Loading...
HomeMy WebLinkAboutTR-10/14/2026 Glenn Goldsmith,President ``�r3F SU�ry Town Hall Annex Nicholas Krupski,Vice President ��V� ��� 54375 Route 25 P.O. Box 1179 Eric Sepenoski J l Southold,New York 11971 Liz Gillooly Telephone(631) 765-1892 Joseph Finora • �OQ Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD RECEIVE® Minutes Wednesday, October 14, 2026 NOV 13 2 03 5 : 30 PM Present Were: Glenn Goldsmith, President Southold Town Clerk A. Nicholas Krupski, Trustee Eric Sepenoski, Trustee Liz Gillooly, Trustee Joseph Finora, Trustee Elizabeth Cantrell, Administrative Assistant Lori Hulse, Board Counsel CALL MEETING TO ORDER PLEDGE OF ALLEGIANCE TRUSTEE GOLDSMITH: Good evening, and welcome to our Wednesday, October 14th, 2026, Trustee meeting. At this time I would like to call the meeting to order and ask that you please stand for the Pledge of Allegiance. (Pledge of Allegiance is recited) . TRUSTEE GOLDSMITH: I ' ll start off by announcing the people on the dais . To my left we have Trustee Krupski, Trustee Sepenoski, Trustee Gillooly and Trustee Finora. To my right we have the attorney to the Trustees, the Hon. Lori Hulse, and we have Administrative Assistant Elizabeth Cantrell. Agendas for tonight ' s meeting are out in the hallway and also posted on the Town' s website. There are a few postponements in the agenda. In the agenda on page six, numbers ten through 12, are postponed, as follows : Number 10, JMO Environmental Consulting on behalf of LUCINDA J. HERRICK REVOCABLE TRUST requests a Wetland Permit to construct a 5, 280sq. ft. Two-story dwelling with gutters to leaders to two (2) 8x8 ' drywells and a French drain for roof runoff; install an I/A OWTS system with three (3) 8 'x8 ' leaching pools; construct a 201x28 ' detached dry garage; install water and electric service; construct approximately 200 ' of retaining wall; construct a driveway; and to regrade and stabilize all disturbed areas . Located: Ocean View Avenue, Fishers Island. SCTM# 1000-9-11-7 . 16 Board of Trustees 2 October 14, 2026 Number 11, CONTINUED FROM 9/16/26 REVISED PROJECT DESCRIPTION ON 9/1/26 Sam Fitzgerald, Architect on behalf, of -- ANDREW- SHANNON & KATHERINE O'BRIEN requests a Wetland Permit- for - the existing 2, 229sq. ft. (Gross floor area) , two-story dwelling, construct additions and alterations for a 2, 503sq. ft . Two-story dwelling consisting of removing the existing two-story west wing and one-story sections, and construct a two-story addition with a slight footprint expansion; construct a 236sq. ft. Screened porch on west side of dwelling; construct a 36sq. ft . Covered front porch; existing 22 . 3 'x20 . 9 ' deck to remain; remove the existing seaward screened-in porch; and to abandon existing septic system and install an I/A OWTS sanitary system. Located: 195'0 Equestrian Avenue, Fishers Island. SCTM# 1000-9-6-4 Number 12, Patricia Moore, Esq. On behalf of FORDHAM HOUSE, LLC, c/o DENIS BOUBOULIS requests a Wetland Permit for the as-built 1, 135sq. ft . On-grade stone patio, as-built 53 linear foot long evergreen screened concrete wall on west side with a 43 linear foot long return; as-built 100 linear feet of 3 . 5 ' wide steps and walkway from elevation of dwelling to lower grade; as-built 69 linear foot long concrete wall with return along east side; as-built 3 . 41x10 . 4 ' outdoor kitchen; as-built 3 . 5 ' x7 . 5 ' generator on concrete pad; remove the as-built 5 ' x5 ' firepit; and to reestablish and perpetually maintain the previously conditioned 50-foot wide vegetated non-disturbance area with lawn to be removed and area planted with beach grass or other drought tolerant vegetation. Located: 5205 The Long Way, East Marion. SCTM# 1000-21-5-11 So they will not be heard this evening. Under Town Code Chapter 275-8 (c) , files were officially closed seven days ago files were officially closed seven days ago. Submission of any paperwork after that date may result in a delay of the processing of the applications . I . NEXT FIELD INSPECTION: TRUSTEE GOLDSMITH: At this time I ' ll make a motion to hold our next field inspection on Wednesday, November 4th, 2026, at 8 : 00 AM. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . II . NEXT TRUSTEE MEETING: TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next Trustee meeting on Tuesday, November 10th, 2026, at 5 : 30PM in the Town Hall Main Meeting Hall . TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Board of Trustees 3 October 14, 2026 III . WORK SESSIONS : TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next work session Monday, November 9th, 2026, at 5 : OOPM at the Town Hall Annex 2nd Floor Executive Board Room, and on Tuesday, November loth, 2026 at 5 : OOPM in the Town Hall Main Meeting Hall . TRUSTEE FINORA: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . IV. MINUTES: TRUSTEE GOLDSMITH: I ' ll make a motion to approve the Minutes of the September 16th, 2026, meeting. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . V. MONTHLY REPORT: TRUSTEE GOLDSMITH: The Trustees monthly report for September 2026. A check for $18, 312 . 99 was forwarded to the Supervisor' s Office for the General Fund. VI . PUBLIC NOTICES: TRUSTEE GOLDSMITH: Roman numeral VI, Public Notices . Public notices are posted on the Town Clerk' s Bulletin Board for review. VII . STATE ENVIRONMENTAL QUALITY REVIEWS: TRUSTEE GOLDSMITH: RESOLVED that the Board of Trustees of the Town of Southold hereby finds that the following applications more fully described in Section XII Public Hearings - Section of the Trustee agenda dated Wednesday, October 14, 2026, are classified as Type II Actions pursuant to SEQRA Rules and Regulations, and are not subject to further review under SEQRA: Lucinda J. Herrick Revocable Trust SCTM# 1000-9-11-7 . 16 Michael J. & Alexandria Prisco SCTM# 1000-139-1-17 Sophie Latham SCTM# 1000-32-1-6. 1 Southold Shores Boat Basin, Inc. SCTM# 1000-57-1-39 . 3 James S . Duffe & Patricia Dolan SCTM# 1000-15-2-9 Freda Gift Trust SCTM# 1000-86-6-26. 2 Nick Pologeorgis SCTM# 1000-135-1-26 Fordham House, LLC, c/o Denis Bouboulis SCTM# 1000-21-5-11 Kimogenor Point Company SCTM# 1000-116-6-24 . 1 Kimogenor Point Company SCTM# 1000-117-10-1 Farther Out East, LLC SCTM# 1000-31-17-19 Board of Trustees 4 October 14, 2026 TRUSTEE GOLDSMITH: That is my motion. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . VIII . RESOLUTIONS - ADMINISTRATIVE PERMITS: TRUSTEE GOLDSMITH: Under Roman numeral VIII, Administrative Permits : Number 1, Sol Searcher Consulting on behalf of ADAM & SARI SIMON requests an Administrative Permit to install . code-.compliant 4 ' pool fencing; trench water line from existing well to dwelling and trench electric line to dwelling; construction activity within Trustee jurisdiction. Located: 4730 Blue Horizon Bluffs, Peconic. SCTM# 1000-74-1-35 . 54 Trustee Finora conducted a field inspection on October 8th, 2026, noting that it was straightforward. The LWRP found this project to be inconsistent. The inconsistencies are: The pool enclosure fence is a structure related to the pool and it ' s proposed approximately 54 to 90 feet from the top of the bluff, where 100 foot is required. The pool is approximately seven feet landward of the 100-foot setback line, leaving room to enclose it landward of the 100-foot setback. The site plan appears to label the area seaward of the 100-foot setback as lawn. I ' ll make motion to approve this application with the condition that the area landward of the pool fence be a vegetated non-turf buffer, which will bring it into consistency with the LWRP, and then it is also subject to new plans depicting a vegetated non-turf. buffer. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . IX. APPLICATIONS FOR EXTENSIONS/TRANSFERS/ADMINISTRATIVE AMENDMENTS: TRUSTEE GOLDSMITH: Under Roman numeral IX, Applications for Extensions, Transfers and Administrative Amendments . In order to simplify our meeting, the Trustees regularly groups together actions that are minor or similar in nature. Accordingly; I ' ll make a motion to approve as a group Items One through Five, as follows : Number 1, Finnegan Law, P.C. on behalf of RIPLEY SHORES LLC requests a Transfer of Wetland Permit #5141 from Douglas DeFeis to Ripley Shores LLC, as issued March 22, 2000 . Located: 1165 Cedar Point Road West, Southold. SCTM# 1000-90-1-3 Number 2, Finnegan Law, P. C. on behalf of FLATO ORIENT LLC requests a Transfer of Wetland Permit #24-2-11 from Board of Trustees 5 October 14, 2026 Arthur Van Dewater to Flato Orient LLC, as issued March 8, 1991 . Located: 600 Bay Lane, Orient . SCTM# 24-2-11 Number 3, Finnegan Law, P. C. on behalf of FLATO ORIENT LLC requests a Transfer of Wetland Permit #5661 from Ann Marie Kelly to Flato Orient LLC, as issued November 20, 2002 . Located: 600 Bay Lane, Orient. SCTM# 24-2-11 Number, 4, Dominic Mavellia on behalf of JULIA MAVELLIA requests an Administrative Amendment to Wetland Permit #10980 to shorten permitted side-yard deck by 5 ' ; remove existing wooden walkway to beach. Located: 1525 North Sea Drive, Southold. SCTM# 1.000-54-4-17 Number 5, Krista Jones on behalf of JANE G. WEILAND requests an Administrative Amendment to Wetland Permit #10955 to expand the previously-approved patio an additional 10 ' x 14 ' landward. Located: 6485 Nassau Point Road, Cutchogue. SCTM# 1000-111-13-11 TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . X. DUCK/WATERFOWL BLINDS: TRUSTEE GOLDSMITH: Under Duck/Waterfowl Blinds : Number One, MICHAEL & LISA BOYD request a Waterfowl/Duck Blind Permit to place a Waterfowl/Duck Blind in Little Creek using private access . Located: Little Creek I make a motion to approve number one. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . XI . RESOLUTIONS - OTHER: TRUSTEE GOLDSMITH: Under Roman numeral XI, Resolutions - Other Number 1, Set 2026/2027 Scallop Season: RESOLVED, that the Southold Town Board of Trustees open the following dates to scallop harvesting and pursuant to Chapter 219 (Shellfish) of the Code of the Town of Southold: From Monday, November 2, 2026, . from sunrise to sunset, through Wednesday, March 31, 2027, inclusive, in all Town waters, as per Town Code. That is my motion. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . XII. PUBLIC HEARINGS: TRUSTEE GOLDSMITH: Roman numeral XII, Public Hearings . At this time I ' ll make a motion to go off our regular meeting agenda and enter into our Public Hearings . Board of Trustees 6 October 14, 2026 TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: This is a public hearing in the matter of the following applications for permits under Chapter 2-75 and- Chapte-r------ --------------- 111 of the Southold Town Code. I have an affidavit of publication from the Suffolk Times . Pertinent correspondence may be read prior to asking for comments from the public. Please keep your comments organized and brief, five minutes or less, if possible. WETLAND PERMITS: TRUSTEE GOLDSMITH: Under Wetland Permits : Number one, CONTINUED FROM 6/11/25, AS PER REVISED SITE PLANS & PROJECT DESCRIPTION RECEIVED 9/17/26 Costello Marine Contracting Corp. on behalf of MICHAEL J. & ALEXANDRIA PRISCO requests a Wetland Permit to remove and dispose of the existing 6 'x44 ' catwalk; construct in-place a new landward 4 ' wide staircase up to a 41x25 ' level catwalk to elevate the dock structure 4 . 