Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
32586-Z
FORM NO. 4 TOWN OF SOUTHOLD BUILDING DEPARTMENT I Office of the Building Inspector Town Hall Southold, N.Y. CERTIFICATE OF OCCUPANCY No: Z-32974 Date: 04/11/08 THIS CERTIFIES that the building ADDITIONS/ALTERATIONS Location of Property: 27550 MAIN RD CUTCHOGUE (HOUSE NO.) (STREET) (HAMLET) County Tax Map No. 473889 Section 109 Block 6 Lot 2.2 Subdivision Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated NOVEMBER 30, 2006 pursuant to which Building Permit No. 32586-Z dated DECEMBER 20, 2006 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is ADDITIONS AND ALTERATIONS TO AN EXISTING LIBRARY AS APPLIED FOR PER ZBA #5945 DATED 10/5/6. The certificate is issued to CUTCHOGUE LIBRARY (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL N/A ELECTRICAL CERTIFICATE NO. 115243C 04/10/08 PLUMBERS CERTIFICATION DATED 03/13/08 THOMAS MARTIN r Aulrhorized Signature Rev. 1/81 r r ' Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT `� iDR TOWN HALL - f 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: V 1. Final survey of property with accurate location of all buildings,property lines, streets,and unusual natural or topographic features. 2. Final Approval from-Health Dept.of water supply and sewerage-disposal(S-_9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead. 5. Commercial building,industrial building,multiple residences and similar buildings and installations,a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and"pre-existing"land uses: 1. Accurate survey ofproperty showing all property lines,streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant.If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$25.00,Additions to dwelling$25.00,Alterations to dwelling$25.00, Swimming pool$25.00,Accessory building$25.00,Additions to accessory building$25.00,Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential$15.00,Commercial$15.00 Date. Am New Construction: Old or Pre-existing Building: (check one) Location of Property:I/'65�57 MAW r,-;, House No. Street Hamlet Owner or Owners of Property: Suffolk County Tax Map No 1000, Section �� Block Lot 2. Subdivision Filed Map. Lot: Permit No.�� Date of Permit. Applicant: ,L MI* . Health Dept.Approval: Ok Underwriters Approval:MllLA + Planning Board Approval:�Wk1halkb Request for: Temporary Certificate Final Certificate: (check one) Fee Submitted: $ '� l V 4PP licant Signature o�/Apr. 7. 2008, 1 ;05PK2187construction consultants 1. i. UMBING No, 9851 P. 2102 Thomas Martin Phone: 631-218-7900 Plumbing & Heating, Inc. fax: 631-219-7575 493-13 Johnson Ave. Bohemia,NY 11716 3-I3-08 Construction Consultants 36 East rd Street Riverhead, lvlY 11901 RE: Cutchogue Library To Whom it may Concern; As the plumber for the Cutchogue Library I am certlWag that all the copper soldered joints were preformed with lead free solder. All water piping was tested to 100 PSI air pressure for 1 hour &. held tight. All gas piping was tested to 5 PSI air pressure for I hour &held tight The gas test was also witnessed by Keyspon Gas Service. -l-tiomas Martin ]resident Suffolk County Master Plumbers Lie. # 2919.P Electrical Inspection C'ertylleate Issue Data Electrical tnapeationgorvice,Inc. Application Number 4/1012008 375 Bunton Avenue 1152430 Ent FWchogue,New York 11772 te311 sglFaa4= Issued To; Ctltchogue-New Suffolk Free Library Street., 27050 Main Road -J Village: Cutchogus ZIP: 11935 Town: Southold Section: Mock: Lot: Contractor: Cell Electric Lighting(L) Lic.# 1022.E W&S examined and found to Ica In comivihme with the Nativnl a ac ncei code. I t3atnmercial f 1 NVDvlorns I 1 pool Ixl 1atRoor Ix: Indoor Ex: t tsement ' : Not Tub ! Rasldential U bet.G"a I t A{tlo NI 2nd Floor N I Outdoor 1 I Addition I . survey f8wifches _ Rocoptarios Fixtures ON Hestwa A/C Fans 48 125 257 3 4 3 DJshwas)ler Wesho WAmps Dryor/,gmps Oven ►aanga/Amps m1crowwas Furnace oil Des c1routetoro Sntoha Detector Sat)1'ransfarmar 1 x 2 By Others Motor Amps Phase UGlan Jacuzzi Tatavislon CO 011foctar 61119 milt: 32586 Other Equipment 1.600 amp M/B Pane;01-400 amp Sub PaneU J, 100 amp Sub Panel/2.100 amp 3 phase AM iBCJ 2 20 amp 3 phase r4/0 Disc./4 20 amp HUMdV S d. Outlets/2 20 amp Appliance Outlets/ President 20 amp 3 phase Air Handlers Disc./1-Time tack/ 152'TrQdc139 Emerg. Lights!17 Exit Lights ROO Inspettioa: Inspector: John Mc Mallon III i Pint fmpwion: owaw2opt Insmtor: John me Mahan ul Th)s ceititiaets must not be a►tort o In any mannar. tnsp@ctora may ba idonlltlad by 111101 aladelplals. FORM NO. 3 TOWN OF SOUTHOLD BUILDING DEPARTMENT Town Hall Southold, N.Y. BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) PERMIT NO. 32586 Z Date DECEMBER 20, 2006 Permission is hereby granted to: LIBRARY CUTCHOGUE PO BOX 935 CUTCHOGUE,NY 11935 for ADDITIONS/ALTERATIONS ,TO EXISTING LIBRARY BUILDING PER ARCHITECTS PLANS AND CERTIFICATIONS, ZBA, PLANNING & LANDMARK at premises located at 27550 MAIN RD CUTCHOGUE County Tax Map No. 473889 Section 109 Block 0006 Lot No. 002 . 002 pursuant to application dated NOVEMBER 30, 2006 and approved by the Building Inspector to expire on JUNE- 20 , 2008 . Fee $ 1, 200 . 00 t orize`d nature ORIGINAL Rev. 5/8/02 o��OF SOUryol Telephone (631) 765-1802 h O Town Hall,53095 Route 25 Fax (631)765-9502 J P.O.Box 1179 Southold,New York 11971-0959 �yCOUN N SOUTHOLD TOWN LANDMARK PRESERVATION COMMISSION CERTIFICATE OF COMPLETION April 07, 2008 Ray Nemschick(for Cutchogue/New Suffolk Library) PO Box 935 Cutchogue,NY 11935 This letter is to certify that you have completed your project to the satisfaction of the Southold Town Landmarks Preservation Commission in accordance with your Certificate of Appropriateness, issued on April 07, 2008. Should you have an questions, feel free to contact me at the number above. Sinc rely, amo er R4 Administrative Assistant Southold Town Landmarks Preservation Commission CC: file, applicant MAILING ADDRESS: AANNING]BOARD MEMBERS OF so P.O.Box 1179 JERILYN B.WOODHOUSE Southold,NY 11971 Chair OFFICE LOCATION: ]KENNETH L.EDWARDS Town Hall Annex MARTIN H.SIDOR 54375 State Route 25 GEORGE D.SOLOMON (cor.Main Rd.&Youngs Ave.) JOSEPH L.TOWNSEND Own Southold,NY Telephone: 631765-1938 Fax: 631765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD March 25, 2008 Mr. Ray W. Nemschick Nemschick Silverman Architects,P.C. 735 Deerfoot Path Cutchogue,NY 11935 Re: Proposed Site Plan for Cutchogue/New Suffolk Free Library Located on the s/e comer of New York State Route 25 and Case's Lane known as 27550 Main Road in Cutchogue SCTM#: 1000-109-6-2.2 Zoning District: Residential-40 (R-40) Dear Mr.Nemschick: At your written request for a Certificate of Occupancy review of site plan requirements, dated March 14th and last revived March 19th,Planning Department staff performed a site visit on March l7th. In reference to the above,the Planning Board held a work session on March 17th and March 24h to discuss the letter, including the as-built site plan drawing page A-2.01 prepared by Nemschick Silverman Architects P.C. dated November 28, 2006 and revised October 22, 2007,the approved site plan prepared and certified by Raymond W. Nemschick,Architect dated October 3'1,.2006 known as A-2.01 and the building elevation plans labeled A-4.0 1,A-4.02,A-4.03 and A-4.04 dated October 31,2006 and the resolution dated November 14,2006 regarding the above referenced site plan application. In reference to the above,the Planning Board has accepted the 'As-Built' plan A-2.01 dated November 28, 2006 and revised October 22,2007. This is to inform you that the site plan requirements have been conditionally satisfied and include the following items: • The Planning Board acknowledges and pp a -roves the removal of the concrete walkway,the change in driveway entrance, and the change to the ground transformer,as shown on the as-built site plan. • As described in the letter from Ray Nemschick dated March 14, the top coating and final demarcation of the parking area will be completed by April 15, 2008. Cutchogue Free Library Page Two March 24, 2008 • As described in the letter from Ray Nemschick dated March 14,the final grading and hydroseeding will be completed by April 30,2008. • As described in the letter from Ray Nemschick dated March 14,the site will have all reconnect of existing lighting completed by April 30, 2008. All outdoor lighting shall be shielded so that the light source is not visible from adjacent properties and roadways. Lighting fixtures shall focus and direct the light in such a manner as to contain the light and glare within property boundaries. The lighting must meet town code requirements. • The applicant also agrees to install all landscaping as shown on the plan. As per the landscape survivability guarantee,the applicant agrees to replace any of the landscape, which dies within three years of planting. Any changes to the as-built site plan beyond those described above must receive approval from the Planning Board. Respectfully yours, Jerilyn B. oodhouse Chairperson cc: file, Building Department with map,Town Engineer with map By signing this letter,the applicant's agent acknowledges that there are mandatory conditions, as described above,that must be completed to the satisfaction of the Planning Board, or risk a fine and/or revocation of the certificate occupancy, and that the applicant has been notified of same. Aa mschick—Applicant's Agent so I (ar-t�r-j-\ I e 5 ".` UNTV TOVmWN OF SOUTHOLD BUILDING DEPT. 765-1802 ENSPECTION [ ] FOUND-.,dATION 1ST [ ] HOUGH PL13G. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLAI-OCE & CHIMNEY [ J� FIRE SAFETY INSPECTION [ ] FIRE REST.TANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS DATE INSPECTORS � - _ A \ Date: December 2G, 2000 Revl5ed. February6, 2007 ----Nems hick ilverman Architects P.c. Final Revl5lon: January 24, 2008 . the business of ARCHITECTURE." l� 11AR 0 4 Michael J. Verity Damon Rallis Southold Town Building Department _.___ �_'_� t �y'��Aop•N Southold, New York Re: Building Construction and Occupancy Cla551fication �. The Cutchogue-New Suffolk Free Library yT ka.029MG yoQ' 27550 Main Road OF NEB Cutchogue, NY 11935 Mr. Michael J. Verity: The following repre5ent5 the Cutchogue-New Suffolk Free Library's Building Construction and Occupancy Cla551fication a5 they relate to State and Local Codes with all final amendments. Occupancy Group "A-3" Construction Classification: "Type V-A" (2 Story * 1 1 ,500 SF- Not including the Cellar a5 allowed) Existing Structure: "Type IV * Type V-A" Proposed Alterations: "Type V-A" Total Gross Square Footage: Cellar: 3,627 SF Not Applicable in SF Calc5 First Floor: 4,707 SF Second Floor: 2,790 SF 7,497 SF < 1 1 ,500 Sf Total Occupied per floor: Max unsprinkled: 100 Per Fire Area fire Area "A" Basement: • Assembly (Un-concentrated) 15 net (o- 900 SF GO Persons o Total fire Area "A" GO Persons 735 Deerfoot Path 9 Cutchogue, New York 11935 ® 631.734.7007 telephone . 631.734.7347 facsimile . www.ns-arch.com ,r. Nemschick Silverman Architects P.c. the business of ARCHITECTURE." Total Occupied per Floor (cont.): Fire Area "13" Basement: • Bu5ine55 100 gross @ 1 ,507 5F 15 Persons • Mechanical Equipment 300 gross @ 1 . 120 5F 4 Persons • -Library (Reading Rooms) 50 net @ 150 5F 3 Persons First Floor: Library (5tack5) 100 gross @ 3,340 5P 33 Persons • Bu5ine55 100 gro55 @ 790-5F 5 Persons • Library-(Reading Rooms) 50 net @ 430 5F 9 Persons Second Floor (open to First Floor): • Library (Stacks) 100 gross @ 2,070 5F 20 Persons • Bu5ine55 100 gr055 @ 240 5P 4 Per5on5 o Total Fire Area "B" 9G Persons In addition please note all exterior walls (new and existing) will have a I hour Fire Rating a5 well a5 required structure rating of I hour (new and existing). A5 separates fire area "A" and fire area "B" a 2hr Separation will be provided per code. If you have any q1Je5t1on5 or would like additional information about this project, please feel free to contact our office. Regards, o Ray NCM5chick, AIA Nemschick Silverman Architects, P.c. 735 Deerfoot Path • Cutchogue, New York 11935 • 631.734.7007 telephone •631.734.7347 facsimile • www.ns-arch.com f Date: January 2, 2008 Nemschick Silverman Architects P.c. . . . the business of ARCHITECTURE." Southold Town Building Department Southold, New York Project Reference: The Cutchogue-New 5uffolk Free Library 27550 Main Road JAN Cutchogue, NY 1 1935 To Whom It May Concern, I hereby certify to the Department'of Buildings of the Town of Southold that I have inspected the above location5; I have 5upervi5ed the preparation of the building plans a5 per State Education Laws; and I have determined to the best of my profe551onal knowledge and belief that the windows, roofing, Biding, high wind Strapping, insulation, and plumbing were installed in conformity, with the filed building plans, the New York Building Code, and generally approved construction practices. Ray NemSchick, AIA Ne chick Silverman Architects P.c. Q Ma N 4O .{• sir Al 'M y OSb 735 Deerfoot Path • Cutchogue, New York 11935 631.734.7007 telephone •631.734.7347 facsimile www.ns-arch.com 269385107 T-578 P002/002 F-879 T � MUNICIPAL TESTING LABORATORY, INC. M AN ENGINEERING INSPECTION AND TESTING COMPANY INC Gw�c��� 1020 NEW 8OUT STREETHICKSVI L E NY 11801 2ND (516)938-7120 TOLL FREE:(800)LAB-MTLO/522-6850 166 (305)884-5107 WEBSITE:WWW.MTLLAB.NETAX:(516)938- 107 January 14, 2008 Construction Consultants Attn: Eric Baumack 36 E 2snd Street, Riverhead, NY 11901 RE: Cutchogue New Library Dear Mr. Baumack: This letter affirms that all inspections performed at the Cutchogue New Library the specifications that were provided to us. y have met and passed The inspections performed included soil field inspection, soil density test, concret concrete test cylinders, rebar inspection and fireproofing inspection. e field inspection, Sincerely, John Hicks Vice President of Operations Ph: (800)522-6850 E-mail:ih—icks@l-ntilab.net "You don't get what you expect,you get wltat you inspect" J J, �ESSIONP Full Service Laboratory and Engineering Consul#ant: Steel, Concrete,Soils,As half p and Ail Building Materials Date: Aril 10, 2008 `: �� N�emschick Silverman Architects P.c. p the business of ARCHITECTURE." Southold Town Building Department: '-'� Southold, New York Project Reference: The Cutchogue-New 5uffolk Free Library 27550 Main Road Cutchogue, NY 11935 To Whom it May Concern, I hereby certify to.the Department of Buildings of the Town of Southold that:I -have inspected the above location5; I have supervised the preparation of the building plans a5 per State Education Laws; and I have determined to the best of my professional knowledge and belief that the Not water heater pre55ure relief valve, Boiler Room combustion air vent and the Handicap Bathroom insulate for the water line were installed in conformity, with the filed building plans, the New York Building Code, and generally approved construction practices. Ray Nem5chick, AIA Nems lick Silverman Architects P.c. ARcy � ,►' rI� �T No.029088/�Q OF N e�� l 735 Deerfoot Path • Cutchogue, New York 11935 631.734.7007 telephone • 631.734.7347 facsimile • www.ns-arch.com a J , TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 - INSPECTION [ ] FOUNDATION 1 ST [ ] ROUGH PLSG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL i. [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION i [ ] FIRE RESISTANT CONSTRUCTION, [ ] FIRE RESISTANT PENETRATION 1-7 REMARKS: l ,,,v"-a, f��.�,.ry 4�,�,,:J�, ., � ,�„ '�... <.�.� '�t��, =�7,✓ .W_. ''"'..'"p.••+�'...- .r'O�"'s..1...,a.'.- �:`.3..� i ,�,r' .r '�'W-"•;�e"'.".r;,.�i' .�':....t; ;"1_ r �'�'p°`�5.. '.-.-v...aY�-�t� `?r^.-tr klLatev. -,.ti},-„tea- s f .�."'_,r°"�...,F.xs`.L/?e.. i?,yr> ,,, �... ,,, ..✓ ��. _ � s' dF ia�•ta'. �...y'"'� i DATE rr "a — INSPECTOR ( �,�(Mol .Ak Date: December 20, 2000 RewSed. February8, 2007 Nemschick Silverman Architects P.c. Final Revl5lon: January 24, 2008 . . . the business of ARCHITECTURE." Michael J. VerityIr Damon Rallis Southold Town Building Department IJ l; 14 a� Southold, New York + Re: Building Construction and Occupancy Cla55ification The Cutchogue-New Suffolk Free Library 27550 Main Road Cutchogue, NY 1 1 935- Mr. Michael J. Verity: The following,repre5ent5 the Cutchogue-New Suffolk Free Library's Building Construction and Occupancy Classification a5 they relate to State and Local Codes with all final amendments. Occupancy Group: •`A-3 a Construction Cla55iflcation: "Type V-A" (2 Story * 1 1 ,500 SF- Not including the Cellar a5 allowed) EX15ting Structure: "Type IV * Type V-A" Proposed Alterations: "Type V-A" Total Gro55 Square FootacJe: Cellar: 3,527 5F Not Applicable in SF Calc.5 First Floor: 4,707 SF Second Floor: 2,790 SF 7,497 SF < 1 1 ,500 SF Total Occupied per Floor: Max unsprinkled: 100 Per Fire Area Fire Area "A" Basement: • A55embly (Un-concentrated) 15 net P- 900 SF GO Persons o Total Fire Area "A" GO Persons 735 Deerfoot Path • Cutchogue, New York 11935 . 631.734.7007 telephone • 631.734.7347 facsimile www.ns-arch.com Nemschick S.Hverman Architects P.c. the business:of ARCHITECTURE." Total Occupied per Floor (cont.): Fire Area "B" Basement: • Business 100 gross @ 1 ,507 5F 15 Persons • Mechanical Equipment 300 gross @ -1 , 120 5P 4-Persons • Library (Reading Rooms) 50 net @ 150 5F 3 Persons -First Floor: • Library (Stacks)- 100- gross @ 3,340 51' 33 Persons • Business 100 gross @ 790 5F 5 Persons • Library (Reading Rooms) 50 net @ 430 5F 9 Persons Second Floor (open to First Floor): • Library(stacks) 100 gross @ 2,070 5F 20 Persons • Business 100 gross @ 240 5F 4 Persons o Total Fire Area "B" 9G Persons In addition please note all exterior walls (new and existing) will have a I hour Fire Rating as well as required structure rating of I hour (new and existing). As separates fire area "A" and fire area "B" a 2hr separation will be provided per code. If you have any questions or would like additional information about this project, please feel free to contact our office. Re r s, I tt Ray Nemschick, AIA �- Nemschick Silverman Architects, P.C. yT No.029086 F OF N�� 735 Deerfoot Path • Cutchogue, New York 11935 • 631.734.7007 telephone • 631.734.7347 facsimile www.ns-arch.com Date: December 2G, 2000 i Revl5ed. Februaryd, 2007 Nemschick Silverman Architects P.c. Michael J. Verity the business of ARCHITECTURE." Damon Rallis Southold Town Building Department Southold, New York Re: Building Construction and Occupancy Classification The Cutchogue-New 5uffolk Free Library 27550 Main Road Cutchogue, NY 11935 Mr. Michael J. Verity: As requested the following represents the Cutchogue-New 5uffolk Free Library's Building Construction and Occupancy Classification as they relate to State and Local Codes. Occupancy Group: "A--3b Construction Classification: "Type V-A" (2 Story * 1 1 ,500 5F) busting Structure: "Type IV t- Type V-A" Proposed Alterations: "Type V-A" Total Gross 5c{uare Footage: Basement: 3,827 5F First Floor: 4,707 5F Second Floor: 2,950 5F 1 1 ,464 517 < 1 1 ,500 5F Total Occupied per Floor: Max unsprinkled: 100 Per Fire Area Fire Area "A" Basement: ® Assembly (Un-concentrated) 15 net @ 900 5F GO Persons e Storage/Mechanical 300 gross @ 480 5F 2 Persons o Total Fire Area "A" G2 Persons 735 Deerfoot Path • Cutchogue, New York 11935 . 631.734.7007 telephone • 631.734.7347 facsimile ® www.ns-arch.com r a � 1 Nemschick Silverman Architects P.c. the business of ARCHITECTURE." Total Occupied per Floor (cont.): Fire Area "B" Basement: • Business 100 gross @ 1 ,807 5F 18 Persons • Storage/Mechanical 300 gross @ G40 5F 2 Persons First Floor: • Library (5tack5) 100 gross @ 3,340 5F 33 Persons • Business 100 gross @ 937 5F 9 Persons • Library (Reading Rooms) 50 net @ 430 5F 9 Persons Second Floor (open to First Floor): • Library (5tack5) 100 gross @ 2,070 5P 20 Persons • Business 100 gross @ 380 5F 4 Persons o Total Fire Area "B" 95 Persons In addition please note all exterior walls (new and existing) will have a I hour Fire Rating as well as required floor rating of I hour (new and existing) as separates the basement from the first floor between fire area "A" and fire area "B" as noted above. If you have any questions or would like additional Information about this project, please feel free to contact our office. //P,155, schick, AIA emscck Silverman Architects, P.c. 735 Deerfoot Path • Cutchogue, New York 11935 631.734.7007 telephone • 631.734.7347 facsimile www.ns-arch.com MUNICIPAL TESTING LABORATORY, INC. Tso AN ENGINEERING INSPECTION AND TESTING COMPANY M L 102 NEW SOUTH ROAD,HICKSVILLE NY 11801 (516)938-7120 INC �� 5884-3427 TOLL FREE:(8 0)LAB MTLO/5 2I 6850 3166 FAX:(516)938 5107 �D ti1 WEBSITE:WWW.MTLLAB.NET January 14, 2008 Construction Consultants Attn: Eric Baumack 36 E 2snd Street, Riverhead,NY 11901 RE: Cutchogue New Library Dear Mr. Baumack: This letter affirms that all inspections performed at the Cutchogue New Library have met and passed the specifications that were provided to us. Inspections performed were: • Soil field inspection& density test • All concrete footings &piers including elevator footing • Concrete foundations • Rebar inspection • Structural steel • Spray-on fireproofing OF NEW • Fireproof paint thickness �Q'��' KA y0� Sincerely, John Hicks /, Vice President of Operations d" �' t ao�i �Cb C? Ph: (800)522-6850 Fp ° 049$ E-mail:jhicks@mtllab.net Reviewq,4J �f r e�^a P•. �.'Y "You don't get what you expect,you get what you inspect" MAN, I L)g OJ C.I. IJ Full Service Laboratory and Engineering Consultant: Steel,Concrete,Soils,Asphalt and All,Building Materials APPEALS BOARD MEMBERS Mailing Address: . BOG Sy Ruth D. Oliva, Chairwoman � QlG Southold Town Hall 53095 Main Road•P.O. Box 1179 Gerard P. Goehringer Southold,NY 11971-0959 James Dinizio, Jr. Office Location: Michael A. Simon �l� Town Annex/First Floor,North Fork Bank Leslie Kanes Weisman Cum 54375 Main Road(at Youngs Avenue) Southold,NY 11971 http://southoldtown.northfork.net i ZONING BOARD OF APPEALS TOWN OF SOUTHOLD Tel. (631)765-1809•Fax(631)765-9064 FINDINGS, DELIBERATIONS AND DETERMINATION �— MEETING OF OCTOBER 5, 2006 ZB File No. 5945- CUTCHOGUE-NEW SUFFOLK FREE LIBRARY Property Location: 27550 Main Road, Cutchogue CTM 109-6-2.2 SEQRA DETERMINATION: The Zoning Board of Appeals has visited the property under consideration in this application and determines that this review falls under the Type II category of the State's List of Actions, without an adverse effect on the environment if the project is implemented as planned. PROPERTY FACTS/DESCRIPTION: The applicant's property is nonconforming with an area of 31,666 square feet, located in the R-40 Low-Density Residential Zone District, with a building established as a library since about 1085. BASIS OF APPLICATION: Building Inspector's July 14, 2006 Notice of Disapproval citing Sections 100-242A (based on ZBA Interpretation No. 5039 in the Walz Application) and 100-244 (280-124) concerning a proposed addition and alterations to an existing library building, for the reason that there will be an increase in the degree of nonconformance. The code requires a minimum of 50 ft. rear yard for nonconforming lots measuring between 20,000 and 39,999 square feet in total, and a minimum front yard setback of 40 feet (instead of 40 feet for the rear yard noted on the Notice of Disapproval). FINDINGS OF FACT The Zoning Board of Appeals held a public hearing on this application on September 28, 2006, at which time written and oral evidence were presented. Based upon all testimony, documentation, personal inspection of the property, and other evidence, the Zoning Board finds the following facts to be true and relevant: AREA VARIANCE RELIEF REQUESTED: The applicant wishes to make alterations and roof addition as described in the diagrams prepared 5/5/2006, updated 6/6/2006, by Raymond W. Nemschick, R.A. The majority of construction will not exceed the existing building envelope, dormers will be added over the first floor, and alterations to the existing basement without major excavation for the new support. The existing rear yard setback is and will remain at 19 feet (exclusive of stairways), and the code requires a minimum of 50 feet. The existing front yard setback facing the Main Road is 38 feet to the front entrance, and the code requirement is 40 feet. This setback will also remain unchanged. REASONS FOR BOARD ACTION: On the basis of testimony presented, materials submitted and personal inspections, the Board makes the following findings: Page 2—October 5,2006 ZBA#5945—Cutchogue Free Library CTM 109-6-2.2 1. Grant of the variances will not produce an undesirable change in the character of the neighborhood or a detriment to nearby properties. The new dormers and alterations to the library building will allow for utilization of the lower floor of the library, after building a new foundation under portions of the building (slightly raising the building for installation of the foundation walls). The new construction will not create a new nonconformance and will be minor with respect to the code required setbacks of the building that has existed in this location for many years. 2. The benefit sought by the applicant cannot be achieved by some method, feasible for the applicant to pursue, other than an area variance. The building has remained in this nonconforming location for many years, with the most recent expansion in 1996. The proposed renovations and dormer additions to this historic landmark will also require a determination by the Town's Landmark Preservation Commission. 3. The relief granted is not substantial. 4. The difficulty has been self-created based upon the size and nonconforming setbacks of the existing building. 5. No evidence has been submitted to suggest that a variance in this hamlet community will have an adverse impact on the physical or environmental conditions in the neighborhood. 6. Grant of the requested relief is the minimum action necessary and adequate to enable the applicant to enjoy the benefit of dormer additions and building renovations, while preserving and protecting the character of the neighborhood and the health, safety and welfare of the community. RESOLUTION OF THE BOARD: In considering all of the above factors and applying the balancing test under New York Town Law 267-B, motion was offered by Member Goehringer, seconded by Chairwoman Oliva, and duly carried, to GRANT the variances as applied for, as shown on the construction and site diagrams prepared 5/5/2006, updated 6/6/2006, by Raymond W. Nemschick, R.A., subject to applicant obtaining a Certificate of Appropriateness from the Town Landmarks Preservation Commission. Any deviation from the variance given such as extensions, or demolitions which are not shown on the applicant's diagrams or survey site maps, are not authorized under this application when involving nonconformities under the zoning code. This action does not authorize or condone any current or future use, setback or other feature of the subject property that may violate the Zoning Code, other than such uses, setbacks and other features as are expressly addressed in this action. Vote of the Board: Ayes: Members Oliva (Chairwoman), Goehringer, Dinizio, and Simon. (Member Weisman was absent during this lution.)This Resolution was duly adopted (4-0). Ruth D. Oliva, Chairwoman 10/iFr/06 Approved for Filing FORM NO. 3 NOTICE OF DISAPPROVAL DATE: July 14, 2006 TO: Nemschick Silverman Architects a/c Cutchogue-New Suffolk Library 735 Deerfoot Path Cutchogue, NY 11935 Please take notice that your application dated June 30, 2006 For permit to construct additions & alterations to an existing library building at Location of property 27550 Main Road, Cutcho ugue NY County Tax Map No. 1000 - Section 109 Block 6 Lot 2 Is returned herewith and disapproved on the following grounds: The proposed additions and alterations to an existinglibrary ibrary building on this non-conforming 32,670 square foot lot in the Residential R-40 District is not permitted pursuant to Article XXIV Section 100- 242A, which states; "Nothing in this article shall be deemed to prevent the remodeling reconstruction or enlargement of a non-conforming building containing a conforming use provided that such action does not create any new non-conformance or increase the degree of non-conformance with regard to the regulations pertaining to such buildings " Article III, Section 100-244, states that nonconforming lots measuring between 20,000 and 39,999 square feet in total size require a rear Yard setback of 40 feet Currently, the library building is noted as being+/- 19 feet. The proposed construction maintains that setback Pursuant to the ZBA's interpretation in Walz (#5309) such additions and alterations will thus constitute an increase in the degree of nonconformance Furthermore, the proposed construction is not permitted without review and ap rop val by the Southold Town Landmarks Preservation Commission because the property is listed on either the Southold Town, New York State and/or the National Registers of Historic Places and requires review by the Southold Town Landmarks Preservation Commission. If the requirements of the town code pertaining to Landmarks (Local Law No 22) are met a Certificate of Appropriateness (C of A)will be issued. The C of A is required before a Building Permit will be approved. Information about the requirements for applying for a C of A is available at the information counter in the Building Department. In a ition s' roval is required from the Southold Town Planning Board. �oas e it Examiner CC: file, Z.B.A.,Planning, Landmark Preservation Note to Applicant: Any change or deviation to the above referenced application may require additional review from the Southold Town Building Department. i i *pF SOdTyolo NV TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: , J DATE ob 8 INSPECTOR OF SOUjyolo N O cou i TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: , wzp�V pL- 1 r DATE 1 �� �� 0 INSPECTOR ' pF SOUl�ol � o cOUl,� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ i J-ROUGH PLBG. [,I�OU DATION 2ND [ NSULATION [ FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: 5 rz�)l L3 al -- ` DATE �" e7 INSPECTOR--, ' o l qso ti o coufff N,N TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ �OUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: DATE l` cL,0 INSPECTOR /iA,".1 ✓ jj'' `.. fjF So4lyOlO courm,��' TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION RAMING STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMAR a DATE �� ® � INSPECTOR SO(/T�,olo Coulov 0c� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ROUGH PL13G. [�FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: DATE � �� s Jo7 INSPECTOR OE SOti,yolo TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION KFOUNDATION 1ST [ ] ROUGH P`L13G. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: Lo-vzb=- v DATE °��� INSPECTOR r SOUryo�o TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: 7 r fi- DATE - �'�� INSPECTOR OF SOUjyolo courm,��' TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION KFOUNDATION 1ST [ ] ROUGH PLOG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: Ao- CIA DATE 7 INSPECTOR r FOUNDATION T) Zak M N"'W --------------- PLUMBING ROUGH-FRAMING& �11 ' L 6� , INSULATION PER N.Y. STATE ENERGY . t WWR � _ f� 1 , 1 • 1 1 i f • . � / � � � III►� • tt . • / J� IMF W MA ei ' ,/ / 1 i •_ o r• i I 1 tZI(.c TOWN OF SOUTHOLD BUIL ING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT 3t_DG. ���T. Do,you have or need the following,before applying? TOWN HALL -- T WIN F SOUTF:OLD Board of Health SOUTHOLD, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 0� - Survey www. northfork.net/Southold/ PERMIT NO. 0 Check Septic Form . N.Y.S.D.E.C. Trustees Examined ,20 Contact: Approve ,20 _ Mail to: Disapproved,a/c Phone: Expiration 120 in e for APPLICATION F B LDIN PERMIT Date i, , 20 INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 3 sets of plans, accurate plot plan to scale.Fee according to schedule, b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for.inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed.within 18 months from such date.If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize,in writing,the extension of the permit for an addition six months. Thereafter,a new pen-nit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions, or alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,housing code,and regulations,and to admit . authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name,if a corporation) (Mailing add ess of applicant) State whether applicant is owner, lessee, agentG engineer, general contractor, electrician,plumber or builder r�— Name of owner of premises (As on the tax roll or latest deed) If 1• n is a.corporati t Y4� n,,signature of duly authorized officer ame.and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location of land on which proposed work will be donee v House Number - Street Hamle County Tax Map No. 1000 Section I Block C(/_� Lot o1 Subdivision- Filed Map No. i Lot (Name) 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy b. Intended use and occupancy. 3. Nature of work(check which applicable): New Building Addition Alteration_ Repair Removal Demolition Other Work (Description) 4. Estimated Cost Fee_ ! (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor .If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. It i 21 , ' 1V 7. Dimensions oflexisting structures, if any: Front �' Rear 1� Depth �(}--6 Height_ `� Number of Stories Dimensions ofrsargy structure with alterations orgdditions: Front 1 -C) Rear Depth —0-n Height ZL Number of Stories 'Z- 8. Dimensions of entire new co struction: Front (y AC Rear Depth Height_ Number of Stories q.�y� � y 9. Size of lot: Front 1 ✓/�aQ Rear S�, C Depth 90 10. Date of Purchase N&Narme of Former Owner _ 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO—)( 13. Will lot be re-graded? YES_%-Z.NO Will excess fill be removed from premises?YES . N0� 14. Names of Owner of premises FM lAfthft AddressZ MKIN g., 'Phone No. Name of Architect Address Phone No Name of Contractor Address Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey,to scale,with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. STATE OF NEW YORK) SS: COUNTY OF�� being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, / (S)He is theL1J (Contractor,Agent,Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief;and that the work will be performed in the manner set forth in the application filed therewith. Swo to before me this day of Notary Public ig e r ant PATi6M WARNER 010"Public State Of ewr York No.OIWA6140448 Qualified in Suffolk County Connnission E*ms January 30 � A 4 COI El - I Y rI Y f1i � T-/ -ror gyp` A-I REFLECTED GLG. PLAN NOTES 4-2 a'-lr� ¢ $�• ¢ FIXTURE �� ®U COI. REMOVE ALL LlGMM5,W!R/N6,RPM,,LMGWk<ETC.�M7ED AND OR °T 5TED FROM ABOVE. CO2. EX15Tr-ISTG OR A SYSTEM TO BE REMOVED AAD REPLACED. REFER i0 MECH.FIXTURE FIX.WATT MANUFACTURER DFG5FORADD7L INFO. O Ora Yx 00r9 I ® CAT.N LIGHTING 92 INC. L03. INSTALL NEW A6 R F1XffR T E AND EXIT S/6A5 AS PER MAN INFO RERS' A HEN 2:C2'LAY-lN TROFFER(?LAW) 62W CAT.M7.SERIES 502 51�LIFILA7/LN5. REFEK TO QELlR/LRL OWi5 FOR ADD7L INFO. ® 10T'2:Y4'LAY-IN TROFFER(2 LAW) 67Y1 LES/0N LIGHTING CO,INC. C04 NEW EXHAUST FAN 5EE t-C H DWG5 FOR ADD7L INFO.CAT.NO.SER/E$502 IAG ES C05. #61ALL I4EW CEIL 6MR,,TIL TEES ETC. SEE F7N15H 55i/EA',LE FOR �6® CCv/ON LIGHTING LO,/AG. A007L IFS. v --- NB'12X4'LAY-IN TROFFER(3 LAh1PJ q_W n� s LAT.All.SET1/E5 502 C05. REFER TO ELECTRICAL DWG5 FOR RIEW-ENCY Ll6MM 6 SLIOTXLE AAm B (1 LAMP) B I ® 17C4'SURFALE HID.FLCIR2ESCENT 67iY LE6/ONLIGMIPY CO,IAfG. CAT NO.SERIES 2750 :>0 X'SU EDED LINEAR INDIRECT FOCALPo RO Ll6M B'S/KLE 5'-4' G FLU0RE',LBT 240H P01NrCANLE-q1SP6510N I HCWlTED ®D EX15716 FIXTURE r0 BE 9EMOVL-37 OR 2a7RErE55E9/xD1REcr /O4„, l�n/MLl�u2,aRELE55FD 65NERAL REFLEGTEO GLG. PLAN NOTES — MmlRKTLlGHT EO. 4-0' 4 S \ Jz.. EXISTI oEMER6ETl:Y L/6NT,REMOTE — O _ " FEAD TO RC-MAIN 601.. 1T 15 TIC CONTRACTOR5 50LE RE5 ON518ZLITY TO Duct"ENrEX15T/AG r ` rF11 I I O �� — - TECH LI6MIN5-STRAI6NTLlNE TRACK EX157#6 S!'RISR TO ORff-KINEALNM fL71VEAREA DAMAGES TO _______ ______.i B'TR4LK LIGHTING 200W EXISTING F/NISFIES TO RBZ4/N 1YA21N5{ARK PRLGED(AZGS 5N4LL BE F B'77N0 CIRCUIT RE-AIRED Ar CONTRACTORS Eve IAd�5 DAm46E5 ARE Dcaf fl-TED C-0. __ ::f. EO. �B' EO A/ p/ 4'TRACK LI6HT/A(5 loon TECHLlGM�T 57RA16N7LINE TRACK PRIOR TO 5TARr OF WORK .":. ..... �7 6 W4LL SLOAI'E(FLLtkZESCBJT) 75W END 602 CO TO TOO? �LABORI0 5MROM ASAFE 17L4C AT .::'.EQ.' �W AD h 3 LLEAN7T17RK ETMROM•0IrAT ALL TlTg5.LEGALLY DART AWAYAND .�.�.:�`::.':.':.'. .' 9 ............M':::: -1 6'COWACT FLt10RE5CEHT 50% JNO L116HTING-HATE L6 6'TRIPLE D!5l .�E OF 1 B¢IS AT REC�/LAR INTERVALS 70 PREVBYT EXCC55lVE ::.. T--/H ROE HOR170MAL 5LR/E5 C650 ACCIM AATICK - .. CLEAR COLOR)WIH54TINHMSH a • ............:...... . I' : p - LATAL0.4 Ab.L6H426/42T 6O3 PROVIDE ALLOWWAL'E IN BASE BlD FOR ADD ACT.FOR REHALD•fEA7 LIGHTING. -•_•----_---- � . J � RdO LIGHTING-ELATE C6 6'TRIPLE K 6'LOHPAG7 FLLl0RE5LElJT 34W WE VERTICAL SERIES C6Gl0 CLEAR I_ -I I w A-! COLOR WITH 5ATIN A0454 LATAL06 A6.C61/426,527` �L 3-l/9•LBr✓EDWALL itUTSH S0W JR1011/6MING-AC1LW RRE5CE55ED CAO& 34 IC5 i • ✓ I J r� ALMO A 3�z iOPEN A I 30-F'EMANT5(MURESCEN) 72W PAL05 VERDES-BOYD 0035/20V, M OIL 22/T;AAD ONE 90hG T-5 ®® LIGHT FIXTURE'X'DENOTE5 LIRCliAR 2GX0 B,4' FXTURE TYPE I I I 35'DlA PETmANTS(fLB7RE5LBJTl I6SW FOCAL POINT STEM M WIT SKYL17Ig ® EXIT LIGHT FIXTURE ON TIFEE LAW TLi;{5,51X LAMP 75,SIX z ® MWL DIFFUSER/RETURN LAM 75W ll' !I' I I I S4ERGEAGY LI6M F/XTLRE O LLG.B15 ICCDC/ES IWLGYiBAWALL SCON',E /A010 B13FER LIGNTMK-HALO6ENDG I A_I R_I L3..B'-0• A-1 �P OfCYJDG B4YONEr BASE LAMP,FRO57ED LITHON LICM/M5-PEW I-ETALIC TOILET EXFIAfIST FAN SET IN CLG GRID TILE , IA 4 Q WALL.5C0AGE-5TA/R 14Y 62W HALF ROV HALL 5C {�} R5TR TO I fELN DWG5 FOR SPEC 5 I LT 1 1% N/6M Hi0r013E6IRIC FIXTURE 721T' LITHOMA L15HTIM5-ARCH SCONCE {} CE/LlM5 GRID/TILES REFER TO FIM5H SERIES 46774W VIERGB.GYOPTION 5 92ME FOR 517E/5M-E/hA ..ETC. I I LEIL/AG FX,UNJED EXIT S/GNW/ BW PAINTED 6rF..ED CL6/50FFIr EMERRGI7YLY B4L17.P C • I F(Z) WALL YKW/rED EXIT 5/6M M ; C. E?' EXYL�ILAIP BW SELPON ARROW I p-/ R 1 A! d.ob 3 L hi7H 1T1ERGENCY AW A i I D ABACKW 0 ELEC7R/L EXHAUST FAN EL fX,X. ELEVATION 5Y1-WL YPL KEYLESS FIXTURE WITH HILL CHAIN RELE55ED L16W FM%RE 5• I i ¢� �� ® 57M 6RAIE 3'-10' I Er A-/ I r - I Y , N r L � No.02908Ei yO F OF N`�� REvsosTsU,SSOrs DRAwncTITLE: DATE [ESCWMR PARTIAL E5A,JEMMT �, ECTED` RuL CEILING PLA/'I /RTIAL fAS,fMfNT Iff"LEC TEP C5IL IN6 nAA/ o�. m wrtxKu oc��p CAD FLE NAAE: emschick Silverman Architects P.c. FLOOR AORTM PROJECT TITLE DATE NSA PRO.ECT+. •..•^'^e Kornaa�rErnme: P2OPQ/P.DADDITIO/1/AA0ALTr2AnO/1T: nOV.26.2006 IVA05.119A -- -' 27550 MAW ROAD SCALE DRAWN NO. 736 e rfoot 631-Path,Culchogue,New York 11935 _ 1 r _\ _ / / �_O_��.K....._.r-.R�.L....__.�.1_.R.R. .F CUTCHOGUC nCW YORK 11955 11 J 1YY/VVV... ��.^. t'✓ AJnoT[D fK-1 Phone:631-734-TOOT Fax:631-734-7347 _ -- --------- .- -...