Loading...
HomeMy WebLinkAbout1000-79.-5-20.12 OFFICE LOCATION: UJ� MAILING ADDRESS: Town Hall Annex P.O. Sox 1179 54375 State Route 25 Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) Telephone: 631 765-1938 Southold, NY www.southoldtownny.gov t9 PLANNING BOARD OFFICE TOWN OF SOUTHOLD To: Leslie Kanes-Weisman, ZBA Chairperson Members of the Zoning Board of Appeals Cc: Julie McGivney, Assistant Town Attorney From: Heather Lanza, AICP, Planning Director LWRP Coordinator Date: October 26, 2026 Re: LWRP Coastal Consistency Review PECONIC LAND TRUST — Plock Shellfisher Preserve, SCTM# 1000-79.-5- 20.12 ZBA File Ref. No. #8143 This application is a request for a variance from Article III Section §280-15. The Building Inspector's Notice of Disapproval, renewed June 9, 2026, is based on an application to legalize the as-built construction of an accessory aquaculture building (Education/Hatchery Building) on an existing foundation at the Plock Shellfisher Preserve, with a side yard setback of 18.7 feet where 25 feet is required. The proposed action has been reviewed to Chapter §268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposal is a MINOR ACTION pursuant to Town Code §268-3 F, and is not subject to review for LWRP consistency. Town Code §268-3 Definitions: MINOR ACTIONS Peconic Land Trust LWRP F. Granting of individual setback, lot line and lot area variances, except in relation to a regulated natural feature or a bulkhead or other shoreline defense structure or any activity within the CEHA; The 30.4' x 23.3' frame building was built without permits on an existing foundation. The variance concerns the side yard setback from the interior lot line shared with Lot 3 of the Plock Shellfisher Preserve subdivision, not the setback from the shoreline, the wetlands or the bulkhead, and the site is not in the Coastal Erosion Hazard Area. The as-built construction was subsequently reviewed and approved by the Board of Trustees under Wetland Permit #10623 (August 14, 2024), and a Certificate of Compliance was issued on August 27, 2024. Pursuant to Chapter 268, the Zoning Board of Appeals shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. 2