5 ' above grade leading to a 4 'x40 ' fixed ramp down to a 4 'x40 ' catwalk; a 31x16 ' adjustable ramp to a 6 ' x20 ' floating dock situated in an "L" configuration supported by two (2) anchor pilings; and to establish and perpetually maintain a 20 ' wide non-turf buffer area along the landward edge of the vegetated wetlands . Located: 905 Westview Drive, Mattituck. SCTM# 1000-139-1-17 The Trustees conducted a field inspection October. 6th, 2026, notes that the new plans appear to show the dock within the pier line, and show adequate water depth for the float . The LWRP found this to be consistent. Is there anyone here wishing to speak regarding this application? MR. COSTELLO: Jack Costello, on behalf of the applicant . If you guys have any questions, I would like to point out the owner is here with me. TRUSTEE GOLDSMITH: Mr. Costello, the only thing that we noticed was just on the plans, that the pier line on .the northerly-facing dock adjacent, doesn' t appear to be accurate. So we just look for new plans that show the pier line from the terminus, from both adjacent docks . Subject to new plans . TRUSTEE GILLOOLY: And the dock conforming with the pier line, right? MS. COSTELLO: We used the piling as the pier line. If I can just show you this . I don' t know if you remember from your site inspection, this dock was flagged about four feet in, three or four feet in, as the end terminus . We have this line, is , an actual photo of the property. Then on this -- TRUSTEE GILLOOLY: Our stenographer is not here tonight, so if you can just speak into the microphone. Board of Trustees 7 October 14, 2026 MS . COSTELLO: I just wanted to show you the picture that references the -- TRUSTEE GILLOOLY: Yes, I think we have it in our packet, right? MR. COSTELLO: Yes . Where the marking was on the dock, you know, the flag I 'm talking about at the end of the float . TRUSTEE GOLDSMITH: Yes . TRUSTEE GILLOOLY: So I remember from the field inspection, are you saying that the survey was not showing the accurate length of the adjacent docks? MS. COSTELLO: Then we had a certified survey done of the garage, it was accurately there. A lot of times, on a survey, the subject property will be correct and the other properties next to it are not certified, and they are just for reference. So that was kind of the confusion on our end from the beginning, but, now, if you remember where that flagging is on the float, it ' s lower than the pier line. TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak regarding this application? (No response) . Any other questions or comments from the Board? (No response) . Hearing none, I make a motion to close this hearing. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: I make a motion to approve this application subject to new plans that show the pier line, the correct pier line, from the dock terminus on the adjacent docks, and the dock, the proposed dock within that, so that we have new plans that are accurate to the code. That is my motion. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE KRUPSKI : Number 2, En-Consultants on behalf of SOUTHOLD SHORES BOAT BASIN, INC. , requests a Wetland Permit for a Ten (10) Year Maintenance Permit to dredge a 7, 510 sq. ft . Area of private communal boat basin to a finished maximum depth of -4 ' MLW by dredging an approximately 5, 330 sq. ft. Inshore area to a maximum depths of -4 ' MLW, and dredging an approximately 2, 180 sq. ft. Offshore area to a depth of -4 . 5 ' MLW, which is to be backfilled with a 6 inch deep, approximately 40 cubic yards gravel cap; and temporarily place approximately 315 cubic yards of resultant spoil inside geotextile tubes located in 2, 340 sq. ft. Deposition area on adjacent parcel to south, prior to removal for offside disposal. Located: Off End of Blue Marlin Drive, Southold. SCTM# 1000-57-1-39 . 3 The LWRP coordinator found this to be consistent . The Trustees visited the property on the 6th of October, Board of Trustees 8 October 14, 2026 noted questions about how to remove the tubes, the ones with the dewatered spoils, and revegetate after the work. It should be noted that we clarified with the agent for the application that they would be removed up to the road using a skid loader, with minimal disturbance. Is there anyone here that wishes to speak regarding this application? MR. HERRMANN: Yes . Rob Herrmann of En-Consultants, on behalf of the applicant. So, yes, we looked at this during field inspections . There is a boat basin with a privately-used community dock. That is the area that is to be dredged. And then the spoils will be pumped onto the adjacent beach to the south, which is owned by Southold Shores Association. I just handed up to Ms . Cantrell an updated permission letter from the . President of Southold Shores Association verifying the association' s granting permission for the spoil plan reflected on the plans by En-Consultants last dated June loth, 2026. As Nick mentioned, there were a couple of questions during field inspections . One was once the spoil that has been pumped into these geo-textile bags, which we 've located landward of spring high water, landward of the beach, and in currently a vegetated area, there was some questions about how that material would ultimately be removed from the site. And also the Board had asked, mentioned that as a condition that area would have to be revegetated in-kind with native vegetation, which of course would be already in the expected scope of work, so there ' s no issue with that being a condition. And we did verify with the applicant and the applicant ' s contractor that the material would be removed through the existing gravel path, using a skid steer and brought out to a truck at the end of the road. We talked about the fact that inevitably part of that path will probably have to be widened in places temporarily, so I would just make the recommendation that along with the condition that the spoil area itself be revegetated, would just be that any disturbance or manipulation of the current path be restored to the same condition that it ' s in right now, in terms of the width and the vegetation adjacent to it, and that is that existing gravel path is depicted on the plans . So that should be easily enforceable. Otherwise, this is a project the Board had looked at a couple of years ago, and had indicated an interest in the project being reviewed, and vetted and permitted by the New York State DEC, which is what has taken us so long to get back to you, but there have been various conditions stipulated in connection with all of the work, and you should have a copy of that DEC permit in your file. TRUSTEE KRUPSKI : Thank you. MR. HERRMANN: Other than that, if you have any questions, let me Board of Trustees 9 October 14, 2026 know. TRUSTEE KRUPSKI : Thank you. Is there anyone else here wishing to speak regarding this application, or any additional comments from the Board? (No response) . Noting that the New York State DEC has also put a lot of time into this application, I make a motion to close the hearing. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE KRUPSKI : I make a motion to approve this application with the stipulation that the areas to be disturbed, including the dewatering site and the pathway to the road, are revegetated with native species following the conclusion of work. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : Number 3, Joan Chambers on behalf of SOPHIE LATHAM requests a Wetland Permit for the as-built demolition of existing dwelling and construction of a two-story dwelling (2, 022 . 7sq. ft . Footprint) with a 13 . 3 ' x5 . 9 ' covered entry porch, a 33. 10 'x9. 6 ' wood deck, a 26. 4 'x9. 6 ' screened porch with 26. 3 'x9 . 4 ' balcony above, and a 51x5 . 2 ' outdoor shower; for FEMA compliance propose to raise the dwelling, demolish and remove existing foundation and replace with new higher foundation to 10 . 42 ' in same footprint; raise as-built decks and extend stairs; remove existing brick stoop and install a 3 . 21x5 ' side entry with stairs; raise the utilities room and install steps to ground; raise propane platform and install 4 ' high fencing surround; install gutters to leaders to drywells; abandon existing septic system and install a new I/A OWTS sanitary system landward of dwelling. Located: 2180 Peters Neck Road, Orient . SCTM# 1000-32-1-6. 1 The Trustees most recently visited the location on the 6th of October. Notes from our inspection read: Establish buffer to match buffer to north and bench to south. Keep trees . The LWRP coordinator found the project inconsistent with its policies, mostly Number Six, protect and restore significant coastal fish and wildlife habitats. Laid out four proposed actions that are found inconsistent, having to do with the as-built nature of .the work, the dwelling' s distance from the wetland boundary, the coastal erosion hazard line, the as-built shower, lack of drainage. And lays out several remediation pathways to bring it into conformity .with its policies . Is there anyone here wishing to speak regarding the application? MS . CHAMBERS : My name is Joan Chambers, I 'm here to represent Sophie Latham, who is. also here with us tonight. I 'm just going to give everyone here a bit of a background on this project, okay? Board of Trustees 10 October 14, 2026 The Latham residence at 2180 Peters Neck Road in Orient has been in the Latham family for four generations . The original home was built sometime in the 1800s in Greenport, and was transported to the current location by George Latham in the 1940s . The first major alteration to the property was the northwest addition of the living room in 1977, and that was recorded with a building permit, and a certificate of occupancy for that addition was issued September 19th, 1988 . The Southold Town Clerk recorded the septic permit in 1986, and that was followed by a Trustees permit dated June 18th, 2008, for the replacement of the existing bulkhead, as well as the New York State DEC permit dated January 22nd, 2010, for removal and replacement of existing timber groin and replacement of the existing bulkhead. In 2024, the current owner, Sophie Latham, the granddaughter of George Latham, made some renovations and repairs to the home that are detailed in Attachment #1 dated 8/21/26, which is included in the package. I won' t take up any more of your time repeating the details of the renovations and repairs, but suffice to say that on March 13th, 2025, when the Building Inspector Nancy Meyer came to the property as part of an application for a pre-CO, she requested a building permit application for the as-built work. The plans were revised and resubmitted to the Southold Town Building Department 5/19/25, and they also requested an updated survey and a FOIA request on the septic permit. On September 29th, 2025, the plans examiner determined they would suspend their processing of the application pending a review by the Southold Town Trustees . An application for review was submitted to the Trustees office on November 12th, 2025, and they responded with a request for additional information on the plans, another updated survey, and a full tidal wetlands permit application. During this time Sophie and I communicated with the Building Department regarding their designation of the renovations constituting a demo of the property, based on the degree of alteration, as well as the request for a septic review, given that the number of bedrooms in the house had actually been decreased from five to four during the renovation. The application to the Trustees was resubmitted on January 7th, 2026. They responded January 21st, saying that the Building Department wanted the house to conform to FEMA regulations, and their application would need to be revised to include that additional work. Now, the finished floor elevation of this house is 7 . 