__.._. ._._._ _. _ _ ,___ htlp:l/www.ns-arch.com D6TRCT: SEClgtt BLOCK LOT: DRAWN BY: re,�%.EaV«ruc,nas�c no 1000 109 6 z EB r wA maGNr IRON RAILIAG/ NAX9RAILS A5 PER LODE FolIff; laW IANIBITTAG PRIMER AND PAINT BLALIC NEW hRIA.GNr IRON RAILIAU/HAWRAILS AS FER LODE. AS PER FIN/5N 5LNEREE 4• PRIME RV R/5T INMBITING PRIMER AND PAINT BLALK A5 P6e FIN15H 50EXtE A r^ ZZ l)` 4-0' 3 ,P.y APPROK GRADE ' Pal r r 1 t&1'!4' 1e•J \'' FON WALLS A5 PER r °b I 1 LOMRE7E PAD 1 I \ , S7M.Cn AL DADS 1.'1 d 1 J h bid I o J. I 1 I 'I I :I FON MLL5 As FER L 7 L•d E \ 1, qI 1.n 5nW nRAL D7.65 A 1 ••1 1 \\o /� I .9 PROVIDE FLOOR CRAI 1°•1 - 10 \ Q 1''� - 1I I I H 1 �. PROVIDE FLOOR I da r I OPE/' SLOPE 1 TOP OF �rN P l 6 cR/s FDsrovEovne I. r h. FMLrCCWACWWIL 1 I •I 72'LI1APE7fR p I 6 a91 4•P87FORATr-DPIFETOBE 1 J. 4 +bn d r I Ot4 tE "",EL2Li ---_--- L -- __4'CONL.SLA8 4•FBZ9O rEOLONNELTED TO ORryaL 6'LRLS'IED STO FILLY COWA67ED 501L EXPAt&OH JOINT ��D ARC ALL F�rsEs '. ,((G NE,y�Scy�j� �AMLLFZ� EXI T 6,6C 77ON A,61-1-fP EXIT I-®Nlal TIVINAL 3,6C TI®N 5LALE=I/4'=1=0' SCALE=I/4'=I'-0' No.029086 Q Oc \I�`N REVSO S IJAWSSONI DRAWNG TRIE °"E WELLED EXIT DETAI I/' CAD RE NAME, Nemschick Silverman Architects P.C. fLOORP nORm BROICT TRLE DATE: NSA PROJECT.: •...um e.woss of ABcnrceeT - PROPOJED ADDITIO/U A/ID ALTERATIO/i!: ACV.28,2006 /I/A 05-1194 27550 MAIM ROAD SCALE �- 736 Deerfoot Palh,Cutehogue,New York 11935 — GI7TGFtOGIIL n[u YORR 11955 �/nOTPD 41 http://www.m�mh.mm : 1- 4-mm a%:6 T- -347 DSTRICT: SECLON BLOCK LOT: DRAWN BY. /•ram ffi.w.an axw..mmcn.= n0 1000 109 6 2 �6 2391dd 2OSGS9ZT29T 1d3G ONIa-iine MOHinos �-0:9T ZOOZ-ITT-To Permit Number Envelope Complialnee Certificate Checked By/Date New York State Energy Conservation Construction Code CQMchaek r2.'Software Version 3.0 Release 2a Data filename: P:12005108TZWC-•G1COPMFI-4\LB92n4 A.CCIC. Section 1: Project Information Project Name: Cutehoguo-New Sutblk F=Library 27550 Main Road 8 No.029086 Q' cutchogue, NY 11935 �Q Designer/Contractor: Netnschick Silverman Architects P.C. OP N � 735 Deerhot Path Cutchogue, NY 11935 Documeut Author. Erik Bjorneby Section 2: General Information Building Location (for weather data): Suffolk, New York Climate Tone: l lb Ideating Dogrce Days (base 65 dcgrc&s F): 5750 Cooling Degree Days (base 65 degrees F): 715 Projcct Type: Addition Window/Wall Ratio; 0.15 Bui�ic >+toor Amy Library it484 Section 3: Requirements Checklist Bldg. I Dept. I Use I I Air Leakage, Component Certification, and Vapor Retarder Requirements [ ] I 1. All joints and penetrations are caulked, gasketed, weather-stripped, or otherwise sealed. [ J 2. Windows, doors, and skylights certified as meeting leakage requirements. [ ] 1 3. Component Rvalucs & U-iaotors labeled as certified. [ ] J 4. Fireplaces installed with tight fitting non-combustible fireplace doors. [ ] I 5. Stair, elovator shalt vents, and other dampers integral to the building envelope are equipped J with motorized dampers. [ ] J 6. Cargo doors aid loading dock doors are weather sealed. [ ) 1 7. Roccsscd lighting fixtures are: (i)Type IC rated and sealed or gasketed; or(ii)installed inside an I appropriate air-tight assembly with a 0.5 inch clearance Sony combustible materials and J with 3 inches clearmice fi-om insulation material. 98Z-d E00/Z00'd Rt-1 VU229189 SIOLIHONV NOS301S N3IH3SW3N-word wdg0:Vo ion-01-uer �9Jdd 20SGS9ZT29T 1d3G JNIG-lIne MOHinos bo:9T ZoaZ-oT-To Climate-Specific Requirements Gross Area or Cavity Cont. Proposed 13udgct Component Name/Descrintion z! R Va1uc It Edue U_Factor U-Factor Roof 1: All-Wood Joist/Rafter/Truss 2030 20.0 0.0 0.051 0.059 Exterior Wall 1: Wood Frank, Any Spacing 2860 19.0 0.0 0.068 0.090 Window 1: Wood Frarne:Single Pane, Clear, SHGC 0.58 389 -- --- 0.460 0,598 Door 1: Solid 67 - - 0.360 0.142 Door 2: Glass, Clear, SHGC 0.32 40 --- --- 0.430 0.598 Basement Wall 1: Solid Concrete or Masonry>� 8" Furring:Wood, Wall Ht 11.7, Depth B.G. 8.7 1670 21.0 0,0 0.081 0.113 Floor 1: Concrete Floor(over unconditioned space) 1100 -- 30.0 0.030 0.055 Floor 2:All-Wood Joist/Truss 600 30.0 0.0 0.033 0,055 Roof 2: All-Wood Joist/Raficr/Truss 1535 39.0 0.0 0.028 0.059 Exterior Wall 2: Wood Frame,Any Spacing 591 19.0 0.0 0.068 0.090 Window 2: Wood 1;+rame:Single pane, Cie&, S140C 0,58 169 - - 0.460 0.598 Door 4: Glass, Clcar, SHGC 0.32 40 --- -- 0,430 0,598 Door 3: Solid ZO - 0.360 0.142 Basement Wall 2: Solid Concrete or Masotuy- 8" Furring: Wood, Wall Ht 11.7, Depth B.G. 9.7 785 21.0 0.0 0.081 0.113 Floor 3: All-Wood Joist/Truss 995 30.0 0.0 0,033 -0.055 Floor 4: All-Wood Joist/Truss 2717 30.0 0,0 0.033 0,055 Roof 3: All-Wood Joist/Rater/Truss 2480 38.0 0.0 0.028 0.059 Exterior Wall 3: Wood Frame, Any Spacing 2478 21.0 0.0 0,062 0.090 Window 3: Wood Prame:Single pane, Clear, SHGC 0.58 364 --- --- 0.460 0.598 Door 5: Glass, Clear, SHGC 0.32 38 - - 0.430 0.598 Basement Wall 3: Solid Concrete or Masonry> 8" Furring: Wood, Wall Ht 11.7, Depth B.G. 8.7 1880 11.0 0.0 0.110 0,113 Floor 5: All-Wood Joist/Truss 2417 30.0 0.0 0,033 0.055 (n)Budgct U-factors are used forsoltware,basal ine calculations ONLY,and arc Dot code requirements. En ve 1 ope PASSES: Design 15%better than code a.02908E Section 4: Compliance Statement '� oa N�� .to The proposed ctrvelope design represented in this document is consistent with the building plane, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the New York State Energy Consavation Construction Code requirements in COMcbeck-EZ Version 3.0 Re1case 29 and to comply with the mandatory requirements in the Requirements Checklist. Whcn a Registered Design Professional h&-,stamped and signed this page, they are attesting that to the best ofbis/ltcr knowledg belig and professional judgment, such plans specifications are in compliance with this Code. e' 'lao Princi al Envelope Designer-dame Si ute Date 98H 600/600'd RV-1 tZ1719189 S1O911HONV NVO83AIIS XOIHOSMN-word wdSO:VO 1002-01-dEP i • A ' -4 _ GOI I T I A-3 TI p AI ¢ � h LL6. R5F1.5C MP GLG. FL/4N NOTE5 41 FIXTURE C�dP�am/ �U 601 REMOVE ALL LI&MA6,W/R116 PlP1N5,Li PVRK ETC.SUSFEM W AND OR 1 T CO2. EA55TG INAGR 5 ABOVE BE REMCJVED AND REPLALl57 REFER TO I-ELN. - { '- �� RR `d' A-( g_q• I FIXTURE FIX.YVATT MANUFACTURER Oh55 FOR ADD7L lAPO. o a O0 YFG 0O0 CO3. INSTALL MEW LIGHTS F1xnpz-5 AAD EXIT 516A5 As FER MANFArnFER5' ®A APYT 1 X2'LAY-IN TROFFER(2 LAIQ) 62W LC410N L16F/NN5 CO,lAG.CAT.NO.SERIES 502 SfELIF(GATIONS. REFER TO ELECTRICAL DY55 FOR ADD7L INFO. . ® LE6lLW Ll6HTIA7G CO.W. C04. HEN DOW 5T FAM SEE t155W Dh55 FOR ADD7L APO. , NEW 1X9'LAY-IN TROFFER(2 LAh1P) 67W O CL I CAT.M SERIES S02 LOS INSTALL AEW LEILlAS GRID,TILES TEES,ETC. SEE FINISH SLFEfX.LE FOR EL a8-0• _ _�� �y ® ALX77L lAPO Y.'s;:?', .;°r�<s""" ""YS;<.•:•'-'n:. .... /EW 2X4'LAY-lN TROFFER(2 LAI•>P) 45Y LC4ION L16HTING LO,INC. CAT.NO.SERIES 572 C�lS. RffflR TO L3ECTRILAL 17WG5 FOR LJ-ERGt7lGY LfGN7A5 SGIELxiE AND B I I'X4 LE MTD.PLap--4Mr 67 LEG/0N L1GM/NG CO,INC. LAYp/T. ®B (2 LAMP)AMPI YY CAT.NO.SERIES 2750 PG IXB'SI/S�(D LINEAR O.D/RELT FOCAL ROlM--E L16HTB'5/N&LE " S'-9- ®L FLL{ORf5C8TT 240W R7/M CABLE SU5FE76/0N AL WTED11 ®D EXISTS F/x1URE TO BE REMOVED �1 ® p� /� / / �1 G A-1 ®R 2X2'RECE5.5ED INDIRECT 104W 1 O;�02 RECESSED GENBRAL RE)=LECTEI/ CL6V. FLAN NOT,6d C-O. 4-0' - EX15nA5 l7-PR61hGY L/6M,R8107E O lEAO TO R&-WN 601.. IT 15 TIE CONTRACTORS 50LE RE5 Or51B21Tr ro AxL9-OffEXIST7M5 TECH LIGMIAG-57RAI6HRlfE TRACK - LOND1nONSFRlORTO WORK IN EACH RES REA.FELTIVE A DAWE5 To ------- ------� - TRACK L16HTIM S �W B 7YYJ GIRLT/IT 005n S`NG FINISH TO REI WM L BINS AVRK PRLGETX/Rf EO. SHALL BE ... EO. EQ. 1ECH Ll6HTIA5-STRAI6HILME TRACK POOREFAIR TO AT RCMRAC EX LIdFSS DAMAGES ARE LCYL4•EN7ED 4']RACK LI&MMS 100W 4.7M CIRCNT ...:'.EO.'.:.::.EO.':w 602 CONTRACTOR TO REMOVE C0I-V'5TIBLE D55RIS FROM 1W MpK PLACE AT A-( WALL F.0 EN OhCff(Ft 75W THE[AD OF EACH DA ND YA FM15H LABOR TO 1,KWIAIN A SAFE AND I 6 hh _ CLEAN ItIORK ENVIROA'hlaTTATALL nr•E5.LEGALLYCART AWAYAND '. ..H.... *H 6-COMPACT FLtVRE5CEM •AW ILBE L1MOR/ZOMA-ELATE AT E C L6 I M.E DISPOACCtSE OF F DEBRIS AT R66ULAR INTERVALS TO PREVENT EXCE55IVE 6 CLEAR COLOR MTH 5ATIN F(MSN ................... , CATALOG Ab.C6H-116/41T G03 FRONDE ALLOWANCE IN BASE BID FOR ADD ACT.FOR REFLACFhE7JT -ELATE LIGHTING. f 6'COMPACT FLGfORESLENT 3UY �L/�AL SER1� CLEARCOLOR MTH 5A77M FIN15HCATALCS No.C6V-126132r3-1/4•LEMSED WALL W45N S �L7ABtE 2 IC43-93�9�E5 fff��� pppI� , Ec.. -0• , CATALC5 NMIDEZ 1643 1--W--IW �� I }�N OPEN TO ABDVE , ALT-2 E°1 I F.� k� i /\ I A-/ 01 30'FEADANT5(FLLVRE5CEMl 72W PALOS VERDE5-BOYD IG1035/20✓ A-/ I ONE 22h'AM7 OAF;4ON T-5 ®® LIGHT FIXTURE X'DENOTES L/RGRAR Z6Xl3 B/u'E FIXTURE TYPE _._ FOCAL FVIW 57EI4 M:T/NT SKYTIOME ® EXIT LIGHT FIXTURE 36'D1A FENDANT5(FLtGRE5CEMV 165W� 75,51X •I ______ I , , .N ]TREE LAMP M6,5IX LAW ® FEGK DIFFUSER/RETURN I!' !1' LAMP 75H0 I L-]•ER6ENLY LIGHT FTX ME S• ,-}-� BBIS SER/L5 TIALQ'iEN MILL SCONCE (� 82FER LlGTITING-fL<LLSa(Lt, Tp .210OCC 54)10NET BASE LAMP,FR05TED TO1LErEMINFiT FAN SET 1N LL6.6RID TIDE LI7FOlJlA LIGHTIAS-DECO hETAL1C REFER TO MECY M 55 FOR SFISC5 I I 4 Q rwvt sconeE-sraRWAr 62W HALF Ranm Muc SCONCE I r-1 WRIA L161MW,-ARCM SCONCE CEIL/MS 6RID/TILES REFER TO FINISH LL �s N/6NT FliOrOl-2EL7RlC FIx7URE 77W LISERIES-AS774 hVEMERGEAGY OPTION 55Ma.LE FOR SITE/sraE/FLULF.ETC. p®, ,° j CEEhER6E Z)'BACCPT 5/GNW/ IDP.PA/NT GY BO LL6/SOFFIT AN . A WALL A4CT/)' EXIT 516 hV N , -4D6 _ �q EMERGENCY DACKLP BW -- SEGnON ARROW ' A-1 A-1 A-I t A LIGHT PACK NTH EMERGENCY W. C, BALaP yyy ELEVAnON5111•50L 0 ELECTRic EvA5r FAN (Y EL.fX X YPC KEYLESS FIXA.RE NTH FELL CH41M RL-LE55EDLlGMF1XnRE 5- I I 1 STEEL CRATE 1 Y y NO.029086 i DMW,G TITLE. GATE DESDwM PARTIAL 6AJEMMT -� Q °o` REFLECTED CEILING PLAA KTVDARTIAL � S M�N� ������� � ��lLIN� CLAN EFm , eawcu ae�i�p SCALE_dB•_1'-0' CAD FILE N111e Nemschick Silverman Architects P.C. ILOOR NO[Z7H iOECT TITLE: DATE NSA PROECT.: PaoPQfEV ADDITIO/i/AfIV ALTUM110/1r: /tOV.28.2006 /I/A 05-1194 735 Deerfoot Path,Cutchogue,New York 11935 — ARYCUTCHOGUL MCW YORK 11955 SCALE: �" Phone:631-734-70D7 Fax:631-734-7347 .._. __ .__-____. .___ __ ._ .__.._ __.................__ .._..._..._ _........._-.__._._ __ _ _ A,/HOTCD httpJTwww.ns-arch.wrn D6TIBCT: SIC BLOCK LOT: DRAWN By. • � Km,oo��.•� no 1000 109 6 z e6 AEW ARLCGNT IRON RAILING/ NANJRAILS AS PER LODE PR1Iff IY/RUST IMII8II7MS PR/F¢RR AND PAINT BLACK AEN NRL9.YNT IRON RAILING/NANDR4/L5 AS FER LODE AS fFR FIMSN SLNEIXCE 4. P,Q/hEW RUST lMf18l77MS FR/ALw AND PAINT BULK A5 FER F1N7W xl0XU.. A T ) T 1}` � 4O• 3 a APPROX GRADE C I° °� h574• Jto,J +�"\•° FDN WALLS AS FD? C I I CONCRETE PAD I I \ 577ai6nRAL DNG5 I.•I 4`0I°!dp I° 9 ° N p d J. I I of \J 4 C� •�,m b J J'y` C J L ° erc po I,J jF FDNWALL5 AS PH2 '•j,i �''d \' ° I'q PROVIDE FLOOR DRAINI''1 1/) 4 I P .. I• I le.J \• \\° a \`� � DRAT FROVIDE FLOOR i. 4dI OPE/' xOFE l P TOP OF BASETIDVr FIN FLe P P• I V — — — —— 6'CRUSTED STOVE OVER •I P°°I p . f FUttrcorPALTT�sox I• I' 1 I b d h �• I. •• I J 4'PERFORATED PIPE TO BE I• Ipp °4 •I i ,I a • -------- ------------- -- -- -- J 4'CONC.SLAB 4'P13.FORATED FIFE TO BE LOMJELTED TO NEW 2'DI414E7ER DRYNBL 6'LRU54EDD STORE OVER FULLY COMPACTED 501L EXPAA610N JOINT ALL E75E5 ' `-` W.N 0 AM-LEP )FXl7' TION 2 ���L�� Xl� ®NCI��J�IN��, -1;,ffC Tl®N SCALE_U'4'=I•-0• SCALE-l/4•-l,-O• No.029086 � y F OF NEB REVGOfW9JEMGSOIXS: MAWNG TIRE °Ae ek WELLED EXIT DETAIV CAD RLE NN.¢ Nemschick Silverman Architects P.c. rLOOIZP nORTTI PROJECT TITLE DATE NSA"20'ECT •...um ww�:.orABcnrtecTuraE: PROPQ/[D ADDITIO/i/AAE7 ALTLRATIO/jA POV.28,2006 /1/A 05-1194 nAln ROAD ��A\ �'} SCALE DRAYRc NO: 736 Deerfoot631-34-7 Cuk:hoguF New York-7347 — r V y K 11550 OGU[•AD YORtt 11935 Phone:631-734-TOOT Faz:631-734-7347 -. -. _—YYYY-_����////---_ ._ Al n07r17 //�K hnpl/Ww .m-amh.com J I \-2 DISTRICT, ¢CTIOR SLOOL LOT: DRAWN BC w®c�aKaux cxncn r.c n0 1000 109 6 Z E� Nov 15 06 11:57a Ray Nemsdiick 6317347347 p.3 Nov-15-1006 08:10em FrwNEUSC1i1CK SILVENO ARCHITECTS:.' 6314672124 T-390 F-DOWM F-063 :'<�: • r GUZZ, NEW —S UFFOLK L 13RA :-Y GAL 6 JLA TIONS /00-/CI! 1 s revlse� ip.12:0� AUDI TQR111M, MEETING HALL 1 PER 5O 5.F OF 5EA TIAIG AREA FLOOR .5PAGE5 W/5EA TWO ROOM AREA SPACES, REM, B MUL TI-Pl RPOSE ROOM = 400 5 01: 8.0 5F; AGE5 OFFICE BV51AE55... I PER l00 S.F. QF 5FATING AREA 5PAGE5 f FLOOR 5PAGE5 AREA REO'lJ 1 f OFFICE.FLOOR AREA = 445 5,F- 4.0 5PA,6', 5 6T PARENWING.AREA '_ !DO -S.F. LO 5PA6E5 15 T 6H/L1�K ;'d 5 R00lt: !OO-SF. LG SPACES 15T YOUNG ADULTS = 300 S.F.. 3.0.5FAGE.5 157" GIRCI4"A770N r= l40 5.F L4 SPA,.'•r:S 2ND REFE-F:';r lGE/NON-FICTIION = 150 5F: 15 SPAc`. i:5 20 5TUD)' ," :?/rOR a' 'B" = 155 ��^,r: L5 5PAi`.-1`5 2jV.9 FlAAMCIA OFF16E ? 100 5.F. /O SPAC rr: 2A't? f�IhGl.r��R OF ICE - 12� S.F. 1.2 5PACE�,, d�IARE,':'c:'uSE.OR .5':RAGE I PER`/000 5.F. OF 5E4TlNG ARE4 Ftc�rif' SPACE:'' AREA 39FACE5 -•- --- - — REOV. B GENERX., 5FORA6E = .�90 5.F- 0.4 SPAG�= I.ST GENER.,V'. STACKS = 2,4.32 5, . 2.4 5PA<•'i: 15,T PR0&f? MMING ROOM - 300 .F. 2N2 . GALL5V.,` .%LOCAL H1=TORr...... 450 5.F. . 0.4 5P.46 21+O REFERF.iv!: 1 NON-FIG i'IGa .. .5k7, 5 F. 0.5 5PAGE 10TAL REO;??RECi,> :276 5PAG.j_S. TOTAL ON Sri F PROWDFr.2 =22.0 SPACES gOTE Ok F ANL'-Olq 5TREE r PARKING 15 AGGE551BLE 'N °NB~ZmF mN—IN.5�20 cr5r OF ITZ O Telephone (631) 765-1800 h`Z` Gy Town Hall,53095 Route 25 Fax (631) 765-6145 0= P.O.Box 1179 y = Southold,New York 11971-0959 i • `F �c SOUTHOLD TOWN LANDMARK PRESERVATION COMMISSION Certificate of Annrondateness Date: November 21, 2006 RE: 27550 Main Road(Route 25), Cutchogue, NY; SCTM 109-6-2.2 Applicant: Raymond Netmschick, AIA on behalf of Cutchogue-New Suffolk Free Library RESOLUTION: WHEREAS, 27550 Main Road (Route 25), Cutchogue, is on the Town of Southold's Register of Historic Places, .and WHEREAS, as set forth in Chapter 170 of the Town Law(Landmarks Preservation-Code) of the Town of Southold, all proposals for material change/alteration must be reviewed and granted a Certificate of Appropriateness by the Southold Town Landmarks Preservation Commission prior to the issuance of a Building Permit, and WHEREAS, an application has been submitted to make alterations to an historic building as shown on materials dated September 26, 2006, and WHEREAS, a public hearing held on October 30, 2006 for the purpose of considering approval of the proposalhas.been concluded, and WHEREAS, the Cutchogue-New Suffolk Free Library did not'agree to. change the style of the entrance dormer-as required by the Commission,_additional discussions were held resulting in___ the Library agreeing to the recommended dormer on ovem er r , an WHEREAS, plans submitted on November 9t" showed an unapproved raised vent along the ridge of the original church building required additional review and discussion, and 2 WHEREAS, final plans dated November 14, 2006 reflecting all approved changes were submitted on November 17, 2006, and WHEREAS, -it appears that the.project requires no further review, and WHEREAS-, the Commission has made the following findings of fact concerning-the property and the proposal: • Constructed.in 1862 and added to-in 1986, the building retains sufficient integrity to reflect its architectural and historical-significance. • The purpose ofthe proposal is to create additional interior space and strengthen the overall structural integrity of the building. • The Commissioners made two site visits to the library and has given as much guidance as possible to the applicant in order for him/them.to-.have.a complete understanding as.to what is needed to make the project approvable. • The Commissioners are guided by the principle, outlined in paragraph 170 8 of'the Code, that any alteration to existing landmarks shall be compatible with its-historic design,.architecture and appearance, as well as with the surrounding district. The Commissioners gave careful, thoughtful, and informed evaluation of the facades as required by paragraph.170-2B3 of the Code. • Ima_letter dated.:September.27,.2006, the.Commissioners listed in detail its concerns with the proposed exterior changes. The library's Building Committee agreed to .accept:the 7Commission'.s.recommendations and the architect has revised the plans for the project to reflect these changes. . • The major recommendation focused on-the proposed arched dormer over the library's main entrance. As proposed, it was•not compatible•with the building's character and.would have had.a substantial.adverse _- .-____--_ _-._ eff-ect-on-the historical and architectural significance of the listed landmark. • The Commissioners were shownfinal November 14, 2006 reflecting an alternate shed-roof dormer design at its meeting on November 21, 2006 which they indicated was satisfactory. 3 NOW THEREFORE BE IT RESOLVED that the Southold Town Landmarks Preservation'Commission determines that the revised drawings dated November 14; 2006 as.presented°do meet the criteria for approval under Chapter 170 of the Town Code. BE -IT FURTHER RESOLVED that the Commission approves-the request for a Certificate of Appropriateness for the Cutchogue-New. Suffol free:l_ibr Sign Date: November.21,2006 Ja s F. Gra .wo airman La dmarks Prese ation Commission t' ( MAILING RESS: PLANNING BOARD MEMBERS *Qf S ti P.O.Box 1179 JERILYN B.WOODHOUSE �OV' Ol0 Southold, NY 11971 Chair OFFICE LOCATION: KENNETH L.EDWARDS N Se Town Hall Annex MARTIN H.SIDOR G • 54375 State Route 25 GEORGE D.SOLOMON �Ol (cor. Main Rd. &Youngs Ave.) JOSEPH L.TOWNSEND yIrou�m�� Southold, NY IY 1, Telephone: 631 765-1938 Fax: 631 765-3136 PLANNING BOARD OFFICE November 14, 2006 TOWN OF SOUTHOLD Mr. Ray W. Nemschick Nemschick Silverman Architects, P.C. 735 Deerfoot Path Cutchogue, NY 11935 Re: Proposed Site Plan for Cutchogue/New Suffolk Free Library Located on the s/e corner of New York State Route 25 and Case's Lane known as 27550 Main Road in Cutchogue SCTM #: 1000-109-6-2.2 Zoning District: Residential-40 (R-40) Dear Mr. Nemschick: The following resolutions were adopted by the Southold Town Planning Board at a meeting held on Monday, November 13, 2006: The final public hearing was closed. WHEREAS, this amended site plan is for the alteration of the existing structure increasing the space in the basement level by 1,788 sq. ft. and the mezzanine level by 2,352 sq. ft. on a 32,670 sq. ft.; and WHEREAS, Cutchogue New Suffolk Free Library, is the owner of the property located on the s/e corner of New York State Route 25 and Case's Lane known as 27550 Main Road in Cutchogue. SCTM #: 1000-109-6-2.2; and WHEREAS, on June 30, 2006, the Southold Town Building Department issued a Notice of Disapproval that the proposed construction will required a variance under Town Code Sections 100-242 A & 100-244, furthermore the proposed construction requires Southold Town Landmark Preservation review/ approval and Southold Town Planning Board site plan approval; and WHEREAS, on August 17, 2006, the agent, Raymond W. Nemschick, Architect, submitted a formal site plan for approval; and WHEREAS, on September 14, 2006, the Architectural Review Committee reviewed the associated site plan materials and approved the site plan as submitted and the Southold Town Planning Board accepted the endorsement; and WHEREAS, on September 19, 2006, the Suffolk County Department of Planning responded after a review and determined this matter is for"local determination as there appears to be no Cutchogue New Suffolk Free Library Page Two November 14 2006 significant county-wide or inter-community impact(s)" and the Planning Board accepts this pursuant to 239L & M General Municipal Law; and WHEREAS, on September 22, 2006, the Cutchogue Fire District reviewed and approved the proposed construction indicating that the "district does not feel that a fire well or hydrant is needed due to the properties location in a near proximity to an existing water supply" and the Planning Board accepts the approval; and WHEREAS, on October 5, 2006, the New York State Department of Transportation reviewed the referral the NYSDOT assigned the case number 06-340 noting that there is no work proposed within the State highway right-of-way and no highway work permit is required at this time; and WHEREAS, on October 5, 2006, the Southold Town Zoning Board of Appeals granted a Variance as applied for and described under Appeal Number 5945; and WHEREAS, on October 17, 2006 the Southold Town Planning Board, acting under the State Environmental Quality Review Act, pursuant to 6 NYCRR Part 617, makes a determination that the proposed action is a Type II and not subject to review; and WHEREAS, on October 23, 2006, the Southold Town Building Inspector reviewed and certified the site plan for "Library is a permitted use by special exception in this R-40 district" and the Planning Board accepts the certification for approval; and WHEREAS, on November 2, 2006, the Architectural Review Committee reviewed the proposed changes as required by Landmark Preservation and issued "conditional approval pending receipt of changes in drawings modifying entry dormer" and the Southold Town Planning Board accepted the endorsement; and WHEREAS, on November 8, 2006, the Southold Town Engineer-reviewed the site plan materials and issued a report letter with comments and the Planning Board accepts the report; and WHEREAS, on November 13, 2006, the Southold Town Landmark Preservation has not issued the certificate of appropriateness from the Hearing Held on October 30, 2006 and the Planning Board will accept changes and or revisions as required by Land Mark Preservation; and WHEREAS, the Southold Town Planning Board, pursuant to Chapter 58, Notice of Public Hearing, has received affidavits that the applicant has complied with the notification provisions; and WHEREAS, the following items shall be required: 1. All outdoor lighting shall be shielded so that the light source is not visible from adjacent properties and roadways. Lighting fixtures shall focus and direct the light in such a manner as to contain the light and glare within property boundaries. The lighting must meet town code requirements. 2. All signs shall meet Southold Town Zoning Codes and shall be subject to the approval of the Southold Town Building Inspector. Cutchogue New Suffolk Free Library Page Three November 14 2006 3. As per the landscape survivability guarantee, the applicant agrees to replace any of the landscape which dies within three years of planting; be it therefore RESOLVED, that pursuant to Southold Town Code 280-131 Part I, the applicant agrees to incorporate all the requirements, comments, and recommendations of each reviewing agency as referenced above and as indicated on the site plan and corresponding attachments; and be it further RESOLVED, that the Southold Town Planning Board has reviewed the proposed action under the policies of the Town of Southold Local Waterfront Revitalization Program and has determined that the action is consistent provided that best management practices are implemented; and be it further RESOLVED, that the Southold Town Planning Board grant approval on the site plan prepared and certified by Raymond W. Nemschick, Architect dated October 31, 2006 known as A-2.01 and the building elevation plans labeled A-4.01, A-4.02, A-4.03 and A-4.04 dated October 31, 2006 and authorize the Chairperson to endorse the final site plan with the following conditions: 1. If necessary, the applicant/agent/owner shall obtain certification from a design professional for the existing septic system or approval from Suffolk County Department of Health Services for the approved construction. This approval must be to the satisfaction of the Southold Town Building Department. If the septic approval changes from the approved site plan, the Planning Board reserves the right to the review of a new site plan application. 2. The owner, agent and/or applicant shall receive approval from the Southold Town Landmark Preservation in the form of a certificate of appropriateness approving the construction and submit such certificate to the Southold Town Planning Department for review. If such approval varies from this approved site plan, requires changes to the approved site plan, the Planning Board reserves the right to the request a revised site plan. 3. The owner, agent and/or applicant shall receive approval from the Superintendent of Highways on all work on the Town Right-of-Way on Cases Lane at the time of construction. The owner, agent and/or applicant must notify the Superintendent's office prior to the commencement of any work in the area. 4. The site plan approval requires that all work proposed on the site plan shall be completed within three (3) years from the date of this resolution. 5. Prior to the request for the Certificate of Occupancy, the owner or authorized agent must request the said Building Inspector and the Planning Board to perform an on- site inspection to find the site improvements are in conformity with the approved site plan. Cutchogue New Suffolk Free Library Page Four November 14 2006 6. If the as-built site improvements vary from the approved site plan, the Planning Board reserves the right to request a certified as-built site plan detailing all the changes. 7. Any changes from the approved site plan shall require Planning Board approval, and any such changes without Planning Board approval will be subject to referral to the Town Attorney's Office for possible legal action. 8. The Planning Board will issue a final site plan approval in the form of a letter following a site inspection and at the time the site improvements are found to be in conformance with the approved site plan. As per the Town Code, one copy each will be distributed to the Building Department, Zoning Board of Appeals and Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Very truly yours, ?Jerilyn B. Woodhouse Chairperson Enc. cc: Southold Town Zoning Board of Appeals Southold Town Building Department Southold Town Engineer . A LOI 1 T I � A3 FL M1 WO CL6. REPLEGTEP GLG. PLAN NOTES FIXTURE 5CHEVULE COI REMOVE ALL Ll6NTIMOVE.IN6 PlP/AY lCY7NY7RK fTL.S/SFEADED AND OR 4 m SI/FFTORTH7FROhl ABOVE. L02 EXISTG+!✓AC SYSTEM TO BE REMOVED AND REPEALED. REFER TO hlEC1L A-I FIXTURE FIX.WATT MANUFACTURER DNGS FOR ADD n INFO. 0 � 00 � 000 ®A AE/Y 2X7'LAY-1N TROFFER(2 LAW) 67W LE-61ON LI6HTIW,CO-W. CO3. IISTALL NEW LIGHTS F1*nFX-5 AND EX/r 51GN5 AS PER t-wwALTI`RER5' >. CAT.M7.SERIES 502 59EL/FILATIOt& REFER TO ELECTRICAL M 65 FOR AC707L IWO. C04. IBY EM/ T FAN SEE I.ECR 01-65 FOR AD077.INFO. I ® LE6/0N.SERIES 02 W. C05. IISTALL hENCEILAG6R/D•T1LE5 7S5 ETC. 5EEF1Nl5H5CNEMEFOR AEN 2X4'LAY-IN TROFFER(2 LAMP/ 67W O C EAT.NO.5ERlC-5 502 ADD7L!/JFO. EL.aB-0' _—.— NENY2X4'LAY-IN TROFFER(3 LAW) `�' LEGION L16HTIN5 CO,1W.L.qT N0 SERIES XJ2 CAS. REFER TO ELECTRICAL DhG5 FOR 8-�R6ENLYLf6NTlA[;SLJEGGLE AND - _ .,' .. B ....., y 1X4'-9PFALE HM.FtCVRE5LENT LEG/0NLI6M/NG CO,/NL', LAYW/T ®B (2 LAMP) 67N EAT.W.SERIES 2750 ' I ® 1M'SUa 30B7 UWAR 1NDIRELT 240N FOCAL P01NF-NffTROLI6MB'5/NCEE 5=4� �`' ' \; I G FLLIORE'5CB1T POINT CABLE 55PB510N IL'IHffED \ EXl5T'6 FIXTURE TO BE RB?OVED ®R 2X2'RELE55ED INDIRECT 1047Y �A� LUMA 2X2 RELE55ED G PLAN REPLEGTEO CLC. LAN NOTES W.. 4'O• 4N• _lam EXISTING fX5;CETGr1 I60;REMOTE O �l WIAD TO R"lly 601. 1r 15 TIE CONTRACTORS SOLE RESFUNSIB21m TO VOW-fw: Ex1577N5 o TECH LI6HriA4G-57RA/6NRINE TRACK LOND1770N5 FR10R TO iYORK IN EACH RE5PfL71VEAREA DAMAGES TO B'TRACK L16Rr/A5 2CYJVl B'H L WRLU/T EXISTING FIX15 ES TO REM41N aRl1`G WORK FROCELLRE5 SR4LL BE -- .... ........ . . EO. aB' EO. REPAIRED AT CONTRACTORS ExPENS�LME55 DAN1A6E5 ARE LYX/MENTED - :::. .:.:.:::': I TEEN L/CM/NK-STRA16NRfAE TRACK PRIOR TO START OFi>bRK �' 4'TRACK LI6NTAG 1LbW ... ...O.F? 4'INO CIRCUIT EQ.,.. 602. CONTRACTOR TO REMOVE COMA5ME DEBRIS FROM TIE:WORK HALE AT 6 WALL SCONCE(FLW/RESGBJT) 75H TIE 60 OF EACH DAY AND RRN15H LABOR TO MAINTAIN A SAFE AND I -•3 3 I CLEAN hIORK EFMROA6gFlTAi ALL 77ME5.LEGALLY CART AWAY AND 6'CON•PALT FLUORESCENT .UONY JW L115IMI/5-ELATE C6 6•TRIFLE DISFl75E OF DEBRIS AT REGULAR INTERVALS TO PREVENT EXCE55IVE ::. N MEE HORIZONTAL SERIES C650 ACCU41 ATTOK :...:...............w. CLEAR COLOR MTI 5ATIN FIMSH CAMALLIG Ib.C6N-116/47T 603 PROVIDE ALLONAA(CE 1N BA5E BID FCR ADD AL T.FOR REPLACD-Off LlGMIAU. '� 6'COMPACT FLUORESCEM' 39W MV L11CNNNG-ELATE C6 6'TRIPLE i i .. I O W A-/ A/ K TL9E VERTICAL 5132/E5 C600 CLEAR N COLOR MTH 5ARN FIN15H CATALOG!b.C6V-I261321" JMOL116HIM-ACLUX RE5CE55ED �L 3-I/4'LENSED HALL WASH � AP16TABLE MR 16 IC43-439 55WE5 I I i a.a '-0' D CATALOG Id/MB621C43�39NZ-Ydf RC F L E 6 E I}��P i OPEN rO/\ABOVE i A I CT-2 A l , M 30'PENDANT5(ftLbRE5GENT/ Wt PALOS VERVE-BOYD 10035120V• I i i".a M C4RCILAR.W 3BASE�T-5 ®® LIGHT FIXiLRE 7C DENOTES ' / \ I I W I FIXTURE TYPE FOCAL FV1NT-5TEM MC(M1T SKYDOFJE ® EXIT LIGHT FIXTURE ON 36'D/A PENDAMS(FLLWRLCENT/ /6Sh' ��M6,51X LAI-1P 75,51X ® WZH.DIFFUSER/RETURN ,-F-. I W155ER155 HAL06EN MU 5LOAeE BR LIER &MMO-HALCY0WC L� EMER6ENLYLIGMFIX1U7E '-F'' D LEG. p Q/COX B-r0hET BAD LAI-F FRO57ED TOILET EXILVST FAN SET IN LEG.GRID 11LE 4 WALL.SWAGE-5TAIRNAY 62Jy LlT1:YJNIA LI6MIAG-DECO 1gTALlG REFER TO I-ELH DAYS FOR SPELLS I I a Iw.FRWNDNALI.SCONCE I TT LITIONIA LIGMA5-ARCH 5LONGE CEILING GRID/TILES REFER TO FINISHy+5 NIGM PHOTOB.ELTRlL F1X2RE 7ZW SER/E5-h6TMW/DgR6EAGYOPT70N 5C4EXLE FOR SIZE/5MLE/MAN/F.ETC. p® ,.0., j CE1UNS.1MN7ED EXIT 516M HI PAIINID 6YP.DO a /5WFF1T EMER6ENLY BACKLP 601 — 0 ♦3EVA710N 5)7•>BOL ��uTEO I' O6 II F(Z) k1ALL hIXT SIGN N TIONARRW ` 4 S1575f7r1raAcap ON LIGPACK h1N EEGfM F < DAMP ' 3fCTIL EXVSrFAN E L.+X'X° � AgCy/I -` ��e'r' W NSCy�Cn KEYLESSFIX7LREMrHF!LCNAIN �} RELE55EO L16Nr FIXTURE 5' ® STgL CRATE 3'-10• I ir - r I v No.0290M 2 OF MAWNG TREE DAM Ixa� PARTIAL 6AJEMCAT REFLECTED CULING PLAIT FARTI L f�i��M�'N7 ff�LfCTEP CEILING PLAN �. ouad a<~ �m CAD FILE MAW. Nemschick Silverman Architects P.C. PLOOR 11OQTM FROIECT TIRE DATE NSA PROFCT Paovq/eD ADDmo/i/MID ALTERAII01Y.' /i/A os I19e•A r m Architects to aoureciP.c NOV.28.2006 .. _�1 735 De:631-34-7 Cutchogue,New York-7347 — _ L. _ _�.�_._-_L�_� L\_� 7' CUTCFIOGUL/1C�./YORIC 11935 �' Phone:631-734-TOOT Fax:631-734-7347 -� -`- `"---'- �� ���-'- - - � - --��_�_���-���- �-`_`"'"---�- -�- -- 06TRCT: geilOrt BLOCfi LOT: quwN fi�NO� h"pW/ .w-amh.wm 1000 109 6 Z EB N91 R&CtOffr IRON RAIL/MS/ !lAImRAlLS AS PER LODE PRIF�W/R5T IWIBIN6 FRlMER AND PAINT BLACK NEW HZLLGNf IRON RAILING/"ERAIL5 A5 FER LODE AS FER F/NI5 4 SGIFRLE 4. FTLh¢W/R6r INN/BITIf•.,PRIMER Alm PAINT BLACK AS F£R fIMSN S H5ZEE A T:30 zo (\ m 4 m 4-0. .P-q -AV X GRADE ' J pal 1. Jl P °I T�v 4 Ie j P "I CCWWETE PAD I I \\ = TRI.GTGZAL DMS I •I d J. Q co- a b f e i�{� C J �le. J.yyI a FDN HALL-5 A5 PER SAdTt.RAL.G DY65 ;I \ ( A I 4 PROVIDE FWOR DRAT I.•,I 1 ;• \ (� I y P .. I• I �' J SIDE FzaoR Og l• SLOPE I TOP Of BASa�ff FIN PLR ---q - - - \ r SLOPE r I •h 6-CR&W 5TOAF OVER Qp. I d. RQLrC,0WACTFD501c 1 I •I i72'TPhZIe�-7 4'PERFORATED PIPE TO .pd COMCCTW TO AEW 2' j r DIA-ZTBZDRrn�i ________ ___ __—tJ ------ L ----------- — --4'COMC.5LAB 4'PBZf- 7EDCOAPECTED TO ADRY7)UL 6'CTd6AW 5TO nUrC IfIACTED 50IL.KANr A,TC"7 ALL MOES NELI-jffC) EXl 7- TI®N 2 Affl 1-512 5XI T I®NGI TUDINAL -55C/0N SCALE=1/4'=1•-0' SCALE=va•=r-D• 7�� .E- o.029086 yo OF N fEVBOWS.EAESSOM DRAN'NG TITLE °"M °Vf"- WELLED EXIT m PETAL/• Nemschick Silverman Architects P.C. FLOOR noarn PTLOECT TITLE DATe WA PROJECT -...me careswAnwnecTTwe: PROPOJLD ADDITIO/if A/1D AL7CRATlo/y! AOV.28.2006 /VA 05-1194 -- . RR _ 735 Deerfoot Path,Culchogue,New York 11935 — CUTCHOGUr-ALW YORK 11935 SCALE: DRAWNG NO, K '1/ Phone:631-734-7007 Fax:631-734-7347 �- — —- ------ --`- -- - — -�-��--- ---' -'� - --- � �--- --- D61RCT: geTioeL BLOCX Loi• ptnwn ar./107CD f I \ L help://www.na-a.h.com ,m, ,a„�,,•••d,�n.c /10 1000 109 6 Z E6 TOWN OP SOUTHOLD PROPERTY RECORD CAR® �'� � 000 0 - _ —2 OWNER STREET a - � VILLAGE DST. SUB. . L•T Q a f�OCcd� C,� iC U �' eLtli",Ak s . FORMER OW ER N E� �r ACR. ✓a 1 N 01vVC 1v .'75�C7. r. S W. TYPE OF BUILDING Vie' - 1 HJ.S � RES. SEAS. VL. FARM COMM. CB. CS. Mkt. Value LAND IMP. TOTAL DATE REMARKS 0 G urlD Q Co - ' 0U Ail `r1 k)Zv Lei g ?.v� 30 0 0 o J� bP (¢ Ak(-" C,v J-3� AGE BU I CONDITION NEW NORMAL BELOW ABOVE FARM Acre Value Per Value Acre Tillable AGE ON WATER. Woodland FRONTAGE ON ROAD Meadowland DEPTH House Plot BULKHEAD Total DOCK - �Ir•?%...�s�t�f' ea� C�.+ .cam . .\•:: _ '. `5 `���r V ,� ' •. � , w- zz October 30, 2006 , Landmarks Nemschick Silverman Architects P.c. Southold Town Hall . . . the business of ARCHITECTURE." Southold,NY 11791 Re: Proposed Library Alterations Cutchogue,New York NSA Project#05-1194 LETTER OF TRANSMITTAL WE ARE SENDING YOU: ®Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples El Specifications ❑ Copy of Letter ❑Change Order ❑ Other Item# iQty Date ..�� Description - --._.--. ...... ._....._. ...... _. 1 3 Samples of CMU for proposed former church foundations i I �- THESE ARE TRANSMITTED as checked below: ❑ For Approval ❑ Reviewed ❑ Resubmit_Copies for Approval ® For Your Use El No Objection with Revisions Noted _❑SubmitCopies for Distribution ❑As Requested ❑ Rejected ❑ Return_Corrected Prints ❑ For Review and Comment ❑ Revise and Resubmit El For: Filing Comments: Note: All samples provided will be used in the construction of new foundations, under the farmer church structure, in an effort to replicate the variety of the existing natural stone to be removed. Copy to: File From: RAYNEMSf//CK, A/A Principal 735 DEER FOOT PATH • CUTHCHOGUE, NEW YORK 11935 631 . 734. 7007 telephone 631 .734.7347 facsimile • http://www. ns-arch . com CONSTRUCTION CONSULTANTs/L. I . CCI PHONE(631) 727-6604 FAx(631) 727-6605 April 9, 2009 Liz Burns Cutchogue New Suffolk Library P.O. Box 935 Cutchogue,New York 11935-0935 Dear Liz: Please find enclosed letter from Suffolk Security certifying the installation of their alarm work in regards to the elevator recall and ventilating equipment. This concludes our final close out paperwork. I appreciate both you and the Library's patience in regards to this matter. Please call if you have any questions. Sincerely, Joel Itzkowitz President cc: R. Nemschick,Nemschick Silverman Architects, w/attachment E. Flaherty, Board of Trustees, Cutchogue Library,w/attachment P. Romanelli, Suffolk Security , R. Fisher, Town of Southold Fire Marshall, w/attachment [D E C E E 10 APR 14 2009 BLDG.DEPT. TOWN OF SOUTHOLD 36 Easr 2No STREET, RWERHEAD, NY 11901 www.ccliinc.com VgIC,y/i,zuu`J i ime: i:4s:o4 vm Page 1 of 1 f Suffolk Security Systems Suffolk Security Systems Incorporated 1515 Young's Avenue• PO Box 1355 • Southold NY 11971-0937 Telephone (631) 765-5262 • Fax(631)765-5488 • infopsuffolksecurity.com April 7, 2009 Memorandum To: Joel Itzkowitz, Construction Consultants Liz Burns, Cutchogue-New Suffolk Free Library From: Paul J. Romanelli, Suffolk Security Systems RE: Fire Alarm System, Cutchogue-New Suffolk Free Library Please be advised that all connections from the fire alarm system to the library's HVAC systems are complete.In the event that of a fire alarm activation,the primary alarm control panel will turn off the HVAC blowers. In order to reactivate the HVAC blowers, the fire alarm system must be reset twice. Additionally,please be advised that the elevator recall is also properly connected to the fire alarm system. Kindly contact me if you have any questions. �r PROPOJL [) APPITIO ij & ALTERATIOINY CUTCHOGUE /1LW , ,,furr0LK 44 AFP DATE./Z-7�6.p�1 NO IFY BUILDING DEPP.RTP.�ENT AT 765-1802 8 AM TO 4 PFA FOR THE FOLLOWING INSPECTIONS i. FOUNDATION - TWO REQUIRED FOR POURED CONCRETE 2. ROUGH - FRAMING & PLUMBING rR LE Ll b RARX 3 INSULATION 4. FINAL - CONSTRUCTION MUST BE COMPLETE FO D C.O. ILL. CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF MEIN YORN STATE NOT RFSPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS, RETAIN STORM WATER RUNOFF 275f5OMAI /IROAI? PURSUANT TO SECTION 45-10C , OF THE TOWN CODE WITH ALL CODES OF a ITiil ;i. i ICERMFICATE NEW YORK STATE & TOWN CODES OF AS REQUIRED AND CONDITIONS OF PLUMBER CERTIFICATION SOUTHOLD TOWN Z5A CUTCHOGUE, AEW XORK 11955 ON LEAD CONTENT BEFORE SOUTNOLDTOWN P NNING BOARD CERTIFICATE OF OCCUPANCY ,CjTHjD 10WN TRUSTEES CERTr�IrnT1)NOF SOLDER USED IN WATER NAILING i. JP+iNECTIONS SUPPLY SYSTEM CANNOT IN.Y.5 DEC REQUIRED. EXCEED2/f00F1% LEAD. MEAT THRU 2/412 fLOOR PLUMBING fbAff ALL C�"I^7',!'f""C.i ir.LL /" 5 ALL PLUMBING WASTE :Ts OF THE UNDEAWAITERS CERTIFICATE; WATER LINES NEED TESTING BEFORE COVERING MEET THE REQUIRED CDDESI-' ,. : I nc�TATE. PROJECT #: 05- 1194 FIRE INSPECTION AfA REQUIRED BEFORE OPENING fEPTEM15ER 182200c� FEg �i�®�567 CONfiAC75 IlYlNO /NIX ." Ni LATEST REVl510N T LATEST REV1510N DWG. NO. DRAWING TITLE DWG. NO. DRAWING TITLE GUTCHO6UE-NEW SUFFOLK FREE LIBRARY - l3'SUANGE /55UANGE 27550 MAIN ROAD T-0.0I TITLE SHEET lq/lB/O6 STRUCTURAL DRAWINGS GUTCHOGUE, NY II935 CIVIL DRAWINGS 5-1 FOUNDATION PLAN Oq/Ig/06 631,734.6360 LIZ BURNS 5) G1VIL ENGINEER5 5ITE PLAN OgpB/O6 5-2 FIRST FLOOR FRAMING PLAN Oq/IB/O6 ARCHITECT ARGNITEGTURAL 5RAXIN655 5-3 5111 FLOOR FRAMIN6 PLAN Oq/Ig/O6 NEM5CHICK 5ILVERMAN AR5HlTEGTS, P.C. 735 ?Elzi PATH A-O.OI NOTES, LEGENDS, ABBREVIATION., $ DETAILS 01115106 5-4 ROOF FRAMING PLAN Oq/Ig/06 CUTCH06UE, NY II935 631.734.7007 A-1.01 5CHEDIKES, NOTES AND LEGENDS 0,06/O6 5-5 STRUCTURAL NOTE5 Oq/I0/06 RAYMOND NEM5GHTCK MFrH ELEC., 57R1/CT ENGINEERS A-1.02 ,/ DOOR 5SCHEDULE5,DETAIL5 S HALL TYl�ES Oq/Ig/O6 5-6 5TRUGTURAL INSPE6 TION NOTES (9440/06 6APANO AND PARKER ENGINEERS, P.C. A-2.0I ARCHITECTURAL SITE PLAN \ OgIII 10/31/O6 5-7 COLUMN 56HELVLE AND 5TRUC70RAL DETAILS Oq/ID/O6 20 HIGH STREET HUNTlN6TON STATION, NY I1743 A-3B.1 BASEMENT REMOVAL PLAN Oq/Ig/O6 5-B 5TR1/5 RI SECTIONS Oq/IB/06 516.42LOI '— CIRO6APANO A-5.52 BASEMENT CONSTRUCTION PLAN Oq/lB/O6 a MECHANICAL DRAWINGS CIVIL ENGINEER: A-3E.3 3A5EMENT REFLECTED CEILLN5 PLAN Oq/IB/O6 M-I EASEMENT HVAG PLAN Oq/IB/O6 JOHN 6. EHLERS LAND 5URVERYOR 6 EAST MAIN 5L A-3.3..4 BASEMENT FURNI7URE PLAN Oq/ll M-2 FIRST FLOOR HVAG PLAN Oq/Ig/06 RIVERHEAD, NY 1I901 631.361..62gg A-3.1.1 FIRST FLOOR REMOVAL PLAN Oq/Ig/O6 M-3 5EGONO FLOOR HVAC PLAN Oq/Ig/O6 JOHN C. EHLERS A-3.1.2 FIRST FLOOR CONSTRUCTION PLAN 01/I0/06 M-4 BASEMENT PIPING PLAN Oq/IB/O6 CEO TECHNICAL CON9OLTANT5: hVNIGIPAL TESTING LABORATORY, INC. A-3.1.3 FIRST FLOOR REFLE67ED CEILING PLAN Oq/IB/O6 M-5 HVAC SCHEDULES 4 DETAIL5 Oq/l8/O6 102 Ni SOUTH RD. HICKSVILLE, NY/I A-3.1.4 FIRST FLOOR FURNl NRE/MILLWORK PLAN Oq/IB/O6 M-6 HVAG DETAILS Oq/IB/O6 516.g3B.7120 R16HARD KASPARIAN, PE A-32.1 SECOND FLOOR REMOVAL PLAN Oq/Ig/O6 M-7 HVAC 5PE61F16ATION5 Oq/IB/O6 A-322 SECOND FLOOR CONSTRZTION PLAN Oq/IB/O6 PLUMBING DRAWINGS IliI IIlII i y I°l"'II"6''44!F i"""i II l I lI:i,i'i, I III IMI/IIqI l I;,II I IlI III INI ,II lII I. yiII I'/'';, ,MI i�I I,I,�Itl^,I III 1 IiI I1I 1I11I,;a II'I II III I I I' I II"_ill i II� I I II IIIII I� �I:':I, 3 T A-323 SECO D FLOOR REFD CEG PLAN '�Oq/I3/06 P-I PLUMBING REMOVAL PLAN OO A-324 5ECON9 FLOOR FURIll PLAN gIll P-2 PLUMBNG WASTE AND VENT PLAN O0 ) LAN LL�� / /N ®R - /®N A-4.01 NORTHELEVATION P-3 PLUMBING ATER SUPPLY PLAN OO SBT PROPER Y A-4.02 SOUTH ELEVATION Oq/1O 10/3O P-4 PLM RI5ER 906RAM5 C DETAL5 O0 lOSullll I , 27550 MAIN ROAD A-4.03 EASTELEVATION 10131/06 P-5 PLUMBN 5PE6/FICAT Oq/IB/O6 I'.. . I, III , II iA III IIIIIIII II, III ' ItlI III II 'I I,II II IIII .,,I" ,AREA OF WORK �T GUTGHOL-0E, Ni II435 o/3i o6 ELECTRICAL DRAWINGS �' III III O 015TRICT. I000 A-4.04 REST ELEVATION Oq/lg/O6 dtl IJ III III IIII 'illllryl ''yI': IIII 'I''i 'I. I iTHROL HSl BLDG. �� 5EGTlON: 104 E-/ III II I I � M 'I I I Ii yT lq0'-1 3/6" �O BLOCK: 06 A-4.05 PROPOSED WILDING SECTIONS 0q/lB/06 ELECTRICAL SITE PLANT RISER DIAGRAMS Oq/Ig/O6 . II IIIII III IIII I .11 — II, u ,J III IIII III I IIII _ _ -y LOT. 2.2 ELc„ yF II ISIIITI d E-2 '41GAL REMOVAL PLANS Oq/IB/06 ZONE: R-40 A-4.06 PROPOSED WILDING SECTIONS 0q/Ig/O6 "I I 'II II ti E-3 CFiLLAR LIG, -yr 11iiij OilJ .l II II I,ajI'I .I lrl ti EXISTING OCCUPANCY CLASSIFICATION I5 AN A-3; LIBRARY U5E NO CHANGE A-4.07 PROPOSED HALL SECTIONS Oq/Ig/O6 PLAN Oq/Ig/O6 II III II ill IryI IN USE OR 06611111. EGRESS CHANGE DUE TO ADDITION OF BASEMENT - E_q FIRST FLOOR LIGHT/Iw, p AND SECOND FLOOR FLOOR AREAS. A-5.01 CIRCULATION AREA 6 DIRECTOR5 OFFICE ELEVATIONS LAN Oq/Ig/O6 III' Illli " ' II I. III ::. I� . II : lu _ 'r HillII IIIII `.' L.. I,I Ii !.I I! it a I, II .,II,I I U m E_5 5�---CND FLOOR LIGHTING PLntt Oq/Ig/O6 l!