AND 2020 NEW YORK STATE FUEL GAS CODDE. ROUGH OPENING, U-FACTOR, LIGHT AREA,VENT AREA, AND EGRESS REQUIREMENTS. 1. VARIATIONS IN CONNECTOR CONFIGURATION SHALL BE APPROVED BY PASSENGER VEHICLE GARAGES 50 psf AS PER PLAN 5. ALL ELECTRICAL WORK SHALL CONFORM TO 2011 NATIONAL. ELECTRIC 10. WINDOWS IN TUB/SHOWER ENCLOSURES AND WITHIN STAIRWAYS SHALL BE ARCHITECT - I - DATE: J-2/09/24 2 OF 9 CODE, NFPA 10 AND 2020 NEW YORK STATE ENERGY CONSERWATION TEMPERED GLA55. UNINHABITABLE ATTICS WITHOUT STORAGE CONSTRUCTION GORE. 5. ALL CONNECTORS SPECIFIED AS A "SIMPSON" TOP MOUNTED BEAM (MAX CLEAR HOT < 42") I 10 psf 15 psf BEAM HANGER ONLY ALONG WITH SPECIFICATIONS L15TED ABOVE. � II. EXTERIOR GLAZING SHALL BE PROTECTED FROM WINDBORNE DEBRIS. UNINHABITABLE ATTICS WITR STORAGE 20 psf 15 psf HANGER SHALL BE ALLOWED TO BE SUBSTITUTED WITH A TOP MOUNTED GLAZED OPENING PROTECTION SHALL MEET THE REOUIREMENTS OF THE LARGE (MAX CLEAR HOT > 42 ) _ _ _ _ MISSILE TEST OF ASTM Elggb AND ASTM EI88b A5 MODIFIED BY 2020 NYS BG HABITABLE ATTICS R i SECTION 501.2.1.2.1. GARAGE DOOR GLAZED OPENING PROTECTION SHALL MEET ATTICS SERVED BY FIXED STAIRS I 30 psf 15 psf j "�, ~ THE REQUIREMENTS OF AN APPROVED IMPACT-RESISTANT STANDARD OR - --- - -- -' SITE WORK ANSI/DA5MA 115. I. STAKEOUT 15 TO BE PERFORMED BY A LICENSED SURVEYOR ROOMS OTHER THAN SLEEPING ROOMS -- 40 sf 15 sf �, P p `'�� 12. AS AN ALTERNATIVE TO NOTE #11 ABOVE, WOOD STRUCTURAL PANELS WITH - -- -- I 1 . E SLEEPING ROOMS 30 psf 15 psf 2. VERIFY ALL GIVEN DATA ON DRAWINGS. IF THERE 15 A DISCCREPANGY, A THICKNESS OF NOT LESS THAN AND A SPAN OF NOT MORE THAN 8 SHALL p p I I. .,. RECEIVE CLARIFICATION FROM ARCHITEOVENGINEER PRIOR TO PROCEEDING. BE PERMITTED A5 GLAZING PROTECTION. PANELS SHALL BE PRECUT AND ----- - - - -- -- - - ------1 "- --------_-- - I ATTACHED TO THE FRAMING SURROUNDING THE OPENING. PANELS SHALL BE STAIRS 40 psf 15 psf \(.�'.` P 3. EXCAVATE AND BACK FILL FOR WORK INDICATED ON DRAWIIN05. PREDRILLED AND SECURED WITH THE ATTACHMENT HARDWARE PROVIDED AS ll --_____- -_-_ --------- STOCKPILE TOPSOIL OBTAINED FROM STRIPPING DRIVEWAY AMP BUILDING PER THE ANCHORAGE METHOD SELECTED IN ACCORDANCE WITH TABLE % I SITE. STOCKPILE ALL EXCAVATED MATERIALS. R301.2.1.2. ATTACHMENT HARDWARE SHALL BE PERMANENT GUARDRAILS AND HANDRAILS 200 psf 15 psf `, CORROSION-RESISTANT AND THE ANCHORS SHALL BE PERMANENTLY INSTALLED - - -1 --- - - 4. NEW AND EXISTING BACK FILL MATERIAL. ARE TO BE FREE OF WEEDS, TREE ON THE BUILDING. ROOTS, ROCKS, AND DEBRIS. ALL SURPLUS MATERIAL THAT IS UNSUITABLE FOR BACK FILL MATERIAL SHALL BE REMOVED FROM SITE. ROOF LOADING (LIVE = GROUND SNOW LOAD) 25 psf 15 psf 5. PROTECT TREES WITHIN EIGHT FEET OF THE BUILDING. -- --"------ - --- -.- -_--= - -- I MALL STRUCTURAL DESIGN CONSIDERATIONS ARE IN CONFORMANCE WITH A5GE 1-I6 (MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES) HOLDONN DETAILS FA57ENINO 50HEDULE A ALL HARDWAFZE TO BE INSTALLED AS PER MANU. SPEG.'s;MANUFACTURER NOTE: THIS 50HEDULE DOES NOT INCLUDE NAILING FOR METAL FRAMING STRAPS a SU55TITUTIOINS MAY BE MADE WHEN LOAD CAPACITIES ARE MATCHED (SEE PAGE 5-005 FOR STRAPPING AND NAILING REQUIREMENTS, Q AND ROUGH OPENING FRAMING REQUIREMENTS) ALL