HomeMy WebLinkAboutTR-10/14/2026 Glenn Goldsmith,President ``�r3F SU�ry Town Hall Annex
Nicholas Krupski,Vice President ��V� ��� 54375 Route 25
P.O. Box 1179
Eric Sepenoski J l Southold,New York 11971
Liz Gillooly Telephone(631) 765-1892
Joseph Finora • �OQ Fax(631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD RECEIVE®
Minutes
Wednesday, October 14, 2026 NOV 13 2
03
5 : 30 PM
Present Were: Glenn Goldsmith, President Southold Town Clerk
A. Nicholas Krupski, Trustee
Eric Sepenoski, Trustee
Liz Gillooly, Trustee
Joseph Finora, Trustee
Elizabeth Cantrell, Administrative Assistant
Lori Hulse, Board Counsel
CALL MEETING TO ORDER
PLEDGE OF ALLEGIANCE
TRUSTEE GOLDSMITH: Good evening, and welcome to our Wednesday,
October 14th, 2026, Trustee meeting. At this time I would like
to call the meeting to order and ask that you please stand for
the Pledge of Allegiance.
(Pledge of Allegiance is recited) .
TRUSTEE GOLDSMITH: I ' ll start off by announcing the people on
the dais . To my left we have Trustee Krupski, Trustee Sepenoski,
Trustee Gillooly and Trustee Finora.
To my right we have the attorney to the Trustees, the Hon. Lori
Hulse, and we have Administrative Assistant Elizabeth Cantrell.
Agendas for tonight ' s meeting are out in the hallway and
also posted on the Town' s website.
There are a few postponements in the agenda. In the agenda
on page six, numbers ten through 12, are postponed, as follows :
Number 10, JMO Environmental Consulting on behalf of
LUCINDA J. HERRICK REVOCABLE TRUST requests a Wetland Permit to
construct a 5, 280sq. ft. Two-story dwelling with gutters to
leaders to two (2) 8x8 ' drywells and a French drain for roof
runoff; install an I/A OWTS system with three (3) 8 'x8 ' leaching
pools; construct a 201x28 ' detached dry garage; install water
and electric service; construct approximately 200 ' of retaining
wall; construct a driveway; and to regrade and stabilize all
disturbed areas .
Located: Ocean View Avenue, Fishers Island. SCTM#
1000-9-11-7 . 16
Board of Trustees 2 October 14, 2026
Number 11, CONTINUED FROM 9/16/26 REVISED PROJECT
DESCRIPTION ON 9/1/26 Sam Fitzgerald, Architect on behalf, of
-- ANDREW- SHANNON & KATHERINE O'BRIEN requests a Wetland Permit- for -
the existing 2, 229sq. ft. (Gross floor area) , two-story dwelling,
construct additions and alterations for a 2, 503sq. ft . Two-story
dwelling consisting of removing the existing two-story west wing
and one-story sections, and construct a two-story addition with
a slight footprint expansion; construct a 236sq. ft. Screened
porch on west side of dwelling; construct a 36sq. ft . Covered
front porch; existing 22 . 3 'x20 . 9 ' deck to remain; remove the
existing seaward screened-in porch; and to abandon existing
septic system and install an I/A OWTS sanitary system.
Located: 195'0 Equestrian Avenue, Fishers Island. SCTM#
1000-9-6-4
Number 12, Patricia Moore, Esq. On behalf of FORDHAM HOUSE,
LLC, c/o DENIS BOUBOULIS requests a Wetland Permit for the
as-built 1, 135sq. ft . On-grade stone patio, as-built 53 linear
foot long evergreen screened concrete wall on west side with a
43 linear foot long return; as-built 100 linear feet of 3 . 5 '
wide steps and walkway from elevation of dwelling to lower
grade; as-built 69 linear foot long concrete wall with return
along east side; as-built 3 . 41x10 . 4 ' outdoor kitchen; as-built
3 . 5 ' x7 . 5 ' generator on concrete pad; remove the as-built 5 ' x5 '
firepit; and to reestablish and perpetually maintain the
previously conditioned 50-foot wide vegetated non-disturbance
area with lawn to be removed and area planted with beach grass
or other drought tolerant vegetation.
Located: 5205 The Long Way, East Marion. SCTM# 1000-21-5-11
So they will not be heard this evening.
Under Town Code Chapter 275-8 (c) , files were officially
closed seven days ago files were officially closed seven days
ago. Submission of any paperwork after that date may result in a
delay of the processing of the applications .
I . NEXT FIELD INSPECTION:
TRUSTEE GOLDSMITH: At this time I ' ll make a motion to hold our
next field inspection on Wednesday, November 4th, 2026, at 8 : 00
AM.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
II . NEXT TRUSTEE MEETING:
TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next Trustee
meeting on Tuesday, November 10th, 2026, at 5 : 30PM in the Town
Hall Main Meeting Hall .
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
Board of Trustees 3 October 14, 2026
III . WORK SESSIONS :
TRUSTEE GOLDSMITH: I ' ll make a motion to hold our next work
session Monday, November 9th, 2026, at 5 : OOPM at the Town Hall
Annex 2nd Floor Executive Board Room, and on Tuesday, November
loth, 2026 at 5 : OOPM in the Town Hall Main Meeting Hall .
TRUSTEE FINORA: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
IV. MINUTES:
TRUSTEE GOLDSMITH: I ' ll make a motion to approve the Minutes of
the September 16th, 2026, meeting.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
V. MONTHLY REPORT:
TRUSTEE GOLDSMITH: The Trustees monthly report for September
2026. A check for $18, 312 . 99 was forwarded to the Supervisor' s
Office for the General Fund.
VI . PUBLIC NOTICES:
TRUSTEE GOLDSMITH: Roman numeral VI, Public Notices . Public
notices are posted on the Town Clerk' s Bulletin Board for
review.
VII . STATE ENVIRONMENTAL QUALITY REVIEWS:
TRUSTEE GOLDSMITH: RESOLVED that the Board of Trustees of the
Town of Southold hereby finds that the following applications
more fully described in Section XII Public Hearings - Section of
the Trustee agenda dated Wednesday, October 14, 2026, are
classified as Type II Actions pursuant to SEQRA Rules and
Regulations, and are not subject to further review under SEQRA:
Lucinda J. Herrick Revocable Trust SCTM# 1000-9-11-7 . 16
Michael J. & Alexandria Prisco SCTM# 1000-139-1-17
Sophie Latham SCTM# 1000-32-1-6. 1
Southold Shores Boat Basin, Inc. SCTM# 1000-57-1-39 . 3
James S . Duffe & Patricia Dolan SCTM# 1000-15-2-9
Freda Gift Trust SCTM# 1000-86-6-26. 2
Nick Pologeorgis SCTM# 1000-135-1-26
Fordham House, LLC, c/o Denis Bouboulis SCTM# 1000-21-5-11
Kimogenor Point Company SCTM# 1000-116-6-24 . 1
Kimogenor Point Company SCTM# 1000-117-10-1
Farther Out East, LLC SCTM# 1000-31-17-19
Board of Trustees 4 October 14, 2026
TRUSTEE GOLDSMITH: That is my motion.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
VIII . RESOLUTIONS - ADMINISTRATIVE PERMITS:
TRUSTEE GOLDSMITH: Under Roman numeral VIII, Administrative
Permits :
Number 1, Sol Searcher Consulting on behalf of ADAM & SARI
SIMON requests an Administrative Permit to install .
code-.compliant 4 ' pool fencing; trench water line from existing
well to dwelling and trench electric line to dwelling;
construction activity within Trustee jurisdiction.
Located: 4730 Blue Horizon Bluffs, Peconic. SCTM#
1000-74-1-35 . 54
Trustee Finora conducted a field inspection on October 8th,
2026, noting that it was straightforward.
The LWRP found this project to be inconsistent. The
inconsistencies are: The pool enclosure fence is a structure
related to the pool and it ' s proposed approximately 54 to 90
feet from the top of the bluff, where 100 foot is required.
The pool is approximately seven feet landward of the
100-foot setback line, leaving room to enclose it landward of
the 100-foot setback.
The site plan appears to label the area seaward of the
100-foot setback as lawn.
I ' ll make motion to approve this application with the
condition that the area landward of the pool fence be a
vegetated non-turf buffer, which will bring it into consistency
with the LWRP, and then it is also subject to new plans
depicting a vegetated non-turf. buffer.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
IX. APPLICATIONS FOR EXTENSIONS/TRANSFERS/ADMINISTRATIVE
AMENDMENTS:
TRUSTEE GOLDSMITH: Under Roman numeral IX, Applications for
Extensions, Transfers and Administrative Amendments . In order
to simplify our meeting, the Trustees regularly groups together
actions that are minor or similar in nature.
Accordingly; I ' ll make a motion to approve as a group Items
One through Five, as follows :
Number 1, Finnegan Law, P.C. on behalf of RIPLEY SHORES LLC
requests a Transfer of Wetland Permit #5141 from Douglas DeFeis
to Ripley Shores LLC, as issued March 22, 2000 .
Located: 1165 Cedar Point Road West, Southold. SCTM#
1000-90-1-3 Number 2, Finnegan Law, P. C. on behalf of FLATO
ORIENT LLC requests a Transfer of Wetland Permit #24-2-11 from
Board of Trustees 5 October 14, 2026
Arthur Van Dewater to Flato Orient LLC, as issued March 8, 1991 .
Located: 600 Bay Lane, Orient . SCTM# 24-2-11
Number 3, Finnegan Law, P. C. on behalf of FLATO ORIENT LLC
requests a Transfer of Wetland Permit #5661 from Ann Marie Kelly
to Flato Orient LLC, as issued November 20, 2002 .
Located: 600 Bay Lane, Orient. SCTM# 24-2-11
Number, 4, Dominic Mavellia on behalf of JULIA MAVELLIA
requests an Administrative Amendment to Wetland Permit #10980 to
shorten permitted side-yard deck by 5 ' ; remove existing wooden
walkway to beach.