+T"" PLANS ARE APPROVED ONLY FOR 'ME HORK INOIGATED ON THESE DRAWINGS, A-502 ENLARGED HG BATH PLANS, DETAILS AND ELEVATIONS 01/I0/06 �I�II "; Noun �II 'I I�1 III III IV II iull I,';, I IIII, III Illll I IIUI Idp,;IIN ,' C,g 41 NOT TOSPECIF BE IONS AV RELIED UPON OR TOON HORK 5il ALL OTHER BE CONSIDERED AS EITHER BEING APPROVED A-503 MILLWORK DETAILS 0108/O6 ARE E-6 GEN.Ir(R FJNIER FLAN Oq/I6/O6 I111i1i IIII .l„ I III II II inl iI�Ii II II II',III I! ILj il,l ',III !I'll I ;;1 IIII III III,' ; SF,$ i ORINACCORDANGEINITHAPPLIGABLEGODE5. CON57RUCTION15NOTT0 II III 'III IIIII II 0 COMMENCE PRIOR TO OBTAINING ALL APPLICABLE AGENCY APPROVALS. A-504 MILLWORK DETAIL5 Oq/IB/O6 E-7 FIRST MOOR POWER PLAN Oq/Ig/O6 i1 II IIIIIII n II . 141wI II d I;, II; ,II .. II: \�i\ i OOR POWER PLAN Ir �I* l 'I ,I,�IIII 41IIA iT.I II IIII II II,j A-5.05 PROPoSED 5TAIR A'PLANS, 5EGTlONS AND DETAIL5 Oq/lB/p6 E-B SECOND f,_ — Oq/Ig/Og li III I ;I q IIII li III "'IIII IIIIIIII Iti+"` III III , `I' _ A-506 EMERGENCY FIRE5TAIR PLANS, SECTIONS AND DETAILS Oq/Ig/O6 E-9 CELLAR FIREALARM PLAN Oq/Ig/Og IJVIi a I IIII :. I ,I IIII II '''I: pp� _ IW InI r Ili III III :I; III 'II IIII 116 ,III r\ E-10 FIRST FLOORf '°ALARM PLAN Oq/lg/06 A-507 ELEVATOR if EXIT PLANS 6 SECTIONS Idl lfl II I. ,IIII a II Iil�, jtl Illllii IIII III III I_yIII II .' :i .c � I �: iL III l illy III'I', I �p,4 { Illll o /o NORTH E-lI SECOND FLOOFFIRE ALARM PLAN L, Jl ;'lilll. I, I IIii, Illr'II :. m `;FAL: G AWING TITLE' I �\ TITLEJPIEET 1194 T.0.01 CONSULTANT. Nemschick Silverman Architects P.c. _ ...the business oFARCHITECTURE." C1MN0 AM /AIY(01 YIO��IR �•C• — Design and Consu/l/ng Services 735 Deerfoot Path, Cutchogue, New York II935 20 Hlgh Street, Huntington, New York Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Fax (516) 421-051 http://wvvw.ns-arch.com 6EN EAR R MO\i NOTE-,; 6ENER�t CONOTRUCTION Ni �,6L-/\ Icy' 5TORAi i AN27 NAN�LEI N� �lNi N07�� �lAN�li (AN-5/ A.117. 017ETA,�� (NOTE: THESE NOTES ARE APPLICABLE THROUGHOUT AREAS OFWORKJ WORK INCLUDED FOR REMOVAL SHALL INCLUDE BUT NOT NE6,E55ARI0Y BE LIM17ED TO REMOVAL OF THE L PAINTING OR INTERIOR FINISHING SHALL NOT BE DONE UNDER CONDITIONS WHICH WILL JEOPARDIZE THE A INTERIOR PARTITIONS, DOORS AND GLAZING A5 INDICATED ON DRAWlN65. 1. INFORMATION SHOWN ON THESE DRAWINGS IS FOR DESIGN INTENT ONLY. VERI%EXl5TING CONDITIONS 1. DELIVER, STORE AND HANDLE PRODUCES IN AGGORDANGEWITH MANUFACTURERS RECOMMENDATIONS, QUALITY OR APPEARANCE OF SUCH WORK. WORKMANSHIP, WHICH IS J)DGED LE55 THAN FlR5T QUALITY B FOUNDATION WALLS AND FOOTINGS AS INDICATED ON DRAWINGS AND DIMENSIONS IN FIELD. COOP91NA TE DISCREPANCIES WITH THE ARCHITECT AND/OR ENGINEER. DO NOT U5/NC MEANS AND METHODS THAT WILL PREVENT DAMAGE, DETERIORATION AND LO55, INCLUDING THEFT BY THE ARCHITECT,WILL BE REJECTED G COLUMNS AND 6/RDER5 A5 INDICATED ON THE DRAWlN65. SCALE DRAWlN65 TO DETERMINE DIMENSIONS 2. CONTROL DELIVERY 56HEWLE5 TO MINIMIZE LONG-TERM STORAGE AT THE 517E AND PREVENT D HVAC EQUIPMENT AS IW CATEL)ON DRAWlN65. 2. ESTABLISH LINE5, GRADES AND BENCHMARKS NECESSARY FOR PROPER WORK. FURNl5H GIVEN SURVEY OVERCRONOI1N6 OF CONSTRUCTION SPACES. IN PARTICULAR, 600ROINATE DELIVERY AND INSTALLATION 2. SUBMIT COLORS TO THE ARGHITEG I, FOR APPROVAL. E EXISTING CEILING,LIGHT PIXTUi CEILING FANS, SMOKE DETECTORS, ETC. AS INDICATED ON PLANS. DATA. TO INSURE MINJWM HOLDING OF STORAGE TIMES FOR ITEMS KNOWN OR RE606NIZED TO BE FLAMMABLE, 3 PREPARE SURFACES TO RECEIVE THE 5PE61FIED FIN15N. TAPE AND SAND SMOOTH 61flpi BOARD TO F EXISTING DUMBWAITER 3. BE RESPON5/BLE FOR QUANTITIES OF WORK FURNISH LABOR, MATERIALS AND EQUIPMENT REQUIRED TO HAZARDOUS, EASILY DAMAGED, OR SENSITIVE TO DETERIORATION, THEFT AND THEIR SOURCES OF L055 RECEIVE THE SPECIFIED FIN15H PAINT 6RADE WOODWORK SHALL BE HAND SANDED BETWEEN COATS 6 PLUMBING FIXTURES AS INDICATED ON THE DRAWlN65. COMPLETE WORK 3 DELIVER PROLU675 TO THE SITE IN THE MAWFA6711RER5 SEALED CONTAINER OR OTHER PACKAGING AND LV57TO GLEAN. ALL HOLE5, PITCH POCKETS OR 5APPY PORTIONS SHALL BE 5CRAPED AND H M15GELLANEOU5 MILLWORK AS INDICATED ON DR,AWIN55. 57'5TEM 60MPLETEWITH LABELS AND lN5TRI/GTION5 OR HANDLING, 5TORIN6, UNPACKING, PROTECTING SHELLACKED, 4, PROVIDE PROOF OF AORKMAN5 COMPENSATION INSURANCE AND DISABILITY INSURANCE 6OVERACE AND INSTALLING. 4. FILL CRACKS, HOLES, IMPERFECTIONS IN EXIS7IN5 WALL5, PARTITION5, OR 6YP50M BOARD Wl7H l 5TAIR5 AND RAMP5 A5 INDICATED ON DRAWlN65 REQUIRED BY GOVERNING STATE LAW PRIOR TO START OF WORK. PATCHING PLASTER AND SMOOTH OFF TO MATCH ADJOINING SURFACES OR LAMINA TEWITH I LAYER OF N076 Y= 48"MIN. IF DOOR HAS CLOSER J PORTIONS OF ROOF A5 IINDlCA7ED ON DRAWINGS. 5. COORDINATE DRYWALL WORK WITH THAT OF THE OTHER TRADES IF DRYWALL 15 IN 60NFLl6T WITH 4. STORE PRODUCTS AT THE 5/TE IN A MANNER 7HATWlLL FACILITATE lNSPEGTION AND MEASUREMENT OF 112'GYPSUM BOARD 70 ACHIEVE REQUIRED SMOOTHNESS, AS PER ARCHI7fC75 IN5PE6 LION. 32 MIN DUCTWORK, PLUMBING LINE5, ETC. aUANTITY OR GOUN7/NG OF UNITS PUSH SIDE I. INDICATE PROPOSED SEQUENCE OF OPERATION5 FOR REMOVAL WORK TO OWNERS REPRESENTATIVE 5. STORE HEAVY MATERIALS AWAY FROM THE PROJECT 57RUCTURE IN A MANNER THAT WILL NOT ✓` WIPE NEW GYPSUM BOARD S'/RFAGES WITH A DAMP CLOTH FUSE PRIOR TO ARLIGA7ION. THE PRIMER, OR REVIEW PRIOR 70 57ART OF WORK INCLUDE 60CRD/NATION FOR 5WT-OFF, GAPPING AND 6 PROVIDE NE5E55ARY BRIDGING AND BRACING REOUTRED 70 SECURE DRYWALL AND MAINTAIN FIRE OR ENDANGER THE S'/PPORTING 6OA15TFZTION. IN ORDER TO LAY FLAT ANY NAP WHICH MAY HA VE FORMED IN SANDING PROCESS. CONTINUATION OF UTILITY 5EROrE5 A REQUIRED, TOGETHER WITH DETAIL5 FOR PI,15 AND N015E 5aW RATING WHERE IN016ATED ON THE DRAWINGS. 6. UPON COMPLETION OF PAINTING WORK REMOVE ALL PAINT FROM WHERE I7 HAS SPILLED, SPLASHED, OR Z X CONTROL PROTECTION. 7 PROVIDE METAL CORNER BEAD5 AT VER71CAL AND HORIZONTAL GWT5IDE 6ORNER5 AND METAL "/' 5PLATTERED ON EXP05ED ADJACENT 5URFAGE5. � 24 �\ � \ �' 2. PROVIDE PHOTOGRAPHS OF EX157ING CONDITIONS THAT M16HT BE MISCONSTRUED AS DAMAGED BY / / l/ l/ l l 7. EXAM/NE FINISH SURFACES AFTER COMPLETION OF WORK INCLUDING MILLAORK INSTALLATION AND -V/ \I REMOVAL OPERATION5. FILE WITH OWNERS REPRE5ENTATNE RIOR TO 57ARF OFWORK B. PROVIDE WATER RE515T ANT 6YD5UMNBOARD FOR PARTITIONS ADJACENT 70 PPLUMBIN6 VE5 OR � ��kJ� � N� �6/�0 I (-1 l®N� g, PROCEPROCED HIT ARCHITECT A5M�MUM OF(3)8"X lO"BRUSH-OUTS OF EACH DOLOR AND FINISH FOR 'I;" „I } I�,I II QUIRED 0 ®IDI 'I' ail 3 PROTECT FROM DAMAGE,EXl5TING FIN15H AORK THAT 15 TO REMAIN IN PLACE, BUT BECOMES EXPOSED FIXIVRE5. AR6HITE675 APROVAL, AT LEA5T 2 WEEKS PRIOR TO 517E APPLICATION. ON-517F APPLICATIONS SHALL Illlllllllllllvdo,llllll, DURING REMOVAL OPERATION PROTECT EX15TING FLOORS, WALL5 AND 6EELlNG5 lN1TH SUl7ABLE 9. WILT-IN CABINET WORK SHALL BE ENCASED IN LAMINATE GLA55 "B"FINISH COMPLETELY,ANY EXP05ED COVERIN65 WHEN REMOVAL WORK CAN CAUSE DAMAGE 7O THEM FACE CABINETS SHALL UTILIZE FIRE RETARDANT WOOD MATERIAL. WOOD BI-0606 SHALL BE PRESSURE BE REQUIRED ONEWEEK PRIOR TT FINAL APPROVAL ARGHITEGT RESERUfS THE RIGHT 70 AD.k/57 ANY 1 I N07B X=36 IN. MIN lF Y=60 IN: X=42IN MIN IF Y=SHIN 4. PROVIDE TEMPORARY AEA TIER RO7EG TON, DURING INTERVAL5 BETWEEN REMOVAL AND REMOVAL OF TREATED WITH A FIRE RETARDATION, PROPERLY 51AL, SAND AND PRIME NEW WOOD 5URFA6E5 TO I. REQUIRED FOR CHANGER IN THE PRODUCTS,RE CONSIDERED EQUIPMENT AND METHODS OF CONSTRUCTION A COLOR NEWISH ONCE THE HALLI TEST HAS BEEN MADE EXI5T/N6 6ON5TRLUT/ON ON EXTERIOR 5'/RFAGES AND IN5TALLA T/ON OF NEW 6ON5TRUGTION, TO ENSURE RECEIVE FIN15H GOAL REQUIRED BY THE CIJO6ONT 6 IDOGUMEN75 ARE CONSIDERED REQN/E5T5 FOR "GUEST/N7ION5';AND ARE 9. FIN15H UNDERSIDE OF SOFFITS(WHERE THEY OGGUR) 70 MA TGH ADIAGEN7 VERTICAL FINISH, U.O.N. l-'//I SUBJECT TO THE FOLLOWING ITEMS: THAT HATER LEAKAGE OR DAMAGE DOES NOT OCCUR TO 5TRZ77JRE OR INTERIOR AREAS OF EXISTING /O. 5ET CEILING HEIGHTS A5 INDICATED ON THE DRAWINGS MEASURED, FROM FINISHED FLOOR UNLE55 NOTED p. REylSlONS TO ENE CONTRACT DOCUf4EN75, hIHERE REGY/E57ED BY THE OWNER, ARGHITEGT OR 10. INSTALL ELECTRICAL 5WI76H AND OUTLET COVER PLATES, 5URFA6E HARDWARE,EEG.,AFTER PAINTING BUILDING. OTHERWISE. SEE FINISH SCHEDULE. ENGINEER,ARE 6ON511i AS "'CHANGES'; NOT SUB5TI7UTION5. AND/OR APPLIGAEION OF WALL COVERINGS AND CARPET. 5. REMOVE PROTECTIONS AT COMPLETION OF WORK ll. NOTIFY THE ARCHITECT IMMEDIATELY AND PRIOR TO ROORE55 OF WORK IF UNUWAL FIELD CONDITIONS B. SPECIFIED CONTRACTOR OPTIONS ON PRODUCTS AND CONSTRUCTION METHODS INCLUDED IN THE IT MODIFY EX15TING FLOOR 5%RFAGE5, TO RECEIVE NEW FLOORING MATERIAL5 7O PREVENT NOTICEABLE CLEAR WIDTH LATCH 5/DE APPROACH - HINGE-51DB APPROACH - 6. CONDUCT REMOVAL OPERATIONS AND DEBRIS REMOVAL 70 ENSURE MINIMUM INTERFERENGE5 WITH ARI5F NH16H WOULD PREVENT THE 6ElLING AND/OR LIGHT FIXTURES FROM BEING INSTALLED AT THE CONTRACT DOCUMENTS ARE CHOICES AVAILABLE TO THE CONTRACTOR AND ARE NOT SUBJECT TO THE LUMP5 AND DEPRESSIONS. ROADS, 5TREE75,WALKS AND OTHER ADJACENT OCCUPIED OR USED FACILITIES. INDICATED HEIGHT REQUIREMENTS FOR 5U85T1TU710N5. 12 PARTITION5 AND MILLWORK TO RECEIVE 5TRAl6HT RESILIENT BASE OR CARPET, COVE RESILIENT BASE 56INGING DOOR 561N&IN6 DOOR 12. IN GENERAL, EXECUTE THE CEILING WORK TO PROVIDE A SMOOTH, CONTNUNU$ MATCHING, TIGHT AND 2. GONTRAG70R5 DETERMINATION OF AND GOMPLIANGEWI EH GOVERNING REGULATIONS AND ORDERS, A5 A7 RE5ILIENT FLOORING. UO.N. 7 DO NOT CLOSE, BLOCK OR OTHERWISE OB5TRUG7 57REETS, AALK5, OR V5ED FACILITIES WITHOUT ALIGNING CEILING. THE FINAL CEILING INSTALLATION SHALL BE REE OF VISUAL DEFECTS, REPLACE 0 STAINED AND PAINTED 5)RFACE5 SHALL BE FINISHED SUCH THAT JOINTS ARE NOT VISIBLE WHEN VIEWED WRITTEN PERMI531ON FROM AVTHORI71E5 HAVING JURISDIG TION. ISSUED BY 6OVERNENG AUTHORITIES, DO NOT CONSTITUTE 5UB5TITUTIONS"AND DO NOT CONSTITUTE A FROM ANY REASONABLE AN6LE 6ElLING TILES DAMAGED BY OTHER TRADES BA515 FOR GHAN6E ORDERS, EXCEPT A5 OTHERWI5E PROVIDED 1N THE GONTRA67 DOCUMENTS. 6. IN AREAS WHERE REMOVAL CAUSED AN UNEVENNESS IN THE FINISHED CONCRETE SLAB, PATCH TO LEVEL l3. THE 6ElLING GRID 5/5PENS10N 5Y504 SHALL BE MANUFACTURED AND INSTALLED IN ACCORDANCE WITH l4. WALL COVERING SEAMS SHALL NOT TO HMS,OCCU WITHIN I"-O"OF CORNERS, APPLY FABRIC 50 WALL IS THE SLAB TO RECEIVE NEW FINISHED FLOORING. DIVIDED WITH A MINIMUM NUMBER OF 5EAM5, AND WITH EQUAL WIDTH PANELS, UO.N. THE MANUFACTURERS STANDARD SPECIFICATIONS AND METHODS OF IN5TALLA710N THE SU5FL-ii 3. 7O THE FULLEST EXTENT POSSIBLE, FURNl5H AND INSTALL PRODUCES OF THE SAME GENERIC K1W,, FROM 15 LOCATE INTERSECTIONS OF DIFFERENT FLOOR FIN15H MATERIALS DIRECTLY UNDER CENTER OF DOORS, NOTE Y = 46"MIN. IF DOOR HAS CLOSER H. UPON COMP CARRYING CHANNELS OF THE REMOVAL {PORK, BROOM CLEAN EACH AREA WHERE REMOVAL OCCURRED. 6ElLING BLACK IRON CARR CHANNELS SHALL BE SECURELY 5UPPORTED BY HAN55i FA57ENEO TO A SINGLE SOURCE, FOR EACH UNIT OF WORK. PRODUCTS REQUIRED FOR THE WORK SHALL BE PROVIDED UO.N. STRUCTURAL SUPPORTS AND PROPERLY SPACED 70 SUPPORT LIGHTING FIXTURES AND ACOUSTIC CEILING PUSH 5/DE IO. DO NOT USE GUTTING TORCHES FOR REMOVAL UNIX WORK AREA l5 CLEARED OF FLAMMABLE A55EMBLY IN ACCORDANCE WITH NY STATE CODE NEW CEILING DFFU5ER5 AND AIR RETURN 6RILLES, FROM RELIABLE SOURCES CAPABLE OF PRODUCING AND DELIVERING UNIFORMLY ACCEPTABLE I6. SUBMIT CARPET SEAMING PLAN(FOR BROADLOOM) 70 ARCHITECT PRIOR TO ORDERING AND AT LEAST 'i MATERIALS PRODUCTS, IN ACCORDANCE WITH CONTRACT TIME REQUIREMENTS. WHEN IT 15 D15COVERED THAT (4)WEEKS PRIOR TO INSTALLATION FOR ARCHITEGT5 REVIEN AND APPROVAL T!I SHALL BE NATURED, ANODIZED, OR EXTRUDED ALUMINUM AND RECEIVE A BAKED ENAMEL AHITE FINISH. FULL 510E 4g MlN Il. AT CONGEALED SPADES, SUCH A5 INTERIOR DLL'TS AND PIPE SPADES, VERIFY CONDITION OF HIDDEN Ll6H7ING FIXTURES SHALL BE FASTENED TO ME STRUCTURE ABOVE WITH SAFETY CHAINS INDEPENDENTLY SPECIFIES!?RODLL'75 ARE AVAILABLE ONLY FROM.FOURGES THAT DO NOT OR CANNOT PRODUCE AN ,, SPACE BEFORE 5TARTIN6 FLAME-GUTTING OPERATIONS. MAINTAIN PORTABLE FIRE SUPPRESSION OF THE 6EILlNG 5YSTEM ADEQUATE QUANTITY 70 COMPLETE PROJECT REQN/IREMEN75 IN A TIMELY MANNER, CONSULT WITH THE IT. METAL DOORS, GONCEG70R LOVERS, FRAMES AND WALL5 AS SPECIFIED, TO RECEIVE A PAINT FINISH 24„ 2_ F__ ') "' ARCHITECT FOR A DETERMINATION OF WHAT PRODUCT QUALITIES ARE M05T IMPORTANT BEFORE SHALL BE PAINTED AS FOLLOWS, I DE✓IGES DURING FLAME-GUTTING OPERATIONS MAINTAIN HORTING UTILITIES SERVING OGGUPIED OR USED 14. DO THE NECE5SARY 6UTFIN6 FOR AND/OR BRIDGING REQUIRED OR LIGHT FIXTURES, AIR DIFFUSER5,ETC. PROGEEDlN6. T-v � \\ \ FAGILI7IE5, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING,A/RI5DIG710N. GYFS'/M: 12. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES l5. INSTALL RESILIENT BASES STRAIGHT AND TRUE TERMINATING THEM AGAINST OUTER EDGES OF DOOR , AS ACCEPTABLE 70 FRAMES FURNl5H AND INSTALL RESILIENT BASE CORNER SECTIONS SHALL BE PROVIDED IN LENG7I5 NOT 4. COMPATIBILITY OF PRODUG IS 15 A BA51C REQUIREMENT OF PRODUCT SECTION. ATIEN THE CONTRACTOR FIRST GOAL LATEX RIMER __ � � . �� �" GOVERNlN6 AUTHORITIES. CEASE OPERATIONS AND NOTIFY OWNERS REPRESENTATIVE IMMEDIATELY IF MEASURED FROM THE CORNER. l5 GIVEN THE OPTION OF SELEG7INC BETWEEN TAO OR MORE PRODUCTS FOR USE ON THE PROJECT, THE SECOND GOAT. LATEX EGGSHELL F SAFETY OF STRUCTURE APPEARS TO BE ENDANGERED. TAKE PREGAU710N5 TO SUPPORT STRUCTURE UNTIL LE55 THAN ILO" PRODUCT SELECTED SHALL BE COMPLETELY GOMPA7IBLEWI EH OTHER PRODI.OTS PREVIOUSLY 5ELEG7ED, THIRD GOAT: LATEX EGGSHELL � 18 MIN, 24 REFERRED DETERMINATION 15 MADE FOR CONTINUING OPERATIONS. 16. COMPLETELY SEAL ABOVE 6ElLING PENETRATION GORES THROUGH FLOOR AND ROOF DECKS TO EVEN IF THE PRODUCTS PREVIOUSLY 5ELE67ED AERE, ALSO, CONTRACTORS OPTIONS. WHEREVER IN THE METAL DOORS FRAMES d GONVEG FOR5: - r'�\ :, ,IP. A''llll .III & COVER AND PROTECT FURNITURE, EQUIPMENT AND FIXTURES FROM 50/LACE OR DAMAGE WHEN REMOVAL MAINTAIN EXISTING FIRE RATING5 TYPICAL . UTILIZE "3W FIRE-STOPPING PRODT.U'T5 $ A556MULlL5 6ONTRA6T DOCUMENTS A PARTICULAR BRAND OR MAKE OF MATERIAL OR EQUIPMENT 15 5HOWN OR WORK 15 PERFORMED IN AREA5 WHERE 5UGH ITE145 HAVE NOT BEEN REMOVED. IT WHERE D,C75 OR PART OF DU6T5 ARE RUNNING PARALLEL OVER FIRE RATED PARTITIONS,EXTEND SPECIFIED, (AND WHETHER OR NOTWITH THEWORDS 'OR APPROVED EQUAL'OR AORD5 OF 51MILAR FIRST GOAL LATEX METAL RIMER „16:= „ 4 i .II IIIII 'I' .� ,,. �k. II PARTITIONS AROUND DUCTS TO EFFECT COMPLETE FIRE RATED ASSEMBLES. IMPACT), ANOTHER BRAND OR MAKE, AHIGH IN THE SOLE OPINION OF THE ARCHITECT 15 EQUAL TO THAT SECOND GOAT: LATEX SEMI CLO55 ENAMEL l4. PERFORM REMOVAL WORK IN A SY57ANCEIG MANNER. USE METHODS NECESSARY NI COMM R65VIL EWORK SHOWN OR SPECIFIED, MAY BE SUB5TITUTFID, CUT ONLY AFTER BEING 5UBMITTED TO AND EXPRE55LY THIRD GOAL LATEX SEMI GL055 ENAMEL INDICATED ON DRAWINGS, IN ACCORDANCE WITH REMOVAL SCHEDULE AND GOVERNING REGULATIONS. IB. WHERE DUCTS PENT RLIN A FIRE RATED PARTITION AT AN ANGLE, •,O THAT A FIRE DAMPER CANNOT BE APPROVED IN WRITING BY THE ARGHITEGT. WTAITH5TANDING SUCH APPROVAL, HOWEVER, THE INSTALLEDRLAM AT CENTERLINE OF RATED PARTITION,HI EXTEND A MATERIAL EQUAL FROM THE RATED PARTITION TO THE 18. PAINT SHALL BE LATEX- INTERIOR FINISHES TO GOMPLYWITH LOCAL WILDING CODE AND SHALL BE I5. FOR INTERIOR SLABS ON GRADE, USE REMOVAL METHODS THATWILL NOT CRACK OR STRUCTURALLY CONTRACTOR ASSUMES THE RISK THAT SUCH BRAND OR MAKE IS NOT EQUAL TO THAT SHOWN OR INTERIOR FINISH 6LA55 G FOR CORRIDORS AND ROOMS. SWINGING DOOR FRONT APPROACH - TlNO HINGED DOORS FIRE DAMPER. COMPLETELY ENCLOSE THE ATi WITH MATERIAL EQUAL TO THAT OF THE PARTITION DISTURB ADJACENT ELECTRICAL, OR PARTITIRAL USE POWER SAW WHERE PO55H ENT IFENANN6/PATFD FIRE RATING. COMPLETE PARTITION FIRE RATING SHALL BE MAINTAINED. SPECIFIED HALLR E AND IF E ANY TIME THE SUBSTITUTE APPEARS NOT TO BE 50 EQUAL, THE GONTRAGTOR MECHANICAL, ELEC7RIGAL, OR STRUCTURAL ELEMENTS THAT GONFLICTWI EH INTENDED FUNCTION OR SHALL REPLACE THE SUBSTITUTE AT THE CONTRACTORS SOLE EXPENSE. IF. INTERIOR FINISHES SHALL BE GLASSIFIFD IN AGGORDANGEWITH 51/RFA6E FLAME RATINGS. ALL 5WlNGING DOOR IN DER/ES VE51CN ARE ENCOUNTERED, IN✓E5E/GATE BOTH NATURE AND EXTENT OF THE CONFLICT SUBMIT REPORT IG. WHERE PIFE5, GONDU175 OR LOW TENSIONWIRIN6 PENETRATE FIRE RATED OR 50UND RATED FINISHES IN THE PROPOSED AREA TO BE INTERIOR FIN15H 6LA55 B. EN15HE5 MATERIAL SHALL HAVE 70 OWNER5 REPRESENTATIVE IN lNR1TTEN,A66URATE DETAIL. PENDING RECEIPT OF DIRE67NE FROM ENCLOSURES SUCH A5 WALL OR SLAB, THE SPA6E5 AROUND SUCH PENETRATION5 5HALL NOT EXCEED FLAME- SPREAD RA EING OF 26 TO 15 SMOKE DEVELOPED RATING OF 6LA55 B, ONER5 REPRIE5ENTA TIVE, REARRANGE REMOVAL SCHEDULE AS NEGE55ARY TO CONTINUE OVERALL JOB 112". PACK SPA6E5 SOLID WITH MINERAL WOOL OR APPROVED EQUAL ON BOTH 5IDE5 OF THE RATED 5, CONS 7RLICTION GALLED FOR BY THE CONTRACT DRAWINGS MAY BE ADAPTED FOR A PARTICULAR 20 ATTACHMENT AND ADHESIVES FOR INTERIOR LOCATIONS,AWN WILL PRODUCE PRODUCTS MORE TOX16 R05RE55 WITHOUT UNDUE DELAY. ENCLOSURE EO ENSURE FULL FIRE/Sci RATlN6 IN COMPLIANCE WITH THE LOCAL WILDING CODE BRAND OR MAKE OF MATERIAL OR EQUIPMENT. THEREFORE, IF ANY CONSTRUCTION NOT REQUIRED BY THE p/qN THOSE GIVEN OFF BYWOOD OR PAPER WHEN DEGOMP051NG OR WANING WILL BE REJECTED. CONTRACT DRAWING5 1N THEIR PRESENT FORM 15 NE6E55ARY BECAUSE OF THE USE OF ANOTHER BRAND 54 MIN /6. 66 SHALL FURN15H LABOR AND MATERIALS TO COMPLETE REMOVAL OF ITEMS SHORN OR NOTED ON THE 20. FURNISH AND 11,57ALL 24 HOUR TEMPORARY LICH71116 INCLUDING TEMPORARY LI6HFIN6 FOR OR MAKE OF MATERIAL OR EQUIPMENT, 5,61I CONSTRUCTION SHALL BE FURNISHED OR PERFORMED BY PUSH 510E DRAWINGS. INSTALLATION OR DELIVERY OF GOODS OR MATERIAL ON WEEKENDS. 714E CONTRACTOR A THE CONTRA 6 TOR'5 EXPENSE AND S)BJE6T 7O THE APPROVAL OF THE ARGHITEGT 21. STEEL STUD AND GYPSUM WALLBOARD PARTITIONS 21. PARTITION THICKNE55 SHOWN ON 60N57RUGTION PLAN(5J OR ENLARGED PLANS ARE NOMINAL IN CASE OF DISCREPANCY BETWEEN A DESCRIPTION OR REQUIREMENT IN THE CONTRA67 DRAWING OR A.STEEL 5TUD5 5HALL BE ROLL FORMED CHANNEL TYPE SECTION5 FABRICATED OF GALVANIZED SHEET I l7 GG SHALL FURNISH A SYSTEM OF TEMPORARY LIG14T AND POWER THROU6/iOUT THE SPACE TO PERFORM ' DIMENSIONS, PARTITIONS ARE DIMENSIONED FROM FINISH FADE OF GYPSUM BOARD TO FINISH FADE OF ANY MATERIAL OR EQUIPMENT AND A CATALOG NUMBER, OR OTHER DESIGNATION FOR THE SAME STEEL, SIZE PER PLANS AND IN THE LONGEST LENG7tr5 AVAILABLE 50 THAT THE STUDS EXTEND q THIS WORK DURING REMOVAL. REMOVE DIMS NOT BEING REUSED OR RETURNED 70 THE WILDING FROM GYPSUM BOARD UNLESS OTHERH15E NOTED. SEE PARTITION TYPE DETAIL FOR ACTUAL DIMENSIONS. MATERIAL OR EQUIPMENT (EVEN THOUGH STATED TO BE ACCEPTABLE), THE DESCRIPTION OR VERTIGALL Y, IN ONE PIECE, FROM FLOOR TO 6ElLING AND/OR BEAM5 AND/OR DECKS ABOVE 2 / —1 2 4g MIN i" THE PREMISES, AND LEGALLY DISPOSE OF THEM REQUIREMENTS SHALL CONTROL. � � \V� f 22. ALIGN AND SAND SMOOTH GYPSUM BOARD SURFACES. Ig. SEE MECHANICAL /ELECTRICAL NOTES AND/OR DRAWINGS FOR DlREG7ION ON REMOVAL OF RECESSED B.6EILlNG AND FLOOR RUNNERS SHALL BE ROLL FORMED CHANNEL TYPE SECTIONS FABRICATED OF U55 / -1 FLUIORESCEN7 LIGHTING, FIRE SAFETY 0EVIGE5, DUCTWORK, DIFF050i 6RILLES, ETC. PROVIDE 23, WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE AND IN PROPER NO. 25 GAUGE, CAL VANIZED SHEET STEEL, RUNNERS SHALL BE IN IO'-O"LENGTHS. X / \ TEMPORARY Ll6HTING THROI/6H0U7 AREA PRIOR TO REMOVING PRESENT L16HIIN6 5YSTEM ALIGNMENT 6. UNLE55 5PECIFIG REQUIREMENT l5 DEFINED OR A SPECIFIC MANUFACTURER, IN THE INTEREST OF \ COMPETITION, THE DRAWINGS t SPECIFICATIONS ALLOW 5EL56TION FROM A VA,RIET(OF L15TED 6,GYPSUM WALLBOARD SHALL BE GRADE W"FIRE- RETARDANT WALLBOARD 48 INCHES WIDE AND OF _— -- W. REMOVE FIRE EXTINW15HER BRACKE75 AND TANKS. TURN UNITS OVER TO OWNER5 REPRESENTATIVE 24. FULLY PACK AND SEAL EXISTING AND NEW FLOOR PENETRATIONS FOR PIPING IN A660ROAZE WITH THE PRODUCT MANUFACTURES. THE 5UB5TlTUTlONS WILL BE CONSIDERED A5 FOLLOWS: EHIGKNE55 INDICATED ON THE GON7RAGT DRAWINGS AND SHALL BE OF UNIFORM QUALITY GONFORMIN6 Ifi�ill IIIIII I: Illhi;d.� '1-Mul I al t —— — MAINTAIN A SUFF161EN7 NUMBER OF EXEIWISPER5 ON THE JOB PER STANDARD 60iTiTION GOVERNING WILDING LAWS. GUDELINE5, OR AS DIRECTED BY PROJECT MDR.. TO FEDERAL 5PEGlFI6ATOM 55-L-30 AND TO ASTM 656. III 25. FIELD CONDITIONS MAY REQUIRE MODIFICATIONS IN THE DETAILS OF THE DRAWlN65 AND QUAN7/71E5 OF A.THE BIDDER WBM1T5 THE ROP05ED SUB5TITUTION5 70 THE ARCHITECT FOR REVIEW DURING THE BIDDING 20. REMOVE DRAPES, DRAPERY RODS, HANGERS AND ASSOCIATED APWRTENANCE5,BLINDS,ETC. WORK INVOL VEO. THE WORK SHALL BE CARRIED CUT TO MEET THESE FIELD 6OWITION5 IN PERIOD AND ARGHITEGT INDICATES ACCEPTABILITY IN AN ADDENDUM WALLBOARD SHALL BE FURNISHED AND INSTALLED IN THE LONGEST AVAILABLE LEN67H5 50 THAT 1\ IQ THROUGHOUT AL TERA LION AREA. ACCORDANCE WITH THE CONTRACT DOCUMENTS. WALLBOARD PANELS EXTEND VERTICALLY IN ONE PIECE ROM FLOOR 70 6EILM6 AND-OR CLASS, IIII�I�I�I�IIIIIIIIIIIII 2/. REMOVE M156ELLANEOUS OCCUPANCY 5/6NA6E, 015PLAY5, FIRE EXTIN60/5HER LOCATION 26. REMOVE MISCELLANEOUS APWRTENANCE5, ETC., ON EXI5T1N6 WALLS WHICH ARE NOT TO BE U5E9 FOR B.THE PROPOSED ALTERNATE MANUFACTURER 15 LISTED IN THE BID DOCUMEN75 BY THE BIDDER AS A BEAMS OR DECKS ABOVE ���LLLIII IDENTIF16A 71ON, AND OTHER SIGH WALL NAN&IN65 THROUGHOUT ALTERATION AREA. NEW AL 7ERATIONS,AS DIRECTED BY OWNERS REFRE5ENTATIVE PATCH HALLS THAT ARE INDICATED TO 'VOLUNTARY ALTERNATE"AH16H SHALL BE SUBJECT TO THE ARCH17FC7 REVIFJN DURING THE BID DELIVER FIRE RATED GYPSUM BOARD 70 THE CONSTRUCTION SITE BEARING UNDERWR17ER5 22 REMOVE VINYLNNOOD BASES AND FINISHED CARPETED FLOORING THROUGHOUT ALTERATION AREA. RECEIVE NEW FIN15HE5. ANALYSIS PERIOD. THE ARCHITECT SHALL BE ADVISED IN WRITING OF TH15 ROPOSED SUBSTITUTION. LABORATORY 6ERTIP16ATION. FRONT APPROACH - TWO HINGED DOOR5 23. SEE ELECTRICAL NOTES/DRAWINGS OR REMOVAL OF ANY EEL. AND RECEPTACLE BOXES, AND 27. NEW WALL5 AND PARTITIONS, WITHIN AREA OF WORK SHALL RECEIVE A PRIMER AND[21 FIN15H 60AT5 OF D. SOUND ATTENUATION BLANKETS SHALL BE COMPRE551BLE MINERAL FIBER("THERMAFIBER"AS SWINGING DOOR SWINGING DOOR IN SERIES A5-1CC D WIRING REMAINING IN THE AL 7ERATION AREA. AL50, 5EE DRAWlN65 AND NOTES FOR AN E665HELL FIN15H PAINT. INTERIOR TRIM(DOORS, FRAMES,ETC)SHALL RECEIVE A RIMER AND[21 G.THE CONTRACTOR HA5 EXPERIENCE WITH THE SUEST1TVTED PRODUST AS AN 'EQUIVALENT"AND CAN MANUFACTURED BY U5 GYPSUM Co. OR APPROVED EQUAL). REMOVAL OF 120V, WALL MOUNTED EMERGENCY LIGHTING FIXTVW5, CONDUIT/WIRING TO L16HT FIXTURES, FIN15H 60AT-5 OF A 5EMI-OL055 FINISH PAINT. COLORS WILL BE SELECTED BY THE ARCHITECT. DEMONSTRATE TO THE 5AT-IFAGTION OF THE ARCHITECT THAT IT I5/N FAG7 EQUIVALENCE IN ALL KEY E. J91NT TRFA7MENT PRODUCTS SHALL CONFORM TO A57M 6-474 AND 6- 475. TAPING AND SPACKLING FIRE SAFETY DEUIGE5, ETC. 2B. ELEVATION O'-O"15 A REFERENCE OF THE EXISTING FINISHED FLOOR HEIGHT NOTATION TO HE16HT5 WILL SPECIFICATION REQUIREMENTS, SHALL BE A THREE(3)60AT 476. APPLICATION. 24. IF EX15TING ASBESTOS CONTAINING MATERIAL /5 ENCOUNTERED DURING THE WORK, REPORT TH15 BE FROM THIS ELEVATION, UNLESS OTHERN155 NOTED. SURFACES ABOVE RAISED FLOOR ARE TAKEN 1. THE BURDEN OF ROOF SHALL BE ON THE BIDDER TO DEMONSTRATE THE 'EaWALENGE"OF THE F. SCREhS FOR FASTENING WALLBOARD 70 STUDS SHALL BE WGLE TYPE PHILIPS HEAD 56REA5, IMMEDIATELY TO THE OWNER PR06PAM MANAGER FOR REMEDIATION ROM FINISHED RAISED FLOOR HEIGHT AND NOTED(A.R.F) PROPOSED SUBSTITUTION 5PEGIFIGALLY MANUFACTURED FOR POWER TOOL INSTALLATION 25 ENSURE THAT FLOOR AND WALL PENETRAT10N5 WITHIN THE AL 7ERATION AREA, CREATED BY TH15 WORK 29. ROOM NUMBERS ARE FOR REFERENCE TO TH15 ALTERATION DURING CONSTRUCTION, ONLY. G. CORNER BEADS SHALL BE BUR -A -BEAD U56 CORNER REINFORCEMENT,, OR APPROVED EQUAL, OR DISCOVERED IN THE RIii BE TEMPORARILY FIRE- STOPPED AT THE BEGINNING AND END OF 30. SEAL PENETRATIONS THROUGH EX157INWHEW FIRE-RATED HALLS, CEILINGS, EEG. WITH H TRIM MEMBER5 SHALL BE FABRICATED OF UE5 NO 25 GAUGE GALVANIZED STEEL AND SHALL INCLUDE EACH DAY. PERMANENT FIRE-570PPIN6 5HALL IN57ALLED DURING THE GENERAL CONSTRUCTION PHASES AR6H17E6FAPPROVED 3M'FIRE-STOPPING PRODUCTS. FIRE-STOPPING PERIME7ER OF DUCT/60NDU17 CORNER REINFORCEMENT AND CASING TYPE E06E TRIM CORNER AND EDGE TRIM MEMBERS SHALL BE IN OF TH15 PROJECT. PENETRATIONS. REFER TO DETAIL5 FOR ADDITIONAL INFORMATION. SINGLE LEN67H5. I—I 4 26. VERIFY FIELD CONDITIONS PRIOR TO BEGINNING REMOVAL AND REP ANY DISCREPANCIES 70 THE 31. SUBSEQUENT TO FILING WITH THE DEPARTMENT OF WILDING, THE ARCHITECT REQUIRES NEW TR-15 FOR 22. THOROUGHLY PA 7GH, GLEAN, AND PREPARE EXISTING PAINTED WALL SURFACES FOR APPL/GA T/ON OF V EYE LEVEL ARCHITECT FOR 6LARTE16ATION AND AMENDMENT WITHDRAWAL OF APPLICANT. INSPECTIONS, TESTS AND OTHER DIRECTIVE 14 REQUIREMENT5 ARE THE 27. REMOVE COMBUSTIBLE DEBRIS FROM THE INORKPLAGE A7 THE END OF EACH DAY AND FURNISH LABOR RE5PON5IBILlTY OF THE CONSTRUCTION MANAGER AND/OR INDIVIDUAL TRADE NEW FINISH PAINT(2 COATS MIN) SUBI-017 SAMPLES TO THE ARCHITECT FOR APPROVAL. 17-14 HANDLE DESK ARM A605 EQUIPMENT PERMITTED 70 MAINTAIN A SAFE AND GLEAN WORK ENVIRONMENT A ALL TIMES. 23. TAPE AND SAND SMOOTH 6YP5/'M BOARD 5C . NHE ARE N07 VISIBLE PAFGH AND REPAIR SURF 32. LARGE SCALE DRAWINGS TAKE PRECEDENT OVER SMALL SCALE DRAWlN65. DETAIL DRAWINGS TAKE TO MATCH ADJACENT OR ADJOINING SURFACES WHERE DAMAGED OR DISTURBED BY NEINWORK. z IN SHADED AREA ARMREST, 2e LOCATE IDENTIFY, STUB OFF AND DISCONNECT UTILITY SERVICES THAT ARE NOT INDICATED 7O REMAIN RREGEDENE OVER LARGE AND SMALL SCALE DRAWlN65. � 29. REMOVE DRYWALL PARTITIONS, ASSOCIATED DOORS, FRAMES, HARDWARE, ELECTRICAL SWITCHES, 33. IN THE EVENT OF A DI5GREPAN6Y BETWEEN DRAWINGS AND SPEC/FIGATION5 OR BETWEEN DRAWlN65 4,5 u RECEPTACLES,ETC, NOTED ON THESE DRAWlN65. SEE ELE6./MECH. DW65. OR ADDL. INFO BRING TIEDISCREPANCY TO THE ARCH17EC75 ATTENTION IMMEDIATELY, IN WRITIN6, FOR CLARIFICATION 24. PATCH EXISTING WALLS H ADJ CENT AREA WHICH ARE SCHEDULED VIA PAINTED SC A5 TO FAINT A xTHE GREATER MONETARY VALUE 5HALL TAKE FREGEOENCE IN THE EVENT THE CONTRACTOR NEGLECTS SMOOTH TRANSITION WITH ADJACENT S)RFAGES AND 50 AS TO BE SUITABLE TO RECEIVE NEW PAINT tr Q � � - v TO OBTAIN GLARIFIGATION FlNI5HE5 a1 /^ 25. NEW WALLS AND PARTITIONS AND EXl5TING WALL5 AND PARTITIONS ADJACENT TO NEW FLOORING SHALL N 1 q N� M® Y�f � � ®�M�N� �l y� l M � 34. THE CONTRACTOR 5HALL TAKE NO ADVANTAGE OF ANYAPPARENT ERROR OR OMISSION IN THE RECEIVE NEW 4"HIGH RUBBER BASE(BOTH 5/DES I/NLE55 OTHERWISE NOTED).E� GONT24GT DOCUMENTS. IN THE EVENT THE GONTRAG70RDISCOVERS SUCH AN ERROR, OR OMISSION IN 6O" mTHE CONTRACT DOCUMENT5, HE5HALL IMMEDIATELYNOTIFY THE ARGHITEGT THE ARCHITECT WILL THENMlN 6 MAX MAKE SUCH CORRECTIONS AND INTERPRETATIONS AS MAY BE DEEMED NECE55ARY FOR FULFILLING THE INTENT OF THE CONTRACT DOCUMENTS. THE ARCHITECT ANO/OR H15 GONS/LTANTS DO NOT ASSUME RESPON5I6ILlTY FOR THE MEANS BYWHIGH 55. VERIFY FIELD CONDITIONS AND NEGE55ARY DIMENSIONS PRIOR TO BEGINNIN6 AORK AT TH15 517E AND SPOUT HE/UHT AND CHAIR HEIGHTS THE REMOVAL IS PERFORMED. THE CONTRACTOR SHALL REMOVE AND/OR PERFORM THE ITEMS NOTED REPORT D15GREPANGIES TO THE ARCH17E6T FOR CLARIFICATION AND AMENDMENT AS SUC.H IN THESE DOCUMENTS IN A PROFESSIONAL MANNER IN AGGORDANGE WITH 'GOOD GENERAL TURNING SPACE PRACTICES,. 36. THE GENERAL CON TRAGTOR SHALL BE RESPONSIBLE TO COORDINATE ALL TRADES UNLESS A KNEE CLEARANCE CON57RU57ION MANAGER 15 PRESENT 3-1. THE GENERAL CONTRACTOR SHALL Co0i TE WITH THE MECHANICAL AND ELECTRICAL DRAWIN65 FOR IN THE EVENT ANY 57RUC TVRAL DAMAGE OCCURS DURING REMOVAL PR06EPURE5, TEMPORARILY ALL 5ELECTIVE REMOVAL WORK AND ROUGH/FIN15H CARPENTRY REQUIRED FOR INSTALLATION OF THEIR 5TABILIZE THE STRUCTURE TO A "SAFE"CONDITION AND NOTIFY THE ARGHITEGT IMMEDIATELY FOR WORK TH15 INCLUDES, BUT 15 NO LIMI7ED TO: THE FRAMED OPENINGS FOR DL6TAORK TRANSFER REGTIF16ATON. GRILLES;PIPING AGGE55190ir CHOPPING FOR DRAINS, FIRE(SMOKE)DAMPERS, ETC. 3 4 CONTROL WTFON DIAME ER a 'o :° y n /� �,/ 516 NUMERAL HEIGHT 70 80 #10 so so CU171, i AN1; �/`ATCT ,i 5�M100L LECG�N� 50 it ea i°a MAIN ENTRY FLOOR {+ Z DOOR CLOSED so 130 �;It 2 , I F GUTTING AND PATCHING REQUIRED SHALL BE DONE IN ACCORDANCE WITH THE WILDING CODE OF NEW ROOM DOOR OPEN o O 8 O h PORK 5TATF AND LOCAL 60DE5 OF THE TOWN OF SOUTHOLD. NEW PARTITION = NFJN SURFACE MOUNTED FIRE EX7/NGUI5HER 0 ROOM TAG EMERGENCY ALARM O ® O m AHERE GUTTING AND PA76HIN6 INVOLVES ADDITION OF REINFORCEMENT OF 57RU67URAL ELEMENTS, 5 MFE EMERGENCY STOP SUBMIT DETAILS AND ENGINEERING CALCULATIONS TO 5HOW HOW REINFORCEMENT IS INTEGRATED WITH O WINDOW TAG BU LLL BE 6 NOT ORIGINAL 57RUG7URE EXl5TING PARTITION TO REMAIN '� EKI571NG SURFACE MOUNTED FIRE EX7INGUlSHER BUT THE X l5 NOT sMFE u x DOOR 7A6 ELEVATOR H015TWAY AND ELEVATOR DO NOT GUT AND PATCH 57RU6WRAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR ____-_-_-_-_-_ EX15TING PARTITION TO BE REMOVED LOAD-GARRYIN6 GAPAGITYOR LOAD-DEFLECTION RATIO FEC NEW REGE55FD FIRE EXIIN605HER CABINET /«\. PARTITION TYPE TAG PANEL DETAIL ENTRANGE5 GAR CONTROL HE/UHT OBTAIN APPROVAL FROM A LlGENSED STRUCTURAL ENGINEER PRIOR TO THE GUTTING AND PATCHING OF �% THE FOLLOWING 5TRUG7URAL ITEMS: '° a EXISTING RECE55ED FIRE EXTIN6UI5HER CABINET EXISTING DOOR TO BE REMOVED q A FOUNDATIONS I-II FIRE HOSE AND RACK /-a SHEET DETAIL LOCATION TAG B BEARING WALL5 C STRUCTURAL CONCRETE � EXISTING DOORIXALL TO REMAIN D STRUCTURAL STEEL FIRE ALARM 5PEAKER/57ROBE UNIT E LINTELS �If(p��l\\ 1 # ELEVATION LOCA TON LAS / 7FRNATE F STRUCTURAL WOOD FRAMING � �' � NEW DOOR(SEE SCHEDULE) D FIRE ALARM BELL A-1 6 MISCELLANEOUS 5TRUGTURAL METALS SHEET 42 MIN Ig 12 MAX 40(42JMIN H EQUIPMENT SUPPORTS [me FIRE ALARM 5TROBE '36 MAX Gfk PLAN NOTE TAG LETTER TOILET = DO NOT GUT AND PATCH OPERATING ELEMENTS OR SAFETY RELATED COMPONENTS IN A MANNER THAT /-0 WORKING POINT A O - PAPER WOULD RESULT IN REDUCING THEIR CAPACITY TO PERFORM A5 INTENDED, OR RESULT IN INCREASED SECTION LOCATION TAG MAINTENANCE OR DECREASED OPERATIONAL LIFE_ OR SAFETY. XXX (RAISED AGGE55 FLOORING,AGT CEILING WORK) A-1 SHEET m EL. +X'-X" REFERENCE ELEVATION DATUM SYMBOL Q o� LJn Q 0 5 POOR 05E MATERIALS THAT ARE IDENTICAL EO EX15TINC MATERIAL. IF IDENTICAL MATERIALS ARE NOT AVAILABLE OR CANNOT BE USED WHERE EXPOSED SURFACES ARE INVOLVED, U5E MATRIAL5 THAT NOTE: MATCH ADJACENT SURFACES TO THE FULLEST EXTENT P0551BLE WITH REGARD 70 VISUAL EFFECT NOTE: REFERENCE SPECIFIC DN95 AITHIN COMPLETE PACKAGE FOR SPECIFIC SYMBOLS RELATED 70 SPECIFIC TRADEWORK. DIMENSIONS NOTE OR ARE 15 BE 1 ATED NIT NAE 15- ERAN. STANDARDS. A DIMENSION, NOTE OR OTHERWISE, INDICATED WITH A DISCREPANCY OR p CONFLICT I I/2" USE MATERIALS WH05E INSTALLED PERFORMANCE WILL EQUAL OR SURPASS THAT OF EXISTING ��� �/ /®N� WITH TH05E REQUIRED BY AN.5.1. 5HALL BE VERIFIED BY THE CONTRACTOR ANSI. I I/4-I 112" 60 MIN MATERIALS CODES, RULE5 AND REGULATIONS SHALL GOVERN THE CONTRACTOR SHALL VERIFY BEFORE GUTTING EX15TING SURFACE5, EXAMINE SURFACES To BE GUT AND RAT6NED AND CONDITIONS I THAT FIXTURES ARE INSTALLED IN ACCORDANGEWl7H APPLICABLE CODES,LAWS AND REC-i)LATONS. UNDER WHICH CUTTING AND PAT6HMG 15 TO BE PERFORMED. TAKE CORRECTIVE ACTION BEFORE PROCEEDING. IF UNSAFE OR UN5ATI5F46TORY CONDITIONS ARE ENCO')N7ERED, PROVIDE TEMPORARY 5/0 WALL OF CLEAR FLOOR 5P G SUPPORT OF TNORK 70 BE GUT. FLR FLOOR OW NO NUMBER SPEC SPECIFICATION AC AIR G TIC,AL0NING GPT CARPET Fp FIREPROOF NON NOMINAL OPR SPRINKLER _ GRAB BAR - END VIEW STANDARD STALL AT WATER CLOSET PROTECT EXl5TING ADVERSE AFA DURING GUTTING AND PATCHING 70 PREVENT DAMAGE ACCEDE AG ACOUSTICAL GT CERAMIC TILE Fps FIREPROOF SELF-CLOSING NTS NOT TO SCALE Sa. SQUARE f PROTECTION FROM UTT'i AEWEATCHI CONDITIONS FOR PORTIONS OF THE PROJECT EHA7 MIGHT BE ACC, AGGE55 G7R CENTER AC1���D'5/51/7/-' N®� 5 EXPOSED WRING GUTTING AND PATCHING OPERA7IOND. ACT ACOUSTICAL PANEL DEMO DEMOLITION FT FEET CA OVERALL 5TD STANDARD ACT ACOUSTICAL TILE DEPL DEPARTMENT FTG FOOTING OG ON CENTER 5TL STEEL CUT EX15TING CONSTRI/GTON TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR PERFORMANCE ADD ADDENDUM DF DRINKING FOUNTAIN GA GAGE, GAUGE OH OVERHEAD .5 TOR STORAGE I. HAND A6 III VATED DOOR OPENING HARDWARE TO BE MOUNTED 30" TO 44"ABOVE OF OTHER 601,157)iTION A6TIVITlE5, AND THE SUBSEQUENT FITTING AND PA76HIN6 REQUIRED TO ADJ ADJACENT OIA DIAMETER GG GENERAL CONTRACT (OR) OPNG OPENING SUSP SUSPENDED THE FLOOR AND 70 BE OPENABLE WITH A SINGLE EFFORT BY LEVER TYPE RESTORE SURFACES 70 THEIR OR16INAL CONDITION AFF ABOVE FIN/SH FLOOR DIAL DIAGONAL 6F/ GROUND FAULT INTERRUPT OFF' OPPOSITE T TREAD HARDWARE /7 tIN ALT ALTERNATE DIM DIMENSION 6L GLASS, GLAZING PG POURED GONGRETE TEL TELEPHONE 2. MAXIMUM EFFORT TO OPERATE DOORS 5HALL NOT EXCEED g.5 POUNDS OR BYPA55 UTILITY 5ER✓ICE5 SUCH AS PIPE OR CONDUIT BEFORE GUTTING, WHERE SERVICES ARE SHOWN OR ALUM ALUMINUM 01V DIVISION 6WB GYPSUM BOARD WALL FL PLATE THK THICK (NESS) EXTERIOR DOORS AND 5 FOUND5 FOR INTERIOR DOORS. REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED. G)TOFF PIPE OR GONWIT INWALL5 OR ARCH ARCHITECT (URAL) DL DEAD LOAD HC HOLLOW CORE FL LAM PLA37I6 LAMINATE TO TOP OF 3. REQUIRED EXIT DOORWAYS SHALL HAVE A MINIOIN 32"CLEAR OPENING WITH THE PARTITIONS TO BE REMOVED. GAP, VALVE OR PLUS AND 5,-AL THE REMAINING PORTION OF PIPE ON ARF ABOVE RAISED FLOOR DN DOWN HOR HEADER Pi PANEL T.0.5. (TOP OF STEEL) DOOR AT 90' EO THE CLOSED POSITION CLEAR CONDUIT TO PREVENT ENTRANCE OF MOISTURE OR OTHER FOREI6N MATTER AFTER O PA551NO AND BD BOARD DP DUST PROTECTION HDW HARDWARE PTN PARTITION TYP TYPICAL FLOOR GUTTING. BLDG BUILDING DR DOOR HST HEIGHT PVC; POLYVINYL CHLORIDE LION UNLE55 OTHERWISE NOTED 4. MAXIMUM H A NAXF THRESHOLD TO BE I/2" MAXIMUM VERTICAL CHANGE AT EDGE 11 PATGHWIEH DURABLE 5EAM5 AND MAKE THEM AS INVISIBLE AS POSSIBLE RESTORE EXPOSED FINISH OF BLK BLOCK D5 DOWNSPOUT HM HOLLOW METAL R RISER VGT VINYL COMPOSITE TILE l5 //4"WI7HA MAX BEVEL OF 45°. SPACE DTL DETAIL HP H16H POINT RA RAISED AGGE55 VDT VIDEO DISPLAY TERMINAL 5. FI/RNISN AND INSTALL A l2"EQUILA7ERAL TRIANGLE(VERTEX POIN71N6 UP)ON DOOR 34 MAX PA76HED AREAS AND EXTEND FIN15H RESTORATION INTO RETAINED ADJOINING GON57RIlGTION IN A BO BOTTOM OF DWG DRAWING HTS HEATING FAD RADIUS 70 MEWS FACILITIES AND A l2"DIAMETER GIRDLE ON DOOR TO WOMENS 29 MIN 38 MAX MATTER THATWILL ELIMINA7EEVIDEN6EOF PATCHING AND REFINISHING. BRO BEARING VIP VERIFY IN FIELD ` BRK BRICK DINR DRAWER HVAG HEATING VENTILATION RP ROOF DRAIN VWG VINYL WALL COVERING FA61L17/E5. THESE 5YMBOLS 5HCULD BE OF GONTRA57IN6 COLOR, 114' THICK AND ( 27 MIN WHERE REMOVAL OF NALL5 OR PARTITIONS EXTENDS FROM FINISHED AREA INTO ANOTHER, PATCH AND BSMT BASEMENT E EAST 1 AIR GONOITIONM6 REF REFERENCE W NEST CENTERED ON THE DOOR 60"NIGH. di N REFS REFRIGERATOR REPAIR FLOOR AND HALL .5'/RFAGES IN THE NBN SPADE TO PROVIDE AN EVEN SURFACE OF UNIFORM BUR BUILT E ROOFING EA EACH 16 ISOLATED GROUND W/ WITH 6. AN IN SHALL O ILLUMINATED ANYTIME THE WILDING IS FLOO L WITH LIGHT HALING REIN. REINFORCED 60LOR AND APPEARANCE REMOVE EXl5TING FLOOR AND WALL FINISHE5 AND REPLACE WITH NEW GAB CABINET ELEC ELEVA TRIO (AL) IN INCH WB WALL BASE AN INTENSITY OF NOT LE55 THAN ONFFOOT CANDLE AT FLOOR LEVEL. RE5 RESILIENT MATERIALS, IF NEGE55ARY, TO ACHIEVE UNIFORM COLOR AND APPEARANCE GB CATCH HOLE ELEV ELEVATION is INSULATION (D) (IOW WG WATER CLOSET 1. FURNl5H AND INSTALL EXIT 5EGN5 PER WILDING 60DE® EACH EXIT. 6 MAX TOE CLEARANCE GHIG GABLE HOLE IN CEILING EMERG EMER6ENGY JG JANITORS CLOSET RFG ROOFING ND WOOD RM ROOM 8. FURNISH AND INSTALL APPROVED EXITING ILLUMINfi7/ON AND ILLUMINATED EXl75IGN5 KNEE CLEARANCE 8 MIN WHERE PA 76HIN6 OCCURS IN SMOOTH PAINTED.SURFACE,, EXTEND FINAL PAINT GOAT OVER ENTIRE CBIF GABLE HOLE IN FLOOR ENGL ENCLOSE (ENCLOSURE) LAM LAMINATE (D) RO ROUGH OPENING pV WIRE MESH /TITLE 24. -4 CCTV CLOSED CIRCUIT TV Ea EQUAL LAV LAVATORY W/O WITHOUT W M UNBROKEN CONTAINING THE PATCH, AFTER THE PATCHE7 AREA HAS RECEIVED PRIMER AND SURFACE D SOUTH 48 MIN l7 MIN DEPTH FIN15H COATS. PATCH, REPAIR OR RE-HANG EXISTING CEIL1N65,AS NEGE55ARY, TO PROVIDE AN EVEN GEM CEMENT EN EACH WAY LL LIVELOAD WP AA 1 FURNISH AND INSTALL APPROVED PANIC HARDWARE ON EXl7 DOORS. SGW SOLID GORE WOOD DOOR GI CAST IRON EWG ELECTRIC WATER COOLER LP LOW POINT YNWM WELDED WIRE MESH O. 5EE I7RfWNINCS THIS SHEET FOR ANSI DETAILS. PLANE SURFACE OF UNIFORM APPEARANCE THOROUGHLY GLEAN AREAS AND SPACES INHERE CUTTING CL CENTER LINE EXG EXCAVATE MAX. MAXIMUM 5D STORM DRAIN WDYF WELDED WIRE FABRIC AND PATCHING 15 PERFORMED OR USED ACCESS. REMOVE COMPLETELY, PAINT, MORTARS, OILS, GLG LS, SECT 5 WE7Y, AND I7EM5 OF SIMILAR NATURE 7HOHOROLGHLYGLEAN PIPING, CONDUIT AND SIMILAR FF_ATURES CEILING EXH EXHAUST MAIL MATERIAL 5F SQUAREOUAFE FOOT T TOR 5 BEFORE PAINTING OR OTHER FIN15HING 15 APPLIED. GLO CLOSET EXIST EXISTING MECH. MECHANICAL 5/M SIMILAR GLR CLEAR (ANGE) EJ EXPANSION JOINT MFR. (D) MANUFACTURE (R) (D) CMU CONCRETE MA50NRY UNIT EXT EXTERIOR MIN. MINIMUM GNTR COUNTER FO FLOOR DRAIN MIR MIRROR `COL COLUMN FDN FOUNDATION MO MASONRY OPENING SFjP,L REVISIONS/SUBMISSIONS: DRAWING GONG CONCRETE FE FIRE EXTINGUISHER MTL METAL PEo Aq DATE DESCRIPTION GONST GON5TRUCTION FIN FINISH (ED) N NORTH \y<E w qp i" 0/1 i Y� UMRPw Ac /10TV, LrGCJ PI. GONER CONTRACT(OR) FIXT FIXTURE N16 NOT IN CONTRACT F ", wnvoa m'R�l A66RILVIATIO/if&DETAII P CORR CORRIDOR ur Ny miW CAD FIT' 1194 A-0.01 PROJECT TITLE CONSULTANT: Nemschick Silverman Architects P.C. r§TM'0" 27550MEIROAL) IO/y/ A/VDAL ��sso r1AIn ROAo ".. the business of ARCHITECTURE." CAPAW AM NWI01 f01Y�1I GC" CUTCHOGUL,/If "^"K ' Design and Consulting Services _ 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New fork Phone : 631-734-7007 Fax : 631-734-7347 (sib) 421-04sq Fax (516) 42I-0563 hfp://www.ns-arch.com a COPYRIGHT AnL WNSCHicR sLv RMAN ARcxrECTs PC PVALLS DOOR FLOOR ROOM NUMBER /NAME FLOOR NORTH EAST SOUTH W TRIM EST GE/LING REMARKS MAT BASE MAT BASE MAT BA5E MAT BASE COLOR MAT HEI6HT FL-B HALLVJAYOOI CPT P-1 RB-1 P-I RB-1 P-1 RB-1 P-I RB-I T30 A6T-2 81-0 FL-3 HC BATH 002 C7 P-1 6T P-I CT P-1 GT P-1 6T TBD ACT-1 B'-0 FL-B HC BATH 003 CT P-I CT P-1 CT P-I CT P-1 CT TBD ACT-I b'-O FL-3 A55ENDLY AREA 004 GP7 P-I RIB-1 P-I RB-I P-I RB-1 P-1 RB-I TBD ACT- GYP BE ER TO F.GLG. PLAN F RE✓ARYING GL6 NEIGH 5.l L 5 FL MEGH ROOM 006 ME P-1 P-1 P-I P-I TBD GYP q'-2 I LAYER OF 5/e" TYPE X"GYP. BD. TO BE APPLIED TO UNDER5IDE OF 5TRUGNRE FL-B ADMIN. OFF. 000 CPT P-1 RB-I P-I RO-I P-1 RB-I P-I RB-1 TBD A6T-2 8'-0 FL-B LAN GL OOq CPT P-I RB-1 P-I Ra-i P-I RB-I P-I RB-I TBD ACT-2 8'-O FL-B FILE ROOM 0/0 CPT P-1 RB-1 P-1 RB-I P-I RB-1 P-1 RV-1 TBD ACT-2 B'-O FL-B BREAK RM 0// GPT P-I RB-I P-1 RB-I P-I RB-1 P-I RB-1 TBD ACT-2 8'-O FL-3 EX5TO BATH 012 E P P P P TBD ACT-1 8'-O FL-B t1E5H. RM 013 WP-2 P P P P T30 GYP 9'-2 /LAYER OF s/e" TYPE 'X"GYP. BD. TO BE APPLIED TO VNDER5IDE OF 5TRUCTIRE FL-B MECH R9 014 WP-2 P P P P TBD 6YP q'-2 /LAYER OF 5/e" TYPE 'X"GYP. BD. TO BE APPLIED TO LINDER5/DE OF 3TRUr7VRE FL-3 ELEV. MEGH RM 015 WP-2 P-I P-I P-1 P-I TBD 6YP 7'-2 /LAYER OF%' TYPE 'X"GYP. BD. 70 BE APPLIED TO UNDER5IDE OF STRUCNRE FL-1 VEST l01 CPT P-I RB-I P-1 RB-I P-1 RB-1 P-I RB-1 TBD 6YP 610 FL-I COPY RM 102 CPT P-1 RB-I P-1 RB-1 P-1 Re-I P-1 RB-1 OD GYP 81-0 FL-I GENIMEOIA C FICTION I03 CPT P-1 RB-1 P-I RB-I P-I RB-1 P-1 RB-I 7BD GYP 8'-ll FL-I CIRCULATION 104 CPT P-1 RB-I P-I RB-1 P-I RB-I P-1 RB-I TBD GYP REFER TO REF. CLG. PLAN FOR VARYING CL6 HEl6HT5. FL-1 HC BATH 105 CT P-I CT P-1 CT P-1 CT P-1 CT TBD GYP 8'-O FL-1 CHILDRFN5 RM I06 CP7 P-I RB-1 P-I RB-I P-1 RB-1 P-1 RB-1 TBD REFER TO REF. GLG, PLAN FOR CLARIFICATION. FL-1 PROGRAMMING 101 OFT P-I RB-I P-1 RB-1 P-I RB-I P-I RB-I TBD GYP Bb FL-1 PARENT AREA 108 CPT P-1 RB-1 P-1 R3-1 P-1 RB-1 P-I RB-1 TBD GYP T-IO I/2 FL-I CHILDRENS LIBRARIAN 1Oq CPT P-I RB-1 P-1 Ra-i P-I RB-1 P-1 RB-I TBD GYP 7'-IO I/2 FL-1 HAI CPT P-1 RB-1 P-I RB-I P-I RB-1 P-1 RB-I 7BD 6YP 8'-O FL-I YA DIRECTOR Ill CPT P-I RB-1 P-I RB-I P-1 RB-1 P-I RB-I TOE, GYP 8'-O FL-1 YOUNG ADUL T5 Il3 GPT P-I RB-I P-1 RB-1 P-1 RB-1 P-I RB-I TBD GYP 8'-lI FL-1 COMPUTER TERMINAL 114 CPT P-I RB-1 P-I RB-1 P-I RB-I P-1 RB-I TBD GYP 8'-ll FL-1 GENERAL STACKS 115 CPT P-I RB-1 P-I RB-1 P-I RB-1 P-I RB-I TBD GYP 8'-ll FL-I CLOSET 116 CPT P-1 RB-1 P-I RB-1 P-I RB-I P-I RB-I TB? 6YP 8'-0 FL-2 DIR. OFFICE 201 CPT P-I RB-1 P-1 RB-I P-I RB-1 P-1 RB-I TBD 6YP REFER TO REF. GL6, PLAN FOR VARYING GLG HE16143. FL-2 INTERMEDIATE LAND/N6 201 CPT P-I RB-I P-I RB-I P-1 RB-1 P-I RB-1 TBD 6YP REFER TO REF. GL6. PLAN FOR VARYING GLG HEl6HT5. FL-2 REFERENGE/NONFIGTION 203 CPT P-1 RB-I P-I RB-1 P-1 RB-/ P-I RB-I TBD 6YP REFER TO REF. CL6. PLAN FOR VARYING CL6 HEl6HT5. 