NAILING IS A GENERAL SPECIFICATION, IT APPLIES UNLESS NOTED OTHERWISEuj (50HEDULE AS PER AWC 2015 WOOD FRAME CONSTRUCTION MANUAL TABLE 5.1) LU cu -- - ---- -- - - ----- -- - _J J M HOLI70WN ',4' HOEDOWN 15' DESCRIPTION FASTENER 5PE0. FASTENER CVANDQUANTITY5FACINOAND QUANTITY SPACING ! Q to FOFOUNDATIONIST /F\ ROOF I$ GE I L 1 NO FRAM I NO -- - -- - --- -- - - - > C0 ENDWALL ENDWALL SEE PAGE 6-003 PER RAFTER N z O RAFTER TO TOP PLATE (TOE-NAIL) (5) 2x FULL (3) 2x FULL CORNER STUD -------------------------- -- '- ----------------------- HEIGHT STUD HEIGHT STUD CONNECTED TO a (B V -L) CORNIER STUD CEILING JOIST TO TOP PLATE (TOE-NAIL) SEE PAGE 6-003 PER JOIST T U CONNIEGTED TO _ TRANSFER SHEAR 2 X :3 fV TRANSFER SHEAR "51MPSON" HDQB �. ° CEILING JOIST TO PARALLEL RAFTER (FACE-NAIL) SEE PAGE 6-003 EACH LAP m HOEDOWN ANCHOR ® 2-I6d COMMON O 2-I6d COMMON NAILS ® 6 O.G. # LOCATIONS NOTED NAILS ® 6" O.G. B q cz " CEILING JOIST LAPS OVER PARTITIONS (FACE-NAIL) -Ibd COMMON ( EACH LAP O ON PLANS 10 O.G. IF BLOCKS c I I BLOCKED CORNER POST --._-- -- -- --- ---- Q CORNER PBS a G O COLLAR TIE TO RAFTER (FACE-NAIL) SEE PAGE 57-003 PER TIE "SIMPSON" HDQB HOEDOWN ANCHOR ® e`"�I- BLOGKIN6 TO RAFTER (TOE-NAIL) 2-5d COMMON EACH END LOCATIONS NOTED ` _ `= ,' �� - - ---------- -- --- --- - ` ON PLANS �� W RIM BOARD TO RAFTER (END-NAIL) 2-16d COMMON EACH END NALL RAM I NO HOLDOWN INSTALLATION OPTIONS: i FOR NEW P. GONG, FOUND.'s TOP PLATE TO TOP PLATE (FACE-NAIL) 2-Ibd COMMON I PER FOOT HOLDOWN CAST IN PLACE w/V O THREADED ROD --- - -- ----- -- -- ------- - --- U • TOP PLATES AT INTERSECTIONS (FACE-NAIL) 4-I6d COMMON JOISTS - EA. SIDE FOR EXIST, P, GONG. OR NEWLY GURRED FOUND.'s CONCRETE w/DED 51MPSONPSE�H16H STREN6 EMBEDDEEPDOI INTO STUD TO STUD (FACE-NAIL) - - -- - 2-Ibd COMMON 24" O°G. � ADHESIVE), Q FOR TEMP,s O F-40 F USE SIMPSON AT �-- "--"-- - - (HIGH STRENGTH ACRYLIC ADHESIVE) HEADER TO HEADER (FAGE-NAIL) I6d COMMON 16" O.G. ALONG EDGES' • OR EXIST. NEW G.M.U. GONG. BLOCK)F / ( L ) TOP or BOTTOM PLATE TO STUD (END-NAIL) 2-I6d COMMON PER STUD ( L) FILL TOP 2 COURSES SOLID 8 CAST IN PLACE HOLDOWN _ - - - - THREADED ROD BOTTOM PLATE TO FLOOR JOIST, BAND JOIST, 2-I6 I�d COMMON III PER FOOT ENDJOI5T, or BLOGKIN6 (FACE-NAIL) - f-fOLDOWN HOLDOWN 'D' - - - - - - ------ -- ---- - FLOOR FRAMINO FOUNDATION ® ONE STORY ONLY JOIST TO SILL TOP PLATE or 61RDER (TOE-NAIL) r 4-5d COMMON PER JOIST n 1 FOR NEWLY POURED ------------------ ----- --- --- ------ -- �+/ i OR T.. FOUNDATIONS (5) 2x FULL ENDWALL BRIDGING TO J0I5T (TOE-NAIL) 2-Sd COMMON EACH END HEIGHT STUD CORNER STUD — - -- -- - - - CONNECTED TO TRANSFER SHEAR BLOCKING TO J015T (TOE-NAIL) j 2-Sd COMMON EACH END 'SIMPSON" HDQB (5) 2x FULL HOLDOWN ANCHOR ® 2-I6d COMMON BLOCKING TO SILL or HE16HT STUD 3-I66 COMMON EACH BLOCK LOCATIONS NOTED NAILS ® 6" O.G. 4 TOP PLATE (TOE-NAIL) ON PLANS 10" O.G. IF BLOCKED -- - --_ -----_.