Located: 1525 North Sea Drive, Southold. SCTM#
1.000-54-4-17
Number 5, Krista Jones on behalf of JANE G. WEILAND
requests an Administrative Amendment to Wetland Permit #10955 to
expand the previously-approved patio an additional 10 ' x 14 '
landward.
Located: 6485 Nassau Point Road, Cutchogue. SCTM# 1000-111-13-11
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
X. DUCK/WATERFOWL BLINDS:
TRUSTEE GOLDSMITH: Under Duck/Waterfowl Blinds :
Number One, MICHAEL & LISA BOYD request a Waterfowl/Duck Blind
Permit to place a Waterfowl/Duck Blind in Little Creek using
private access . Located: Little Creek
I make a motion to approve number one.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
XI . RESOLUTIONS - OTHER:
TRUSTEE GOLDSMITH: Under Roman numeral XI, Resolutions - Other
Number 1, Set 2026/2027 Scallop Season: RESOLVED, that the
Southold Town Board of Trustees open the following dates to
scallop harvesting and pursuant to Chapter 219 (Shellfish) of
the Code of the Town of Southold: From Monday, November 2, 2026,
. from sunrise to sunset, through Wednesday, March 31, 2027,
inclusive, in all Town waters, as per Town Code.
That is my motion.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
XII. PUBLIC HEARINGS:
TRUSTEE GOLDSMITH: Roman numeral XII, Public Hearings . At this
time I ' ll make a motion to go off our regular meeting agenda and
enter into our Public Hearings .
Board of Trustees 6 October 14, 2026
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: This is a public hearing in the matter of the
following applications for permits under Chapter 2-75 and- Chapte-r------ ---------------
111 of the Southold Town Code. I have an affidavit of
publication from the Suffolk Times . Pertinent correspondence
may be read prior to asking for comments from the public.
Please keep your comments organized and brief, five minutes
or less, if possible.
WETLAND PERMITS:
TRUSTEE GOLDSMITH: Under Wetland Permits :
Number one, CONTINUED FROM 6/11/25, AS PER REVISED SITE
PLANS & PROJECT DESCRIPTION RECEIVED 9/17/26
Costello Marine Contracting Corp. on behalf of MICHAEL J. &
ALEXANDRIA PRISCO requests a Wetland Permit to remove and
dispose of the existing 6 'x44 ' catwalk; construct in-place a new
landward 4 ' wide staircase up to a 41x25 ' level catwalk to
elevate the dock structure 4 . 5 ' above grade leading to a 4 'x40 '
fixed ramp down to a 4 'x40 ' catwalk; a 31x16 ' adjustable ramp to
a 6 ' x20 ' floating dock situated in an "L" configuration
supported by two (2) anchor pilings; and to establish and
perpetually maintain a 20 ' wide non-turf buffer area along the
landward edge of the vegetated wetlands .
Located: 905 Westview Drive, Mattituck. SCTM# 1000-139-1-17
The Trustees conducted a field inspection October. 6th,
2026, notes that the new plans appear to show the dock within
the pier line, and show adequate water depth for the float .
The LWRP found this to be consistent.
Is there anyone here wishing to speak regarding this
application?
MR. COSTELLO: Jack Costello, on behalf of the applicant . If you
guys have any questions, I would like to point out the owner is
here with me.
TRUSTEE GOLDSMITH: Mr. Costello, the only thing that we noticed
was just on the plans, that the pier line on .the
northerly-facing dock adjacent, doesn' t appear to be accurate.
So we just look for new plans that show the pier line from the
terminus, from both adjacent docks . Subject to new plans .
TRUSTEE GILLOOLY: And the dock conforming with the pier line,
right?
MS. COSTELLO: We used the piling as the pier line. If I can just
show you this . I don' t know if you remember from your site
inspection, this dock was flagged about four feet in, three or
four feet in, as the end terminus . We have this line, is , an
actual photo of the property.
Then on this --
TRUSTEE GILLOOLY: Our stenographer is not here tonight, so if
you can just speak into the microphone.
Board of Trustees 7 October 14, 2026
MS . COSTELLO: I just wanted to show you the picture that
references the --
TRUSTEE GILLOOLY: Yes, I think we have it in our packet, right?
MR. COSTELLO: Yes . Where the marking was on the dock, you know,
the flag I 'm talking about at the end of the float .
TRUSTEE GOLDSMITH: Yes .
TRUSTEE GILLOOLY: So I remember from the field inspection, are
you saying that the survey was not showing the accurate length
of the adjacent docks?
MS. COSTELLO: Then we had a certified survey done of the garage,
it was accurately there. A lot of times, on a survey, the
subject property will be correct and the other properties next
to it are not certified, and they are just for reference. So
that was kind of the confusion on our end from the beginning,
but, now, if you remember where that flagging is on the float,
it ' s lower than the pier line.
TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak
regarding this application?
(No response) .
Any other questions or comments from the Board?
(No response) .
Hearing none, I make a motion to close this hearing.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: I make a motion to approve this application
subject to new plans that show the pier line, the correct pier
line, from the dock terminus on the adjacent docks, and the
dock, the proposed dock within that, so that we have new plans
that are accurate to the code. That is my motion.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE KRUPSKI : Number 2, En-Consultants on behalf of SOUTHOLD
SHORES BOAT BASIN, INC. , requests a Wetland Permit for a Ten
(10) Year Maintenance Permit to dredge a 7, 510 sq. ft . Area of
private communal boat basin to a finished maximum depth of -4 '
MLW by dredging an approximately 5, 330 sq. ft. Inshore area to a
maximum depths of -4 ' MLW, and dredging an approximately 2, 180
sq. ft. Offshore area to a depth of -4 . 5 ' MLW, which is to be
backfilled with a 6 inch deep, approximately 40 cubic yards
gravel cap; and temporarily place approximately 315 cubic yards
of resultant spoil inside geotextile tubes located in 2, 340
sq. ft. Deposition area on adjacent parcel to south, prior to
removal for offside disposal.
Located: Off End of Blue Marlin Drive, Southold. SCTM#
1000-57-1-39 . 3
The LWRP coordinator found this to be consistent .
The Trustees visited the property on the 6th of October,
Board of Trustees 8 October 14, 2026
noted questions about how to remove the tubes, the ones with the
dewatered spoils, and revegetate after the work.
It should be noted that we clarified with the agent for the
application that they would be removed up to the road using a
skid loader, with minimal disturbance.
Is there anyone here that wishes to speak regarding this
application?
MR. HERRMANN: Yes . Rob Herrmann of En-Consultants, on behalf of
the applicant.
So, yes, we looked at this during field inspections . There
is a boat basin with a privately-used community dock. That is
the area that is to be dredged. And then the spoils will be
pumped onto the adjacent beach to the south, which is owned by
Southold Shores Association.
I just handed up to Ms . Cantrell an updated permission
letter from the . President of Southold Shores Association
verifying the association' s granting permission for the spoil
plan reflected on the plans by En-Consultants last dated June
loth, 2026.
As Nick mentioned, there were a couple of questions during
field inspections . One was once the spoil that has been pumped
into these geo-textile bags, which we 've located landward of
spring high water, landward of the beach, and in currently a
vegetated area, there was some questions about how that material
would ultimately be removed from the site. And also the Board
had asked, mentioned that as a condition that area would have to
be revegetated in-kind with native vegetation, which of course
would be already in the expected scope of work, so there ' s no
issue with that being a condition.
And we did verify with the applicant and the applicant ' s
contractor that the material would be removed through the
existing gravel path, using a skid steer and brought out to a
truck at the end of the road.
We talked about the fact that inevitably part of that path
will probably have to be widened in places temporarily, so I
would just make the recommendation that along with the condition
that the spoil area itself be revegetated, would just be that
any disturbance or manipulation of the current path be restored
to the same condition that it ' s in right now, in terms of the
width and the vegetation adjacent to it, and that is that
existing gravel path is depicted on the plans . So that should be
easily enforceable.
Otherwise, this is a project the Board had looked at a
couple of years ago, and had indicated an interest in the
project being reviewed, and vetted and permitted by the New York
State DEC, which is what has taken us so long to get back to
you, but there have been various conditions stipulated in
connection with all of the work, and you should have a copy of
that DEC permit in your file.
TRUSTEE KRUPSKI : Thank you.
MR. HERRMANN: Other than that, if you have any questions, let me
Board of Trustees 9 October 14, 2026
know.
TRUSTEE KRUPSKI : Thank you. Is there anyone else here wishing to
speak regarding this application, or any additional comments
from the Board?
(No response) .
Noting that the New York State DEC has also put a lot of
time into this application, I make a motion to close the
hearing.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE KRUPSKI : I make a motion to approve this application
with the stipulation that the areas to be disturbed, including
the dewatering site and the pathway to the road, are revegetated
with native species following the conclusion of work.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : Number 3, Joan Chambers on behalf of SOPHIE
LATHAM requests a Wetland Permit for the as-built demolition of
existing dwelling and construction of a two-story dwelling
(2, 022 . 7sq. ft . Footprint) with a 13 . 3 ' x5 . 9 ' covered entry porch,
a 33. 10 'x9. 6 ' wood deck, a 26. 4 'x9. 6 ' screened porch with
26. 3 'x9 . 4 ' balcony above, and a 51x5 . 2 ' outdoor shower; for FEMA
compliance propose to raise the dwelling, demolish and remove
existing foundation and replace with new higher foundation to
10 . 42 ' in same footprint; raise as-built decks and extend
stairs; remove existing brick stoop and install a 3 . 21x5 ' side
entry with stairs; raise the utilities room and install steps to
ground; raise propane platform and install 4 ' high fencing
surround; install gutters to leaders to drywells; abandon
existing septic system and install a new I/A OWTS sanitary
system landward of dwelling.
Located: 2180 Peters Neck Road, Orient . SCTM# 1000-32-1-6. 1
The Trustees most recently visited the location on the 6th
of October. Notes from our inspection read: Establish buffer to
match buffer to north and bench to south. Keep trees .