5PRIN6LlNE FL-2 STUDY/NTOR ROOM 'B"204 CPT P-I RB-I P-I RB-I P-I RB-I P-I RB-I 7BD GYP REFER TO REF. GLG. PLAN FOR VARYING 6L6 HEl6HT5. FL-2 5IDDY/TUTOR ROOM 'A"205 CPT P-1 RB-I P-I RB-I P-I RB-I P-I R8-I TBD 6YP REFER TO REF. CL6. PLAN FOR VARYING CL6 HEl6HT5. `p \ FL-2 FINANCIAL DIRECTOR 206 CPT P-1 RB-1 P-I RB-1 P-1 RB-I P-1 RB-1 TBD GYP REFER 7O REF. CL6, PLAN FOR VARYING CLG HEIGHTS. n FL-2 GALLERY/AUD10207 CPT P-I RH-I P-I RB-I P-I RB-I P-I RB-I 7B9 6YP REFER 70 REF. CLG. PLAN FOR VARYING GLG HEIGHTS. ry FL-2 LOCAL HISTORY RM 20B CPT P-I RB-I P-I RB-I P-I RB-I P-I RB-I 7BD GYP REFER 70 REF. CLG. PLAN FOR VARYING GLG HEl6HT5, ITEM I OFaCRIPFIOWLOCATICW MAIkIPACFLRER X REMARKS ITEM HSKIPFIOAK. ATlC1V MAMPAO1tIRER X WAWACnPWR X Rp/,1RK5 PAINT ftLG'R!GASP CEILINS P IWLISIfA4IB MIZIEY6M5WLRMIN M'IW2R IpVlI611E AG11].V'E'14H (QLF ASl6l HCM[LR•d6ttMI WI NML L[WUFM1A"RE W.ZIFXA.'viRG NWikll.@L(<WIAWSME kMIA'N.2R.YS III£ N1rG4fA5R15NWPk,YtZ IN[R Ab 5111Y N N4LSIfAINS WGYfkBt.VtlYi�rs � Ki-I NMLIOFV]'Mlill ARY+1nYk-RRtlN W6dl-4leRkFIX ASWIkR9SIKf4 hl9m rFfYAY kN •1CMICLL rE11Mf 1YE ro xeuAw ran rumvrxsruurauNrxarere,exX"-"kmaewe. Pa xeseeoure� .uwvPlnmueYSEleaal r<tc« z Arosxuram:ruE l4,_2„ rvu m;as Aw Tins rAPik FHt aN a®eeaure� xrir,e•a�ew.E xeE-eaaeAs�nxwrrsrs.�eergl on&R re Teas eEamlrlEwe,auXx rxrrr LPI' rA0'(r RE IWM%RW-MFBlAa]YIKA�FLIg1 rRM&M1M STRIP 16YH1- � 9.YX l%.q£I NIMLVFF iO W.II WI flGq` IA:V'flfX ft[CR LI /wNKrrE AS B+nYIXrlcrs 9£LIKN M40E5Y[/E ASFWAwMrrPLr5 E6U.MN EPIIII.MGi9EL 5H'rKR Aa".tliBRAMVIH rve xcax sr3aeuwuwrs,wEm retwuwewa Hnrrocarxverva/w P/Y rcn,�,uxe UN07r I,iIIdJSINSPTF51 fRY6WA[!8(rrtlu5KF6f AYMISS'52ttN KFFKNAYE CF FlOA4NJUY.YCNLCIdYl4Y. NOMsMrdavNSIMMAIIptW.'E hN IlErt9VscFlwqu sin. mTSXNWKtt® nrerPnua.ro�.x"rmerww.u�Eeealemmnvcum.Xtr.�,voewe. avxrmn vaArs�An FMMEaSMGMW5MM aeNeA�rarM J,vo rvnroPwawrars.ua�scuaer uw: msaxrnws .Y LMIPAL2R5WL Fe0Y91FfEAMJMb flN5L5W1WN EVN T&.(9r1A£YA'EYIBrEIV.ti:O.Pl6lVANO 1811£Y ECEM145fVY3'L9/ M9. flA519tX4L5 KWFkM1INb/4{Atl2ElNI JB/MBIMWWAAA% RRNS'IINIWUL A'D fIXGT'S4flF+I0AYWReiKRRReYAIO AWb,AL FAI]t GIMErfldPMENL YIFKBNTIYP/d'G1M£(IYCENSIF.Hi flGN£KIGNIIGE.NLtl FFR Al4PPf[VI {1N1. AFUIN4Lf M�.Vb Gi PSIN1.1MM4 FAtlUE ttv[erAW A4MUKlRKR Io tl6IN/AIkWNAr ttMRA41[Ib a'ERSC 4l.giV,•.LL/a3IA'@eIIWM MAIIK.IARRh®S411L ME ItlfPAfEALL SPFk8lNa5EY£IBYrAE RMLF All[HWE.WMRR bNE ftOI. 11HEdlbl®i01AIGl AYMlt M12NGFbrIN4fLMFki/M 5'I4L XGYY MI6t2 pO19MAhN AYJ AMJ/XfIK NEOINS A'OMi.'AH41. arsarmeirs/r�wXruitrvxx` vr. rorwsi�e� e ra'�e I �wu.i. eir°""a-wacrrAcmlR,rnasinu lcwrt.ec/aeuae I\6 fff@nI8/Ar MIfN AIpE A'D 66'[®WMFXGINSflNGFi lb M1l]Hf ICWYWIA ATN rgMFN®Mr46M1Y '\D\J m�e neuxraAcaw�IEXeim roavrevmm+caarlaeraaerowrawE.crl��meAaw uaeae meumrs nuvsm (t\3 aawxvxxe reae w.uffaau®nrcamekrex.eosEa u+rb,uwesrxay.wl®meu msrnercvw�:. I.D. MANUFACTURER MODEL R.O. ELEVATION REMARK5 O A MARVIN OR EQUAL CUSTOM VERIFY IN FIELD I MULTI WIDE ROUND TOP AVOID WINDOWS W/5PRIN5LINE B MARVIN OR EQUAL CUSTOM VERIFY IN FIELD l MULTI WIDE ROUND TOP WOOD WINDOWS W/5PRIN6LlNE G MARVIN OR EQUAL CUSTOM VERIFY IN FIELD l t-VLTI WIDE ROUND TOP A00D WINDOWS W/5PRIN6LlNE D MARVIN OR EQUAL CUSTOM VERIFY IN FIELD I I-R/L AWIDE ROUND TOP WOOD WINDOVV5{W 5PRIN&LINE E MARVIN OR EQUAL WANN 2828 2'-5"X 2'-4 q/Ib" 2 F MARVIN OR EQUAL WAWN 2828 2'-5"X 2'-4 11/0' 2 6 MARVIN OR E60AL HAWN 2828 2'-5"X 2'-4 q/16" 2 H MARVIN OR EQUAL WAWN 2828 2'-5"X 2'-4 q/I6" 2 J MARVIN OR EQUAL WANN 2828 2'-5"X 2'-4 q/I6" 2 K MARVIN OR EQUAL HAWN 2828 2'-5"X 2'-4 q/16" 2 L MARVIN OR EQUAL WAI*2828 2'-5"X 2'-4 q/l6" 2 M MARVIN OR EQUAL HAWN 2828 2'-5"X 2'-4 06" 2 N MARVIN OR EQUAL CUSTOM VERIFY IN FIELD 3 GOTHIC HEAD W/5PRIN6LlNE z P MARVIN OR EQUAL HAWN 2828 2'-5"X 2'-4 q/Ib" 2 i Q MARVIN OR EQUAL WAWN 2828 2'-5"X 2'-4 q/I6" 2 qq R MARVIN OR EQUAL WAINN 2826 2'-5"X 2'-4 q/I6" 2 O ? 5 MARVIN OR EQUAL HAWN 2828 2'-5"X 2'-4 q/I6" 2 T MARVIN OR EQUAL WA9N 2828 2'-5'X 2'-4 qA6" 2 U MARVIN OR EQUAL HAWN 2626 2'-5"X 2'-4 q/l6" 2 V MARVIN OR EQUAL HAWN 3248 3'-I"X 41-0 I/I6" 221 W MARVIN OR EQUAL HAWN 3246 3'-I"X 4'-0I/l6" 2 ~ ~ � O IL X MARVIN OR EQUAL HAWN 3246 3'-I"X 4'-0 I/l6" 2 Y MARVIN OR EQUAL WAWIV 3248 3'-I'X 4'-O l/l6" 2 j L LIJ NOTES: _ REFER TO SGHEWLE +� 5_7" ALL OPERABLE WINDOWS SHALL INCLUDE INSECT 5GREEN5, FACTORY HERD AND 5EAT BOARDS,AND FACTORY 9 VERIFY IN FIELD EXTENSION JAMBS. O ALL GLAZING WITHIN F THE FINISHED FLOOR SHALL BE TEMPERED GLASS AS PER NYS GODS- VERIF7'WI7H O MANUFACTURER FOR SPECIFIC REQUIREMENTS PRIOR TO ORDERING WINDOWS. JSCALE = N L5. SEAL SPED L' REVISIONS/SUBMISSIONS. DRAWING TITLE. 5 �W. Msr M1` DATE DESCRIPTOR H W� • ct�-� WNW Vn MRPWCM , "CEILDULF/',/TOTE/' � Ia�lma Revllxinl * * & LEGCAI)l re CAD FILE NAME 1194 A-1.01 PROJECT TITLE. DATE NSA PROJECT •: CONSULTANT. �.Q FLOOR P /IORTp the business PROPOJED ADDITIO/1J A/1D ALTEZAT O/y/: /C PT. 18. 2000 /1JA 05-1194 emschick Silverman Architects P.C. _ 27550 MAI/Y ROAD SCALE: DRAWING No.: ". .. CMANO AND �ANN01 DNOMDII�, Design and Consulting Servloes 735 Deerfoot Path, Cutchogue, New York 11935 Phone : 631-734-7007 Fax : 631-734-7347 20 High Street, Huntington, New York CUfCt1000E,NEW YORIC 11955 W (516) 421-045-1 Fax (516) 421-0565 /10TED A http://www.ns-arch.com DISTRICT: SECTION: BLOCK: LOT: DRAWN BY. L\ •O COPYRIGHT 2006 NEWCHCK MVERMM ARCHTECTS PC /�{Q 1000 109 06 2.2 MR /ram DOOR FRAME GROUP I 6RCUP 2 GROUP 3 206 A. DEFLE6TO TRACK GROUP 3A BOLTED TO 5TRUOTURE ABOVE O HIN6E5: (l 112 PR)5TANLEY, FBB 17q, 4 I/2" HIA&E5: (l I/2 PW 5TANLEY, FEB 179, 4 112" NlN6E5: OAP)STANLE ,, FBB17Q 4 1/1"X 4 5TRDCRAEABOVE 32"O.C. NO. FROM/TO NIT OIMEN5/0 THRESHOLD HOME RATING REMARK5 X 4 I/2"X 5TV p T. x 4 v2"X 5T0 HT. HW6Es: 112" 5TANLEY, FBBnq, 4 uz"x a 112"x 5TV MT. J HAND MAT ELEV MAT ELEV GROUP CLOSER: L6N 4041(ADA APPROVED) CLOSER: LGN 4041 (ADA APPROVED) I/2"X STD PIT 1 „ EXTEND EVERY THIRD 5TU9 UP TO UNDERSIDE OF CLOSER: L6N 4041(ADA APPROVED) CLOSER: L6N 4041(ADA APPROVED) 5TRUGTURE ABOVE. SET 1/0 STUD DOWN l/2"FOR 2OGA. DEFLECTION TRACK EXP. B 3.01 HALLWAY 00//ADMIN OFF16E 008 (2)30 X 6'8 HR/RH WD 2A HM A 3 SGFD RN ACTIVE W/V.P. EACH LEAF STOP: IVES FLOOR OR WALL STOP STOP: IVES FLOOR OR WALL STOP STOP: IVES FLOOR OR WALL 5TOP STOP: IVES FLOOR OR WALL STOP �LTED TO 57R1/GTI/RE ABOVE® EXPAN510N STUD TO RIDE FREE IN TOP TRACK LOGK5ET: YALE CYLINDRICAL LOGK5Ep H.D. L05K5ET, PALE CYLINDRICAL LOGK5ET HE, LOCK5EF YALE CYLINDRICAL LO6KSEF H.D. 1 _ 32"O.G. LOCK5EL YALE CYLINDRICAL LOGKSEH HD. - 1 ' 240A. TOP RUNNER SET BETWEEN FULL HEIGHT 8.02 ADMIN OFFICE COB/LAN RM 004 3b X 66 LH 4VD I HM A 4 - 5400LN SERIES, WITH AU LEVER 5400LN SERIES, WITH AU LEVER S400LN SERIES, WITH AU LEPER ��; I I I STUDS. TAB INTO STUD FLANGE AND FASTEN 5400LN SERIES WITH AU LEVER HANDLE AND TRIM X 626, PASSAGE HANDLE AND TRIM X 626, PRIVACY HANDLE AND TRIM X 626, ENTRY BOO FILE RM 010/BREAK RM 01I 30 X 616 LH WID IA HM A l - LOCK FUNCTION WITH 6-PIN HANDLE AND TRIM X 626, ENTRY LOCK FUNCTION WITH 6-PIN AGG 5: -lO"X 34"5,5. KICK PLATE FUSN INTERCHANGEABLE LOCK GORE LOCK FUNCTION WITH 6-PIN INTERCHANGEABLE LOCK CORE E CEILING(SEE PLANS) 3.04 ADMIN OFFICE 006/CLOSET 26 X 6 B RHR WD I HM A I I-112 HR SGFD 5/DE INTERCHANGEABLE LOCK GORE : CEILING (SEE PLANS) -DOOR HOLDER(FOOT) ACC 5: l0"X 34"5.5. KICK PLATE BOTH AGG 5: -HEAD G FOOT FLUSH BOLTS IN :! B.OS ADMIN OFFICE 008/MEGH RM 013 (2)30 X 68 LHg2H VJD 2 HM A ALUMINUM 3A I-l/2 HR xFD LH ACTIVE LEAF SIDES OF DOOR AOG 5: -HEAD f FOOT FLL15H BOL T5/N ACTIVE ACTIVE LEAF FULL LENGTH OF LEAF FULL LENGTH OF ASTRAGAL $ ASTRAGAL 6 600RDINA70R. �J B.06 ME6H RM 013/MEGH. RM 014 3'O X 60 LH HM I HM A 4 - COORDINATOR. -IO"X 34"5.5. KICK PLATE ON -IO"X 34"5.5. KICK PLATE ON PU5N PUSH SIDE BOTH LEAFS. 1 CONTINUOUS I-I/2"X I-I/2"I66A. GOLD ROLLED B.07 HALLWAY OOI/MENUS H6 BA TH 002 30 X 6'B LH WD l HM A 2 - SIDE BOTH LEAFS. -ZERO ✓r367AA HIGH SOUND - - 1 :: /LAYER 5/8"GYP. BOARD EACH 1 CHANNEL CAT AT 8'-O"O.G. VERT/GALL Y MAX AUTOMATIC DOOR BOTTOM SIDE BOB HALLWAY CO//h'OMEN5 HG BATH 003 3'0 X 68 RH WD 1 HM A 2 - -ZERO It370A MAGNETIC DOOR SEAL FOR HEAD AND JAMBS, .3b X 68 LHR 3-I/2"5AFB INSULATION B.Oq HALLWAY 001/MEETING RM 004 I'6 X 6 b RHR 4A HM A 3 - 3-l/2"SAFB INSULATION B.IO MEETING RM 004/MEGH RM 006 30 X b 8 RH 4 HM A ALUMINIUM 3A I-I/2 HR SGFD GROUP 6 GROUP 6A I LAYER 5/8"GYP. BOARD EACH 20 X 6 B LH GROUP 4 GROUP 5 : `�/ B lI MEETING RM 004/WELLED EXIT 30 X b b LHR GALV. I GALV. B ALUMINUM 5 I-l/2 HR f..'FD POOR TO BE INSULATED NO HONEY COMB PERMITTED. HINGES: (I-I/2PRJ 5TANLEY, FBB 179, 4 I/2"X HINGES: (I-I/2PR)5TANLEY, FBB 179, 4 I/2"X HINGES: (I SET)JOHNSON HD BI-FOLD DOOR HINGES: (2 SETS)JONNSON HD BI-FOLD _ 3 5/8" 22 GA STEEL STUDS® I6"O,G. HDWRE PER 501/0 GORE WD DR. DOOR HDWRE PER SOLID GORE WD 5/DE(WIR. ®WET AREAS) PROVIDE GLEAN GYP. BD. TRIMMED OPENING. 4 I/2"X STD WL 4 //2"X STD WT CLOSER L6N 4041(ADA APPROVED) 6LOSER: I&4041(ADA APPROVED) ,j WALL BA5E-5EE 50 EPLE 3 5/8"22 6A. STEEL 5Tl/OS® I6"O.G. B.12 MEETlN6 RM C04/CL05ET (2) 40 X 6 B BF WD 3 - - CLOSER: LGN 4041(ADA APPROVED) CLOSER: L6N 4041(ARA APPROVED) B O MEETING RM 004/CLOSET (2) 40 X 6 B BF WD 3 - - PROVIDE GLEAN GYP. BD. TRIMMED OPENING. STOP: IVES WALL STOP STOP: IVES WALL STOP 206A. BOTTOM RUNNER EXP. 1 WALL 5A5E-5EE SCHEDULE STOP. IVES FLOOR OR WALL STOP STOP: IVES FLOOR OR MALL STOP LOGK5ET., YALE CYLINDRICAL LOGK5Eb H.P. LOGKSET.� YALE 6YLINORI6AL LOCK5EF HD. BOLTED TO FLOOR 9 32'O.G. 2C6A. BOTTOM RUNNER EXP. BOLTED 3..14 ME6H. RM 014/ELEV. MA6H RM 015 30 X 66 RHR HM IB HM A 4 I-112 HR 5GF9 [OGKSET YALE CYLINDRICAL LOGK5E7,�N.D. LOCKSET. VON RUFFIN PANIC BAR EXIT I ; TO FLOOR a 32"O,G. 54OOLN 5ERIE5, WITH AU LEVER DEVICE- 99E0(RIM DEVICE)EXIT ✓40OLN SERIES WITH IVES DR FULL 540OLN SERIES, WITH IVES OR _ - NEW FINl5NED FLOOR HANDLE AND TRIM X 626, HANDLES A5 PER ARCHITECTS FULL HANDLES A5 PER NEIN F/NI34ED FLOOR ONLY- NO EXTERNAL HARDWARE SELECTION FROM MANUFA671)REER5 AR6HI MCT5 5ELEC TION FROM AEW/EX15T'G_c0-FLOOR/5LAB ND. TRACK I ROLLERS W/FLOOR GUIDE PROVIDE CLEAN GYP. BD. STOREROOM FUNCTION WITH 6-PIN FULL LINE MANUFA67UREER5 FULL LINE NFJN/EXI5T65UB-FLOOR/SLAB I I,OI PROGRAMMING 107/CLOSET 50"X 6 b" BF VJD 5 6 - TRIMMED OPENING. INTERCHANGEABLE LOCK 60RE AG65: -10"X 34"55 KICK PLATE ON p �,/ INSIDE FACE OF DOOR. AG65: 55 KICK PLATE ON IN515E FACE OF AG65: 55 K16K PLATE ON JN5IDE FACE Wf"t T W!`�h h TY� � A665: -IO"X 3q"5.5. KICK PLATE PUSH -ZERO N367AA H16H SOUND DOOR OF DOOR. SIDE AUTOMATIC DOOR BOTTOM 2 2.01 GALLERY/AUDIO 207/EMER. EXIT 57AIR 30 X 66 RH GALV. lA GALV. A 5 /-112 HR 5CF9 -OCYJR HOLDER(FOOT) -ZERO ✓<370A MA6NETI6 DOOR NON RATED(U5E MR. GYP. 6 PET AREAS) NON RATED NSE MR. GYP. 0 WET AREAS) 202 2NO FLR CONNECTOR 2021PIR. OFF 201 3'OX66 LH WD l HM A 7 - SEAL FORHEAD AND JAMBS. I,�I n .,/ ^ L� ^ I^I n I^I I� ^ I^I /� 2.03 REF. NON-FIG. 2,93/STUDYRM 204 5OX60 RH WD I HM A 8 - I A Y ALL T I PE IA (r1-IY'1SE Y ALL) 2A NALL 7rfE 2A (CT- A5E Y ALL) 2.04 REF NON-F16. 203/5WT'RM 2O5 3b X 60 LH WD I HM A 8 - f� SAME AS TYPE l FXGEPTWITH 6"STUD � /� SAME AS TYPE 2 EXCEPT WITH 6"5ND GROUP 7 GROUP B 2.05 REF. NON-F16. 203/FIN. DIR. 206 30 X 66 RH WD I HM A 7 - NlN6E5: (I-1/2PR)5TANLEY, FBB 17q, 4 1/2"X NlN6E5. (1-1/2PR)5TANLEY, FBB I79, 4 1/2"X q L T�/� @ (�LJ p �� I^I ^ ��) PROVIDE GLEAN 6YP. BD. TRIMMED OPENING. 4 112"X STD XT 4 //2"X 5TD MT. A L- I 5 f-I/"t Y 'A 206 FIN DIR. 206/5TC 30 X c e BF PVP 5 6 - CL05ER: LGN 4041(ADA APPROVED) CLOSER: LGN 4041(ARA APFRO✓ED) 25 SAME A5 TYPE 2 WITH GYP. BD AND FIN15H 2.07 6ALLERY/AUDIO 207/LOG HIST. RM 208 30 X 6 d RH WD lA HM A 7 - STOP: IVE5 FLOOR OR WALL 5TOP STOP. IVES FLOOR OR WALL STOP ON 151PE LOCK5EL YALE CYLINDRICAL LOGK5ET,-H.D. LOCK5ET- YALE CYLINDRICAL L0CK5ET N.D. 540OLN 5ERIE5 WITH AU LEVER 541 SERIES, WITH AU LEVER HANDLE AND TRIM X 626, ENTRY HANDLE AND TRIM X 626, FUN6 TION WITH 6-PIN GLA55ROOM RAC TION WITH 6-PIN LEGEND MAT. = MATERIAL LH = LEFT HAND AL = ALUMINUM 5CFD = SELF 6L05IN6 FIRE DOOR INTERCHANGEABLE LOCK GORE INTERCHANGEABLE LOCK CORE RHR = RIGHT HAND REVERSE ACT = ACTIVE LEAF GL = 112' THICK TEMPERED 6LEAR 6LA55 GALV. = 6ALVANIZED AGG 5: 51D X 39"55. KICK PLATE PUSH AGG'5: 51D X 39"5.5. KICK PLATE PUSH SIDE SIDE LHR = LEFT HAND REVERSE HM = HOLLOW METAL BF = BI-FOLDING -DOOR HOLDER(FOOT) -DOOR HOLDER(FOOT) RH = R16HT HAND WD - WOOD IM = INSULATED METAL CAULK BOTH 5/DE5 WITH 3M FIRE BARRIER IR�IDER5IDE OF 5TRUbTLRE ABOVE GP 25PO CAULK. NOM'5: U ALL EXISTING DOORS ADJACENT TO AFFECTED WORK AREA(5)SHALL BE PREPARED, PRIMED AND PAINTED WITH NEW TRIM COLOR PER AR6HITEGT5N5ER SELECTION. DOOR FRAME TO ALSO BE PREPARED, AND PAINTED NOTES: UNDERSIDE of 57R1/GNRE ACJVF l5/8° 2GGA STEEL STUDS®24"O.G. AS NOTED ABOVE PROVIDE NEW SIGNA6E PER 51GNAGE SCHEDULE CONTRACTOR TO PROVIDE DOOR SIGNAGE SCHEDULE TO ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO ORDERING/MANUFAGNRING. IJ PROVIDE GONSTR!/GTION CORES FOR ALL LOGKSETS, MASTER KEYED W/5 KEYS EACH 20 GA. DEFLECTION TRACK EXP. BOLTED TO 5/8"GIP. BOARD 2) ALL DOORS AND FRAMES SHALL BE PAINTED BOTH 5/DE5, U.O.N. 2) PROVIDE lO FASTER KEYS TO OWNER/CONSTRUCTION NCR. .:,< 1 STRUCTURE ABOVE® 32"0.6, 3) ALL DOORS/ROOMS SHALL RECEIVE NEW 5I6NAC-E 3) FINAL KEY CODING/CORES SHALL BE BY OWNER. 4) WHERE PAIRS OF DOOR5 ARE NOTED IN 5CHEDULE, HAND NOTED SHALL BE AG 1/VE LEAF. ,r 3" THERMAREER 5AFB INSULATION(5SVUND GEILIN6 (SEE PLANS) 5) ON ALL BI-FOLD DOORS PROVIDE 5TAINED WID MOLDING TRIM AT HEAD TO CONCRETE HDWRE $ GAP. PROVIDE DETAIL TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION ATTENUATION FIRE BLANKETS) 6) ALL EXISTING DOOR5 TO BE REFINISHED. METAL DOORS TO BE 5GRAPED, PRIMED AND PAINTED ROOD DOORS TO BE SCRAPED, RE-STAINED AND POL YURETHANED. GEILIN6 'SEE PLAN5J _ _ 1112'R1610 IA�S')IATION SET BETIM1EEN 5TUD5 VARIES �L�L VLF CONTINUOUS /-I/2"X l-1/2"I6GA. GOLD ROLLED 6HANNEL GAT AT 6'-O"O.G. VERTICALLY MAX &KEXl5TIN6 FOUNDATION WALL SEE/ SCHEDULE 1 SEESEE 51 1 SEESEE 51 1 SEE 5GHEDULE SEE SCHEDULE SEE SCHEDULE SEE SCHEDULE ' [2]LAYERS 5/8"FIRE RATED TYPE X"GYP. HOLLOW METAL DOOR FRAME MA50NRY PARTITION BOARD EACH 5/DE (lNIDTH VARIES) 5EE 5TUD5 a l6"0.6. WITHWELDED CORNERS 3 5/8" 22 GA T L CONTINUOUS 6"22 CA. GALV. SHEET STEEL Z" (- FILL FIRST CELL SOLID Wl7H GYP. BOlMAS. 6ROUI. REFER TO 5TRUGT. KICK. (BOTH 51DE5) PARTITION N DW65 HALL BASE-5fE 56HELVLE WALL BA5E-5PF SCHEDULE (WIDTH VARIES) HOLLOW METAL DOOR FRAME 20 6A. BOTTOM RUNNER EXP. BOLTED TO 20 CA, BOTTOM RUNNER EXP. BOLTED TO _ FLOOR a 32"Ob. FLOOR ® 32'0.6. C WITHWELDED CORNERS U / / \ / \ O '� CONTINUOU5 BACKER ROD AND CAULK BOTH NEW FINISHED BOOR _ 112" TYR SIDES WITH 3M FIRE BARRIER GP 25WB �- 0 � � U� w CONTINUOUS CAULK I 'i O ¢ JOINT ALONG - - CAULK. — — O - NEW FINISHED FLOOR m Q7 / `r u PERIMETER -___- NEW/EXlSTG`..✓�-FLOOR/SLAB IN91A TE JAMB WHERE �rl -__ J,-, _',_ I,�I ^ NEW/EX15T65UB-FLOOR/SLAB I,�I ^ �/ ,( ADJACENT TO SOUND _ -_ T___ - -T_ ry y `�TR�L, TY�� YY!` LL TI PE Y (4)'Z"6LIPS PER JAMB MlN SENSITIVE ROOM - _ 1 _-I-, _ 4 \ (4)7'CLIRS PER JAMB MIN 2HR. FIRE FATED JOINT ALOS CAULK (OL DES U411) JOINT ALONG 51ZE VARIES O PERIMETER JAMB SECT "A„ 4A WMFI�� TY� 4� JAMB SECT "B" HEAD SIMILAR I,�6IM/E0IG5I TYPE 4�,/EXGEPTWI7NB22GAfSIT�L.^STUDS® I^I I I O _ - CONC. FDN IWILI �� y `TALL T I FE 4L1 (VTI/tSE Y YI�I�I�) O s/e°GYP. BD. 5AME A5 TYPE 4 EXCEPT WITH 22 6A. 5TL. STUDS _-_-- Y2"R161D IN5ULA TION DON OR 24"O.G. -- FWAL SET BETWEEN I% 20 6A. GOINTAOUS CAULK 5TL 571/D5® 24'O.G. JOINT ALONG - SEE 5GHEDULE SEE 5GHEDULE SEE 5GHEDULE E SGHEDUL SEE SCHEDULE E 56HEDUL SEE/, SCHEDULE Z PERIMETER 9I SHAFT WALL ASSEMBLY SHALL BE SEPARATE AND INDEPENDENT FROM %'XP 6YP. BD. RETURN IN HALL /STRLbNRE BALKING. n J-6HANNEL / FLOOR STRUCTURE A�VE CAULK JL Q\ GROUT FRAME SOLID/ BARRI�GP SIDE PlIT H 3M FI l"SHEETROGK BRAND 6YF5I/M PROVIDE ANCHORS(3)PER 5 1/6" KORFIL INSULATION LINER PANELS w / / JAMB PER SDI 571/D5, 5/B"TYPE X"RRE RATED NEW l/5G STEEL J-Rl/NNER 24GA. W 61P.BOARD SLEEVE/FIRESTOP i,b i. BOLTED TO SLAB 32"O.G. �f- JAMB SEG T °G" PENETRATIONS TO GODS 7HRU CUSHION A6A1-A0 STRUCTURAL NEW USi STEEL J-RUNNER 24GA. // �j MASONRYWALL. � w dIA 5 � TT / LOADING THERMAFIBER 5AFB G90 CW BLO'GK MIT. HtL HEIGHT INSULATION(50UND ATTENUATION 4 \ \ G 56ALE = N L5. SEE PIAN FOR SIZE FIRE BLANKETS) l516' 206A 5TEEL 5TUD5 \ I"SHEETROGK BRAND GYPSUM NEWTAUR-O-WAL TRUSS TYPE MASONRY A LINER PANELS VERIFY VERIFY REINFORCIN5 EVERY SECOND CaRSE i ELEVATOR t O O O SHAFT [2]LAYERS 5/8°FIRE RATED COO Xx, a e FILL FIRST 3 COURF.E-5 OF BLOCK GIP / ' °° WITH 3000 PSl CONCRETE 4"U5G STEEL G-H STUDS 22 GA DOORVINYL REDUCER �.} DOOR DOOR P FRAME RUBBER BASE 0 24"O,G. MAX. A STRIP „ FRAME HALL BA -5EE G E ULE (21LAYERS 5/8"FIRE RATED A GROUT MARBLE -5EE 5GHEDULE N6 REBAR MIN,24°H16H DOWELED INTO A-1.03 A-L03 CARPET VINYL GERAMIG 7 ry SADDLE EXISTIN65LA8®4'-0"O.G. GYP 2" 2' COMPOSITION TILE CARPET NEW FINISNm FLOOR ( NEW USG STEEL J-RUNNER 24GA. 2 5EE 5GHEDULE 2' SET 5GHEDULE - _ — _ �6AIN�STRUCTURAL LOAD/ ION TILE V� ® 2O.G MAX 4"U56 STEEL H STUDS 21 GA --- FLOOR SLAB ry NIL TI NIT--GIGO EPDXY 5Y5TEM m SEGTION A WALL TYFE 5 (ELEV. SHAFT) NALL TYFIE 6 (5HAFF i /HALL) A A I: CARPET / VGT DETAIL 2: GERAMIG TILE / GARPET DETAIL J 6 2HR. FIRE RATED 2"FURRED MASONRY HALL 1. ALL DOOR5 TO BE I8 GA. METAL (HOLLOW OR INSULATED WHERE NOTED). A-L03 A- .09 /3HR. FARE/ RATED�/(UpL DE5 Ugl4AJ \ / NL DE5 U415) 2 ALL FRAMES TO BE I6 6A HOLLOW METAL. Y Y�61� T �P'� ( 1�� Y . �H>� T) 3. ALL DOORS HAVE A l 314" TH16KNE55 VERIFY �� ¢, ALL FRAMES 70 HAVE[4]ANCHORS PER JAMB VERIFY SAME a TYPE 3 EXGEPTWI7H 22 GA. 5TL. STUDS® 24"O.G. 5, PROVIDE[3]SILENCERS PER JAMB AT STRIKE OF SINGLE SWING 3HR. FIRE RATED 6 PROVIDE PROVIDE LOUVER UNITS ® EAGHHEAD OF DGRBOOhDOORS 8. PROVIDEV4"WIRE 6LA55 VISION PANEL AT ALL RATED DOOR5 COO DOOR GARPET -DOOR FRAME q PROVIDE P UNDERCUT DOOR /0. ALL FRAMES TO BE FULL YWELDED. KNOCK DOWN FRAMES ARE NOT ACCEPTABLE FRAME x ;:;; , GROUT 'Y MARBLE CERAMIC <„ w SADDLE fu TILE VGT GARPET SCALE = NT.S. 3: GERAMIG TILE / VGT DETAIL 4: CARPET / GARPET DETAIL S Ep C REVISIONS/SUBMISSIONS', DRAWING TITLE t7c W ti"T DATE: DESCRIPTION 5 y Fn a9nam vn¢oroRPI DOOR./'CNL[)UL/',DETAII,/' * & WALL TYPU P SCALE = NL5. NOTE: REFER TO MEGH DW65 d DOOR SCHEDULE FOR UNDERCUT DOOR GON5ITIONS. ^-!it Ap CAD FILE NAME' a 1194_A-1.02 PROJECT TITLE. DATE: NSA PROJECT : CONSULTANT: FLO R � PROPQ/'ED ADDITIO/1J AND ALTERATIO/1J: Nemschick Silverman Architects P.C. JEPl. 18, 2006 /1JA051194 '...the business of ARCHITECTURE.. COANO AND PARKNII tiNWNN0ID, 6Q 27550 MAIA ROAD SCALE: DRAWING NO.. Design and Consulting Services - --- 735 Deerfoot Path, Cutchogue, New York 11935 � CUTGf10GUE, NEW PORK 11935Ar 20 High Street, Huntington, New York PIOTI=D Phone : 631-734-7007 Fax : 631-734-7347 (sib) 421-o4sa Fax (sib) 421-Osb3 SECTION. �� 1 02 DISTRICT' BLOCK LOT. DRAWN BY: http://www.ns-arch.com 0 CUYRlcHr 2006l &CHCK SLVERnun ARCH171 s rc. /`{O m 1000 109 06 2.2 IL Land Now or Formerly of: Roman Gat o/Ic Church of 5acred Heart u9 z 2 - ' - - - 4 r �1 0 sa O1T� ��AN N®T50 1 GdI m cla I I�Q°o m 6-O 22 ' G22 3 COI. CAREFULLY REMOVE AND 5AVE EX15TG WOOD RAMP AND 5TORE IN �11 NFJ'J GONGRE . WALK 3l,9 •�,_ 5AFE PLACE UPON COMPLETION OF CON57RXTION, RE-INSTALL RAMP. 06 - L7 i � SCRAPE AND RE-POLY WOOD. 'I, • "� —•— - G22 '—' '=� G23 CO2. CAREFULLY REMOVE AND 5AVE EXI5TG 5TAIR AND STORE IN SAFE t i 150, x PLACE UPON COMPLETION OF 60N57RUCT10N, RE-IN5TALL 5TAIR. 13.0' 15..0' SCRAPE, PRIME, AND PAINT 1 6N G23 51.0' le 23-- I' `---------------------- I � G03, WELL ONSTE. REFER ITOWIVILLDW65 FOR ADD'TLL INFO. NEW DRY 1 ti F 604. PROP05ED 4"DIA. 56HEDULE 40 57EEL PIPE COLUMNS 5ET IN 16"DIA. I GI4 I X 4b"DEEP 4,000 P51 CONCRETE A5 PER PLAN5, 57EEL PIPE TO BE FILLED 50LIP AND COPED AT TOP FOR A 5Ml-ROUNDED 5MOOTH FINISH. COLUMN TO BE PRIMED AND PAINTED 5AFE=( YELLOW WITH ' '•,,1 1 Q p C Dhb 60AT5 OF 6L055 ENAMEL PAINT. EXI5TIN6 NEW s _ C05. NEW HEDGE ROW TO PLANTED UPON COMPLETION DaLARD5 AND CONCRETE WALK CONCRETE LW 1 L -II ELE6TR16AL WORK. TO REMAIN " WALK, ' EX15TIN& / 5TORY FRAME p GO6. NEW ELECT. SERUIGE UNDERGROUND FROM TRANSFORMER TO BLD6. AS NEW 2 STORY FRAME 5110WN 600ROINAIF RUN IN FIELD W/ELECT. CONTRACTOR AND FINAL NEN E� I 11� LOCATION OF NEW MOP IN BASEMENT C07. EX15T6 6A5 METER TO BE REMOVED AND REPLACED W/NEW A5 PER 41.0' G08 TO \ J/ 5 Q NEW UNDERGROUND FEED FRO�T� POLE TO MANHOLE(NEW ON II L NEW TRANSFORMER. CONTRACTOR TO BE RESPONSIBLE FOR ® --`------------------------ ` 30' •a '6 lIIl RESTORATIONOFEXI5TG51TEWORK7OMAT6HEXl5T66ONDITION5 I -III REQUIREMENT5I AL5, REFER TO ELECTDP65 FOR AD1271 . .o - i - J ��I GOq. IN5TALLATION OF ELECT TRANSFORMER SHALL BE A5 PER LIPA GI4 ° 5PECIFICA7/ON5 INCLUDING BUT NOT LIMITED TO: PAD, TRAN5FORMER, XISTING SPOT 379`-- - -- -- ---- ----- I BLA5T WALL5, 5GREENIN6,ACCE55, SOUND PROTECTION, 5/6NAGE,ETC, I L HT TO REMAIN Qj _ 45 U '� 5UBMIT 5HOP DW65 TO AR6HITE6T/ENGINEER FOR REVIEW AND �N \ VIDE 60PIE5 OF CRIC, LIFA APPROVAL TO ARCHITECT FOR RECORD. tone/ay _ N w GlO D ST LED UPON 1 .. : --._� N REIN AL � J �� D - -- 03 1 ' ON G17 /l DN 1 ' ., ` . ✓ -------- . '. �O '� I'�, b i '� Gll. NEW aE,ADWAYS1RIPlNTION OF ALL 6/MARK��AS PER CIVIL ENGINEERING DW65,� 1 TYPICAL. Cl2. NEW CONCRETE APRON REFER TO CIVIL DW65 FRO ADD TL INFO -- ----- ------- ----- --- _ 6,5'+/- C13. CONTRACTOR TO 5T06KPILE 5TONE MATERIAL IN A 5AFE LOCATION TO ON I �� PROTECT FROM DAMAGE UPON REMOVAL FROM EXI5T 6 F-OUNDATION5, p 30 15.0' 13.01 UTILIZE TN 5 57O E MATERIAL TO CREATE NEW PLANT WALL5 A5 I I 1 DEPICTED ION PLAN5 AND OETAIL5 CONTRACTOR TOI RN15H NEW EXIST'G WELL 70 J - W'�'VGRE7F GI4 HEX" / 0 I '� MATERIAL TO MATCH WHERE REQUIRED . 1 5 0 \• k RATIO. _ , `u GI4. CONTPA6 TOR TO PREPARE EXI5TIN6 6RADE, 5llTABLE FOR BE ABANDONED _ __ _ --- ___ _-_-_ 170 -__ ____ 1j IN5TALLATION OF NEW 50D 6RA55 MATERIAL. PURNI5N AND IN57ALL 26A I I 2TA 505 WHERE INDICATED ON PLAN5. 50D MATERIAL SHALL BE U5E0 IN '• \ 4 ALL AREA5 WHERE EXI5TIN6 GRA55 /5 DI570RBED OR AFFECTED BY l l NEW WORK OR 6ON57RUGTION OPERATIONS BY TH15 OR ANr OTHER { I NEW EJ EXIST'G GONGRETEWALK I ---- REFER TO CIVIL A NG RRAIN FOR A L INFO ••, •, -,- �,-,_-, � ENGINEER/ D G5 O DDT Z 1 0_ 615. GONG I � CONTRACTOR RELATED TO 7H15 PROJECT. ro -'--'�--_ - _ i NEW DRAINAGE STRI,G7URE5 5ET/N NEVJ CONCRETE BASEWITHIN q' q_O„ _ _ / ASPHALT PAVEMENT AND 5U36RADE REFER 70 CIVIL DRAWINGS FOR I \ _..__EXI51-lhYrFl-AG � _ l 14 /.TJ lb l7 `� I i ' 1 \ POLE TO REMA-N,., 4I EXISTING SPoT I ADD'TL INFORMATION. I "I - LIGHT BE T r I 1 •� - VELI 4 I 1 Gl6 REFER TO CIVIL OWG5 FOR NEW GRADING r I 1 - G17. LL5 TO REMAIK PROTEG7WRING EXCAVATION/ _ ___________________ _ \,�/''\,�J EX15TINC 5IGIJ- - CO. REFER TO 27 1 ',II EXI5T6 WINDOW WE Q I _ _.._._____ TO REMAIN - - GONSTRL07ION NEW CONCRETE PAD FOR ELEGTRIGAL TRANSFORMER. R=1� 1 .�I / 5TRUGNRAL AND ELECTRICAL DW55 FOR ADO'7L INFO. Glq. EX157Yo CONCRETE CURB TO BE DEMOLISHED AND RE-BUILT .u -- G 1 C20. INCLUDE IN BA5E BID THE REMOVAL OF EX157'G TREE5 ALONG I EXISTING SPOT - // 1 Q / ,, -- - _ _ ��a ', � PROPERTY LINE PROVIDE ADD AL 7ERNA7E5 FOR TREES THAT CAN BE ,\ I LIGHTS 70 REMAIN ____. _ lea ...__..- ° /y '�. � SALVAGED. TYPICAL R(3). / - I d- C21. EX15T6 MA50NRY PATIO TO BE DEMOLlSHED AND REBUILT 22 NOENSER UNITS COORDINATE I EXISTING SPOT7� lSl G PROVIDE NEW CONCRETE PAD5 FOR GO T 1 LIGNT TO REMAIN 6 _ / - T6 25b 2 O T6 256 I ' , WITH MECHANICAL FOR SIZE OF UNITS m1 - _ EW D'TL O 1 G23 NEW AREAWAY REFER O MEGH DW55 FOR ADD7L INFO z z - - _ - I ARK/ LOT I T- G24. PROVIDE CONCRETE LANDING FOR NEW 5TAIR. REFER TO 5TR1/G7UR4L 3 F+isr/ -- - I x �s �^ DWG5 FOR ADDT1 INFO. •, 11 ) - - -� DR RGNAGE Gf�LG ULATIONS fib. V=4200 10FTx.17 FT x l 26 AOL— TW=26.5 , �� FOR eGD�TER DRAIN RING5 714 CUFT/42.23 6UFT2IN FT 6'D1A RIN5=I7 FT 6 i R=5 PROVIDE 3 e DIAMETER X 6 FT DEEP DRAIN RIN65 Vsl- --- - R=2' l 22 - -- - - _- / / RAINAGE NOTES --�'--- _-_-__-_-____-_-___-----_-. .-__ -- - D 1. ALL DRAINAGE COMPONENTS MUST BE H2O TRAFFIC RATED . . 2 DRAIN RING FRAME AND CRATE-5 TO BE CA5T IRON 24"DIAMETER _ �_ ---. -- -__--- •..^„',, 5300K OR EQUAL 3. TRENCH DRAIN TO BE AGO POWER DRAIN __ - -� - T\UQY' ,�E `"„' n,P / 4. DRAINAGE PIPING FROM TRENCH DRAIN 70 DRAIN RING TO BE b" TRENCH DRAIN A7 TOP T I RING 5ET TO A66EPT PIPE FROM �`�\ DIA. GRAIN RING ELEVATION TO BE \ G12 263 '.- nrye 3 / -- -- -- -- - -- ------ PARKING GALGULATION5 (100-19U \, {I - _....__..____.._-__.._-. __.__-_ ____-___- _____ __-___ .__-__._ FETING HALL BUT < / AUDITORIUM, M I PER aO S.fi OF SEATING AREA, BV I \ _ PER 4 5EAT5 WHERE PROVIDED. NO, OF - -_ O AREA NG 5EAT5 REOP..S ;,� v - -- / ._-__a-___-________-__--_____ FLOOR �L NEPURP05EE ROOM�M = g005.F. 305EAT5 = 1.55PACE5 / / - Fts --- " -- `• ` - --- ----__ 15T PR06RANNIA6 ROOM = 300 5,E 10 5EAT5 =25 SPACES I _ __----____-__-____-__\ __________ _ r� ���� I5T GHILDREI NS ROOM = 100 S.F. 5EAT5 =2.0 5PAGE5 .-----" - U I57 YOUNG ADULTS = 300 S.F. IO 5EAT5 =25 SPADES ' J/ j ®�Q \ \ T �` / _ 0 •9 15T GENERAL 5PACE5 = 2e0 5.F. 0 5EAT5 =4.5 5PA6E5 \- "- - _._=o�.__�j_____---____________. __.__.____. 2ND REFERENCE/NON-F1G710N = L`A SF. 65EAT5 =ZO SPACES h ---"------------- ---- 2ND STUDY/ NTOR p' SS'B'R = 15�.F. 45EAT55=l.O SPACES c �o TOTAL =2705PAGE5 '� -------- V 11 =22.0 5PACE5 - , Q TOTAL PROVIDED \ ; / - - - - - - - - - - - 51TE INFORMATION /BLDG DEFT. NOTES ------- -------"------ . ------- _--_ SUBJECT PROPERTY: \ 27550 MAIN ROAD \ / / -- -------- CUTGH06UE, NEW YORK 1I935\ DISTRICL 1000 ZONE. R-40 -., --- ---_.-_,_ SECTION. lOq PARKING. 22 -----__-_-___ BLOCK: 6 LOT: 22 PROPO D: e s \ , __ NOTES: -- _ __ _ 1. SIDEWALK TRAFFIC 5HALL NOT BE IMPEDED AT ANY TIME _ __ THROWHOUT GON5TRZ7'ION NITHMT PROPER 5IDEYVWLK GL051NG PERMIT5. PROVIDE ALL NECE55ARY TEMPORARY PROTECTION TO \ - - -- ENSURE THE SAFETY OF ALL PEDE5TRIAN5. NOTE: \ - - - - PLOT PLAN INDICATED ABOVE 15 BA5E9 ON A SURVEY PREPARED BY JOHN C. EHLER5 LAND 51/RV F1'OR, DATED MAY 11,2006. 5/ T PLAN JSCALE = I//O" = P_61 S N 0N� REVISIONS/SUBMISSIONS: DRAWING TITLE' 0' 5' 10, 20' (i sc�F DATE DESCRPTION + na mnemc unrn raawicvic /10" = 11-01, ARCHIMCTI �TM r zsoas ce'V °F NEB y CAD FILE NAME: PROJECT TITLE', DATE, NSA PROJECT CONSULTANT Nemschick Silverman Architects P.c. PROPOJED ADDITION) M17 ALTrRA-n0/1f-. /'EPT. 18, 2006 "...the business of ARCHITECTURE." CMMO � MMLo1 OIONmI�. P.C. 27550 MAIA ROAD SCALE DRAWING NO Design and consulting services CUTCMOGUE,/1EW YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 High 5treat, Huntington, New York Phone : 631-734-7007 Fax : 631-734-7347 q (51,6) b 420459 Fax (516) 421-0563 AJ NOTED DISTRICT' SECTION. BLOCK LOT: DRAWN BY: A— http://wvvw.ns-arch.com I I I I Ii I I I ------------------------------------------- I I R5MOVAL PLAN -----------------------r11 _________L_IN_E_O_F APPROX EX6AV_A_TION ______ J ---- VERIFY IN FIELD. 11 DOI. FLOOR/CRATE TO BE EXCAVATED TO ACCOMMODATE INSTALLATION OF NEW FOUN9ATION5/WALL5. REFER TO 57RU6TURAL DW65 FOR ADD'TL INFO. (TYP) LINE OF FIRST FLOOR 5TRLUT)RE LINE OF FIR57 FLOOR STRL'GTURF I�__ D02. EXl5T'C FLOOR 5Y57EM ABOVE GIRDERS AND COLUMNS TO BE REMOVED, ABOVE TO RE IN ABOVE TO BE REMOVED ___ CUTBACK TO GL0SE5T_DINT AND DISCARDED ACCORPIN5L Y. REFER TO , 03 STRUCTURAL DW65 FOR ADD'TL INFO. (TIP. FOR ALL) 1 D25 1 III �' O -------- 50'-31/2" VERIFY IN FIELD DI4 005 REMOVE EX15TINO LICHT FIXTURES, BULBS, SUPPORTS AND WIRING I � COMPLETELY WIRING SHALL BE REMOVED BACK TO SOURCE- D 3 TYPICAL FOR ALL. V.I.F. I -10" ` ❑ PO4. EX15TC STONE FEW WALL TO BE REMOVED IN ITS ENTIRETY YJORK SHALL --- BE- BE GOORDlNA 7E9 AND PHASED WITH EXCAVATION CONTRACTOR/BLDG �\----____ ------ MOVER FOR REQUIREMENTS PRIOR 70 START OF WORK. T \ / r / 4b" �� -- -, D05. REMOVE EXlST'G INTERIOR PARTITIONS, DOORS, FRAMES AND ASSOCIATED 1 \ / T'G ---------------- - HAROWAREASINDIGA7EDONDI'JC5. (7YP) 7-F D04 r_iD 17 l/2 r--__-, BATH DOG. EXl5TG DUMBWAITER AND A5506IATED HARDWARE TO BE REMOVED AND i _ I �� i _ j �7 DO LEGALLY DISCARDED. �L I I \/ I I I � I I s'- S 007. EXISTS MECH. EQUIPMENT TO BE REMOVED AND DISCARDED. REFER TO n I r_� r-r r-r r-, I N I D3 --- MEGH D455 FOR ADD'7L INFO (TYP) / \ I _ L_ _ - __ DOY Irll PC DOB. EXIST6 CLG. TILES, TEES, WALL ANCLE5 SUPPORTS, ETC. TO BE REMOVED / \ fly aF D09 AND DI5P05ED OF LEGALLY. r -- rm D09. EXl5TG UTILITY SINK TO REMAIN PROTECT DURING GONSTRI/GTION. TI I JJJI��� DID. EXISTS MILLWORK TO REMAIN PROTECT DURING CONSTRUCTION./ \ O2 DOI DI5 I DIb li / D21 1 DII. REMOVEEXl57'6 CARPET/FLOORING COMPLETELY. _L______ I/ y 7YP I ________IJ L r -�\_ r l r D24 �TG'RA 15 /MEGH DI2. CREATE NEW OPENING ANI FLOOR FOR 5 C rFOR A99 T4 TIONINFO REFER TO FX/5TG ____, r_ ® I�_- _ 1 / STRUCTURAL AND MECHANICAL DRAVJIN65 FOR ADD7L INFORMATION °v +--- DIa I DIb IL os J EXl5TG EXl5TG BREAK RM. � � 1 DI3. AFTER STRUCTURE ABOVE I7 SHORED AND STABILIZED, REMOVE EXISTING ____ J I I J COLUMNS. SEE SHORING NOTES BELOW. CRAWL SPACE $TORA6E /MEGH. ® DI4. EXIST'6 BATH TO REMAIN. PROTECT DURING GON57RIIG7ION. DI9 O �5 V.I.F. I I I I �I,Q I I II EXl$T 6 I I I OB �I I I DIS. PORTION OF HALL TO BE UNDERPINNED AND EXTENDED 70 NEW DEPTH. II j CRAWL SPACE I DOI DO REFER TO 5TRUG 7URAL DWGS FOR ADD'7L INFO. DI6. LINE OF EXCAVATION. REMOVE EX15TIN6 CONIC, SLAB AS RE0'D TO INSTALL II ppI I o\ . i 0 PLO,I NEW FDN REFER 70 5TRLOTURAL OWC5 FOR ADD7L INFO. III • ill 05 DIP. 7YP. - 04- TyP, III DIS D I DR.. EXl5T'6 STAIR, RAILIN55, ETC. TO BE REMOVED IN ITS ENTIRETY. DII 1 - ----------- ------- I I ® „%�`,\ DIa Ili O5 D35 DID. E-0 CU AN7RTOVEMA/N PROTECT DUR/NC -0 ACLO.IF YP. Dl9 S.-J^!GUT AND REMOVE GONG SLAB AS 55. TT TO ACCOMMODATE NEW NF TO OTE r r DIb DI8 �_ BELCH. AS PER S7RUGTURAL DVJ65. TYPICAL. SEE SHORING NOTE fi _ --_ w>-»I _________, /• \ DIa 4 DO I . - O _ _ �I D20. EXISTS PIER AND FT65 BELOW TO BE REMOVED. GOORDINA7EWITH - - ��_-------- r----- y+ _ _ _ _ _ �,, _______ I I I I 1 - _ - - STRUCTURAL PHIS 5. 71'P I 2 - - - - - - ______ _ _ _______________ r - r- r-r L D32 L r L D32 � J LI D2l ACCOMMODATE NEW OPEMG REFER TO 1 -+ - �� r T 5TR CUT EXl5TG FOR WALL 'T NT L 1-1 ILE - STRUCTURAL DWGS FOR ADD'TL INTO. DI3 DI3 I DI6 - - - 022 SAW CUT EXl5TG FDN HALL TO ACCOMMODATE NEW AGGE55 DOOR TO CRAWL SPACE REFER TO 5TRUG TURAL DH65 FOR ADD7L INFO. DOI - I Id TYP '^ r, D23 SAIN CUT EXl5T'G FDN WALL TO ACCOMMODATE NEW AREAWAY `; O5 CONSTRUCTION REFER TO MECHANICAL (AND 5TRZWRAL)DW65 FOR TYP. ADD'77 INFO. I I I I I I I O I I -��-�-� I,II F, O• ____ r-J D24. PROVIDE TEMP. SUPPORT FOR lN57ALLMENT OF NEW COLUMN REFER TO 7YP. I L-L I�_ _,I 1 V._��� DI2 V-,�1 � 57RUG7URAL DWGS FOR ADD'Ti INFO. li _ --- L I I �------�-i------ ---- 1----- + / li� II I i 7YP. I D25. EXISTING RAMP, PLATFORM, RAILINGS, FDN AND FIGS TO BE REMOVED {_______L_ O K EXCAVATION AND FOUNDATI NNbR . ---__ ---- L - - - � L____JI �t� Dlq SEE PRESERVATION N0750BELOW.EW � Dill _ f D26. CAREFULLY REMOVE AND 5TORE EX15T'6 MILLWORK. " r----Ji --- - - I- o - - - - -Q - - - - - -- - - - - - ____ __ __ I > 027. REMOVE WALL AS READ TO INSTALL NEW FT65. BELOW. REFER 70 J UCTURAL DHI FOR A00'71 INFO. D23. EXCAVATE A5 REQ'D 70 INSTALL NEW AREAWAY AND/OR PELLET,EXIT. -- 929. REMOVE EXl5TG GONG. STAIR AND FOUNDATIONS. 20 D33 D30. EXl5TG STEPPED FTC. TO REMAIN. V.L6 EX15TENOE AND EXTENT IN FIELD. L/NE OF APPROX EXCAVATION 3 DI7 EX/57 '6 D31. 54W CUT EXl5TG SLAB AS READ TO INSTALL NEW ELL-V. FIT. REFER TO L ----------------'-------------- --- L______-____� WORK SPA 5TRUCTURAL DWG5 AND APPROVED SHOP OW65 FOR AOD7L INFO. VERIFY INFIELD. I i A72 D32 SAW CUT AND TRENCH EX1576 SLAB AS READ TO ACCOMMODATE NEH _____________________ TIP PLVM91N65ANlTARYWA57EL1NE REFER TO PLUMBING OW65 FOR ADD'TL m III 111 Dlq ry INFO. III - o3 033 SAW GUT AND TRENCH EX15T6 SLAB A5 REQD TO AGGOMMODATE NEW III III _ DII RECEPTACLES RECE55ED IN PLR. REFER TO ELECTRICAL DVJGS FOR =I -'j TYP. ADD'R INFO. III - III J D34. EXl5TG HOUSE TRAP 70 REMAIN PROTECT DURING GON57RIA:T/ON QII _ _ __ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _j _ _ - - D35. EXI5T6 BLADDER TANK TO BE RELOCATED. REFER TO PLVMBIN6 DN65 qq IIL III I I I FOR ADD7L INFO. nr------------ --ITI r� L J 036. EXISTING RAMP, PLATFORM, RAILING5, FDN AND F76570 BE REMOVED kl2 III III OI Ht----------------Itl D33 COMPLETELY TO ACCOMMODATE NEW EXCAVATION AND FGUNTA710N HORK. HI �O SEE FRE5ERVA TION NOTES BELOW, H zll III 03 �O 6,5N5i�A� REMOVAL III N®7�� �I II II II myµ\ I I 6OL IT 15 THE CONTRACTORS SOLE RE5P lL17Y TO ON5/B DOCUMENT EXl5TIN6 III TIP. I�.c'�-----____--_ LINE OF APPROX VA TION CONDITIONS PRIOR TO PORK IN EACH RESPECTIVE AREA, DAMACE5 TO _EXCAV ___-----____µ1---_ Lµ____----_ �� DI2 DI2 I�/il VERIFY IN FIFLD. III III k ABOVE ABOVE II EXISTING FINISHES TO REMAIN DURING WORK PROCEDURES SHALL BE \II REPAIRED AT GONTRAGTORS EXP-N5E, UNLESS DAMACE5 ARE DOCUMENTED III III 34 L yl PRIOR TO START OF WORK. - III I I I CO2, CONTRACTOR 7-0 REMOVE GOMBI/STIBLE DEBRIS FROM THEWORK PLACE AT THE END OF EACH DAY AND FURNISH LABOR TO MAINTAIN A SAFE AND REMOVAL PLAN LE& N: uL Jlli CLEAN ENVIRONMENT AT ALL TIMES. LEGALLYCART AWAY AND DISPOSE OF DEBRIS AT REGULAR INTERVALS TO PREVENT EXGE55IVE EX15TIN6 WALL TO REMAIN n r EXI3T/N6 PLUMBING FIXTURES TO AGQ/MULATION. _u r� BE REMOVED � EXISTING WALL TO BE REMOVED I�x �L 603. TH15 PROJECT WILL REQUIRE THE USE OF A BUILDING MOVER TO G T T �,l EXISTING DIFEU5ER TO BE REMOVED THE TEMPORARY WlEA5URE5 NECESSARY FOR EXCAVATION, SHORING, AJ 5UPPORTING AND/OR LIFTIN6 OF THE EXl5TIN6 STRUCTURE(5) TO EX15TINC DOOR TO REMAIN L-T EXISTING DUCT TO BE REMOVED ACCOMMODATE THE PROP05ED FOUNDA TION WORK. BIDDERS SHALL CONTACT.. DAMS BROTHERS EN6/NEERING 30 BARTEAU AVEWE, BLUE POINT, EX15TIN6 DOOR TO BE REMOVED 4y EXISTING L16NT FIXTURE TO BE REMOVED NY 117I5(631)363-6240. PRIMARY CONTAGT.� ERNIE DAVl5. NO ALTERNATE COMPANIES HILL BE ACCEPTED FOR TH15 PHASE OF WORK, EX15TIN6 GLAZING TO REMAIN c#o EX15TIN6 GLC FAN rO BE REMOVED 604. THE CONTRACTOR 5HALL BE RE5PON5I5LE FOR ALL REQUIRED 5HOR/NC, BRACING, TEMPORARY MEASURES,ETC. NECE55ARY FOR THE SAFE AND COMPLETE EXECUTION OF ALL WORK NOTED ON THESE DRAWINGS. g=--=-=T EX15TIN6 GLAZING TO BE REMOVED GONTRAGTOR SHALL FIELD SURVEY THE EXl5TIN6 GONDI7ION5 AND PREPARE TEMPORARY MEA5URE5 PLANS AND DETAILS, SUFFICIENT TO DE56RIBE THE CHARACTER OF WORK NECESSARY TO EXECUTE THE CONSTRUCTION PROCEDURE5 50 AS TO MAINTAIN THE INTEGRITY OF THE EX15TIN6 FA6ILITIE5, WHICH ARE TO REMAIN THESE PLAN5 AND DETAlL5 SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF WORK DRAWINGS AND OETAIL5 5HALL BE 5I6NE9 AND SEALED BY A LICENSED ENGINEER APPROVED TO PRA6TICE EN5INEERIN6 WITHIN THE 5TA IF OF NEW YORK. 605. WHERE NOTED ON PLAN5 TO P06OWNT AND RECORD AND/OR RECONSTRUCT EX15TIN6 GONOITIONS, THE CONTRACTOR SHALL INCLUDE IN BASE 131D TIME AND EXPENSE REQUIRED TO PROVIDE DETAILED A5-BUILT OR EX15TIN6 CONDITIONS PLANS AND DETAILS OF THE ITEM(5)REQUIRING RECONSTRUCTION. IN ORDER TO PRESERVE THE INTEGRITY OF THE EX15TIN6 � REMOVAL ITE B 57RUGTI /ARCHITECTURAL FEATURES OF THE BUILDING SITE, THESE ITEMS SHALL BE DOCUMENTED FOR PURPOSES OF ITS REGON5TRLOTlON OF Ifl IDENTICAL OR 51MILAR 60N5TRUGTION FINISHES, MATERIALS, 5IZE5 AND GONF16//RATION5. THESE DRAWIN65 AND DETAIL5 SHALL BE SUBMITTED TO THE ARCHITECT F-OR REVIEW AND APPROVAL, PRIOR TO COMMENCINb RE5ON5TRUC TION WORK. 606. WHERE ITEM5 ARE NOTED TO REMAIN AND PROTECT DURING GON5TRLOTION 6ENERAL CONTRACTOR SHALL BE RE5PON515LE TO FURNISH AND INSTALL .6 MIL POLY 5U57 PROTEG TION OVER AND AROUND AND/OR EN5AP5ULATE SUICH ITEMS TO 5,4FE6VARD FROM DAMAGE. IN ADDITION, HORIZONTAL AND VERTICAL 5URFACE5 OF ITEMS SUCH A5 MILLNORK, COUNTERS, FURNITURE, ETC. SHALL BE FROTE67ED WITH 7"MA50NITE COVERING OVER POLY. ALL SUCH PROTECTION SHALL BE REMOVED AND SALVAGED OR DI56ARDE9 AT PROJECT COMPLETION. COT THE PROJEGTWILL BE P11A5ED TO ACCOMMODATE TOTAL WORK REQUIRED. CONSTRUCTION OPERATION5 AND SEQUENCING SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL HITH OWNER PRIOR TO COMMENCEMENT OF PORK. SEA PEC Ape REVISIONS/SUBMISSIONS: DRAWING TITLE: DATE DESCRIPTION s C O 0711 m vne =RRienc P)Afr-MCAT REMOVAL PI_A/1 IU31m Revuani y r°s 0 l" P� rF IGq.I CAD FILE NAME: //1194 A-3.6.1 PROJECT TITLE. DATE: NSA PROJECT * CONSULTANT. Nemschick Silverman Architects P.C. FLOORP 275 0M EDADDITIO/1fA/1DALTERATIO/1f: " AhebusinessofARCHITECTURE." W(rl O Mp BAN YIOMMS. P.C. iFYI. 18, 2006 /1/'A 05-1194 esign and Consulting Services 27550 MAIN ROAD SCALE: DRAWING NO.: 735 Deerfoot Path, Cutcho ue, New York 11935 GUTCYIOGUE, /1EW YORI( 11935 9 0 High 5treat, Hurtington, New York Af NOTED Phone : 631-734-7007 Fax : 631-734-7347 421-045q Fox (516) 421-0563 A 5 6 b e 1 DISTRICT SECTION: BLOCK LOT: DRAWN BY: http://www.ns-arch.com c Co YMGHT 2006 NHMscHlck sTVERMnN nRgREcis Hc, /10 1000 109 06 2.2 EL I III I I j D II A -4 -4.0 J I j G31 COI• 5CRAPE EXISTING CONCRETE SLAB GLEAN OF ALL DIRT/OLD GLUE 50'-3 112" 68'-O" TTP- RESIDUE, ETC, AND PREPARE SLAB IW NEW SELF LEVELING FLOOR COMPOUNDS BY AROEX OR ARCH APPLIED EQUAL FOR A SMOOTH AND LEVEL SURFACE ALIGN FINIAL PREPARED FLOOR SURFACE WITH NEW _ CONCRETE SLAB-TYPICAL FOR ALL SPACES/LOCATION5. 