Loading...
HomeMy WebLinkAboutF-2026-0666 OFFICE LOCATION: o MAILING ADDRESS: Town Hall Annex �� �°� P.O. Box 1179 54375 State Route 25 Southold, NY 11.971 (cor. Main Rd. &Youngs Ave.) 'Telephone: 631 765-1936 Southold, NY 11971 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD To: Glenn Goldsmith, President Town of Southold Board of Trustees Cc: Honorable Lori Hulse, Attorney From: Heather Lanza, AICP, Planning Director LWRP Coordinator Date: November 9, 2026 Re: LWRP Coastal Consistency Review WALLACE, SCTM# 1000-136.-1-40 This application proposes to construct an L-shaped fixed timber dock with open-grate decking, water and electricity, consisting of a 4' x 78' catwalk and a 4' x 16' step-down platform. The proposed action has been reviewed to Chapter§268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is INCONSISTENT with the policies of the LWRP as follows: Policy 5. Protect and improve water quality and supply in the Town of Southold. 5.3 Protect and enhance quality of coastal waters. A. Protect water quality based on an evaluation of physical factors (pH, dissolved oxygen, dissolved solids, nutrients, odor, color and turbidity), health factors Wallace LWRP (pathogens, chemical contaminants, and toxicity), and aesthetic factors (oils, floatables, refuse, and suspended solids). Policy 6. Protect and restore the quality and function of the Town of Southold's ecosystem. 6.2. Protect and restore Significant Coastal Fish and Wildlife Habitats. A. Protect Significant Coastal Fish and Wildlife Habitat values from uses or activities that would: 1. Destroy habitat values associated with the designated habitat through: a. direct physical alteration, disturbance, or pollution, or b. indirect effects of actions, which would result in a loss of habitat. 6.3. Protect and restore tidal and freshwater wetlands. A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction. C. Prevent the net loss of vegetated wetlands according to the following measures. Use the measure resulting in the least environmentally damaging practicable alternative. 1. Avoid placement of fill in or excavation of vegetated wetlands: a. Choose alternative sites which would not result in adverse impacts on wetlands. b. Reduce scale or intensity of development to avoid excavation or fill. c. Choose design alternatives which would avoid excavation or fill. 2. Minimize adverse impacts resulting from unavoidable fill, excavation, or other activities by: a. reducing scale or intensity of use in order to limit incursion into wetland areas b. designing projects to result in the least degree of adverse wetland impacts Town Code §275-11 A(7) states the following: (7) Critical environmental areas. At the discretion of the Board of Trustees, any operations proposed in critical environmental areas (§ 275-2) may be subject to 2 Wallace LWRP more stringent requirements than detailed in this section. Such requirements may include, but are not limited to, denial of certain operations, shortening or reducing the size of structures, and increasing the width of nondisturbance buffers. The LWRP states the following: Policy 9.4 Assure public access to public trust lands and navigable waters. E. 3. Obstruction of navigable waters and underwater lands is limited.- b. to the minimum necessary for access to navigable waters. The minimum is determined by evaluating the following factors: ... (ii) the range of tidal water level fluctuation, ... (vi) whether or not alternative means to gain access are available. Piers, docking facilities, and catwalks must not result in an unnecessary interference with use of public trust lands. Alternatives to long piers or docks include use of dinghies to reach moored boats and mooring in nearby marinas. Dredging solely to accommodate the draft of larger boats is not a recommended alternative. The proposed action is recommended as INCONSISTENT for the following reasons.. 1. The dock is a new structure in Eugene's Creek (East Creek), within the Cutchogue Harbor Wetlands Significant Coastal Fish and Wildlife Habitat and Critical Environmental Area. The State habitat narrative identifies docks in previously undisturbed areas as a cause of habitat loss (Policy 6.2 A). 2. The step-down platform ends in approximately 12" to 18" of water at mean low water. A vessel kept here will sit on or just above the bottom at low tide, scouring the creek bottom and resuspending sediment in nursery habitat (Policies 5.3 A and 6.2 A). 3. The size and draft of the vessel are not provided, so the one-quarter creek width limit, which includes the vessel, and the 15' property line clearance cannot be confirmed (Town Code §275-11 C(2)(b)[2] and C(2)(a)[5]). 4. Approximately 45' of the catwalk crosses high marsh and intertidal marsh, with piles at about 8' on center driven through the vegetated wetland (Policy 6.3 C 1 and 2). 5. The dock is not shown to be the minimum necessary for access to navigable waters, and alternatives such as a mooring reached by dinghy or a marina slip are not discussed (Policy 9.4 E 3 b). 