HomeMy WebLinkAbout32913-Z FORM NO. 4
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Office of the Building Inspector
Town Hall
Southold, N.Y.
CERTIFICATE OF OCCUPANCY
No: Z-32456 Date: 07/11/07
THIS CERTIFIES that the building ADDITION
Location of Property: 835 SHIPS DR SOUTHOLD
(HOUSE NO.) (STREET) (HAMLET)
County Tax Map No. 473889 Section 79 Block 3 Lot 33
Subdivision Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore
filed in this office dated APRIL 13, 2007 pursuant to which
Building Permit No. 32913-Z dated APRIL 17, 2007
was issued, and conforms to all of the requirements of the applicable
provisions of the law. The occupancy for which this certificate is issued
is DECK ADDITION TO AN EXISTING SINGLE FAMILY DWELLING AS APPLIED FOR.
The certificate is issued to DANIEL & CATHERINE O'NEILL
(OWNER)
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL N/A
ELECTRICAL CERTIFICATE NO. N/A
PLUMBERS CERTIFICATION DATED N/A
e
Authorized Signature
Rev. 1/81
Form No.6
TOWN OF SOUTHOLD F
BUILDING DEPARTMENT
TOWN 765 802 L ` Ph JUL 9 2007
APPLICATION FOR CERTIFICATE OF OCCUPANCY
Tu" �F SG'!i asJtL3
This applicationmust be filled. n by typewriter or,.ink and submitted to the Building Departmenf with the following:
A. For new building or new use:
1. Final survey of property with accurate location of all buildings, property lines, streets, and unusual natural or
topographic features.
2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead.
5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate
of Code Compliance from architect or engineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. For existing buildings (prior to April 9, 1957) non-conforming uses, or buildings and "pre-existing"land uses:
1. Accurate survey of property showing all property lines, streets,building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is
denied, the Building Inspector shall state the reasons therefor in writing to the applicant.
C. Fees
1.. Certificate of Occupancy-New dwelling$25.00, Additions to dwelling$25.00,Alterations to dwelling$25.00,
Swimming pool $25.60,Accessory building$25.00,Additions to accessory building$25.00,Businesses $50.00.
2. Certificate of Occupancy on Pre-existing Building- $100.00
3. Copy of Certificate of Occupancy-$.25
4. Updated Certificate of Occupancy- $50.00
5. Temporary Certificate of Occupancy-Residential $15.00, Commercial$15.00
xi
Date. /
New Construction: Old or Pre-
`p stmg Builds : (check one)
Location of Property:
House No. Street _ �r Hamlet
Owner or Owners of Property: P&/y�G
Suffolk County Tax Map No 1000, Section 7 Block Lot J j
Subdivision Filed Map. Lot:
Permit No. Z �� �' Date.of Permit. �/`/7—(!�) Applicant: /
Health Dept. Approval: Underwriters Approval:
Planning Board Approval: /
Request for: Temporary Certificate Final Certificate: (check one)
Fee Submitted: $ p�>
App scant i •at re
C.d
FORM NO. 3'
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Town Hall
Southold, N.Y.
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL
COMPLETION OF THE WORK AUTHORIZED)
PERMIT NO. 32913 Z Date APRIL 17, 2007
Permission is hereby granted to:
DANIEL O 'NEILL
835 SHIPS DR
SOUTHOLD,NY 11971
for
DECK ADDITION TO AN EXISTING SINGLE FAMILY DWELLING AS APPLIED FOR
at premises located at 835 SHIPS DR SOUTHOLD
County Tax Map No. 473889 Section 079 Block 0003 Lot No. 033
pursuant to application dated APRIL 13 , 2007 and approved by the
Building Inspector to expire on OCTOBER 17, 2008 .
Fee $ 200 . 00
Authorized Signature
ORIGINAL
Rev. 5/8/02
SOUjyOlo -
�`� '
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION
[ ] FRAMING / STRAPPING XFINAL
[ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
REMARKS:
p
1
P-7-0
DATE INSPECTOR
oF sorry
ono
• ao
coUM`I,Nc�
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ kl/FOUNDATIONI 1 ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION
[ ] FRAMING / STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE'SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
4fo
REMARKS: C
DATE C INSPECTOR
FIELD P4SPECTION REPORT DATE COMMENTS
FOUNDATION(IST) y
------------------------------------
�C
FOUNDATION (2ND)
C4
0
ROUGH FRAMING& y.