55 feet, and the elevation required in 2025 by FEMA for an AE-6 zone is eight feet, which means that the house needed to be raised 5 3/8th inches in order to conform. Sophie and I have made several appeals for relief of this decision, and as apparent by the application before you, we lost Board of Trustees 11 October 14, 2026 every argument . What followed were meetings, estimates of costs, which started at half a million dollars and went up, and revisions to plans and surveys, and it all resulted in Sophie ' s decision to raise her house to the current FEMA-required height, despite the fact that her original application was made in 2025 . She is planning for the future of this property, and with that in mind, she also decided to install a new IA sanitary system. That application has been submitted and accepted by Suffolk County Board of Health, pending Trustees approval . We have also made application to New York State DEC, even though there was no planned alteration to the bulkhead, shoreline or footprint of the house. It is our sincere hope the Trustees see this application as a 19th century family home being rededicated to future generations, and grant this permit so we can, after 19 months of paperwork, move this project forward. TRUSTEE SEPENOSKI : Thank you, for your comments and -- MS . CHAMBERS : I can write a book about that one. TRUSTEE GOLDSMITH: I appreciate that, and further that you went through such an ordeal for five-and-a-half inches . MS . CHAMBERS: Five-and-a-half inches, yes . But, you know, Sophie said if we are going to raise it, let ' s raise it to current standards . You know. I mean hopefully the water will never get that high, but we decided to do it. So that ' s the plan. TRUSTEE SEPENOSKI : All right. So the Trustees notes, as I mentioned at the top of my commentary was to establish, a buffer to match the buffer to the north and the bench to the south. That was based on our being in the field and seeing that a flanking of this property on both sides is native, vegetated buffer. I see that you've included one on your plans as well for 15 feet. I think the LWRP speaks to that attempt to bring it into some kind of revegetation along the shoreline . I think a 25-foot buffer would suffice and satisfy the LWRP' s concerns . I think that ' s the only amendment to your current proposal that I see needing to be addressed. MS . CHAMBERS: Okay, so the existing buffer, which is all the wetlands towards the causeway. TRUSTEE SEPENOSKI : The north side, yes . MS . CHAMBERS: That ' s obviously not being touched. Actually, that whole end of the house, the northwest end, is that addition that was CO' d already. So you are talking about the buffer .on the side, along the bulkhead. TRUSTEE SEPENOSKI : That ' s right . MS . CHAMBERS: And how wide do you want to see that? TRUSTEE SEPENOSKI : It ' s currently at 15 . I would add an additional ten and make it 25 feet. MS. CHAMBERS : Make it 25 feet . TRUSTEE CHAMBERS: And vegetated with native vegetation. MS. CHAMBERS : Native vegetation, non-turf buffer, 25 feet from the bulkhead in. I think that ' s, you know, not a problem at all . Board of Trustees 12 October 14, 2026 You have to speak up here, Sophie. MS. LATHAM: Can you just explain, so in front of the house, between the house and the bay, you want 25 feet not of lawn. You want me to dig the lawn out. TRUSTEE SEPENOSKI : That ' s right. You don' t even have to dig the lawn out. You just need to plant it with a native species . There are several species that do well in that area: Cape American beach grass, Golden Rod. MS . LATHAM: Okay. And can you tell me the purpose of that? TRUSTEE SEPENOSKI : The purpose of it is to mitigate nitrogen falling from a treated, irrigated lawn surface towards the Orient Harbor, and set down a deeper set of roots in an area that seasonally experiences high amounts of salt and wave action. So stabilizing the soils in that area behind the bulkhead MS. LATHAM: Okay. And where is the nitrogen coming from? TRUSTEE SEPENOSKI : Nitrogen comes from lawn treatment of fertilizer put down. MS . LATHAM: Yeah, I would never treat our lawn. I mean, you saw it . We don' t treat our lawn. TRUSTEE SEPENOSKI : I actually made a comment in the field that I don' t think this lawn has ever been treated. MS. LATHAM: Yes, we would never treat the lawn. But, yes, that ' s fine. I 'm completely fine with putting native species down. I was just wondering -- okay. TRUSTEE SEPENOSKI : So in order to bring this into conformity with the LWRP, the additional buffer would do so, and we can move forward with this this evening. MS. LATHAM: Okay, great, thank you. TRUSTEE SEPENOSKI : Thank you. Is there anyone else wishing to speak regarding this application? (No response) . Members of the Board? (No response) . Hearing no further comments, I make a motion to close this hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : I make a motion to approve the application with the condition that a 25-foot vegetated non-turf buffer be established from the bulkhead landward with native species, mix of native species in that area, and a new set of plans depicting that buffer, thereby bringing it into consistency with the LWRP. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MS. CHAMBERS : Thank you, folks . TRUSTEE GILLOOLY: Number 4, Cole Environmental Consulting on behalf of JAMES S . DUFFE & PATRICIA DOLAN requests a Wetland Board of Trustees 13 October 14, 2026 Permit to demolish existing dwelling, rear patio, outdoor shower, concrete front porch, walk and driveway; construct a proposed 2, 405sq. ft. Two-story dwelling with basement and ±636 attached garage; a 423sq. ft. Rear patio and a 224sq. ft. Roofed-over patio, a 176sq. ft . Roofed-over front porch, and ±44sq. ft. Egress window; install gutters to leaders to drywells to contain roof runoff; construct a 16 ' x31 ' in-ground pool with coping; install pool enclosure fencing with gates; connect pool to drywell #2 for backwash, install a pool equipment area within a sound attenuating enclosure; install a ±1, 004sq. ft. Asphalt driveway with irregular ±170sq. ft. Front walk and stairs; abandon existing cesspools, install a FUJI CEN-5 I/A OWTS sanitary system and new 4" cast iron waste line; and to establish and perpetually maintain a 40 ' wide non-disturbance buffer area along the landward edge of the vegetated wetlands . Located: 1270 Greenway East, Orient. SCTM# 1000-15-2-9 The Trustees most recently visited the site on the 6th of October, noting Board discussed northwest corner expansion and recommended moving mass of that section further landward or relocating. Pool okay with setback, non-disturbance buffer on the plans . The LWRP reviewed this application and found it to be inconsistent . The inconsistency found that the existing dwelling is replaced with a larger dwelling within the 100-foot wetland setback. The proposed dwelling is 54 . 8 feet from the wetland boundary, the same as the existing dwelling, however the amount of development within the 100 feet is increasing. Number two, the building footprint increases by eight-hundred square feet, which is 50% . Lot coverage increases 11 . 5% -- goes from 11 . 5% to 19%, including the pool, patios and porch. Rebuilding offers an opportunity to locate new structures farther from the wetland. Number three, the northwest wing of the dwelling expands the footprint of the existing dwelling within the 100-foot setback on the side facing the wetland. Reconfiguring the dwelling so that the expansion is located farther away from the wetland would reduce the amount of new structure within the setback. And the proposed leaching galleys are approximately 68 to 93 feet from the wetland boundary, and a future expansion galley approximately 58 feet where 100 feet is required. And the LWRP recommends some options to help bring this into consistency. Is there anyone here wishing to speak regarding this application? MR. COLE: Chris Cole, Cole Environmental, agent for the applicant . You met with the homeowner onsite for a pre-application meeting earlier this year. His takeaway from the meeting was that the Board didn't want to see any further encroachment towards the wetlands . So from the plans that were initially submitted, they were redesigned to go no further than the house Board of Trustees 14 October 14, 2026 was currently setback from the wetlands, and made a little jagged edge to maintain that setback. I provided that, you know, our discussion onsite for the Trustee meeting, and provided that to him, and we have actually updated plans that are increasing the buffer specifically in between the closest setback and the wetlands . So I would provide that to you. And I also have the architect who designed the house with the homeowner here . He did inform me that what they tried to do here was they tried to keep the majority of the house basically in the same footprint that it was, keeping the garage and the driveway, the curb cutouts, any runoff from the driveway, as far away from the wetlands as possible. So that ' s why the driveway is on, if you' re looking at the plans, to the right side. And the one-story addition into the two-story, was meant to have less development closer to the wetlands . So in here we are proposing an additional approximately 1, 550 square feet of buffer in between the wetlands and the development, and we are proposing a buffer that is approximately 4, 000 square feet, minimum being 40-feet .wide, and that includes about 3, 500 square-feet of existing lawn. As Trustee Sepenoski just mentioned, reduction of lawn means reduction of water, fertilizer, herbicides, pesticides, et