6. The survey labels the adjacent parcel to the south as owned by Daniel Wallace. If the applicants own that parcel and its permitted dock (Permit No. 3690), water 3 Wallace LWRP access is already available, and a second dock would not be the minimum necessary (Policy 9.4 E 3 b (vi)). 7. No plans for the proposed water, electricity or lighting on the dock were provided (Town Code §275-11 C(2)(a)[12] and [13]). 8. The materials for the piles, caps and stringers are not specified (Town Code §275- 11 C(2)(a)[3]). Several components of the proposal further the LWRP policies: • Open-grate decking and a catwalk at least 4' above the marsh reduce shading of the wetland vegetation. • No float is proposed, so no float will rest on the bottom at low tide. • The dock does not extend past the pier line of the adjacent permitted docks (Permit Nos. 552 and 3690) and is 15' from the seaward extension of the north property line. If permitted, the Trustees should consider requiring the following: 1. Determine if the dock is the minimum necessary for access to navigable waters as described above in items 5 and 6, including the availability of marina slips or moorings, and whether the applicant owns the dock on the adjacent parcel to the south. 2. Provide the dimensions and draft of the vessel, and limit the vessel to one that does not contact the bottom at mean low water. 3. Use untreated materials for all piles, caps and stringers. 4. Install a silt boom for all intertidal construction that will retain all suspended sediments within the immediate project area (Town Code §275-11 A(2)), and remove excess fill from pile installation from the wetland the same day (Town Code §275-11 C(2)(c)[1][e]). 5. Submit plans for the water, electric and lighting installation. Lights should be directed onto the dock and off when the dock is not in use. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. 4 STATE OF NEW YORK DEPARTMENT OF STATE ONE COMMERCE PLAZA KATHY HOCHUL 99 WASHINGTON AVENUE GOVERNOR ALBANY,NY 12231-0001 WALTER T. MOSLEY HTTPS://DOS.NY.GOV SECRETARY OF STATE NYS DEPARTMENT OF STATE OFFICE OF PLANNING, DEVELOPMENT AND COMMUNITY INFRASTRUCTURE MEMORANDUM To: Heather Lanza, Planning Director, LWRP Coordinator, Town of Southold From: NYS Department of State, Coastal Consistency Unit Date: October 14, 2026 Re: F-2026-0666: Daniel F. and Gayle B. Wallace - Construct an "L"-shaped fixed timber dock, constructed with open-grate decking, consisting of a 4'x78' catwalk and a 4'x16' step-down platform. Construction of dock will result in approximately 370 square feet of coverage over Eugenes Creek, seaward of MHW. —720 Oak Street Cutchogue—Eugene's Creek Enclosed is a copy of the Joint Application, Federal Consistency Assessment form and supporting project information for the above-referenced project for your information and preliminary review. Please contact Jeremy Campbell, the Department of State reviewer assigned to this project, at Jeremy.Campbell@dos.ny.gov or(518) 473-9962 to discuss applicable LWRP policies and concerns, and any additional information which may be necessary to assist you in reviewing this project. Any comments you may have will assist the Department of State in reaching a decision as to the consistency of the proposed action with the approved Town of Southold LWRP. We would appreciate hearing from you on this proposed project within 30 days. If we do not hear from you by that date, we will presume that you have no objections to the proposed project. Enclosures NE K Department STATE of State PORK Department of Office of Department STATE Environmental General Services of State y Conservation Us Army Cows of Engineers JOINT APPLICATION FORM For Permits for activities activities affecting streams, waterways, waterbodies, wetlands, coastal areas, sources of water, and endangered and threatened species. You must separately apply for and obtain Permits from each involved agency before starting work. Please read all instructions. 1. Applications To: >NYS Department of Environmental Conservation ❑✓ Check here to confirm you sent this form to NYSDEC. Check all permits that apply: ❑Dams and Impound- ❑✓ Tidal Wetlands ❑ Water Withdrawal ✓❑ Stream Disturbance ment Structures ❑Wild, Scenic and ❑ Long Island Well ❑ Excavation and Fill in ❑401 Water Quality Recreational Rivers ❑ Incidental Take of Navigable Waters Certification . Coastal Erosion Endangered/ [I Docks, Moorings or ❑Freshwater Wetlands Management Threatened Species Platforms >US Army Corps of Engineers 0 Check here to confirm you sent this form to USACE. Check all permits that apply: ❑ Section 404 Clean Water Act ✓ Section 10 Rivers and Harbors Act Is the project Federally funded? Yes F; No If yes, name of Federal Agency: General Permit Type(s), if known: Preconstruction Notification: (—Yes ❑ No >NYS Office of General Services ❑ Check here to confirm you sent this form to NYSOGS. Check all permits that apply: 0 State Owned Lands Under Water ❑ Utility Easement(pipelines, conduits, cables, etc.) ❑ Docks, Moorings or Platforms >NYS Department of State ✓0 Check here to confirm you sent this form to NYSDOS. Check if this applies: ✓❑Coastal Consistency Concurrence 2. Name of Applicant Taxpayer ID if applicant is NOT an individual Daniel F. Wallace &Gayle B. Wallace Mailing Address Post Office/City State Zip PO Box 1062 Cutchogue NY 11935 Telephone 516-641-2506 Email wgwallace54@gmail.com Applicant Must be (check all that apply): © Owner ❑ Operator ❑ Lessee 3. Name of Property Owner if different than Applicant) Same as Applicant Mailing Address Post Office/City State Zip Telephone Email For Agency Use Only Agency Application Number: JOINT APPLICATION FORM 08/16 Page 1 of 4 JOINT APPLICATION FORM—Continued. Submit this completed page as part of your Application. 