PLUMBING
V
r
INSULATION PER N.Y. �3
STATE ENERGY CODE
V �
' Sp
l
FINAL
ADDITIONAL COMMENTS
O
0 Z
0
s
oz
x
�d
r
y
o d TOWN OF SOUTHOLD PROPERTY RECORD CARD
79 3 Yr,
OWNER STREET �� VILLAGE DIST. SUB. LOT _
AL
FbkMER OWN E ►v E ,egCR a
Mar540 /, f -1Qq,5eP1 J�C4f S w TYPE OF BUILDING
kES2 SEAS. VL. FARM COMM. CB. MICS. Mkt. Value
LAND IMP. TOTAL DATE REMARKS
le
/.� b � fay a,ov
U Lf a 5. o U �-� S/� rviro- iGcm-_.�� r��� �l .vr ✓ 7'� 7 5
6r 3 /1 -6
/J� - �o v f=o .moo. GR�" �,/% /6.v yL- P_ 41—
AGE BUILDING CONDITION
NEW NORMAL BELOW ABOVE 41 a 9~ 4--! v
FARM Acre Volue Per Ve.lue
Acre
Tillable _ FRONTAGE ON WATER
Woodland FRONTAGE N O D
o Z — z3 B` �� firer
Meadowl,and DEPTH
House Plot BULKHEAD
Totals �- DOCK
i
a ■■■■■ ■■■■IN 0 No M MEN
ENE
■■
*Y k ` i m wl' I j {lt 'j'y1y f F esis o r ■■■■■■■■■■■■■■■■■■■■■■■■ONE■■
Ina /r`rv4st d F
vet . i n d' ■■■mom■■■■■■■■■■■■■■■■■■mom■■
33
f1�Y 2K R ...' i11 .L Y 4
; .. , ;, a4ry«Ad ■■■■■■■■■■■■■■■■■■■■■
4� �� z : ti� ■■■■■■■®■■■■■■■■■■ I M ON
MEN 0 0■
NEON i■■■■■■■■■■■■■■■■■■■■■
■■■■■■ ■■■■mow■■�■■■■■NEI
ME
■■■■■■■■
■■■■m� �■■ ■gym■■i�o■■■■■■■■■■■
■■■■ ■WEA■■■■■■■��■■■■■■■■■■■■
■■■ BN 121HEMI mom No
■M■m te
: .. . , ■■■■■■L�l1■ ■ ■ii■1�■■■■■■■■■■■■■■
■■■■■■r■■■■■■■■■■■■■■■■■■■■■■
' ■■■■■■■■■■■■■■■■■■■■■ ■■■®■
■■■■■■■■■■■■■■■■■■■■■ ON
ONO MEBasement
Foundation
..
Ext. Walls
Fire
- Place
TOWN OF SOUTHOLD . BUILDING PERMIT APPLICATION CHECKLIST
BUILD)NG DEPARTMENT Do you have or need the following,before applying?"
TOWN HALL Board of Health
SOUTHOLD,NY 11971 __'- 4 sets of Building Plans
TEL: (631) 765-1802 Planning Board approval
FAX: (631) 765-9502 Survey
www.northfoik.net/Southold/ PERMIT NO. 222132- Check oZOD , D(] '
Septic Form
N.Y.S.D.E.C.
Trustees
Examined 1 ,20--9,7— Contact:
Approved ,20_0Z Mail to: 2590 Bay Avenue
Disapproved a/c Mattituck, New York 11952
Phone: 631-905-4646
Expiration 120
(' Building Inspector
1 ra 2007 ', � '';� ,
APR - APPLICATION FOR BUILDING PERMIT
[p
TQW�' QF SOLIT'Hono Date , 20
INSTRUCTIONS
a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4
sets of plans, accurate plot plan to scale.Fee according to schedule.
b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector
issues a Certificate.of Occupancy.
f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the
property have been_epacted.in-the,interim,the_Building Inspector may authorize .in writing,the.extension..of:the,permit for an
addition six months.Thereafter, a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or
Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The
applicant agrees to comply with all applicable laws, ordinances,building code_,housing code, and regulations, and to admit
authorized inspectors on premises and in building for necessary inspections:
- nnnnV O'Neill — liomeow er
(Signature of applicant or name,if a corporation)
Same As Above
(Mailing address of applicant)
State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician,plumber or builder
Owner
Name of owner of premises Danny O'Neill
(As on the tax roll or latest deed)
If applicant is a corporation, signature of duly authorized officer
(Name and title of corporate officer)
Builders License No. 21536-11
Plumbers License No. N/A
Electricians License No. N/A
Other Trade's License No. N/A
1. Location of land on which proposed work will be done:
835 Ships Drive Southold 'Town of Southold
House Number Street Hamlet
County Tax Map No. 1000 Section 79 Block 3' Lot �3
Subdivision Ra,,vIew woods—Bstates Filed Map No. 5520 Lot
(Name)
Y �
2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: .