32-9 112, 9. GI-1 602. EXISTS MILLWORK TO REMAIN. PR07ECT DURING CONSTRUCTION I'- m 4 A � YOb TYP. --- -- T (7 G03. PROPOSED COLUMN AND FOOTING BELOW REFER TO STRUCTURAL DWGS 61T 21'-9112" 4'-ll" 6'-O" 9'-lO" `0 FOR EXACT LOCATION5(TYP) G2� m TYP ❑ C04. NEW BFAM5 ABOVE TO BE INSTALLED. REFER 70 5TRU57I/RAL DW65 FOR ADD'N- INFO. N NS COS, EXI5r6 SINK TO REMAIN PROTECTWRI 6 GO L _ U 606. NEW g'-O"X 4'-0"RAIN PROOF INLET LOUVER. REFER 70 STRU6T DW65 - - - mAl O B FOR A-COA6. F0. REF. G26 G07. NEW 6"GONG. CURBWDEx-O-TFa'COATINS FOR WATERPROOFING. I - - - - - - _ - _ - ur 012ATH E N O I O T'(P D2 GOB. NEW EPDXY FLOOR ENAMEL PAINT FINISH OVER PREPARED FLOOR SURFACE O G03 TYP G32 sO "I/ \ \ BREAK RM T,PIGAL FOR MESH SPACES. REFER TO FINISH SCHEME AND 5PE65 FOR III TYP III 51M " MESH. RM �I °// G35 - N ADOT'L INFO. NOTE: REFER TO OTHER PLANS p EXI6716 CRAWL 014 N Trp Coo NEW ELEVATOR AND ELEVATOR. M55H. RM REFER TO APPROVED SHOP EELE✓ATION5 FOR SCOPE OF 3 624 -----, I �v DWG5 FOR APPTL INFO TS/ . WORK FOR EXIS 4'-8 l/2" IIII III - ITv rJ-PAGE ry GOI 621 RESTORED FRONT PORCH ry 05 610. PROPOSED INTERIOR STAIRS. REFER TO DETAILS AND 5TRZT R4L DWG5 / /'_I" _ STEPS GOI STORAGE -- 03 .. " GII GOI FOR ADD'7L INFO. + 7)O'P 2 TYP. G09 3 G21 7YP. rj CII. EX15T'657FEL COLUMN TO REMAIN. (TYPJ I , -- -- O7- P - -- - - - - -�O�- - - - - - - - ' - - j- - - - - -- 612. PROPOSED WELLED EXIT. REFER TO DETAILS AND 5TRUGNRAL OW65 FOR - O - _ _ ABOVE - _ __I TYP. TYP. _ MEGN. RM B03 ADD'7L INFO. 6 O - MEET/N�7 04 I GI4 H 4B G3 I 2'-6 //2° 3 B.14 q- 006 Cl3 NEW 361HISH RAILING WITH CLEAR TEMPERED GLA55 PANELS. 6 ' 0 62 - - - - 71T. TYP. -_-` O GI4. NEIN EXHAUST FAN TO BE LOCATED OVER NEW TOILEr5. REFER TO MECH. 5 N G21 1 _ G29 S DWG5 FOR ADD'TL INFO, I ROOM 3'-IO I/2 - Gal 6I5. NEW STEEL MOE COLUMNS ADJACENT TO EXISTS COLUMN REFER TO B G36 1 0'-4" B" ''-q" 6'-O' 5' I/2" - ____ STRIUGT DINGS FOR ADD7L INFO (PIP FOR ALL) GO ELEV. 1 GOI B 616. EXTEND EXISTING 5ANITARYWAI5T TO PROPOSED FIXTURES, REFER TO B.lo _ m ( ;HG BATH RM �1EGH. RM I Os 4A5 h I " o/s PROP. H.G 112" a ENGINEERING DW65 FOR ADD71 INFO 5 I - G17. PROP05FD AREAWAY. REFER TO ENGINEERING DW65 FOR AD07L INFO. N , I I ELEVATOR / 3 L q I FIZ2L P/LE RM. CO.. PROPO5ID LAN ROOM REFER TO DETAILS/FORM TIRE PLAN FOR ADD'TL - h -- ^ I GIb G36/' I I I 20 OIO INFO(TYP) COMPUTER5 AND ALL RELATED EQUIPMENT TO BE PROVIDED BY II ° - ------ - - ; B.osOWNER AND INSTALLED BYOTHERS G O O - - - - --- - - - - --- l9• NEYJMILLWORK. REFER TO DETAILS/WRNITURE PLANE RADD'rL INF� 7YP. o _ ___ __ (TYP.JNEW REINFORCED kI . 4 ry 3 2 3 G20 PROVIDE SHELF AND ROD IN CLOSET (I)PJ Y TYTP116DALTWHERWE 11 MEGN ROOM 2-0 112 3'-1 l/2" l0'-4 112" l0'-4 //2" 4'-61 LLl'�i41�� /� h GOIG2/. REFER TO MEGN., ELEG.,AND PLUMBING OP.GS FOR ALL SIZES AND INDICATED BY N 5'-2 I/2" 5'-2 I/2" 5'-2 //2" 5'-2 112" O3 I - - - - - - - - - "I 2 7' 6 O /✓2�� 3'-O" T-ll" LOCATIONS OF AND EQUIP. PROVIDE t HIXISEKEEPIN6 PAD BENEATH ALL HATCH 1 m 5 ALIGN LINE OF ry FLOOR MOUNTED EGNIIPMEM PREPARE AND PAINT ALL PA55 SAFETY \- .3 SOFFIT -l G22. NEVJ BEAMS ABOVE TO BE 5/STER'D TO EXlST'G. REFER TO 57RUGT DWGS ABOVE 9, 7„ FOR ADD'TL INFO, I I - - - - CLOSET- - _ G 3--_ _ I UGR I OA4 - - -� - a EO G23 NEW FIXTURE REFER TO SGHEWLE FOR ADD'TL INFO, a DN4" - - -F -41 I'-3 I/ "6 r o UP_ - - _ 2- -L 624. EXISTING MILLWORK AND SINK TO BE REMOVED AND STORED WRING I I B07 ( I G13 I _�2 -- - GONSTR,CTION GAP EXISTING PLUMBING 7EMPOR4RILY. REINSTALL AFTER 1 - - ---- PR O5ED COLUMN AND FOOTING ARE INSTALLED AND THE WALL 15 B REPAIRED, 3 I/ /-N I/P - / I I I N SEE G34 TYP. C25. NEW AG6E55 DOOR. CONTRACTOR TO VERIFY OPENING. B.II I cw LAN RM. z I 20 _ REAWAY T7P. - TYP. n m G26. NEW 2'-o"X B"INLET LOUVER ABOVE EXISTS WINDOW. REFER 70 STRUGT. Gll /T D I a m G36 I I � - TYP. ® __ _ �- - - - -_ r 1 DW55 FOR ADD'TL INFO. LLED In ° G I ,I - - - - - - - - - - - -- UP 14 I! N. I ----- I CIE, I Lr G27. NEW 2'-O°X IO"INLET LOWER. REFER TO 57RUGT. OWGS FOR ADD'TL INFO, o I 1 B _ -: --- ---- I L- � J 1 620. NEW,35LO"X I'-4" THRU FDN WALL UP TO GGIO5ENECK ABOVE GRADE I 11 -- -I PROVIDE GAL VANIZED AREAWAY WALL REFERTO5TRLCLDWG5FOR - - - - - - - - - 5 I __ GIb I ____ I ---- --- -__�_ __-_ - - - B4O2 ui ADM/NISTRAT/1/E - ADD'TL INFO. 4 GO g_q 629. EX15T6 PRESSURIZED TANK RELOCATE AS PER PLOMBIN6 DWG 5. REFER TO --- - - - - - - - ------------------- ----- o I I _ OPF/GE PLUMBING DWGs FOR ADD'r� 1NFo. �A STAR A WELLED 1/2„ -5A- a f PROPOSED EXIT G30. NEW ELECTRIC TANKLE55 HOT WATER HERTERS. REFER TO MEGN DINGS I GI2 L -- ----------------- ----- - -- O'-Il" FOR A00rL INFO. ----- ---------------- G3T -_----_-- ABOVE 6'-5 //2" 20'-IO l/2' 13-2 //2 GI4 C3/. DRAIN 4"PIPE r0 NEW DRY kElI (TYP) REFER TO CIVIL D465 FOR _ _ n,P. ADD'TL INFORMATION NEN REINFORCED \ ` ! __ FOUNDA TION WALLS- 11 7 - - - __ 632. FURNISH AND INSTALL NEW.- 30"B-LABEL ACCESS DOOR AND FRAME -5.a6 - - -- - BY KARP OR APPROVED EQUAL, WITH KEY LOCK AND DRYWALL BEAD I INDICATED BY WALL N II �'�, ,, I 35 �,, - - - - I IN5TALLATION FLANGE FOR FLUSH FRAME INSTALLATION SEAL AND GOI FIRE5TOP TO MEN FOUNDATION OPENING DOOR TO BE PRIMED AND PAINTED HATCH 9'-3 //2" 1,-O„ b'-6 //2" - 7'_l" TYP. GII I _ 7yp, Typ TO MArGHWALL SURFACE 600RD IN5TALLATION HEIGHT IN FIELD BASED ON v NEW FOUNDATION 1,, L _ FINAL GRANL 5PA65 FLOOR ELEVATION ADD7L. NOTE FOR MECH RM DOOR TO BE 5TD. 5TL.-NO DRYWALL BEAD. WALLS - r - 633. NEW RAT 51AB IN CRAWL SPACE. REFER TO 5TRUCHRAL DWG 5 u 1 1 �1 I� 634. BOX OUT NEW COLUMNS WITH 2-1/2 22 GA 5TL 57UD5 TO MAINTAIN AS SMALL A PROFILE A5 FO5313LE IN BOTH DIRE6HON5 - TYPICAL FOR ALL TYP. I NEW COLUMN CONFIGURATIONS UO.N. ' � I 635. SCAR PATGN ALL EXISTING WALLS TO REMAIN AND PREPARE FOR HEN FINISHES AS PER FINISH SCHEDULE. TYPICAL THROIUGHWT ENTIRE BUILDING. A _ EXISTING WINDOWS/WELL TO REMAIN - 636 NEN FOR FLOOR DRAIN SET IN NEW/EXl5T'6 SLAB. REFER TO PLUMBING DW65 = - TYPICAL CLEAN CUT WELL,WINDOW AND -- SURRGV/NDING TRIM AND PREPARE FOR G3Z NEW ELEVATOR PIT AND SUMP PIT A5 PER DETAILS AND STR/GTURAL DWGS. 4 4 _ j NEW FINISH AS PER FINISH SCHEDULE REFER TO ENLARGE PLANS. MFRS SPEGIFIGATIONS FOR ADD'rL INFO - _ _ _� I I. G38, PROVIDE SLEEVED GORE THRUWALL FOR HYDRAULIC LINES AND AND _ 1 0, 6'-5 112" - - - -- - CONTROLS TO ELEVATOR SHAFT. 600RD. WITH MFR. FOR EXACT L05ATION5. FIRE STOP WI TH APPROVED FIRE5TOPPlN6 MATERIAL. SMOKE TIGHL �®N�fi ��fil ®N ���N ��� N� g„ - EXISTING WALL TO REMAIN OQ® PROPOSED PLUMBING FIXTURES -- PROPOSED WALL REF. FLR. PLANS PROP05ELP DUCTWORK FOR SIZE 7777 z PROPOSED HALF HEIGHT WALL ----- FROP05E9 GLAZING GUARDRAIL EXISTING DOOR TO REMAIN PROPOSED DOOR REF. FLR, PLANS COI. IT IS THE CONTRACTORS SOLE RE5PON5/0ILITY TO DOCUMENT EXISTING AND SCHEDULE FOR 5/ZE CONDI71ON5 PRIOR TO WORK 1N EACH RESPECTIVE AREA. DAN46E5 TO EXISTING GLAZING TO REMAIN EXISTING FINISHES 70 REMAINEXPENSE, WORK PROCEDURES SHALL BE CU REPAIRED AT CONTRACTORS EXPENSE, UNLESS DAMAGES ARE DOCUMENTED PRIOR TO STAR OF WORK. g PROPOSED GLAZING REF. FLR. PLANS 602. CONTRAS TOR TO REMOVE GOMB05TIBLE DEBRIS FROM THE WORK PLACE AT AND SCHEDULE FOR SIZE THE END OF EACH DAY AND Fl/RVISH LABOR 70 MAINTAIN A SAFE AND GLEAN WORK ENVIRONMENT AT ALL TIMES. LEGALLY CART AWAY AND DISPOSE OF DEBR15 AT RE60LAR IN7ERVAL5 TO PREVENT EXGE551VE ACCUMULATION SEAL' J grcPE qCy REVISIONS/SUBMISSIONS DRAWING TITLE. NEGy�Rs DATE: DESCRIPTION n� C� 0/115M yjJWMRP4`M bAfLMMT CO/V,/TRUCTIO/Y PLAN Knb 10/]INS RLVUIMI J z�oec r 'cv CAD FILE NAME. /A 194_A-5.6.2 PROJECT TITLE: DATE: NSA PROJECT o: CONSULTANT: FLOOR PROPCVLE) ADDITIOII r A/9D ALTf-PATIO/I/-. Nemschick Silverman Architects P.C. /EPT. 18, 2006 NJA05-1194 7 MAO ROAD 2550 "...the business of ARCHITECTURE." CANIND MO �Alllr�l MONm1�, RC. SCALE' DRAWING NO: Design and Consulting Services CUTCHOGUE./1EW YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, Now cork Phone : 631-734-TOOT Fax : 631-734-7347 (5161421-0451 Fax (516) 421-0563 AJnOTED R DISTRICT: SECTION- BLOCK: LOT: DRAWN BY: ��5 • r 1, http://www.ns-arch.com 0 COPYRIGHT sacs NEMSCHICK S-VERO M ARCM1Ecrs pc, n0 TH 1000 109 06 2.2 1�J L D -4Ae PLAN AI COL REMOVE ALL L16HTIN6, WIRIN5, PIPING,DUCT(NORK, ETC. 565PENDE9 AND OR SUPPORTED FROM ABOVE. A CO2. EXIST6 H✓AC 5Y57]EM TO BE REMOVED AND REPLACED. REFER TO ME514 -4A5 D{NG5 FOR ADD7L INFO. CO3. INSTALL NEW L16HT5 FIXTURE5 AND EXIT 516N5 AS PER MANUFACTURER5' 5'-7" l-O 20'_6 1/2^ 1`O 4_g' 5PE606ATION5. REFER TO ELECTRICAL ONES FOR ADD7L INFO. 604 NEH EXHAUST FAN. SEE MEGH. 0065 FOR AAD'TL INFO. COI C05. INSTALL NEW CEILING GRID, TILES, TEE5, ETC. SEE FIN15H 5GHEDULE FOR G- RDD'TL INFO. C06. REFER 7O ELECTRICAL DH65 FOR EMERGENCY Ll6HTIN6 SCHEME AND LAYOUL 96. EQ `p — EQ .,.00 .,,, ry -- 4 B � 0 CY B v FA] v e/ crI 4 .. HlO BOXED m EL. +7 165 ry . . . , . . . / . . . EC1 GOI IT CIS THE CONTRACTORS SOLE REACH RESPECTIVE- TO ARGUMENT EXISTING 'EL +7-0"'�'�' I CONDITIONS PRIOR TO XORK IN EACH RESPECTIVE AREA. DAMAGES TO ' EQ. W I �,, ry AGT_2 II EX1571N6 FINISHES 70 REMAINWRIN6 HORK PROCEDURES SHALL 6E REPAIRED AT CONTRACTORS EXPENSE, UNLE55 DAMAOE5 ARE DOCUMENTED B m B n PRIOR TO 5TART OF WORK. H602. CONTRACTOR TO REMOVE COMBUSTIBLE DI5905 FROM THE HORK PLACE AT y I o' O h>' o■ ev ■O■ o THE END OF EACH DAY AND FURNISH LABOR TO MAINTAIN A SAFE AND N ryYAND DISPOSE OF DEBRCLEAN ORK I S AT R55ULAR INTERVALS TO ARTLPREVENT EXGE55IVE GC - Q B/ BOXED CL6 - ''-O" 6'-O" 4'-0' 4'-3 I/2" 6'-ll" n 4'-6" 603 PROVIDE ALLOHANGE 1N BASE BID FOR ADD AL L FOR REPLACEMENT AGT-I GT-I 8 O GLG . . . . . E. 7'-O" 04 EL. LIGHT/N6. 6 B/0 BOXED LG. B/ GLG. /0 GL - - —- -- - �i GOl B Fq 418/�ri OGLG. „ EL. +T_O" EL. +6,_q„ n N EL: +T-2 AFT. 6L6 , AFF. /Ot L6. �EL +q,_2„ I I � F AGT-2 �, .. /R OS El z z �+ A 3 AGT-I EQ. - __ ECJ .a A- AGT-2 EQ. . , . . , .. EQ L b Q. ' O /Q 6L6 �' Ing'-O° 4 p ,_ 3 - � . ACT-1 Ck ry - , SO Q, EQ. EQ. ., EL. +7L2" EL. 6LC K0r8L0" 'Y A 3 E/�, �O„ 5 I r G p AGT-1 OPEN TO ABOVE Ac7-2 II _ - - - - w A-I A-I 04 I A-I A-I I D I I I I I I NOTE: ll" II" REFER TO FIN15H SGHEWLE FOR ALL FINISH AND CUB57RATE DESIGNATIONS. - /O GLG. j I I — I AGT-2 I u I FIXTURE SC�El%�E FIXTURE FIX. WATT MANUFACTURER © p LEGION LIGHTING CO., INC. NEW 2X2'LAY-IN TROFFER(2 LAMP) 62N G -4.OE �A GAL NO, SERIES SO2 -4A6 NEM 2X4'LAY-lN TROFFER(2 LAMP) 62H LEGION Ll6HTIN6 60., INC. A A I A I A I A2 GAL NO. SERIES 502 - O6 MEN 2'X4'LA TROFFER(3 LAMP) 99H LEGION LIGHTING CO., INC. �p A3 CAL NO. SERIES 502 1'XW SURFACE MM FLOVRE56ENT LEGION LIGHTING CO., 1N6, ®g (2 LAMP) 62H GAL NO. 5ERIE5 2750 ® IX6'5U5PENAE9 LINEAR INOIRE-GT 240H FOCAL POINT-METRO LIGHT 6'5INGLE 5'; 3'-lQ" G FLUORESCENT POINT GABLE 6U5PEN510N MOUNTED �D EXISTS FIXTURE TO BE REMOVED EX15TINC EMERGENCY LIGHT, REMOTE Ln / }� HEAD TO REMAIN �, f F 0' TRACK Ll6HTIN6 200PV TECH Ll6HTIN6 -5TRAICHTLINE TRACK � /f 6' THO CIRCUIT 4' TRACK 1.16HTIN6 /00yl TECH LIGHTING -5TRA16HTLINE TRACK ` F/2 4' TWO CIRCUIT �✓ �G HALL SCONCE(FLWRExENT) 75H H 6"60MPACT FLUORESCENT SOH -VNO L116HTIN5 -ELATE C6 6" TRIPLE TUBE HORIZONTAL SERIES 6650 CLEAR COLOR WITH SATIN FINISH CATALOG No. 66H-126/42r K 6"COMPACT FLLbRESGENT 3gH -VNO LlIC14TINC -ELATE 66 b" TRIPLE TUBE VERTICAL SERIES 6bOO CLEAR COLOR XITH SATIN FIN15H 6ATAL06 No. CCV-1264i2r 3-I/4°LENSED NULL HASH� HON. -LINO LUCHTING-A6ULUX RE5G55ED L AD.N/STABLE MR 16 1643-43q SERIES CATALOG WNPER IC43-43gHZ-HH M 30"PEWANT5(FLUORESCENT) 72M.. FAL05 VER D V, ONE, 40/'1 035 I2O ONE, � GIROULAR 26X13 BASE FOCAL POINT-STEM MOUNT 5KYDOME ❑� LIGHT FIXTURE W DENOTE5 36'121A PENDANT5(FLUORESCENT) 165H THREE LAMP TBU6, 5IX LAMP 7S, 5IX FIXTURE TYPE N LAMP 751,10 ® EXIT LIGHT FIXTURE z ® MECH. DIFFUSER 7 RETURN ,-I-, M15 SERIES HALOGEN WALL SCONCE BELFER L16HTIN6-HAL06ENX P Q10I IOW BAYONET BA5E LAMP, FR05TED EMERGENCY LIGHT FIXTURE XALL SCONCE-5TAIRXAY 62H LITHONIA L16HTIN6 -DECO MEFAL16 4 p HALF ROUND HALL SCONCE TOILET EXHAU5T FAN SET IN GLG. GRID TILE. FOCAL POINT-LUNA 2X2 RECESSED REFER TO MECH D065 FOR SPEC OR 2X2'RECESSED INOIREGr I04H INDIRECT LIGHT --II--}} LITHONIA L16H7IN5 -ARCH SCONCE -I-+ CEILING GRID/TILES REFER TO FIN15H CT75 NIGHT PHOTOELECTRIC FIXTURE 72H 5ERIE5 -lN5TMW EMERGENCY OPTION SCHEDULE FOR SIZE/5T(LE/MANUF ETC. CEILING MOUNTED EXIT SIGN PAINTED 6YR BD 6L6/SOFFIT Vl/ 6H ' ' ' EMERGENGYBAGKUP -- HALL f—MTED EXIT 5/GN W/ 556TION ARROW EMERBEN6YBACKUP bW LIGHT PACK HITH EMERGENCY 50X BACKUP XX ELEVATION 5111450L z ELE6TRIC EXHAUST FAN RE6E55ED LIGHT FIXTURE ® 57EEL GRATE BE, �pE AON REVISIONS/SUBMISSIONS. DRAWING TITLE. DATE. DESCRPTION' yew cy c�OA 09AE vAMMIRwcnc 6A/'EMENT REFLECTED s * IU31M RLV p i GEILI/'IG PL A/I so? pQ P > - CAD FILE NAME. //1194 A-5.63 PROJECT TITLE DATE NSA PROJECT +. CONSULTANT: Nemschick Silverman Architects P.C. PL A PROPQ/EDADDITIONfA/VDALTERAIIO/Vf: JC "...the business of ARCHITECTURE." G"M0 MID PMIR01 mmomm P& - _ _ - - -. — -- _ - _ 27550 MAIA ROAD SCALE: 6 DRA N NO.: . 18, 200 1194 Design and Consulting SerZ'es --- — — —� CTFICHOGUI , /VEW YOR( 119�5 735 Deerfeot Path, Cutchogue, New York 11935 20 High 5treat, Huntington, New cork - -- 1 Phone : 631-734-7007 Fax : 631-734-7347 _ _ __ _ Af NOTED —� (516J 421-0439 Fax (516) 421-0563 DISTRICT: SECTION: BLOCK LOT. DRAWN BY. hftp://www.ns-arch.rom ®coamk;xr 2006 xeMscxcR.�vsRdwu nvcxrtsas ac NO fl 1000 109 06 2.2 EL IL I li I I I I I'VR / 7�//q fLA A/C 7 -5 ------------------------------------------------------------------------------------------------ L F-Ol. RELOCATE EXlSP6 BREAK ROOM TABLE INTO NEW BREAK ROOK I I F02. LAN ROOM TO HAVE 'AORK 5PACE"(DE5K AND 5TORAGE). F03. CONTRACTOR TO PROVIDE NEW WORK STATION5 A5 INDICATED ON DWG. PROVIDE RECEPTACLE5 FOR EACHWORK STATION REFER I I TO ELE6TRI6AL DA65 FOR AD07L INFO, F04. PROVIDE ROD AND 5HELF IN 6LO5EL (SEE DETAIL 5HEET A-505) l� F05. PROVIDE FOLDING CHAIR5 TO AC6014MODATE 30 06CUPANT5 A5 5HOWN IN DWG. F06. NEW BOOK 5HEL VING(5EE DE516NATED 5FE61FICA TIONS) - _ FOZ DOPY ROOM TO HAVE 'WRK SPACE"(DE5K 6 3TORA60 DO -------------- - - - - - - - - - - - - - - - - - - - - - — - - — Exisr6 REF. BAT °l2 BREAK RM. 1 1 1 NEW MECH. on 3,_6„ EX1ST'6 CRAWL oia MULTI-PUNGT/ON 1 1 5PAGE ROOM 1 1 FOI R III I� 4'D1A. - ----- ------ 0000 00000111 STORAGE ON .o. 11 ois 11' 1 P/LE RM. 1110000 0000011 1 � 0 II m I / = 1 1 , MEGHA�NIGAL Fos MEGH. N N 1000 000011 O ; I� NEW ELEVATOR N N - i ------ - ___ _ t 84"H = HEI6HT OF NEW 5HEL VING o _��� 36"W = WIDTH OF 5ECT/ON FOR NEN 5HELV/N6 —-- `� R= RELOCATED EXI5TIN6 FLRN17VRE FO4 N N 1 I Foa le 1 1 11 1 HALLWAY 5 1 1 00l 11 I I I — _ _ — � � F 4 6L055T � ��__- COATS - - ' T O" 5'-3 I/2" I''-7" 5'3 l/2" 5'B I/2" I w I UP EW I HG ATH rl -- - �0 0 LAN RM 15 m ------------------ 11 � 4 EX/5T'6 N WELLED L 5PAGE EXIT cea 0 0 4 0 m a0 Cm r, q N 4 N m 0 0® 0 m o 00 IS a o N m m N m N m ry ® N N N ^ O N 0 O ------------------- m Q n _I T � N m - L N ry N N O ry 03A-5El " l l w T I"UR 9I TUR5 If;�A/ w ?�_y� T-3" l'-b" 2'-6" 6'-7" 2'-b" I'-7" 2'-6" 6'-111, 11-6�, J56ALE = 1/4"= PO" NOTE: TH15 PLAN 15 FOR ILLUSTRATION PURP05E5 ONL'r ALL FURNITURE WILL BE FURNI5HED AND AND IN5TALLED BY OTHER5. COORDINATE MILLWORK ADJOINING FURNITURE /N/TH O/NNER5 1/ENDOR PRIOR TO MFR / IN5TALLATION. REFER TO SHEET A-3.12 AND DETAIL 5HEET5 FOR MILLWORK TO BE FURNISHED AND#STALLED 3r C.C. SE/FL REVISIONS/SUBMSSIONS DRAWING TITLE: �pED E Chime DATE: DESCRIPTION a yc Fn 09/18 o YM MRLRICRIG 6A/'EMILAT 1MIM RLv I i e s * FURNITURE PLA/V * A npmv P CAD FILE NAME: //1194 A-5.6.4 PROJECT TITLE: DATE: NSA PROJECT x: Nem CONSULTANT',schick Silverman Architects P.C. FLOORP noRl» PROPOjt_D ADDITIO/Vj AND ALTERATIO/y/: jEPT. 18, 2006 NJA 05-1194 •...the business of ARCHITECTURE.* CADANO AND DANI.1 INOINOIO. D.C. 27550 MAIA ROAD SCALE: DRAWING NO.. Design and Consulting services -- -- - — — - - - - -- -- CUTCHOGUE, Mid YORK 11955 735 Deerfoot Path, Cutchogue, New York -7347 20 High street, Huntington, New rork A/ /VOTED A\ R Phone : 631-734-TOOT Fax : 631-734-7347 (5I6) 421-048q Fox (5I6) 421-0563 DISTRICT. SECTION BLOCK, LOT DRAWN BY !�_5 b l 44 http://wvvw.ns-arch.com ( • J w copvRlcnr sooe xEMscxcx sI.vERuax nacwrecrs rc /VO TF1 1000 109 06 2.2 EL L----------------------- -r------------------------ REMOVAL PLAN 1\1075.0 11 DI4 I j' IIII DOL REMOVE EXIST'& CARPET/FLOORIN6. 5GRAPE/PREP 5URFACE FOR NEW EXISTING FJ EXI5TIN&F.J i FINISH TO REMAIN TO BE REMOVED 111 �-------------�r1 III IIII III D02. EX15T6 6LAZIN6, TRIM,AND A55061ATEL)HARDWARE TO BE REMOVED IN 1,I IT5 ENTIRETY AS INDICATED ON DRAWINGS. (7YP) I;I IFr--� 1 33'-4" ' I I I I I I I I I I I I D03. EXIST'G WAD STAIR, RAILINGS, ETC. TO BE REMOVED AND LEGALLY II I, D23 DIkARDED. II I, D04. REMOVE EX157& INTERIOR PARTITIONS, DOORS, FRAMES,AND A550CIATEl7 - - - I',I - _ - _ ❑ - - - - - - - - - - - HARDWARE AS INDICATED ON DRAWING5. (7YR) r DI5 III I , I I I I I r - II _ DO5. EXl5T'6 5TAIR TO BE REMOVED AND DISCARDED. PREPARE AREA FOR O o __________ _ 1N51ALLATIONOFNELN57AIR. REFER T05TRZRIRAL DW65/ I I I I I I AR6HITE67URAL DETAILS FOR ADD'TL INFO. i J L _ _________ ___ I `� , � � I 1 r_� L _J L_ J L DOG. EXl5T5 DUMBWAITER AND ASSOCIATED HARDWARE TO BE REMOVED AND DISCARDED. PATCH EXl5TG AND INFILL FLOOR OPEN'G W/GON57RUGTION -----' \ y I11I I Dla II BATH( , IL Ji1I DOI o 0 I;� DI8 I AS PER STRUGIDRAL DWGS. PREPARE FOR NEW FINISHES. i DOS _ TYR.. �� .' /as EXIST'G J I �, /JJ�� 007. SAFE OFF AND GAP PLUMBING PRIOR TO REMOVING EXl5TG TOILET, SINK, VA. OFF/GE � AND A550GIATED HARDWARES. ABOVE 0I2 D08. CAREFULLY REMOVE EXl5TG TIMBER FRAMING. TAG AND STORE SAFELY r-----rl HALL F-OR RE-05E (TYP. THROUGHOUT) �__ - - rII I DOA. REMOVE WALL AND FLOOR FINISHES DOWN TO SUBSTRATE D26 1I1 �b_____JI i I O2 DID. EXl5TG MILLWORK TO BE REMOVED IN l75 ENTIRETY. 2 I Dll. EX15T'G LIGHTING TO BE REMOVED IN IT5 ENTIRELY. � III < I TYP. DI2. EX15716 DUCTWORK TO BE REMOVED IN ITS ENTIRETY. J o - I � � rI °_________ DI3. AFTER SHORING 155TABILIZED REMOVE EXISTS FLOOR 5Y57 PM IN ITSDOI ENTIRETY AS DENOTD BACK TO NEAREST FLOOR JOISTS TO q NP ` I --------- --- I ACCOMMODATE 11,15TALLA TION OF NEW FLOOR AS PER STRUCTURAL 19VJG5. REMOVAL TO BE PHASED T MAINTAIN LA 7ERAL 5TA8/LITY BY EXISTING L- L- ` i' I 57RL6TURE TO REMAIN 5EE SHORING N07E BELOW. III ` rX1ST'6' ----� `` ' 1 / I D14. REMOVE EXl5TG CONC. STAIR/RAMP. EXlST'6 GHIL PENS EXl5TG N MEET/N6 RM. RM `� `� 1 ` GENERAL STACKS DI5. REMOVE FLOORING AND CUT BACK EXISTS FLOOR J0I5T5 AS REOD TO EX1576 ,' ++1 - /� CREATE NEW SHAFT OPEN&. RE-FRAME FLOOR AS PER 57R06T. DW65. CIRCULATION x\\ `}v REFER TO MEGH DWGS FOR ADD'7L INFO. 9I6. REMOVE FLOORING AND GUT BACK EXIST&FLOOR JOISTS AS REO'D TO ` ` 1 CREATE NEW ELEVATOR. SHAFT OPEN'G. iDII ,' DI3 . 1 DIZ REMOVE EXl5TG COLUMNS A5 PER 5TRUCTURAL DWG5 PROVIDE TEMP. Ji----------� --- L-------_ SUPPORTS AS NEEDED IN ORDER TO INSTALL NEW COLUMNS. REFER TO 5TRZ9RAL Dh65 FOR ADD'7L INFO, NIA/ __-- I ,� DII `\ lol `` o.�T---------------------J r-I-I r I DI6. GUT BACK EXISTING FLOORING/5UB FLOOR TO ACCOMMODATE NEW COLUMN DI9 �LL���PP����If p INSTALLATION REFER TO 5TRU6T DWG5 FOR ADD'TL INFO, (TYP. ALL NEW I COLUMN LOCATIONS). rL- �< 0I2 DI9. GONTRAGTOR TO REMOVE EXISTS WALL FINISHES, GYP HD, PLASTER ETC. �I II I I ABOVE $ I DOWN TO FRAMING FORM INSIDE BLD'&FIRST, TO EXPOSE EXIST 6 DI2 O IIII , DI2 \\ I THROUGHOUT CONDITIONS. CUTBACK EX15716 FLOORING/PLATES TO ACCOMMODATE NEW COLUMN(5)1N57ALLATION. VERIFY REWIREMEN75 IN FIELD TO REMOVE DOI Og DOI EXl5TG EXTERIOR F/NI5H/SHEATHING INCLUDE/N BA5E BID REMOVAL OF ADJACENT WINDOWS,DOORS, Mll51G, EQUIPMENT, ETC, TO ACCOMPLISH THI5 I I 02 DN SCOPE. REPLACE AND RESTORE TO ORIGINAL CONDITION AFTER COLUMNS ARE INSTALLED. 04 < ' DI9 /i -- I D20. EXIST'& TIMBER P057 TO REMAIN PROTECT WRING GON57R1.0 AON AND � ---- I I L -_ - �< 1 DOI I PROVIDE TEMP. 5HORIN6 WITH VERTICAL AND HORIZONTAL BRACING AT ALL r-_--=_-_- r-r tl II DOa I TIMES. ------�j T, ' %' -_-_ -_ 1 _-_ -_- 021 DII I D21. REMOVE EXl5T'6 FLOORING AND CUTBACK EXISTS,FLOOR J01575 A5 REQD - -I r= = =_ III DI2 I TO INSTALL NEX STAIRS. RE-FRAME A5 PER DETAIL5. ;%' 4'- 5'-3" '��.% w;% I II TrIP I D22. EXl5TG COLUMNS SET IN HALL TO REMAIN (7YP UO.N) ____ _________ DI I_ THROU6HOUT - - - - - - _ - - - � Di _ r--r D23. LINE OF EX157"G ROOF ABOVE REFER 70 ELEVATIONS FOR 1ADD7L INFO. 1 Ip� - II MI - M 11 I o D24. EXI5T6 WOOD STEP/RAMP TO BE REMOVED. EX15T6 RAILIN65 TO BE EXlST'6 _ l _E _ I L_ 5TORE9 AND REUSED. PROVIDE 5NOP DW65 TO ILLUSTRATE EXl5T'6 COPY ROOM VEST 'r---- ----- I CONDITIONS TOBEREBUILTA515. L----JL----- I I l07 (� � --_ I I 025. REMOVE EXISTS WOOD RAMP, GONSTRIIGT A NEW STAR WITH EXl5TG STONE. I I 026. CARPET TO BE RECLAIMED AND STORED FOR REUSE I 1 EX/576 STA/R I I II -�IJ Dla LI"P- � I IQ L -yid - - - - - I+� - - - II 1iI11I11 � I II i 2 O,FN5RAL )REMOVAL )=L-AN NOTF5 DI4 11; I-i TYP. I --rl r � 1r-' �1I1I____ _ _______rd o I_� 'u__�1 ° COI. 1T 15 THE CONTRACTORS 50LE RESPONSIBILITY TO DOCUMENT EXI5TM CONDITIONS PRIOR TO WORK IN EACH RE5PEG TIVE AREA. DAMAGES TO t11+------Q -------Tli I DTYR.. I EX15TING FINISHES TO REMAIN DI/RIN5 WORK PROCEDURES SHALL BE I I I I REPAIRED AT CONTRACTORS EXPENSE, LINLE55 DAM46E5 ARE DOCUMENTED PRIOR TO START OF WORK. O III------- -------+u 602. CONTRACTOR TOREMOVECOMB/571BLEDEBRI5FROM THEWORKPLAGEAT 11111 T1'P. THE END OF EACH DAY AND FURNISH LABOR TO MAINTAIN A SAFE AND III CLEAN PORK ENVIRONMENT AT ALL TIME5, LEGALLY CART AWAY AND III DISPOSE OF DEBRIS AT REGULAR INTERVALS TO PREVENT EXCE551VE ACCUMULATION 603. THI3 PROJECT WILL REQUIRE THE USE OF A BUILDING MOVER TO FACILITATE III IIII I I THE TEMPORARY MEASURES NECE55ARY FOR EXCAVATION, 3HORIN5, IIII 111111 SUPPORTING AND/OR LIFTING OF THE EXl5TING 5TRUGR/RE(5) TO ACCOMMODATE THE PROP05ED FOUNDATION kORK. BIDDER5 SHALL 111111 111 r__O r__, CONTACT. DAV15 BROTHERS ENGINEERIN6 30 BARTEAU AVENUE BLUE POINT, EM® Xx � ��A' L 6E` r III ----_-___ NYll7/5(630ILL BE AC PRIMARYGONTAGLSE OFDAVIS. NO ALTERNATE /J-�l N v 111111 I i II O ' O COMPANIES WILL BE ACCEPTED FOR THIS PHASE OF WORK. ILL Ju 504. THE CONTRACTOR SHALL BE RE5PON5I0LE FOR ALL REQUIRED 5HORING, EXISTING WALL TO REMAIN (ten r EXISTING PLUMBING FIXTURES TO L - - �u J BE REMOVED COALING, TEMPORARY F ALL PO ETC. NECESSARY FOR THE SAFE AND COMPLETE EXECUTION OF ALL WORK NOTED ON THESE DRAWINGS. EXISTING WALL TO BE REMOVED I�x�hl EXISTING DIFFUSER TO 8E REMOVED CONTRACTOR SHALL FIELD SURVEY THE EX15TING CONDITIONS AND PREPARE TEMPORARY MEASURES PLANS AND DETAIL5, SUFFICIENT 70 EX15TIN5 DOOR TO REMAIN L EXl5TING DI/LT TO BE REMOVED DESCRIBE THE CHARACTER OFW NECESSARY TO EXECUTE THE GON57RUCTlON PROCEDURES SOA AS TO MAINTAIN THE INTEGRITY OF THE S EXISTING FACILITIE5, WHICH ARE TO REMAIN Th'E5E PLAN5 AND DETAIL5 EX15TINC DOOR TO BE REMOVED fy EXl57-ING LIGHT FIXTURE TO BE REMOVED SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OFWORK. DRAWINGS AND DETAIL5 5HALL BE EXISTING&LAZING TO REMAIN oho EXISTING GLG FAN TO BE REMOVED 5I6NED AND SEALED BY A LICEN5ED ENGINEER, APPROVED TO PRAL TI6E ENGINEERING WITHIN THE 5TATE OF HEX PORK. EXl5TING GLAZING TO BE REMOVED GO5, WHERE NOTED ON PLAN5 TO DOCUMENT AND RECORD AND/OR RE6ON57RUCT EX15TING CONDITIONS, THE GONTRAG TOR SHALL INCLUDE IN BASE BID TIME AND EXPENSE REQUIRED TO PROVIDE DETAILED A5-BIILT OR EX15TING CONDITIONS PLANS AND DETAILS OF THE ITEM(5)F4S901RING RECON5TRGTION IN ORDER 70 PRESERVE THE INTEGRITY OF THE EX15TING GONSTRUGTION/ARCHl7E677)RAL FEATURES OF THE BUILDING/SITE THESE ITEMS SHALL BE DOCUMENTED FOR PURPO5E3 OF ITS RE60N57RZT1QN OF IDENTICAL OR 51MILAR GON5TFU6TION FINISHES, MATERIAL5, 51ZE5 AND CONFIGURATIONS. THE5E DRAWING5 AND DETAILS 5HALL BE S/BMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL, PRIOR TO 60MMEZINC RE50N5TRU57lON WORK. \ 506. WHERE ITEMS ARE NOTED TO REMAIN AND PROTECT DURING CON5TRZTION, GENERAL CONTRACTOR SHALL BE RE5PON5/BLE TO FURNISH AND INSTALL .6 MIL POLYWST PROTECTION OVER AND AROUND AND/OR ENGAf`5ULATE 51.UH ITEMS TO SAFEGUARD FROM OAMA6E IN ADDITION, HORIZONTAL AND VERTICAL SURFACES OF ITEMS 51.OH AS MILLWORK, COUNTERS, R/RNI R/RE, / fL OOR 9 MO\ /AL ��A A / 5Z SHALL CT PROTECTED WITH 7" ED AN TE COVERING OVER POLY. ALL i/ �v (A.l'H PROTECT/ON SHALL BE REMOVED AND SALVAGED OR DISCARDED AT PROJECT COMPLETION. SCALE = I/4" = I'-0' 507 THE PROJECT WILL BE PHASED TO ACCOMMODATE TOTAL Y1'ORK REQUIRED. GON5TRU6TION OPERATIONS AND 5EQUENCIA6 SHALL BE SUBMITTED TO THE ARCHI7E6T FOR REVIEW AND APPROVAL WITH OWNER PRIOR TO COMMENCEMENT OF WORK. SEAL'' p q H REVISIONS/SUBMISSIONS. DRAWING TITLE. DATE DESORPTION. vnreo Ks.w rlRff FLOOR * aT i d * * Iw�im tsvinoni REMOVAL PLO J- 0 0290A 9TF o, de`N y CAD FILE NAME. //1194_A-3.1.1 PROJECT TITLE: DATE NSA PROJECT •: CONSULTANT ROAD Nemschick Silverman Architects P.C. L PROPOJ 27550 MAEDADDITIO/1/ A/1DALTERAT Oy/: ...the business of ARCHITECTURE." wCAP- �p µp �AlIRp1 OIONmU, �.Q UTCHOGUE, /Y jr-PT. 18, 2006 /1fA 05-1194 DesfAN and Consulting Services /1 SCALE: DRAWING NO: _ CEW PORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 P,/'NOTC=D 20 High 5treet, Huntington, New York A -5 . 1 . 1 Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0439 Fax (516) 421-o563 DISTRICT. SECTION BLOCK. LOT: DRAWN BY: ��\1 I I http://www.ns-arch.com to COPYRIGHT 2006 NEMSWON SLVERMAN ARCHIiKiS PC NO F1 IOOO 1 O9 OG 2.Z EL I II D I/2 A +- (V.LF) NLFJ (VI"'.) G25 4'-I0 I/2" N�W 601. PREPARE EX157-6 PL'rkW0 SUB FLOOR FOR APPL. OF NEW FINISHED BT ARE O PER FINISH 9EOUAL O APPLY 5L T PAPER O FLOOR PREP RAMP cog EXIT $TA/R BY ARDEX OR APPRO✓ED EQUAL OVER I5*FELT PAPER MOISTURE BARRIER. C24 G25 (A5 PLYWOOD) 602 NEW EXPOSED STEEL 6OLUMNS ADJACENT TO EXISTING TIMBER GO AND ASSOCIATED EXP05ED 5TEEL BRA6KET5 AND CUPS SHALL BE SHOP FABRICATED AND PREPARED FOR APPLICATION OF CUSTOM POWDER GOAT _ _ _ _ _ _ _ - PA GO O ____ _ _ - __ FAINT L R TO BE MATTE BLACK FOR ALL. GO --- - - - _ L K L LOR TO REPLICATE UP ___-- __ __ _ - - - I I I =-_- ---- r - - - - �- - - - - _ 1- - - \\�Y/// I WROUGHT IRON. GRIND ALL WELDS, SEAMS AND EDGES SMOOTH TO TOUCH � BEFORE PRIMING AND FINAL POWDER GOAT PROCESS. G34 -€ - - - - - - - - -__--'-`--' -  603. PROP05ED COLUMN REFER TO 5TRU671)RAL DW55 FOR EXACT LOCATIONS _ _ _ -- -- ----I ----- --- (TYP) : � 1 2 _ - - - - - - - - - __ _- - - - - - - - -_� -- --� _- - I- I C04. NEW BEAMS ABOVE TO 8E INSTALLED. REFER TO STRLL'TURAL DWGS FOR --- - „ -_m(7YPJ ,.___ 5'-5 I/2' 03 G29 20'-7 l/2" G29 06 2 I G33 I GI4 YA VI IREGTOR - ` BENGN WITH STORAGE , NG BATH R - I- L- -- LI C_D lI I_ � I G05. EXISTING TIMBER BEAMS TO BE RIPPED DOWN AND APPLIED TO NEW BEAMS G21 ', __ :,.y _ I HALL i __ - _ � I, __ _ I I III L,I J L` III I TO CREATE GOFFERFI7 CEILING REFER 70 DETAILS FOR ADD'TL INFO. zo co m (YPJ _ - _ -- - - N - _ - -- r Ill " GO6. VERIFY NEW ENCLOSURE SIZE PROXIMITY TO EXISTING WINDOW TRIM NOTIFY ? GHILDREN5r2b l05 n YOUNG ADULTS COMPUTER ARCHITECT IF EN6L050RE ENCROACHE5 LE55 THAN 2" TO OUTER EDGE OF PARENT/NG LIBRARIAN ub O - s Jill TERMINAL III _ �- - I_— _--_I TRIM. FFIT --_ II e ® ALIGN, ll4 C07. NEW SHAFT WALLS AND DUCTWORK REFER TO MEGH. DW65 FOR ADD'TL AREA —/ _ /08 k A°BV. VVV / VH5 INFO. = I - � 606. NEW ELEVATOR - REFER TO DETAILS AND SPE6IFI6ATION5 FOR ADD7L INFO. F_- - 1 _-1 I I I II ' III O _ 5'-O" 6'-6" J 6 G09, NEW EXTERIOR EXIT STAIRS REFER TO DETAILS AND 5TROC nPAL DW65 04 - - __ - GO -- ___- -_ -_ - _-- i - 30 I I I FOR ADDTL INFO I (7YPJ 9 9- ___ _ __ _ __ __ - --_ __ ___ - - - - - - - - - - - _ 03 ____ o -- __O _ __ ___ a I I I I I ,- I CIO PROPOSED INTERIOR STAIRS REFER TO DETAILS AND S7R1/6TURAL DWGS I' q�_p� T 2�_q� l'-2//2' 7� ie G02 I FOR ADD7L INFO. 4A GI3 4c6 I/2" l5 I l/2' 7 5'-S I/2' 20'-7 l/2' --- I'-2' _ 5 __ I603 CIL PROPOSED GONG. STAIR 6 RAMP. REFER TODETAILS AND 57RZTLRAL bGI5 IG (TYPJABV.q3� 7 - 5� (TYR) G35 I P 5 FOR ADD'R INFO. - (7YP 2 GI8 CNILDREN'S G35 - 1--- _ _- I f J 6I2 PROPOSED WELLED EXIT. REFER TO DETAILS AND 5TRZ7VRAL DW65 FOR N E RROGRAMM/NG ROOM G/RGULAT/ON -- -- Ili A0D'TL NFO, / 107 � 14o, lC6 104 � GI3 NEW 36'HIGHWROKHT IRON RAILING TO CODE. PRO✓IDEWRGM/6HT IRON HANDRAILS WITH SUPPORTS ON WELLED EXIT-BOTH 5IDE5 4IIIe m E J G31 I PROP Ob I/ GI4. NEW EXHAUST FAN TO BE LOCATED OVER NEW TOILETS REFER TO MEGH. A5 GI9 I ) ELEVATOR I __ m __ PAIS5 FOR ADO'TL INFO. GO j - --�-- ------ ---- z- �GI91 -, -- ---- I r I GI5. NEWNLE55 STEEL TAININ15H OASIS RADII FOUNTAIN MODEL MI40R WITH I I - I -I_- STAINLE555TEEL FINISH. ___________ __ I -- __ -- N `_ - / . -- 1=-- e 616. NEW MARBLE SADDLE THRESHOLD I G28 2 � _ I - - I 04 GOI ��. t`. � I I _ _ I__ - (nPJ LI I _ I j ° ___ __ ___ ___ ____ ____ o - _ - - - - - - - - - _ - - - - - - - _ - A C17 PROPOSED AREAWAYPROVIDECALV "X 'RE6 T. 57EEL GRA TING OVER THROUCHOU7 GOI f I� f -- 1 \ -------------------------------------------------- B- - - - - - - -5 — — _ OPENS A5 PER SPECIFICATIONS REFER TO OWGS FOR A0011 _ _ p m __ (T1 PJ r--- __ _� `--i7 IL—i � I G2B 3 l-b q�101� h6 I I I INFO. I -5,06 -- I GIB. FRONT 5TEP5 TO BE RE6ON57RUGTED WITH NEW FRAMING MEMBER5 AND (TYPJ l I I ___ GENERAL /MED/A ------------------------------- ------- GI9 GO-7 �� �,I COMPUTER I ------ -- -- --- -- -- -- ---_--- I B F/GTION � D7�570XARGHITDEEGTKFOR RF/IEW/APPRO AIST'G STEPS PROVIDE SHOP �a 4 N AREA I I , - - - - -- x \ -` .I I G22 l03 -- ---- -- \ .. ........., �T - - - I 619 NEW MILLWORK. REFER TO DETAILS/RIRN17Ve PLAN FOR ADD7L INFO I - __ 0 m _ G24 G28 I I 1 I I j I B (lYP) .ol � (7 J G29 G29 I I ALIGN (71PJ --_ =L L- - - _ 2 G{O 1 I (�JG24 . .. I' -I i E Dill -4'°'' G20. RE7/5E MASONRY REMOVED FROM EXISTS FDN WALL TO CREATE NEW LANO5GAPE WALL. REFER TO 517E PLAN AND DETAILS FOR ADD'TL INFO — --- -� - — ® - - --- ------  - -- ( J W I ry -- -- I - -_ 621. RESTORATION: 7�\ GONSTRI/G7 NEW CONCRETE STOOP/5TC-F5 AT SIDE ENTRY TO NEST _ 6 \ (IYPJ ELEVATION. DROP HEIGHT DOWN r RI5ER FROM EXI5TIN6 ELEVATION AND I REMOVE/REPAIR AFFECTED 5/DING TO MATCH EXI5TIN6. UTILIZE 3000 F51 GI9 I ____ -_ _ I 04 - I 6ONCRETE REINF. WITH FIBER ME5H REINFORCING. PROVIDE 5HOP DWG5 TO ONO VEST - - - _ ___-_ _o ARCHITECT FOR REVIEW/APFRO✓AL. COPY ROOM I N _ - -_- 622 NEW 36"HIGH GATE REFER 705E5TION5 AND INTERIOR ELEVATIONS FOR , I 7, I�-Y . 0 ADD'TL INFO(7YP) 102 6' /„ i - — G23. RESTORATION CONSTRUCT NEW RAMP/PLATFORM AT REAR OF BLD'G TO MATCH EXIST'G GI'I GIN PROPOSED II \ _-- _ I- --- GOI O5 IN KIND PROVIDE SHOP 0k 65 TO ARCHITECT FOR REVIEW/APPRO✓AL, 5_0 II I E " " I II (7YP) �1PJ r________________ PRIOR TO REMOVAL WORK. 4 2 4 IO I/2 GI3 G 12 pe 20 II' O STAIR A� I _ -�F JJ_ -- -- C24. PATCH FLOOR/S%B FLOOR AT LOCATION5 OF NEW FLOOR RE5I5TER5 - -- GENERAL 16-4 I/2 20-10 I/2 ALIGN �I' ' ' � I I STACKS - I__ ti TYPICAL THROLtSHOUT ENTIRE SPACE REFER TO MEGH. DWGS FOR ADD'TL r G28 - -- --I - T _ `n INFO. G25. NEW GONDEN5IN6 UNITS ON 4"REINF GONG. PADS. REFER TO MECHANICAL _ L w - - - - - - - - - - - - G35r -_ �r�1J- AND 51RG61URAL DWGS FOR ADD7L INFO(7)PJ h (TYPJ _ I G26. NEW '9ERK0"ELEGTRl6 BASEBOARD HEATERS. REFER TO MECHANICAL , GI3 v N I III III III I 627 NEW 6AL✓ANIZED AREA WAYWALL. REFER TO MECHANICAL OWG5 FOR (TYP) —— --- I AOD'TL INFO. COORD. WU MECH. GONTRA6 TOR FOR ELEVATION(DEPTH)OF STAIR O ° _ ° FND. WALL. PROVIDE A MIN 12"STONE BED l2"BELOW BOTTOM OF DUCT --_ -�. -i- - - _ _ _ 1 II PENETRATION THRU WALL. GON7RA67OR TO FURNISH AND INSTALL PROP05ED RAMP DN O G G03 dl - - II AL16N C REM9VABLE STEEL GRATE COVER CUSTOM FIT AROUND DUCT PENETRATION RAMP j 4A5 I YPJ % -4A6 /IAFPROVRLSEGTIONS). PROVIDE SHOP OW65 70 ARGHI ECT FOR REVIEW Q i 628. NEW 36'-O"X l'-4" THRU FDN WALL UP TO GOOSENECK ABOVE GRADE. -- P/GT/ON ' _ , _ + -_-________ _ �_� PROVIDE CAT.✓ANIZED AREAWAYWALL. REFER T057RUGL DWGS FOR GII __ - - _ - - - ---- -- 1--- - - ADD'TL INFO. L � �_ __ �/NE OF 2ND FLOOR A�UE ____t RAMP ON � III ? - I'-6" 35-9 l/2" - G29. ALIGNEDGEFLU5HWITHEXI5TINGWINDOWTRIM CENTER OFF COLUMN O.A. - DIMENSION SHOULD BE VERIFIED IN FIELD L . (7YP, ALL PILASTERS) Go, III III I II I I GO, C30. PATCH, PREPARE, PRIME AND PAINT ALL AFFECTED WALL5 WHERE REMOVAL _ _ g G2b _ WORK TOOK PLACE ALIGN ALL SURFACES TO BE PLUMB AND TRUE. REFER ', o, TO FINISH SCHEDULE FOR PROPOSED FINISHES TO BE INSTALLED. C31. FLASH PATCH/MAKE NEW SLAB READY FOR APPLICATION OF NEW FLOOR I/2 O O FIN15H AS PER FINISH SCHEDULE -4.A - - _ - - J C32. PROVIDE EXPANSION JOINT AT 1NTER555TION OF NEW CONCRETE FLOOR TO EX15T1N5 WOOD FRAME FLOOR TO REMAIN COVER WITH NEW FLOORING LOOSE LAYER BETWEEN FULLY ADHERED TILES ON OPPOSITE 5I5E5. 20 20 G33. REBUILD/REGON5RZCT WALL WHERE REMOVED OR OPENED TO (7YPJ AOCOMMODATE COLUMN INSTALLATION. UTILIZE NEW MATERIALS TO MATCH EX15TIN5 FOR ALL. G34. FURNISH AND INSTALL NEW OBSCURE WINDOW TINTING ON INSIDE FACE OF BATHROOM WINDOW AS MANUFACTURED BY 3M OR APPLIED EQUAL. PREPARE WINDOW SURFACE PER MFR. RECOMMENDA TlONS, 5'-0" l5'-0" I-O" 8'-l" 6 5 I/2 l2 6 I/2 BUILDING l5 I I/2 V.Lfi BVIL I DING 12 5 1/2 EUILDING G35 PATCH SEEMOVEDRWITCCONNO4"APA RATFD PLYWOOD SUB FLOORING INHERE REMOVED TO ACCOMMODATE GOLIFIN/57RIKNRE INSTALLATION. ADD BLOCKING A5 REOD TO MAKE SOLID CONNECTION. EXISTING WALL TO REMAIN On® PROPOSED PLUMBING FIXTURES 21'-0" RAMP l4'-6 I/2" 40'-I I/2" BUILDING PROP05EO WALL REF. R. PLANS PROP05ED DUCTWORK FOR 512E A r-rr- PROPOSED HALF HEIGHT WALL 22'-0" 57ONE6ALL 8'-I" 10'-O"5TONE WALL lT-1 1/2" STONEWALL 16'-5//2'576NE WALL �T ,t PROPOSED GLAZING GUARDRAIL 575AI I�� C®N5 7/' �I®N FAN AI EXISTING DOOR TO REMAIN COI. IT 15 THE CONTRACTORS SOLE RE5P0N51BIL17Y TO D060MENT EXl5TING PROP05E0 DOOR REF. FLR. PLAN5 CONDITIONS PRIOR TO WORK IN EACH RESPECTIVE AREA. DAM45E5 TO AND SCHEDULE FOR SIZE EXISTING FINISHES TO REMAIN DURING ACRK PROCEDURES SHALL BE REPAIRED AT CONTRACTORS EXPENSE, LINLE55 DAMAGES ARE DOGIMIENTED EX15TIN5 GLAZING TO REMAIN PRIOR TO START OF WORK. g PROPOSED GLAZING REF FLR. PLANS CO2 CONTRACTOR TO REMOVE COMBU5TELE DEBRl5 FROM THE WORK PLACE AT AND SCHEDULE FOR SIZE THE END OF EACH DAY AND PIRNI5H LABOR TO MAINTAIN A SAFE AND GLEANWbRK ENVIRONMENT AT ALL TIMES. LEGALLY CART AWAY AND DISPOSE OFDEBRIS AT REGULAR INTERVALS TO PREVENT EXCE551VE ACCUMULATION 603, ALL WROUGHT IRON 5HALL BE PRIMED AND PAINTED WITH(2)GOATS CLO55 BLACK PAINT TO MATCH EX15T'G. SCALE = 114" _ PO" SEAL:�_ REVISIONS/SUBMISSIONS: DRAWING TITLE. DATE: DESCRPTION \yS W, pH�T o9nvm vnrnroawlcrc FIR/-f FLOOR �4m�a "r R vw CO/t/TRUCTIO/I PL M Tr No.o2 yo?� CAD FILE NAME. FOF IJ E� 1194 A-3.1.2 CONSULTANT FLOOR P AORTN PROJECT TITLE: DATE NSA PROJECT ♦: Nemschick Silverman Architects P.C. PROPQ/'EDADDITIOPIJA/VDALTERATIO/If. ...the business of ARCHITECTURE" W(51,6) MO Alfa PAltl M falO�l=§. RC. ICU ,/'EFT. 18, 2006 n,IA OS-1194 27550 MAIN ROAD Design and Consulting Servlces - 11955 SCALE. DRAWING NO.: 735 Deerfoot Path, Cutchogue, New York 11935 20 High 5troot, Huntington, New York f.�/ /VOTED Phone : 631-734-7007 Fax : 631-734-7347K U n W Y rc 1 421-0439 Fax (516) 421-0563 DISTRICT. SECTION: BLOCK LOT: DRAWN BY: A _5 . I .2 http://wviw.ns-arch.com ItA a COPYRIGHT 2M NExscxcn sLveRAN ARcxrscTs vc NORTH 1000 109 06 2.2 EL IRVI,5C7�r CLlO. PLAN N075-5 D p' COI. NOT U5ED CO2. NOT U5FD 603. INSTALL NEW LIGHT FIXTURES AND EXIT 5/6N5 A5 PER MANUFACTURERS' SPECIFICATIONS. REFER TO ELECTRICAL DW65 FOR APP TL INFO. 604. NEW EXHAU5T FAN, REFER TO ME6H. DP 65 FOR ADD'7L INFO. 605 NEW BOX BEAM ENCLO50RE REFER TO DETAIL5 FOR ADD'TL INFO. — - - - - - - - — - - - - - - - - — - - - - - - - 3/0 GL6 — — — — — — —— — — 606. REFER TO ELECTRICAL OW65 FOR EMERGENCY LIGHTING 5CHLDULEANO r - - 5 EL +B'-O" r — - - - - - - � ? � LAYOUT. - - - - - - - - _______-___ O O ______ _ __ G07. REMOVE AND RIPPED DOWN TIMBER MEMBER5708E SECURED TO UNDER SIDE OF BOXED BEAM5 A5 INDICATED. REFER TO OE7A1L5 AND FlN15H IN -1 _ „ r _ _ __ ___ ________ - � � i SCHEDULE FOR ADD'TL INFORMATIOK I in I G I G08. FIXTURES TO BE APPLIED ON CATHEDRAL GLG, SECURED TO 5TRUCTURE m, �� °- I MEMBER5. OPEN GEILIN6 AND SLAB'IN BLK,WHERE REQ'D,DINE TO FIX7URE 04 m 1 SIZE PATCH/REPAIR GL6. PRIME AND PAINT A5 PER FlNI5H SCHEDULE. W i H Acr-I y m — 010 50FF1T 1 EQ. F/1 .�B/O GLG. _ EL. + B-7-I/2" M ¢ ¢ 03 /O GLG EL. +8'-O" DEL. +8'-O" - ea. 9'-I u2° Ea. d rrn 040 c� LG EL. +a'-o' = o I 'u B/O SOFFIT EL. +7'-10-1/2"+- _ H / ,t f f ,t tN �' EL. +7-IO H /o GLG. _ +' F O C EL/O+T 8'-Ir G C F 61 N I=t R��,LEC 7E� Cd 6, PAN N®755 1 H y y H N I p� L p 601. I��7HE0��RA�GTTORWORK lIN EA�NRESPEGTIVE AREAUMEDAMAGES�O BE 6'-O 1/2" B'-2" 4'-q" 8'-lo I/2" 5'-6" 2'-O" 2'-O" q'-2 //2" 3'-3" 5'-7" I'-IO" — -- - T K = O5 07 `� I EXI5TIN6 FINI5HE5 70 REMAIN DURING WORK PROCEDURES SHALL C KK EL +b'-8" �K 4'-b I/ " ry mP C N PR�ORRTO START OFWORK.5 EXPENSE, UNLESS DAMAGES ARE DOCUMENTED ¢ BiO SQFFir ry 602. CONTRACTOR TO REMOVE COMBUSTIBLE DEBRIS FROM THEWORK PLACE AT �HH y �yy T K 7YP THE END OF EACH DAY AND FURNISH LABOR 70 MAINTAIN A 5AFE AND f V Q Q B V;�F 17 OPEN TO ABOVE J m h I DISPOSCLEAN EOOF DEBRRK I 5 ATEREGULAR IN7ERVAL5NTAT ALL 6T0 LPRfVENT EXCESSIVE ZOPEN TO ABOVE in :+i ! ,�B/O GLG. ") I AGGUMI/LA HON, g EL +T-lO" ¢ ¢ EL. +6'-lI"(rYPJ 4'-5" U O T-6" T-6" 4-6" K n -4A9 603 PROVIDE ALLOWANCE IN BASE 8/D FOR ADD ALT. FOR REPLACEMENT LIGHTING. 4. I *H H H 510 5OFFIT N tv I C04. REFER TO ELECTRICAL DWG5 FOR EMERGENCY LIGHTING SCHEDULE AND EL +7-lo K u K K \C+ .0 N G C I LAYOUT. L__ _ _ Q n L l o l______________________________LINE O�_F_R 6E_________ - F TYP. o� •o NH I 55 7R 7q 29 N W I H H H G G01 G �+ 3/0 SOFFIT �B/O GLG. EL +7 Ea. YEL. +7'-10-I/2" ---- EQ. F/2 ER. I I T Q II i I L �} ¢ ti I I TO A80VE ut I I m � V ------ -- --- --- YP M r m —_------- 'H '�H 6'-6" 4-7112" 4'-7112' 8'-6" 6'-O" L_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - EQ, ____ ____ _ Ip -4 I M I /OIB GLG' �B/O GLC. I m I NOTE: EL. +b'-O" DEL +e'-o" ob I _ K K 08 COORDINATE LIGHTING L06ATION5 WITH ARCHITE67 PRIOR TO ROLUN-IN FOR = I Q '� GOB B/O BM EN6L05 R. q' COORDINATION WITH 5HELVIN5 VENDOR y /O SOFFIT I TIP. K EL. +6-7-I/2" I FOR FINAL LAYOUT. EL +b'-O" 1 N yp I ttYUYui 8/O GLG. ,LB/O 6L6. EL TIMBER TRI ATHEDRAL q E. +6'-ll"(7YP. -EL +b'-ll"(7YPJ EL + b'-3-I/T' GGEIL�IdS L CEILING pp REFER TO FINISH SCHEDULE FOR ALL NOTE: C C 1 I Q FINl5H AND SUB5TRATE DESIGNATIONS. 6 I/2' I F 1 FIXTURE FIX. WATT MANUFACTURER I F EL 6B 7-112" R 0A LEGION LIGHTING 60., INC. I N •o . NfW 2X2'LAY-lN TROFFER(2 LAMP) 62W o CAL NO. 5ERlE5,502 A -4.05 I Ea. NEW 2X4'LAY-IN TROFFER(2 LAMP) 62VJ LE6/0N -5 CO, INC. ' GAT: NO.. 5ERIERlE5 502 I 1 0 A3 NEW Z'X4'LAY-lN TROFFER 0LAMP) gSYy LEGION LIGHTING CO., INC. GAT. NO. 5ERlE5 502 I Q K K M �K K I'X4'SURFACE MTD. FLOURE56ENr LEGION LIGHTING CO., INC. ®g (2 LAMP) b2W GAT. NO. SERIES 2750 IXd'56FENDED LINEAR INDIRECT FOCAL POINT-METRO LIGHT 6'51NGLE 1 ry OPEN OPEN p/2 ®C. FLUORESCENT 240W POINT GABLE 5')5PEN5ION MOUNTED m TO ABOVETO 6'6„ ABOVE �D 6�-7�� EXI5T'G FIXTURE TO BE REMOVED ¢ OPEN TO ABOVE ¢ EXISTING EMERGENCY LlGH7, REMOTE SLOPED GEILIN6 -_--_--_ HEAD 70 REMAIN 6' TRACK LIGHTING 200W TECH LIGHTING -3TRA16HTLINE TRACK SLOPED GEILIN6 " 8' TPO CIRCUIT TECH LIGHTING -5TRAI6HRINE TRACK " -------'--- 0 O F~/2 4' TRACK LIGHTING IOOW 4' TW0 CIRCUIT — L — - 1#C WALL 56ON5E(FLCURE55ENT) 75W �H 6"COMPACT FLUORESCENT SOW TUBE L116HTINC -ELATE C6 6" TRIPLE TUBE HORIZONTAL 5ERlE5 6650 CLEAR COLOR WITH 5ATIN FIN15H CATALOG No. C6N-126/42T ,h (?'COMPACT FLUORESCENT 39N! -VNO L116HTINC -ELATE 66 6" TRIPLE TUBE VERTICAL 5ERlE5 C.600 CLEAR COLOR WITH 5ATIN FIN15H CATAL06 No. C(2V-1261,,,32T � 3-I/4"LENSED WALL WASH �rOW, -Bh'0 LIGGHTING-ACULUX RE5GE55ED L AL?J)37A3LE MR/6 IC43-43 t 5ERlE5 GATALO6 NUMBER 1643-439HZ-WH 4M 30"FENDANT5/FLUORESCENT) 72W. ONE,PAL05 V RUSE ONE, 40W 50112 005 120Y IRV CIRCULAR 2CX13 BA5E � LIGHT FIXTURE 'X' DENOTES FOCAL POINT-5TEM MOUNT 5KYDOME I/ nl FIXTURE TYPE 36°PIA PENDANTS(FLIIORESGENT) I65YJ ON THREE LAMP Mb,, 5IX LAMP 75, 5IX EXIT LIGHT FIXTURE LAMP T5HO z MEGH. DIFFUSER /RETURN ,-}_, W155ERIE5 HAL06EN WALL SCONCE BELFER LIGHTING-14AL065NX `#p 6100.96 loom BAYONET BA5E LAMP, FRO57EV EMERGENCY LIGHT FIXTURE WALL 5CONCE-5TAIPM'r 62IN LITHONTA L16HTIN6 -DE60 METALIC Q Q HALF ROM WALL 5CON6E � TOILET EXHAU5T FAN 5ET W GLG. GRID TILE. El R 2X2'REGE55ED INDIRECT 104M FOCAL POINT-LUNA 2X2 RECESSED REFER TO MEGH OW65 FOR 5PE6 5 INDIRECT LICH7 LITHONIA LI6HTIN6 -AR6H. SCONCE CEILING GRID/TILES REFER TO FINISH CT75 NIGHT PHOTOELEGTRIG FIXTURE 72W 5ERlE5 -W5TM W/EMERGENGYOPTION SGNEWLE FOR S/ZE/SME/MANUF. ETC. GEILIN6 MOUNTED EXIT SIGN!'