4. Name of Contact/Agent En-Consultants, Robert E. Herrmann Mailing Address Post Office/City State Zip 1319 North Sea Road Southampton LNY 111968 Telephone 631-283-6360 Email rerrmann@enconsultants.com 5. Project/ Facility Name Property Tax Map Section/ Block/Lot Number: Wallace Property 1 11000-136-1-40 Project Street Address, if applicable Post Office/City State Zip 720 Oak Street Cutchogue NY 111935 Provide directions and distances to roads, intersections,"ridges and bodies of water Property located on east side of Oak Street, +/-281 south of Pierce Road (map provided). F Town F Village city County Stream/Waterbod Name Southold I I Suffolk Eugene's Creek Project Location Coordinates: Enter Latitude and Lon itude in degrees, minutes, seconds: 41 Latitude: ° 0' 1.308 Longitude: 72 ° 28 15.996 6. Project Description: Provide the following information about your project. Continue each response and provide any additional information on other pages. Attach plans on separate pages. a. Purpose of the proposed project: Private, noncommercial boat dockage. b. Description of current site conditions: Residential,one-family dwelling. c. Proposed site changes: Construct an"L"-shaped fixed timber dock(constructed with open-grate decking), consisting of a 4'x 78'catwalk and a 4'x 16' step-down platform,as depicted on the project plan prepared by En-Consultants,dated September 29,2026. d. Type of structures and fill materials to be installed, and quantity of materials to be used (e.g., square feet of coverage, cubic yards of fill material, structures below ordinary/mean high water, etc.): See"c."above and project plans prepared by En-Consultants, dated September 29, 2026. Construction of dock will result in approximately 370 square feet of coverage of Eugene's Creek, seaward of MHW. e. Area of excavation or dredging, volume of material to be removed, location of dredged materialplacement: N/A f. Is tree cutting or clearing proposed? 7 Yes If Yes, explain below. r No Timing of the proposed cutting or clearing (month/year) Number of trees to be cut: Acreage of trees to be cleared: JOINT APPLICATION FORM 08/16 Page 2 of 4 JOINT APPLICATION FORM—Continued. Submit this completed page as part of your Application. g. Work methods and type of equipment to be used: Standard construction methodology for docks. h. Describe the planned sequence of activities: Standard construction methodology for docks. i. Pollution control methods and other actions proposed to mitigate environmental impacts: N/A j. Erosion and silt control methods that will be used to prevent water quality im acts N/A k. Alternatives considered to avoid regulated areas. If no feasible alternatives exist, explain how the project will minimize impacts: The"no action"alternative would prevent safe, private noncommercial dockage for owner's watercraft. I. Proposed use: ✓0 Private ❑ Public ❑Commercial m. Proposed Start Date:I ASAP Estimated Completion Date: ASAP n. Has work begun on project? F Yes If Yes, explain below. F" ' No o. Will project occupy Federal, State, or Municipal Land? Yes If Yes, explain below. r' No p. List any previous DEC, USACE, OGS or DOS Permit/Application numbers for activities at this location: Unknown. q. Will this project require additional Federal, State, or Local authorizations, including zoning changes? Yes If Yes, list below. No USA COE, NYS DOS,Town of Southold JOINT APPLICATION FORM 08116 Page 3 of 4 JOINT APPLICATION FORM-Continued. Submit this completed page as part of your Application. 7. Signatures. Applicant and Owner(If different) must sign the application. Append additional pages of this Signature section if there are multiple Applicants, Owners or Contact/Agents. hereby affirm that information provided on this form and all attachments submitted herewith is true to the best of my knowledge and belief. Permission to Inspect - I hereby consent to Agency inspection of the project site and adjacent property areas. Agency staff may enter the property without notice between 7:00 am and 7:00 pm, Monday- Friday. Inspection may occur without the owner, applicant or agent present. If the property is posted with"keep out"signs or fenced with an unlocked gate, Agency staff may still enter the property. Agency staff may take measurements, analyze site physical characteristics, take soil and vegetation samples, sketch and photograph the