a. Existing use and occupancy Single Family Dwelling
b. Intended use and occupancy Single Family Dwelling
3. Nature of work(check.which applicable): New Building Addition Alteration
Repair Removal Demolition Existin DeDther Work construct New Rear Deck
(Description)
4. Estimated Cost 5,000.00 Fee
(To be paid on filing this application)
5. If dwelling, number of dwelling units N/A Number of dwelling units on each floor N/A
If garage, number of cars N/A
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. N/A - Residential
7. Dimensions of existing structures, if any: Front 61 Rear 61' Depth 3.1'
Height approx. 16' Number of Stories 1 story
Dimensions of same structure with alterations or additions: Front 61, -Rear 611+ 19:'6_'
Depth 31 , + 20' deck Height approx. 16' Number of Stories 1
8. Dimensions of entire new construction: Front 19'6" Rear 19'6" Depth 20'
Height 2' Number of Stories N/A for deck
9. Size of lot: Front 120.94' Rear 120'.00' Depth 186.06' & 183�.08' (South)
10. Date of Purchase N/A Name of Former Owner N/A
11. Zone or use district in which premises are situated Residential
12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO XX
13. Will lot be re-graded? YES NO xx Will excess fill be removed from premises? YES NO xx
-
'14. Names of Owner Of piernises—Dar1rN7.0-!'�te-i1 1_. AddTeS�`835--ships .D.r. Phone No. 516-380-8643
Name of Architect Address Phone No
Name of Contractor Address Phone No.
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO xx
* IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES NO XXX
* IF YES, D.E.C. PERMITS MAY BE REQUIRED.
16. Provide survey, to scale, with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey.
STATE OF NEW YORK)
fI�' S:
COUNTY OF �7' u A`
Zaauy O'Neill being duly sworn, deposes and says that(s)he is the applicant
(Name of individual signing contract)above named,
(S)He is the Owner of the premise
(Contractor,Agent, Corporate Officer, etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief, and that the work will be
performed in the manner set forth in the application filed therewith.
Sworn _ efore me this day of 1 ( 20 v 7
Notary Public Signature of Applicant
Claire L. Glew
Notary Public, State of New York
No. 01 GL4879505
Qualified in Suffolk County
Commission Expires Dec.8,24210
SUY L. N
.'SUBDIVISION-MAP-04='BAYVIEK WOODS"E5TATEV-
-FILED..IN-THE-SUFFO.LK COUNTY.GLERK'5.0.FFIGE.-. :DANIBL O'r1SQ.L "
ON SEPT .qTN, La70".A5 MAP NO;.5520: '" CATJFIERIl�IB O•NEQ.L y� E
FIItST'AM�tICANTITLB-INSURANCB'_ " . .
5.ITUNE: ,'$fit VIEW.,'" ° : :..S>OMPANYOFNS9V:YORK .
.. .: ' HSBC MORT(3AM CORPORATION(USA): '.: .. S
TOWN:. 50UT�f0.LD
SUI=I=MK'.GOUNTY.`'NY:!'. .`.
. . . .
5URVEYED 06TO5ER"'�6,.2004
PROPOSED DEGK"-SHOWN,:SURVEY. .. ' :: ��moo. ..
NOT.UPDATED"APRIL IO,-2007. .,Nooa .'.
-5UFFOLK OOUNTY:TAX.#.:
Al
low' +'
Proposed:. -
' Wdod.Deck
. . .. .. � �
.
OQ
. 01
NOTEs:.
MONUMENT FOUND::.
0 . : -PIPE FOUND ;
AREA.="21,068.5.F.:or..0.48".AGRE .. . d � �
ALL CORNERS FOUND:AND•MARKED . .. : . . ` .. . : .
JOHN C,EHLERS LAND SURVEYOR
GRARH I G SCALE I"._' Q'.: : :: ". .: : :.: 6.BAST MAIN.STREET .. :N.Y.S.uC.NO:50202'." .
:. . RPMtHE",.N.Y..11901. '
:. .
369-8288Fax REF.—NXCompaqservmAFo.XO4XO4-293.pro
—
i\ 293.
Trademark Railing&Decking Page 1�of 4
"sr'4'i' 6wrsa � c+s•,, -5�.ar a7i xw�,„7ti f � ,b>,a»"�rw���
ngv
ty
vt� �
� >
�d
�■t }'y � e i.q ,&... ,. � b: . .is" m 4. �.
: } , Please read all instructions completef before starting
- , part of the Installation.Each railing kit comes complet
r ' R all parts,hardware and installation gui a to install one
•[�r"dW'lrrfq; - a complete rail section(excluding posts Railing sectio
have been pre-cut to 6 ft.or 8 ft. lengff s.Check to ens
4Y .•fnstal(amon ,,h that the kit is complete.Safety:Alway wear goggles i
handling,cutting,drilling and fastenin materials. Not
>•Warraes Check local code requirements.