✓ 6W PAINTED GYP. BD 6LG/50FF/T EMERGENCY BACKUP A WALL MOUNTED EXIT SIGNW/ [� 5ECTIONARROW EMERGENCYBA6KVP ILP LIGHT PACK WITH EMERGENCY BACKUP 'SOW '-Lr'X E ELEVATION 5YMBOL YT.. +X'-X" ELECTRl6 EXHAU5T FAN ri. REGE55ED LIGHT FIXTURE ® 5TEEL GRATE REVISIONS/SUBMISSIONS: DRAWING TITLE: DATE: DESCRPTION: W� �O ViwnroavwcuG FIRJT FLOOR r r * 0b RErLEGTED CEILI/1G PLAN 9 0290A OPT 1 F O- Blt CAD FILE NAME: PROJECT TITLE. DATE NSA PROJECT , CONSULTANT. FLOOR P NOGZffi PROPOJEU A1212ITIO/1-/ ME?ALTERATION): JEPT. 18, 2006 nJA 05-1194 Nemschick Silverman Architects P.C. ...the business of ARCHITECTURE." CAPANO ANO O"W" NMOMNNN6 PI _ — _ 27550 M IN DRAWING NO. SCALE' CUTCFIOGUE,/1EW YORI( 11955 Design and Consulting ServicesAf 735 Deerfoot Path, Cutchogue, New York 11935 20 Hugh 5tree6, Huntington, New rork —� NOTED Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-045-1 Fax (516) 421-0565 DISTRICT. SECTION: BLOCK', LOT' DRAWN BY' ��J • I .� http://www.ns-arch.00m COPYRIGHT 2006 NEMSCHCK 9LVERMAN HRCMTECi3 P.0 /1O 1000 109 D6 2.2 A -4A5 /4: d y VR/ YIITA /=�- / /A / tl0T --,5 RAMP DN FOI. CONTRACTOR TO PRO✓IDE NEW l'✓ORK 57ATION5 A5 INDICATED ON OW, PROVIDE RECEPTACLES FOR EACH WORK STATION. REFER TO NEW EXIT ELECTRICAL DW65 FOR ADD'TL INFO, o STAIR F02. PROVIDE ROD AND SHELF IN GL05E7 (5EE DETAIL 5HFET A-505) -0.Ob VIEW O F03 G.O. TO PROVIDE NEW MILLWORK FOR SHEL VE5 TO MATCH EX15T'G. II RAMP I i =-_ __--__ -_ REFER TO DETAIL SHEET A-503 FOR ADD7L INFO. (T(PICAL) _______- _-- F04. NEW CUSTOM RECEPTION DESK SEE A 5.04 FOR DETAILS III IIII UP - - - II I I I I I I I I I I -_-- i G _ ____ __-_ _ _- F05 NEYJ USTOM MILLWORK BENCH SEE DETAIL SHEET FOR ADDITIONAL El r - J_ I INFORMATION —I—I—I—IJ —IJJ —I —I � � J - - - — FO6. EXISTING TABLES TO BE RELOCATED O _ 30"W 30"W 24'W 24"W 24'H 30"W 24"W 3 - - _____ _________ 64"H 3 2 24"H B4"H 84"H b"W ��� T I I ❑ O �I II I R ^I I' F07. RELOCATED BOOK SHELVES. ' CJ C� 'CJ LJ ry S N � N N � N N N 0 5'-4" 4'-3" 7'-ll/2" 3�_3� 3�_3�� = I N I YA D/RELTOR Fos N i i HG BAT m ---------�.� li Fol Q ON/LDREN5 __- I - - - LIBRARIAN -ffALr _ II IR „, PARENTNS = N;: 1 YC"AaL75 ' AREA 4 6_O - - - - -------- � I - � � II DVD/VHS d. I R m �I - "4L7- F061 — IF06 p _I I N N' I I I I I I I I I R I i PR06RAMM/N6 ] " ul ---- -- --_` II'. I____-- - o � coMmiER 1ERM/NAL NE o o I /o� " i GH/LDREN5 Foe �. o I LR "t R R R -------------- m ®I ROOM --------------------- IR I = 6'-7 l/2�� 41_O„ I2,_5„ 4'-4 l/2" b'-I" , >. ` I I HEN 5 CIRCULATIONm R-- R-- R -0 5'DIA N O 6'-7//2" 4,_4„ l'_9„ 3'_O" I'_q„ 3',O" I'-4" 5'-O l/2" b'-I" PROP. m I 66"H ELE✓ATOR - e I 5'-3' 36"W 36"W ..' .: __ '. �m R R I I I I Q ro i! N N N !', FOI I � i .:,:.. .,;,;. .. -- -- I R I I I 84"H = HEIGHT OF NEw SHEL✓ING 66"H 66"H 66"N m - 36"W= WIDTH OF SECT/ON FOR NEW SHEL✓lNG 361W 36 1 W 36"W I� — -___________________ ------ _ I I__________________________________________________ � � � ®o R= RELOCATED EXISTING FURNITURE N N F03 N NII Ni= N I I 3A5 O I FOb 66"H 66"H 66"H 361W 36"W 361W I I i �♦ m I a u w. I ---------------- --------- ------------------- GENERAL /MED/A .� k� ® I _ m COMP. _ - � -I N•a Ficr�oN I I N 5 �.05 R N �r N AREA c I I I I h I I I FOS e I 1 1 I 5'41/2" 4'7" 6'-8 l/2" 3'3" 4'p° � I ., :�,.:/...�I:: I _ 1 1 R � I pN -005 _- ___ L- - - - -- I� 42"H 84"H 84"H 42"H 42"H B4"H 64"H 84"H 42"H 94'H 34 H _ IL J -- - I Q'® - - _ _ 6 .. 36"W Ili 30"W 30"W 24"W 24"W 24"W 30"W 24'W 36"W - -1 �4"h' 3OUJLIT _ 3' 2'O" 5' IO I/2" ` _ I JE--�-- _ NEW --_ L IR IF ---- � ID 00 1/E5T. I`. EXIT I COPY ROOM o) -- - I R R I NEW STAIR 'A' I FII I I ti - m l I k I R R U W V M45/G N I k I - - - - - - - - - - - - - - R 5'41/2" 4'-O" 4'-61/2° I I I I m ®I I R R v I IR 2 I m I I I I Q I Q I I RAMP DN NEW G ni R L RAMP 4A6 I -4 I R = I FOB N I � I m R F/GTYON m E ® REL66A7FI7 RAMP ON NW 6'DIA I I I STAIR 4 R N ry i -4.05 N I I I I I N I I R 19,57 FLOOR �VRAUfief FL-AN SCALE = I/4" = I'-O" NOTE.' THl5 PLAN 15 FOR /LLU5TRATION PURP05E5 ONLY. ALL FORM TUREWILL BE FURNI5HED AND AND IN5TALLE12 BY OTHERS. COORDINATE MILLWORK ADUOINING FURNITURE /N/TH OWNER'5 VENDOR PRIOR TO MFR / INSTALLATION. REFER TO SHEET A-312 AND DETAIL 5NEE75 FOR MILLWORK TO BE FURNISHED AND INSTALLED BY G.G. SEAL` REVISIONS/SUBMISSIONS. DRAWING TITLE. tgP AACy DATE: DESCRPTION. ��5 �m mneiro unvn roavwan� FIR-/T FLOOR iaswa rsvu�rni �* "a FURNITURE PLAN a � 29M {oP CAD FILE NAME: P of '11 CONSULTANT: //1194 A-3.1.4 PROJECT TITLE DATE: NSA PROJECT «. FLOOR P NORTFI Nemschick Silverman Architects P.C. PROPQ/'EDADDITIONfANUALTI=RATIONf: fEpT. ig, 2006 NfA05-1194 ' . the businessolARCHITECTURE." CAPANO AND PAIDCOI MN WO. O.C. 27550 MAIN ROAD SCALE: DRAWING NO.. Design and Consulting Services :20 735 Deerfoot Path, Cutohogue, New York 11935 De Higign street, HwntConsulting New Fork _ GUTGf10GUE,NEW YORK 11935 Phone : 631-734-7007 Fax : 631-734-7347 (sle) am-oa3a Fax (sle) 42I-05e5 v Af NOTED P DISTRICT. SECTION BLOCK' T' DRAWN BY hftp://www.ns-arch.com 11 0 copmlcHi ssoa NEMscxcK sLVEPMAN AacwiEcis pc NO f1 1000 109 :061 2.21 E REMOVAL FILAN N®TE,5 DOI. EX15TIN5 WODO 57AIR5, RAILIN65, 5TRUCTI/RE, ETC. TO BE REMOVED AND DISCARDED AGGOROIN6LY. D02 EXISTING GLAZING 70 REMAIN- PROTECT DURIN6 GON5TRI/G7/ON. D03 REMOVE EX15TIN5 WOOD RAILlN65 AND TRIM ALON6 EDGE OF WALL. 1904. CAREFULLY CUT AWAY EXISTING GYP. BOARD CEILING TO REVEAL EXI5TIN6 TRU55 WORK REMOVE ANY FIXTURES/APPURTENANCE AS NE6E55ARY 005. REMOVE EX15TING ROOFING AND GUT BACK EXISTING R.R. AS PER 02 STRUCTURAL DW55 TO ACCOMODATE NEW EMERGENCY EXIT STAIR GON5TRUGTION 02 DI2 O5 006. PARTIALLY REMOVE WALL A5 REOUIRED TO ACCOMMODATE NEW OPENING. r____________________________________________________________________________________________ _________ ____________ GOOROINATEHEIGHFOFNEWFLOOR NARIESJ. REFER TO DOOR SCHEDULE 1 FOR ADD'TL INFO. I i r D07. REMOVE EXI57G INTERIOR PARTITIONS, DODRS, FRAMES, GLAZING AND A550GIA TED HARDWARE AS INDI6A TED ON DW65. (T1TJ ' I II I DOB. REMOVE 016, FAN5,L16NT FIXTURE5, SMOKE OETE6TOR5,, DIFFUSER5, ETC., -r-r-rr- -r-T' ONCL6. III 001 , ` 1 I I D09, REMOVE EXI5TIN5 ROOFING AND CVF BACK EXI5TIN&R.R. TO CL05E5T R.R. 1 / Q / ` /' 1 1 1 I AS PER STR(IGTURAL DW65 IN ORDER TO CON5TRl/CT NEW DORMER/EXT II � � � ' I I 1 I III I 1 WALLS REFER TO ARGHl7EG NR9L FOR ADD'TL INFO. PROVIDE TEMPORARY 5HORING AS NEEDED ID . D II Ilr +1 11 +i I------ O6 `+<y/' •}/ lY `+� DIO. REMOVE EXl5TING DOOR, FRAME,AND ASSOCIATED APFI/R7ENCE5, I I I 1 rr 'Y II IV F r J r---' r--- V '/ `` • III 11 DII. REMOVE EX15TING ROOFING AND GUT BACK EXl5TING R.R. TO CLO5E5T R.R. 1 1 1 I I d �hY''"�"'Y 7- 1 f�'1 1 f"Y 1 ✓ERIFYI IN FIELD , ` 1 1 I 1 IN ORDER 7O CONSTRICT NEW ELEVATOR BULK HEAD REFER FO APPROVED 7� Oq 1 1 I I I 1 SHOP DRAWIN65 AND 5nR'ZTVRAL DRAWIN65. PROVIDE TEMPORARY ILL.J� ;Il lil L.J�I ILL�J� IL�J� 1 71P. ` 1 111i i SHORING. III 11 II I 9I2. LINE OF ROOF ABOVE DI3. EX15TING HEAVr TIMBER BEAM 70 REMAIN PROTECT DWIN6 REMO✓AL OF TrPI____________________>_____________________� _�_ _ _ _____ I ROOFING ABOVE. EX/5T'6 q 1 DI4. EX15TIN6 NEAVY TIMBER P05T TO REMAIN PROTECT DMIN6 REMOVAL OF 11 0 11 I 11 `� 11 I I 11 ROOFING/H.T. BEAM5 AND PROVIDE 7EMPORARY SHORING AS NEEDED. TYP. CHILDREN5 n '�` 1 -- ili ills 1 it ROOM (BELON) LOCAL IOY F`. HISTORY RM. I I zo CIRCULATION ++ ++i 11 DI3 11 II Il Il I I I I 1 I I I / I I I I 1 I I 1 / I 'nP li; ;�11 � NERAL REMOVAL PLAN N®75� I I1 I I I I I I I / I 1 1 1 1 1 60I. IT 15 THE 60NTRA6TDR5 SOLE RC-5PONC15&ITY TO DOCUMENT EXISTING E:] O r '' 1 11 11 I L CONDITIONS PRIOR TO WORK IN EACH RESPECTIVE AREA. DAMAGE5 TO IL II Imo__ ________________��� 1 v�`� /'/ I I i EX15TING FIN15HE5 TO REMAIN DURING WORK PROCEDURES SHALL BE -7 I REPAIRED AT CONTRAG TOR5 EXPENSE, UNLESS DAMAGE5 ARE DOCUMENTED ________ __________` - __________—_—________ I — PRIOR TO START OF hbRK I 1 r'11 I1 11 11 I I n I r n '� `---------�— I I 11 / / " 1 II 111 II IL.J1 1L.JI 1L.JI III �/,' III I I I L.J II �___� �___� �___� `� I 11 I I 602. CONTRACTOR 70 REMOVE GOMB/'5TIBLE DEBRIS FROM THE WORK PLACE AT L -� I II II O6 p O6 i _ i I I I I I I THE END OF EACH DAY AND FURNISH LABOR TO MAINTAIN A SAFE AND N I v 1 I I CLEAN WORK ENVIRONMENTATALL TIME5. LEGALLY6ART AWAYAND II I O 7(P. 6E'NERAL 5TACK5 I I II 015P95E OF DEBRIS AT REGULAR INTER✓AL5 TO PREVENT EX6E55/VE 1 11111 l�/) I I ACCUMULATION. III (BELO 1 1 III I COT III I I 2'-5" 2l'-6" I I I DO'1 111II h I I h 1 III -J 7P. I+/ 1 11111 `}/ I T }/ N Ol ------------------------------------ ----i I __ D09 _ 1 r -I---�-- --------- r T--------- 1 O9 I \ / DI4T________ _ _ \ / I 1 0 / lu ll q-rP PARKIN&CALCULATION5 /100-191J ILL FIL1.t7 5na5 rY5ElnMs.mN/ .WEn '�' / / + =W r�`\ /'Ir I I e nan-�tRLnhl -[a2 st es�nccs ry2 I II / i I I II ,�` II I % I I I LKFK.E t]YIAE55 IFBtIroSF.Cf S51nM5ME1 41 � / \\ I I 1 a nFRLEFtaR nwEn =W5F r5vncrs -- _ j i____-_ 6F P MN nRA -1.5A I A� -- 1 -- — 1 —_ --- ---- ------------ , 'r ggLqPEb'eF =Im SP. IO5FnL6 / A /177,11 1 6F YqN Tlf =.CO SE 3.4SF 5 / \ I I 15r LIhYWATILW =HO Sf. lASWL(5 n r EXl5TING PLUMBING FIXTURE5 TO zra aertueee/xav-ncTla. •Iw5F. I95P/L6 /r EX15TING WALL TO REMAIN (%uL BE REMOVED xo 5nor/nnae avV ,ISS5F /s 9 FIN4YdR a`r •Im 5F. r � zo 91�1c twice •w5F EX15TIN6 WALL TO BE REMOVED x EXISTING DlFFU5ER TO BE REMOVED _ Hnetra'rcrz5r0W£ Man SF.asnnxs nxe+ I / I I I h I I I hI I I EX15TIN6 DOOR 70 REMAIN J EX15TING DUCT TO BE REMOVED SvnL£5 .r-+lh� 1 k+i 1 III -I'+Jl 1 L_�I Fla�z vnu5 nesn Min. 6 KKRLL STORn££ - 4715F. 05vnrs ✓�\ EXl5TING DOOR 70 BE REMOVED EXl5TING LIGHT FIXTURE TO BE REMOVED Isr eaawt 5TA =2+12 eF ze svnccs I AV i 1 1 Q Isr n7al5w 'M nron - .5w st 005`nCf5 I \ I I o zI0 fMLLfFr/Lanl Nlsrazr 1w5F. 114 P ES I \I I 1 EXISTING GLAZING TO REMAIN EXl5TING GLG FAN 70 BE REMOVED zro �rsueree/newnenav Sb SF os vra I- 1 —� L-11 ---------------� L_____ EX15TIN6 GLAZING TO BE REMOVED TOW =ao swccs 1 rornt n+vwom =zza svnra I I I I DI2 IT,�NOVAL IfkL AN SCALE = I/4" = I'-O" SE PSO AO REVISIONS/SUBMISSIONS DRAWING TITLE. 9S N F DATE: DESORPTION: 048s vnleoroa vwculc fc.GO/v FLOOR * REMOVALPLAM 7 0.9290Bfi 1� OF N6`N CAD FILE NAME. 11 1194_A-3.2.1 CONSULTANT: FLOOR P /YORTK PROJECT TITLE. DATE: NSA PROJECT ♦, Nemschick Silverman Architects P.C. PROP0fEDA1)DITI0/tJA/YDALTERATIO/1f: fEPi. 18, 2006 /1fA05-1194 "...the business oFARCHITECTURE" WC51,6) NO AND PAMIm1 m MMM P.C. Design and Consulting ServicesIrr CUTC MAIN ROAD 735 Deerfoot Path, Cutchogue, New York 11935 _ -- SCALE: DRAWING No: Phone : 631-734-TOOT Fax : 631-734-7347 20 High street, Huntington, New cork _ _ GUTGfIOGUt:, tV�W YORK 11935 /� /yOTED 421-0434 Fax (51(p) 421-0563 z DISTRICT SECTION: BLOCK. LOT. DRAWN BY: —J http://www.ns-arch.com 0 coPmlcxr 2006 NeµscHcx auvemnnN nxxTEcrs a.c /10 f1 1000 109 06 2.2 F1 -4A5 A-4.GI 601. LAMINATED SAFETY GLA55 W/TINTED INTERLAYER SET WI THIN POWDER p i r 5TA/R 5Ay COATED ALUMIIW)M FRAME.- - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ CO2. PROPOSED COLUMN REFER TO 5TRUCTURAL DWG 5 FOR EXACT LOGATlON5 06 I 40'-I I/2" (TYP) "Loll 6" 20 7/2 b q 6 CO3. NEW CEDAR ROOFING TO MATCH EXI5TlNG. ALL TRIM AND 5/DING TO MATCH o'a0 v2° 4'-lo 112' I EXl5TING. (VI.F) GIb I DM I 3'-G I/2" GIb I'-ll l/2" 604. NEW SHAFT WALL5 AND DUCTWORK REFER TO MEGH. DW15 FOR All Ir - I II II II II II II ____ - - - _-_- -- COS O. NEW ELEVATOR -REFER 70 DETAILS AND 5PEGIFIGA7ION5 FOR ADD'TL INFO IL ________I__ _ � -_ Q G06. NEW EXTERIOR EXIT STAIR. REFER TO DETAIL5 AND STRUGNR4L DNIGS FOR r g� � � 1 _ _ I -_ - , r i^l _ _ T_h 2.05 III _ _ III - __- __ I,I 204 � I ADD'TL INFO J -- � L � � I_-_ i \ GOZ PROPOSED INTERIOR STAIRS. REFER 70 DETAILS AND STRUGTUR4L Dh55 I I JN. I - v FOR ADD'TL INFO. I �a - I P _ 4 6ALLERY/AVD/O 2.01 __ D� 1 �� I_ _ J N III N $�DY/ �rOR - GOB. NEW 41 HIGH RAILING WITH GLA55 PANEL IN5ERT5. PROVIDE SHOP O4 ��_ ��� _ IR�T _�00 - I 1� ICI _ �9 j Tv ROOM :4l I5 DR44VING 70 HP APPROVED HY THE ARCHITECT: - L m 207 � ICI r� l _ ' - �r F/_ - - FINANCIAL - m ll O 2°5 �1= GOq. NEW MILLWORK REFER TO OETAlLS/FURNITURE PLAN FOR ADD7L INFO I � a - - -_I - - r I�l =1—I ,_�_ = III _�_ _I ICI I �_ -- _I _ ICI 2C6 _ 1_ N (TYPJ �IT- T -' n- l f I� CIO. SCRAPE, PRIME AND PAINT 5)RFAI A5 PER FIN15H SCHEDULE. (TYP) Ii _�_ II _ III ' O III ui jII jR _ r _ ; ry CIL PATCH ROOF TO MATCH EXl5T'G, REFER TO DETAIL5 FOR ADDTL INFOTi F-1 . _ _ 1 1_ I _F 1 �rI r _I 4 O S 2 6 IIIII 20'-7 l/2" m III b„ q,_6„ 6„ �Jlr m Gl2 FJOSTING STEPS AND RAILINGS TO REMAIN �_r T n -- - j------� 7-7 _ _ - �_ J _ _I ---- _- - -- --- --- IQ - ry CO. VERTIGALHAND HORIZpNTOI B AGINR FCST5 TO GEMAIN AS NEEDEDVIDE TEMPORARY - -- - —--- I T � _ I- _ _ __ _ •o ! J G14. PROPOSED STEPS AND RAMPS REFER 70 SECTIONS AND DETAILS FOR r I_ - I �' I - _� _ 2.06 - IIII ry IIII N O 5TUDY/ TUTOR Imo= ry ADD7L INFO. r�1 n�� r r _ - I�_ I_ �_ rI �_ _I - _ 5T6. Q III -5.05 I__m_ 4 ROOM P CI5. PROPOSED P LAMINATED 5AFETYB'/TT-6LASS WINDOW IN 5TAINLE55 STEEL r N I' `F I- HEAD AND 5HOE. CONTRACTOR TO HAVE REP. FROM WINDOW _ / MANUFACTURER VI51T 5ITE TO VERIFY FIELD CONDITION5 AID PROVIDE MAX. 20 PANE CONFIGURATION AND ALL A550GIA7ED HARDWARE AND 5EALANT5. 7YP. HISTORY OPEN rO N �- GIG. EXISTING GLAZING TO REMAIN AS DENOTED ON PLANS. 6 / �., �9 ROOM �. T ,BELON %/ - - 2oe PROP. 6 l m ELEVATOR - - 1�- 617. SEE ENLARGED PLANS FOR DIMENSIONS AND ADD7L INFO. OPEN TO G18. EX15TIN5 CHIMNEY TO REMAIN THERE 15 NO INCREASE IN HEI6HT NEAR TH15 __ _____________--______ s 1 LOCATION. ' _BELOIIC O' I III -II I - � __ _ �� i j � Glq. 0005ENEGK VENT THRU ROOF. REFER TO MEGH DWGS FOR ADD'TL INFO. - Clio ______ ______________ -_ _--' 620 Ni BERKO' ELECTRIC BA5EBOARD HEATERS, REFER TO MEGH. OW65 FOR I/2 TIP. -' ADD'7L INFO. I ob - - - - - - ___ ___ � _____________ -jP ---------------------------------------------- - ------ --_ ___ --- _ - _-- - I� -_�-- --_--_--_ - -11- C21. LINE OF COLUMNS/5TRU67URE BELOW FLOOR. REFER TO ARCHITECTURE INTERMEDIATE RAMPDN ------------- --- --- -------------- ------- - - GIO RAMP DN LANDING I''-b" 10'-OH 5 L \�{ Y DWGS FOR ADD7L INFO. YP. m 202 A Q-, 2'_1„ III IIII �-V 9 II =1 I :o SEARCH IIII IIII 04 4'-Io v2^ o i_6" 4'_7° D Gn DN I REFERENCE/ PROPOSED -_ YA e m OPEWTO READING Goa ry G21 I li °� li I NON-FICTION _ LON DN AREA - 7YP. ry � _ _ _ r I _ _ � -1 Ir -- 78l/2" 7 I 103 _ ip I I 6 ______ ___ - - ______ ___ _ _ _ -- -- III III y I �- --1 _ - - r - T J - - __ III -- - __ TYP. I. j ry COI. IT I5 THE CONTRACTORS SOLE RESPONSIBlLI7Y TO DOCUMENT EXISTING _ �s - - © �� - 5'7" n CONDITIONS PRIOR TO hbRK IN EACH RFSP56TIVE AREA DAMAGES TO 0 I III EXISTING FINISHES TO REMAIN DURING WORK PROGEEDURES SHALL BE III_' 02 I ____ III / / .:� I I—=7 r-- �S' REPAIRED A GONTRAGTOR5 EXPENSE, UNLE55 DAMAGES ARE DOCUMENTED —_ Ell I GI5 li III �_ / _ ,_ _ ''' —_ __ --- --_ ___ II PRIOR T05TART OFW9RK. , II --- ----III 1 ff — I- G02. CONTRACTOR REMOVE FURNISHNP LABOR T MAINTAIN OOMBU5 LS FROM T A 5AP PLACE AT _ } — T E J THE ENP OF EACH OA GLEAN WORK EAMRONMEN AT ALL PI LEGALLY CART AWAYAND �1 bii6 23'-q" ICI��__ DISPOSE OF DEBRIS AT REGULAR INTERVALS TO PREVENT EXCESSIVE 'I III j III_ ACCUMULATION DIR. OFF/GE s.o I 2O PEN _1 III �" r-s Irr - —I 2oi e os P I ri- iLll Ii I —hl� Q YP. I YP BELOW -_ Goa Gol TYP PARKING CALCULATIONS (I00-lqU Oi - 1_ # 03 f NaITGRItMf�TiNS IW1 IftR.S�SF. �nnas ner=+ 1 —I �E L, Ll TYP. -I- nters wa[swss�nNssmn naE+ _� ��� /� � a nan-npnxfra�l ,ecnss aunts - 'II _� EL- e(Fre{p5;f�i._ IF£R ICd sF.eF.sFnnxs,wt_n - - - �AIF- now I''-b I/2' L II - vncrs AIa�cnn -5 1/2" _I_ -_-- - e anrFr .wE+ 44ssF 4.w.ca - - _ _ Isi PA4NnN5 AaFil -!aJ 5f, IsPnc£s - - L_ '',,[' 5T cNIlm46IS RroM -kn SF. 10 senccs r -4A6 5T Ydfikncurs -&n sF. 30 S'.ICS L r C I IST WRUCAncN =Ifs SF US^neE -I zee rffttRe+senav-FILnON -Iso51 sm awnrurca Ail s =Iss sF Is 111 6C lO'-71/Z" .YS� FINUKIAL diIGE IPJ SF IO S�ne£5 A �I. xm dRrcroa anrF =COSA uvnea - �I vu�sat;F oe srczee IF£4 seen sf.ossnrmisnaFn r r r -- __ -_ - R na 51 AieIA Kn - -HI OPEN TO i i � ° ;i' i OPEN TO a a� aTCRAaE 4T4IP 0311 NOTE BELOW o BELOW I J- DIMENSIONS FOR WINDOWS THIS I_ O '4 5r Aisrnus ze vnca 04 IO _ - IST rawwvnnxm III,SF. 13 svnccs SIDE MATCH EAST SIDE. NOT xm suteariiau wsrazr ra IF. oe s�ncEz SHOWN FOR DRAWING CLARITY zm r+aFsmt-.FIlan'-Fenax = sw sF. o55Pne£s L _ -- L I'I it _ J - I rorK =nosrncts - N I- routpawtom C,0N5TRJro I ®N PLAN LE6EN --- 5,_2„ b,_/„ 16,_6„ b,_I„ 5_2„ EXISTING WALL TO REMAIN OE ® PROP05ED PLUMBING FIXTURES 40- 2 PROP05ED WALL REF. FIR. PLAN5 FROP05ED DING TAYIRK FOR 5IZE �rmn PROPOSED HALF HEIGHT WALL ----- PROP05ED GLAZING 61/ARORAIL EXISTING DOOR TO REMAIN PROPOSED DOOR REF. FIR. PLANS AND SCHEDULE FOR 5IZE >� EX15TIN5 GLAZING TO REMAIN g PROPOSED GLAZING REF PLR. PLANS AID 56HEDULE FOR 5IZE SCALE = 1/4" = P-O" SEAL. A�p,I RCH,T REVISIONS/SUBMISSIONS: DRAWNG TITLE: 0 sc F DATE: DESCRIPTION: OA wlnelm VA!DTORMJ C fECOND FLOOR e CO/Y,/TRUGTIO/I PLA/1 - � r Na 0 1C? 9rF or NEi CAD FILE NAME: PROJECT TITLE DATE. NSA PROJECT CONSULTANT, FLOOR P NORTfl PROPQ/I D ADDITIO/Y AND ALTERATIONJ: JEPT. 18, 2006 N,/A 05-1194 Nemschick Silverman Architects P.C. 27550MAINROAD "...the business otARCHITECTURE." CAPANO AND PAIINNII NIWNIMM PI _ _ SCALE. DRAWING NO: Design and Consulting Services _ _ _ GUTCI�OGUE, N( W YORK 11935 735 Deerfoot Path, Cutchogue, New York 11935 20 Hlgh 5treat, Huntington, New rork Air NOTED A\ ^/ Phone ; 531-734-TOOT Fax : 631-734-7347 516) 471-0439 Fax (516) 421-0563 DISTRICT SECTION. BLOCK. LOT. DRAWN BY /�1-5 .2 e 2 http://www.ns-arch.comYRIGHT 2006 NEMSCNCN SiS'LVERMPH MCHRECTS PC NO 1000 109 06 2.2 ' - ER ¢ EQ. EQ ¢ EO. E ER N2 - -I �- III - IIII ELTB q P7 PED CEILING, 1�� COI. PATCH RLL OPENINGS, CRACKS, SEAMS, HOLES, ETG FOR ENTIRE BUILDING ry III �J- CEILINGS WHERE DAMAGED/REND✓AL5700K PLACE PREPARE FOR N - ti GLG LOIN PT 6 B/O GLG 6 a 3a2 - - APPLICATION OF NEW FINISHES A5 PER FIN15H SCHEDULE(TYPICAL w C IIII EL. 6 9 EL +9-4" W J- I - - - - I - 7HROLUNOUT. ;2q m rN I _ m ¢ I—I CO2. UNDERSIDE of ROOF DECK ABOVE SHALL BE PREPARED W/NEW 2"Rl6/D a rVB/p GLG - --1 =_ -_- -- . -n � I _ IIII _ _ - I_��_ �_ h_� 4'-O" 4'- 2'-ll/2" l- 1- lN5ULATIONBOARDS SETBE7WEENEX157G RAFTER5W/IN5ULATIONBAFFLE Y EL +B'-O' �' I,' H H -I_ TOWARD EXI576 LATH FOR MAINTAINING AIR SPADE COVER OVER EX15T6 1/ " IO'-ll" 10'-1 112' 8'-I I/2" _ -- 1 r _ r _ _ - r „ K K _ - _ _ T L h M J 7-r RAFTERS PI /� GYP. BD, TAPED AND SPAGKLED TIGHT TO EXIST'G 7RU55 r r I� T MEMBERS. SEAL /CAULK ALL EDGES. P P P P - - I _n F-' -1 _ �I h_ �_ �I-I N K w CO,3 INSTALL NEW LIOHT5 FIXTURE5 AND EXIT 5l6N5 A5 PER MANUFAGNER r 11 ' I U 5PECIFICATION5 REFER TO ELECTRICAL DP 65 FOR ADD'TL INTO EQ. Eq. EQ. EQ. Eq. EQ. Eq. Eq. _ n - I,ITS _ _FI �I F h _ j E 3 _ I,I �W K �K J1 I� C04. EXISTING HEAVY TIMBER TRU55E5 EKP05ED DURING REMOVAL PROCESS TO _____ n SLOPED CEILING G LO_W PT 1 BE GLEANED AND 'CRAPED OF ALL RESIDUE SAND DOWN AND PREPARE LI �I _III r _ -, _r �I� _ r r I2 N 51. 7 FOR NEW OIL RUBBED FINISH,WHERE EXPOSED. PROVIDE SAMPLE FINISH 70 0 m 7YP ¢ ¢ ¢ ¢ III 1 L r, rr I�LI II _ Ih I� IVI _ ARCHITECT FOR REVIEW AND APPROVAL 11511 SMALL SAMPLE OF ��I I_� __ -I I_ __ _�_ _I__� �_I _ II F!__ - __I_ I__ ' GO5 W ]-i - MATERIAL REMOVED FROM PROJECT. _ l 1 l 1_ _I- CL6 Hl6H PT C05. GYP BD. CEILING TO BE FIN15HED A5 PER FIN15H xHEWLE (7YP) I�_- _I10 II _I __I_I _ - _I _ l I '� TYP j- EL. +q'-O" 6'-Ip I/2" ¢ iv w ,� B/O GLG I III I - - r - r_, -� FI I_ ! OS _��- GO6. REFER TD ELECTRICAL OWGS FOR EMERGENCY LI6h7ING SCHEDULE AND _ r LAYOUT // %ABOVE 7_1] *K �'-°�°cE2/ntz = ROUTE NEW VENT LINE ABOVE CEILING To BELFREY TOWER AND CARRY UP ABOVE ROOF LINE TO NORTH SIDE OF ROOF AND TERMINATE TO EXTERIOR CO. Co. ~- WALL W GAP/BIRD SCREEN AND WALL COINER -SET FLUSHW/EXT NULL. MATCH COLOR OF LOWER W/EX15T'6 5IDIN6. -� � EXI5TG 5LOPED N j 7YP. j GLG, TO REMAIN -i-I- ^^ � / ' / K K K „ 'K K /= �A/V N®��� 0 1 - ER. ER, 3-5 6-41/2' 3-2 1, I - L------y, GOl � � GO5 ¢ JIl_ C-01. IT/5 THE CONTRACTOR550LERE5PON5IBILI7Y 70 DOCUMENT EXI5TI1J6 ABOVE CONDITIONS PRIOR TO WORK IN EACH RE5PEC THE AREA. DAMAGE5 TO CLG. _ - EX15TINC FIN15HE5 TO REMAIN DURING AORK PROGEDURE5 SHALL BE 5'-II 112" ¢ 5'-11112' ¢ 5'-lI 112' ¢ 6'-O" 3'-2 I/2" ¢ m 6'-4 112' ¢ 3'-2 112" W REPAIRED AT GONTRACTOR5 EXPENSE, UNLE55 DAMAGE5 ARE DOCUMENTED V PRIOR TO 57ART OF PORK. 6'-7" III 4'-7' 4'-7" 2 4 112 /O 11 /O l0 112 B 4 2 w 0 6 602. CONTRACTOR TO REMOVE GOMBY5TIBLE DEBR15 FROM THEW PLACE A7 K K K _ O H& K K K K K V K THE END OF EACH DAY AND FURNI5H LABOR TO MAINTAIN A SAFE AND K K -� �+ ELF Eq, EQ. m m GLEAN WORK ENVIRONMENT A ALL TIMES, LEGALLY DART AWAY AND H H n N N N DISPOSE OF DEBRIS AT REGULAR INTERVALS 70 PREVENT EXCESSIVE L L O6 V JI AGGUhNLATON. n M I, G03. CONTRACTOR TO INCLUDE IN BASE BID ALLOWANCE SUFFlGEN7 FOR THE ---------- EQ. EQ. Eq, EQ. m _---_ - 2 COMPLETE IURN-KEY 05TALLATION OF FIRE 5UPPRE55/ON SYSTEM IN _ II _ ACGOROANGEW/NY5BG 5EGr10N qO3 INCLUDE IN THI5 ALLOWANCE ALL ® a v G WORK ASSOCIATE,)WITH THI5 5Y57EM, INCLUDING 5ERV16E MAIN AORK TO ry GLG HIGH Pr e, W K K K K GASES LANE ROADWAY,UNDERGROUND TRENCHING TO BLOC.;SERVICE E9TRY POINT AND A550CIATED METERING, REQUIRED 05 S Y, RPZ OR - - m _ _ _ DOUBLE CHECK VALVES,ALARMS, SIGNALING DEVICES, ETC,PIPING, �- -------------------------------- ------- ----- - � �- .. i . '/ 5LEEVES, HEAD5,DEFLEGTORS, ETC. FOR THE COMPLETE OPERATIONAL L �GURVED CEILING 41 i K U __ � I-_ �' I -- I _ SYSTEM, IN ADDITION ALL 51/PPORTS, 57R,4P5, WIRES, ETG AScAGIATED NU INSTALLA7/ON. PROVIDE ALL READ FILING/OBTAIN ALL READ III _ff _ APPROVALS. LI I 1 1 oOe" 7 M -I 1-__ _I O5 AIL I��� C04, REFER TO ENGINEERING DVJG5 FOR INFORMATION ON ALL MEGH,ELECT., L_ 7YP. �I--, '�� '_-II- ' e PLUMBINGWORKREQDWIiHINCEILING/CEILING GAMYm _ K605. ALLCOMMIT/RAGEWAY55H,ALL BE RUN CONGEALED WITHIN EXIST'6� -�I � �1-- - — - AC EPTEDGNLING/WALLS. NOEXPOSEDWIRING/CONDUITSWILLBE 5 /2" 5'-5 //2" 3'-4" LL -PARKING QALOULATION5600-I4/l _ - _- IL �-- _ C-- 'II - - - -- — I E EQ Eq EQ. `/_ eaae yAusrWSt-Anxsaar+ ,ws+ v 17.. -J I III I I I I I I - I'� _L-IC I-n- -J-_! LLILL Hj - - -Ir-- 1 [ _'ll_ 7� ��� �� � a nan-rw+rracav =eat sF ,vacs r---L_-� r- - ESLOPED CEILING w ,r +K SLOPEDI- / ` crrrc�esrrss, r rfe k0 sF LKSFArke A�.1 i_- n - L 3,T2 �I- FIXTURE FIX. WATT MANUFACTURER awe Pca Aeon LEGION LIGHTING CO., INC. s ue ' `M'`sf 4v' -_- -- -F- —1Fl NEW 2'X2'LAY-IN TROFFER(2 LAMP) 62W sr PAr4anrx M64 =rco sF runts �I_ ¢ I- �A GAT: NO. SERIE5502 'T `0m 5`P`W -rco 5A.. WsAccs - Ir- �- I- O5 EQ. Eq. 05 —i LEGION LIGHTING CO., INC. NT Yn+uA 75 -,cn sF 3OSPAca NOTE, --I I- IYP 7yP �— - NEW 2X4'LAY-lN TROFFER(2 LAMP) 62W rsr crauunox =ra eF r+vita REFER TO FINISH SCHEDULE FOR ALL !-I- ® GAT N0. 5ERIE5502 �- a® /ru4frcncw =rw sF re vnccs FINISH AND SUBSTRATE DESIGNATIONS. � '�I LEGION LIGHTING CO., INC. a+o snnr/rvrav av re =rseP. rs vaa �I --�I_--I1 NEW 2'X4'LAY-IN TROFFER(3 LAMP) 45W am rvruw�u crr�ce =kosF. �.osPnca I-I - A3 GAT: NO. SERIES.XJZ - - sm marerea crfK, ,rat sF vvAea -- 11 ---rl- I'X4'SURFACE MTD. FLOORE5CENT LE61ON LIGHTING CO., INC.B (2 LAMP) f-- 62PV GAT. NO. 5ER1E527`.XJ w,rve+r-fcn 5rcw"cf rrfrz rcwst cPs=Anru"ar" - " I- I _�I_ 1 '___ I'Xe'5U5PENDED LINEAR INDIRECT FOCAL POINT-METRO LIGHT B'S1N6LE ncge vnca + v�ArDa, r_r ®G FLUORESCENT 240W POINT CABLE 5U5PEN5/ON MOUNTED 6 bf}LIUL 5TOC15F +A 9F os S^Aa5 �I --�- EXl5T6 FIXTURE TO BE REMOVED rsr saxu"t suvA:s z+aa sP, z+vAus _- h - - D ST nines ,cost cav"ca K II 3M1b 5,1LLERY/1a961p5ia¢Y 4S95F 045PAcfs - - EXr571NG EMER6ENCY LIGHT, REMOTE - _ - awe ��/N�,VfrcncW - Sro sF. as.s°ACEs - -L HEAD TO REMAIN -L - I - TOTA =]1D 8ACE5 _ _ - �- L- �- _� - - - 0' TRACK LIGHTING 200W TECH LIGHTING -57RAIGH711NE TRACK - roru nmwom -so s=Ac�s F� e' 7wo uRcurr - f TECH LIGHTING siTRAlGH7LINE TRACK _ _ _ �- ---- -- -- I�- 1---' F~/2 4' TRACK LIGHTING IOOW - 4'TWO CIRCUIT I I - - ' -- � � II - I-� JI� I- 1#p WALL 5CONCE(FLOURE5GENT) 75W H b"COMPACT FLL0RE5GEN7 Spur .MIND L116HTING -ELATE G6 6" TRIPLE TUBE HORIZONTAL SERIES 6650 CLEAR COLOR WITH 5ATIN FIN15H CATALOG No. 66H-126/42T �K 6"COMPACT FLLORE5GENT 3qA' .MMO LOPTIN6 -ELATE Cb 6" TRIPLE 7UBE VERTICAL SERIES 6600 CLEAR COLOR WITH SATIN FIN13P CATALOG No. C6V-126/32r 3-114"LENSFI7 WALL WASH 50N1 -MIND L1r6HT1N6-AGULUX RE5CE55ED Y'L AD.A/5TABLE MR l6 1643-43q SERIES GATALO6 NUMBER 1C43-43gHZ-NH ON 30"PENDANT5(FLUORESCENT) 72W ONE,FAL05 V RDD -6040NJ�3511 CIRCULAR 2CX15 BASE P06AL POINT-57EM MOUNT 5KYDOME 0 ❑� L16HT FIXTURE 'X' DENOTES 36"DIA PENDANTS(FtbORE-56ENT) 16 FIXTURE TYPE THREE LAMP T6U6, SIX LAMP 75, SIX N LAMP T5H0 ® EXIT LIGHT FIXTURE z z MECH. DIFFUSER / RETURN ,-I-, 6615 SERIES HAL06EN WALL SCONCE BEIFER L16H7IN6-HALOCE II P GAI rOOW BAYONET BASE LAMP, FR05TED 112 EMERCEI I6HT FIXTURE WALL 56ONCE-57A1RWAY 62W LITHONIA LIGHTING -DECO METALIC 4 q HALF ROUND WALL 5CONCE z TOILET EXHAV5T FAN 5ET IN CL6. GRID TILE. 2X2'REGE55E0 INDIRECT I04W FOCAL POINT-LUNA 2X2 REGE55ED REFER TO MECH VW FOR SPEG'S R INDIRECT LIGHT 1/TNONIA LIGHTING -ARCH SCONCE CEILING GRID/TILES REFER TO FIN15H CT75 N16HT PHOTOELECTRIC FIXTURE 72W 5ERlE5 -WSTMW EMERGENCY OPTION 5CHEDULE FOR SIZE/5TYLE/MAN)F. ETC, G PAINTF�>GYP. BD CL6/5OFF1T ER5 MOUNTED EXIT SIGN NU EMMERGENCY BW BACKUP -- WALL MOUNTED EXIT 5/6N W/ SECTION ARROW EMERGENCY BACKUP bW k ItT LIGHT PACK WITH EMERGENCY 50H BACKUP XX ELEVATION 5YM90L z ELECTRIC EXHAUST FAN E�. +X'-X" RECESSED LIGHT FIXIURE ® 57EEL GRATE SEAL ypED qc REVISIONS/SUBMISSIONS. DRAWING TITLE. xyt A/i� DATE: DESCRIPTION yO Fn mneraa uiucu roavmcul� JI=G071D FLOOR e eT a a5ima aev ro i REPLECTED CEIU/1G PLA/1 o OI90fifi 9 A of NC" y CAD FILE NAME: 1194A,525 PROJECT TITLE: DATE NSA PROJECT u Nemschick Silverman Architects P.C. CONSULTANT: FLOORP /YORTFI PROPQ/C=D ADDITIONf A/VD ALTERATIONf: _/EpT, 18, 2006 TYfA OS-1194 " ..the business of ARCHITECTURE." OMANO MO PAMNNII NN011NNIIO. RC. 27550 MAI/1 ROAD SCALE DRnw1NG No Design and Consulting Services ----- -- ---- --- -- _ -- -- - - - GUTGKOGUE, II YORK 11935 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York Af/10TED Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0439 Fax f516) 421-0563 DISTRICT SECTION' BLOCK' LOT. DRAWN BY: �_� http://www.ns-arch.com a Capmlcni soda NEMecMCR sluEriMr�u nacwTECR pc /10 1000 109 06 2.2 rL11 -4,a5 I�Vllqlv/ 7�11U AAA/ No 755 FOI. G.G. TO PROVIDE NEw MILLWORK FOR 5HEL✓E5 TO MATCH EX15T6. D REFER TO DETAIL 5HEET A-5.03 FOR ADD7L INFO. (TYPICAL) -4!)b O I I I I I I I I I I I I I I I I I I I IOM i I I I I i I I I II I II II II I II II r El / -- L 1 a N - - 84"H= HEIGHT OF NEiN 5HEL✓ING ------------ -----------� 36"W = WIDTH OF SECTION FOR NEIN 5HEL✓ING l HII I I GALLERY/AUD/O r �_ _ Il _ _ R- RELOCATED EX15TING FIRM TIPE 4,_8„ 6,_3, 4,_7„ 5'-IO" i _ � r_! _ - g_2„ N m 207 , - I- -r ,� �� � hTI_ I _ �� _ I - ��_ _ �� I II li o � i II 577JDY/ 17JTOR II _�II _ _ jQ1d__ -R _[I _I � nrCrC-_ ROOMA 1 42"H 42"H 42"H 42'H 42"H 42"H 42"H =— - _I _ I _IrIFS I Pk r �I IT _ -_ 84"N 64"H 84"H - II 361tN 36"W 36"W 36"W 36°W 36"W 36"W r - 1 l - r- _ r �� '��� --Iri - _ FINANCIAL 136"W 36"W 36"W - _ _ _ �I -_ _� __ - _- �i-� � r� I hrI� D/RBG�TOR x - 5'-5I/2" 32'-8 I/2" Ir _ _ - _ _In - ______ III _ - II rl� _ I � � J � I I184°H B4"H 84"HII O 136"W 36"W 36"W I I - 1 1- d. _' F r__ -�T-F - I-F I __�r� _ � -- j���T -T x 9'-8 I/2" J�_ O Fr�1 _ I- _ _ _-$ t- I-t - _ I I I 577/DY/ TUTOR I- _�� -IIIL sr6. =I Lill 11 Roots BI - % 11 11 I''-8" 3'-q 112' 1'-8" 3'-q I/2„ /,_8„ 13'- I/2" �- e HROOM 9 " OPEN TO i / /- i :/ i _ � /��i� 84"H 84"HII "WI I ___ _____��q //2n___-__ _ ___ -- PROP. I I 36 w 36 I 1 I_ N - - ELEVATOR 1 4z H 3'-5 2' -0PEN TO- �� BELOW-- B4"H e4"Hi li ry ry — ------------- ------ -- W11 p m ? 7 T 1/2" L v --- — - II II 11 __________ MEZZANINE ea„„-H - - � -- -------------- I} .� U RAMP DN CONNECTOR RAMP DN 1 36"W 3'-ql/2" "{yl 3 6„ - O 42"H 42"H 42"H 42"H 42°H 42"H 42"H 101 LOBBY/ 11 11 PROPOSED 1 W 36"W 36"w 36"W 36"W 36"W 36"W 36"W T, -- -,-1 ---------------------- SEARCH READING 4'-B" 6'-3" 4'-T" 5'-lO" AREA g 6ALLERY/AUDI q'2 In° zo'-q' _DN- Ii-==== 4z"H NON�F/GNGE/ 11 --- N ry --------------- - (- -------— - 11 _ _ II � I - NON-FICTION li -J �LJ I11 -- - f, 103 _ LL j -- 'I� // II142"H 42"14 42"HII 42 H DIX OPP/GE � - I � - „ �- ,.-------------- ---- _ ____-__-___---- _ IIPi6"W 36"W 36"WI __ 20l I = __ - _ J_`—_ _ u I�, - FI 11' I136"w 36"W 36w Ili P 1 ...... .x. 42"H 42"H 42"H } p - % _ -III-I -I- --- -C :1,_ .uk 4,_I„ _- W _I �-- J 36 W 3'-q l/2" "w 3'-9 I/2" W 2" Il'gl':': I- L 1 W f 1 Ili _I -� . J -, L- m W PARKING CALCULATIONS/I00-IqU __ - N J AINnORIW I'H"nits N4L IF645J SF.a`.SE�nMS ARN - L �` f ry O _7 gaze vote vvvnrvns Ram+ ARP.1 ran. - I ( L o- I ILI-_ 2 ,k{ e rurFn.RFl7.,ERce74 =aw sF evAca 1 L --L -I H O F Fol I ....... p lII - ---I- - - ry oFFrcE sr>Ir�s_ I FER an sF.L�vnrrtu AREA rl_ r- LI - nceR vncLs ARFA Sao `�1 - [ 6 OFFILERLGR AREA -445 SF. 45PAc£5 — __ � -- 1 I5T rWb,lNSM -ICa SF. rOVAGP' l ( -� r14 I- IST YaMK APAIS 3Gtl SF. E_L— - 15F c,W nd H 5£. IAS4V.£5 G _T ITT AM RB�ETGE/M1bN-FknaV 15n5F. I55PAYI5 -4,06 --CLI- ' :p )' J—� 44A6 XYJ 5TOY/MLR AV V -105F. IS d'b nN981ALd 4E -.b95fi Lo a'm nlrvEcrae as4ce =¢o sF a vncEs I__ �_� jIwV. FL/WR SPA PAFMMS RaM1 dw 5F. 03 SAFl5 L " '• L• ••••••. - III l_ _ _ - __nl O siORA£f 474 SF. 055PAL6 - 15r CS&RAL 5TA5K5 -y433 SF. )A SALES N b . YYJ b41ERY/LLCAL HISTLRY - 4`A5F. 0.4 SALFi - - 1 _ _— _ Vol-71/2" - xm RearE/naRFlLnex - 5ro sF osvneEs l-_ �__ L -1 J- - roru L OPEN TO ® -T LI roiN.FROVInEn =uovvs - ��1 =/ �j I� -II_-I MOM(------------------------------- --,- NOTE: THIS PLAN 15 FOR ILLUSTRATION 0URFO5E5 ONLY. ALL FURNITURE WILL BE FURNISHED AND AND IN5TALLED BY OTHERS. COORDINATE MILLWORK ADJOINING FURNITURE WITH OWNER'5 VENDOR PRIOR TO MFR / INSTALLATION. REFER TO 5HEET A-3/.2 AND DETAIL 3HEET5 FOR MILLWORK TO BE FURNI5HED AND IN57ALLED BY G.C. SEAL': PEo o REVISIONS/SUBMISSIONS: DRAWING TITLE eS ey NFMS N/gym DATE. DESCRIPTION fells, 5 aUcv�vonranwlcm J'ECO/V FLOOR * FURNITURE PLAN r 9T` ;A CAD FILE NAME: //1194_A-5.2.4 PROJECT TITLE DATE NSA PROJECT rr' CONSULTANT: Nemschick Silverman Architects P.C. FLOOR P N PROPO-IIAVA IO/VJANDALTERATIO/If: ./'EPT. 16, 2006 NfA 05-1194 27550 MAIN ROAD the business of ARCHITECTURE:' CMANO AM �A1�f01 OION014, 60. SCALE' DRAWING NO: Design and Consulting Services _ CUTCINOGUE, NEW YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 so ilgn street, Huntington, New cork _ - -- —� . ^ . /f Phone : 631-734-7007 Fax : 631-734-7347 (516) a2I-o439 Fax (516) 421-osys DISTRICT: SECTION BLOCK LOT: DRAWN BY L) 4 hftp;//wvvw.ns-arch.com ®coar�xr zssa rEuscrtcx slLveraaa aacHlrecrs Pc /1O 1000 109 06 2.2 EL 11 AREA OF REMOVAL WOR ®® II II III IL L uu ® ® 191 ® ® ® as NEW STAIR STRUCTURE TO BE INSTALLED I@ WITH EXISTING DECKING (VI.E).. IIWIW IWIWIWII�pIWIWI - --- ' I I - - -- - -- --------- -------------------- ----------------------- -----------------�--- - 1 1 --------------- r_-_-+------—-------------1 I I Ex57R6 cONG. RAMP TO BE REMOVED __�__f-- AND REPLACED FOLLOWlN6 BACKFILL OF GRADE AROUND FORMER CHURCH �_ ___ _r____------_____L_r________— . — L------------------------- _______________ - L_____L _ �_______ r__ __ STRUGNRE NLFJ 157IN6 NORTH (ffAf) L VAT101V SCALE = 1/6" = I'-0- (WITH REMOVAL WORK) A p -4A5 -406 GUT IN NEX FIDE VENT FOR ENTIRE LENGTH NEW 5HED DORMER WI IN NEW CEDAR ROOF18r, EX15TIN6 CEDAR ROOF TO REMAIN VERIFY ALL TRIM AND 5IDIN6 TO MATCH EX15T'6(V LF) EXP05URE TO MATCH NEW. (V I.F) NEW 5HED DORMER WITH NEW CEDAR ROOFING. EXISTING WOOD SHINGLE ROOF BE STRIPPED TO NEW WOOD PLANK E5 A5 E MATCH EXISTING. ALL TRIM AND 5IDIN6 TO MATCH EXl5T6 NLFJ PLYWOOD XPOS RE T INSTALL NEW Ix WOOD PULL BACK SHINGLES AS NECESSARY TO SPLICE LA TH FOR ER CWR E TO MA.F). EXl5T6 70 REMAIN NEW SHINGLES. ----- --- ----- ---------------------------------------------- NEW ELEVATOR BULKHEAD. PROVIDE NEW FURRING ON FORMER CHURCH NLFJ' AND WOOD BEVELED CLAPBOARD SIDING TO IF MATCH EXl5TIN6. PATCH AND REPAIR ROOF AND 51D1N6 A5 NECE55ARK REFER TO 5TRUCTURAL Vic TOP OF EXl5T6 RIDGE V.I.F DWGS FOR ADD7L INFO. GENERAL NOTE: (EL. +24'-9 I/2" V.LFJ EX15TIN6 FORhIER CHURCH 57R(/G7URE 15 CONSIDERED A LOCAL LANDMARK &/ILDIN6 IN THE TOWN OF 5CUTHOLD. GREAT CARE 5HOULD BE TAKEN TO REVERSE CABLE, NEW CEDAR ROOFING. ALL TRIM _ _ PROTECT ALL EXTERIOR EXISTING FEAMRE5, ALL PORTION5 OF THE ORl6/NAL NEW Ix4 RAKE BOARD. PAINT TO MATCH EXl5TIN6 I- `� 3 -I_J_-i LJ - I_J ft2 5TRUCIT RE AND EXTERIOR FIN15H PI LL REMAINWITH THE EXCEPTION OF -ru-/ - -' -- - - - - -- - THE ORIGINAL F-CUNDATION AND EXl5T6 FRONT STAIR S7Rl/G7URE N.O.NJ NLFJ. -L- ALL EXl5TIN6 5IDIN6 AND TRIM OF LATE5T ADDITION(1966)5HOULD BE ALL TRIM AND SIDING TO MA7GH EX1576 _ _ IEEE FRE55URE WASHED AND RE5EALED. ALL EX157r PAINTED IiRFACE5 5HOULD NEW 5HED DORMER WITH NEW CEDAR ROOFING. � J I - - - - -- - BE SCRAPED, PRIMED AND PAINTED 70 MATCH EXl5T6 DOLOR NLFJ. NLFJ - - -- - - - - - - j 'v NEW WOOD BEVELED CLAPBOARD 5IDIN6 TO N MATCH EX15TIN6 NLFJ - - - - ------ - -- _-- - ---- -110 TOP OF SECOND FLOOR EX1571N6 WOOD BEVELED CLAPBOARD 5IDIN6 TO �.,, —� I r REMAIN PATCH AND REPAIR A5 NECESSARY. EXISTING BRICK CHIMNEY TO REMAIN PRE55UREWA5H UP COMPLETION. NEW EXTERIOR METAL STAIR. REFER TO DETAIL 5HEET A-5.07 FOR v—� N — — O `— EXISFING IRON RAIL TO REMAIN ADD'TL INFO. _c=� ---1 — — — -M EX15TIN6 CO c=] —, I�W 5 TA ALLEIDWTHEXX15 BE KING NE. 5TA1R TO REMAIN c=� TOP OF FIR5T FLOOR --- Mill I F(VkF). APPROX. TOP OF GRADE (V.I.F) - II I I I I I I I RETAIN EXl5T6 Ll6HTIN5 ARRESTOR. VERIFY EXl5TIN6 CONC. RAMP TO BE REMOVED NEW MASONRY LANDSCAPE ARG'UND PROPER REPLACEMENT AFTER WORK 15 COMPLETE NLFJ �_� L_�I AND REPLACED FOLLOWING BACKFILL OF PERIMETER OF ELEVATIONS. ALL GRADE AROUND FORMER 6HLR6H STONE TO BE RED FROM EXl5T6 ELECTRICAL SERVICE BOX TO BE I I II II I � srRUCIURE. NLFJ I I FORMER CHURCH CH 5TOR STONE O � REMOVED PATCH AND REPAIR SIDING TO MATCH I I I I I I r I —1 I I FOUNDATIONS. EX15T6 NLFJ. --J--J EXI576 FORMER CHURCH 5TRUGTURE 70 BE TEMPORARILY SUPPORTED. r--LI --J I ALL STONE FOUNDATION5 TO BE REMOVED AND STOCK PILED FOR __________I__ 1_ 1_______________________ ____- LL_ L_ 1 _J -_-____________ __-- REUSE BOTTOM OF EX/5T'G FOOTING (V.LF) F- �------------- r- r--------------------- r----------- - r- r------ -I _________—_____________L------------ L_�_______________ _____________________________________________________________ L__—_____J 4A5 4A6 SCALE = I/4" = I'-O" AREA OF NEW EXTERIOR WORK E 3 EX15TIN6 FORMER CHURCH 5TRl/G7URE AND FINISHES TO REMAIN N.O.W. SE '�P A00 REVISIONS/SUBMISSIONS. DRAWING TITLE: DATE: DESCRIPTION MOM VYUWMR WA G /VORTN ELEVA110/1-/' ionime r¢vinrni s Pr Na. p 9TF OF NEB A CAD FILE NAME: //1194 A-4.01 CONSULTANT: PROJECT TITLE: DATE: NSA PROJECT . Nemschick Silverman Architects P.C. FLOORP /1oRT� PROPQ/'ED ADUITIO/1/ AND ALTI=RATIO/y/: ff PT. 18, 200(5 /VVA 05-1194 "...the business of ARCHITECTURE." CA�AMO Design �d oI Consulting Se LO. 27550 MAIN ROAD SCALE DRAWING NO; Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High stroot, Huntington, New York GUTGFIOGUE, NEW YORK 11955 Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-045-1 Fox (516) 421-0565 AJ/10TED http://www.ns-arch.com DISTRICT. SECTION: BLOCK; LOT. DRAWN BY: A .O 0 coavlaenr soon IEMscwcN NtvStunN npcxTcrs Pc, p{Q 1000 109 06 2.211EL AREA OF REMOVAL WOR rr-r-r-r-Inr -1I--1-1 -1- � I =�® ® ® ® ® BL IL LILLILIIJIJIJJJJI Mim REMOVE EXISTING CECKI5TAIR5. GAREFULL - REMOVE EXISTING DECKING, TO BE limuplaullu RE-INSTALLED ON NEW 5TAIR STRU67URE (VI.F). = — -- 1__________-- A4A OF REMOVAL WORK - l__T -;_ --= ------- -- _ _ _ _ _ _ I_ 1 1-, _L 1 I 7 l-- L---- --.__I EX15TINC FORMER CHURCH 5TRUCTURE ANO E AREA OF NEW EXTERIOR WORK. SCALE = I/8" = I'-O" (WITH REMOVAL WORK) GENERAL NOTE., EX15TINC FORMER CHURCH STRUCTURE 15 CON5/DERED A LOCAL LANDMARK B/ILOING IN THE TOWN OF.5011THOLD. GREAT CARE SHOULD BE TAKEN TO PROTECT ALL EXTERIOR EX15TIN5 FE4 AlRE5. ALL PORTION5 OF THE ORIGINAL 1662 5TRU67VRE AND EXTERIOR FINI5H WILL REMAIN WITH THE EXCEPTION OF THE ORIGINAL FOUNDATION AND EX15TG FRONT 5TAIR 5TRN5TLRE. (U.O.N) p q ALL EXISTING 5IDlN5 AND TRIM OF LATEST ADDITION(l9a6)SHOULD BE -4.06 -4A5 PRESSURE WA5HED AND RESEALED. ALL EXl5TG PAINTED SURFACES SHOULD BE SCRAPED, PRIMED AND PAINTED TO MATCH EX157'G COLOR(V I.F). - EXISTING CEDAR ROOF TO REMAIN VERIFY EXF05URE TO MATCH NHK (✓I.F) ---- ----- NEVV WOOD BEVELED GLAPBOAROSIDING TO __ MA CHEXI TI ' NI.F) - pj NEW 5HED DORMER WITH NEW CEDAR ROOFING. REVERSE GABLE,1 NEW CEDAR ROOFING. ALL - - - ALL TRIM AND SIDING TO MATCH EX15T6 IF). Q TRIM AND 5/9IN6 TO MATCH EX13TINC (VLF) ��.� �JJJJ TOP OF EX/5rG R/DGE (V..I.F.) -S.ob (EL. +24'-9//2" V.I.F) 0 I JI i- - I 1 1 1 I �I - L I _ I III NEW Ix4 RAKE BOARD. PAINT TO MATCH ILIJ I- I_ I- 1 - J -1 II II _ _ EXISTING (V.I.F). IIII- Ili - - - L -L_I—J _ - �- .-_ �— - � � � - NEW WOOD BEVELED CLAPBOARD SIDING TO MATCH EXISTING (V l.F). n l nNG 51/ TO PLYWOOD 51/65TRATE. lN5TALL NEW Ix 1 i I I I III I I I - _ ___ WOOD LATH /RE TO MATCH EXIST'G TO REMAIN ONN FORMER CHURCH(OF). TOP OF SECOND FLOOR EXISTING WOOD BEVELED CLAPBOARD SIDING TO REMAIN PATCH AND REPAIR A5 A5 NEGE55ARY. FRE55 RE WA5H UP COMPLETION. N EXISTING WOOD SIDING TO REMAIN ® ® ® ® ® ® ® ® 111 EX15TIN5 GONG. 5TAIR TO REMAIN. o- did d� EXl57IN5 IRON RAIL TO REMAIN. NEW STAIR 5TRZTURE TO BE IN5TALLED WITH EX15TIN5 DECKING (%/LF). 0 TOP OF FIRST FLOOR (a. f O'-O" VLF) APPROX. TOP OF GRADE (V.I.F) r r EL. -2'-4° V.LF I I I I I I J I I I I I I I NEW MASONRY LANDSCAPE ARO/ND PERIMETER OF ELEVATION5. ALL 5TONE TO BE EX15 FORMER CHURCH STRUCTURE TO BE 11 11 j J� FOUNDATIONS. TEMPORARILY WPPORTED. ALL STONE r RECAPTURED FROM FORMER CHURCH STONE T'G FOUNDATION5 TO BE REMOVED AND STOCK 11 J J r _J PILED FOR RE-LSE. I NEW GONG. WELLED EXIT 5TAIR. REFER r0 ' EX15TIN5 FOUVi RATION TO REMAIN STRUCTURAL DW65 FOR ADD'TL INFO. rJrJ I I I I I I NEW IRON RAILING PAINTED BLACK TO MATCH r r �'� EX15TINC TO REMAIN NLF). �_ J _ _______ ______ _____ ____ _______ _ _____ __L_ ____ 1____ J_ _ _______________ ___ _________ F 1 _1J Lr _TJ LT L_T—"T - T —T _T r. L _I _T L_r —T —I —, eorroM of EXisr'G FOOTING N.I.FJ I I I I I r-_________� I r- I I I I I I I I I I I I I I I I r_1 —�___ _rL_Lr_______ _�J_1T _LJ _J— —J_ _L-1 _______ _J___ _1______ _____ _I_____ _1 _r—L —1 r —J_l _1____ 1 L__-______1------------------L___L____________1___.L -'• (EL. - l2'-8' V.LF) L J (iffO '� T) L V A T101 �' "4A6 -4A5 -5A6 L SEAL, REVISIONS/SUBMISSIONS DRAWING TITLE' 56ALE = l/4" = I'-O" Y g * OiS DATE: DESCRIPTION 4r F rnnem zvR l VR c fOUTF1 LLEVAllO/1f nt _ yc 9` ia�ima rsvv�nni � & r yo9k 1��y`r CAD FILE NAME: //1194 A-4.02 PROJECT TITLE DATE. NSA PROJECT «. CONSULTANT. FfT!' Nemschick Silverman Architects P.c. L 27550MEDADDITIO/YfAVDALTERATIO/Yf: ...the business of ARCHITECTURE.' CAPANO Alm �A ONa1�10. P.C. fLY 1 . 18, 2006 TYfA 05-1194 Design and Consulting Services 27550 MAIN ROAD SCALE: DRAWING NO.. 735 Deerfoct Path, Cutchogue, New York 11935 20 High 5treet, Huntington, New cork Cl1TGMOGUE, NEW YORI( 11955 L/�\ Phone : 631-734-7007 Fax : 631-734-7347 510) 421-0499 Fax 516) a21-0563 nOTF� A-4• . 