The LWRP coordinator found the project inconsistent with
its policies, mostly Number Six, protect and restore significant
coastal fish and wildlife habitats. Laid out four proposed
actions that are found inconsistent, having to do with the
as-built nature of .the work, the dwelling' s distance from the
wetland boundary, the coastal erosion hazard line, the as-built
shower, lack of drainage. And lays out several remediation
pathways to bring it into conformity .with its policies .
Is there anyone here wishing to speak regarding the
application?
MS . CHAMBERS : My name is Joan Chambers, I 'm here to represent
Sophie Latham, who is. also here with us tonight.
I 'm just going to give everyone here a bit of a background on
this project, okay?
Board of Trustees 10 October 14, 2026
The Latham residence at 2180 Peters Neck Road in Orient has
been in the Latham family for four generations . The original
home was built sometime in the 1800s in Greenport, and was
transported to the current location by George Latham in the
1940s .
The first major alteration to the property was the
northwest addition of the living room in 1977, and that was
recorded with a building permit, and a certificate of occupancy
for that addition was issued September 19th, 1988 .
The Southold Town Clerk recorded the septic permit in 1986,
and that was followed by a Trustees permit dated June 18th,
2008, for the replacement of the existing bulkhead, as well as
the New York State DEC permit dated January 22nd, 2010, for
removal and replacement of existing timber groin and replacement
of the existing bulkhead.
In 2024, the current owner, Sophie Latham, the
granddaughter of George Latham, made some renovations and
repairs to the home that are detailed in Attachment #1 dated
8/21/26, which is included in the package.
I won' t take up any more of your time repeating the details
of the renovations and repairs, but suffice to say that on March
13th, 2025, when the Building Inspector Nancy Meyer came to the
property as part of an application for a pre-CO, she requested a
building permit application for the as-built work.
The plans were revised and resubmitted to the Southold Town
Building Department 5/19/25, and they also requested an updated
survey and a FOIA request on the septic permit.
On September 29th, 2025, the plans examiner determined they
would suspend their processing of the application pending a
review by the Southold Town Trustees .
An application for review was submitted to the Trustees
office on November 12th, 2025, and they responded with a request
for additional information on the plans, another updated survey,
and a full tidal wetlands permit application.
During this time Sophie and I communicated with the
Building Department regarding their designation of the
renovations constituting a demo of the property, based on the
degree of alteration, as well as the request for a septic
review, given that the number of bedrooms in the house had
actually been decreased from five to four during the renovation.
The application to the Trustees was resubmitted on January 7th,
2026. They responded January 21st, saying that the Building
Department wanted the house to conform to FEMA regulations, and
their application would need to be revised to include that
additional work.
Now, the finished floor elevation of this house is 7 . 55
feet, and the elevation required in 2025 by FEMA for an AE-6
zone is eight feet, which means that the house needed to be
raised 5 3/8th inches in order to conform.
Sophie and I have made several appeals for relief of this
decision, and as apparent by the application before you, we lost
Board of Trustees 11 October 14, 2026
every argument .
What followed were meetings, estimates of costs, which
started at half a million dollars and went up, and revisions to
plans and surveys, and it all resulted in Sophie ' s decision to
raise her house to the current FEMA-required height, despite the
fact that her original application was made in 2025 .
She is planning for the future of this property, and with
that in mind, she also decided to install a new IA sanitary
system. That application has been submitted and accepted by
Suffolk County Board of Health, pending Trustees approval .
We have also made application to New York State DEC, even
though there was no planned alteration to the bulkhead,
shoreline or footprint of the house.
It is our sincere hope the Trustees see this application as
a 19th century family home being rededicated to future
generations, and grant this permit so we can, after 19 months of
paperwork, move this project forward.
TRUSTEE SEPENOSKI : Thank you, for your comments and --
MS . CHAMBERS : I can write a book about that one.
TRUSTEE GOLDSMITH: I appreciate that, and further that you went
through such an ordeal for five-and-a-half inches .
MS . CHAMBERS: Five-and-a-half inches, yes . But, you know, Sophie
said if we are going to raise it, let ' s raise it to current
standards . You know. I mean hopefully the water will never get
that high, but we decided to do it. So that ' s the plan.
TRUSTEE SEPENOSKI : All right. So the Trustees notes, as I
mentioned at the top of my commentary was to establish, a buffer
to match the buffer to the north and the bench to the south.
That was based on our being in the field and seeing that a
flanking of this property on both sides is native, vegetated
buffer. I see that you've included one on your plans as well
for 15 feet. I think the LWRP speaks to that attempt to bring
it into some kind of revegetation along the shoreline .
I think a 25-foot buffer would suffice and satisfy the
LWRP' s concerns . I think that ' s the only amendment to your
current proposal that I see needing to be addressed.
MS . CHAMBERS: Okay, so the existing buffer, which is all the
wetlands towards the causeway.
TRUSTEE SEPENOSKI : The north side, yes .
MS . CHAMBERS: That ' s obviously not being touched. Actually,
that whole end of the house, the northwest end, is that addition
that was CO' d already. So you are talking about the buffer .on
the side, along the bulkhead.
TRUSTEE SEPENOSKI : That ' s right .
MS . CHAMBERS: And how wide do you want to see that?
TRUSTEE SEPENOSKI : It ' s currently at 15 . I would add an
additional ten and make it 25 feet.
MS. CHAMBERS : Make it 25 feet .
TRUSTEE CHAMBERS: And vegetated with native vegetation.
MS. CHAMBERS : Native vegetation, non-turf buffer, 25 feet from
the bulkhead in. I think that ' s, you know, not a problem at all .
Board of Trustees 12 October 14, 2026
You have to speak up here, Sophie.
MS. LATHAM: Can you just explain, so in front of the house,
between the house and the bay, you want 25 feet not of lawn.
You want me to dig the lawn out.
TRUSTEE SEPENOSKI : That ' s right. You don' t even have to dig the
lawn out. You just need to plant it with a native species .
There are several species that do well in that area: Cape
American beach grass, Golden Rod.
MS . LATHAM: Okay. And can you tell me the purpose of that?
TRUSTEE SEPENOSKI : The purpose of it is to mitigate nitrogen
falling from a treated, irrigated lawn surface towards the
Orient Harbor, and set down a deeper set of roots in an area
that seasonally experiences high amounts of salt and wave
action. So stabilizing the soils in that area behind the
bulkhead
MS. LATHAM: Okay. And where is the nitrogen coming from?
TRUSTEE SEPENOSKI : Nitrogen comes from lawn treatment of
fertilizer put down.
MS . LATHAM: Yeah, I would never treat our lawn. I mean, you saw
it . We don' t treat our lawn.
TRUSTEE SEPENOSKI : I actually made a comment in the field that I
don' t think this lawn has ever been treated.
MS. LATHAM: Yes, we would never treat the lawn. But, yes, that ' s
fine. I 'm completely fine with putting native species down. I
was just wondering -- okay.
TRUSTEE SEPENOSKI : So in order to bring this into conformity
with the LWRP, the additional buffer would do so, and we can
move forward with this this evening.
MS. LATHAM: Okay, great, thank you.
TRUSTEE SEPENOSKI : Thank you. Is there anyone else wishing to
speak regarding this application?
(No response) .
Members of the Board?
(No response) .
Hearing no further comments, I make a motion to close this
hearing.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : I make a motion to approve the application
with the condition that a 25-foot vegetated non-turf buffer be
established from the bulkhead landward with native species, mix
of native species in that area, and a new set of plans depicting
that buffer, thereby bringing it into consistency with the LWRP.
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MS. CHAMBERS : Thank you, folks .
TRUSTEE GILLOOLY: Number 4, Cole Environmental Consulting on
behalf of JAMES S . DUFFE & PATRICIA DOLAN requests a Wetland
Board of Trustees 13 October 14, 2026
Permit to demolish existing dwelling, rear patio, outdoor
shower, concrete front porch, walk and driveway; construct a
proposed 2, 405sq. ft. Two-story dwelling with basement and ±636
attached garage; a 423sq. ft. Rear patio and a 224sq. ft.
Roofed-over patio, a 176sq. ft . Roofed-over front porch, and
±44sq. ft. Egress window; install gutters to leaders to drywells
to contain roof runoff; construct a 16 ' x31 ' in-ground pool with
coping; install pool enclosure fencing with gates; connect pool
to drywell #2 for backwash, install a pool equipment area within
a sound attenuating enclosure; install a ±1, 004sq. ft. Asphalt
driveway with irregular ±170sq. ft. Front walk and stairs;
abandon existing cesspools, install a FUJI CEN-5 I/A OWTS
sanitary system and new 4" cast iron waste line; and to
establish and perpetually maintain a 40 ' wide non-disturbance
buffer area along the landward edge of the vegetated wetlands .
Located: 1270 Greenway East, Orient. SCTM# 1000-15-2-9
The Trustees most recently visited the site on the 6th of
October, noting Board discussed northwest corner expansion and
recommended moving mass of that section further landward or
relocating. Pool okay with setback, non-disturbance buffer on
the plans .
The LWRP reviewed this application and found it to be
inconsistent . The inconsistency found that the existing dwelling
is replaced with a larger dwelling within the 100-foot wetland
setback. The proposed dwelling is 54 . 8 feet from the wetland
boundary, the same as the existing dwelling, however the amount
of development within the 100 feet is increasing.
Number two, the building footprint increases by
eight-hundred square feet, which is 50% . Lot coverage increases
11 . 5% -- goes from 11 . 5% to 19%, including the pool, patios and
porch. Rebuilding offers an opportunity to locate new structures
farther from the wetland.
Number three, the northwest wing of the dwelling expands
the footprint of the existing dwelling within the 100-foot
setback on the side facing the wetland. Reconfiguring the
dwelling so that the expansion is located farther away from the
wetland would reduce the amount of new structure within the
setback. And the proposed leaching galleys are approximately 68
to 93 feet from the wetland boundary, and a future expansion
galley approximately 58 feet where 100 feet is required.