site. I understand that failure to give this consent may result in denial of the permit(s) sought by this application. False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the NYS Penal Law. Further, the applicant accepts full responsibility for all damage, direct or indirect, of whatever nature, and by whomever suffered, arising out of the project described herein and agrees to indemnify and save harmless the State from suits, actions, damages and costs of every name and description resulting from said project. In addition, Federal Law, 18 U.S.C., Section 1001 provides for a fine of not more than $10,000 or imprisonment for not more than 5 years, or both here an applicant knowingly and willingly falsifies, conceals, or covers up a t- E y m e or uses a false, fictitious or fraudulent statement. S Date i / ic J- ec II that app ❑ Owner ❑Operator ❑ Lessee Printed Name Title X Daniel F. Wallace Property Owner Si natu wner if different than Ap licant Date Printed Name Title X [Gayle B. Wallace Property Owner Signat re Contact/ Agent Date Printed Name Title Robert Herrmann Coastal Management Specialist For Agency Use Only DETERMINATION OF NO PERMIT REQUIRED _ Agency Application Number (Agency Name)has determined that No Permit is required from this Agency for the project described in this application. Agency Representative: Printed ; Title Name Signature � —❑ Date JOINT APPLICATION FORM 08/16 Page 4 of 4 EAST 3 CUTCNOGUE 5C Nagstran Map 445 1"-2000" 4 �/- l Site(Access via Peconic Bay Nlinery East creek) C NIF WILLIAM FELIX FAMILY TRUST & IVA M FELIX FAMILY TRUST 4' x ±3' STEPS DOCK PROPOSED FIXED "OF 4H xPED 8'OCATWALKCON OPEN-GRATE i i i I/l AND TERMINAL 4' x 16' STEP-DOWN PLATFORM � � 4 ,� i i90'' i-- �x cE l fix a Aw ECN � i i i i78'i 15 z —12.. i wncc ±33' i —18" i Ot50' R i i/ / 74' STEP(S) � x -zf.. c, O I PAVER 8 _/ / 16(• x-24' PATIO i i i I 1 STORY r••r� I N4 FRAME HOUSE i' / Z —6" ✓v I GARAGE `6 i i i i �% 2 —12" I x -18" M5 G PROPERTY LINE i `� O' X-24• ,I1� �1� �C WAII�� ADJ.CONC.wAil 4" u. EAr" EN cE FENCE N�F DANIEL WALLACEQ4' 3 ADJ. DOCK Nof�e5: 0 I 1. Purpose Private.norroeme dA 6oat dacLw 2. Plan based on hydrow*ic survey prepared 64 K—rtk M,Woyrk i Land 5urve4lrq,PLLC.,last dated April 7,2026 5. 17atum;MLW-0'-0" 4. Dock to 6e eogpped wfi water arc!electrlclty 9. Plan arc!cros5vlew dlaciramz are 56-na k In E N - CONSULTANTS ratue arc)are Intended ody to estaMlsh project 1319 NORTH SEA D. lixaum,5W,aid 6a5Ic aondeWl5for pe—ftm i ROP05ft9 n0CK FM nANE� & 6A11.� SOUTHAMPTON, NY 11968 as or su65Gtute for e rglrrel,rq are N I to saw Or cor5t�ructlari W&I ACC ON W6M5 CM, pLm for cmghdtam pxpm5 eureNOGU�, SU��OI,K CO, NY 631-283-6360 6. Project 6cabal,720 Oak 5t,,�&w; SCfM Klo,1000-IM-1-40 SN��1 10� 2 9-29-26 5�cflON pOp05�P F102 -5`Mp�P POCK 111 = 10' F102 POCK S� 3 51��5 Op�N-GpA� n�CKING 14' MIN. 6" CApS & 511�ING�pS �' "� 51�p-nOWN p�AOpM x 5V(5) MHW 2'-6" MAW 0'-0" �X, t?�r, WPJ,� EX, GpAbE s � IMF . 8" x VAp, ��NCATH PL1 5 C + 6 0,C) E N - CONSULTANTS 1319 NORTH SEA RD, ITOP05W POCK FOB PANEL & GAU SOUTHAMPTON, NY 11968 W&I Aa ON 26ft5CM, 631-283-6360 CUTCH06M, 5UFFaK CO., NY SHfff 2 OF 2 9-29-26 25 PindarOO I 11 yuk r Vineyards ® \1 / 1 *+ 25 ® Raphael Vineyards �p\ �Rh uaoW Cr,rk 9 Wall - \\ Callers \ Vineyards \ Ps EAST �1 193�� curcHocuE HOG NEC :-�,ri�:�� - ,,, • BAY ® 1 SC Ha stronn Ma #45 9 P PeWi conic Bay nery 6'+ Sh(Access via f subject property and by ^--� barge via Eugene's Creek) ♦ N F ET N CK ` Little Hayruater Nag A `� Cure + NA AU Neck \, p'�}���� •`!�''' ��j Horseshoe Marsh Pt Cutchogue Cori / Harbor Q Fork des% I Wit rru�•ta _IIQJI r Pn 1 i / L Old Cove q �L6Cll YC f apsw NEW SUFFOLK \ 15 Nassau Pt W0 LITTLE PECONIC BAY Nartl' NEW YORK STATE DEPARTMENT OF STATE COASTAL MANAGEMENT PROGRAM Federal Consistency Assessment Donn An applicant,seeking a permit,license,waiver,certification or sinular type of approval from a federal agency which is subject to the New York State Coastal Management Program(CMP),shall complete this assessment form for any proposed activity that will occur within and/or directly affect the State's Coastal Area. This form is intended to assist an applicant in certifying that the proposed activity is consistent with New York State's CMP as required by U.S. Department of Commerce regulations (15 CFR 930,57). It should be completed at the time when the federal application is prepared. The Department of State will use the completed form and accompanying information in its review of the applicant's certification of consistency. A. APPLIC.kNT (pleaseprint) En-Consultants I. Name: Daniel F.Wallace&Gayle B. Wallace 1319 North Sea Road 2. Address: PO Box 1062,Cutchogue,NY 11935 Southampton, NY 11968 3. Telephone: Area Code(516 )641-2506 631-283-6360 B. PROPOSED A(TIVTTY: 1. Brief description of activity: Construct an"L"-shaped fixed timber dock(constructed with open-grate decking),consisting of a 4'_x 78'catwalk and a 4'x 16'step-down platform.as depicted on the project plan prepared by En-Consultants,dated September 29,2026. 