Fes, Ftc�ure i 1. POST SLEEVE INSTALLA1 IONS
The Trademark Post Sleeve has been deigned to slide
fGe11e easily over a nominal wood 4"x 4"post af er the deck sub-
Sroclirure structure is complete and the deck board ias been fasten(
`y If the nominal wood 4'W"post is twisted ir oversized it wi
`f f t:.r�,•;A.�t be necessary to shave the post. Do not f ce the Post
k Sleeve as this may cause it to crack or s it.The 4"x4"wo
post should extend down to the bottom o the rim joist.Foi
firmest attachment,completely"BOX IN" he 4'W"wood
KIP r' post and the Post Sleeve so there is sup rt on all four
sides. (see Figure 1)The Post Sleeve m also slide over
wood post that has been mounted to the eck or a concre•
slab using the Trademark"SURFACE MC LINT BRACKET
` e` lsk �w `1 ti Note: If optional Post Skirt is to be used,i istall over Post
Sleeve prior to installing railing.
,1F lw,�,ST 2. POST SLEEVE HEIGHT
CALCULATIONS
Sn�1r ternecrth Figure 2 Calculate and cut Post Sleeve to required height(see FigL
rhe,batlty 2). Slide Post Sleeve over 4"x4"wood post into position. F
36"rail cut Post Sleeve to 37". For 42"rai cut Post Sleeve
r
43"
--_" 3. MEASUREMENTS AND CU TING
'' --------- — Measure between posts,top and bottom t 3 obtain the rail
T length.Also check the rail opening to ensi ire the Post
Sleeves, newels or walls where the rail is to be installed ai
® r,; .s+ x.=.L,at square and plumb.To obtain proper baluc ter spacing be
(D<,-sra-g•PAL MT, � sure to measure and cut retainer and bolt m rail equal
distances from the center.Cut handrail to match retainer.
_I --------
sf;a.E6f7w4EN I�` 4. RETAINERS AND BOTTOW RAIL
BRACKET INSTALLATION (see Figure 3)
------- - Place the"U"shaped end of the painted E tainless steel
T---- bracket on the underside of the retainer a d bottom rail. B
"' •"�"t' '' sure to place the bracket just slightly insid a(1/16")the cut
edge of the retainer and bottom rail.Mark and pilot drill ho
with a 3/16"bit. Drill out the two mounting holes to 3/8".
o Note:When drilling for the bottom rail,dril through bottom
Figure 3 wall only—do not drill through the top sud ace.Using the
enclosed tool, screw the threaded inserts nto the holes frc
N;ErMNkR ANC)ec,TrcyM RAIL the bottom until flush.Be careful not to ov r torque. Install
inserts and fasten brackets with panhead olts to the
--- --- -• underside of the Retainer and Bottom Rai using the 1/4"
20 panhead screws.
5. ASSEMBLE, FASTERS AND LIRE
Align the ends of each Baluster with the p-e-drilled holes ii
the,Retainer(see Figure 4).Using the 1-3 4"#8 wood
screws,fasten the Balusters to the Retain r first,through i
pre-drilled holes. Do not over torque.A11gr the ends of the
�igure_4 Balusters with the holes in the Bottom Rai and fasten the
http://www.trademarkrailing.com[trademark/select installation/select installation.html 4/2/2007
Trademark Railing&Decking Page 2 of 4
7 Balusters to the Bottom Rail through the re-drilled holes
' IJ.,.°z---► •I E•EG.LLEE 2E.J..r}EP "'�� 1 using the 3"#8 wood screws. Place the artially assembl
railing against ainst a solid surface and slide tt a Handrail over t
:W%'GttEG•.����-�-..-..'vim :-�.. .�,.-,_
Retainer. Note: If the mounting brackets over any of the
pre-drilled holes in the Retainer or Botton i Rail,or they are
too close to allow the installation of a Bali ster,do not use
the end Balusters. Seal any exposed hol s with a white
silicone exterior-grade caulking.
AVATEia
i 6. CENTER RAILING SUPPORT
p ETE.E•i _�. Install center support in center of railing(see Figure 5)
f BUTTOPfe.L
_ 7. LEVEL AND ATTACH RAILING see
Figure 6)
Level the assembled railing prior to makir g any markings
drilling. Place assembled railing between Posts and level.
Mark holes. Remove assembled railing, I rill pilot holes in
Figure 5 the Posts with a 3/16"drill bit. Re-positior assembled railir
and attach to Posts with#14 x 2"stainles steel screws.