02 DISTRICT. SECTION: BLOCK', LOT. DRANM By http://www.ns-arch.com ®CUYRIGHT 200E ususcHCK s-w N nRcnnECTs rc. NO f1 1000 109 06 2.2 EL I� I II AREA OF REMOVAL WORK 7� � IVIIIIIIIIIIVIVIIIIIIIIIVIIIIIIVIIIIIYIIIIIVIVIII IVIYIIIIIIIVVVIIIIIIIIVIIIIIIVIIIIIIIIIIVVIIIIIIIIIIIIIVIIIII I , II IVIIIIVIIIIIIIIIVIIVIIIIIIVIIVIIIIIYIIIIIIIIIIIVIIIIIIIIYIIIII 11JLLLILLLILILI—YJJJJ�1111L111�LV_ILILII—IJJJJ11111 ® ® ® ® AREA OF REMOVAL WORK IIIIITI n Illllllf m IWIWIWIIWIW� "11 I I I ------- - ------ -- ---_' --- -7� 7, ____- -- -- -- - - J - - __ ----------- -------- --------- -- _ -J GENERAL NOTE: ------------------------ t EXISTING FORMER GM/RGH 57RL'GTURE IS CONSIDERED A LOCAL LANDMARK _ BUILDlN6 IN THE TOWN OF 50UTHOLD. GREAT 6ARE 5HOULD BE TAKEN 70 '-' I- PROTECT ALL EXTERIOR EXI5TIN6 TEATURE5, ALL FORTION5 OF THE ORl6INAL 1 1062 57RUCR)RE AND EXTERIOR FIN15H PVILL REMAINWITH THE EXCEPTION OF THE ORIGINAL FOUNDATION AND EXI576 FRONT STAIR 5TRUCTLRE. NON) ALL EXI57IN6 51DINC AND 7RIM OF LATEST ADDITION(1966)5H(WI L?BE PARE55)RE WA5HED AND RESEALED. ALL EX15716 PAINTED 5URFACE5 5HOULD BE SCRAPED, PRIMED AND PAINTED TO MA76H EXISTS COLOR(V✓F). LA SCALE = I/6" = I'-O" (WITH REMOVAL WORK) - 6 e MATCH EXI57IN6 GABLE END TRIM(VI•F). NEW REVERSE 60BLE, NEW CEDAR ROOFING. _ - -_ �__ - - -- �- ALL TRIM AND 5IDIN6 TO MATCH EXI57IN6 PROVIDE EXPOSED COFFER VALLEY 7YP. ALL (VLF) 5101N5 A7 ANGLE TO MATCH RAKE AT EXI5T6 EXI57IN6 BRICK CHIMNEY TO REMAIN GABLE ENO. NEW WOOD BEVELED CLAPBOARD SIDING TO MATCH EX15TING(VIF). TOP OF EX/5T 6 RIDGE (V./.F) (EL. +24'-9 //2' V.I.F) NEW SHED DORMER WITH NEW CEDAR ROOFING, 12 ALL TRIM AND 5IDIN6 70 MATCH EXI576 9 12 9 Ix4 FRIEZE BOARD. FINISH 7O MATCH - EXI57IN6(VLF). NEW STRIP MOULDING 70 MATCH EX15TIN5 N - - (V/.F). q _-- -- - ----- -_ -_-_ NEW WOOD BEVELED CLAPBOARD 5I0IN6 TO MATCH EXI571N6 (VLF). 0D EX13TINC MOD 5H1N61E ROOF BE STRIPPED _ _ _ TO PLYWOOD SUBSTRATE. INSTALL NEW Ix O K __-- _ - r7]i� WOOD LATH AT EXR050RE TO MATCH EXI5T 6 TO REMAIN ON FORMER 6HUR6H(VLF) - -- - - - - -- - _ TOP OF SECOND FLOOR N NEW STRIP MOULDING TO MATCH EXI57IN6 REMOVE EXI57IN6 5IDIN6 DOWN 1'-0"FROM -- - TOP FLATS TO ALLOW FOR NEW STRAPPING - (V./F). AND PLYWOOD 5UB5TRATE OVERLAP IV./F). a F=M EXI57IN6 Yl00D BEVELED GLAF`ECA SIDING TO ___-- - --------------- - _ _________ ___—___--`--_ __---- DETAIL SHEET A-5.07 FOR ADD'R INFO.REMAIN. PATCH AND REPAIR NE6E55ARYPRF55l/RE WASH UPCOMPLETION. EXISTING GONG. RAMP TO BE REMOVED AND REPLACED FOLLOWING BACKFILL OF 6RADE AROUND FORMER CHURCH 57RUCTURE (VLF) EXISTING RAIL TO REMAIN. TIE LLLL] LLLU NEW MA50NRYLANO5GAPEAROUND _ _ _ _ _ _ _ - TOP OF FIRST FLOOR PERIMETER OF ELEVATIONS. ALL STONE r0 (EL. +O'-O" V.LFJ BE RECAPTURED FROM FORMER CHURCH srONEFouNDAnoNs. APPROX. TOP OF GRADE (V.I.FJ 4f Ir— ==T=11 L� 11 FI r III III III III III III Lj I I III I I III I I �L I I II,I I I ICI I I III I I III I I 11FIII _ III I II III IIL-1=-1==JI �r 1 = ==t_ J �L_1--L=J� EXI57IN6 FOUNDATION TO REMAIN Lr_______ __7 L____________J 1 I L_�'----- I I I II L Lr I I I I I I 11 L____ -------------L-------r_1__-------------------- r_____1 L-----------L------------J1 ---- I _----_- J BorroM OF ExisT6 FOOTING (V l.F) L----J_---- --------- __--J (EL. - 12'-6" V.LF SEA �y5 * FCC REVISIONS/SUBMISSIONS. DRAWING TITLE: �Y Rf+ SA DATE: DESCRIPTION o �Oi m9 09n11,06 v�roa Mi EA/7 ELEVATIO/VV a � m �N]I/U Isvvnni z s v g 9 D ti m r) CAD FILE NAME /A 194 A-4.05 PROJECT TITLE. DATE NSA PROJECT e: CONSULTANT, FLOOR P N0R119 PROPQ/ED ADDITIO/V,/ AND ALTERATION,/': ,/EPT. 18, 2006 NIA 05-1194 Nemschick Silverman Architects P.c. '...the business afARCHITEMRE.' W(5,16) NO AND PI III RC. 27550 MAIN ROAD SCALE DRAWING NO: Design and Consulting Services CUTCHOGUE,NEW XORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, New cork /t/ NOTED Phone : 631-734-7007 Fax : 631-734-7347DISTRICT. SECTION BLOCK LOT, DRAWN By -4 03 421-043q Fax (516) 421-0363 http://www.n5-arch.com a COPYRIGHT soon rv�wnsclfce SILVEWAN AlcnirecTs re NO F1 1000 109 06 2.2 E6 TFr r-r r r IF r r r-r-In AREA OF REMOVAL WORK II ® ® p 11111111111011111111V01111 IIII � IIIIIIVIIIIII801 9 ® ® P Ilulllllloollllllllll I VIIIII � IIIIIIIIIIIIIIVI IJJIJI JI JI J11 JL JL JL JL b L llJ a0 �� AREA OF REMOVAL VJO ml Immlml �111WIWIlI�{IIIJllIIIU (n I ❑❑ ❑❑ I m --------- , i, -------------- -- -- --1 , SCALE= I/8" = P-O" TOP of EX/ST16 RI06E (V.I.F) (EL. +29'-01/2" ✓I.F) -4.05 4A6 i NEW SHED DORMER WITH NEW CEDAR R00171116. ALL TRIMAND S1DIN6 TO MATCH EX15T'6(V..LF). Q w � NFJN 5HEO DORMER WITH NEW CEDAR ROOFING. ALL TRIM AND SIDING TO - MATCH EXIST'GNLFJ. - I ' -11 - -I h EX13T116 BRICK CHIMNEY TO REMAIN O L EX15TINC EXTERIOR FIN15H TO REMAIN. ® ® _ -- - - -- EXISTING WOOD SHINGLE ROOF BE -- STRIPPED 7-0 PLYWOOD 5'/B5TRATE j - _--- -- - - INSTALL NEW lx NbOD LATH AT EXPOSURE ® ___ -_— TO MATCH 6TOREMAIN ON 'm _ FORMER CHURCH NLFJ. LOFT SPACE BEYOND NEW WORD BEVELED CLAPBOARD 50N6 TO TOP OF SECOND FLOOR _ MArcH EwsnN6 NLFJ. (EL. + b'-9" V.I.F) Q a �LINE OF EXlSTING/PROPOSED SECOND FLOOR EX15TIN&GONG, RAMP TO BE REMOVED AND REPLACED FOLLOWING BACKFILL OF 6RADE AROI/ND FORMER CHURCH 5TRZ77 RE(V1F). ® ® ® EX15TIN6 WOOD BEVELED CLAPBOARD SIDING TO REMAIN PATCH AND REPAIR AS NECESSARY. FFE55YRE WASH UP COMPLETION. TOP OF FiRsr FLOOR (EL. +O'-O" V.I.F) _ '$0 Ly APPROX. TOP OF GRADE (V.LF) a. -2'-4" V.I.F) I r--------jI I I EXISTING GONG. STAIR TO BE REMOVED AND ----------i I MEN MA50NRY LANDSCAPE AROUND REPLACED FOLLOWING TO BE LL OF SPADE AND J --------------- — 1 PERIMETER OF ELEVATIONS. ALL STONE r-------- I TO BE RECAPWRED FROM FORMER AROUND FORMER CHURCH 5TRUC MRE(VIF). I L---------i r-------------- --------------------- GHY/RGH STONE FOUNDATIONS. EXIST'&FORMER CHURCH STRUCTURE TO BE � j II Ir I II I ^,I > TEMPORARILY SUPPORTED. ALL STONE ----------I�I � FOUNDATIONS TO BE REMOVED AND STOCK PILED I I I r-------- I I FOR RE 05E I---------- I I I I I I I IL___ LI J---- ----- L--------------------L-- --- ------t- ------J---------1- ------------ -------------------L- eorroM of Ex15r6 FoorN6 (v.LF) L-----------------------I----------------------------�------------ ----- 1------ J------------- ------_1 7-r- ------------ (EL. - 12'-6" V..I.FJ F_J_L_F r_A-L_T GENERAL NOTE, L___--J L_____J EX15TINC FORMER CHURCH 5TRUGTURE 15 6ON5IDEPED A LOCAL LANDMARK D)ILDIN5 /N THE TOWN OF.50UTHOLD. 6REAT CARE SHOULD BE TAKEN TO PROTECT ALL EXTERIOR EXISTING FEATURES. ALL FORTION5 OF THE ORIGINAL e C 1862 STRUCTURE AND EXTERIOR F1NI5HWILL REMAINWITH THE EXCEPTION OF -4.a5 -4.q6 THE OR151NAL FOUNDATION AND EXIST&FRONT STAIR 5TR 7ZIRE (VON) ALL EXISTING 51DIN5,AND TRIM OF LATE5T ADDITION(laee)5HOULD BE PRESSURE WASHED AND RESEALED. ALL EXI57G PAINTED 5URFACE5 SHOULD BE SCRAPED, PRIMED AND PAINTED TO MATCH EXI576 COLOR NLFJ. (WITH REMO✓AL lNORK) - 5GALE = I/4' = I'--O" S aEa cy REVISIONS/SUBMISSIONS. DRAWING TITLE. DATE: DESCRIPTION. .1/1 m YN MRMMG WCJ7 ELUVATIO/if ia�vm atvv�ati '� Na 0 OPF P y CAD FILE NAME: 15777 //1194 A-4.04 PROJECT TITLE: DATE' NSA PROJECT •: CONSULTANT. FLOOR Nemschick Silverman Architects P.C. PROPOfED ADDITIO/y/'AND ALTERATIOHYf: jr-PT. 18. 2006 /4fA 05-1194 '...the business&ARCHITECTURE." W(5,16) MO AM PAIIIII= �11�®IR EC. 27550 MA/1 ROAD SCALE. DRAWING NO.: Design and Consulting Services CUTCNOGUE,Ar-W YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, New York Phone : 631-734-7007 Fax : 631-734-7347 421-04s9 Fax (516) 421-0e63 (F/ Af/10Tr1J A DISTRICT: SECTION: BLOCK LOT'. DRAWN BY: ��� •04 hftp://www.ns-arch.com o coPvalclrt zwe reMscnice sEv�nry arcNrzcrs PC.11NO TN 111000 109 06 2.2 E6 AREA OF REMOVAL WORK ® ® II II IIIOIIVu91111110111111 IIIIIIIIIIIVIIIIII � IIII 9 ® ® Q � Illlllllllltllllllllllll I Illllllll � uullollllllllll u_u11�J JI Jl JL JL�1 JL JL 1L W a0 �� AREA OF REMOVAL WORY IL -- --- - -------------------, ___________=====r== J 1______________________________ ___________________________ _____J-= _-----------I ----- ----- --------- , - r -- I TOP OF EX15T15 R/DGE N.LF.) a. t 29'-0 I/2" V.I.F) e -- L NEl'J SHED DORMER WITH NEW GEDAR ROOFING. ALL TRIM AND 5/DI16 TO MA 7CH EX15765 NLFJ. Q NEW SHED DORMER WITH NEW CEDAR ROOFING. ALL TRIM AND 501% TO MATCH EX15TG ry EXI5TIN5 BRICK CHIMNEY TO REMAIN m _ _ EX15TINO EXTERIOR FIN15H TO REMAIN ® ® -__ - - --_- EXISTING WOOD 5HlNGLE ROOF BE 5TRIPPED 70 PLYWOOD S085TPA IF AT V INSTALL NEW Ix WOOD LATH AT EXP05LRE TO MATCH EX15TI51 TO FORMER CHURCH N.I.F). ON LOFT SPACE BEYOND NEW WOOD BEVELED GLAP<�OARD SIDING TO TOP OF 5E60ND FLOOR MATCH EXISTING NLFJ. a �LINE OF EXISTING/PROPOSED SECOND FLOOR REPLACED GONG RAMP TO BE ILL OF6 AND ° REPLACED FOLLOWING BAGKFILL OF GRADE `0 AROUND FORMER CHURCH 5TRUCTURE(vIF). EX1571NG WOOD BEVELED CLAPBOARD 51DIN5 TO REMAIN PATCH AND REPAIR A5 NECE55ARY. PRE55UREWA5H UP GOMKETION. TOP OF FIR5T FLOOR APPROX. TOP OF GRADE N.I.F.) wr E1115TIN6 GONG 5TAIR TO BE REMOVED AND --------� NEW MASONRY LANDSCAPE AROUND REPLACED FOLLOWING BAGKFILL OF BRADS J r---------- --------------------1 PERIMETER OF ELEVATION5. ALL 5TONE AROUND FORMER CHURCH 5TRZnRE MF). I- 1 1 1 1 r______________ _____________________ TO BE RECAPTURED FROM FORMER EX1516 FORMER CHURCH 5TRUGTURE TO BE I L CHN/RCH 5TONE FOUNDATIONS, ^� S TEMPORARILY SUPPORTED. ALL 5TONE r-------- 1 FOUNDATIONS TO BE REMOVED AND STOCK PILED I 1 FOR RE-USE. I-- I I I L I L I I I L - I I I I I I _ __ J__ --__ _______t:_ ______D__________1_ _____________ ____________________L_ BOTTOM OF EXlST'G FOOTING (V.LF) _________ 1______ I I I T r_1_L_T GENERAL NOTE: L_____J L-----J EX15TINC FORMER CHURCH 57RU67URE 15 CON5/DERED A LOCAL LANDMARK BUILDING IN THE TOWN OF 5OUTHOLD. GREAT CARE 5HOLLD BE TAKEN TO 6 PROTECT ALL EXTERIOR EX15TW5 FFEA71/RE5. ALL PORTION5 OF THE ORIGINAL L 1662 5TRUGTURE AND EXTERIOR FIN15H WILL REMAIN WITH THE EXCEPT/ON OF THE ORIGINAL FOUNDATION AND EX15TG FRONT STAIR 5TRZ7URE (UO.N) ALL EX157/N5 5IDIN5 AND TRIM OF LATE57ADDITION(1986)SHOULD BE FRE55URE WA5HED AND RE5EALED. ALL EX15TG PAINTED SURFA6E5 5HOUL0 BE 56RAFM PRIMED AND PAINTED TO MATCH EX15T'G COLOR NLFJ. (WITH REMOVAL 1NORK) . S CEP Cy REVISIONS/SUBMISSIONS DRAWING TITLE DATE: DESCRIPTION' m r /'7' F ♦�I N ni �A 0911d(✓� VJII[0 roRREICLMG WId � -LLVfi 110/ If 10/JI/W RCVI/'all No 0 0 y F O` rIEVI CAD FILE NAME //1194 A-4.04 CONSULTANT. PROJECT TITLE: DATE: NSA PROJECT x; Nemschick Silverman Architects P.C. I'LOOR PLM NORTf1 PROPQ/EDFaDDITIO/1JA/VDALTERATIO/VJ: ".. .the business oFARCHITECTURE" W(r"16) AMO MO !•AMr01 M��R GQ -ff PT. 18, 2006 /NfA 05-1194 Design and Consu/ling Services SCALE. DRAWING NO: 735 Deerfoot Path, Cutchogue, New York 11935 27550 MAIN ROAD CUTCFIOGUE, YEW YORK 11955 20 High 5troat, Huntington, No" York Af NOTED Phone : w.ns-arch.co Fax : 631-734-7347 42I-o49q Fax (516) 421-0563 �_� • O A http://www.ns-arch.com DISTRICT: SECTION: BLOCK. LOT: DRAWN BY 4 x COPYRGHT seta WIAs CK saVOMAN AacxTECTs a,c, NO TYi 1000 109 06 2.2 E6 NEW RIDGE VENT FOR EXTENT OF NEW 6EILIA6 OPEN'6* TRU55E5 LINE OF FINISH FLOOR INSULATION BAFFLE SET BETWEEN R.R.5 TO MAINTAIN MIN. PAIR 5PAGE RAILING W/GLA55 PANELS STEEL BEAM REFER TO OUT'BACK EX1576 ROOFING 15HFATHINC + 57RUGTURAL DW65 FOR ® RIDGE TO PROMOTE AIR FLOW THRV + ADDTL INFO. RIDGE VENT. EXI576 RR5 TO REMAIN LINE OF FIN15H FLOOR EXTEND R.R5 OUT Pl?TH BL06KIN6, IF REQD TO PROVIDE SUITABLE DECORATIVE COLUMN CLEARANCE FOR INSULATION WITH AIR STEEL BEAM REFER TO 57RI/G7UR.4L DWG 5 FOR ADD'TL INFO. 5PAGE NEW 2"RI6I0 IN56LATION BD. SET PROP05ED CURVED BEAM TO BETWEEN EXI5TIN5 R.R.5 TIGHT AT CON6TRU5T NEW BROW DORMER. MOISTURE BARRIER. REFER TO 5TR/GTURAL DW55 FOR 3 ADD'TL INFO. FINISH OVER NEW I/2"GYP. BD. WITH NEW I/2"GYP. BD. GEEING -4.07 PROP05ED 2X12 R.R. V1/ EXISTING TRUSS TO BE GLEANED, R-306 INSULATION --_________________________\--- + PREPARED, OIL RUBBED TO + DE5/RED FINISH ` i + _ BOTTOM OF GJ=ILlN�7 I PROPOSED RAMP WITH 6LA55 PANEL TA /L / GUARD5 AND HANDRAILS A5 PER MFR. ' 5PE65 AND W.5 CODE REFER TO i i 5TRUCWR4L5 OR ADD'TL INFO SCALE _ l" _ PO" SCALE = P _ l'-0' i 1/2"GYP. BD. FINISH CEILING MEZZ*1NE l I/2"HAT CHANNELS ® l6"DG CONNECTOR 4.(�4"GON6. SLAB VY/M7L. DECKING i i -;EX(5filNG G.J TO REMAIN. NEW 2X12 F.J. TO BE TOP OF SECOND FLOOR i 515TERED. = G I LINE OF FIN, FLOOR ' ` FANVAVVvW PROP05ED EXTERIOR 5TEEL 5EAM5 REFER TO 5TRUGTURAL ' TO DETAIL5 FOR LINE OF FINISH FLOOR ' � ` RDD'T[.EXIT 5 AINFO.IRS REFER DWGS FOR ADD'TL INFO i t - ❑� ❑❑❑ ❑❑ ❑[1❑ I ti- i O ED CIRC. TO 5TEEL BEAM REFER TO STRUG NRAL + i LEI m ' LIE]+ J LIDT I INFO.DWGS FOR ADOTL INFO, ' I EXISTING F ❑ ❑❑ + TOP OF FIRST FLOOR /EST. ; TO REMAIN ' DROPPED SOFFIT I i � � l 1/2"HAT CHANNELS ® 16'OG. I � ° ° EXl5T'6 CRAWL I/2"GYP, BD. GEEING p PROPOSED FOUNDATION � '� �� 5PAGE WALL$AND FOOTINGS ' REFER TO 5TRUCTURAL HG BATH 9 hlA(L Y HG BATH _ DW55 FOR ADD'TL INFO. L�6 TA IL T /L SCALE = P_ l'-O" TOP OF CELLAR FLOOR I I C ` -- ` i NEW GONG, SLAB. REFER TO 5TR,U'TURAL DW65 FOR ADD'TL INFO. 7 \ SCALE = I/4��N EX15TIN6 TRU55 WORK TO BE 2 REVEALED AND FIN15HEO IN 4a5 PLACE A5 PER ARCHITECT ------ ' ' 2 -4.07 ________ EXISTING 2X12 R.R. I i PROP05EDMILLWORK DECORATIVE TRIM DIRE C BOTTOM OF CEILING STYLE PERR ARCHITECTS _ ® 5ELEG7/ON 5EE DE7AlL5. _7571145 TIMBER- COLUMN TO M ® PROF05ED RAMPWITH 6LA55 PANEL GUARDS AND HANDRAIL5 A5 PER MFR, 5PE65 AND NY5 GODS. REFER TO PROPOSED EEL BEAM REP / I 5TRUGTURAL5 FOR ADO'TL INFO (TYPICAU. FER TO I i LOCAL g STRUCTURAL W65 OR H/STORY cos GALLERY MEZZANINE ADD'rL INFO. ry ROOM CONNECTOR Q ' o / PROPosED PROPOSED TOP OF LOFT PLAN PROA95ED / / / / / j - / / j GONG. 5LAB READ/NG ; GONG. SLAB ON i / DECKING. '- - '-` (EL. + I'-IO-I/2" V.LFJ(EXIST) i METAL DECKING v / / �/ ON METAL i _________-- AREA TOP OF 5EGOND FLOOR TOP OF SECOND FLOOR / __ _ 1 __________________ I L � EX15TIN6 F.J. O TO REMAIN s - 6HlLDRENS SK ED R . A 516,G BD. ON i j ROOM TAIL5 FOR _--_ -`'A4 15/d" TCHANNEL5. ro OTT INFO., ------G/RGULArION----- ------ PROGRAMM/N6 TOP OF FIR57' FLOOR - O ` ---------------------- ------------------------------------------ TOP OF FIR5T FLOOR N TOP OF CELLAR FLOOR PROVIDE(2)LAYERS 5/B" TYPE 'X" �` �i(EL. - l2'-6" VIE) GYP BD. ON l 5/b"HAT GHANNEL5 4 FA57ENED TO UNDERSIDE OF EXISTING STRUCTURE TO REMAIK 4 ' © NEW A.G.T CEILING. i PROPOSED 5TEEL BEAM ry -446 (7YPIGAL). REFER TO MEGHANIGAL/57"ORAGE 5TR 16TURAL DIN65 FOR 4 ADDTL INFO. MULTI PUNCTION RM. HALLWAY WORK 5PAGE PROPOSED FOUNDATION ' N&L5 AND F007IN55. REFER TO 5TRI/GTURAL OW65 FOR ADD'TL INFO. TOP OF CELLAR FLOOR I I PROPOSED REFER T AND NEW GONG 5LAB. FROP05ED COLUMN5 AND \` i FOOTING. REFER TO REFER O 5TRU6TU INFO FOOTINGS(TYPICAL). �`-----------' AOV'TLUINF DWGS FOR DWGS FOR ADD'TL INFO. ADD'TL INFO. REFER TO 5TRUG7U24L DW65 FOR ADDTL INFO. SCALE = I/4"= I'-0" SEAL: REVISIONS/SUBMISSIONS DRAWING TITLE: SgF A,qc DATE: DESCRIPTION MA&M VAe MRWMG 2R0PQfL1)-/ECTI0/1f topirca rsvinwii At aT Na 029 5 'f P yOP CAD FILE NAME: OF NE`N /A 194_A-4.05 CONSULTANT. PROJECT TITLE: DATE: NSA PROJE «. �emschick Silverman Architects P-C. CT FLOOR PLAA noRTri ..the business oFARCHITECTURE." CMAM AM is 1 ���,� �� Design and Consulting Services PROPOff_D ADDITIOtVf A/VD ALTERATIOTVf: fEPf. 18. 2006 /VVA 05-1194 735 Deerfoot Path, Cutchogue, New York 11935 27550 MAI/1 ROAD Phone : 631-734-7007 Fax : 631-734-7347 20 Hlgh street, Huntington, Now York CUTCHOGUE, /1EW YORK 119M SCALE: DRAWING NO.: http://www.ns-arch.com /TOTED A A516 421-0431 Fax (516) 421-0565 DISTRICT. SECTION. BLOCK: LOT: DRAWN BY, �� /I •O� P COPYRGHT AD6I SCNCK siLvElw,AN ARCNrECTs rc NO ZTFI 1000 100 06 2.2 EL I l NEW WINDOW REFER TO WINDOW 56HEDULE FOR ADDTL INFO. 4"GONG. SLAB W/MTL. DEGKIN6 NEH ROOF RAF7ER5. REFER TO 5TROOMRAL5 FOR ADDTL INFO. LINE OF FIN. FLOOR NEW R-36C BATT IN50LATICK 5TEEL BEAM-5 REFER TO STRUCTURAL DW65 FOR ADDTL INFO. I \ \ I \ i \ \ NEW MICRO-LAM FRAMING NEW 5TEEL BEAM REFER TO REFER TO \ 5TRUCTURAL5 FOR ADDTL INFO. \ STRUG77/RALS FOR ADDTL INFO. + + NEW WB 5TEEL FRAMING. REFER TO \ + + 5TRZTURAL 9W65 DD FOR ATL INFO. PROVIDE BL06KINC A5 REQD. \ \ I I \ \ \ NEW ROOF RAFTERS. REFER TO \ 5TRUGRURAL5 FOR ADDTL INFO. \ \ NEW R-366 GATT IN51/LATION. \ 15/B"HAT GHANNELS® I6'OG. OO OO I I OO Oo d NEW 57EEL COLUMN. REFER TO 5TRXT11RAL5 FOR ADDTL INFO. \ I I I/2"6YP. BD. FINISH CEILING I I \ �, SCALE = I-1/2" = I'-O" B EXISTING TRU55 hORK TO BE REVEALED AND FINISHED IN -4.07 PLACE A5 PER ARCHITEOT PR0P05ED 2" --_________________ ------------------ �. RI61D INSULATION., EXISTING 2X12 R.R. r �� 1 1 PROPOSED 2XIO R.R. W/ i R-30G INSULATION. 1 I � BOTTOM OF CEILING I BOTTOM OF CEILING ; 1 _ ' - EXISTING NERVY TIMBER COLUMN TO REMAIN 4.06 'ti i NEW SOFFIT. REFER NON-PIG m m •`'< ,,, GALLERY DETAILS FOR ADDTL INFO. °- NEW 2X12 R.R. _ I N i PROPOSED MILLWORK. s 9 ry ZDEGORATIVE TRIM TYPE $ I STYLE PER ARCHITECTS 5ELE6TION. 6EEDETAIL5. TOP OF 5E60ND FLOOR _ ` _ ,f TOP OF SECOND FLOOR -- ------------------------------- 1 PROPOSED MILLWORK. I/2"GYP BD. ON �` % 4 �OP05ED STEEL BEAM //2" 5YP BE. ON I' DECORATIVE TRIM TYPE ! 15/B"HAT GHANNELS. 15/8"HAT CHANNELS. STYLE PER E T R I f T T F 17RL16ALL REFER TO h 5T T T E FON. SEE 4,T 55T 5. �L2 UTL INFO. DWGS FOR - &EX /MEDIA ° GHILDREN'S FROP05ED 5TEEL BEAM m / PIG 1 (T1'PIGAL). REFER TO PROPOSED 5TRU GONG. GTI/RAL DW65 FOR ROOM ADD INFO. EXl5TIN6 F.J.L SLAB ON i TO RE14AIN TOP OF FIRST FLOOR METAL DEGKIN6 FROP05ED DUG TWORK TOP OF FIRST FLOOR (TYPICAL. REFER TO i I MECHANICAL DP 65 FOR 1 1 ADDTL INFO. 1 1 PROPOSED-TFFIT. I/2"GYP BE,, ON m- m i-u I l5/B"HAT GHANNEL5. J„mam �mti m-- m NEW A.C.T. CEILING. � " N � 1 4 I 1 4 I " � MULTI-PUNGT/ON � Q {NORK SPACE m PROP05ED COLUMN AD PROPOSED COLUMNS AND FOOTING REFER TO 1 57RUGTURAL DW65 FOR FOOTINGS(TYPICAL 1 TOP OF CELLAR FLOOR TOP OF CELLAR FLOOR J mlllLl Dw�s�oRSaD�7 NFL. SSW /¢I ADDTL INFO. 1 of 1 1 ----------------------------------------- SEAL �SRED Aq REVISIONS/SUBMISSIONS DRAWING TITLE o9 sm] YUM R1Rlcm PROPOfEDfOCTI0/if n � 10/]VC6 RCVll%1M1 N I � A N e •k. �`• _ CAD FILE NAME: //1194_A-4.06 PROJECT TITLE: DATE: NSA PROJECT •: CONSULTANT. FLOOR P NOQTFi PROPO/ED ADDITIO/if A/11) ALTERATIO/1f: fEPT. 18, 2006 /1/A 05-1194 Nemschick Silverman Architects P-c. laz "...the business of ARCHITECTURE." W(5,16) NO An Mlrml pa�l�, (••O• 2755 M CUTCIIOGUE, /1EW YORI( 11935 SCALE: DRAWING NO: Design and Consulting Services _ 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, New York �/ NOTED /A\ /A' Phone : 631-734-7007 Fax : 631-734-7347 421-0451 Fax (516) 421-0569 DISTRICT. SECTION. BLOCK'. LOT: DRAWN BY: /�—T •O b http://www.ns-arch.com vp coavmcnr sons rEnnscncK 91LVERMnN nRCHrECTs Rc. NO 1000 109 06 22 NOTE: NEW GONnNuaU5 ROOF VENT REFER TO 5TRU6TURAL DW65 FOR ALL INFO RELATED TO CODE READ REVERSE GABLE,NEW CEDAR ROOFING. ALL TRIM AND 5DING TO STRAPPING AND SHEAR WALLS, ETC. MAT5PEXI5TIN6. (VLF) NEW 2"RI6ID INSULATION MA7GN EXISTING GABLE END TRIM/PROFILE5. NEW R-21 GATT INSULATION NEW I'Xb"RAKE BD SET OFF EXTERIOR WALL FACE W/PX2"FURFM6 57RIP5 SPA6ED AT I6"O.G. W/INLET SCREEN FOR VENTED SOFFIT EX15T#6 2"X12"ROOF RAFTERS. NEW 2X12 R.R. ® I6"0.6. ON RADIUS REFER TO 5TRZ7URAL5 FOR NEW REVERSE GABLE FRAMING. REFER WITH R-30C BAIT INSULATION. EXTENT OF WORK. TO 5TRUGTURAL5 FOR AD9'721 INFO. NEW CONGEALED COPPER FLASHING PROPOSED DU67WORK REFER TO I NEW 1/4"PAINT&RACE PLYWOOD SOFFIT SANDED NEW(2)LAYER5 11W APA RATED AT ROOF INTER5E6 TION. MECHANICAL DINGS FOR ADD7L ( l SIDE AND PAINTED 70 MATCH EXl5TIN6. PLYWOOD WITH 30#BUILDING FELT I OVER NEW 5TANDl & SEAM COPP R INFO, ROOFING OVER EYEBROW NEW CURVED TUBE STEEL. REFER TO ( NEW EXTERIOR WALL MEW DORMER) 57R1/57TIRAL DORMER. VERIFY STRUCIRAL DWG,FOR ADD'TL INFO. -(2)2'X6" TOP FLATE5 RADIUS W/5TRUGTURAL DRAWINGS. -2'X6"W0OD 5TU95 a 16"O.G. -CLEAR CEDAR BEVELED CLAP BOARD 51PINC TO MATCH EX15TIN6 NEW(2)LAYER5 3/4"APA RATED i NEW R-396 BATT 1N5ULAT10N SET PROFILE d EXPOSURE PLYWOOD BOX BEAM B I BETWEEN J015T5/R4F7ER5. ILDIN&PAPER -112"COX WOOD 5HEATHIN6 NEW(4)LAYERS 3/4"PLYWGOD i NEW 1/2"GYP.j BD. FINISHED -2'X6"SOLE PLATE TOP PLATE NEW 112"GYP. BD. FIN15HED 6EILIN6.-R-21 DATT INSULATION WITH VAPOR CEILING. BARRIER NEW CURVED TUBE 5TEEL. REFER TO -112'GYPSUM WALLBOARD 5TRUCTURAL DW65 FOR ADD'TL INFO, NEW PX2"FURRING STRIPS® EACH NEW R-36C BATT INSULATION SET R.R. EXTENf+-+- -WALL FINISH AS PER SCHEDULE UWER5IDEDOF URVED TUBE STEEL BETWEEN RAFTERS FOR ENTIRE .BOTTOM OF ROOF TRUSSES NEW(2)2'XIO"HEADER FOR GYP. BD. BOX CUT NEW NEW(2)LAYERS 3/4"FLYViroD I X CLEAR PINE Nm TRIM, PRIMED I ® lO" AND PAINTED TRIM 60LOR TO MATCH WALLBOARD. BACK FIST TO BEND i O.C. AROUND CURVE. EXISTING -TYPICAL FOR ALL WINDOWS NEW(2)LAYERS 1/4"GYPSUM 1 STRAPS-FULL WIDTH OF MDE a 6" / TO CURVED BEAM RADIUS. i NEW 605TOM INFAILA TED,5AFETY 6LA55 NEW(2)2'Xl2"FLUSH HEADER WINDOW BY "MARVIN". REFER TO � WINDOW SCHEDULE FOR ADD'TL INFO, i' i EXISTING TRIM TO REMAIN NEW R-21 GATT INSULATION NEW WINDOW BY 'MARVIN" i i EXISTING FRAMING TO REMAIN ROOF BEYOND EX15TIN6 EXTERIOR F/NI5HE5 TO i REMAIN NEW 2'X6"SILL PLATE LAMINATED 5AFETY&LA55 W/TINTED NEW EXTERIOR WALL MEW DORMER/ i EXI57ING INSULATION TO REMAIN INTERLAYER SET WITHIN POWDER -(2)2'' TO PLATES / COATED ALUMINUM FRAME -CLEAR i LINE OF FINISHED FLOOR CLAP BARD SIDI BEVELED NG TO MATCHEXI57ING PROFILE d EXPOSURE -13#BUILDING PAPER PROVIDE NEW 4'X4"POURED CONG. -1/2"GDX PLY",9 5HEATHIN6 CURB AT FLOOR E06E. PREPARE -2 X(7'SOLE PLATE FOR APPLICATION OF NEW CARPET -R-2/BATT INSULATION WITH VAPOR i' i NEW WALL BASE SEE FIN15H NEW 2 I/2"GONG. SLAB WITH l 1/2" PROVIDE 5/0"RE6LE7 REVEAL W TILE FINISH BARRIER i i SCHEDULE FOR ADD'71. INFO. / NEW 2 1/2"60NC. SLAB. REFER TO BLOCK DECKING. REFER TO INTEGRAL SPACKLE FLANGE FOR TAPED -112"GYFS')M WALLBOARD i' i' 5TRZ7URAL DW55 FOR ADOT2 INFO. EDGE NEW CONTINUO/.,BENT PLATE POUR STOP. _LyALL FINISH A5 PER SCHEDULE i NEW 3/4"APA RATED FLYh1OOD S'JBFLOORINB STRI/GTURALS FOR ADDT'L INFO. REFER TO STRUCTURAL DRAWIN65 FOR STEP POUR STOP IN TO ACCOMMODATE ADD'TL INFO. BLAZING SHOE TO BEAR DIRECTLY ON 37FEL BEAM. NEW STEEL BEAM REFER TO 57RUGNRAL DRAWINGS FOR ADD'TL INFO. + TOP OF SECOND FLOOR WRAP END OF FLOOR CONSTRUCTION W® 8 /O + + ALUM BREAK METAL, POWDER COAT WHITE + I DTTOM OF BOXED BEAM NEW I-5/8"HAT 6HANNELS® I6 NEW 5TEEL BEAM REFER TO T,_�r�� EXISTING(3J 2 XIO"HEADER STRUCTURAL DWGS FOR,ADD'TL INFO, NEW W6 FRAMING. REFER TO NEW HEADER. REFER TO STRUCTURAL TO REMAIN NEW 112"GYP. BD. FIN15HED 6EILIN6, 1 STRUCTURAL DW65 FOR ADD'TL INFO. I I DRAWIN55 FOR AODTL INFO. 1 TYPICAL. NEW 5TEEL BEAM REFER TO NEW W"GYP. BD. FIN15HED 6EILIN6. 1 1/4"PAINT GRADE PLYWYJOD SOFFIT, STRUCTURAL DW65 FOR A9071. NEW l"X TRIM S'IRRO/ND SANDED 1510E AND PAINTED TO INFO. MATCH EX15TIN6. -TYPICAL WHERE NOTED, NEW 1-5/8"HAT CHANNELS a l6"O.G. 1 I I NEW 2 XI2"F.J. ® I6"O.G. Wl7H R-30 EXISTING EXTERIOR DOOR TO II 1 I I REMAIN EXl5TIN6(3J 2°YIO°HEADER TT SET IN F.J. FOR TIRE LENBTH REFER TO 5TRUCNRAL EX15TIN EXTERIOR WALL TO REMAIN. TO REMAIN DW65 FOR ADD7L INFO. 6 11 j 11 LINE OF NEW STRUCTURAL I I LINE OF EX15TIN6 EXT WALL COLUMN ALONG EXTERIOR BEYOND. LINE OF NEW 5TRLCTURAL COLUMN I WALL. REFER TO STRUCTURAL ALONG EXTERIOR WALL. REFER TO I � I DPT65 FOR A0071. INFO. I I 5TRL167VRAL 12W65 FOR ADD'TL INFO. EXISTING WINDOW TO REMAIN I I FL I I I I I I I I I I I I I I i l I I I I I I I I I I I I 11 I I PROVIDE 5TEEL CLIPS W/SLOT E45TINO WOOD SILL TO REMAIN ANCHORS TO FLOOR SLAB. REFER TO EX15TIN6 FLOOR J015T TO REMAIN STRUCTURAL DRAWINGS FOR ADD'TL 1 NEW FLOOR REGISTER. REFER TO INFO. MECHANICAL DW65 FOR A9071. INFO. 1 LINE OF NEW FINISHED FLOOR NEW I2"BOND BEAM AT TOP OF WALL OVER EX15TIN6 314"SB-FLOOR. LINE OF NEW FINISHED FLOOR EXISTING GONG. STAIR W/REINF. AS PER STRUCTURAL DW65. NEW STEEL BEAM REFER TOI I I STRUCTURAL O4Y6,FOR ADD7L INFO. I I TOP OF FIR5T FLOOR uull EXISTING FLOOR JOISTS NEW 12"5M.. BLOCK FILLED SOLID + + TO REMAIN 1 a + + NEW 4"STD. BLOCK WITH 6"57D. BLOCK BACKUP BOTH + + + FILLED SOLID, PROVIDE FAORI6 FLASHING OVER 8"BLOCK + EXISTING STONE VENEER NEW STEEL BEAM. REFER TO DOWN BETWEEN AND OUT FOUNDATION WALL AT 4"BET. + 70 REMAIN NEW GONG. PORGH/57EF5/RAMP. + STRUCTURAL CW65 FOR CARRY OVER FDN WATERPROOFINGW/MIN. 6"OVERLAY- - REFER TO PLANS d 57R1/CTURALS ADD7L INFO. FOR ADD'TL INFO. TYPICAL AROUND PERIMETER, 1 1 1 EX15TIN6 STEEL BEAM ry _ NEW ACT 6EILIN6. REFER TO FINISH w = SCHEDULE FOR ADD'TL INFO NEW LAYER OF FABRIC FLA5HIN6/ I I l �- �_ _ � ASHING AT I I _ _ ._ � ' i;, � � ALUMINUMR V. GRADE . ,i DUG WORK 5E7/N SOFFIT WITH T, ��'�� I NEW T �� 3`-=�5 Ohl 'i" "" WALL REGI57ER. REFER TO INTERSECTION OF FLOOR WOOD NARlF5J z I it I U, L . �S 1 L I 2 -fi lI 11-i fi 1I ME-GNANIGAL DW65 FOR ADOTL INFO, e FRAMING AND NEW GONG. PORCH NEW 6YF3UM WALLBOARD 6EILIN6 d APPROXIMATE 6RADE LINE STRUCTURAL SUPPORT 5Y5TEX CARRY UNDER DOOR SILL d DOWN I I REFER TO SPEGIFlGA7/ON5 AND ) NEW SCHEDULE CEILING A5 PER FINISH I I DETAILS FOR ADD'TL INFO. I SGHEWLEWALL ASSOCIATED L�i SHELF d FDN WALL. 1 _ NEW 3 5/B"22 BA. SM. SNDS ® W 0.6. TEE5, MAIN5, 5UPPORT5, HE5, WALL R Q INLINEWWALL BEYOND TO FRAME AN5LE, ETC1ON FOR z 1 HANGERS FOR SOFFIT ANGLE, ETC. FOR THE COMPLETE NEW I I/2"RIGID INSULATION REFER I I O TO DETAILS FOR ADD'TL INFO. I I I I I I I I 1 I I I I I NEW I AL HH RE N0UND �n ' I EXISTING FURRING TO REMAIN -------- PA2 I 1 -TTPIGAL WHERE NOTED. O 1 I TGH/PREPARE FOR NEW FINISHES. v I I NEW GONG. FOUNDATION WALL AND Foo71N6. REFER TO 57RU1571R,AL NEW DAMPROOFIN6 OVER INSIDE FACE / 0455 FOR APP TL INFO. OF FDN WALL TO BE KARNAK #90.3 OR N 1 I APPROVED EQ. EX15TIN6 GONG. FOUNDATION WALL 11 WN&X8"5TRU6. 5TEEL COLUMN REFER TO d FOOTIN55. 5TRZTURAL5 FOR AOD'TL INFO. 15/6"20 CA. 57EEL 5TUD5 o 16"0.6. W✓I I/1" 1 11 1 11 11 R1610 INSULATION BETWEEN 5/6"6YPS)M WALL I \ FINISH AS PER FINISH SCHEDULE I NEW GONG. SLAB. SEE STRUGTURALS NEW WATER PROOFING, KARNAK #b6 OR FOR ADD'TL INFO. I \ APPROVED EQUAL, GOAT OVER FOOTINB/WALL 1 I I INTERSECTION d DOWN TOE OF FRONT EDGE 1 1 \ NEW CERAMIC TILE FLOORIN6, SEE 1 FINISH 56HEL%F FOR A00'71. INFO. NEW WALL BASE- REFER 70 FINISH SCHEDULE 1 NEW DAMPROOFING OVER INSIDE FAGS I OF FDN WALL TO BE KARNAK #9O3 OR 1 I I NEW WALL BA55 SEE FIN15H NEW NON-SHRINK&ROUT 11 11 APPROVED EQ. LINE OF FINl5HED FLOOR EX15TIN6 6ON6. SLAB. TO REMAIN SCHEDULE FOR ADD'TL INFO. 1 LINE OF NEW FIN15HED FLOOR I I 1 EXI57'6 FTC. AND FDN. TO REMAIN. I TOP OF BASEMENT15? _ ® -ll'-O I/2" r--1----------- -III- ITi ;�111 I- _ 11 J_ I I NEW 4"PERFORATED DRAIN NOTE TILE SET IN 12"CRUSHED REMOVE WATER TABLE AND EX15TIN6 5IDIN6 TO ACCOMMODATE SHORING/ 5TONE BED. PIPE TOORYWELL. RAISIN65TRU6TURETOFA6ILITATEFDN/EXCAVATIONWORK. RE576REW/NEM l l MA7ERIAL5 TO MATCH EXl5TIN6. F/NI5H NEW MATERIALS TO MATCH EXl5TIN6. G = = = 3/4" = I'-O" SCALE = 3/4"= I'-O" �� a ;m� S o + F REVISIONS/SUBMISSIONS: DRAWING TITLE: SCALE 314' I'-O" J SCALE DATE, DESCRIPTION e eT n'I_ -� oznem viurvroaPrttu� PROPQ/'EDWALL,/'ECJ1O/1f R ioi�im acvvlon i N -� CAD FILE NAME: //1194 A-4.07 PROJECT TITLE, DATE' NSA PROJECT ». CONSULTANT: Nemschick Silverman Architects P-C. FLOORP 27550M /1ROATIO/iJA/1DALTERATIOy/: '...the business ofARCHITECTURE' CAPAW AM P I pO�N. P,Q ,/'EPT. 16, 2006 /1,/'A OS-1194 Design and Consulting Services 27550 MAIN ROAD SCALE DRAWING NO.: 735 Deerfoot Path, Cutcho ue, New York 11935 GUTGFIOGUE, /1�W YORK 11935 9 20 High Street, Huntington, New York f�/ /DOTED //�' 7 Phone : 631-734-TOOT Fax : 631-734-7347 \\�J�JJ(5116) 421-0451 Fax (s16) 421-056s y- .0 / DISTRICT SECTION: BLOCK. LOT: DRAWN BY'. http://www.ns-arch.00m 0 CCPYNGHT 2W6 PEMSCHICCN SI@ RMAN ARC47CTS PC, /10 in 1000 109 O6 2.2 L� H a RAILING WITH 6LA55 PANEL IN5ERT5. REFER TO 5ECTION5 FOR ADD'TL INFO. b, EXISTING DOOR AND GLAZING TO REMAIN PROTECT ry /� DURIN5 6016TRUCTION NEW 6IRCULATION DESK. REFER TO 5HEET 5.04 FOR All A007-L INFO. NEW YA DIRECTOR AND CIRCULATION DESK, REFER TO SHEET 5.04 FOR ADD'TL INFO. NEW ADA A6GE55173LE DRINKlN6 FOUNTAIN 5ET® 36` EXISTING GLAZING TO REMAIN PROTECT DURING m A.FF. - REFER TO FLOOR PLAN FOR ADD'TL INFO. CON57RUCTION a N ❑ OPEN TO BEYOND p O ~ � Q o o m (T` fELL A7101V A �l ClILADON 10 DDT TlC/\l AT Cl CU TlC 10 PROPOSED DOOR TO BE 5ELECTED BY ARCHITECT REFER TO DOOR 55HEDULE FRGP05ED LIGHT FIXTURE 5HEET A-1.01 FOR ADD'TL REFER TO ENGINEERING DWG 5 INFO. (TYP) FOR ADOTL INFO. (TYP) PROP05ED LIGHT FIXTURE. REFER TO ENGINEERING DW65 SELECTED BYARC ARCHIIEGT PROPOSED E FOR ADD'TL INFo. (TYP) REFER TO WINDOW SCHEDULE ON 5HEET A-1.0/FOR ADD'TL INFO. (TYP) ro j ro , Y / m NEW TINTED BUTT-6LAZED 6LA55 70 8E SELECTED BY / \` ARCHITECT.T--5T PROPOSED P TEMPERED ELEVATION 'A" WTT-GLAZING, REFER To ELEVATION B DETAIL5 FOR ADDTL INFO. ry ry FROP05ED WINDOPIS TO BE m 5EL55TED BYAR6HITEGL L (Tyr) L — — — _ N ry 0 PAINT WALL A5 PER FIN15H 5GHEDULE. REFER 70 SHEET v P A-L02 FOR ADDTL INFO. OPEN TO ENTRY m - IT FOYER ry 7� u� m v ELEVATION "C" ELEVATION V' SEAL: K�P¢W ARCy� REVISIONS/SUBMISSIONS DRAWING TITLE: DATE: DESCRIPTION: j >" * W']I VAN' RORICVIG CIRCULATION AREA d * .0 DIRECTOR/'OFFICE ELEVATION,/' la E _ CAD FILE NAME CONSULTANT. 1194_A-5.01 Nemschick Silverman Architects P.c. FLOOR P NORTM PROJECT TITLE DATE. NSA PROJECT a. "...the business of ARCHITECTURE." p�µp Design and of pppgSp PI _ _ PROPOTED ADDITION)AND ALTERATIO/YJ: JUT. 18. 2000 A rA 05-1194 Design and Consulting Services 27550 MAIN ROAD 735 De: 631-rfoot Path, Cutchogue, New York -7347 � 27550 AIA R NEW YORK 11935 SCALE DRAWING No.. Phone : 631-734-TOOT Fax : 631-734-7347 20 High street, Huntington, New York J � - http://www.ns-arch.com 516) 421-0451 Fax (516) 421-0565 - �- A v� v - - - - - -- AJ NOTED A DISTRICT: SECTION' BLOCK LOT: DRAWN BY: L —5 A COPMIGHT 2006 NEWHCN SLVEINIAN ARCHITECTS PC NO TM 1000 105 0(7 2.2 EL �- . 01 u PROVIDE OBSCURE WINDOW TINTING. EX1576 HINDON! TO REMAIN. PROTECT O O O �' — - DURING CON5rRU N.6 TIO O O MIRROR ® GOAT HOOK TO BE HAND DRYER MOUNTED AT 4B" s O % 50AP DISPENSER A.F.F. it p F 1 / 5 VAi q 0 m ACCE55IBLE SINK O m HC BA rH ' COORDINATE FLOOR 3'-O� s CRAB BAR 0 F.E6157ER WITH ell ME6HANZAL5. REFER 3'-O" 2 TO ME6N. DING 5 FOR _ \\ MAX TOILET _ ADD'TL INFO. O _ --_ \ Q LOVE BA5E TILE m ;y COVE BA5E TILE a TOILET TI55UE DISPENSER ELEVATION A I!FLEVA TIC,IV B ELEVATION O ELEVATION D SCALE = 1/2" = I'-O" MIRROR - __ _ GOT HOOK TO BE MOI/NTED AT 46"A.F.F. La O SOAP DISPENSER \ O NAND DRYER O O C O ® ACCESS/BLE SINK 4'-C" 6" I 1 ME 2 °�O \ MAX GRAB BARE A O o 4 O iV m TOILET T155YE COVE BA5E TILE DISPENSER TOILET MARBLE SADDLE ELEVATION A ELEVATION B ELEVATION G ELEVATION D a � � � 2„ 2„ -T HALLWAY J SCALE = 112" - I'_°" Foal mU NtFJ I — I - _- - - - - MARBLE SADDLE s MIRROR A I � HAND DRYER c 1 \ SOAP DISPENSER 6 B ® I I m ro ro m � � l A6GESSIBLE SINK 0 T � q O MENS i � � O a-o' O HC BATH GRAB BAR O MAX v I m m m 4 4 rTOILET5a E Q - - - COVE BASE TILE DISPENSER TOILET I ELEVATION A ELEVATION B ELEVATION C ELEVATION D JSCALE = I/2" _ ,'_O° F7:1 �__= UME� I N � �C, 7-f r= =1UL_ EE 5YMBOL EQUIPMENT TYPE MANUFAGTJRER MODEL NO. REMARKS OI TOILET PAPER DISPENSER BOBRICK B-4260 51IRFA6E MOUNTED a 24"AFF 0 CRAB BAR(40) BOBRICK B-5506 MOUNTED o 36"A.F.F. O CRAB BAR 06 J BOBRICK B-5006 MOUNTED o 36"AF.F. ® 50AP DISPENSER BOBRICK B-2/II MOUNTED® 42"A.F.F. 55 MIRROR BOBRI6K B 293-2436 I MOUNTED® 40"A.FF. TO BOTTOM © HAND DRYER NORLD DRYER RA #473 MOUNTED® 42"AFF. O GOAT HOOK 303RICK 3-2116 MOUNTED o 46"A.F.F. NOTES: OPERATING 6ONTROL5 OF ALL NAND DRYER5, SOAP 015PEN6ER5 AND MULTI FURF05E UNITS TO BE 42"A.F.F. PROVIDE BLOCKING FOR ALL WALL MOUNTED FIXTURE5 AND ACCE550RIE5. 6ONTRA6TOR TO VERIFY 512E5 IN FIELD. SEAL. KEREO qCy REVISIONS/SUBMISSIONS: DRAWING TITLE DATE DESCRIPTION m� +� ° mo wneioa vNDroaPtt E/1LARGED HC PUATKROOM PLAN,/', Q' ¢T * -� iaevoa r¢vinohi t + * DETAIL/ & ELEVATIONf 9T � OPT P oy .,Igv� 1 CAD FILE NAME 1194_A-5.02 CONSULTANT. PROJECT TITLE, DATE: NSA PROJECT FLOOR P /IORTf1 Nemschick Silverman Architects P.C. PROP OfLDADDITIOnfA/1DALTLRATIONf: fLPT. 18, 2006 nfA05-1194 ...the business of ARCHITECTURE." CAPANO AND PANNmI MN NOW RC. 27550 MAIN ROAD SCALE DRAWING Ni Design and Consulting Services I IT _ GUTCFiOGUL, YLW YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 ao High street, Huntington, New York Af NO Tf D rr� PhO//www. s-arrh007 Fax : 631-734-7347 (516) 471-045-1 Fax (516) 421-0565 DISTRICT' SECTION' BLOCK: LOT' DRAWN BY A-J O2 http://www.ns-arch.com p carmlcnT 2006 rvErdscHcry s+vsren+nN nncw>Ects Pc /YO Tf1 1000 109 06 2.2 EL 2'-6" �-V E ' B ip -SA3 m G -5A3 BLACK LAMINATE EDGEWI7H p E CREAM COLORED LAMINATE CREAM COLORED LAMINATE _5 INLAY INLAY. -5D3 BLACK LAMINATE EDGE WITH EDGE OF BLACK LAMINATE 2,_6„ CREAM COLOR LAMINATE INLAY. ry KEYBOARD TRAY UNDERMOUNT. N 5TYLE 70 BE 5ELE6TED. 4"WIRE FULL (TYP) A BOOK CATCH TRAY ADA GOUNTE O BOOK RE77 RN �p m o ry v N 2'-O" N UPPER AND LOWER SILENCER(7YPJ FULL DRAW EXTENSION- 50 L85. a 6"BLACK LAMINATE BASE ° 6'WOOD BASE 2'_6„ A -5.p5 (DCI�7CtAIONQKfN � 5E -ION fi/qfU CIR6UUA7l0N � �1� � 3 6T/ON 7kf� ) CIRCULATION L 5K AL J SCALE _I" SCALE = Y' = I'_O" BLACK LAMINATE EDGE ON EDGE WITH CREAM COLOR CREAM PROP05ED LAMINATE TO BE BLACK LAMINATE ON EDGE COLORED LAMINATE INLAY. 5ELE67EO BY AR6HITF6T N CHERRY VENEER PL 7W00D - 57AIN BOOK RETURN GRADE ADA ACCE55 ¢ ADA ACCESS p l 112"BLACK LAMINATE REVEAL BOOK RETURN W/ I I/2'BLACK LAMINATE REVEAL \ � ANGLED SHELF. N 3'-3" CHERRY VENEER PLYWOOD - STAIN ¢"yy/RE p)LL5 TO A0_07ABLE SHELF T // ,� I 2 ° GRADE LGHERRYVENEER m LGH ERR Y VENEER CHERRY VENEER PLYWOOD BE SFLE-6T. BY PLYWOOD - 5TAIN PLYWOOD- 5TAIN ry CHERRY VENEER _ ARCHITECT GRADE GRADE PL YAbOD - 5T4IN ; ro GRADE �v n l/4"REVEAL FULL DRAW EXT 50 LBS, ry L0GK5 b"WOOD BASE 6"BLACK LAMINATE BA5E 6"BLACK a - LAMINATE WOOD - 3A5E 7/ON L 050 �FA PVP� y�e P05T BEYOND GENERAL NOTE: FROP05ED LAMINATE I l/B°PLASTIC LAMINATE 70P 70 MA7GH EXI5T'6 5HELYIN6 70 BE SELECTED BY ARCHITECT. 314"PLASTIC LAMINATE 5IDE5 TO MATCH EX15T6 58EL VING 4 z l 112"REVEAL MILLWORK BE INSTALLED AND FURNISHED BY G.G. SEE PLAN FOR DIMENSIONS OF MILLWORK SHELVING, (7YPI6ALI 6ONTIAUX5 WOOD CLEAT5 FOR MOUNTING N DE5K TOP. ry WALL BEYOND �31a" �l�N TNIRU MI LAORK @ 'A L�19 6 TOR AORK �0R _-OH 4� 1/ 5 � SCALE = I" = P-O" SEA ytE w. /v, REVISIONS/SUBMISSIONS DRAWING TITLE: FnA DATE: DESMIPTICN mllE yjue MR m MILLWORK PLM P. DI=TA0./ 6 ELEVATIO/If r S9 0290A6 CQ- OF CAD FILE NAME: 1194 A-5.05 PROJECT TITLE: DATE: NSA PROJECT x: CONSULTANT: FLOOR P /IORZTH PROPOJED ADDITIO/1J A/1D ALTERATIO/If.. ,/EPi. 1 S, 2006 IVA 05-1194 Nemschick Silverman Architects P.c. 27550 MAIN ROAD SCALE. DRAWING No: "...the business of ARCHITECTURE." wcr]) NO MO PAIIt(�1 OIOMmI�. P.C. esign and Consulting Services GUTGf10GUE, /YEW YORK 11935 735 Deerfoot Path, Cutchogue, New York 11935 0 High 5troet, Huntington, New York A,/ AOTID {/.A.\\ /�'\) Phone : 631-734-7007 Fax : 631-734-7347 421-0459 Pax (516) 421-0565 /may-5 .O5 http://www.ns-arch.com DISTRICT. SECTION: BLOCK. LOT: DRAWN BY. CCPYWW X061£MSCHICIf HLVLIEMNN PRCHIECTS PC /10 Th1 1000 109 06 2.2 EL u ry I, 11112, 3/4„ ry Il l/ 3/4" N 112 Ta/4" ry L ll 13/4° _5.0 L ll ' Ir FlN15HED CEILING SEE FIN15HE0 CEILING SEE FIN) PLAN EILIN6 SEE XAGT H7. FINISHED CEILING SEE GL6 PLAN EXACT HT _ CLG. PLAN EXACT HT I'-3" 4'-6" 1'-3' GLG. PLAN EXACT H7. n v BLOCKING A5 \ BLOCKING R5 RERED AS BLOCKING AS REQUIRED REQUIRED REQUIRED 'v RD.k/5TRBLE MDF AD-V57ABLE MDF v AD.k'ISTABLE MDF o SHELVTABLE MDF _ m SHELVES W/FLAST. LAM. n m 5HELVE5 lW FLA5T. LAM ON ALL SIDES PROVIDE SL N SHELVES tW PLAST LAM ry rn ON ALL SIDES PROVIDE 5L N ry SHELVES 1P 5 A5TFRO LAM N m �TL PIN5 SIDES (4 PER SHEDE)ST. w ON ALL SIDES PROVIDE ST. N 5TL. PINS(4 PER SHELF) 5R. PINS (4 PER SHELF) STL. PINS (4 PER SHELF)OD CONTINUOUS WOOD !^ CONTINUOUS WOOD CONTINUOUS WOOD CLEAT6ONTIS FORMOUNTING CLEATS FOR MOUNTING CLEATS FOR MOUNTING UPPER CABINETS NTIN5 UPPER CABINETS UPPER GABINET5(YYP) UPPER CABINt75(YYPJ 2„ 2„ 2„ 2„ 2" 2" in 2„ 2„ m ^� 4"HI6H 314" THICK m 4"HIGH 3/4" THICK 4"HIGN 314" THICK 4"HIGH 3/4" THICK PLA5. LAM MDF 2' / ;a PLA5. LAM MDF 2,_p, _ `p PLA5. LAM MDF a BACK5PLA5H P FLATS. LAM. MDF BACK5PLA5H v BACK5PLA5H N BACK5PLA5H N " - n LAMINATED ry LAMINATED MDF 'N COUNTERTOP ry LAMINATED MDF N 6GUNTER70P - v LAMINATED MOF `v COUNTERTOP v v COUNTERTOP I'-O" 3'-O" I'-O" LAMINATED R COUNTERTOP II/2" THK. 5TRAIGHT 9,_p" l'-O" `4 FULL EXTENSION - - - - MDF VERTICAL a �o DRAWER SLIDES(TrnJ - - - I I/4"CONTINUOU5 SUPPORTS TUBULAR 57EEL I" 3/4" m ALUMINUM M AN&OUS APPLIANCE(05GU 6, ALUMINUM AN6LE Ea. Bp SD O I 4 ¢ 4"WIRE POLL (T7P) REMOVABLE 314" '�+ CONGEALED NINCE N N PLA5. LAM MDF N (rYPJ lI V � �l�l '� 1 AT �)fl N RAL I " 5L�I A AREA PANEL g„ 4"RUBBER BASE 4'RUBBER BASE 4"RUBBER BA5E SCALE = r = l'-O" FIN. FLOOR SEE SCHEDULE FORFADDR SEFO SCHEME FOR A50 rL INFO. FIN FLOOR SEE SCHEDULE FIN. FLOOR SEE SCHEDULE FOR Ann'71 WFn FOR AnnTI INFn I / filCN A MILL AORK �5 CT/0N A MIS XOR -5 CTlCN A MIL AORKC filCN A MIL�LAOR I" I'O' = - 2,_q„ 2_6„ N 1I/2' 1�_p�� (-ll/T' BLACK LAMINATE EDGE i BLACK LAMINATE E06E WITH N BLACK LAMINATE EDC _ CREAM COLOR LAMINATE CREAM COLOR LAMINATE INL, BLACK LAMINATE ED6E WITH CREAM COLOR LAMIM CREAM COLOR LAMINATE INLAY. m CHERRY VENEER PLY6 N CHERRY VENEER PLYWOC CHERRY VENEER PLYWOOD - `0 GRADE O GRADE O GRADE GHEE VENEER PLYWOOD - STAIN N 11/2'BLACK LAMINATE R I I/2'BLACK LAMINATE RE✓EI l 1/2'BLACK LAMINAT! w I I/2'BLACK LAMINATE REVEAL SHELLAMINATED a I N O r Q O O N N I"DIA. CHROME N ROD lW HANGER END BRACKETS. 