2. Purpose of activity: Safe, private boat dockage. 3. Location of activity: 720 Oak Street Suffolk Southold Cutchogue County City,Town,or Village Street or Site Description 4. Type of federal permit/license required: Section 10 5_ Federal application number,if known: Unknown 6 If a state permit/license was issued or is required for the proposed activity, identify the state agency and provide the application or permit number, if known: Articles 25& 15 C. COASTAL ASSESSMENT Check either"YES"or"NO" for each of these questions. The numbers following each question refer to the policies described in the CMP document(see footnote on page 2)which may be affected by the proposed activity. 1. Will the proposed activity result in any of the following: YES/NO a Large physical change to a site within the coastal area which will require the preparation of an environmental impact statement? (11,22,25, 32,37,38,41,43) ❑® b. Physical alteration of more than two acres of land along the shoreline, land under water or coastal waters? (2, 1.1, 12,20,28,35,44) 7❑® c. Revitalization/redevelopment of a deteriorated or underutilized waterfront site'? (1) u� d. Reduction of existing or potential public access to or along coastal waters? (19,20) ❑® e. Adverse effect upon the commercial or recreational use of coastal fish resources? (9,10) X❑ f. Siting of a facility essential to the exploration,development and production of energy resources in coastal waters or on the Outer Continental Shelf? (29) xnJ g. Siting of a facility essential to the generation or transmission of energy'? (27) ❑ X❑ h. Mining,excavation,or dredging activities, or the placement of dredged or till material in coastal waters? (15,35) i. Discharge of toxics,hazardous substances or other pollutants into coastal waters? (8, 15,35) MM j Draining of stormwater ninoff or sewer overflows into coastal waters? (33) F41,k. Transport,storage,treatment,or disposal of solid wastes or hazardous materials? (36,39) 1. Adverse effect upon land or water uses within the State's small harbors? (4) 2. Will the proposed activity affect or be located in,on,or adjacent to any of the following: YES/NO a. State designated freshwater or tidal wetland? (44) ®❑ b. Federally designated flood and/or state designated erosion hazard area? (11, 12, 17) �[ c. State designated significant fish and/or wildlife habitat? (7) d. State designated significant scenic resource or area? (24) e. State designated important agricultural lands? (26) _ f. Beach,dune or Barrier Island? (12) g Major ports of Albany,Buffalo,Ogdensburg,Oswego or New York? (3) X h. State,county,or local park? (19,20) i. Historic resource listed on the National or State Register of Historic Places? (23) _ _ 3.Will the proposed activity require any of the following: YES/NO a. Waterfront site? (2,21,22) _®E]_ b. Provision of new public services or infrastructure in undeveloped or sparsely populated sections of the coastal area? (5) ❑® e Construction or reconstruction of a flood or erosion control structure? (13, 14, 16) ❑� d. State water quality permit or certification? (30, 38,40) ❑][� e. State air quality permit or certification? (41,43) ❑❑ 4.Will the proposed activity occur within and/or affect an area covered by a State-approved local waterfront revitalization program,or State-approved regional coastal management program? ®❑ (see policies in program document*) D.ADDITIONAL STEPS 1. If all of the questions in Section C are answered"NO",then the applicant or agency shall complete Section E and submit the documentation required by Section F. 2. If any of the questions in Section C are answered "YES", then the applicant or agent is advised to consult the CMP, or where appropriate,the local waterfront revitalization program document*. The proposed activity must be analyzed in more detail with respect to the applicable state or local coastal policies. On a separate page(s), the applicant or agent shall: (a)identify,by their policy numbers, which coastal policies are affected by the activity,(b) briefly assess the effects of the activity upon the policy; and,(c)state how the activity is consistent with each policy. Following the completion of this written assessment, the applicant or agency shall complete Section E and submit the documentation required by Section F. E.CERTIFICATION The applicant or agent must certify that the proposed activity is consistent with the State's CMP or the approved local waterfront revitalization program, as appropriate. If this certification cannot be made, the proposed activity shall not be undertaken. If this certification can be made,complete this Section. "The proposed activity complies with New York State's approved Coastal Management Program, or with the applicable approved local waterfront revitalization program, and will be conducted in a manner consistent with such program." Applicant/Agent's Name: Daniel F.Wallace&Gayle B.Wallace Agent: En-Consultants PO Box 1062 1319 North Sea Road Address: Cutchogue, NY 11935 Southampton, NY 11968 Telephone: Area Code( 516 ) 641-2506 (631)283-6360 Applicant/Agent's Signature: Date: October 8,2026 F.SUK'IISSION REOWREMENTS 1. The applicant or agent shall submit the following documents to the New York State Department of State, Office of Planning and Development,Attn:Consistency Review Unit,One Commerce Plaza-Suite 1010, 99 Washington Avenue,Albany,New York 12231. a.Copy of original signed form. b. Copy of the completed federal agency application. c.Other available information which would support the certification of consistency 2. The applicant or agent shall also submit a copy of this completed form along with his/her application to the federal agency. 