cetera, that would be encouraged to go towards the wetlands, the pond, that is there. , One thing that is not mentioned on this new plan is we are going to propose a one-time invasive species removal . There ' s Oriental bittersweet choking trees around the pond, Multiflora rose, privet . So we would be popping, cutting those vines, popping that out . Porcelain berry as well, and then replanting the area with native species to protect that pond. And I have the architect here who can speak to the septic location a little more in-depth than I did. They looked at where the wells are, and other septic systems, and this was the best location. We got a variance from the Health Department, but that ' s really the only location that the Health Department accepted, so he can elaborate on that or any further pieces about the house design or the siting. TRUSTEE GILLOOLY: Okay, thank you, so much, for providing the extended buffer proposal . I certainly appreciate the effort that has gone into this, and I appreciate the one-time invasive clean up. I think, you know, while I understand the effort there, the idea that this is going from an existing one-story home to a two-story home in some areas, and only one story expanding further to the north, it still is additional structure closer to the wetland. So what we had hoped to see was a reconfiguration of this house using the additional property available to have that addition farther away from the wetland and the bank. . You know, we are measuring here from the wetland, which I Board of Trustees 15 October 14, 2026 think is appropriate. There is a slope here that obviously contributes to the environmental factors on this property, so I think the buffer is very appropriate. But I have concerns about this one-story addition, um, encroaching further toward the wetland within that 100-foot boundary. MR. COLE: Understood. We took those comments from the field and brought it to the architect. He can speak a little bit to how putting that addition on the side with the garage, it was not something that we could put together for a hearing right now. MR. CONWAY: Robert Conway -of Bello Architects, just speaking quickly. . So the one-story portion of the home that we are speaking of, on the north side, it ' s got this primary bedroom. The whole goal of building a new house here is they have older children. They want to be on the first floor so they can each have some space, if they plan to move here full-time. We looked at some options about relocating that bedroom to other parts of the house, and it would be a substantial redesign of the property. We had initially come up with the concept of retaining the garage in its location, being that we would not be impacting the- driveway, the curb cuts, keeping runoff as far from the sloped area and into the wetlands . So to make the gesture, as the Trustees had suggested, of moving their bedroom to the rear of the property, would significantly change our plan, so we had .taken the feedback of no closer to the wetlands, to be dimensionally from the wetlands, so that since the wetlands are a radius curve, we respected that with our setbacks . TRUSTEE GILLOOLY: Thank you, for your comments here. It does seem that the proposed asphalt driveway is significantly increasing as well, so it does seem like there are alterations to that driveway that you were just talking about. MR. CONWAY: Widening the driveway, to the south, so further away. They would be open to going to a more permeable material for that. TRUSTEE GILLOOLY: Right . I think the issue here from the LWRP perspective, as well as the Trustees perspective, is the additional encroachment on the, so the code ' s setback for a home structure would be 100 feet. Here we are 54 . 8 feet. And while it ' s one thing to look at the existing sort of grandfathered footprint of the existing house, when you are, this is the time, if you are completely redesigning, to move as far as away from the .wetlands as possible. And given that this lot is not constricted in the way that many other lots are, there is an opportunity to redesign here. And I think that we would like to see another proposal that puts the structure farther away. MR. CONWAY: Thank you, for your comments . MR. COLE: Just looking at the plan on that, I 'm not an architect, but if the one-story on the north side closer to the wetland was shifted, or potentially could be shifted over, but still kind of like splitting the difference, shifting kind of Board of Trustees 16 October 14, 2026 where the porch is and the porch comes closer to the street, but still crossing the line, you know, a little bit of where the old house was, is that something that the Trustees would consider if that ' s possible to do? -- --.---- TRUSTEE GILLOOLY: I mean, I think we would like to take a look at it. It ' s hard to say just from, you know, without looking at the plans, but I think that an effort to reduce the increasing impact on the wetlands .here is something that we would look favorably upon. MR. COLE: Okay. TRUSTEE FINORA: I would just add that, as a general comment, the size of development and the activities here concern me, given the size of the property and the available buildable space on the property. The overall size of the house is significantly increased. We see an increase in the proposed driveway, with impervious surface. We see the addition of a sizeable pool. And overall, my position is that there ' s too great of an impact to this property, and the size and scale of development is too great of an impact to be comfortable from an environmental standpoint given its proximity to the wetland, and also because of the significant grade changes that occur on this property. So I would be looking to see a significant reduction of scale in one capacity or another, but out of those different components . MR. COLE: I just wanted to mention, we did increase the buffer significantly, and that is specifically because the property does slope down to the wetlands . So we are addressing that. The one-story addition, for you specifically, it ' s not about that addition, it ' s just the overall development at any point; is that correct? TRUSTEE FINORA: That ' s right. I would characterize this as too many increases in impact, and the scale of this development is too great for this particular portion. MR. COLE: If we propose a gravel driveway, does that alleviate at least some of the concerns then? TRUSTEE FINORA: Certainly that is a positive improvement in this, yes . MR. COLE: Okay. TRUSTEE GILLOOLY: Is there anyone else here wishing to speak regarding this application, or any other comments from the Members of the Board? TRUSTEE FINORA: Let me just make one additional comment . I would also say that this proposal is substantially out of scale with the adjacent properties as well, and I would look to that as a guideline from my position here in that the adjacent, at three or four properties have development that ' s at a much smaller scale that what is proposed here. That ' s the last point I want to make. I 'm sorry. MR. COLE: I ' ll take those points back, to the client. TRUSTEE SEPENOSKI : I guess I just have a question for you, Mr. Board of Trustees 17 October 14,. 2026 Cole. I see the 150 feet from well, described in an arc, which seems to be related to the location of the leaching galleys? MR. COLE: Yes . TRUSTEE SEPENOSKI : Down in the corner of the property. And I was just curious, is there any house behind this house -- MR. COLE: Behind it -- TRUSTEE SEPENOSKI : (Continuing) -- in other words, our current sanitary code, which I 'm not entirely familiar with at the county .level, but I do understand you have to locate leaching galleys, in Orient in particular, because there ' s no street water. It ' s from wells . Would the location of the leaching galleys there in the corner prove problematic for a future home on the rear side of this property? TRUSTEE GILLOOLY: On the south side. Yes . TRUSTEE SEPENOSKI : Would it create problems for their design? MR. COLE: I understand. I believe that ' s one parcel. It ' s hard to see some of the lot lines . But I believe it ' s one parcel. So unless it was subdivided and made into strange lots, I don' t believe it would. TRUSTEE KRUPSKI : Like the current road? Like Greenway? TRUSTEE SEPENOSKI : Or if it were turned into Greenway and was subdivided, it would constrain the location in the future. MR. COLE: If a new lot that doesn' t exist were to be created. TRUSTEE KRUPSKI : It seems like putting an unfair disadvantage on a potential future neighbor there, by -- it doesn' t seem very neighborly, by tucking your leaching galleys up against the rear property line to gain access to a bigger pool . MR. COLE: Robert looked into that, and he can elaborate a little bit more about that . MR. CONWAY: I ' ll just speak quickly to the leaching galleys and stuff. They are located where we are permissible by Suffolk County. They have nothing to do with the proposal of the swimming pool. It ' s purely the offset from the wells . When we talked the distance between a drinking well and leaching pool is 150 feet, so even if there was a lot created behind them, they would have to just respect 150 feet for their well . From our position their leaching galleys are relatively close. TRUSTEE SEPENOSKI : So there ' s really, just building off of what you were saying, there is really no other location for the leaching galleys on this property. MR. CONWAY: Correct . It ' s a very small sliver of property that is clear, and we are increasing the variance because we can' t even meet that point . TRUSTEE KRUPSKI : That ' s likely why the houses in Orient are typically smaller and more conservative and restricted, because you don' t have public water, and you have a lot of native, natural environment. I would also just like to note that while the proposed vegetated buffer is a step in the right direction, a lot of these measurements are being taken from the wetland line, as Board of Trustees 18 October 14, 2026 Trustee Gillooly said, but a lot of this is sloping bank, which frankly I think the jurisdiction line could be from the top of that bank. So this is a very sensitive property. This pond, I believe, ties into the neighboring pond to the side, that you can see on the satellite there. And I think what I felt that Trustee- Finora was driving at, too, was that this project is being built almost to the fullest extent here, on a very sensitive property, and, I mean, as we discussed before, when you purchase, or maintain ownership of an environmentally sensitive property, you are becoming a steward of the land. And that 'should really be accounted for. Either you want a house with a pond in the back or you don' t . And I think sometimes people get confused about trying to squeeze their uses in with the environmental uses and aspects of the property. TRUSTEE GILLOOLY: It ' s, you know, it ' s really something that you were able to maintain 60 feet for setback on the pool but only 54 feet for the house. So, I think there needs to be some reworking here in terms of cumulative impact of this large of a dwelling. MR. COLE: I will take the Trustees ' comments and discuss them with the homeowner and try to come up with something that fits for both parties . If there are any other comments that you would like, or any other design elements that you see, let us know. TRUSTEE GILLOOLY: Are there any other comments? Is there anyone else here wishing to speak regarding this application, or any other comments from the Board? (No response) . Hearing none, I make a motion to table this application for submission of .new •plans . TRUSTEE FINORA: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: Number 5, AMP Architecture on behalf of FREDA GIFT TRUST requests a Wetland Permit for additions and alterations to the permitted two-story dwelling consisting of removing the screened-in porch with entry steps, outdoor shower, two exterior doors and one set of windows; install a 10 ' wide entry in place of windows; construct a 13 . 