- I CORNER POST LEDGER STRIP TO BEAM (PAGE-NAIL) 3-I6d COMMON EACH JOIST JOIST ON LEDGER TO BEAM (TOE-NAIL) 3-5d COMMON ~ PER JOIST r ' NAILS ® 6 M. _ BAND JOIST TO JOIST (END-NAIL) 3-I6d COMMON PER JOIST 2 I6d CO BAND JOIST TO SILL or TOP PLATE (TOE-NAIL) 2-I6d COMMON I PER FOOT ° ° ROOF SHF-ATH I NO ° I _ STRUCTURAL PANELS: INTERIOR ZONE Sd COMMON 6" EDGE / 12" FIELD I PERIMETER EDGE ZONE e Sd COMMON EDGE /6" FIELD 51MPSON' ST DI4 II HOEDOWN INSTALLATION OPTIONS: SABLE ENDWALL RAKE OR RAKE TRUSS Sd COMMON 4" O°G. ��-� w/ FOR NEW P. CONC.CAST IN PLACE w "I 8'm THREADED ROD _ / UP TO q" RAKE OVERHANG ---_ -- - ---_-- -- - -1 HOLDOWN G L / / - - - GE I L I NO SHEATH I NO FOR EXIST. P. GONG. OR NEWLY GURRED FOUNW.'s ---1- ° ° � :'CIED -- --- ---------- MIN. ---- ---1 --- --- -- ----- CONCRETE w/D�DSIMPSc, (?N SET (HIGH STRENt TD EPDXY INTO FR GYPSUM WALLBOARD -- - 5d COOLERS 1" EDGE / 10" FIELD j ADHESIVE), d FOR TEMP.s O F-40 F USE 51MPSON AT CORNER (HIGH STRENGTH ACRYLIC ADHESIVE) ONE #4 REBAR FOR EXIST. /NEW G.M.U. (GONG. BLOCK) SPECIFIED NOTE �/ WALL 5HF_ATHINO TYP. FOUND. NOTE FILL TOP 2 COURSES 50LID # CAST IN PL.AGE HOLDOWN - --- - -- II COMMON 6" EDGE / 12" FIELD w/ T/8 ROD OD STRUCTURAL PANELS GYPSUM WALLBOARD 5d COOLERS 'I" EDGE / 10" FIELD - - - --- -- ------ - Z Lu NAILINA/STRAFFINO DEADER �FLOOR SHE47HINO (SUBFLOOR)----— - ---- , - ---- o NOTATION: -------------------- �- Sd COMMON =_---� �- A - NUMBER OF Sd NAILS ® EA. END OF STRAPPING (2018 WFGM, TABLE 51,P. 15q);WHEN STRAPP N6 STRUCTURAL PANELS: I or LESS: 2u REQUIRES OVER 14 NAILS,USE 51MPSON G516 STRAPPING (OR EQUAL). b" EDGE / 12" FIELD -I' GREATER THAN I": IOd COMMON 6" EDGE / 12" FIELD ----- ---i--.-_--_ B - NUMBER OF SILL STUDS-ON FLAT (DOES NOT APPLY TO DOORS) (2018 VI TABLE 3.235, P. qU G - NUMBER OF FULL H;=16H7 KING STUDS ® EA. SIDE OF HEADER(2015 WFGM,TABLE 3.230,P. 2q ; =---------- -- ---------------------j ALTERNATE A5 PER TABLE 3.23D,P. 2q3) - - NAILING REQUIREMENT5 ARE ALL BASED ON W SHEATHIN6 NAILED 6" O.G. AT THE PANEL. EDGE.G SCHEDULES SHALL BE USED WHERE WALL SHEATHIN6 NAILING 15 REDUCED. A 0 -- D D - NUMBER OF I6d NAILS,END-NAILED THROUGH ADJACENT KING STUD TO END OF HEADER® EA. SIDE ALTERNATIVE NAILIN (2015 WFGM,TABLE 3.1, P. 15q) FOR EXAMPLE, IF WALL SHEATHING 15 NAILED 3" O.G. AT THE PANEL EDGE TO OBTAIN HIGHER E (2-PLY) - NUMBER OF JACK STUDS ® EA. END OF 2-PLY HEADER(2018 WFGM,TABLE 3.22F,P. a) SHEAR CAPACITIES, NAILING REQUIREMENTS FOR STRUCTURAL MEMBERS SHALL BE DOUBLED, OR G E (5-FLY) - NUMBER OF JACK STUDS ® EA. END OF 3-PLY HEADER (2015 WFGM,TABLE 3.22F,P. 2 ,5) ALTERNATE CONNECTORS SHALL BE USED TO MAINTAIN THE LOAD PATH. F - NUMBER OF I6d NAILS,END-NAILED THROUGH ADJACENT JACK STUD TO END OF 51LL(5) ® EA. IDE 2 - WHEN WALL 5HEATHIN6 15 CONTINUOUS OVER CONNECTED MEMBERS, THE TABULATED NUMBER OF PROJECT: B E (DOES NOT APPLY TO DOORS) (2015 WFGM, TABLE 5.5,P. I011) NAILS SHALL BE PERMITTED TO BE REDUCED TO I-I&P NAIL PER FOOT. Ff�STENiNO SC B —� s FOR ROOF 5HEATHIN6 WITHIN 4' OF THE PERIMETER EDGE OF THE ROOF, INCLUDING 4' ON EACH ��� n [A� ^ SIDE OF THE ROOF PEAK, THE 4' PERIMETER EDGE ZONE ATTACHMENT REQUIREMENTS SHALL BE IV'/-�K F I ROUGH OPENING FRAMING REOUIREMENT5 FOR WINDOW/DOOR OPENIN65 USED. (IN ACCORDANCE WITH WOOD FRAME CONSTRUCTION MANUAL 201 91, EDITIOPll DECK / SHED A 7(2.