6. POST CAP APPLICATION
Apply generous amount of construction g ade adhesive to
top edges of Post Cap and press Post Ce p firmly into plac
9. FASTEN HANDRAIL TORETAINER
�• Take remaining self drilling screws and in itall up through t
�-t}=Go retainer into the handrail to lock it in place.Space screws
'4?tA iPT
[iiTTFM ECrET- evenly.
7JtiC04i
iL�CJ:
G•TT6M till 6'A1V i'iGRS
�I 'v,
I
}
t
6LM^' 4 ;
DGJ:11l T KIM%
Gi00t I�--Ci.HPj1,Qi&t57 T�ggiy4t
Fig�u re_6
a
HQ1Y.Wnu r.+u[.xa+
3
P x
iIq'uis
off x.l'SCRIWS 1
G
t 1
"s
Railing Conversion for Stairs
The assembly and installation of stair rail is the same as for horizontal rail(see over)except for ch nges
detailed below. Please read instructions for horizontal rail before attempting to assemble and cony irt to
stair rail.
Figure7 and 8.
h4://www.trademarkrailing.com/trademark/select installation/select installation.html 4/2/2007
Trademark Railing&Decking Page 3 of 4
Figure 1. PREPARATION:
a First check the rise and run of the stairs to deterr iine the proper
stair rail angle. (see Figure 7)Check the rail opei iing to ensure
`' - '�•-� the sleeves, newels or walls where the stair rail i to be installed
are square and plum. Measure between the Pos Sleeves to
$ �~ obtain the rail length. Be sure to measure betwei n the Post
s Sleeves at both top and bottom.TIP: Ensure the proper fit by
cutting a test piece of wood to the previouslydet rmined length
i fti`. e 4 and angle and fit it into the opening Once the pr per g
�.- ~•.. I measurements have been confirmed,measure tl e handrail and
i 1 retainer from the center of each part and trim an qual amount
from each side to obtain the top length measurec between the
sleeves.
2. 13ALUSTERS
1.Suit Angla � Cut Balusters to proper angle,top and bottom. K ep length
identical.
f 3. DRILLING HOLES RETAINER AlD
BOTTOM RAIL
` • "�' The Retainer and Bottom Rail have been factory Irilled for
,l✓_`n "horizontal'rail installations to assist with the as mbly. For a
stair rail installation,the Retainer and Bottom rail holes will
need to be re-drilled to match the required stair r it angle. From
the center of the top holes,draw a line the prope angle down
the side of the bottom rail to be used as a guide ee Figure 8).
Using a 3/16th bit, drill through the top hole follov ing the angled
guideline,and through the bottom of the rail mak ig sure to drill
through as close to the center line as possible.T P:Use a drill
guide to ensure accuracy.
4. MOUNTING BRACKETS
Bend the brackets to the proper angle(fop of st it bend in,
Bottom of stair bend out).
5. ASSEMBLE AND INSTALL
Assemble as per horizontal rail installation instru tions Step#5.
u
COMPOSATRON
COMPOSITE TECHNOLOGY
TALL Surface Mount Bracket (SMB) Installation Guide
(4x4 and 6x6 applications)
NOTE. 1)Fora 36"tall rail, use a 34"SMB, and fora 42"Tall Rail, use a 40"SMB. 2) Only use piece post skirt
this system.
1. PLACEMENT
Center the Surface Mount Bracket(SMB)at each post location and mark the mounting hole loce tions
on the surface.Position the open slot away from all fastening locations.
2. MOUNTING THE POST
Mark SMB mounting locations onto the deck surface.
•Concrete installation: Drill marked mounting locations with a 3/8 dia. Masonry bit to accept 3/8
dia.x 4"wedge anchors. Gently tap the anchors into the drilled holes.
•Wood Installation:There must be a solid base to fasten SMB to.A 5"min.thick blocking must
be securely fastened to the structure prior to installation of the SMB. DO NOT fasten the SMB
directly to the deck surface.The SMB is to be installed using 3/8"dia.x 5"lag bolts(the lag
bolts will require a 1/4"pilot hole to ensure the wood foundation blocking does not split).
3. FASTENING
Place the SMB over the mounting locations.Lightly tighten the mounting fasteners so that the Sl 1113 can
still move freely, but tight enough for the SMB to sit flush with the mounting surface.
Note:Wedge anchors are for concrete installation ONLY. For installation to wood surface refer t i local building c
http://www.trademarkrailing.com/trademark/select installation/select installation.html 4/2/2007
Trademark Railing&Decking Page 4 of 4
(Recommended: Use minimum 3/8"x 5"lag bolts into solid wood mass underbody.)
4. SIT ADJUSTMENTS
If the SMB is out of plumb and or level,add shims to the base of the SMB.
Check for plumb and square.Repeat until correct.