And the LWRP recommends some options to help bring this
into consistency.
Is there anyone here wishing to speak regarding this
application?
MR. COLE: Chris Cole, Cole Environmental, agent for the
applicant .
You met with the homeowner onsite for a pre-application
meeting earlier this year. His takeaway from the meeting was
that the Board didn't want to see any further encroachment
towards the wetlands . So from the plans that were initially
submitted, they were redesigned to go no further than the house
Board of Trustees 14 October 14, 2026
was currently setback from the wetlands, and made a little
jagged edge to maintain that setback.
I provided that, you know, our discussion onsite for the
Trustee meeting, and provided that to him, and we have actually
updated plans that are increasing the buffer specifically in
between the closest setback and the wetlands . So I would provide
that to you.
And I also have the architect who designed the house with
the homeowner here . He did inform me that what they tried to do
here was they tried to keep the majority of the house basically
in the same footprint that it was, keeping the garage and the
driveway, the curb cutouts, any runoff from the driveway, as far
away from the wetlands as possible. So that ' s why the driveway
is on, if you' re looking at the plans, to the right side. And
the one-story addition into the two-story, was meant to have
less development closer to the wetlands .
So in here we are proposing an additional approximately
1, 550 square feet of buffer in between the wetlands and the
development, and we are proposing a buffer that is approximately
4, 000 square feet, minimum being 40-feet .wide, and that includes
about 3, 500 square-feet of existing lawn.
As Trustee Sepenoski just mentioned, reduction of lawn
means reduction of water, fertilizer, herbicides, pesticides, et
cetera, that would be encouraged to go towards the wetlands, the
pond, that is there.
, One thing that is not mentioned on this new plan is we are
going to propose a one-time invasive species removal . There ' s
Oriental bittersweet choking trees around the pond, Multiflora
rose, privet . So we would be popping, cutting those vines,
popping that out . Porcelain berry as well, and then replanting
the area with native species to protect that pond.
And I have the architect here who can speak to the septic
location a little more in-depth than I did. They looked at where
the wells are, and other septic systems, and this was the best
location.
We got a variance from the Health Department, but that ' s
really the only location that the Health Department accepted, so
he can elaborate on that or any further pieces about the house
design or the siting.
TRUSTEE GILLOOLY: Okay, thank you, so much, for providing the
extended buffer proposal . I certainly appreciate the effort
that has gone into this, and I appreciate the one-time invasive
clean up.
I think, you know, while I understand the effort there, the
idea that this is going from an existing one-story home to a
two-story home in some areas, and only one story expanding
further to the north, it still is additional structure closer to
the wetland. So what we had hoped to see was a reconfiguration
of this house using the additional property available to have
that addition farther away from the wetland and the bank. .
You know, we are measuring here from the wetland, which I
Board of Trustees 15 October 14, 2026
think is appropriate. There is a slope here that obviously
contributes to the environmental factors on this property, so I
think the buffer is very appropriate. But I have concerns about
this one-story addition, um, encroaching further toward the
wetland within that 100-foot boundary.
MR. COLE: Understood. We took those comments from the field and
brought it to the architect. He can speak a little bit to how
putting that addition on the side with the garage, it was not
something that we could put together for a hearing right now.
MR. CONWAY: Robert Conway -of Bello Architects, just speaking
quickly.
. So the one-story portion of the home that we are speaking
of, on the north side, it ' s got this primary bedroom. The whole
goal of building a new house here is they have older children.
They want to be on the first floor so they can each have some
space, if they plan to move here full-time.
We looked at some options about relocating that bedroom to
other parts of the house, and it would be a substantial redesign
of the property. We had initially come up with the concept of
retaining the garage in its location, being that we would not be
impacting the- driveway, the curb cuts, keeping runoff as far
from the sloped area and into the wetlands .
So to make the gesture, as the Trustees had suggested, of
moving their bedroom to the rear of the property, would
significantly change our plan, so we had .taken the feedback of
no closer to the wetlands, to be dimensionally from the
wetlands, so that since the wetlands are a radius curve, we
respected that with our setbacks .
TRUSTEE GILLOOLY: Thank you, for your comments here.
It does seem that the proposed asphalt driveway is
significantly increasing as well, so it does seem like there are
alterations to that driveway that you were just talking about.
MR. CONWAY: Widening the driveway, to the south, so further
away. They would be open to going to a more permeable material
for that.
TRUSTEE GILLOOLY: Right . I think the issue here from the LWRP
perspective, as well as the Trustees perspective, is the
additional encroachment on the, so the code ' s setback for a home
structure would be 100 feet. Here we are 54 . 8 feet. And while
it ' s one thing to look at the existing sort of grandfathered
footprint of the existing house, when you are, this is the time,
if you are completely redesigning, to move as far as away from
the .wetlands as possible. And given that this lot is not
constricted in the way that many other lots are, there is an
opportunity to redesign here. And I think that we would like to
see another proposal that puts the structure farther away.
MR. CONWAY: Thank you, for your comments .
MR. COLE: Just looking at the plan on that, I 'm not an
architect, but if the one-story on the north side closer to the
wetland was shifted, or potentially could be shifted over, but
still kind of like splitting the difference, shifting kind of
Board of Trustees 16 October 14, 2026
where the porch is and the porch comes closer to the street, but
still crossing the line, you know, a little bit of where the old
house was, is that something that the Trustees would consider if
that ' s possible to do?
-- --.---- TRUSTEE GILLOOLY: I mean, I think we would like to take a look
at it. It ' s hard to say just from, you know, without looking at
the plans, but I think that an effort to reduce the increasing
impact on the wetlands .here is something that we would look
favorably upon.
MR. COLE: Okay.
TRUSTEE FINORA: I would just add that, as a general comment, the
size of development and the activities here concern me, given
the size of the property and the available buildable space on
the property.
The overall size of the house is significantly increased.
We see an increase in the proposed driveway, with impervious
surface. We see the addition of a sizeable pool. And overall, my
position is that there ' s too great of an impact to this
property, and the size and scale of development is too great of
an impact to be comfortable from an environmental standpoint
given its proximity to the wetland, and also because of the
significant grade changes that occur on this property.
So I would be looking to see a significant reduction of
scale in one capacity or another, but out of those different
components .
MR. COLE: I just wanted to mention, we did increase the buffer
significantly, and that is specifically because the property
does slope down to the wetlands . So we are addressing that.
The one-story addition, for you specifically, it ' s not
about that addition, it ' s just the overall development at any
point; is that correct?
TRUSTEE FINORA: That ' s right. I would characterize this as too
many increases in impact, and the scale of this development is
too great for this particular portion.
MR. COLE: If we propose a gravel driveway, does that alleviate
at least some of the concerns then?
TRUSTEE FINORA: Certainly that is a positive improvement in
this, yes .
MR. COLE: Okay.
TRUSTEE GILLOOLY: Is there anyone else here wishing to speak
regarding this application, or any other comments from the
Members of the Board?
TRUSTEE FINORA: Let me just make one additional comment . I would
also say that this proposal is substantially out of scale with
the adjacent properties as well, and I would look to that as a
guideline from my position here in that the adjacent, at three
or four properties have development that ' s at a much smaller
scale that what is proposed here. That ' s the last point I want
to make. I 'm sorry.
MR. COLE: I ' ll take those points back, to the client.
TRUSTEE SEPENOSKI : I guess I just have a question for you, Mr.
Board of Trustees 17 October 14,. 2026
Cole. I see the 150 feet from well, described in an arc, which
seems to be related to the location of the leaching galleys?
MR. COLE: Yes .
TRUSTEE SEPENOSKI : Down in the corner of the property. And I
was just curious, is there any house behind this house --
MR. COLE: Behind it --
TRUSTEE SEPENOSKI : (Continuing) -- in other words, our current
sanitary code, which I 'm not entirely familiar with at the
county .level, but I do understand you have to locate leaching
galleys, in Orient in particular, because there ' s no street
water. It ' s from wells . Would the location of the leaching
galleys there in the corner prove problematic for a future home
on the rear side of this property?
TRUSTEE GILLOOLY: On the south side. Yes .
TRUSTEE SEPENOSKI : Would it create problems for their design?
MR. COLE: I understand. I believe that ' s one parcel. It ' s hard
to see some of the lot lines . But I believe it ' s one parcel. So
unless it was subdivided and made into strange lots, I don' t
believe it would.
TRUSTEE KRUPSKI : Like the current road? Like Greenway?
TRUSTEE SEPENOSKI : Or if it were turned into Greenway and was
subdivided, it would constrain the location in the future.
MR. COLE: If a new lot that doesn' t exist were to be created.
TRUSTEE KRUPSKI : It seems like putting an unfair disadvantage on
a potential future neighbor there, by -- it doesn' t seem very
neighborly, by tucking your leaching galleys up against the rear
property line to gain access to a bigger pool .
MR. COLE: Robert looked into that, and he can elaborate a little
bit more about that .
MR. CONWAY: I ' ll just speak quickly to the leaching galleys and
stuff. They are located where we are permissible by Suffolk
County. They have nothing to do with the proposal of the
swimming pool. It ' s purely the offset from the wells .
When we talked the distance between a drinking well and
leaching pool is 150 feet, so even if there was a lot created
behind them, they would have to just respect 150 feet for their
well . From our position their leaching galleys are relatively
close.
TRUSTEE SEPENOSKI : So there ' s really, just building off of what
you were saying, there is really no other location for the
leaching galleys on this property.
MR. CONWAY: Correct . It ' s a very small sliver of property that
is clear, and we are increasing the variance because we can' t
even meet that point .
TRUSTEE KRUPSKI : That ' s likely why the houses in Orient are
typically smaller and more conservative and restricted, because
you don' t have public water, and you have a lot of native,
natural environment.
I would also just like to note that while the proposed
vegetated buffer is a step in the right direction, a lot of
these measurements are being taken from the wetland line, as
Board of Trustees 18 October 14, 2026
Trustee Gillooly said, but a lot of this is sloping bank, which
frankly I think the jurisdiction line could be from the top of
that bank.