3. If there are any questions regarding the submission of this form,contact the Department of State at (518)474-6000. 'These state and local documents are available for inspection at the offices of many federal agencies, Department or environmental Conservation and Department of State regional offices,and the appropriate regional and county planning agencies. Local program documents are also available for inspection at the offices of the appropriate local government. DANIEL F. WALLACE & GAYLE B. WALLACE 720 OAK STREET CUTCHOGUE,NY SCTM#1000-136-1-40 2a) The proposed project is located adjacent to State designated tidal wetlands, and thus must be consistent with Policy 44. Because the project will not affect the benefits derived from tidal wetlands and will require a Tidal Wetlands Act permit from the NYSDEC, it will be consistent with Policy 44. 2c) Because the subject property is located adjacent to a State designated significant fish and wildlife habitat,the proposed project must be consistent with Policy 7. Although the project will cause a temporary disturbance at the site during the work period,the surrounding habitat will not be "significantly impaired" as defined by Policy 7. The project will thus be consistent with Policy 7. 3a) Because the proposed activity will occur at a waterfront site, it must be consistent with Policies 2, 21, and 22. The project will be consistent with 1) Policy 2 because the proposal is considered a water dependent use by this policy; and 2) Policy 21 in that it will not inhibit or preclude existing or future water-related recreation on the adjacent waters. Policy 22 does not apply to the project. 4) See attached LWRP Consistency Assessment Form. Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS l, All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area(which includes all of Southold Town) If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail, listing both supporting and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 136 - I - 40 PROJECT NAME Daniel F.Wallace and Gayle B.Wallace The Application has been submitted to (check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees LFESI Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital ❑ construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grant, loan, subsidy) ❑ (c) Permit, approval, license, certification: Nature and extent of action: Construct an "U-shaped fixed timber dock(constructed with open-grate decking,and equipped with water and electricity),consisting of a 4'x 78'catwalk and a 4'x 16'step-down platform,as depicted on the project plan prepared by En-Consultants,dated September 29, 2026. Location of action: 720 Oak Street,Cutchogue Site acreage: 7,157 sf Present land use: Residential,single family dwelling Present zoning classification: R-40 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: Daniel F.Wallace&Gayle B.Wallace (b) Mailing address: PO Box 1062 Cutchogue,NY 11935 (c) Telephone number: Area Code 516-641-2506 (d) Application number, if any: Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes ® No ❑ If yes, which state or federal agency? NYSDEC,NYSDOS,&USACE C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. ❑Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 6 through 7 for evaluation criteria ® Yes ❑ No ❑ Not Applicable The dock is proposed along a developed shoreline characterized by numerous dockage facilities and would be located within the"pier line"of the two adjacent Trustees-permitted docks to the north(Wetlands Permit No.552)and south(Wetlands Permit No.3690). Thus, consistent with Policy 3,the dock would be harmonious with the visual quality of the surrounding environs. Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III - Policies Pages 8 through 16 for evaluation criteria ❑Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III - Policies Pages 16 through 21 for evaluation criteria ®Yes ❑ No ❑ Not Applicable To the extent that it is applicable,the project is consistent with Policy 5 because the entirety of the proposed dock would be constructed with untreated,light-penetrating,open-grate decking. Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. ®Yes ❑ No ❑ Not Applicable The proposed dock is consistent in all ways with the standards for issuance of wetland permits pursuant to Section 275-12 of the Town Code,and more specifically with the "construction and operation standards"for docks set forth by Section 275-11(C)(2).And to further consistency with Policy 6 by preventing the project from creating a"fragmentation of ecological communities"along the developed shoreline or causing the physical or functional loss,or degradation of the adjacent tidal wetlands,the dock would be constructed with untreated,light-penetrating,open-grate decking,and elevated at least 4 feet above the grade of wetlands to ensure the continued growth of tidal marsh beneath it;and because of the limited water depth,the dock is designed with a terminal fixed step-down platform rather than a float. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑ No® Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. ❑Yes ❑ No ® Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. ® Yes ❑ No❑ Not Applicable The dock is proposed within the"pier line"of the two adjacent Trustees-permitted docks to the north(Wetlands Permit No. 552)and south(Wetlands Permit No.3690);it would be located at least 15 feet from the 90-degree seaward extension of the laterally extended northerly property line;and given its 33-foot seaward extension beyond mean low water,the dock and any associated watercraft would extend substantially less than one-quarter of the 410-ft width of the waterway,thus collectively ensuring the dock would have no impacts on existing navigational conditions or otherwise adversely impact public and recreational use of Eugene's Creek,consistent with Policy 9. Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 5 for evaluation criteria. ❑Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy It. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. ❑Yes ❑ No® Not Applicable Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages 62 through 65 for evaluation criteria. ❑Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable PREPARED BY TITLE Coastal Management Specialist DATEOctober 8,2026 Robert E. He nn Amended on 811105 ENVIRONMENTAL QUESTIONNAIRE This is intended to supplement ENG Form 4345, Application for Department of the Army Permit, or the Joint Application for Permit used in the State of New York. Please provide complete answers to all questions below which are relevant to your project. Any answers may be continued on separate sheet(s) of paper to be attached to this form. PRIVACY ACT STATEMENT The purpose of this form is to provide the Corps of Engineers with basic information regarding your project. This information will be used to facilitate evaluation of your permit application and for public dissemination as required by regulation. Failure to provide complete information may result in your application being declared incomplete for processing, thereby delaying processing of your application. GENERAL--APPLICABLE TO ALL PROJECTS 1. Explain the need for, and purpose of, the proposed work. Private,noncommercial boat dockage. 2. Provide the names and addresses ofproperty owners adjacent to your work site (if not shown on the application form or project drawings). North: W Felix Family Trust&IM Felix Family Trust,760 Oak Street,Cutchogue,NY 11935 South: Daniel Wallace,571 Monroe Blvd FI 1,Long Beach,NY 11561 (Please note that depending upon the nature and extent of your project, you may be requested to provide the names and addresses of additional property owners proximate to your project site to ensure proper coordination.) 3. Photographs of the project site should be submitted. For projects in tidal area, photographs of the waterway vicinity should be taken at low tide. Using a separate copy of your plan view, indicate the location and direction of each photograph as well as the date and time at which the photograph was taken. Provide a sufficient number of photographs so as to provide a clean understanding of conditions on and proximate to your project site. See attached 4. Provide a copy of any environmental impact statement or any other environmental report which was prepared for your project. N/A (continued on next page) Page 1 S. Provide a thorough discussion of alternatives to your proposal. This discussion should include, but not necessarily be limited to, the "no action" alternative and altrnatives(s) resulting in less disturbance to waters of the United States. For filling projects in waters of the United States, including wetlands, your alternatives discussion should demonstrate that there are no practicable alternatives to your proposed filling and that your project meets with current mitigation policy (i.e. avoidance, minization and compensation. No action would prevent safe,private dockage of owner's watercraft. DREDGING PROJECTS N/A Answer the following if your project involves dredging. 1. Indicate the estimated volume of material to be dredged and the depth (below mean low water) to which dredging would occur. Would there be overdepth dredging? 2. You can apply for a ten-year permit for maintenance dredging. If you wish to apply for a ten-year permit, please provide the number of additional dredging events during the ten-year life of the permit and the amount of material to be removed during future events. 