HomeMy WebLinkAbout1000-79.-5-20.12 OFFICE LOCATION: UJ� MAILING ADDRESS:
Town Hall Annex P.O. Sox 1179
54375 State Route 25 Southold, NY 11971
(cor. Main Rd. &Youngs Ave.)
Telephone: 631 765-1938
Southold, NY
www.southoldtownny.gov
t9
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
To: Leslie Kanes-Weisman, ZBA Chairperson
Members of the Zoning Board of Appeals
Cc: Julie McGivney, Assistant Town Attorney
From: Heather Lanza, AICP, Planning Director
LWRP Coordinator
Date: October 26, 2026
Re: LWRP Coastal Consistency Review
PECONIC LAND TRUST — Plock Shellfisher Preserve, SCTM# 1000-79.-5-
20.12
ZBA File Ref. No. #8143
This application is a request for a variance from Article III Section §280-15. The Building
Inspector's Notice of Disapproval, renewed June 9, 2026, is based on an application to
legalize the as-built construction of an accessory aquaculture building
(Education/Hatchery Building) on an existing foundation at the Plock Shellfisher
Preserve, with a side yard setback of 18.7 feet where 25 feet is required.
The proposed action has been reviewed to Chapter §268, Waterfront Consistency
Review of the Town of Southold Town Code and the Local Waterfront Revitalization
Program (LWRP) Policy Standards. Based upon the information provided on the LWRP
Consistency Assessment Form submitted to this department, as well as the records
available to me, it is my recommendation that the proposal is a MINOR ACTION
pursuant to Town Code §268-3 F, and is not subject to review for LWRP consistency.
Town Code §268-3 Definitions:
MINOR ACTIONS
Peconic Land Trust LWRP
F. Granting of individual setback, lot line and lot area variances, except in
relation to a regulated natural feature or a bulkhead or other shoreline
defense structure or any activity within the CEHA;
The 30.4' x 23.3' frame building was built without permits on an existing foundation. The
variance concerns the side yard setback from the interior lot line shared with Lot 3 of the
Plock Shellfisher Preserve subdivision, not the setback from the shoreline, the wetlands
or the bulkhead, and the site is not in the Coastal Erosion Hazard Area. The as-built
construction was subsequently reviewed and approved by the Board of Trustees under
Wetland Permit #10623 (August 14, 2024), and a Certificate of Compliance was issued
on August 27, 2024.
Pursuant to Chapter 268, the Zoning Board of Appeals shall consider this
recommendation in preparing its written determination regarding the consistency of the
proposed action.
2