So this is a very sensitive property. This pond, I believe,
ties into the neighboring pond to the side, that you can see on
the satellite there. And I think what I felt that Trustee- Finora
was driving at, too, was that this project is being built almost
to the fullest extent here, on a very sensitive property, and, I
mean, as we discussed before, when you purchase, or maintain
ownership of an environmentally sensitive property, you are
becoming a steward of the land. And that 'should really be
accounted for. Either you want a house with a pond in the back
or you don' t . And I think sometimes people get confused about
trying to squeeze their uses in with the environmental uses and
aspects of the property.
TRUSTEE GILLOOLY: It ' s, you know, it ' s really something that you
were able to maintain 60 feet for setback on the pool but only
54 feet for the house. So, I think there needs to be some
reworking here in terms of cumulative impact of this large of a
dwelling.
MR. COLE: I will take the Trustees ' comments and discuss them
with the homeowner and try to come up with something that fits
for both parties .
If there are any other comments that you would like, or any
other design elements that you see, let us know.
TRUSTEE GILLOOLY: Are there any other comments?
Is there anyone else here wishing to speak regarding this
application, or any other comments from the Board?
(No response) .
Hearing none, I make a motion to table this application for
submission of .new •plans .
TRUSTEE FINORA: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE FINORA: Number 5, AMP Architecture on behalf of FREDA
GIFT TRUST requests a Wetland Permit for additions and
alterations to the permitted two-story dwelling consisting of
removing the screened-in porch with entry steps, outdoor shower,
two exterior doors and one set of windows; install a 10 ' wide
entry in place of windows; construct a 13 . 10 'x22 . 3 ' screened in
porch with entry steps; construct a 151x25 ' partially raised
swimming pool with a 515sq. ft. Raised deck surround and steps to
ground with locking gate; a showerhead to be installed on an
exterior wall within the deck footprint; install. a drywell for
pool and pool equipment area; relocate existing a/c units;
existing generator; and to establish and perpetually maintain a
10 ' wide non-turf buffer along the landward edge of the top of
the bank.
Located: 7715 Indian Neck Lane, Peconic. SCTM# 1000-86-6-26. 2
The Trustees conducted a site inspection October 6th, 2026,
Board of Trustees 19 October 14, 2026
noting to extend buffers, inquire about tree removal.
The LWRP found the project to be inconsistent with respect
to Policy 6. 2 and 6. 3 .
Is there anyone here wishing to speak on behalf of the
application?
MR. PORTILLO: Yes . Good evening. Anthony Portillo, AMP
Architecture.
In regards to the tree removal, I just brought some photos .
. I 'm not sure if this is the tree that is in question. And
again, we are fine replacing this tree. -If I could pass this
on.
Um, so for the scope of the project there is an existing
screen porch on the seaward side of the home. And it ' s really an
unusable size, so they are looking to extend that screened porch
in line with the existing setback of the home. It will be built
on a deck, so it won' t be built on a foundation, so post beam
construction. And then proposing a deck with a swimming pool,
again, mostly in construction. The pool will have a foundation
around it. And a dry well for the swimming pool, and plus we are
proposing a ten-foot non-turf buffer around the entire property.
One thing I ' ll mention, the property is very large, so' the
additions are minimal to the actual property size. So total lot
coverage is 3 . 1% . We are not passing by the existing house
setback at the rear or at the seaward side, and we ' re not
extending past the pier line.
I can answer any questions the Board might have.
Oh, and if that ' s the tree, we can either pull that or we can do
a one-to-one. ,
TRUSTEE FINORA: This photo depicts the evergreen tree?
MR. PORTILLO: Yes . So you see there' s the' line of the footprint
of the deck over here.
TRUSTEE FINORA: No, this was not the particular tree in
question. There was a large oak adjacent to the area of the
pool, proposed pool, and I think that was the nature of the
question proposed from the field notes . But I don' t have a plan
here that would show where that tree is located anyway. I don' t
think it was shown on the survey.
Nonetheless, that ' s, it was a large diameter hardwood,
maybe, I don' t know 24-inch, 30-inch diameter tree.
MR. PORTILLO: In the location of the proposed deck and pool?
TRUSTEE FINORA: Yes . Directly to the -- no, that ' s a contour.
But in this area. It ' s near the generator/utility pole area.
There is actually a contour showing 16 feet in the vicinity of
this tree that we are discussing now.
MR. PORTILLO: So there is no plan really to remove that tree. I '
can take a better look at that.
TRUSTEE FINORA: There are a couple of other comments from the
Trustees about including plans for a dedicated drywell for the
pool, some minor comments, and also noting that the pool is
shown here with a reveal of two-and-a-half feet above grade,
when our typical policy is two feet.
Board of Trustees 20 October 14, 2026
Is there a hardship in lowering that to two feet?
MR. PORTILLO: No, I don' t think so.
TRUSTEE FINORA: Are there any other comments?
MR. PORTILLO: The drywell is depicted on the site plan.
TRUSTEE FINORA: Oh, it is? Is it dedicated to the pool?
MR. PORTILLO: Yes .
TRUSTEE KRUPSKI : In terms of other comments, I think the Board' s
practice recently has been for inground pools, to limit them to
being no higher than 12 inches out of the ground. Because we
have been seeing this big increase of these large gunite
structures adjacent to the wetlands that are not
really -- they' re out-of-ground pools built out of gun ite now.
So, I don' t- know how the rest of the Board feels about
that, but .
TRUSTEE GILLOOLY: Yes, I think even our code updates reflected
that if the pool was exceeding 12 inches above grade it would
have to be at 100 feet. And so here we are at 60 feet, so I
believe the one-foot maximum should be applied here.
TRUSTEE FINORA: Also the proposed pool drywell is almost
precisely at the location of that hardwood. So that is
something that we would need to adjust here .
MR. PORTILLO: That 65 foot is the elevation 14 . We are 91 feet
to the corner of the deck.
TRUSTEE GILLOOLY: Thank you. But, yes, still not conforming with
the 100-foot, so I think in that case the one-foot above grade
would be the one we would like to see.
MR. PORTILLO: So if we could conform to 100 feet, then the deck
could be -- if they wanted the pool to be at the level of the
house, instead of down -- it ' s nine feet.
TRUSTEE KRUPSKI : He' s not measuring from top of bank, is he?
TRUSTEE FINORA: No, he ' s measuring from the property line.
TRUSTEE KRUPSKI : We are measuring from the top of the bank.
TRUSTEE FINORA: This is the top of the bank dimension. This is
the 91 to the property line.
TRUSTEE GILLOOLY: Okay, sorry. We had it correct. We would
consider this measurement at 65 feet here.
MR. PORTILLO: So the Board would like it to be at 12 inches
above grade, or one foot.
TRUSTEE SEPENOSKI : Or less ..
MR. PORTILLO: Okay. Should I provide revised drawings?
I think if I can table, just because I 'm not sure how they
feel about that . I don' t want to make that decision. I can come
back next month and provide drawings, revised drawings for you.
I ' ll take a better look at that oak tree, too, to make sure I 'm
not --
TRUSTEE FINORA:, Okay. Any other comments from the Board?
TRUSTEE GILLOOLY: If you are revising the plans it might be wise
to add that oak tree and other significant trees to the plan so
that we can knock those and keep track.
MR. PORTILLO: Trees that are being affected? I mean, I don' t
need every tree.
Board of Trustees 21 October 14, 2026
TRUSTEE FINORA: Trees germane to the project and anything
potentially at risk of, you know, shading the pool that you
don't, you know, you want to be concerned about things of that
nature.
MR. PORTILLO: That ' s fine.
TRUSTEE FINORA: Any other comments from the Board?
TRUSTEE KRUPSKI : No.
TRUSTEE FINORA: I ' ll make a motion to table this application.
TRUSTEE SEPENOSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: Number 6, Patricia Moore, Esq. On behalf of
NICK POLOGEORGIS requests a Wetland Permit for the as-built
3 . 9 ' x4 . 5 ' cantilevered platform off bulkhead to 3 . 4 ' wide steps
down to a 3 . 41x8 . 4 ' lower cantilevered deck; and for proposed
3 . 4 ' wide steps to beach.
Located: 22655 Soundview Avenue, Southold. SCTM# 1000-135-1-26
The Trustees conducted a field inspection October 6th,
2026. Notes read: Any stairs constructed in place that are
fixed and
non-retractable are doomed. Wave action in recent storms has
caused major damage to their property and adjacent properties .
The LWRP found this to be inconsistent. The inconsistencies
are: The most recent Board ,of Trustees permit at this location
does not include a permit for stairs to be constructed seaward
of the bulkhead retaining wall. The stairs are a new structure,
not an in-kind replacement of a permitted structure. The
photographs submitted with the application shows the stairs,
landing and lower platform already framed with new,
pressure-treated lumber. The asphalt stairs were constructed
without Board of Trustees review or permit. The stairs add a new
structure on the beach within the CEHA. Structures on beaches
are not permitted unless it is approved by the Board at its
discretion, based on its site inspection. Beach stairs are not
recommended in this location. The beach is exposed to high wave
action from Long Island Sound, and the stairs are likely to be
damaged or lost repeatedly during storms, adding debris to the
beach and the Sound.
Because the stairs were not previously permitted and are
within the CEHA, the action is not a minor action under Town
Code 268-3 (a) or (b) of Chapter 111 a Coastal Erosion Hazard
Area permit may also be required.
Is there anyone here wishing to speak regarding this
application?
MS . MOORE: Yes . Patricia Moore, on behalf of Mr. Pologeorgis .
I sent in a letter and I went back through the records. He
built this staircase along the bulkhead because he thought he
had a permit for the beach stairs already.
So, and what I did, is I did find back since, well 1998
there were beach stairs, and in 2012 there were beach stairs
Board of Trustees 22 October 14, 2026
that were replacing the original beach stairs . So there has
been a history of beach stairs on this property.