3. Indicate on your drawings the dewatering area (if applicable) and disposal site for the dredged material (except landfill sites). Submit a sufficient number of photographs of the dewatering and disposal sites as applicable so as to provide a clear indication of existing conditions. For ten-year maintenance dredging permits, indicate the dewatering/disposal sites for future dredging events, if known. 4. Describe the method of dredging (i.e. clamshell, dragline, etc.) and the expected duration of dredging. 5. Indicate the physical nature of the material to be dredged (i.e. sand, silt, clay, etc) and provide estimated percentages of the various constituents if available. For beach nourishment projects, grain size analysis data is required. (continued on next page) Page 2 6. Describe the method of dredged material containment (i. e. hay bales, embankment, bulkhead, etc.) and whether return flow from the dewatering/disposal site would reenter any waterway. Also indicate if there would be any barge overflow. MOORING FACILITIES Answer the following if your project includes the construction or rehabilitation of recreational mooring facilities. 1. It is generally recommended that any fixed piers and walkramps be limited to four feet in width, and that floats be limited to eight feet in width and rest at least two feet above the waterway bottom at mean low water. Terminal floats at private, non- commercial facilities should be limited to 20 feet in length. If you do not believe your proposal can meet with these recommendations, please provide the reason(s). This proposal shall meet these requirements. 2. Using your plan view show to scale the location(s), position(s) and size(s) (including length, beam and draft) of vessel(s) to be moored at the proposed facility, including those of transient vessel(s) if known. See attached 3. For commercial mooring sites such as marinas, indicate the capacity of the facility and indicate on the plan view the location(s) of any pro osed fueling and/or sewage pumpout facilities. If umpout facilities are not planne7please discuss the rationale below and indicate the distance to the nearest available pumpout station. N/A 4. Indicate on our plan view the distance to adjacent marine structures, if any are proximate and showthe locations and dimensions of such structures. Docks to north and south. (continued on next page) Page 3 S. Discuss the need for wave protection at the proposed facility. Please be advised that if a permit is issued, you would be required to recognize that the mooring facility maybe subject to wave action from wakes of passing vessels, whose operations would not be required to be modified. Issuance of a permit would not relieve you of ensuring the integrity of the authorized structure(i) and the United States would not be held responsible for damages to the structures) and vessel(s) moored thereto from wakes from passing vessels. N/A BULKHEADING/BANK STABILIZATION FILLING ACTIVITIES N/A Answer the following if your project includes construction of bulkheading (also retaining walls and seawalls) with backfill,filling of waters/wetlands, or any other bank stabilization fills such as rip-rap, revetments, gabions, etc. 1. Indicate the total volume of fill (including backfill behind a structure such as a bulkhead) as well as the volume of fill to be placed into waters of the United States. The amount of fill in waters of the United States, can be determined by calculating the amount of fill to be placed below the plane of spring high tide in tidal areas and below ordinary high water in non-tidal areas. 2. Indicate the source(s) and type(s) of fill material. 3. Indicate the method of fill placement (i.e. by hand, bulldozer, crane, etc.). Would any temporary fills be required in waterways or wetlands to provide access for construction equipment? If so, please indicate the area of such waters and/or wetlands to be filled, and show on the plan and sectional views. The foregoing requests basic information on the most common types of projects requiring Department of the Arm permits. It is intended to obviate or reduce the need for requesting additional injrmation; however, additional information may be requested above and beyond what is requested in this form. Please feel free to add any additional information regarding your project which you believe may facilitate our review. Page 4 DANIEL AND GAYLE WALLACE,720 OAK STREET,CUTCHOGUE 'T 790 % -4 1i r t a o. B , _i r. •o• Figure 1. Aerial view of subject property and surrounding docks to north,south,and east in 2021, with yellow line added to depict pier line of adjacent docks to north and south. Image by Google Earth. Mill w3% �" <SFI•^ icsi Figure 2. Looking east toward Eugene's Creek over location of proposed`Z"-shaped fixed dock to extend seaward from location of existing gate,and at adjacent docks to north (left),south (right),and east(across creek). ` a ~� ����,;✓yQF� :Ny1 � 1 I '�������14► __H� �,Mj�S,: * "z 'ram III J,r ' � _ ,� i MWESMt 4� d { r 7�.1 ' � •t t��`»-•.�'•i��r 7 \ v, �/ i_/: ,�Ri�� r�• �:tS"�.f-Z.i'l a, � � I s 1