10 'x22 . 3 ' screened in porch with entry steps; construct a 151x25 ' partially raised swimming pool with a 515sq. ft. Raised deck surround and steps to ground with locking gate; a showerhead to be installed on an exterior wall within the deck footprint; install. a drywell for pool and pool equipment area; relocate existing a/c units; existing generator; and to establish and perpetually maintain a 10 ' wide non-turf buffer along the landward edge of the top of the bank. Located: 7715 Indian Neck Lane, Peconic. SCTM# 1000-86-6-26. 2 The Trustees conducted a site inspection October 6th, 2026, Board of Trustees 19 October 14, 2026 noting to extend buffers, inquire about tree removal. The LWRP found the project to be inconsistent with respect to Policy 6. 2 and 6. 3 . Is there anyone here wishing to speak on behalf of the application? MR. PORTILLO: Yes . Good evening. Anthony Portillo, AMP Architecture. In regards to the tree removal, I just brought some photos . . I 'm not sure if this is the tree that is in question. And again, we are fine replacing this tree. -If I could pass this on. Um, so for the scope of the project there is an existing screen porch on the seaward side of the home. And it ' s really an unusable size, so they are looking to extend that screened porch in line with the existing setback of the home. It will be built on a deck, so it won' t be built on a foundation, so post beam construction. And then proposing a deck with a swimming pool, again, mostly in construction. The pool will have a foundation around it. And a dry well for the swimming pool, and plus we are proposing a ten-foot non-turf buffer around the entire property. One thing I ' ll mention, the property is very large, so' the additions are minimal to the actual property size. So total lot coverage is 3 . 1% . We are not passing by the existing house setback at the rear or at the seaward side, and we ' re not extending past the pier line. I can answer any questions the Board might have. Oh, and if that ' s the tree, we can either pull that or we can do a one-to-one. , TRUSTEE FINORA: This photo depicts the evergreen tree? MR. PORTILLO: Yes . So you see there' s the' line of the footprint of the deck over here. TRUSTEE FINORA: No, this was not the particular tree in question. There was a large oak adjacent to the area of the pool, proposed pool, and I think that was the nature of the question proposed from the field notes . But I don' t have a plan here that would show where that tree is located anyway. I don' t think it was shown on the survey. Nonetheless, that ' s, it was a large diameter hardwood, maybe, I don' t know 24-inch, 30-inch diameter tree. MR. PORTILLO: In the location of the proposed deck and pool? TRUSTEE FINORA: Yes . Directly to the -- no, that ' s a contour. But in this area. It ' s near the generator/utility pole area. There is actually a contour showing 16 feet in the vicinity of this tree that we are discussing now. MR. PORTILLO: So there is no plan really to remove that tree. I ' can take a better look at that. TRUSTEE FINORA: There are a couple of other comments from the Trustees about including plans for a dedicated drywell for the pool, some minor comments, and also noting that the pool is shown here with a reveal of two-and-a-half feet above grade, when our typical policy is two feet. Board of Trustees 20 October 14, 2026 Is there a hardship in lowering that to two feet? MR. PORTILLO: No, I don' t think so. TRUSTEE FINORA: Are there any other comments? MR. PORTILLO: The drywell is depicted on the site plan. TRUSTEE FINORA: Oh, it is? Is it dedicated to the pool? MR. PORTILLO: Yes . TRUSTEE KRUPSKI : In terms of other comments, I think the Board' s practice recently has been for inground pools, to limit them to being no higher than 12 inches out of the ground. Because we have been seeing this big increase of these large gunite structures adjacent to the wetlands that are not really -- they' re out-of-ground pools built out of gun ite now. So, I don' t- know how the rest of the Board feels about that, but . TRUSTEE GILLOOLY: Yes, I think even our code updates reflected that if the pool was exceeding 12 inches above grade it would have to be at 100 feet. And so here we are at 60 feet, so I believe the one-foot maximum should be applied here. TRUSTEE FINORA: Also the proposed pool drywell is almost precisely at the location of that hardwood. So that is something that we would need to adjust here . MR. PORTILLO: That 65 foot is the elevation 14 . We are 91 feet to the corner of the deck. TRUSTEE GILLOOLY: Thank you. But, yes, still not conforming with the 100-foot, so I think in that case the one-foot above grade would be the one we would like to see. MR. PORTILLO: So if we could conform to 100 feet, then the deck could be -- if they wanted the pool to be at the level of the house, instead of down -- it ' s nine feet. TRUSTEE KRUPSKI : He' s not measuring from top of bank, is he? TRUSTEE FINORA: No, he ' s measuring from the property line. TRUSTEE KRUPSKI : We are measuring from the top of the bank. TRUSTEE FINORA: This is the top of the bank dimension. This is the 91 to the property line. TRUSTEE GILLOOLY: Okay, sorry. We had it correct. We would consider this measurement at 65 feet here. MR. PORTILLO: So the Board would like it to be at 12 inches above grade, or one foot. TRUSTEE SEPENOSKI : Or less .. MR. PORTILLO: Okay. Should I provide revised drawings? I think if I can table, just because I 'm not sure how they feel about that . I don' t want to make that decision. I can come back next month and provide drawings, revised drawings for you. I ' ll take a better look at that oak tree, too, to make sure I 'm not -- TRUSTEE FINORA:, Okay. Any other comments from the Board? TRUSTEE GILLOOLY: If you are revising the plans it might be wise to add that oak tree and other significant trees to the plan so that we can knock those and keep track. MR. PORTILLO: Trees that are being affected? I mean, I don' t need every tree. Board of Trustees 21 October 14, 2026 TRUSTEE FINORA: Trees germane to the project and anything potentially at risk of, you know, shading the pool that you don't, you know, you want to be concerned about things of that nature. MR. PORTILLO: That ' s fine. TRUSTEE FINORA: Any other comments from the Board? TRUSTEE KRUPSKI : No. TRUSTEE FINORA: I ' ll make a motion to table this application. TRUSTEE SEPENOSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 6, Patricia Moore, Esq. On behalf of NICK POLOGEORGIS requests a Wetland Permit for the as-built 3 . 9 ' x4 . 5 ' cantilevered platform off bulkhead to 3 . 4 ' wide steps down to a 3 . 41x8 . 4 ' lower cantilevered deck; and for proposed 3 . 4 ' wide steps to beach. Located: 22655 Soundview Avenue, Southold. SCTM# 1000-135-1-26 The Trustees conducted a field inspection October 6th, 2026. Notes read: Any stairs constructed in place that are fixed and non-retractable are doomed. Wave action in recent storms has caused major damage to their property and adjacent properties . The LWRP found this to be inconsistent. The inconsistencies are: The most recent Board ,of Trustees permit at this location does not include a permit for stairs to be constructed seaward of the bulkhead retaining wall. The stairs are a new structure, not an in-kind replacement of a permitted structure. The photographs submitted with the application shows the stairs, landing and lower platform already framed with new, pressure-treated lumber. The asphalt stairs were constructed without Board of Trustees review or permit. The stairs add a new structure on the beach within the CEHA. Structures on beaches are not permitted unless it is approved by the Board at its discretion, based on its site inspection. Beach stairs are not recommended in this location. The beach is exposed to high wave action from Long Island Sound, and the stairs are likely to be damaged or lost repeatedly during storms, adding debris to the beach and the Sound. Because the stairs were not previously permitted and are within the CEHA, the action is not a minor action under Town Code 268-3 (a) or (b) of Chapter 111 a Coastal Erosion Hazard Area permit may also be required. Is there anyone here wishing to speak regarding this application? MS . MOORE: Yes . Patricia Moore, on behalf of Mr. Pologeorgis . I sent in a letter and I went back through the records. He built this staircase along the bulkhead because he thought he had a permit for the beach stairs already. So, and what I did, is I did find back since, well 1998 there were beach stairs, and in 2012 there were beach stairs Board of Trustees 22 October 14, 2026 that were replacing the original beach stairs . So there has been a history of beach stairs on this property. What has occurred over the years is that the beach is getting eroded, so the bulkhead is much -- there ' s more exposure of the bulkhead from the sand. And so rather than go from the- top of the bulkhead straight out, which is the design of the original stairs, he brought them along the edge of the bulkhead. In fact they are not finished. They are, he' s designed them so he can lift the stairs out of the damage or out of the water. So it ' s a -- that is going to be the final design to be able to have the steps come up out of the beach. He designed it in a way that he thought was actually more appropriate than the original stairs that went straight out. TRUSTEE GOLDSMITH: So, just to clarify, for the record, what is there now does in no way, shape or form reflect what was permitted back in 2010 when there was at least 30 feet of beach grass dunes in front of the bulkhead, with another 50 to 60 feet of beach seaward of that before you hit mean high water. The permit that was there, you keep talking about beach stairs, were stairs through