What has occurred over the years is that the beach is
getting eroded, so the bulkhead is much -- there ' s more exposure
of the bulkhead from the sand. And so rather than go from the-
top of the bulkhead straight out, which is the design of the
original stairs, he brought them along the edge of the bulkhead.
In fact they are not finished. They are, he' s designed them so
he can lift the stairs out of the damage or out of the water. So
it ' s a -- that is going to be the final design to be able to
have the steps come up out of the beach. He designed it in a way
that he thought was actually more appropriate than the original
stairs that went straight out.
TRUSTEE GOLDSMITH: So, just to clarify, for the record, what is
there now does in no way, shape or form reflect what was
permitted back in 2010 when there was at least 30 feet of beach
grass dunes in front of the bulkhead, with another 50 to 60 feet
of beach seaward of that before you hit mean high water.
The permit that was there, you keep talking about beach
stairs, were stairs through dunes, through wetland vegetation,
to access a beach, and then walk another 50 feet on that beach
to access the water.
The mean high water mark on those plans was at least 60-70
feet, if not more, seaward than the latest survey that shows the
mean high water basically just off of the bulkhead.
We also saw that the structure was destroyed in the recent
storm.
In your letter you also talked about when he started on
land, previously, and that got wiped out, so when it was even
further landward than where it ' s built, it was destroyed.
Last winter the existing structure washed away while stored
upland. The most recent built structure was destroyed. The beach
stairs that were permitted were --
MS. MOORE: No, the older stairs were --
TRUSTEE GOLDSMITH: The older stairs were a walkway through a
vegetated dunal area to access a beach. So what is there now is
not a permitted structure and was destroyed multiple times .
The construction of that stair platform was on the beach.
There was damage to the neighboring properties on both sides .
The neighbor to the east, brick patio was destroyed. The
neighbor to the west, their deck was destroyed, and these stairs
were destroyed.
So I think, looking at that, and being that it is a
structure on the beach that is constantly getting destroyed,
it ' s not appropriate to put this structure back at all .
MS . MOORE: Well, he must have access to his beach.
TRUSTEE GOLDSMITH: So there is other ways to access said beach.
MS. MOORE: The CEHA does exempt -- there is no CEHA requirement
for beach stairs . That is specifically a listed structure that
is permitted to be constructed within the CEHA area under the
111 code.
Board of Trustees 23 October 14, 2026
But if there is a different design that is recommended,
I ' ll go back to him and suggest to .him, modify this design. He
thought he was doing the right thing, but if there is an
alternative design that -- he needs access to his beach.
Everybody that has waterfront property has the ability to get to
their beach. The erosion that ' s occurred and the storms that
have occurred, we' ll all have to deal with, but, you know, you
still have to be able to get to your own property, and he does
have a right to that, to access that.
So .if you want to me to go back to him and have him
consider an alternative design, I would be happy to do that.
TRUSTEE SEPENOSKI : Does he have waterfront property left? I
mean, does he have beach left? Because it appears to me that
the mean high water is lapping against the bulkhead.
MS . MOORE: Well, I think what we are getting is more serious
storm tides . That ' s the problem. .
TRUSTEE SEPENOSKI : No doubt about it.
MS. MOORE: And the storms that have occurred are the ones that
have been destroying a lot of the ancillary structures that have
been built along this waterfront. No doubt. No doubt .
TRUSTEE SEPENOSKI : . I completely agree with that . I think there
is another hidden, well, it ' s actually quite obvious once you
understand the principles at play, but along this entire stretch
of coastline, in attempt to save their properties, they' ve
hardened the shoreline with steel and vinyl bulkheading. And
what that has done over the last several decades is wiped out
any beach that residents enjoyed along the seaward edge of these
bulkheads, including the starvation of Southold Town' s beach,
which as we all know from the Suffolk Times headlines, and
anyone who' s seen it, is non-existent, because there is no
material left to flow along the shoreline.
So it is both the effort to protect property and the
increasing severity and frequency of storms that has led to the
destruction of the beaches, and jeopardize the structures that
you are now proposing rebuilding along this property. Or
rebuilding again.
MS . MOORE: Replacing.
TRUSTEE KRUPSKI : It ' s not replacing.
TRUSTEE SEPENOSKI : So I think that there is a moment in which
lawyers, including yourself, have to think about what is best
for the shoreline and what is realistic given the severity of
the storms and real lack of beach there.
MS . MOORE: Well, the property does have protection with the rip
rap that has been in place. The sand will, in some areas, be
lost, and hopefully will be regained through other storms .
TRUSTEE KRUPSKI : The 70 feet gone. I really, I don' t even
understand what we are talking about here. There ' s 70 feet of
beach gone, there was an illegal structure -built that was gone
within one storm, and then rebuilt again. And we heard
testimony earlier that the structure was built with the storms
in mind, to withstand them. Obviously not, because it already
Board of Trustees 24 October 14, 2026
disappeared once and then was rebuilt for a second time
illegally. So I 'm not even .sure --
MS. MOORE: I don' t know that to be the facts .
TRUSTEE KRUPSKI : . This Board does . And I 'm not even really sure
what we' re talking about at this point. I can' t fathom this
application.
I mean you are going to have, from a legal standpoint,
you' re going to have kids walking along this beach at low tide
getting hit by this structure. I really don' t understand what we
are even talking about. here.
MS . MOORE: The beach access, I think if you looked up and down,
you have decks that are in the way. So, I walk this beach. When
you walk this beach, you generally are walking below the high
tide. This is --
TRUSTEE SEPENOSKI : That ' s going to be blown out in one wave in
that, and it ' s, 30 years we've tried to permit structures for
it, so we know that the materials that you are introducing into
that high-energy area are not going to just become hazards
sticking out of the beach with nails and screws?
I mean, that ' s kind of the idea behind permitting
structures that have longevity, that they don' t become
hazardous . That' s why it ' s coastal erosion hazard area.
I think that ' s a really poor design. I think it
looks -- probably the best thing in this location is a ships
ladder from the top of bulkhead down to the beach, as athletic
as that sounds .
MS. MOORE: Well, somebody. my age might have an issue going down
the ships ladder.
TRUSTEE KRUPSKI : And they might have an issue getting their
property destroyed and affecting the other properties .
Ms . Moore, we 've been doing this for how long in front of
the Town. Logically speaking, what are you doing with this
application? This makes no sense. It ' s like a flat earth theory.
I can' t even --
MS . MOORE: You went there before my other application, so I
would have happily met you there and talked to you and gone back
to the client and said this is a concern of the Board, the way
it ' s built.
TRUSTEE KRUPSKI : Well, our notes are always available for your
client to look at, or yourself, and frankly you could have asked
us at any time what our separate thoughts are. But any
discussion is really meant for this hearing.
And, frankly, you have been doing this for too long. You
are too- much of a professional not to know what you are talking
about with this . There is no surprise here. This is a terrible
application. And it ' s a dangerous application. And you know
that. And I don' t appreciate you representing that it ' s not.
MS . MOORE: Honestly, I guess in my opinion it seems like a
standard set of stairs, but if you feel differently,
respectfully, I will go back to the client, I ' ll have him speak
to somebody with knowledge on how to make these stairs better so
Board of Trustees 25 October 14, 2026
that they are not subject to any, to storm damage or can be, as
you said, it ' s detached in some way so that in the wintertime
during storms, that it can be, the lower parts can be protected.
So, I ' ll go back.
- ---- --- TRUSTEE- -SEPENOSKI : The engineer or designer who creates what
could last there would deserve a Nobel prize for ingenuity.
Because the amount of wave energy that that area receives on a
regular window of, storm activity, it ' s just, I can' t see it
surviving.
TRUSTEE KRUPSKI : Well, if you find that person, let ' s fix Town
Beach and fix the roads that are eroding, and then also raise
the roads throughout the town that are getting regularly flowed
over. So if you find that person, let ' s do that . Please do. I
will welcome that.
MS . MOORE: Well, I do feel that every homeowner should have
access to their property.
TRUSTEE KRUPSKI : As do I .
TRUSTEE GILLOOLY: And they live two doors down from Town Beach,
so they have access to Town Beach, which is a mere hundred feet
away.
TRUSTEE SEPENOSKI : That ' s true. There is access provided nearby
by the Town. Common access .
MS . MOORE: That is not what I consider to be your own access,
your own property access . So I think all of us walk their
beaches when we are walking along Town Beach, so we actually go,
you know, in that direction.
TRUSTEE GILLOOLY: I think you are familiar with the common
lands, right? So hopefully you are walking on the common land,
which is at mean high water, which is actually right up to this
bulkhead, so.
MS. MOORE: Okay. Usually I 'm much more seaward of that and have
no problem. So, I will request that this matter be adjourned so
that I can go back to the client and see what kind of access he
could design. So.
TRUSTEE GOLDSMITH: Is there anybody else here wishing to speak
regarding this application?
(No response) .
I 'm of the mindset that we make a decision tonight, so I 'm
going to make a motion close this hearing.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: .All in favor?
(ALL AYES) .
MS. MOORE: I would object --
TRUSTEE KRUPSKI : The hearing is closed.
TRUSTEE GOLDSMITH: Due to the adverse environmental impact; due
to the fact that this stairs has been destroyed multiple times;
due to the fact that these stairs are on a beach; due to the
fact that these stairs are subject to storm tide damage; due to
the fact that these stairs are creating an adverse environmental
impact; due to the fact that these stairs adversely affect fish,
shellfish or other beneficial marine organisms; 275 (e) , increase
Board of Trustees 26 October 14, .2026
the danger of flooding and storm tide damage, as we saw for
ourselves that this proposed, or this built, as-built, without a
permit, steps, were destroyed multiple times, and wood was on
the beach of the Sound; also that it will otherwise adversely
affect the health, safety and general welfare of the people of
Town; people will have to--navigate around -t is o stac e-- --- - -
as they are trying to walk the foreshore along the beach, and
also; (j ) adversely affect the esthetic value of the wetland and
adjacent areas; and also the fact that the conditions on this
property have changed significantly since a wood walkway was
approved back in 2011, with a 30-foot beach dune and another 50
to 60 feet of beach that is no longer there; due to all that and
due to the LWRP inconsistency, with all the reasons stated
therefore, I make a motion to deny this application as
submitted.