6. INSTALL RAIL SECTION
•Cut the post sleeves to the desired length and slide them over the SMBs'squeezing the top of he
SMB to start the post sleeve and slide it down until flush with the base.
•Place assembled rail section between the posts and mark the bracket hole locations onto the r ost
sleeves as per the Railing Installation Guide supplied with the railing kit.
•*IMPORTANT: Remove the rail section and drill the bracket hole locations with a 7/32dia.drill
bit(*THIS DRILL SIZE IS CRITIACAL*).Drill through both the post sleeve and SMB.
•With all holes drilled,place rail section between posts and install as per the Railing Installation Guide.
6. FINAL STEP
With all rail sections installed,tighten all the SMB base fasteners. Install the 2 piece post skirts
supplied in the SMB kit(if you have purchased the SMB alone,you will need to purchase a 2 pie ce post
skirt to hide the base and fasteners).
•For Concrete installation: If the concrete anchors have tightened leaving the too much thread
exposed for the 2 piece post skirt to install properly, it may be necessary to cut the top of the
wedge anchor so it no longer interferes with the skirts snapping assembly).
r
RA ILING SECTION
2"#145S
,. .
PAN NERD SCREW
r
RAILING(MOUNTING BRACKET
POST SLSEVE
+ I SURFACE MOUNT BRACKET
SMB BASE FASTENER
2 pcs.POST SIGRT
Manufactured under Compos-A-Von Research&Development
US Patent 6,702,259,82.
tS0 www.composatron.com
0
0
http://www.trademarkrailing.com/trademark/select installation/select installation.html 4/2/2007
GENERAL NOTES WIND FRAMING NOTES
1).RIDGE+TO-RAFTER ASSEMBLY:
1-1/4'x 20 gauge strap shall be attached to each patr of rafters In accordance to table 3.4.
When a collar its Is used In leu of a ridge strap,the number of 1 od common nalls required
CONSTRUCTION NOTES' In each and of the collar Us need not exceed the tabulated number of 8d nails In the strap.
1).The Information within this set of construction documents Is related to basic design 2).RAFTER-TO-WALL ASSEMBLY:
~ Intent and framing details.They are Intended as a construction aid,not a substitute Lateral framing and shear well connections for rafter,calling or truss to top plate shall be In o
for generally accepted good building practice and compliance with current New York accordance to table 3.3.When a rafter or truss do not fall In tine with studs below,raftere
State building codes.The General Contractor Is responsible for providing standard or trusses shall be attached to the wall top plate and the well top plate shell be attached to
construction details and procedures to ensure a professionally finished,structurally the to the wall stud with uplift connections.Roofs overhanging the rake aide of the building
sound and a weatherproof completed product shall be connected with uplift connections In accordance with table 3.3a
2).The General Contractor Is responsible for ensuring that all work and construction 3).WALL-TO-WALL ASSEMBLY:
meets anent federal,state,county and kcal codes,ordinances and regulations,eta Well studs above and Studs below a floor level shall be attached with uplift connections In
These codes are to be considered as part of the specifications for this building and accordance with table 3.3b.When well studs above do not fall In line with etude below,the
should be adhered to even If In valance with the plan. studs shag be attached to a common member In the floor assembly with uplift connectors In
accordance with table 3.3.
3).Dimensions shall take precedent over scaled drawings.
(DO NOT SCALE DRAWINGS),. 4).WALL ASSEMBLY TO FOUNDATION:
First wall studs shall be connected to the foundation,sill plate,or bottom plate with uplift
4).The engineer has not been engaged for construction supervision and assumes no connectors.Steel straps shall have a minimum embedment of 7Inches In concrete
responsibility for construction coordinating with these plans,nor responsibility for foundation and slobon-greds,15 inches In masonry block foundations,or lapped under
construction means,methods,techniques,sequences,or procedures,or for safety the plate and nailed In accordance with table 3.3b.When steel straps are lapped under the
precautions and programs In connection with the work.There are no warranties for a bottom plate,3 Inch square washes shall be used with the anchor bolts.Anchor bolt
specific use expressed or Implied In the use of these plans. spacing le to be spaced and sized Ideccordenco to table 3.2a.In addition to spacing, a
anchor bolts are to be spaced between 6-12Inches from the end of a sill plate and all
5).Refer to the Window and Door schedule for exterior openings. oomem.
6).The General Contractor Is to ensure that masonry or prefabected fireplaces meets 5).TYPE I EXTERIOR SHEARWALL CONNECTIONS:
or exceeds manufacture's specifications and applicable codes. Type I exterior sheer walla with a minimum of 7/16 Inch wood structural panel on the exterior
attached with Sd common nalls at 8'o.a at the panel edges and 12'o.a In the field,and
7).The General Contractor Is to consult with the owner for all bulltan Items 12 Inch gypsum wallboard on the Interior attached with Sd cooler nails at 7'o.a at panel
such as bookcases,sheMng,pantry,closets,trims,eta edges and 10'o.a In the field shall be in accordance with the length requirements specified
In table 3.15a-b.