-FEp:,;L E SIONAOE FOR TRUSS TYPE, FRS-ENGINEEREDaWOOD AND/OR TIMBER CONSTRUCTION �, ROUGH � A B G D (3-PLY F - - -Hord THE FOLLOWING 516NA6E SHALL BE AFFIXED TO THE ELECTRIC METER BOX ATTACHED 1490 PARADISE POINT ROAD OPENING 2'-O" 2 I I 2 j I I 2 TO THE EXTERIOR OF STRUCTURE OR AFFIXED TO THE EXTERIOR WALL OF THE SOUTHOLD NY 11971 �� RESIDENTIAL STRUCTURE AT A POINT IMMEDIATELY ADJACENT TO THE ELECTRIC BOX OR 4'-0" �II 3 I 2 3 I I 3 O BLE ENDW?�LL A LOCATION LIKELY TO BE SEEN BY FIRST RESPONDERS WITH APPROVAL BY THE SF'L- I G ( I ill../ OF TOF FL AA 7E AUTHORITY HAVING JURISDICTION: PROVIDE (2) 2"xl0" HDR (MIN.) U.O.N. b'-o° 4 - 4 I i 4 BRAC.1NO/STRAFFINO DRAWING TITLE: _ _ { FOR RAKES PROVIDE oR HOLDOWN ANCHOR BOLT 8'-O" 1 6 2 B 5 I I 5 T�S LI TOP PLATE SPLICE REQUIREMENTS TOP PLATE SPLICE REQUIREMENTS BAYS BOAI OG \<TOA CKIN R 12"O.C. CONSTRUCTION TYPE DESIGNATION SHALL FOR WIND - EXPOSURES BBG - FOR WIND - EXPOSURES BBC - BE I II III iV , OR V TO INDICATE FASTENING SCHEDULE �— ONE STORY SLAB ON GRADE ROOF THE CONSTRUCTION CLASSIFICATION OF R GASES --_- __-- -_- _-- -- -_-- THE STRUCTURE UNDER SECTION 602 OF -- �: � 8 2 5 8 2 I 6 I _ -- ALL OTHER � ---- -- -- ------ 11 --- - -- 12-O -' -- I 8 is + isa� -- L- ---- DIMENSION (FT.) LENGTH (FTJ BUILDING MINIMUM SPLICE THE NYS BG. - - - - I BUILDING MINIMUM SPLICE III DIMENSION (FT.) � LENGTH (FT.) ---- - ----� PAGE: - TYP. STRAP w/(5) ---------- - - - -- - 1 - - - -- - ---- ------ Sd NAILS EA. END 12-O - --- " - 1 OF EA. STRAP " DESIGNATION FOR STRUCTURAL 3-O 6 DIAMETER COMPONENTS THAT ARE OF TRUSS TYPE, -- ---- ---- - --- ATTIC PRE-ENGINEERED WOOD OR TIMBER /' N / O R O L.T I G T I O N i 6'-O" --- CONSTRUCTION AS FOLLOWS: ■ 0 li 20'-O" "Fit = FLOOR FRAMING, I NGLUD I NC G-00 * - SPECIFICATION (2018 WFGM TABLES 3.2A B 3.25, P. 15-1-I60) 24'-O' q'_p"�'_p" - --- - -- -- - - --- ---- BLOCKING 2 BAYS GIRDERS BEAMS l --- -- - 0" -- - 24'-0" 6'-0" BACK® 4 0 o.c. - "R" = ROOF FRAMING CORNER sq --- ------------------ �I — ---- ------ - ----------------.--- i' - "FIR" = FLOOR I$ ROOF FRAMING DATE: 12/09/24 3 OF 9 CONDITION FOR ALL STRUCTURES: 5/8"� ANCHOR BOLTS a 3Q" O.G. 28'-O" 5'-O"/6'-3" 28'-O" -1'-O" �^ 51-011 SECOND FLOOR 36'-011 -1'-O"/8'-q" 36'-O" NOTES: I.TABULATED SPLICE LENSTH5 ASSUME TOP PLATE-TO-TOP PLATE CONNECTION USING 2-I6d NAILS PER FOOT.FOR SHORTER SPLICE LENGTHS,THE NAIL SPACING SHALL BE REDUCED IN ORDER TO 40'-O" 8'-O"/10'-O" 40'-O" II'-D" BLOCKING 2 BAYS 1. MIN. '1" EMBEDMENT INTO CONCRETE PROVIDE AN EOUIVALENT NUMBER OF NAILS ___ _ _ ____ ` IPEND 15 EMBEDMENT FOR G,M.U. (BLOCK) FOUND. B FILL 1 BACK® 4'-0" o.G. CONDITION IN EXPOSURE B 5o'-O" 13'-O" = w/ 3 SQUARE WASHERS AND END NUT SETUP; - ------ _ TYP. STRAP w/(3) ✓}' `< „ 2.TABULATED SPLICE LENGTHS ASSUME A BUILDING LOCATED 50-O IO-O /I2-6 TOP TWO COURSES SOLID I -- - Sd NAILS EA. END STROKE LATERAL 5. OADSHER KA L MUD CE LENISTHS ARE BASED ON e>FOOT E THE TD BY ABULATED ATED UNIT 60'-O" - - - 12'-O"/15'-O" 60-O -- - ---16-O FIRST FLOOR OF EA. STRAP f.f _ 2. ANCHORS NOTED HEREIN ARE NOT TO 8E USED FOR ----- ----- " PLAN DIAGRAM OF ZONES OR REPLACED BY HOLD DOWN5 FOR SHEARWALLS FOR ALTERNATIVE WALL HEIGHTS MULTIPLY THE ABOVE '10-0 14-0 -10'-O" Iq'-O" 4.< NOTED MIN.SPLICE LENGTH BY THE FOLLOWING FACTOR 3. ANCHOR BOLTS ARE TO BE BETWEEN 6" B 12" (ADDITIONALLY,ROUND UP TO THE NEAREST FOOT): 501-011161-oil80-O" 22'-0" a 6 FROM ENDS AND CORNERS (TWO ® CORNERS) a'WALL- 1.125 __— �—- _ _ ___ ._ — --� --.