MS. HULSE: And just to be clear, the structure that is currently
being applied for was not an in-kind replacement of what was
permitted previously. It ' s a completely different structure and
completely different design as well.
TRUSTEE GOLDSMITH: That is my motion..
TRUSTEE GILLOOLY: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
MS . MOORE: I want to apologize to Lori on the record because I
made a flippant comment on another matter, and very
unprofessional. Please, excuse me. Thank you.
MS . HULSE: Thank you.
TRUSTEE KRUPSKI : Number 7, Sol Searcher Consulting on behalf of
KIMOGENOR POINT COMPANY requests a Wetland Permit to replenish
the beach between the 4-foot and 6-foot contour lines using
clean beach sand; a total of 163 cubic yards brought in to raise
elevation to 6-foot with 10-foot wide transitional areas; plant
with approximately 4, 000 Cape American beachgrass plants 12"
on-center; and provide 4-foot wide beach access path.
Located: 50 Jackson Street, New Suffolk. SCTM# 1000-116-6-24 . 1
The LWRP found this to be consistent.
The Trustees visited the property on the 6th of October,
and noted that it was a straightforward application.
Is there anyone here wishing to speak regarding this
application?
MR. BERGEN: Dave Bergen, with Sol Searcher Consulting, on behalf
of the applicant Kimogenor Point Company.
This is an interesting project in that we contacted the DEC
and Jim Burton, and that name escape me, the head of the Habitat
Division. Anyhow, came out and visited the site, and they were
the ones that proposed this hopefully solution to the problem.
So with that, all it is is trying to rebuild beach that has
washed away and create a vegetated dune.
So, with that, if there are any questions, I 'm here to
answer them.
Board of Trustees 27 October 14, 2026
TRUSTEE KRUPSKI : Thank you. Are there any comments from the
members of the public or the Board?
(Negative response) .
All right, hearing none, I wish you luck in the endeavor, it ' s
an all-too-common story throughout Town, as we just witnessed
through multiple applications tonight.
But I make a motion .to motion to close the hearing.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE KRUPSKI : And I make motion to approve this application
as submitted.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : Number 8, Sol Searcher Consulting on behalf
of KIMOGENOR POINT COMPANY requests a Wetland Permit to
replenish the beach between the 4-foot and 6-foot contour lines
using clean beach sand; a total of 244 cubic yards brought in to
raise elevation to 6-foot with 10-foot wide transitional area;
plant with approximately 6, 000 Cape American beach grass plants
12" on-center; and provide 4 ' wide beach access path.
Located: 80 Jackson Street, New Suffolk. SCTM# 1000-117-10-1
The Trustees visited the location on the 6th of October.
Notes read straightforward.
And the LWRP found the project to be consistent with its
policies as well.
Is there anyone here wishing to speak regarding this
application?
MR. BERGEN: Dave Bergen, Sol Searcher Consulting, on behalf of
Kimogenor Point Company.
This property is contiguous to the property that we just
had a public hearing on.
Harry Arnold. That ' s the name of the person from the DEC,
in addition to Jim Burton, who came out and looked at this and
suggested this .
So I 'm here to answer any questions you might have.
TRUSTEE SEPENOSKI : None. I believe a prior application,
everything was hashed out in there, so any other comments from
the public or Members of the Board?
(No response) .
Hearing no further comment, I make a motion to close this
hearing.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
TRUSTEE SEPENOSKI : I make a motion to approve this application
as submitted.
TRUSTEE KRUPSKI : Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
Board of Trustees 28 October 14, 2026
TRUSTEE GILLOOLY: Number 9, Sol Searcher Consulting on behalf of
FARTHER OUT EAST, LLC requests a Wetland Permit to construct a
28 'x24 ' two-story dwelling that contains a 493sq. ft. Garage area
with a 178sq. ft . Finished first floor space to access a
672sq. ft. Second-floor living space with a 7 'x15 ' balcony; a
3 ' x12 ' first floor concrete patio; and 'a 3 ' x4 . 9 ' first floor
roofed-over concrete patio; install a stormwater management
system; install a raised gravel driveway with septic area
underneath, and install an I/A OWTS sanitary system; and to
establish and perpetually maintain a 20 foot wide native
vegetated non-turf buffer area along the landward edge of
vegetated wetlands .
Located: 865 Rabbit Lane, East Marion. SCTM# 1000-31-17-19
The Trustees most recently visited the site on the 6th of
October, noting to review further at work session.
We are in receipt of a letter from a neighbor, Mr. Robert
O' Brien, PE, who is adamantly against this application and the
environmental impacts .
The LWRP reviewed this application and found it to be
inconsistent with Policies Four, Five and Six. A summary of
those findings is as follows :
Number One, the entire parcel is within 100 feet of the
wetland boundary.
No location on the lot can meet the 100-foot setback for a
residence or for sanitary leaching structures for any
residential development here places the dwelling and sanitary
system within the protected setbacks of the wetland.
Number Two, the residence is proposed at only 28 . 5 feet
from the wetland boundary on the east side, and 61 . 5 feet from
the wetland boundary to the north, where 100 feet is required.
Number Three, the sanitary system is not fully detailed.
We do have a letter from Suffolk County addressing that.
Number Four, the sanitary setbacks to the wetland are not
correct. They are measured to the northern wetland boundary, not
the closer eastern wetland boundary, which makes it even closer.
Approximately 65 feet where 75 is required.
The proposed leaching trenches are approximately 62 feet,
where 100 feet is required. And any leaching under the raised
driveway, no more than approximately 44 feet at the farthest
possible location, where 100 feet is required.
And the pump station is at approximately 64 feet .
Number Five, the raised gravel driveway begins at the
southeast corner of the building and is approximately 31 feet
from the wetland boundary at Flag 6, where 50 feet is required.
Number Six, the 20-foot non-turf buffer is not adequate to
protect the wetland, given how close the building, driveway and.
sanitary system are.
The photographs show the cleared area covered in wood chips
rather than vegetation
Number Seven, the site is very low-lying and highly
vulnerable to flooding. Any dwelling here is inconsistent with
Board of Trustees 29 October 14, 2026
Policy 4 . 1 (a) (1) , which directs development that is not
water-dependent away from coastal erosion hazard areas .
Policy 4 . 1 (a) (5) requires flood plane development to meet
federal flood insurance standards .
Number Eight, groundwater is very high. It was encountered
at elevation 0 . 0, with the highest expected groundwater at
elevation 0 . 3 feet at high tide, and three feet below grade.
Groundwater that rises with the tide is directly connected to
Marion Lake and the wetland.
The test hole was taken on a neighboring property, not the
subject parcel .
The two-foot deep drywells would have little separation
from groundwater, so any stormwater drainage system would likely
operate poorly.
Number Nine, the site cannot support a septic system that
protects the wetlands, ,Marion Lake and Gardner' s Bay because
separation and proximity can' t be achieved, and because it is
subject to flooding and sea level rise.
Number Ten, nitrogen from effluent will reach Marion Lake
and Gardiners Bay very quickly. Gardiners Bay is part of the
Peconic Estuary, which is a USEPA designated estuary of national
significance. Nitrogen pollution is already causing harmful
algal blooms in these waters .
And Number Eleven, the survey is dated July 9th, 2020, and
the wetland boundary was delineated on June 23rd of 2020 . The
Town Code requires a survey created no more than five years
before the application.
In the six years since, sea level has continued to rise,
and wetlands in the area have likely expanded, making the
situation even worse than is portrayed on the site plan.
And Number Twelve, the current 2026 aerial shows that
clearing and a driveway exists on the site without permits from.
the Trustees for work within 100 feet of the wetlands .
Is there anyone here wishing to speak regarding this
application?
MR. BERGEN: Yes . Dave .Bergen, Sol Searcher Consulting, on
behalf of the applicant .
Thank you, for all that information from the LWRP.
As you know,. I attended the work session the other night,
which was very useful to obtain that information. One thing
that was interesting for me, is I realize the plans that you had
were not the most recent sanitary plans, and so I had submitted
to the office last week a more recent sanitary plan and I have
another copy of the sanitary plan.
I ' ll speak into the microphone, sorry.
Another copy of the sanitary plans because this one has a
distance that was requested the other night from the eastern
wetlands depicted on this plan, as well as the distance from
Marion Lake wetlands .
So if I could, I would like to bring this up to you. I
don'.t have enough copies for everybody. There ' s three copies .
Board of Trustees 30 October 14, 2026
TRUSTEE GILLOOLY: I see the updated sanitary site plan does
include a test hole that - is actually on the subject parcel,
which is helpful .
MR. BERGEN: Yes . I ' ll go through several of the items .
The -- yes, the updated site plan that I dropped off at the
office the other day does show that the test hole is in fact on
our property.
Just a couple of points here, none of the septic system or
leaching areas proposed were beneath the driveway. There are no
retaining walls associated with this sanitary system. I bring
that up because it was brought up at the work session. Because
what they are able to do is construct the sanitary system, and
only have to increase the elevation by approximately one foot to
do that, and then they can gradually do a 3-to-1 slope of soil,
to decrease that increased elevation down to match the elevation
of the property. And the point of this is, I know there was a
question about will there be a wall around the septic system.
And, no, there will not be. There is no need for a retaining
wall around it .
They are estimating approximately 30 cubic yards of
material be needed to raise the septic system up. But the rest
of the material that is needed will be located, as is done with
construction of septic systems, underneath the leaching area to
provide for appropriate drainage.
With regards to groundwater -- and when they did the test
hole, groundwater at 1/2 foot where the highest groundwater was
found at one foot . This provides a 2 . 5, with the engineering of
this septic system, provides two-and-a-half feet of separation
between groundwater and the septic system, and I have been told
Suffolk County requires two feet. So it ' s actually more than
what is required by Suffolk County.