dunes, through wetland vegetation, to access a beach, and then walk another 50 feet on that beach to access the water. The mean high water mark on those plans was at least 60-70 feet, if not more, seaward than the latest survey that shows the mean high water basically just off of the bulkhead. We also saw that the structure was destroyed in the recent storm. In your letter you also talked about when he started on land, previously, and that got wiped out, so when it was even further landward than where it ' s built, it was destroyed. Last winter the existing structure washed away while stored upland. The most recent built structure was destroyed. The beach stairs that were permitted were -- MS. MOORE: No, the older stairs were -- TRUSTEE GOLDSMITH: The older stairs were a walkway through a vegetated dunal area to access a beach. So what is there now is not a permitted structure and was destroyed multiple times . The construction of that stair platform was on the beach. There was damage to the neighboring properties on both sides . The neighbor to the east, brick patio was destroyed. The neighbor to the west, their deck was destroyed, and these stairs were destroyed. So I think, looking at that, and being that it is a structure on the beach that is constantly getting destroyed, it ' s not appropriate to put this structure back at all . MS . MOORE: Well, he must have access to his beach. TRUSTEE GOLDSMITH: So there is other ways to access said beach. MS. MOORE: The CEHA does exempt -- there is no CEHA requirement for beach stairs . That is specifically a listed structure that is permitted to be constructed within the CEHA area under the 111 code. Board of Trustees 23 October 14, 2026 But if there is a different design that is recommended, I ' ll go back to him and suggest to .him, modify this design. He thought he was doing the right thing, but if there is an alternative design that -- he needs access to his beach. Everybody that has waterfront property has the ability to get to their beach. The erosion that ' s occurred and the storms that have occurred, we' ll all have to deal with, but, you know, you still have to be able to get to your own property, and he does have a right to that, to access that. So .if you want to me to go back to him and have him consider an alternative design, I would be happy to do that. TRUSTEE SEPENOSKI : Does he have waterfront property left? I mean, does he have beach left? Because it appears to me that the mean high water is lapping against the bulkhead. MS . MOORE: Well, I think what we are getting is more serious storm tides . That ' s the problem. . TRUSTEE SEPENOSKI : No doubt about it. MS. MOORE: And the storms that have occurred are the ones that have been destroying a lot of the ancillary structures that have been built along this waterfront. No doubt. No doubt . TRUSTEE SEPENOSKI : . I completely agree with that . I think there is another hidden, well, it ' s actually quite obvious once you understand the principles at play, but along this entire stretch of coastline, in attempt to save their properties, they' ve hardened the shoreline with steel and vinyl bulkheading. And what that has done over the last several decades is wiped out any beach that residents enjoyed along the seaward edge of these bulkheads, including the starvation of Southold Town' s beach, which as we all know from the Suffolk Times headlines, and anyone who' s seen it, is non-existent, because there is no material left to flow along the shoreline. So it is both the effort to protect property and the increasing severity and frequency of storms that has led to the destruction of the beaches, and jeopardize the structures that you are now proposing rebuilding along this property. Or rebuilding again. MS . MOORE: Replacing. TRUSTEE KRUPSKI : It ' s not replacing. TRUSTEE SEPENOSKI : So I think that there is a moment in which lawyers, including yourself, have to think about what is best for the shoreline and what is realistic given the severity of the storms and real lack of beach there. MS . MOORE: Well, the property does have protection with the rip rap that has been in place. The sand will, in some areas, be lost, and hopefully will be regained through other storms . TRUSTEE KRUPSKI : The 70 feet gone. I really, I don' t even understand what we are talking about here. There ' s 70 feet of beach gone, there was an illegal structure -built that was gone within one storm, and then rebuilt again. And we heard testimony earlier that the structure was built with the storms in mind, to withstand them. Obviously not, because it already Board of Trustees 24 October 14, 2026 disappeared once and then was rebuilt for a second time illegally. So I 'm not even .sure -- MS. MOORE: I don' t know that to be the facts . TRUSTEE KRUPSKI : . This Board does . And I 'm not even really sure what we' re talking about at this point. I can' t fathom this application. I mean you are going to have, from a legal standpoint, you' re going to have kids walking along this beach at low tide getting hit by this structure. I really don' t understand what we are even talking about. here. MS . MOORE: The beach access, I think if you looked up and down, you have decks that are in the way. So, I walk this beach. When you walk this beach, you generally are walking below the high tide. This is -- TRUSTEE SEPENOSKI : That ' s going to be blown out in one wave in that, and it ' s, 30 years we've tried to permit structures for it, so we know that the materials that you are introducing into that high-energy area are not going to just become hazards sticking out of the beach with nails and screws? I mean, that ' s kind of the idea behind permitting structures that have longevity, that they don' t become hazardous . That' s why it ' s coastal erosion hazard area. I think that ' s a really poor design. I think it looks -- probably the best thing in this location is a ships ladder from the top of bulkhead down to the beach, as athletic as that sounds . MS. MOORE: Well, somebody. my age might have an issue going down the ships ladder. TRUSTEE KRUPSKI : And they might have an issue getting their property destroyed and affecting the other properties . Ms . Moore, we 've been doing this for how long in front of the Town. Logically speaking, what are you doing with this application? This makes no sense. It ' s like a flat earth theory. I can' t even -- MS . MOORE: You went there before my other application, so I would have happily met you there and talked to you and gone back to the client and said this is a concern of the Board, the way it ' s built. TRUSTEE KRUPSKI : Well, our notes are always available for your client to look at, or yourself, and frankly you could have asked us at any time what our separate thoughts are. But any discussion is really meant for this hearing. And, frankly, you have been doing this for too long. You are too- much of a professional not to know what you are talking about with this . There is no surprise here. This is a terrible application. And it ' s a dangerous application. And you know that. And I don' t appreciate you representing that it ' s not. MS . MOORE: Honestly, I guess in my opinion it seems like a standard set of stairs, but if you feel differently, respectfully, I will go back to the client, I ' ll have him speak to somebody with knowledge on how to make these stairs better so Board of Trustees 25 October 14, 2026 that they are not subject to any, to storm damage or can be, as you said, it ' s detached in some way so that in the wintertime during storms, that it can be, the lower parts can be protected. So, I ' ll go back. - ---- --- TRUSTEE- -SEPENOSKI : The engineer or designer who creates what could last there would deserve a Nobel prize for ingenuity. Because the amount of wave energy that that area receives on a regular window of, storm activity, it ' s just, I can' t see it surviving. TRUSTEE KRUPSKI : Well, if you find that person, let ' s fix Town Beach and fix the roads that are eroding, and then also raise the roads throughout the town that are getting regularly flowed over. So if you find that person, let ' s do that . Please do. I will welcome that. MS . MOORE: Well, I do feel that every homeowner should have access to their property. TRUSTEE KRUPSKI : As do I . TRUSTEE GILLOOLY: And they live two doors down from Town Beach, so they have access to Town Beach, which is a mere hundred feet away. TRUSTEE SEPENOSKI : That ' s true. There is access provided nearby by the Town. Common access . MS . MOORE: That is not what I consider to be your own access, your own property access . So I think all of us walk their beaches when we are walking along Town Beach, so we actually go, you know, in that direction. TRUSTEE GILLOOLY: I think you are familiar with the common lands, right? So hopefully you are walking on the common land, which is at mean high water, which is actually right up to this bulkhead, so. MS. MOORE: Okay. Usually I 'm much more seaward of that and have no problem. So, I will request that this matter be adjourned so that I can go back to the client and see what kind of access he could design. So. TRUSTEE GOLDSMITH: Is there anybody else here wishing to speak regarding this application? (No response) . I 'm of the mindset that we make a decision tonight, so I 'm going to make a motion close this hearing. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: .All in favor? (ALL AYES) . MS. MOORE: I would object -- TRUSTEE KRUPSKI : The hearing is closed. TRUSTEE GOLDSMITH: Due to the adverse environmental impact; due to the fact that this stairs has been destroyed multiple times; due to the fact that these stairs are on a beach; due to the fact that these stairs are subject to storm tide damage; due to the fact that these stairs are creating an adverse environmental impact; due to the fact that these stairs adversely affect fish, shellfish or other beneficial marine organisms; 275 (e) , increase Board of Trustees 26 October 14, .2026 the danger of flooding and storm tide damage, as we saw for ourselves that this proposed, or this built, as-built, without a permit, steps, were destroyed multiple times, and wood was on the beach of the Sound; also that it will otherwise adversely affect the health, safety and general welfare of the people of Town; people will have to--navigate around -t is o stac e-- --- - - as they are trying to walk the foreshore along the beach, and also; (j ) adversely affect the esthetic value of the wetland and adjacent areas; and also the fact that the conditions on this property have changed significantly since a wood walkway was approved back in 2011, with a 30-foot beach dune and another 50 to 60 feet of beach that is no longer there; due to all that and due to the LWRP inconsistency, with all the reasons stated therefore, I make a motion to deny this application as submitted. MS. HULSE: And just to be clear, the structure that is currently being applied for was not an in-kind replacement of what was permitted previously. It ' s a completely different structure and completely different design as well. TRUSTEE GOLDSMITH: That is my motion.. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MS . MOORE: I want to apologize to Lori on the record because I made a flippant comment on another matter, and very unprofessional. Please, excuse me. Thank you. MS . HULSE: Thank you. TRUSTEE KRUPSKI : Number 7, Sol Searcher Consulting on behalf of KIMOGENOR POINT COMPANY requests a Wetland Permit to replenish the beach between the 4-foot and 6-foot contour lines using clean beach sand; a total of 163 cubic yards brought in to raise elevation to 6-foot with 10-foot wide transitional areas; plant with approximately 4, 000 Cape American beachgrass plants 12" on-center; and provide 4-foot wide beach access path. Located: 50 Jackson Street, New Suffolk. SCTM# 1000-116-6-24 . 1 The LWRP found this to be consistent. The Trustees visited the property on the 6th of October, and noted that it was a straightforward application. Is there anyone here wishing to speak regarding this application? MR. BERGEN: Dave Bergen, with Sol Searcher Consulting, on behalf of the applicant Kimogenor Point Company. This is an interesting project in that we contacted the DEC and Jim Burton, and that name escape me, the head of the Habitat Division. Anyhow, came out and visited the site, and they were the ones that proposed this hopefully solution to the problem. So with that, all it is is trying to rebuild beach that has washed away and create a vegetated dune. So, with that, if there are any questions, I 'm here to answer them. Board of Trustees 27 October 14, 2026 TRUSTEE KRUPSKI : Thank you. Are there any comments from the members of the public or the Board? (Negative response) . All right, hearing none, I wish you luck in the endeavor, it ' s an all-too-common story throughout Town, as we just witnessed through multiple applications tonight. But I make a motion .to motion to close the hearing. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE KRUPSKI : And I make motion to approve this application as submitted. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : Number 8, Sol Searcher Consulting on behalf of KIMOGENOR POINT COMPANY requests a Wetland Permit to replenish the beach between the 4-foot and 6-foot contour lines using clean beach sand; a total of 244 cubic yards brought in to raise elevation to 6-foot with 10-foot wide transitional area; plant with approximately 6, 000 Cape American beach grass plants 12" on-center; and provide 4 ' wide beach access path. Located: 80 Jackson Street, New Suffolk. SCTM# 1000-117-10-1 The Trustees visited the location on the 6th of October. Notes read straightforward. And the LWRP found the project to be consistent with its policies as well. Is there anyone here wishing to speak regarding this application? MR. BERGEN: Dave Bergen, Sol Searcher Consulting, on behalf of Kimogenor Point Company. This property is contiguous to the property that we just had a public hearing on. Harry Arnold. That ' s the name of the person from the DEC, in addition to Jim Burton, who came out and looked at this and suggested this . So I 'm here to answer any questions you might have. TRUSTEE SEPENOSKI : None. I believe a prior application, everything was hashed out in there, so any other comments from the public or Members of the Board? (No response) . Hearing no further comment, I make a motion to close this hearing. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE SEPENOSKI : I make a motion to approve this application as submitted. TRUSTEE KRUPSKI : Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Board of Trustees 28 October 14, 2026 TRUSTEE GILLOOLY: Number 9, Sol Searcher Consulting on behalf of FARTHER OUT EAST, LLC requests a Wetland Permit to construct a 28 'x24 ' two-story dwelling that contains a 493sq. ft. Garage area with a 178sq. ft . Finished first floor space to access a 672sq. ft. Second-floor living space with a 7 'x15 ' balcony; a 3 ' x12 ' first floor concrete patio; and 'a 3 ' x4 . 9 ' first floor roofed-over concrete patio; install a stormwater management system; install a raised gravel driveway with septic area underneath, and install an I/A OWTS sanitary system; and to establish and perpetually maintain a 20 foot wide native vegetated non-turf buffer area along the landward edge of vegetated wetlands . Located: 865 Rabbit Lane, East Marion. SCTM# 1000-31-17-19 The Trustees most recently visited the site on the 6th of October, noting to review further at work session. We are in receipt of a letter from a neighbor, Mr. Robert O' Brien, PE, who is adamantly against this application and the environmental impacts . The LWRP reviewed this application and found it to be inconsistent with Policies Four, Five and Six. A summary of those findings is as follows : Number One, the entire parcel is within 100 feet of the wetland boundary. No location on the lot can meet the 100-foot setback for a residence or for sanitary leaching structures for any residential development here places the dwelling and sanitary system within the protected setbacks of the wetland. Number Two, the residence is proposed at only 28 . 5 feet from the wetland boundary on the east side, and 61 . 5 feet from the wetland boundary to the north, where 100 feet is required. Number Three, the sanitary system is not fully detailed. We do have a letter from Suffolk County addressing that. Number Four, the sanitary setbacks to the wetland are not correct. They are measured to the northern wetland boundary, not the closer eastern wetland boundary, which makes it even closer. Approximately 65 feet where 75 is required. The proposed leaching trenches are approximately 62 feet, where 100 feet is required. And any leaching under the raised driveway, no more than approximately 44 feet at the farthest possible location, where 100 feet is required. And the pump station is at approximately 64 feet . Number Five, the raised gravel driveway begins at the southeast corner of the building and is approximately 31 feet from the wetland boundary at Flag 6, where 50 feet is required. Number Six, the 20-foot non-turf buffer is not adequate to protect the wetland, given how close the building, driveway and. sanitary system are. The photographs show the cleared area covered in wood chips rather than vegetation Number Seven, the site is very low-lying and highly vulnerable to flooding. Any dwelling here is inconsistent with Board of Trustees 29 October 14, 2026 Policy 4 . 1 (a) (1) , which directs development that is not water-dependent away from coastal erosion hazard areas . Policy 4 . 1 (a) (5) requires flood plane development to meet federal flood insurance standards . Number Eight, groundwater is very high. It was encountered at elevation 0 . 0, with the highest expected groundwater at elevation 0 . 3 feet at high tide, and three feet below grade. Groundwater that rises with the tide is directly connected to Marion Lake and the wetland. The test hole was taken on a neighboring property, not the subject parcel . The two-foot deep drywells would have little separation from groundwater, so any stormwater drainage system would likely operate poorly. Number Nine, the site cannot support a septic system that protects the wetlands, ,Marion Lake and Gardner' s Bay because separation and proximity can' t be achieved, and because it is subject to flooding and sea level rise. Number Ten, nitrogen from effluent will reach Marion Lake and Gardiners Bay very quickly. Gardiners Bay is part of the Peconic Estuary, which is a USEPA designated estuary of national significance. Nitrogen pollution is already causing harmful algal blooms in these waters . And Number Eleven, the survey is dated July 9th, 2020, and the wetland boundary was delineated on June 23rd of 2020 . The Town Code requires a survey created no more than five years before the application. In the six years since, sea level has continued to rise, and wetlands in the area have likely expanded, making the situation even worse than is portrayed on the site plan. And Number Twelve, the current 2026 aerial shows that clearing and a driveway exists on the site without permits from. the Trustees for work within 100 feet of the wetlands . Is there anyone here wishing to speak regarding this application? MR. BERGEN: Yes . Dave .Bergen, Sol Searcher Consulting, on behalf of the applicant . Thank you, for all that information from the LWRP. As you know,. I attended the work session the other night, which was very useful to obtain that information. One thing that was interesting for me, is I realize the plans that you had were not the most recent sanitary plans, and so I had submitted to the office last week a more recent sanitary plan and I have another copy of the sanitary plan. I ' ll speak into the microphone, sorry. Another copy of the sanitary plans because this one has a distance that was requested the other night from the eastern wetlands depicted on this plan, as well as the distance from Marion Lake wetlands . So if I could, I would like to bring this up to you. I don'.t have enough copies for everybody. There ' s three copies . Board of Trustees 30 October 14, 2026 TRUSTEE GILLOOLY: I see the updated sanitary site plan does include a test hole that - is actually on the subject parcel, which is helpful . MR. BERGEN: Yes . I ' ll go through several of the items . The -- yes, the updated site plan that I dropped off at the office the other day does show that the test hole is in fact on our property. Just a couple of points here, none of the septic system or leaching areas proposed were beneath the driveway. There are no retaining walls associated with this sanitary system. I bring that up because it was brought up at the work session. Because what they are able to do is construct the sanitary system, and only have to increase the elevation by approximately one foot to do that, and then they can gradually do a 3-to-1 slope of soil, to decrease that increased elevation down to match the elevation of the property. And the point of this is, I know there was a question about will there be a wall around the septic system. And, no, there will not be. There is no need for a retaining wall around it . They are estimating approximately 30 cubic yards of material be needed to raise the septic system up. But the rest of the material that is needed will be located, as is done with construction of septic systems, underneath the leaching area to provide for appropriate drainage. With regards to groundwater -- and when they did the test hole, groundwater at 1/2 foot where the highest groundwater was found at one foot . This provides a 2 . 