____--__ ___ REFLECTIVE REFLECTIVE z (SEE DIAGRAM TO LEFT) BLOCKING 2 BAYS 10'WALL- 1.25 II'WALL- 1.315 THIS COLUMN w/MULTIPLIER BACK 0 4'-0" O.C. RED PANTONE WHITE 4. COORDINATE w/ HOLDOWN LOCATIONS 12'WALL- IS FOR 10'-0" WALL #I87 4.TOP PATES SHALL BE A MINIMUM OF STUD GRADE MATERIAL M 15GELLANEOUS FRAM I NO O RAPH I GS I I/� I T t—� /� �,{ I/� (THAT EXCEED FRAMING 5TANDARD5, IT IS REO'D FOR FRAMER TO HAVE A F I REBI�OGK I I 0 FOR FLA I FORM WOO1� FRA " I I O WORKING KNOWLEDGE OF TIHE AMERICAN WOOD COUNCIL [ANC] DETAIL BOOK (FOR ENOINEERED LUMBER De. WOOD I-JOISTS] SEE MANU. SPEG.'s FOR ADDITIONAL INFO.) AND ALL RELEVANT PORTIONS OF THE RESIDENTIAL CODE) Q BLOGKINO UNDER LOAD BEARING WALL I. FOR PLATFORM FRAME GON5TRUGTION: THE SOLE SERVES 0 AS FIRE-5TOPPING. ui NON-LOAD BEARINO WALL OFFSET FROM SUPPORT J cu 2. FOR PLATFORM FRAME CONSTRUCTION: THE DOUBLE JOI5T STUDS STUD SERVES AS FIRE51LOPPIN6. Q cy) N SUBFLOOR •- 5. FOR PLATFORM FRAME CONSTRUCTION: THE SOLE AND DOUBLE W SUBFLOOR 50LE PLATE j PLATE SERVE AS FIRESTOPPING. r- �I 4. FOR PLATFORM FRAME CONSTRUCTION: THE DOUBLE O -p 0 SOLE PLATE y JOIST SERVES AS FIRE5TOPPIN6. >' (.0 5. FIRE5TOPPIN6 SHALL BE 2 INCHES OF WOOD BLOCKING O C (V Z O OR OF NONCOM-BUSTIBLE FILL. � - Ln �� 6. FOR PLATFORM FRAME CONSTRUCTION: THE SOLE I N AND 2 INCHES OF WOOD BLOCKING PLACED BETWEEN O 4- 0 — -- JOISTS SERVE A5 RE 0 - 0 FI STOPPING. 0 m ' _ -1. FOR PLATFORM FRAME CONSTRUCTION: THE SOLE AND O 0 co Lr) MAXIMUM OFFSET " , _ 2 INCHES OF WOOD BLOCKING PLACED BETWEEN JOISTS J015T DEPTH,d `� �� i � - � { I Q � � 0 MATCHED SIZE OF BLOCKING SERVE AS FIRE5TOPPIN6. UNDER NON-LOAD BEARING FIRESTOPPIN6 AND - PARTITIONS a 52" O.G. BLOCKING STUD FFes�.. i 3 8. THE HEADER SERVES AS FIRE-5TOPPIN6. DOUBLE PLATE 9. TWO-INCH WOOD BLOCKING OR THE EQUIVALENT SHALL BE ADDED BETWEEN STUDS IN PARTITION ADJACENT TO-- n , i W STRINGER TO SERVE AS FIRESTOPPIN6. GE I L I NO BRAG I NC7 6 10. THE SPACE BETWEEN A CHIMNEY AND COMBUSTIBLE FLOOR GANTILE�ERED FLOOR - -- _ GABLE ENDWALL II `-- ��� �:,�/� -., -----_- �_ _ ! FRAMING SHALL BE FIRESTOPPED AT THE BOTTOM WITH APPROXIMATELY I-INCH DEPTH OF NONCOMBUSTIBLE MATERIAL STUD 2 HELD IN PLACE BY METAL LATH OR WIRE FABRIC. SUCH SUBFLOOR SOLE PLATE 2"x4"CONTINUOUS GABLE END FIRESTOPPING SHALL NOT BE REO UIRED WHEN THE BOTTOM OF 70 LATERAL BRACE a 60.0. TRUSSI THE VERTICAL OPENING 15 SEALED BY PLA5TER ON THE CEILING BAND AND CHIMNEY. THE SPACE ABOVE THE FIRE-STOPPING SHALL BE U JOIST 2) IOd NAILS TRUSS OR LEFT UNFILLED 50 THAT HEAT FROM THE CHIMNEY CAN BE CARRIED G.J. AWAY BY AIR CURRENTS MOVING UPWARD AND OUT THROUGH NORMAL n , PLATFORM FRAME CON5TRUCTION 5HRINKA6E CRACKS OF THE INTERIOR FINISH. PLASTER GEILIN6 ONW NONCOMBUSTIBLE LATH, EXTENDING TO CHIMNEY FACES, WILL SERVE 10) ad -LOCATIONS REGUIRUN6 FIRE5TOPPING- AS FIRE5TOPPIN6. NAILS • FIRE- FIRE- WOOD FIRESTOPPING FIRESTOPPING 1 STOPPING 5TOPPIN5 FIRE- FIRE_ SOLE i STOPPING STOPPING JOIST * 5d COOLER NAILS® 10" O.G. U 2"x4" BLOCK NAILED TO EA. BRACE VERTICAL LOCKING FIRE5TOPPING WHEN w/(4) IOd NAILS STUD 20 ga. STRAP GovTO VN IS APPLIED GYPSUM BOARD JOISTS DOUBLE PLATET * (10)8d NAILS TO UNDERSIDE OF �� 5d COOLER NAILS® lo" O.G. LOCATION I LOCATION 2 LOCATION 3 LOCATION 4 �+) JOIST SHALL BE LOCATED DIRECTLY COTE' ENDWALL STUDS S NONCIRESTOTIBLE LOT�ATE DENOTES ALT.FOR USE OF DRYWALL SCREWS FIRESTOPPING LOCATION Q OVER STUDS,UNLE55 TOP PLATE 15 4"a EDGE/12"m FIELD FULLY BLOCKED SOLE WOOD FIRESTOPPING OF&IIRDER DESIGNED TO CARRY THE LOAD SCREWS#b - Vw TYPE W OR 5 FIRE5TOPPING LOCATION 5 LOCATION 6 INTERIOR STUC DETAIL OVERLAID ROOF ATTACHMENT ® VALLEY "I'''illl, 2"SPACE NOT TO BE FILLED NONCOMBUSTIBLE FIRESTOPPIN6 FIRESTOPPING AFFROX,I INCH THICK LOCATION '1 n � '� STRAPPING w/ 4 ad NAILS LOCATION 8 FIRESTOPPING LOCATION 9 4 EA. END a R.R. LOCATION 10 (FULL WIDTH 2'x I BLOGKIN& O Lu V N I, � I TOP PLATE DRILL 2"0 INTO ROOF NTERSEGTI ON DEZ'A I L DECK FOR STRAPPING INSTL. EXIST.OR NEW I NEW R.R. SET w/. R.R. BELOW UPPER TOP PLATE LAPS 4 IOd NTINUOUS 1_OWER TOE NAILS NOTED GONT.BLOCKING TOP PLATE 5PIKED TO R.R.'s ALIGN NEW d EX. R.R. AS 5HOWN I PLAN VIEW GTE: SIMILAR® '5HED' ROOF,R.R. IN LINE H GENERAL REQU I REMENT5 FOR GENERAL REQU I REMENT5 FOR W INSTALLATION OF CLINCHED NAILS INSTALLATION OF TOE-NAIL5 0 MAIN MEMBER i Li.l I. TOE-NAIL5 SHALL BE DRIVEN a AN ANGLE OF PROJECT: MEMBERS '-DIAM.X 5 APPROX. 50' w/THE MAIN MEMBER 4 STARTED APPROX. Y5 THE LENGTH OF THE NAIL FROM THE MEMBER END, I. NAILS SHALL BE DRIVEN PEFZPENDIGULAR TO AS SHOWN ABOVE THE MEMBER, STRAIGHT THROUGH AND BENT OVER KUMAR A MIN. OF (5) NAIL DIAM.'s AT A q0° ANGLE 2. THE MIN. PENETRATION OF THE NAIL IN TO THE MAIN DECK / SHE D MEMBER, FOR THIS APPLICATION, SHALL BE AT LEAST SIX TIMES THE DIAM. OF THE NAIL 5. TO AVOID SPLITTING, NO MORE THAN 2 TOE NAILS SHALL BE INSTALLED IN EA. SIDE OF A RAFTER OR GEILIN6 JOIST NHEN IN EA. 51DE WHD FASTENED TO A 2""xb TOP PLATE. '`1L5 1490 PARADISE POINT ROAD SOUTHOLD, NY 11971 C_:HIM. CHASE SEGURINO © STD. SIDE WALL DRAWING TITLE: FRAMING GRAPHICS BEAM CONNECTION PATTERNS FIREBLOCKING DETAILS NOTE: (51M. a CHASE WITHIN PLANE OF ROOF w/ STUDS TO ATTIC FLOOR 4 BLK'G TO R/L 51DE5 w/STRAPPING TO R/L 5Z)E5) 11 PAGE: w TOP PLATE a O -0)i[Q GHIM. CHASE WALL p i p v d) 0` 0 4 0 e 4 ; lu a z DATE: 12/09/24 4 OF 9 ROOF p CL H zQQ .a Q 0 ]:0:N REO'D BLOCKING TO AL16N w/ 5TRAPPIN6 Q t-W 0. o EA. LEVEL ABOVE w N THE F I R5T FL. a w 3 "• f ter , FLOOR/CLG. f SIDE VIEW PLAN VIEW I O NE AL S"�'MBOL <E�' : EXISTING TO BE DEMOLISHED NEW PARTIAL HEIGHT WOOD FRAME (L.G. STL. x Q WHEN APPLICABLE) EXISTING TO REMAIN NEW FOUNDATION WALL y LU -----{ NEW WOOD FRAME (L.G. \ J I----I 5TL. W O WHEN APPLICABLE) © NEW I-HR FIRE RATED X MIN. (2) 2"x4" STRUCTURAL V a ' CV WOOD FRAME (L.G. STL. .O P05T FOR 4 WALLS = 07 WHEN APPLICABLE) (MIN. (2) 2 xb STRUCTURAL O r- P05T FOR 6 WALLS), U.O.N. _ _0 } 0 � NEW 2-HR FIRE RATED � Of WOOD FRAME (L.G. 5TL. O CV z O WHEN APPLICABLE) 'co 'I � � X N O O O a- 0 4-J N O cu Q a 26 W U ,1 U k � M c- + U � Q . - U) DEMOLITION NOTE: j Q PROVIDE 5HORING AND SUPPORT TO ALL AFFECTED STRUCTURAL MEMBERS PRIOR TO THE COMMENCEMENT OF ANY DEMOLITION OR CONSTRUCTION. EXIST. RAILING ' TO BE REPLACED II TEMPORARY 5HORING/DEMO SEOUENGING NOTES: - - I. INSTALL TEMP. POSTS 4 GIRDER PER DEMOLITION _ 11PLAN 4 PER DETAILS. 