And just to jump ahead a little bit, because I think you
guys probably want to know where this is with the Suffolk County
Health Department . Suffolk County Health Department has
accepted this plan and says all they are waiting for now is. a
Trustee permit and a DEC permit, and then they' ll go ahead and
release their permit .
And so that I know we have run into before, chicken or egg
theory here. They want other agency permits first before they
release it. But the point of this is they are satisfied with the
engineering of this septic system.
I believe I covered all the septic system questions through
this. And what I would like to do is move on to now the house
itself.
For that we 've got a new plan for the house that has the
house raised. This is to address the LWRP' s concerns about
being located in a flood zone, et cetera. I have copies of
this .
So with that, and also you' ll note even with raising the
house by four feet, you' ll. notice we still met sky plane. So
there is not an issue with exceeding the sky plane here.
Board of Trustees 31 October 14, 2026
So with that, what I would like to do is have the architect
Mark Schwartz come up to talk about changes in the design of
this house.
MR. SCHWARTZ : Hello. Mark Schwartz, architect for the project.
We have slightly ,revised the plans to raise the lower level
of the garage so we are flood compliant with the flow-through
foundation. We have tried to design the smallest possible
footprint for a house in Southold Town, which requires 850
square feet . So we have a portion on the upper level, and the
entry/storage/laundry on the lower level.
One thing I did note, and I mentioned to Dave this morning,
I did notice we are able to slide this house probably about ten
feet closer to the property line to the south, which gives them
more separation from the wetlands, in that area, based on the
average setbacks of the houses adjacent to this house down the
road. There is some, you know, that 40-foot can be maybe
30-foot, we can get another ten feet or so from the wetlands on
Marion Lake.
The property is -- currently the property has kind of a
swale that goes right down the property line, right directly
into Marion Lake. That is certainly something that we would
look at as part of raising grade, to some degree, to level off ,
the property so you are not running off directly into Marion
Lake, which it does now, the entire property. So that is what we
propose as part of the project.
MR. BERGEN: Just to finish up then with some other comments . I
know there is an obvious concern about, I ' ll call it the
wetlands at the east, that was not Marion Lake but the wetland
that now joins with the lake. That was mentioned in the pre-
submission conference request back in March, that we wanted to,
talk to the Trustees about that..
We are willing to do a couple of things to help mitigate
this from an environmental perspective. We are willing to add a
very, if needed, or if it ' s palatable to the Trustees, a
retaining. wall along that wetland boundary, to be no more than
one-foot high, and go in behind it to try to help retain the
water on the property, not to go into that wetlands .
We are also, I know we proposed a 20-foot non-turf buffer.
We are willing to make the entire property a non-turf buffer to
help mitigate this situation.
Finally, this is a very small house. Again, you see, it ' s a
one-bedroom, 850 square-foot, so it ' s going to produce a limited
amount of wastewater. Because of that, we are willing to give
up laundry facilities in the place to help reduce any wastewater
flow or reduce the wastewater flow that laundry facilities will
create from entering into the IA system.
Correct me if I 'm wrong, but the setbacks for septic
systems, both leaching pools and cesspools, are they still the
same as they have been for the last few years since IA systems
have been introduced, or have those setbacks changed at all?
It.' s interesting to note, obviously the purpose of IA
Board of Trustees 32 October 14, 2026
systems has helped greatly reduce the opportunity for nitrogen
and other harmful components to get into the, leach into the
soil, and in this case leach into the wetlands . And so the fact
that there is an IA system here, that will greatly reduce the
opportunity for that to happen, and the fact that the structure
is so small, and if we were to willing to give up laundry
facilities so you have a one-bathroom, one-bedroom cottage,
essentially, over the garage, we hope that that would help
mitigate the challenge that is faced with the setback from the
septic system to the eastern wetland. That plus of course the
making the whole thing a non-turf buffer.
So with that, I know it ' s a lot to listen to, I 'm here to
welcome any comments from you folks . We know we might not be
able to resolve this this evening, and we might be asking for
this to be tabled, but we would like to have an exchange of
information here.
TRUSTEE GILLOOLY: Mr. Bergen, are you able to speak to the fill
that was added and the driveway that was added and the shed that
was added without Trustee permits, and how that came to be?
MR. BERGEN: This is the first I 'm hearing of that . I didn' t, I
had not been on the property prior to this past year, so I don' t
know what the property looked like. And the aerial photographs
looked, you know, you can' t really tell if material was added to
a driveway or not.
TRUSTEE GILLOOLY: It ' s funny, because looking right there at
the 2023 imagery, it ' s very clear that there are piles of
material that were moved onto that property, seemingly from the
property --
MR. BERGEN: I see that now.
MR. DOWLING: I 'm Tom Dowling (sic) , the homeowner. Gerard, from
Soundside Landscaping added that. It was added because we were
having a wedding on the property. So we can easily remove it.
It ' s simply woodchips . He said it would decay and amount to
nothing.
So there is nothing there. That ' s the driveway, gravel.
You are welcome to go and look at it . It ' s purely woodchips .
The shed, I wasn' t aware it required a permit. I thought
sheds can go on a property without a permit. I 'm a rule follower
so I would have certainly gotten a permit if I knew one was
required. If I knew what was required. But that ' s the
background. And I 'm happy to scrape the woodchips away, if that
helps. But that ' s the background. The wedding was in May.
TRUSTEE KRUPSKI : Are you a new owner to the property?
MR. DOWLING: I 'm not .
TRUSTEE KRUPSKI : Okay. So were you there when this photo took
place?
MR. DOWLING: It ' s a little hard to tell . Sorry, I can just tell
because the --
TRUSTEE GILLOOLY: This is 2023 .
MR. DOWLING: Yeah, so, I was there when that photo was taken,
yes .
Board of Trustees 33 October 14, 2026
TRUSTEE GOLDSMITH: Because based on our site visit it looked
like a lot more than just woodchips .
MR. DOWLING: I 'm happy to, you know, take them -- no, it ' s
woodchips, and I 'm happy to get Gerard to scrape them out or
sign an affidavit that it ' s woodchips . It ' s literally 100%
woodchips . There is not a stitch of -- there is a bit of gravel
that washed from the road, as you know, Rabbit Lane is a gravel
road, that washed slightly onto the property. But it ' s not, I
would not say that it ' s anything other than what you would see
on any other gravel road.
TRUSTEE FINORA: What ' s shown in the photo here are woodchips
from 2023?
MR. DOWLING: No. No, the woodchips were just put here for the
wedding. The wedding was in May. They were put there in, maybe
in June.
TRUSTEE FINORA: So what is this material stockpiled in 2023?
MR. DOWLING: I have no idea. Can I take a closer look?
TRUSTEE GILLOOLY: Sure.
MR. DOWLING: I have no idea. That predates the -- oh, sorry.
That was temporarily put there during construction across the
road. I beg your pardon. That was temporary storage of the
excavation material .
TRUSTEE KRUPSKI : If you can just step back, we don' t have a
stenographer here today.
MR. DOWLING: Yes . So that is fill from construction across the
road that was put there temporarily, subsequently been removed.
So if you go look at that property right now, you' ll see the
only thing on that property is woodchips and a shed. There has
not been an inch of fill added.
TRUSTEE GILLOOLY: You can pull the new map, the most recent one.
It is woodchips from our site visit. The is the current
condition.
Okay, is there anyone else here wishing to speak regarding
this application?
(No Response) .
TRUSTEE GILLOOLY: Okay, thank you, for the presentation of some
new materials tonight . However, the distance of the house has
not changed at the closest point, which is 28 . 5 feet; is that
correct?
MR. BERGEN: Correct.
TRUSTEE GILLOOLY: Okay, well, given that this house that is
being proposed is a mere 28 . 5 from the wetlands, where our code
calls for 100 feet, in order to alter. these setbacks we have to
find that there is no adverse effect on the wetland, which we
were unable to do here.
This parcel is located entirely within wetlands
jurisdictional area and flood zone AE, with extremely shallow
groundwater conditions . I do not believe the application has
sufficiently demonstrated that the proposed development can meet
our environmental protection standards, specifically our
standards for issuance of permits, which we have to show under:
Board of Trustees 34 October 14, 2026
275 . 12 (a) , no substantial adverse effect on wetlands;
275. 12 (b) , no substantial damage from erosion, turbidity or
siltation;
275. 12 (d) , no substantial adverse effect on wildlife,
vegetation or natural habitats;
275 . 12 (e) , no substantial increase in danger of flood and
storm tide damage;
275 . 12 (g) , no substantial change to natural water movement;
and 275 . 12 (i) , no substantial adverse effect on public
health, safety and general welfare of the Town.
Based on our review of the application, site inspection and
the extensive LWRP findings, I make a motion to close this
application.
TRUSTEE GOLDSMITH: Second. All in favor?
MR. BERGEN: Excuse me. The public hearing has not been closed
yet.
TRUSTEE GOLDSMITH: She just made a motion and I seconded it.
MR. BERGEN: She made a motion. I wanted to add one comment in
before --
TRUSTEE GOLDSMITH: Do we want to rescind the motion?
TRUSTEE GILLOOLY: I have made a motion, so I would like to vote
on that.
TRUSTEE GOLDSMITH: I second. All in favor?
(ALL AYES) .
TRUSTEE GILLOOLY: Based on our review of the application, site
inspections and LWRP findings, I make a motion to deny the
application as it fails to meet our standards for issuance of
permit under Chapter 275-12 (a) , .(b) , (d) , (e) , (g) and (i) , and does
not comply with the LWRP. That is my motion.
TRUSTEE GOLDSMITH: Second. All in favor?
(ALL AYES) .
TRUSTEE GOLDSMITH: I make a motion for adjournment.
TRUSTEE FINORA: Second.
TRUSTEE GOLDSMITH: All in favor?
(ALL AYES) .
Res ectfully submitted by,
Glenn Goldsmith, President
Board of Trustees