8).Wind load requirements shall be taken Into account during construction.
FOUNDATION NOTES: Type 11exterioE shearwelllsshRIOR �allmost the equiremWALL lentsof table 3.16a-b times the appropriate
1).The General Contractor and Mason to review plane,elevations,details and notes to length adjustment factors In table 3.16.
determine Intended heights of finished floor(a)above typical grade. 7).INTERIOR SHEARWALL CONNECTIONS:
2).All footings to rest on undisturbed(vtrgln)soil.Assumed bearing 3000paf Allowable aldewall lengths provided In table 3.14 shall be permitted to be Increased when
Interior shearwalls are used.Sheathing and connections shall be In accordance with
3).Provide 12'expansion Joint material between concrete slabs and abutting 2.4,4.2 and 22A respectively, m.
concrete or masonry wails.oaring In exterior or unheated Interior areas. 8).CONNECTIONS AROUND EXTERIOR WALL OPENINGS:
Header and/or girder connections shall be attached with uplift connections In accordance
4).Any now concrete walla being attached to existing concrete structure shall
be Installed with 94 re-bar,18'long at 12'o.a.Use approved epoxy for Installation. With fable 3.6.Window sill platen shell be have steel connectors In accordance with table
3.6. •
5).Unless otherwise noted,all slabs on grade to be 2600 p.s.I..Concrete to be 9).CATHEDRAL CEILING ASSEMBLY:
pouted on 4 Inch thick sand or gravel NI with 6x6 wire mesh reinforcing.Interior slabs Where a ridge Is to be used as a structural beam,the rafters shall either be notched and
to be minimum 3-1/2 Inch thlck anchored on top of the beam or slope connectors shall be attached to each rafter-to-ridge
8).Gawk spaces to be provided with a minimum 18°x24'eases opening.Install one along)he open caging part of the building.Connections to the ridge and wall shall be be
8x18 cast fron foundation vent for every 150 sq.ft.clams. attached with the above ulrements.
7).DampproofexterioroffoundationwithbituminouscoalingaspersectionR468of DECK AND COVERED PORCH NOTES:
N.Y.S.Residential Construction Cade.A 8-mll polyethylene film shall be applied over 1).Unless otherwise noted,all framing material to be#1 ACO pressure treated lumber.
the below grade portion of exterior walls prior to back611ing. All fasteners,hangers and anchors to be galvinlzed or etalnlese steel.
8).Drainage as per section R405 of N.Y.S.Residential Construction Code. 2).Girders for dock joists to be bolted to each post with washers and nuts.
Girders on concrete plers shall be anchored with proper steel connectors anchored
FRAMING NOTES Into concrete with a minimum 12'dla x 7'long anchor bolt with washers and nuts.
1).All framing techniques and methods as prescriptive design of 1995 SBC High Wind 3).Posts supporting girders shall be anchored to a 12'xl2'xl2'thick concrete fooling.
Edition Wood Framing Construction Manual. Use a minimum 12'die x 7'Iong anchor bolt with washers and nuts.Footings Shall
2).Unless otherwise noted,all framing and structural wood materiel to be#2+STIR. be 3 Ill.below grade.Concrete piers to be used with all porches/decks with roofs or pergulas.
Doatlas Flr. 4).Dockjolsts to have blocking at B'0 o.a.
3).Floors,walls,oegings and rafters to be spaced at 18Inches o.c.unless noted 5).A minimum of 10 Inch flashing shall be installed between the building and ledger.
otherwise. Ledger to be fastened to building with 1/2'dia,bogs with washers and nuts '
4).Unless otherwise noted,all bearing wall headers to be(2)200#2+STR.Doug.Fir. where needed.
Beating wall headers to have(2)Jack studs and(2)full length studs on each aide o1 all 8).Concrete piers shelf be a minimum 8'above grade.
openings.LVL headers to have(3)jack studs and(2)full length studs on each side of
openings.Beating wag windowsills shall also have(2)window sill plates for 2x4 well 7).All joists to be supported with hangers and anchors.Each Joist shall also be anchored
openings between 0 and WO and 2x6 welt openings between 6'11 and 8'9.Provide fire to glyder(s).
and blocking where applicable.
6).All flush beemafheaders to be Installed with heavy duty galvinlzed hangers and 8).Covered Roofs shell be assembled and anchored the same manner as a typical building.
nara anchorewapplicabletoallconnectingjoists. PLUMBING NOTES
6).Double up floor joists under walls that run parallel to the floor Joist and under bathtubs. 1).All water supply,drainage and venting to be Installed as per N.Y.S.Residents[
Floors to hove ceramic the Installed shall be verified for proper load capacity unless noted Construction Code.
on plane.