2.REMOVE EXIST. GIRDER. EXIST. STAIR _ 3.INSTALL NEW GIRDER PER PROPOSED PLANS;SECURE EXIST. RAILING TO BE REPLACED �I EXIST. FLOOR JOISTS TO NEW GIRDER. TO BE REPLACED ---- -Il 4.REMOVE TEMP. POSTS 4 GIRDERS. - l EXIST. RAILING -- TO BE REPLACED EXIST. DECKING " EXIST. DOORS TO BE REPLACED TO BE REPLACED -I- __ - � I _ - - — - - ---------_-- - F.. I I NOTE: MINIMAL DISTURBANCE TO THE BLUFF WILL BE DONE. HACND -_____ ___ _.________ I N PULLING OF INVASIVE SPECIES: ENOLI5H IW (HEDERA HELIX) AND t(1 EXIST. OUT SHOWER 4 w p I COMMON PERIWINKLE (VINCA MINOR). ANY AREAS WHERE INVASIVE b PLUMBING TO BE REMOVED I SPECIES ARE REMOVED, NATIVE NON FERTILIZATION DEPENDENT VEGETATION WILL BE PLANTED AND A SUITABLE SEED MIX WILL BE \ r' ADDED TO ANY D15TURBED AREAS. I I 11 i EXIST. BEAMS I' AREA OF DISTURBANCE ON BLUFF TO BE APROX 5% OF THE 50ZUARE TO BE REPLACED �I FOOTAGE OF THE SLUFF. EXISTING �u--t DECK 145.2 S.F. ii EXIST. EXIST. EX15T. STORAGE 5TORA6E STORAGE EXIST. DEGKIN6 I I TO BE REMOVED I N I H XQ Z lU w J � INO - -------- �_ TO BE REMOVED - — — --- t1 -�- - - -- -- —*— --------------- EXIST. RAILING ----- TO BE REPLACED EXIST. RETAINING WALLZ 1. 11 TO BE REPLACED w EXISTING - - a WALK 111 EXIST. STAIR I 1 EXIST. DECKING TO BE REPLACED TO BE REPLACED ---- TI EXIST. DEGKIN6 PROJECT: -- TO BE REPLACED - l° KU w o MAR EXISTING ---- ` EXISTING DECK SHED i LANDING LAND I NG / I I 1490 PARADISE POINT ROAD SOUTHOLD, NY 11971 DRAWING TITLE: F -'OFOSEI�) STORAO E SHEC) STAIR I7)EMOL, I T I ON PLAN PROPOSED 17EO< STAIR DEMOLITION FLAN PROPOSED DEMOLITION PLANS SCALE: 114" = 1'-0" SCALE: 114" = P-a" PAGE: ell It ff 'm u m in AM2.v :imw DATE: 12/09/24 5 OF 9 II i •(x r � 4 EXISTING TO BE DEMOLISHED NEW PARTIAL HEIGHT — -' WOOD FRAME (L.G. 5TL. < WHEN APPLICABLE) EXISTING TO REMAIN Lu NEW WOOD FRAME (L.0. NEW FOUNDATION WALL Lu cc 5TL. WHEN APPLICABLE) . ' > -� NEW I-HR FIRE RATED MIN. (2) 2"x4" STRUCTURAL O Lo �, WOOD FRAME (L.G. 5TL. a P05T FOR 4" WALLS 07 WHEN APPLICABLE) (MIN. (2) 2"x(b" STRUCTURAL O POST FOR 6" WALL5), U.O.N. _ 0 NEW 2-HR FIRE RATED +-+ WOOD FRAME (L.5. 5TL. LO O (\J Z O WHEN APPLICABLE) a '� Lo d' 2: X N 0 O +- 0 M � N cc Q 0 W D -�-J 70 U • - 4-J m -c + U c ---------------- --- ------------------ -- BOTTOM OF BANK-/ - -- BOTTOM OF BANK -- PROP. GONG. PAD ® STAIR BASE (SEE PAGE 5-1) - REPLACE EXIST. TREAD5 (THRU-FLOW) _ y Q ✓€ STRINGERS z z PROPOSED 56" TURNBUCKLE - ---- z (SEE PAGE 5-2) -�y B- p m m RAILING REPLACEMENT PROPOSED 36" TURNBUCKLE RAILING REPLACEMENT - .tm PROP. 5ONOTU5E5 ® — - EXIST. 4"X4" POSTS (SEE PAGE 5-2) 2 NEW THRU-FLOW x Q w p DEGKIN6 EXIST. PROPOSED 56" TURNBUCKLE 2'-4" z COVERED PROP. 50NOTUBES DECK ® LANDING RAILING REPLACEMENT �t I I I EXISTING ! 2 2 �ryoy+ /rye+ ryas+ LANDING EXISTING C� DECK p p p 145.2 S.F. Q d PROP. E.P.D.M. N m EXIST. MEMBRANE;SLEEPERS EXIST. EXIST. Q w z O STORAGE STORAGE STORAGE O Vd/FLOW-THRU DEGKIN6 ABOVE w N r NEW THRU-FLOW N 0 0 DEGKIN6 1 X R - U PROPOSED 56" TURNBUCKLE L x 2 RAILING REPLACEMENT -- - - z w Q a - -® ®-- GUTTER O GUTTER H16H i dJ O � ' PROP. P. GONG. RETAINING --�►�- - POINT,BELOW - WALL, IN-PLACE Off WALK DOWNSPOUT 4 REPLACEMENT OF -`'`"- i- z \ LEADER TO DRY WELL --1-L' L--- j- PROJECT: EXI5TING RETAININ6 WALL EXISTING —� — (SEE PAGE 5-1) — -- 2 p ' WALK _ �,( �/� /� REPLACE EX15T. \� �\U 1 r 1 A R TREADS 6 5TRIN6ER5 2 (SEE PAGE 5-2) DECK / SHED PROPOSED 36" TURNBUCKLE �� NEW THRU-FLOW - -- TOP OF BANK RAILING REPLACEMENT DEGKIN6 N O �- - - - / m Lu _ EXISTINO LANDING NEW THRU-FLOW TOP OF BANK LANDING 1490 PARADISE POINT ROAD PROP. 50NOTUBE5 SEE PAGE S-I 1 - DEGKIN6 SOUTHOLD, NY 11971 ® WALK(SEE PACE 5-1) DRAWING TITLE: PROPOSED SHED & DECK PLANS 0 5 10 20 0 5 10 20 FROfi'. 05Er7) STORAGE CJHEF,) FLOOR FLAN GRAPHIC SCALE 1/4"=V-0" FRCFCSF-r�) ROOF PLAN GRAPHIC SCALE 1/4"=1'-0" SCALE: 1/4" = I'-O" SCALE: 1/4" = I'-O" PAGE: A i A 0 UI'h ;t 4"'" ■ 0" ' 'uo"k DATE: 12/09/24 6 OF 9 l: < Lu LU co cy) 4- (\J rY Lr) D 0 0 (.0 FPROPOSED56"H TURNBUCKLE 0 c: C\] z0 RAILING REPLACEMENT Lr) cu r- PROF. r:;FIDM c 2: x n c\j ROOF MEMBRANE O 0 0 4 1 -.�J- Qo 0 M T__ 4-J 4-J cu * TOP OF 11ANK-\ EXISTING OUT SHOWER 4 c: o q cp ALL PLUMBING TO BE REMOVED < PROF. F. CONC. RETAINING d I) WALL IN-PLACE EXIST REPLACEMENT Or- VEOET� EXISTING RETAINING HALL SLOPED 4--j BANK NOTE: MINIMAL DISTURBANCE TO THE BLUFF WILL BE DONE. HAND C) PULLING OF INVASIVE SPECIES: ENOLISH IVY (HEDERA HELIX) AND COMMON PERIWINKLE (VINCA MINOR). ANY AREAS WHEREINVASIVE (D PROPOSED 56"HrURN5UrKLrz SPECIES ARE REMOVED, NATIVE NON FERTILIZATION DEPENDENT VEGETATION WILL BE PLANTED AND A SUITABLE SEED MIX WILL BE 4-J M RAILING REPLACEMENT ADDED TO ANY DISTURBED AREAS. ■ AREA OF DISTURBANCE ON BLUFF TO BE APROX 590 OF THE SQUARE EXIST. I FOO7Ar_-F_ OF THE BLUFF. V�_SETATE I NOTE: NO TREE REMOVAL 15 PERMITTED WITH TH15 PERMIT. ANY TREE EXIST. SLOPED M TRIMMING OR REMOVAL A550CIATED WITH TH15 PROJECT WOULD --} - - �I,r VEGETATED BANK REQUIRE A SEPARATE TREE LETTER I ER AND I NSPECTI ON FROM A MEMBER OF THE BOARD OF TRUSTEES. SLOPED I BANK _—.-- cn TOP OF EXIST. BULKHEAD (D BEACH BEACH FAST ELEVATION (FRONT) SCALE: 1/4" = I'—V PROPOSED BUFFER AREA —BETWEEN EXIST. HOUSE TO BANK z w WIDTH VARIES 0 L) J a5.5' TO TIE LINE a OBSERVED HIGH WATER EXISTING 2 STORY 44.01 To FACE OF 5UILKHFAD FRAME HOUSE 15 NOT PART OF THIS FILING 7 PROPOSED 56"H TURNBUCKLE KUMRAILING REPLACEMENT AR EXISTING FF a HOUSE ELEV. +24.5 DECK / SHED PROF. E.P.D.M. ROOF MEMBRANE EXISTING ROOF DECK 1 , -1 +25.5' 65' TO TIE LINE ® OBSERVED HIGH WATER1490 PARADISE POINT ROAD LT SOUTHOLD, NY 11971 70P OF BANK 21.2' TO FACE OF BULKHEAD -/ PROF. SIDIN6;N H.O. SELECTION -PROPOSED 56"H TURNBUCKLE DRAWING TITLE: PROP. 5ONOTUBE5 RAILING REPLACEMENT >a LANDING PROPOSED EXTERIOR ELEVATIONS REPLACE EXIST. TREADS 4 5TRINeER5 --- - -__ - - ---- \ \ (SEE FACE 5-2) t_fN5TOR.A6E SHED FLOOR a LANDING ELEV. +16.5' \� \, PAGE: 0 PROF. SONOTUDES a LANDING \\\'�\\ REPLACE EXIST. DATE: :12/09/24 7 OF ,TREADS 4 STPIINSERS (SEE FA&E 5-:2) BOTTOM OF BANK TOP OF BULKHEAD -—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-— r-LEV`. +&h' E PROF. CONO. PAD__/ i a STAIR BASE (5EE PAGE 5-2) IBEACHI AVERA OE 0RAl:)rz 6 BOTTOM OF BULKHEAD EXIST. BULKHEAD —-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-—-— TO REMAIN ELEV. +5.V EXIST. STEPS TO REMAIN SOUTH ELEVATION (RIOHT SC)E) SCALE: 1/4" = I'—a" Framing i Strapping r; ,t •.. a a �! 11� D- • •