5, with the engineering of this septic system, provides two-and-a-half feet of separation between groundwater and the septic system, and I have been told Suffolk County requires two feet. So it ' s actually more than what is required by Suffolk County. And just to jump ahead a little bit, because I think you guys probably want to know where this is with the Suffolk County Health Department . Suffolk County Health Department has accepted this plan and says all they are waiting for now is. a Trustee permit and a DEC permit, and then they' ll go ahead and release their permit . And so that I know we have run into before, chicken or egg theory here. They want other agency permits first before they release it. But the point of this is they are satisfied with the engineering of this septic system. I believe I covered all the septic system questions through this. And what I would like to do is move on to now the house itself. For that we 've got a new plan for the house that has the house raised. This is to address the LWRP' s concerns about being located in a flood zone, et cetera. I have copies of this . So with that, and also you' ll note even with raising the house by four feet, you' ll. notice we still met sky plane. So there is not an issue with exceeding the sky plane here. Board of Trustees 31 October 14, 2026 So with that, what I would like to do is have the architect Mark Schwartz come up to talk about changes in the design of this house. MR. SCHWARTZ : Hello. Mark Schwartz, architect for the project. We have slightly ,revised the plans to raise the lower level of the garage so we are flood compliant with the flow-through foundation. We have tried to design the smallest possible footprint for a house in Southold Town, which requires 850 square feet . So we have a portion on the upper level, and the entry/storage/laundry on the lower level. One thing I did note, and I mentioned to Dave this morning, I did notice we are able to slide this house probably about ten feet closer to the property line to the south, which gives them more separation from the wetlands, in that area, based on the average setbacks of the houses adjacent to this house down the road. There is some, you know, that 40-foot can be maybe 30-foot, we can get another ten feet or so from the wetlands on Marion Lake. The property is -- currently the property has kind of a swale that goes right down the property line, right directly into Marion Lake. That is certainly something that we would look at as part of raising grade, to some degree, to level off , the property so you are not running off directly into Marion Lake, which it does now, the entire property. So that is what we propose as part of the project. MR. BERGEN: Just to finish up then with some other comments . I know there is an obvious concern about, I ' ll call it the wetlands at the east, that was not Marion Lake but the wetland that now joins with the lake. That was mentioned in the pre- submission conference request back in March, that we wanted to, talk to the Trustees about that.. We are willing to do a couple of things to help mitigate this from an environmental perspective. We are willing to add a very, if needed, or if it ' s palatable to the Trustees, a retaining. wall along that wetland boundary, to be no more than one-foot high, and go in behind it to try to help retain the water on the property, not to go into that wetlands . We are also, I know we proposed a 20-foot non-turf buffer. We are willing to make the entire property a non-turf buffer to help mitigate this situation. Finally, this is a very small house. Again, you see, it ' s a one-bedroom, 850 square-foot, so it ' s going to produce a limited amount of wastewater. Because of that, we are willing to give up laundry facilities in the place to help reduce any wastewater flow or reduce the wastewater flow that laundry facilities will create from entering into the IA system. Correct me if I 'm wrong, but the setbacks for septic systems, both leaching pools and cesspools, are they still the same as they have been for the last few years since IA systems have been introduced, or have those setbacks changed at all? It.' s interesting to note, obviously the purpose of IA Board of Trustees 32 October 14, 2026 systems has helped greatly reduce the opportunity for nitrogen and other harmful components to get into the, leach into the soil, and in this case leach into the wetlands . And so the fact that there is an IA system here, that will greatly reduce the opportunity for that to happen, and the fact that the structure is so small, and if we were to willing to give up laundry facilities so you have a one-bathroom, one-bedroom cottage, essentially, over the garage, we hope that that would help mitigate the challenge that is faced with the setback from the septic system to the eastern wetland. That plus of course the making the whole thing a non-turf buffer. So with that, I know it ' s a lot to listen to, I 'm here to welcome any comments from you folks . We know we might not be able to resolve this this evening, and we might be asking for this to be tabled, but we would like to have an exchange of information here. TRUSTEE GILLOOLY: Mr. Bergen, are you able to speak to the fill that was added and the driveway that was added and the shed that was added without Trustee permits, and how that came to be? MR. BERGEN: This is the first I 'm hearing of that . I didn' t, I had not been on the property prior to this past year, so I don' t know what the property looked like. And the aerial photographs looked, you know, you can' t really tell if material was added to a driveway or not. TRUSTEE GILLOOLY: It ' s funny, because looking right there at the 2023 imagery, it ' s very clear that there are piles of material that were moved onto that property, seemingly from the property -- MR. BERGEN: I see that now. MR. DOWLING: I 'm Tom Dowling (sic) , the homeowner. Gerard, from Soundside Landscaping added that. It was added because we were having a wedding on the property. So we can easily remove it. It ' s simply woodchips . He said it would decay and amount to nothing. So there is nothing there. That ' s the driveway, gravel. You are welcome to go and look at it . It ' s purely woodchips . The shed, I wasn' t aware it required a permit. I thought sheds can go on a property without a permit. I 'm a rule follower so I would have certainly gotten a permit if I knew one was required. If I knew what was required. But that ' s the background. And I 'm happy to scrape the woodchips away, if that helps. But that ' s the background. The wedding was in May. TRUSTEE KRUPSKI : Are you a new owner to the property? MR. DOWLING: I 'm not . TRUSTEE KRUPSKI : Okay. So were you there when this photo took place? MR. DOWLING: It ' s a little hard to tell . Sorry, I can just tell because the -- TRUSTEE GILLOOLY: This is 2023 . MR. DOWLING: Yeah, so, I was there when that photo was taken, yes . Board of Trustees 33 October 14, 2026 TRUSTEE GOLDSMITH: Because based on our site visit it looked like a lot more than just woodchips . MR. DOWLING: I 'm happy to, you know, take them -- no, it ' s woodchips, and I 'm happy to get Gerard to scrape them out or sign an affidavit that it ' s woodchips . It ' s literally 100% woodchips . There is not a stitch of -- there is a bit of gravel that washed from the road, as you know, Rabbit Lane is a gravel road, that washed slightly onto the property. But it ' s not, I would not say that it ' s anything other than what you would see on any other gravel road. TRUSTEE FINORA: What ' s shown in the photo here are woodchips from 2023? MR. DOWLING: No. No, the woodchips were just put here for the wedding. The wedding was in May. They were put there in, maybe in June. TRUSTEE FINORA: So what is this material stockpiled in 2023? MR. DOWLING: I have no idea. Can I take a closer look? TRUSTEE GILLOOLY: Sure. MR. DOWLING: I have no idea. That predates the -- oh, sorry. That was temporarily put there during construction across the road. I beg your pardon. That was temporary storage of the excavation material . TRUSTEE KRUPSKI : If you can just step back, we don' t have a stenographer here today. MR. DOWLING: Yes . So that is fill from construction across the road that was put there temporarily, subsequently been removed. So if you go look at that property right now, you' ll see the only thing on that property is woodchips and a shed. There has not been an inch of fill added. TRUSTEE GILLOOLY: You can pull the new map, the most recent one. It is woodchips from our site visit. The is the current condition. Okay, is there anyone else here wishing to speak regarding this application? (No Response) . TRUSTEE GILLOOLY: Okay, thank you, for the presentation of some new materials tonight . However, the distance of the house has not changed at the closest point, which is 28 . 5 feet; is that correct? MR. BERGEN: Correct. TRUSTEE GILLOOLY: Okay, well, given that this house that is being proposed is a mere 28 . 5 from the wetlands, where our code calls for 100 feet, in order to alter. these setbacks we have to find that there is no adverse effect on the wetland, which we were unable to do here. This parcel is located entirely within wetlands jurisdictional area and flood zone AE, with extremely shallow groundwater conditions . I do not believe the application has sufficiently demonstrated that the proposed development can meet our environmental protection standards, specifically our standards for issuance of permits, which we have to show under: Board of Trustees 34 October 14, 2026 275 . 12 (a) , no substantial adverse effect on wetlands; 275. 12 (b) , no substantial damage from erosion, turbidity or siltation; 275. 12 (d) , no substantial adverse effect on wildlife, vegetation or natural habitats; 275 . 12 (e) , no substantial increase in danger of flood and storm tide damage; 275 . 12 (g) , no substantial change to natural water movement; and 275 . 12 (i) , no substantial adverse effect on public health, safety and general welfare of the Town. Based on our review of the application, site inspection and the extensive LWRP findings, I make a motion to close this application. TRUSTEE GOLDSMITH: Second. All in favor? MR. BERGEN: Excuse me. The public hearing has not been closed yet. TRUSTEE GOLDSMITH: She just made a motion and I seconded it. MR. BERGEN: She made a motion. I wanted to add one comment in before -- TRUSTEE GOLDSMITH: Do we want to rescind the motion? TRUSTEE GILLOOLY: I have made a motion, so I would like to vote on that. TRUSTEE GOLDSMITH: I second. All in favor? (ALL AYES) . TRUSTEE GILLOOLY: Based on our review of the application, site inspections and LWRP findings, I make a motion to deny the application as it fails to meet our standards for issuance of permit under Chapter 275-12 (a) , .(b) , (d) , (e) , (g) and (i) , and does not comply with the LWRP. That is my motion. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: I make a motion for adjournment. TRUSTEE FINORA: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Res ectfully submitted by, Glenn Goldsmith, President Board of Trustees