.t 2).Verify seppo system with the Engineer for Suffolk County Health Department approval.
7).Provide blocMnglbddging In flcorjoists at 8'0 o.m.Use solid blocking In floor Jolate
under all bearing walls. 3).If wall studs,plates orJo[ats are cut out during Installation for any plumbing related work,
provide adequate bracing and plates to protect and secure the structure.Verify with the
8).Provide Insulation baffles at save vents between rafters.Install draft blocking as state code and manufacture's recommendation for maximum hole size and spacing permitted.
needed HVAC SYSTEM TES
C Unless otherwise noted,all roofs and wage to have a r over la es an he 4-ply Fir 1).Mechanical subcontractor Is responsible for adhearing to all applicable codes end safety
COX exterior sheathing grade plywood.Plywood to cover over pietas and headers.
. requirements. ,
10).Unleee otherwise noted use 3/4'thick T&G PTS Fir or Advantech plywood subfloor 2).HVAC subcontractor Is to fully coordinate all system data and requirements with the
adhered.with PL400 adhesive and screwed to floor Joists.Finished floor to be installed equipment supplier.
over subfloor as per manufacture'a Instructions,
11).All bathroom walls to have 112'thldk molature-reslstant she struck Garage walls and 3).HVAC subcontractor to provide final system layout dewing and submit it to the General
callings and over furnace to have 518'thick type-x sheetrock.Al other parts of building Contractor and owner for final review and approval.
to have regular 1/2"sheetrock.Ali walls to be taped and finished. ELECTRICAL NOTES:
12).49 roof with a pitch less than 4:12 shall be Installed with an Ice&Water barrier or 1).All electrical to be Installed as per N.Y.S.Residential Construction Code.
approved equal.Flat roofs shell be applied with a Fiberglas base sheet with an EPDM
torch down type material over. 2).All electrical work shall be approved by a qualified Underwriter.
13).All sill plates and wood In contact with concrete to be pressure treated.Sill plates to 3).Install Smoke detectors and Carbon Monoxide detectors throughout as per section R317
be Installed with a foam sill gasket and oop•r-tex termite shield or approved equal. of N.Y.S.Residential Construction Cale.
r� •��, N�.�.s3.�x1..
NG
L. . ; 2 x 10 �,r, l~ � i� Goy
wee
75 C- NU1> -1N51 VVE _ n IN,Z_�„ �. ' � � t r19
t it ►, rr 1 -P3 I.,�12 oF.Q. 15 tr�t' aRJ_ ;: .._OR_kC,�_� f
t 'f
\�.................. ......—.._...__...._.......- ._:..,___'^•—__....---._- —._ ae.wrwa�•n. ..ww-w....�.rs+.awrnn.o-... ..» -,�:•w......F.,.,,'�wr.�..a:,.,..w..,.•�..�+.r.....+....-ham.... CROSS
5CALE 30
--�
y
t i
i r-yr
• t _r� S o
o ' --- -
OCCUPANCY OR
{ USE IS UNLAWFUL
i
WITHOUT CERTIFICATE
= RETAIN STORM WATT" OF OCCUPANCY
r- z, i OF THE TOWN CODE
Cai 10 V Fro' i
A DATE: 17 E'.P. " JC
ALL CO`JSTRUCTIION SHALL
t NOTiFY E3,iIL !' IT AT
MEEK'THE REQUIREMENTS OF THE 765-1802 8 f,M i u T hE
�._..._.._..�.� - T ._._ .. -- ._ .�. . . �..._ _,.,... �.,.. _ .�.,�,._�.��... - _. ._.. .- - .. - , - •-- CODES NEW YORK STATE. � . " . . :_. R�D
OF FOLLC'',..i'.�G
FORrPOUREDU r
_..... _..... „ _ .
.__. .. ,_,.......,. . ...- _....-.__ .. . _. _ b . . .. .._...._ ,.a..._ ........... .v _ . ... _ . . - 2. ROUGH - FRA':,,a: PLUM3ING
r-} /r�•�of c 3. INSULATION
4. FINAL - CONSTRUCTION MUST
BE COMPLETE F'"7' CO.
ALL CONS T RJC t t. �171 T THE
REQU!REMEN 1 S yr )':.`.�OF NEW
3
YORK STATE. NOT i;�-s�'O'iv51BLk FOR
DESIGN OR CONaTRUC T!ON ERRORS.
F NEw
C� Y J. � 0
t 1 k' i��• 1 i t � N
s
r
��q ��• 078�66
�n v
L- 9�FESSI ONP
i
t