6"BLACK LAMINATE 6"BLACK LAMINATE 6"BLACK LAMINATE 41fOOD BASE 6"BLACK LAMINATE I'X 4"WD. CLEAT WOOD BASE WOOD BASE WOOD BA55 PAINTED TO MATCH a m GL05ET INTERIOR EX/5TIN6 PAR _ _ _ _ Ml � V �l�N Ml l e � �/ �l�N �AL ORK< L 1/A 710N � filON AT M L�XOR 5 6 7l0N A 7 6L OOET (T) .) SCALE = I' _ l'-O" 1'-O" SCALE = I„ = I'-O" 2 2 A-5.05 A-5.05 A-5.05 A-5.05 -5.05 -5.05 5,_T„ N N N FlNl5HED CEILING SEE FINISHED CEILING SEE FINISHED CEILING SEE GLG. GLG. PLAN EXACT Hi. GL6. PLAN EXACT HT. PLAN EXACT HT. o N N RD.fl/57ABLE MDF SHELVES N A0Lt6TA3LE MDF 5HELVES W/PLASL LAM. ON ALL SIDES AD.tiSTABLE MDF 5NEL VE5 W/PLA5T. LAM ON ALL 51DE5 W/FLA5T. LAM ON ALL SIDES PROVIDE ST PROVIDE SL SM. PINS(4 PER 5TL. PIN5(4 PER SHE PROVIDE ST 5TL. PIN5(4 PER SHELF) SHELF) 4"911 THICK 4"HIGH 3/4" THICK PLRS. LAM MDF � 4"Hl6H 314" THICK PLA5. PLA5. LAM. MOF ;o BA6K5PLA5H ry LAM. MDF 3A6K5RLA5H a BACK5PLA6N w LAMINATED MDF LAMINATED MOF^ COUNTERTOP LAMINATED MDF COUNTERTOP COUNTERTOP UNDER COUNTER SOLD BLOCKING A5 REQD \APPLIANCE(0.5.C.1) LAN. MPF FAKE / \ LAN. MDF PANEL m REMOVABLE 3/4"PLA5. LAM 4 m MDF PANEL / \ \ / 4 4"RUBBER BASE "RUBBER BASE 4"RUBBER BASE / \ FIN FLOOR SEE SCHEDUL FIN. FLOOR SEE SCHEDULE E FOR ADD7L INFO. FIN. FLOOR SEE SCHEDULE FOR ADD'TL INFO. FOR ACP TY INFO. 9 I'-6 I/2" 2'-6'MIN ADR I'-6 I/2" I'-2 1/2" 3'-8" 24"MIN ADA I'-lO" I'-2 //2" /O'-4 3/4' � � SIGN MUD fil- UN� 7l0N Room I � pRc6AMM/NO AREA I � � LAN ROOM SEAL ' Aq REVISIONS/SUBMISSIONS. DRAWING TITLE. DATE DESCRIPTION' SCALE = I" = l'-0" � �a"O c� m� MILLWORK DETAIL N 09 CP r y CAD FILE NAME' P of raE 1194_A-5.04 PROJECT TITLE DATE: NSA PROJECT x: PROPO/ED ADDITION/AND ALTERATIO/I : fEPT. 18, 2006 /)JA 05-1194 Nemschick Silverman Architects P.C. "...IhehuslnessotARCHITECTURE." CMANO AND PAMM OIONmI�. I.C. 27550 MAIN R SCALE: DRAWING NO Design and Consulting Services _ - - - CUTGFIOGUE, /VEW YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 Nigh street, Hcnnngton, New rork _ _ AJ/VOTED �A` /� Phone : 631-734-7007 Fax : 631-734-7347 `� DISTRICT SECTION: BLOCK, LOT. DRAwNBY: A 5 .04 (516) 421-04511 5 0 CCPRGHT 2006 NEM5CHCR NLVE6MAN ARCHITECTS PC iDDO 109 O6 2.2 MR http://www.ns-arch.com ll I I -5.06 5.0 - O --__ m 3R a 537" 4R ® 6.72" m i / 3'-O //4" U. 3'-0 114, r N 9'-O 114" 3'-O 114" `0 w ® ® Q \ 36"HIGH GATE �n ON l9R® 6.96" UP I4R® 6.78" DN I4R® 6.76" Q UP I9R® 6.96" — -- __ w m III III - r� � ® Q6 = II m — — — — I o PROPOSED LABOVESOFF r m PROPOSED m 57"AIR 'A" I I L LINE®LANDING ABOVE - -� 4 I PROPOSED m P05T ON TO FOUNDATION STA/R "A" (REFER TO 5TRZTUF1AL5) L J m I I I �� -- - TOP OF 5ECOW FLOOR PROP05ED P �ms � 5TAlR /=�-AN = fA5 M)5N7 5TA1 A FLAN = r-1ROT -57A19 /A " PLAN = 5E60N� IL001IR j ® J in m J SCALE = I/2" , I'_O" 5cALE - I/2" _ l'-O" L--- L--- L� I LrL \ I TOP OF F/R5T FLOOR ? - -- PO5T DN TO FOUNDATION - /P TREAD (REFER TO 5TR(/G7l/RAL5) TREAD 4"REINFORCED CONCRETE - ON METAL DECKING ON In P N METAL 5W FRAMING I, o- Z- T-' G / TREAD N05INO TREAD N051N \ L- - m m m L--- / . . . . . CONCRETE FILL IN N ® L__\ -5A6 _ _ _ 5TEEL PAN GON5T., \ ui �f `I / / / BETWEEN 5TEEL 5TRINGER5 \ L--- L \C / TOP OF CELLAR FLOOR / CONCRETE Fill IN / 5TEEL PAN GONSL, ° BETWEEN 5TEEL 57RIN5ER5 ° ° ° d ° d d 5TEE1 ANGLE ANCHOR BOLTED THRU NEW L - -J / / ° d d ° d d ° d q 4 CONCRETE FOOTING d ° 4 d ° d d° d d° d ., g ° d' d SCALE_ 1/2" _ l'-O" _ � SCALE = I/2" = I'-O" SE �q iA REVISIONS/SUBMISSIONS DRAWING TITLE. m DATE: DESCRPTIOR mnam vn¢o raaaarvw PROPQ/'EDfi'AIR °A' * iornma uevu�rni PLANE„/EGTIONf& DETAIIf N N 29086 P� T P of N CAD FILE NAME: 1194 A-5.06 PROJECT TITLE: DATE: NSA PROJECT *: CONSULTANT. Nemschick Silverman Architects P.C. FLOORP N PROPOfED ADDITIO/1f AND ALTERAIIONf: fEPT. 18, 2006 NJA 05-1194 27550 MAIN ROAD ". . .lhe business of ARCHITECTURE." W(5,1(9) MO AND PAlIK01 m10Mm1�. RC. _ _ SCALE DRAWING NO Design and Consulting Services - -- - _ — - CU IOGUE, /1EW YORK 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, New York J - -- - - - - �A\ Phone : 631-734-7007 Fax : 531-734-7347 421-045a Fox (5Ib) 421-0565 Af/10TED DISTRICT: SECTION BLOCK LOT: DRAWN BY �—J .05 http://www.ns-arch.com e COPMICHi R006 kHMSCHCk SLVERMNJ ARCHiECi9 PC J1Q 1000 1� 06 2.2 M II T-10" I6'-9" l9 R a 7" X, TREAD 4 g -5AT --r��r 11 I I -I��, i ` � I � lL TREAD NOSING ` IN, � -- --- °� CONCRETE FILL IN \ _ -- lb'-lO" 91 STEEL PAN GONSL,FT— ` I - _ l9 R ®7" Q BETWEEN STEEL STRINGERS ` HAND RAIL PER NY5 BUILDINGLDINO GODS b STEEL ANGLE ANCHOR BOLTED THRU NEM 4 4 GONCRETEFOIOTING a r f d° / \\ I II- - - — n�a ea 4 e a ng ° A - - - - -- I� - SCALE = 1/2„ _ ,,_G„ �� I I C -T77 � T I �C C C - 7 ll" / — F U T FLOOR C — C 4"REINFORCED CONCRETE TREAD 'I W C — � I oN METAL DECKING ON METAL 57UD FRAMING SCALE = I/2" = I'-O" C - 7 5EE 5TRl/CTVRAL5 FOR MORE INFO. I" C = C C — C \ 41 C = 5EE DETAIL5 ON A-507 \ m \ EL COL B SE 7E 6-O CE _ C T` \ \ \ TREAD NOSING (T )5E 5 5 3O7 3 C = 7 46"X 60"X 12"GON6. PRO SEE 57RUGNRAL5 FOR MORE INFORMATION \ \ — STEEL D,L 4�EASE PLATE(TYP)SEE \ STRUG d165 6'O" STEEL COL ON BASE PLATE \ \ \ _ 5 \ UP MO (TYP)5EE 57RUG RARAL 9WG5CONCRETE FILL IN \ \ \ STEEL PAN COAST, I ! IEEN STRINGERS \ \ \ 40"X 72"X 12"CONC. PAD III - - - - - - - - - - - - - - - - - -o - - - - � r 5EE STRUGNRAL DINGS FOR MORE INFOMATION STEEL COL, SEE 5TRU6711RAL DPV65 � —_ - �_ I - -_._ _ ._ Ir___ ---_ - I 1 -___.—_ --1- - - NEX STEEL GIRDER li l N - � �� T 5EE5T,RXTURAL5 J SCALE = V2' = P-O" FOR MORE INFO, GUTTER(TYP) 57EEL TUBE SEE 57RUG77)RAL5 FOR MORE INFO. I I/2"DIA, 6ONTINU2/5 ALUMINUM PIPE RAILING ROOF RAFTER FASTENED TO TUBE STEEL AND DOUBLE PLATE PROVIDE I/2"x I/2" VERTICAL .OF TZ) BLOGKIN6 AT TOP OF TUBE STEEL BAR5® 4"O.C. 501 FLASNING (7YP) 3"6ONCRETE WITH 6/6 /CX/O MNLM ON KNEEVJALL 7O1^L/DBL I I/2"GALVANIZED I PLATE FASTENED UFPC-R METAL DECK TUBE 57EEL SEE 5TRZnRAL5 FOR MORE INFO. �PITGH 5L B T _ _ CON CANT(7(P) SECOND FL. I/4"PER FL .I ' a 6'-IG° CONTINUOUS BENT PLATE POUR STOP LONER 7VBE STEEL EE 5TRIO77I FOR STEEL TUBE SEE g + + MORE INFO. 5TRIONRALS FOR MORE INFO. 3"CONCRETE WITH 6/6 IOX/O NXM ON I I/2"GALVANIZED METAL DECK STEEL COLUMN 5EE MORE FOR SCALE MORE INFO. F SEE DETAILS ON A-5,07 SCALE = I" _ I'-O" EE FIR57 FL. 46"X 72"X I2"GONG. PAD AV. GRADE (VARIES) I I ----------------- I I r g 11 II g 46"X 72"X 12"GONG. PAD IL A B � REp REVISIONS/SUBMISSIONS: DRAWING TITLE: DATE', DESCRIPTION'. aP cyb F�� 09/1 oe vnvn roMCM EMt=RGF-/'ICY FIRCd7AIR v vm A v� PLA/y,/'„/'ECTIO/) 6 DETAII 9�R CF NE`N A CAD FILE NAME: 1194 A-5.06 CONSULTANT: FLOOR P ��[�p PR PROPO/ED ADDITIO/Y/A/9D ALTERATION/:PROJECT TITLE DATE: NSA PROJECT x Nemschick Silverman Architects P.C. JEPT. 18, 2006 n/Nos-119a "...the business of ARCHITECTURE." CAPM0 Mp PIOgNfi�, PA iii Design and Consulting Services 27550 MAI/1 ROAD SCALE. DRAWING NO: 735 Deerfoot Path, Cutchogue, New York 11935 Phone : 631-734-7007 Fax : 631-734-7347 http://www.ns-arch.com 20 High street, Huntington, New cork Y RK 19 /10TED (516) 421-0499 Fax (516) 421-0563 DISTRICT' SECTION: BLOCK', A LOT: DRAWN BY: A _5 .O a COPYRIGHT M06 NE HICK SILVFRMAN AIRCHIiECT3 PC, /y0 p 1000 109 �U 2.2 MR / • O ■ siA1 6 1/2" 6, l'-/0 1/2' T _ ir - — _ �— 4'-O I/2' 4'-b I/2" 7-5 I/2" 7" I'-3 I/2" -5.m '' I B , N AREAWAY 4 2'-8 I/2" 6 2'-8 I/2" AUTOMATIC FIRE 5 VENT BY BIL60, TYPE 5-205 :p 36'x30" m s s CONTINUOUS CANT 57R1P Q EPDM RUBBER ROOF MEMBRANE 24"X 24"X (2)25 6" TREATED WOOD FRAMING MIGROPROGESSOR 8" 24"SUMP PIT 6,_4„ 6' 2" CONTROL CONTINUOUS COPPER FLASHING/EDG APPING AND DRIP, TYPE AROUND ENTIRE BULK AD l/2 7-P 7 3'_5" STEEL NBE FRAMING 2' POWER UNIT PT FURRING 57R1P5 VERTICAL ® l6"O.G. MIN. SUBMERSIBLE O 3/6"INFAIL. 8D/CLAP BD BALKING DRAIN LEGATION al CLEAR CEDAR CLAP BD 5/DING AT WELLED EXIT, _ — — = m `� ' PREP05E0 AREAWAY. REFER TO MEGH. TO MATCH EXI5TG. VERIFY AND 5TRl/6TURAL 0W65 FOR AD97L INFO. CONNECT 4"PERFORATED PIPE TO EXI5T6 EXF05LIRE TO MATCH. EX15TINC DRYWELL -- - 20'-I0 l/2" PROP05ED ROOF 5TRl/GT7URE- REFER TO 57RU6T. DW65 FOR W ADD'TL INFO PROVIDE 57EPPED COPPER FLA5HIN6 BELOW NEW FURRED _ _ 5IDIN6 AT MA5. PENETRATION PLAN / _ 3/405 (EN /� F� 001R 5GALE _ 1/2" = P_0" l /�l / �v b'G9O GENCRETE BLOCK lW DURO-WAL HORIZ TRU55 TYPE REINF. EVERY OTHER 6OUR5E _ v 1 KORFIL lN5ULATION �� �//ATOR fLAY - fA5 i� NT I'LOOR RO ID J 56ALE - I/2' _ 1'-0" PINOOD/MAA550NRY JOINT TOLL PREVENT WATER FER. T -sm TOP OF SECOND FLOOR 5DT ��9 T 2 61-41 . : m — T� - - 2' 4 O NEW WRO6HT IRON RAILING/FGANORAILS A5 PER CODE I/2 p " 7// b ' w v PROP05ED AREAWAY. REFER TO MEGH PRIME W/RU5T INHIBITING PRIMER AND PAINT BLACK A5 PER �. AND 5TRU67VPAL DP65 FOR ADD'TL INFO. FIN15H 56HEDME. SF 4 n I57® I1'NLF.J u 20'-10 I/2" TOP OF FIRST FLOOR rob - - - - - - - - - (EL. + E'-E" V/F) /yp/ — COR O _ Yam" / W / � 5GALE = I/2"= I'- " Of NEW WRa'/GHT IRON RAILI HANDRAILS A5 PER CODE PRIME lW RUST INHIBITING 4" NEW WROU HT IRON RAILING/HANDRAIL5 A5 PER CODE. PRIMER AND PAINT BLACK PRIME W/RU5T INHIBITIN6 PRIMER AND PAINT BLACK A5 PER A5 PER FIN15H SCHEDULE FIN15H 56HEDULE. EXI5T6 STONE USED FOUNDATION WALL MEWL , {fit �dq� fi_ � LEGATION 4 m PLC 1/ tl — �/R� / �L OOR U L 5GALE _ 1/2" _ l'-O" 2'-O" ° ° APPROX GRADE TYP. P d � � Idea o 9 TOP OF BA5ENENT FLOOR I° l° ° FONWALLS AS PER I I I I \ � ° ° srRucTURAL DW65 I 'I (EL. - Il'-o" VLF •----�� ! Pro o t�----• - ° °/e� P °I � � IN 4°3�, W . 1 d ° 11 III'1. ' 1 I"IRONIrE WATERPROOFING 2" A 1 5 4 ; d ELEVATOR PIT eP N a rya I a° a d N �I a. ` ; ® R K 1. �. I° ELEVATOR PIT LADDER 2 2�, O 1 ;..- i -.+—, .—+. — .-�I ICI FDNWALLS A5 PER d I ° 6-a' d N I 1 24"X 24"X 24"SUMP PUMP 51RUCTURAL DW65 /2' \d °I 5 . ,• — �, . ,1; .�-, i ° °p TOP OF BASEMENTFIN FLR ° ° \ o ° of _`r •s.0 u� SLOPE I" 510PE1 6„GRAVEL BA5E 6"CRUSHED STONE OVER XOPEELEVATOR PIT FLOOR FULLYGOMPAG7ED SOIL - All ^d - - — — — — - NOTE: 4"PERFORATED PIPE TO - - � — - - - -I _ - - a BE CONNECTED 70 EXISTING o LJ_4 FIN15H 5CHEDULE TO BE OBTAINED °— — — — — — ° FROM ELEVATOR MAM/FACTURER AND ° DRYI"IELL w APPROVED BYARCHITECr 4"GONG. SLAB I 5 3'-2" 3'-6" 4'-10" I'-5 I/2 4"PERFORATED PIPE TO BE 11 ¢ NOTE.- REFER CONNECTED TO EXISTING TO STRUCTURAL DWGS FOR ALL DRYVJELL p'-6^ REINFORCEMENTS, TIES, STRAP5, ETC. FOR 6"CRUSHED 5TONE OVER 60NSTRUCTION A55EMBLIE5. FULLY GOMPAGTED 50IL EXPAN5I0N JOINT AROUND ALL E96E5 R fLIAN = 5 6(VN )"L00f �ELEVATOR SECTION � LL5 � EXIT SECT/ON �, L� � X17LONC1 � VINAL � 6T1ON � ��� 5GALE = I/2" = I'-O" I SCALE _ l/2" = I'-O" / 56ALE _ 1/2'= I'-O" SEA y't �, REVISIONS/SUBMISSIONS DRAWING TITLE' DATE: DESCRIPTION: a mneim VAWMRMM ELEVATOR&WELLED EXIT * WIM MVI/Imi PLANE&JI IONf er S Na 629006 JO rF DF NEB+ CAD FILE NAME' 1194 A-5.07 PROJECT TITLE: DATE: NSA PROJECT a: CONSULTANT'. Nemschick Silverman Architects P.c. L PROPOfED ADDITIONf AND ALTERATIONf: fEPT. 18, 2006 NJA -11 ...the business afARCHITECTURE." OMANO AND PANNOI dONNYIA. P.C. 27550 MAIN ROAD SCALE D WING NO Design and Consu/ting Services - — _ - CLIFF CUE, NEW YORI( 11955 735 Deerfoot Path, Cutchogue, New York 11935 20 wgh Street, Huntington, New York V - NOTED �— ^ .O Phone : 631-734-7007 Fax : 631-734-7347 516) 421-0499 Fax (516) 421-0563 DISTRICT SECTION BLOCK: LOT' DRAWN BY Jh http://www.ns-arch.com •caamlcnr zoos rTmscrtcx sLvelMnN nacwtEcrs pc NO ft 1000 109 06 2.2 MR +/-) 4'-6 1/2" (+/-) 50'-2 1/2" (+/_) 64'-0" 6-4" 21'-q 1/2" (+/-) _1� (+/-) 24'-0" (+/-) 40,_0" V-0 1/2" (+/-) q'-q 1/21, +/-) 4'-0' (+/-) 13'-5" (+/-) 13'-2" (+/-) 13'-5" (+ -) 4'-2 1/2" (+/-) 4" _ (+/-) 13 4 IV q EXIST J'5 TO BE (+/-) 4'-q" 21'-9 I/2" (+/-) 5'- EX15 IN6 GJ'S TO BE AT NEW O REM VIED AT NEW OPENING. m N © 1.2 T5 6X4XI/4 .3 ® DUG OPENING. W DOUBLE \ t; EXIS IN6 GJ15 TO PEP. (51ZE s v BE UT BAGK AND Q O TO MATCH +v x FRA IED ONTO m _ + EXISTING FJ) `r NEW ARING - EXISTING HEADER E ISTING HEADS EXISTING HEADER EXISTING HEADS v X X X m WAL \ TO REMAIN TO REMAIN TO REMAIN TO REMAIN i AN 11 16.1 6 12 X 3 I'-q 12" 23.5 IlfoANN �.q® q_I q. 45 ®q.Y q.I ® q'6 NEW (2) 2X6 POST 7 N z (1) 6X6 PO T DOWN F to r r �D DOWN TO EXISTING 20 O" 38V Q z TO XISTING FOUNDATION WALL. EXISTING FJ'5 TO O O Ul FOUNDATI N WALL W8 X 10 W8 X 10 BE GUT BAGK MOM,,, (+ -) I' W6 X l.4 X V D 0 a "-q IL Q AND REFRAMIED `t �Q �sp 3 - N F- LLt1JI V a' `_r `r `t DOWN TO EXI5TTIN6 Q S O INTO NEW HEADER. s T T T T T T T T T T T I3 3 N JO X N x OX IY X d) HEADER. N X X X X X X X X X X X X X X X X X N W (N N N NO _ X X 4 X X T z F lK (2) NEW FJ'S �p `� .q .p .p .p .q s .9 T5 X4XI/4 IIIIIll N = X N N .� N N X \ T FO N O (SIZE TO MATCH 3 3 3 3 3 3 3 3 3 3 `fl Y 10 r �p � y III xx � 4" 4ya ? 3 ® z0 - 3 W8X10 NOX10 W8X 10 3EXI5TING) F O X (3) NEW FJ'5 o xx V r (SIZE TO MATCH N o W ® m EXISTING) AN 13 224 12 X Ic.el GAN 11 N NEW (2) 2X6 PO5T EXISTING BEAM u� N 1q 'uS - l.0 8.3 T 4 7 FOUNDATIONDOM TO ISWTALL. - TO REMAIN m �® W12 X 14 �r r© WI2 x 14 (9 r® WI2 X 14 1q (2) 13/4"XII 'T/8" MIGRD-LAM 3Y GANT. 14.25 4,52 4.8 4.8 4.q EXI5TIN6 GJ'S TO O (3 r EXISTING 8X8 P05T UP TO r BE GUT BACK AND B N m r �F o Q N REF MI D INTO ROOF AND DOWN (T I. N W 2) 2XIO 5-q + FLOOR FRAMING. (T(P. FOR 8) T Q QQ Q z Q T T ry HEADER. W8X 10 W8 X 10 W8 X 10 iv _ r O O X X X X EXISTING _ TO BE O TOP OF0EX15 ING ® X O m cV z F ry_ REMO ED AT NEW FIR5T FLOOR STEEL O IN iV ry s $ 3 DUCT PENIN6. GIRDER. X Q X X X - NO N O O N O 3 x N } N N m X W X XO ; X 3 + X X WBX10 W8X10 EXISTING BEAM `r TO REMAIN LL = - _ 4 IK� NEW 6X6 POST (3) NEW FJ'S o AN 14 21.q 12 X 5.4 ® GAN WI2 X 26 BENT BEAM v, } p r UP TO ROOF - (SIZE TO MATCH `- O WI2 X 14 O _ WI2 X 14 FRAMING. o T T T T T T T T T T T T 11.3 41 W12 X 14 5.8 4.8®o z04. 5.q bl Iq.6 N (2) NEWTFJ'S 1 X X X X X X X X X X X X X X �r m r k)1� Tl_+ I IT2 W2I 2I XI �I I2 2I dI G m m(SIZE TO MATCH ¢ F T T T T T T T T T T T T T T T T Tw ADD 2X6 STUDS TO q 3 + -1 N EXISTING HEADER SUPPORT cV m ¢ 0 f EXISTING) O X X sX X X X X X X X X X X X X X X X 0 W8X 10 WB X 10 - O N W8X 10 STUDS. TOTAL NUMBER OF - z z S ,p "p ,p ,q ,p "p .p .p .4 p .D "D _N WI2 X 6 BENT BEAM m _ STUDS SHALL BE (6). (TYP. `9 _O T EXISTING FJ'S TO S 3 3 3 3 3 3 3 3 3 S 3 3 T FO N O BE GUT BAGK N < /Ib" L . GO G. OV R 3 x X X X V V N O F V V d) EAGH END OF EXI5TIN6 p - Oi 4 NH X I- AND REFRAMIED u� Iy q/I6" TYPE 'UF5" ORM EGK X O O 1 "I N 0 9 w INTO NEW HEADER. 11' 3 O 1 IN �+- 6 6 , W/ 6 -W2 XW2. W.W.F X X O F X X X HEADER) 4 EXISTING HEAD R ® c_v N v N c_v OTA SLAB THICK E55 2 I/2 ® © A T. 12 14 TO BE REMOV D AN . 16 15.8 12 X 22.0 GAN _ W8 XJO- ! 18-X 10 W8-><10 N - W8X 18 _ EXI5TIN6 HEADER EXISTING HEADS EXISTING HEADER EXISTING HEADS ® ® 31 ® �� ® lb Q NEW 6X6 POST TO REMAIN TO REMAIN TO REMAIN TO REMAIN NEW DOUBLE UP TO ROOF ADER. (SIZE 7�gJ7 0 --ml z ® � W12X26 � ®m � 51 � WI2 X 14 ®� q® WI2 X 26 � FRAMING. * Q6OTING FJ) OS N N 6.8 l.8 4.8 4.8 1.5 N O 4.2 -0' EXISTING FJS TO BE * 0 O O ry N 0 m l�u D m r �4 r m4'-II /2"N 4" REMOVED AT NEW t� �3 X ® O X X 0 5-10 DUGT OPENING. �xC W W r- NEW 6X6 P05T W8X 10 W8X 10 W8X 10 z �- ----- - UP TO ROOF - I® ©# It FRAMING. X X Q X X X 0 X 0 N 3 X X X X 3it 2) 2 X 6 (3) 2 X 10 EXISTING HEADER W8X 10 W8 X 10 W8 X 10 TO REMAIN I'-O" v It EXISTING EARING (2) 2X6 JACK 515TER NEW FJ TO WALL TO REMAIN. 5TUD AND (2) 2X6 EXISTING FJ. 4 � 4'-II I/2" KING 5TUD AT µ m A EACH END OF ® W12X2b ® WI2 X 14 © SY W12X26 OM! 5-q HEADER. (I) 2X6 JACK 6.0 b.q 3.6 O 3.6 6.5 5.5 5TUD AND (2) 2X6 umi N cV N N KING STUD AT NEW 6X6 POST GANT. , W8X 18 GANT. EACH END OF UP TO ROOF NEW 6X6 P05T Q HEADER. (T TP. FRAMING. Al FRAMIN UP TO ROOF U.N.O.) GANT. 'D W8 X I8 G�_ O W8X18 GURVED N W8X 18 W8XI8 (TYP. FOR 6) ? - H546 GURVED _ + NEW (4) 2X6 NEW (4) 2X6 P05T DOWN TO N N V N N POST DOWN TO EXISTING X X X X EXISTING FOUNDATION ®T T �1^112XI4 QN N W12X14 FOUNDATION LL ATION W ALL. N N - O a � !+/-) 22'_4" 21'-9 I/2" (+/-I 6'-I" (+/-) l'_2" (+/-I b'_8" (+/-) Y'_2n (+/-) 13'-5" (+/-) 13'-2" +/-) 4'-b I/2" (+/-J 50'-2 I/2° 24.'_O" 40'-0" SECOND FLOOR FRAMING PLAN SCALE: 1/4" = 1'-0" REVISIONS/SUBMISSIONS: DRAWING TITLE: �.W mnA DATE: DESCRPTIOR MEZZANINE n+e-a mmew eo FRAMING PLAN A P OF CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT PROP. ALTERATION x: CONSULTANT. FLOOR PL N NORTH S TO Nem EXIST'G LIBRARY -SCALE schick Silverman Architects P.C. 6 05-1194 DRAWING NO.: .the business of ARCHITECTURE." CAPANO AND PARKER ENGINEERS, P.C. Design and Consulting Services ROUTE 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 $16) 421-045q Fax (516) 421-0565 DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com NvcxlECTa rc NO TH MJR II 4'-6 1/2" (+/-) 50'-2 1/2" (+/-) (54'-0" (+/_) 24'_0" (+/-) 40'-0" (+/-) 13'-5" (+/-) 13'-2" (+/-) O O a EXISTING WALL N FRAMING AT ORIGINAL BUILDING TO REMAIN. O � NEW(3) XI2 RR NEW(3) 2X12 RR N ? n BELOW DO ER WALL BELOW DORMER WALL N i � - a ¢ a � O z N - ? OF w (2) 2X6 HEADER FX15TINO RR'S TO EX15TING XI2 RR'S EX15 IN6 2XI2 RR'5 EXISTING RR'S TO = N R O x O BE REMOVED H a I(" O.G. O REMAIN 6 I6" .C. TO REMAIN H BE REMOVED p N U N ry F- F f o z_ Ip N N z p I EXISTING 16" O.G. OGREMAIN S M (2) 2X6 HEADER N + �K a 4 N, So N N NEW 2XI2 RR'5 N ry Z ® EXISTIN6 RR'S TO BE ® 16" O.G. X LI p 3 3 ® REMOVED AT NEW `D ry DUCT OPENING. p z 2 I/2' L.W. GON . OVER I I/2" O NEW 2XI2 RR'S z y X EXISTING BEARING i O N TYPE "B-LOK", 26A., 1- a I6" O.G. D F p gzN WALL TO REMAIN GOM OSITE FLOOR PECK N z Z z z z ry 3 DOWN TO GLG, O- W N TOTAL SLAB T IGKNE 5 = 4" N EXI TIN6 8X8 POST DOWN TO �QyyII z Q gWQ a ® z LEVEL.. d N m FOIST FLOOR FRAMING. (TYP. lY K EXI5TIN6 RR'S TO B ? EXISTING RR'S TO N EXISTIN6 XI2 RR'S EXIS ING 2XI2 RR5 m BE GUT BACK AND EXIST RR'S TO RR TO (2J 2X O O O O O REFRAMIED INTO 5-q BE REMOVED ® I6" O.G. O REMAIN ® Ib" .G. TO REMAIN BE REMOVED ry W a (5) 2Xb P05T DOWN 1.1 NEW 2XI2 RR N N N NEW HEADER. z TO TOP OF EXISTING 7, EXISTING 2X6 GL6 TIES m OD N WALL.. H I6" o.C. ro REMAIN R X O NEW DUCT OPENING NEW 2XI2 RR'5 Q O LL w w w L N F THRU ROOF. LOGATE N 7 R <t HI X6Y '(4XI/4 �F �Y N ® I6" O.C. w i_v O O l� �j BETWEEN RR'S. X X ID NEW 2XI2 BUILT VER EXISTING z ry x X X X N N N T F O NEW 2XI2 RR'S N' 7 RR'S ® I " O.G. + HEADERS AT x x x X X X z z z z z THIS WALL TO xN tV ® b" O.G. N N ,p REMAIN. x 3 O NEW (3) 2 12 RR 1p DOWN TO POST ® NEW (3) 1 3/4"XII 1/4" _ `� �i z BELOW B ARIN z x x x 3 F WALL. F EXISTING 6X12 MICRO-LAM SLOPING N O N_ BEAM. NEW 6X6 POST SUPPORT BEAM IN PLANE _ - DOWN TO NEW OF DORMER ROOF LINE, N aS MEZZANINE _ m 6 X 10 FRAMING. Z ^ T2 Ib 1.6 N BEARING N. IN Q - d� G a u�iu a uryi OVER NEN XI 'S ®IL 5_q TO REMAIN. N S_q pp �j p >p x N p f I6" O.G. / f 0 p N NEW BEARIN6 WALL �^ '� / x N NE 2XI2 BUILT z v ABOVE SLOPING �' a ® VER RR'S ® F ® (3) 2XI0 HEADER p SUPPORT BEAM. 16" O.G. O Q (2) 2XI2 N 'ry X N zip m N 2XI2 RR'S 4.4 (2) X 12 RIDGE 2.3 (4) 2X6 P05T ry p CONTINUOUS F ® 16" O.G. FROM RIDGE 1z FLUSH HEADER ® a Nx N ry BEAM DOWN TO .5 .5 .5 .5 O .5 I. J34 W Xs HEADER OVER �+- XISTING R 5 TO =D EXI TIN6 2XI2 RR5 EXISTING XI2 'S EXISTIN6 RR'S TO WINDOW. CANT. 31 46 b 4X1/4 4b GANT. BE RE VED 0 6 I6" O.G. TO REMAIN o 16" Ob. T AIN O o o BE REMOVED N 2 X4 z z (2) 2X6 J.5. AND G BEAM (@ (2) 2XI2 1.0 POS NEN 2XI2 5 N EXISTIN6 2 6 GL6. TIES ~ ® (4) 2X6 K.5. i' OCH END OF (3) 2X6 POST. G NTINUOUS z 3 2X4 NEW 2XI2 RR'S ® I6" O.G. O REMAIN w HEADER. N FLUS HEADER a P05 . N NEW 12" O.G.O.G3) 2XI2 RR uryi NEW (2) 2XI m Q EXISTING RR' TO (2) 2X POST <Y —� 0 N I O NEW 6X6 P05T O VALLEY O I.6 X 10 I.6 O OF OPENING �_ N Q Q REMAIN. O X = x 3 DOWN TO NEW tt1 NEW bX6 P05T THIS WALL F N N MEZZANINE f DOWN TO NEW UNO �.I :K W FRAMING. u� MEZZANINE 'Y 3 e {I IJtI NEW 2XI2 RR ----- " I3J K EXISTING RR'S TO EXI TIN6 2XI2 RRS EXISTIN6 2XI2 'S EXI5TIN6 RR'S To G. ADJACENT TO NEW z 2" BE REMOVED ® Ib" O.G. TO REMAIN ® I6" O.G. TO MAIN BE REMOVED V 2ND FLOOR HALL. I�i i® H55 6 4XI/4 ® i % a EXISTING 2>6 GL6. TIES h O GANT. 14.0 CURVE BEAM 4.0 CANT.. �- EXISTING N ------- - -- - NEW 2XI0 RR'S ® 16" O.G. O REMAIN NEW 2XI0 RR'S = HEADER TO x X X ® 16" O.G. x REMAIN. Q (2) 2X6 HEADER m O z m v (2) HEADER (3) 2X6 T P05T , NEW 2XI2 RR'S (2) 2X6 HEADERXN xN NEW 2XI2 '5 .�+.. EXISTING RR'5 TO 11 ® Ib' O.G. W O O W m ® I6' O 5 q REMAIN. All— T _ (I) 2X6 JACK F.q NEW 6X6 POST ? Ti z NEW 6X6 POST STUD AND (2) 2X6 gN DOWN TO NEW a 't V Q N DOWN TO NEW KING STUD ATQO, MEZZANINE EACH END OF qa FRAMING.MEZZANIN p FRAMING. O Q HEADER. (TYP. f EXISTING RR'S TO t- EXI TIN6 2XI2 RR'S EXI5TIN6 2XI2 '5 R EXISTING RR'S T (2) 2X6 HEADER U.N.0) r BE REMOVED 4Q11 ® Ib" O.G. TO REMAIN ® 16" O.G. TO MAIN Q BE REMOVED r x IA EXISTING 2 6 GL6. TIES w X (V (2) 2X6 HEADER EXISTING N ® I6" O.G. O REMAIN iF ry •F HEADER TO EXISTING m x x O� m REMAIN. + HEADER TO REMAIN. 2 5 m (3) 3/4" XII I/4" z NEW 2 2X GL6. TIES z (3) 3/4" XII I/4' m 2.5 MIGRO-LAM - MICRO-LAM' NEW (4) 2X6 NEW (4) 2X6 EXISTING 2XI2 RR'S w Hl u? EXISTING 2XI2 RR'S ff05T DOWN TO m m POST DOWN TO ® I6" O.G. TO REMAIN ® I6" O.G. TO REMAIN EXISTING EXISTI j NEW (2) 2X GLG. TIESNIB WALL. � WALL. NEW (2) 2X6 EXISTING G.T. I�IZEXI5TIN6 G.T. G.T. HEADER. TO BE TO BE GUT -0" 5" 5" (TYP. FOR 2) REMOVED AT BACK AND NEW DUCT REFRAMIED N OPENING. INTO NEWp(2) (+/-) T-2" (+/-) 6'-6" (+/-) Y'-2" (+/-) 1V-5" (+/-) 13'- 'EXISTING 2X6 HEA(+ 113'_5" 4'-6 1/2" (+/-) 50'-2 1/2" (+/-) 24'-0" AF (+/-) 40'-OfiEADER TO ROOF FRAMING PLAN SCALE: 1/4" = 1'-0" SEAL: REVISIONS/SUBMISSIONS DRAWING TITLE: ytEPE qCN� DATE DESCRIPTION: W.NEy� a ROOF SRAM I NG P'�'oneo �eccMlNLlull PLAN N9TE No. CAD RILE NAME: NE PROJECT TITLE: DATE: NSA PROJECT .' CONSULTANT: FLOOR PL N NORTH Nemschick Silverman Architects P.C. PROP. ALTERATIONS TO EXIST'G LIBRARY B/24/06 05-1194 '.. .the business of ARCHITECTURE." CAP AND PAHKEa EN�IrEEaB, P.c. ROUTE 25 SCALE DRAWING NO.: Des/gn and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High 5kreak, Huntington, Non York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Fox (516) 421-0565 DISTRICT: SECTION BLOCK: LOT: DRAWN BY: = http://www.ns-arch.com .ca .GRsmsencxxs<verwNNaa�cTsrc N0 TH MJR ��✓✓✓ STRUCTURAL NOTES NYS CODE CRITERIA 4 DESIGN LOAD5 - 2002 EDITION IN AGGORDANGE WITH NY5 BUILDING GODE (2002) 5EGTION 1603, THE FOLLOWING PARAMETERS AND DESIGN LOADS WERE UTILIZED IN CODE GOMPLIANGE GONGRETE MASONRY PAINTING THE STRUCTURAL ANALY515 OF THE NEW GOMPONENT5 (MEZZANINES, ROOF) OF THI5 CATEGORY I BUILDING (5G-NY5 REF TABLE 1604.5) I. ALL DESIGN AND CONSTRUCTION SHALL BE IN GOMPLIANGE WITH I. ALL GENGRETE DESIGN, MATERIALS, MIXES, ADDITIVES, AND I. ALL CONCRETE WORK SHALL COMPLY WITH THE PROVISIONS OF I. ALL STEEL AFTER FABRICATION SHALL BE THOROUGHLY GLEANED A) DESIGN GRITERIA THE NEW YORK STATE BUILDING GODE PROVISIONS (BG-NYS), PLACEMENT SHALL COMPLY WITH THE PROVISIONS OF CHAPTER Icl, GHAPTER 21, "MASONRY", IN THE NEW YORK STATE BUILDING CODE OF RUST, DIRT, L005E MILL SCALE, AND OTHER FOREIGN MATTER. STEEL - TYPE 2 GONSTRUGTION AND ASO DESIGN METHOD PER BG-NY5 AND AI56 STEEL LATEST EDITION. "GONGRETE", IN THE NEW YORK STATE BUILDING GODE (BC-NY5) (BG-NY5) AND AGI 530. AFTER GLEANING, STEEL 5URFAGE5 SHALL BE SHOP PRIMED WITH AND AGI 318 GONSTRUGTION MANUAL, qTH EDITION. AS MODIFIED IN BG-NY5 SEGTION 1,108. ONE GOAT OF METAL PRIMER, AND ONE GOAT COLOR TO BE CONCRETE - STRENGTH (LRFD) DESIGN PER TH EDITION. N'rS AND AGI 318 LOAD COMBINATIONS 2. MASONRY DESIGN SHALL COMPLY WITH THE WORKING STRE55 SELECTED BY OWNER. PAINT GOAT5 SHALL BE FULL WETTING, NRY 2. SPECIAL INSPECTION OF CONCRETE GONSTRUGTION, AS REQUIRED DESIGN GRITERIA AS DETAILED IN B MA50 - ASD DESIGN PER Br_-NY5 AND AGI 530 G-NY5 5EGTION5 2100 AND APPLIED THOROUGHLY AND EVENLY TO THE SURFACES, AND FREE DEFLECTION LIMITS - NOTE EXCEED VALUES IN BC-NY5 TABLE 1604.3 I. LOAD GOMBINATIONS SHALL BE IN AGGORDANGE WITH THE NEW BY BC-NY5 CHAPTER 1-7 SHALLBE PROVIDED BY A LIGENSED 2101. FROM SPRAY DUST, RUNS OR SAGS. YORK STATE BUILDING CODE PROV1510N5 FOR ALLOWABLE ARGHITEGT OR ENGINEER. B) ASD LOAD GOMBINATIONS (5C,-NY5 1605 3 U LRFD LOAD COMBINATIONS (BG-NY5 1605 2 U STRESS DESIGN (A5D),SEGTION 1605.5, FORMULAS I6-1 THRU I6-12. 3. MASONRY SHALL GONFORM TO ASTM G-10, GRADE N. 2. PRIMER SHALL BE RUST-O-LEUM IObq RUST-INHIBITING PRIMER OR 3. MATERIALS USED TO PRODUGE GONGRETE SHALL COMPLY WITH APPROVED EQUIVALENT. SECOND GOAT SHALL BE RUST-O-LEUM D 1.40 GENERAL APPLICABLE STANDARDS IN AGI 318 AND BC-NY5 11103. 4. MORTAR SHALL BE TYPE M, IN AGGORDANGE WITH A5TM G-270 1060, OR APPROVED EQUIVALENT. D+L 1.2D+1.6L+.55 -CEMENT AGI 318 5.2 AND BG-NY5 TABLE 2103.1(2) AND SHALL HAVE A GOMPRES5IVE D+L+S 1.2D+1.65+(I.OL OR .54 I. MAXIMUM STEP OF FOOTINGS SHALL BE ONE VERTIGALLY TO TWO -AGGREGATE AGI 515 5.5 STRENGTH OF 2500 P51 ® 28 DAYS. 3. AFTER EREGTION, TOUGH UP ALL FIELD CONNECTIONS AND D+(W OR .-7E)+L(OR 5) 1.2O+1.6W+L+,55 HORIZONTALLY WHERE ELEVATIONS GHANGE. -WATER AGI 318 5.4 ABRADED SURFACES WITH SAME TYPE OF MATERIAL USED FOR .6D+W 1.2D+I.OE+I.OL+.25 -STEEL REINFORGEMENTAGI 316 3.5 5. GROUT SHALL BE COARSE GROUT AND 5HALLGONFORM TO ASTM G SHOP GOATING. .6D+.1E .qO+(I.OE OR 1.6W) 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO -WELDING AWS DIA 416 AND SHALL ATTAIN A STRENGTH OF 4000 P51 ® 28 DAYS FABRIGATION. -ADMIXTURE AGI 315 3.6 WOOD G) ROOF LOADS 6. ALL BEAMS AND LINTELS SHALL HAVE 8" MINIMUM BEARING EACH 3. ROOF SHALL BE SLOPED TO DRAIN, MINIMUM 1/8 INGH PER FOOT. 4. GONGRETE EXPOSURE SHALL BE GLA551FIED AS SEVERE IN END. WHERE 5TRUGTURAL MEMBERS INTERFERE WITH BEARING, 1. ALL WOOD DESIGN, MATERIALS AND GON5TRUGTION SHALL EXPOSURE GATE60RY: B C(B -NY5 5EGT. IbOq.4) AGGORDANGE WITH BG-NY5 FIGURE lg04.2+2. PROVIDE GONNEGTION TO MEMBER. GOMPLY WITHTHE PROVISIONS OF GHAPTER 25, "WOOD", IN THE GROUND SNOW LOAD: 45 P5F (BG-NY5 FIG. 1608.2) 4. FINAL SIZE AND LEGATION OF ROOF MOUNTED EQUIPMENT SHALL 5. AGGREGATE SIZE AND GONGRETE AIR CONTENT SHALL BE IN 1. FILL TWO GOURSE5 OF BLOCK WITH GROUT UNDER ALL BEARING NEW YORK STATE BUILDING CODE (BC,-NY5) AND THE NATIONAL BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO AGGORDANGE WITH BG-NY5 TABLE lg04.2.1. AREAS MINIMUM. DESIGN 5PEGIFIGATION FOR WOOD CONST'RUGTION, SNOW EXPOSURE FACTOR, Go: I.1.0 (BC-NY5 TABLE .1) GONSTRUGTION. SNOW IMPORTANCE FACTOR, Is: 1.0 (BC,-NY5 TABLE 1604.5)604.5) b. CONGRETE EXPOSED TO WEATHER SHALL BE AIR ENTRAINED AND 8. MASONRY ANCHORS AND TIES GONNEGTING MASONRY TO 2. WOOD PE51ON SHALL BE IN AGGORDANGE WITH THE ALLOWABLE THERMAL FACTOR, Gt: 1.0 (B 8 G-NY5 TABLE 1b0 .3.2) 5. ROOF DRAINS SHALL BE KEPT ERLOGGED BY REGULAR SHALL ATTAIN A MINIMUM STRENGTH OF 4000 P51 ® 28 DAYS. 5TRUGTURAL STEEL BEAMS AND GOLUMN5 SHALL BE PROVIDED AT STRESS DESIGN SPECIFICATION (A5D) AND METHODOLOGY IN MAINTANANGE TO PREVENT WATER BUILD-UP ON ROOF. MAXIMUM AGGREGATE SIZE SHALL BE Y2". MINIMUM AIR A MAXIMUM 5PAGING OF 32" ON CENTER, UNLESS OTHERWISE BG-NY5 SECTIONS 2304 THRU 2306 AND AS PRESENTED IN THE BALANGED ROOF SNOW LOAD, Pf: 32 P5F (A5GE 1 EQ. 1-1) 6, SEE MEGHANIGAL AND ARGHITECTURAL DRAWIN65 FOR SIZE AND ENTRAINMENT SHALL BE 5-)�%. NOTED. ALL ANGHOR5 AND TIES SHALL BE GALVANIZED OR NATIONAL 510NEGIFIGATION FOR WOOD GONSTRUGTION, LATEST UNBALANCED ROOF SNOW LOAD, PF: 64 P5F (A56E 1 EQ. 1-1) LOGATION OF ALL OPENINGS IN ROOF, FLOORS, AND WALLS NOT 5TAINLE55 STEEL. EDITION, AND APPLICABLE SUPPLEMENTS. SHOWN ON STRUCTURAL DRAWINGS. �. THE SEISMIC DESIGN AND GONSTRUGTION OF CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF BG-NY5 SECTION IglO AND Cl. ALL MASONRY WALLS SHALL BE CONSTRUCTED WITH GALVANIZED 3. ALL LUMBER SHALL BE DOU6LA5 FIR LARCH NO. 2, 1. GONTRAGTOR SHALL SUBMIT 5TRUGTURAL STEEL FABRICATION AGI 515. ALL SHEAR WALLS SHALL BE DESIGNED AS ORDINARY "OUR-O-WAL" REINFORCEMENT INSTALLED AT 16 INCHES ON Fb = 815 P51 D) FLOOR 6 ROOF LOAD SUMMARY DRAWINGS AND LIGHT GAGE STEEL SHOP DRAWINGS PREPARED REINFORCED GONGRETRE SHEAR WALLS. GENTER. FV = o5 P51 BY A PROFE55IONAL ENGINEER AND APPROVED BY THE GENERAL Ft = 515 P51 LEVEL DEAD LOAD (P5F) LIVE LOAD (P5F) GONTRAGTOR TO ENGINEER FOR REVIEW PRIOR TO FABRICATION b. CONCRETE FLOOR SLABS SUPPORTED DIRECTLY ON GRADE SHALL 10. REINFORCEMENT FOR MASONRY WALLS SHALL BE A5TM A615 Fc PERPENDICULAR = 625 P51 AND GON5TRUGTION. SHOP PRANIN65 SHALL BE SIGNED AND NOT BE LE55 THAN 3 1/2" THICK OR AS NOTED ON PLANS AND GRADE 60 DEFORMED BARS, SIZE AND NUMBER AS SHOWN ON Fc PARALLEL = 1300 BASEMENT FLOOR (SLAB ON GRADE) NA 100 SEALED BY A LICENSED ENGINEER. SHALL BE PLACED ON A 6 MIL POLYETHYLENE VAPOR RETARDER DRAWINGS. FILL REINFORGEMENT CELL SOLID WITH MASONRY E = IbOOp00 P51 WITH 6" JOINT LAPS. GROUT. MAXIMUM M015TURE CONTENT < Ig%. FIRST FLOOR 45 150 8. 5PEGIAL INSPECTION SERVICES, A5 REQUIRED IN ACCORDANCE q, CAST IN PLACE ANCHORS SHALL BE DESIGNED IN ACCORDANCE II. FILL ALL BOND BEAMS SOLID WITH MASONRY GROUT. 4. ALL WOOD GONSTRUGTION SHALL COMPLY WITH THE NATIONAL MEZZANINE 45 150 WITH GRAFTER 1-1 INAND AS DETAILED IN PLANS AND WITH STRENGTH DE516N CRITERIA IN BC-NY5 SECTION 1913. DESIGN 5PEGIFIGATION FOR WOOD GONSTRUGTION, LATEST ROOF (BALANCED) 22 32 NOTES, SHALL BE PROVIDED BY A CERTIFIED INSPECTION AGENCY 12. BRIGK VENEER WALL SHALL BE ANCHORED TO STEEL STUD WALL EDITION. UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER. 10. GONGRETE PROTECTION FOR REINFORCEMENT SHALL CONFORM TO AT 16" O.G. HORIZONTALLY AND 24" O.G. VERTICALLY WITH METAL ROOF (UNBALANGED) 22 64 LATEST A.G.I. 5PEGIFIGATION. TIES (a GAUGE MINIMUM). TIES SHALL BE GALVANIZED OR 5. ALL WOOD EXPOSED TO WEATHER SHALL BE GGA TREATED IN Cf. ALL RETAINING WALLS SHALL BE ADEQUATELY BRAGED DURING STAINLESS STEEL. AGGORDANCE WITH AWPA STANDARDS. GONSTRUGTION TO MAINTAIN SAFETY AND STABILITY. BACKPILLING 11. ALL TEMPERATURE REINFORCING SHALL BE 5UFFIGIENTLY 6. ALL WOOD CONNECTORS SHALL BE BY "TEGO", OR APPROVED SHALL NOT BE PERMITTED UNTIL CONCRETE HAS ACHIEVED 10% EMBEDDED TO DEVELOP FULL STRENGTH IN ALL CONCRETE WALLS 13. PROVIDE VERTICAL GONTROL JOINTS IN EXTERIOR MASONRY EQUAL. OF THE SPECIFIED DESIGN STRENGTH. AND SLABS. WALLS AT 40'-0" O.G. MAXIMUM. 10. IF CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFER FROM 12. PROVIDE ADEQUATE TIES FOR ALL STEEL REINFORGED IN SLABS, 14. ALL GMU WALL5 TO BE FACE BEDDED UNLE55 NOTED OTHERWISE. 7. MEMBERS DE516NATED AS "MIGRO-LAM" SHALL BE MANUFACTURED WHAT 15 SHOWN ON DRAWIN65, THE ENGINEER SHALL BE NOTIFIED BEAMS, PIERS, AND HALLS, REINFORCED TO BE HELD AT CORRECT PROVIDE FULL BEDDING AT ALL VERTICAL REINFORCING GELL5 IN ACCORDANCE WITH SPEGIFIGATION5 BY TRU55 JOINT GORP. IMMEDIATELY AND WORK SHALL NOT PPOC-RE55 UNTIL ALL 015TANGE FROM FORMS AND EARTH BY STEEL CHAIR5 OR TIES. AND GMU PIERS FILLED SOLID WITH MASONRY &ROUT. BOISE, IDAHO. NO SUBSTITUTES SHALL BE PERMITTED WITHOUT THE PROBLEMS ARE RESOLVED TO THE SATISFACTION OF THE ENGINEER'S APPROVAL. ENGINEER, 13. FOLLOW C.R.5.1. RULES FOR PLACING ALL REINFORCING, STEEL AND 15. REPRESENTATIVE TEST CYLINDERS SHALL BE TAKEN BY A TESTING DESIGN STRESSES ARE AS FOLLOWS: AGGE55ORIE5. LABORATORY TAKEN FROM THE MORTAR PLAGED EAGH DAY IN I. CONTRACTOR SHALL PROVIDE ALL SHORING AND BRAGING AGGORDANGE WITH MORTAR 5PEGIFIGATION5. TESTING SHALL BE Fb = 2600 psi REQUIRED TO MAINTAIN THE SAFETY AND 5TABILITY OF THE 14. CONTRACTOR SHALL SUBMIT CONCRETE MIX REPORT WITH PERFORMED AT 7 AND 28 DAYS AND PAID FOR BY THE FV = 285 psi E) WIND LOADS (GALGULATED PER BC-NY5 16011.6) EXISTING STRUCTURE THROUGHOUT THE CONSTRUGTION PHASE. COMPRE55ION TEST RESULTS TO ENGINEER FOR REVIEW PRIOR TO GONTRAGTOR. E = 2,000.000 psl WIND LOADS ARE CALCULATED FOR AN ENCLOSED STRUCTURE STARTING FOUNDATION GONSTRUGTION. BASED ON A 120 MPH DESIGN WIND SPEED. ALL SIDES OF THE 12. 5PAGING OF BEAMS SUPPORTING MEGHANIGAL EQUIPMENT SHALL GONSTRUGTION 8. ALL ROOF SHEATHING TO BE 1/2" EXTERIOR GRADE APA PANEL STRUCTURE ARE ASSIGNED THE WORST EXF05URE FACTOR FOR THE BE VERIFIED WITH EQUIPMENT SUPPLIER PRIOR TO FABRICATION 15. REPRESENTATIVE TEST CYLINDERS SHALL BE TAKEN BY A TESTING SPAN RATING 24/16 WITH PANEL GLIP5 FOR A SPAN OF 24" MAX. SITE AS LISTED BELOW. AND CONSTRUCTION. LABORATORY TAKEN FROM THE CONCRETE PLAGED EACH DAY IN A. MASONRY GONSTRUCTION SHALL COMPLY WITH BG-NY5 SECTION q ALL FLOOR SHEATHING TO BE 3/4" EXTERIOR GRADE APA PANEL AGGORDANGE WITH GONCRETE SPECIFICATIONS, BUT NOT LESS 2104 AND AGI 530. BASK WIND SPEED. 120 MPH (BG-NY5 FIG. IbOq) 13. ROOF TOP EQUIPMENT SHALL BE ANCHORED TO DUNNAGE STEEL IN THAN I CYLINDER PER 150 GY OF CONCRETE NOR LE55 THAN I SPAN RATING 48/24 FOR A SPAN OF 24" MAX. AGCORDANGE WITH MANUFACTURERS SPECIFICATIONS. CYLINDER FOR EAGH 5,000 5F OF SURFACE AREA FOR 5LAB5 B. SEISMIC, REQUIREMENTS FOR MASONRY SHALL BE IN ACCORDANCE EXP05URE GATE&ORY: C (BG-NY5 SECT. IbOq.4) AND HALLS. TESTING SHALL BE PERFORMED AT T AND 28 DAYS WITH BG-NY5 SECTION 2106. IMPORTANCE FACTOR, Iw: 1.00 (BIG-NY5 TABLE 1604.5) 14. ALL FOOTINGS AND SLABS SHALL BE GAST ON UNDISTURBED OR AND PAID FOR BY THE GONTRAGTOR. CONTROLLED COMPACTED SOIL, 2 T5F DESIGN BEARING G. MASONRY SHEAR HALLS SHALL COMPLY WITH THE REQUIREMENTS WOOD - GLULAM END ZONE WIDTH: II.7 FT. (36-NY5 SECT. Ib0q.6.3) CAPACITY. WHEN FOOTINGS ARE BEING PLAGED, A SOILS 16. ALL MESH SHALL BE SPLICED SO THAT THE OVERLAP BETWEEN FOR ORDINARY REINFORGED MA50NRY SHEAR HALLS OF BG-NY5 ENGINEER RETAINED BY THE GONTRAGTOR WILL EXAMINE THE SOIL OUTERMOST GROSS WIRES OF EACH 5HEET 15 NOT LE55 THAN THE SEGTION 2106 AND AGI 530. I. WOOD MEMBERS IN POOL AREA SHALL BE GLULAM AS 5PEGIFIED AT FOOTING BOTTOM, AND BELOW 5LAB5 AND CONFIRM ITS 5PAGIN6 OF THE GRO55 WIRES PLUS TWO INGHES, UNLESS BY THE AMERIGAN INSTITUTE OF TIMBER GONSTRUGTION. GONFORMANGE TO THE DESIGN BEARING ASSUMPTION. NO OTHERWISE SHOWN ON THE DRAWING. D. PROVIDE MINIMUM VERTICAL AND HORIZONTAL REINFORCEMENT IN MAIN WIND FORGE RESISTING SYSTEM LOADS (PSF) (56-NY5 TABLE 16Egb.2.1(1)) FOOTINGS OR 5LAB5 SHALL BE PLAGED UNTIL 5UGH ALL MASONRY SHEAR 14ALL5 IN AGGORDANGE WITH BC,-NY5 2. SHOP DETAILS SHALL BE FURNISHED BY THE FABRICATOR AND CONFIRMATION 15 OBTAINED. IT. ALL GONGRETE SHALL ATTAIN A MINIMUM 5TREN6TH OF 3,00E P51 5EGTION 2106.4.2.3.1 OR A5 SPECIFIED ON PLANS. APPROVAL OBTAINED FROM THE BUYER BEFORE WORK 15 ® 28 DAYS. FOUNDATION, SLABS ON GRADE AND CONCRETE COMMENCED. DIREGTION END ZONE INTERIOR ZONE 15. THE CONTRACTOR SHALL RETAIN THE SERVIGES OF A LICENSEE) EXPOSED TO WEATHER SHALL BE AIR ENTRAINED. SOILS ENGINEER. SOIL BORINGS AND TESTING, AS REQUIRED BY 3. MATERIALS, MANUFAGTURE AND QUALITY GONTROL FOR GLULAM WALL TRANSVERSE 30.12 20.52 THE 501L5 ENGINEER, SHALL BE PERFORMED TO VERIFY THE 18. GONGRETE USED ON THE MEZZANINE LEVEL SHALL BE L16HTHE16HT STEEL MEMBERS SHALL BE IN GONFORMANGE WITH PRODUCT STANDARD MINIMUM A55UMED DESIGN BEARING, CAPACITY OF 2 T51F. A GONGRETE (115 PGF) AND SHALL ATTAIN A MINIMUM STRENGTH OF 56-13, "5TRUGTURAL GLUED LAMINATED TIMBER". WALL LONGITUDINAL 22.16 15.11 BORING LOG, AND BEARING ALLOWABLE REPORT, SIGNED AND 5000 P51 AT 28 DAYS. I. ALL STEEL DESIGN, FABRICATION AND CONSTRUCTION'5T SHALL SEALED BY A PROFE551ONAL ENGINEER, SHALL BE SUBMITTED TO COMPLY WITH THE PROVISIONS E GHAPTER 22, "STEEL", IN THE 4. GLULAM MEMBERS SHALL BE MADE OF DOUGLAS FIR, ROOF WINDWARD -21.38 -1g.02 THE ENGINEER OF RECORD. Iq. ALL GONGRETE REINFORCING STEEL SHALL BE IN AGGORDANGE NEW YORK STATE BUILDING CODE (BC,-NY5) AND THE AISG STEEL Fb = 2,000 P51 WITH ASTM A-615 GRADE 60 DEFORMED BARS. GONSTRUGTION MANUAL, 15TH EDITION, 2005, FV = 165 P51 ROOF LEEWARD -18.61 -14.06 2. STEEL DESIGN, FABRICATION AND GONSTRUGTION SHALL BE IN E = I, 0 P51 SHALL INSPECTION AND TESTING 20. WELDED WIRE MESH SHALL BE IN ACCORDANCE WITH ASTM A-185. AND SHALL BE MANUFACTURED FOR NET CONDITION OF ACCORDANCE WITH THE ALLOWABLE STRESS DESIGN SERVICE, AS DEFINED BY AITG. THE FOLLOWING INSPECTION AND TESTING SERVICES SHALL BE 21. THIS GONTRAGTOR SHALL COOPERATE WITH ALL OTHER TRADES 5PEGIFICATION(A50) AND METHODOLOGY AS PRESENTED IN THE PROVIDED BY A LIGENSED TE5TIN6 AGENCY APPROVED BY THE AND WHERE REQUIRED INSTALL ALL BUILT-IN WORK, SLEEVES, AI5G STEEL MANUAL, 15TH EDITION. 5. ADHESIVES SHALL MEET THE REQUIREMENTS FOR NET CONDITION ENGINEER OF REGORD; INSERTS, ETC., AS REQUIRED FOR A GOMPLETE JOB. OF SERVICE, A5 DEFINED BY AITG. 3. THE STEEL FABRICATOR AND ERECTOR SHALL BE AISG CERTIFIED. F) SEISMIC LOADS (BUILDING COMPONENTS ONLY) 1. ON 51TE INSPECTION OF GONGRETE FORMWORK, SUBGRADE 22. ALL STRUCTURAL MEMBERS SHALL BE POURED FOR THEIR FULL 6. THE FABRICATOR SHALL DE51ON AND FURNI5H ALL STEEL USE GROUP: I (BC,-NY5 TABLE 1(D045) PREPARATION, REINFORCEMENT PLACEMENT AND SPLICING. DEPTHS IN ONE OPERATION. GONSTRUGTION JOINTS SUCH AS A 4. ALL STRUCTURAL STEEL SHALL BE ASTM Agg2 GRADE 50, EXCEPT CONNECTION HARDWARE NEGE55ARY FOR THE GONFIOURATION 0,2 SECOND SPECTRAL RESPONSE AGGELERATION = 25 (BC,-NY5 FIGURE I615(I)) DAYS POUR JOINTS SHALL BE LOCATED IN THE MIDDLE THIRD OF STRUCTURAL TUBE WHICH SHALL BE A5TM A500 GRADE B. AND SHOWN. 2. PROGUREMENT AND ON 51TE CURING OF ALL REQUIRED CONCRETE THE SPAN, MAIN REINFORCING TO RUN THROUGH THE JOINT, KEY 5TRUGTURAL PIPE WHICH SHALL BE A51FM A501. 5TRUGTURAL 1.0 SECOND 5PEGTRAL RESPONSE ACCELERATION = .Ol (B6-NY5 FIGURE 1615(2)) GYLINOERS AND MORTAR AND GROUT SPECIMENS, AND ROUGHEN JOINTS TO EXPOSE AGGREGATE FOR GHEMIGAL PLATES, ANGLES, AND CHANNELS SHALL BE ASTM A36. 1. ALL GLULAM SHOP DRAWIN65 SHALL BE SEALED BY A BOND. PROFE55IONAL ENGINEER PRIOR TO SUBMISSION FOR APPROVAL. SEISMIC, GATEGORY (SDG): G (BG-NYS 5EGT. 1616.3) 3. TRANSPORTING TO AND TESTING OF ALL CYLINDERS AND 5. ALL STRUCTURAL STEEL USED A5 EXTERIOR WALL LINTELS SHALL IMPORTANCE FACTOR, Ie; 1.00 (BC,-NY5 TABLE 1604.5) SPEGIMEN5 AT A LIGENSED TESTING LABORATORY. 25. NO HORIZONTAL JOINTS SHALL BE PLAGED IN WALL5 EXCEPT AS BE GALVANIZED. SHOWN ON THE DRAWIN65, WITHOUT THE APPROVAL OF THE UNDERPINNING SITE GLA551FICATION: D (B6-NY5 TABLE 1615.1.1) 4. ON SITE OBSERVATION OF ALL CONCRETE PLACEMENT TO VERIFY ENGINEER. 1. ROOF DEGKIN6 OVER THE ELEVATOR SHALL BE 1-1/2" B-LOK 5PEGTRAL RESPONSE AGGELERATION5, Sds: 0.261, Shc: 0.112 (BG-NYS SECT, 1615.1.3) COMPLIANGE WITH ALL AGI REQUIREMENTS FOR PLAGEMENT (BOTH GALVANIZED GOMP051TE DEGK 220A DECK, OR EQUAL, AND 1. PIT UNDERPINNING SHALL BE PROVIDED WHERE NEW FOOTINGS HOT AND GOLD WEATHER REQUIREMENTS) 24. MAXIMUM LENGTHS OF FOUNDATION WALL POUR IN ONE OPERATION SHALL BE CONTINUOUS OVER THREE SUPPORT BEAMS (MIN). FALL BELOW A LINE EXTENDING DONN FROM THE BOTTOM OF THE RE5PON5E MODIFICATION FACTOR, R: 3.0 (BG-NY5 TABLE 161b) 5HALL BE NO MORE THAN TWO GON5ECUTIVE COLUMN DIM. OR 60 EXISTING FOUNDATION AT A SLOPE OF 2 HORIZONTAL TO I ANALYTICAL PROGEDURE; EQUIVILENT LATERAL FORGE PROGEDURE (BC,-NY5 SECT. 1611.4) 5. ON SITE INSPECTION OF STRUCTURAL STEEL ERECTION. FEET. B. FLOOR DEGKIN6 SHALL BE 1-1/2" B-LOK GALVANIZED GOMPO5ITE VERTICAL AND WHERE THE DEPTH OF UNDERPINNING 15 LE55 THAN DEGK 220A DECK, OR EQUAL, AND SHALL BE CONTINUOUS OVER 5'-0" BELOW THE EXISTING FOUNDATIONS. SEI5MIG BASE SHEAR FACTOR Gs= 0.08g (BG-NY5 SECT. I61-1.4.I.1) 6. ON 51TE INSPECTION OF CONNEGTION BOLTING AND WELDING 25. ALL SLABS ON GRADE SHALL HAVE THICKENINGS, DEPRESSIONS, THREE SUPPORT BEAMS (MIN). 2 THE DEPTH OF UNDERPINNING SHALL BE DETERMINED BY THE 2:1 SEISMIC BASE SHEAR (NORTH MEZZANINE) = 5.60 KIPS - INCLUDIN& VERIFICATION OF WELDER GER .TIFIGATES AND USE OF OPENINGS, ETG., AS REQUIRED OR AS SHOWN HEREIN OR ON INFLUENCE LINE FROM THE BOTTOM OF THE NEW FOUNDATION (SEE SEISMIC BASE SHEAR (SOUTH MEZZANINE) = 13.40 KIPS PROPER ELECTRODE5 FOR MATERIAL BEING, WELDED. ARCHITECTURAL DRAWIN65. q. FLOOR DEGKIN6 SHALL BE GALVANIZED UNIFORM UPS 26 GA BY - - UNITED STEEL DECK, OR EQUAL, AND SHALL BE CONTINUOUS OVER DETAIL). -I. ON 51TE INSPECTION OF GONGRETE MASONRY INSTALLATION 26. PROVIDE POGKET5 IN WALL FOR COLUMNS, BEAMS AND SLABS. THREE SUPPORT BEANS (MIN) WHERE INDICATED.INGLUDIN6; 3. UNDERPINNING SHALL BEAR ON SUITABLE SOIL OF SIMILAR 27. MINIMUM BEARING ON WALL5 OR BEAMS: 4" FOR SLABS, 8" FOR G. ALL JOIST AND DEGKIN6 SHALL BE INSTALLED PER SJI AND SDI BEARING CAPAGITY OF THE BUILDING FOUNDATIONS. FINAL DEPTH A. VERIFICATION OF MORTAR AND GROUT MIX USED IN BEAMS, U.O.N. RECOMMENDATIONS RESPECTIVELY. OF UNDERPINNING SHALL BE DETERMINED BY A SOILS ENGINEER GONSTRUCTION. PRIOR TO GONSTRUCTION. 28. TOP ELEVATION OF SLABS SHALL VARY ACCORDING TO FINISH 11. BEAM GONNEGTIONS ARE SIMPLE CONNECTIONS AS DEFINED IN 4. CEMENT USED IN UNDERPINNING SHALL BE HIGH-EARLY TYPE III IN B. TYPE, SIZE, AND PLACEMENT OF GMU UNITS AND FLOOR MATERIAL. SEE ARGHITEGTURAL DRAWIN65. GHAPTER J OF THE AISG 5PECIFIGATION UNLESS OTHERWISE NOTED GONSTRUGTION JOINTS. ON PLANS AND SHALL BE DESIGNED TO WITH5TAND ONE-HALF THE AGGORDANGE WITH A5TM G150. 2q. IN ANY APPROVED GONSTRUGTION JOINT, PROVIDE 2"X 4" KEY MIN. MAXIMUM ALLOWABLE 5ERVIGE UNIFORM LOAD FOR THE 5. GONSTRUGTION SEQUENCE: G. TYPE, SIZE, GRADE, AND PLAGEMENT OF REINFORCEMENT, AND 24 BAR DIAMETER LAP (16" MIN) OF REINFORCING, EXGEPT PARTIGULAR BEAM AND SPAN CONDITIONS SHOWN OR THE LOAD CONNEGTOR5, AND ANGHOR5. FOR 5LA55 ON GRADE. INDIGATED ON DRAWINGS. MINIMUM ASD GONNEGTION DESIGN LOAD GAPAGITY SHALL BE b KIP5 (5ERVIGE LOAD). A. GON5TRUGT PANELS "A", LEAVING 2" GAP AT TOP. D. PROTECTION OF MASONRY DURING GOLD WEATHER OR 30. SLAB ON GRADE SHALL BE POURED IN STRIPS. GONSTRUCTION OR B. AFTER 24 HOURS,PACK GAP SOLID WITH NON-SHRINK HOT WEATHER. GONTROL JOINTS SHALL HAVE A MAXIMUM 5PAGING OF 30'-0" IN 12. WELDING SHALL BE IN AGGORDANGE WITH AWS SPECIFICATIONS GROUT. EITHER DIRECTION. MAXIMUM AREA OF POUR SHALL BE 210E 50. USING El0-XX ELECTRODES FOR HIGH STRENGTH STEEL. E. PROGUREMENT AND TESTING OF GROUT AND MORTAR FT, G. ALLOW 3 DAYS (MINIMUM) FOR CURING, FOR COMPLIANCE WITH SPECIFICATIONS. 15. ALL BOLTS SHALL BE A5TM A-325N AND SHALL BE INSTALLED TO 31. ALL WALL AND PIER FOOTIN65 SHALL BE MINIMUM 12" THICK WITH A SNUG CONDITION AS DEFINED IN AISG SPEGIFIGATION5. D. AFTER 3 DAYS, REPEAT ABOVE PROCEDURE WITH 8. TIMELY ISSUANCE OF FIELD AND TEST REPORTS TO THE OWNER, (2) #5 CONTINUOU5 BOTTOM AND PROJECT 6" MINIMUM BEYOND ALL ARGHITEGT AND ENGINEER OF RECORD. FAGES OF HALLS AND PIERS UNLE55 OTHERWISE NOTED. 14. WELDING AND BOLTING OF STRUCTURAL FRAMING SHALL BE PANELS "B" INSPECTED BY A TESTING LABORATORY EMPLOYED BY AND PAID SOIL INVESTIGATION AND 51TE PREPARATION 52. GROUT USED SHALL BE NON-FERROU5 NON-SHRINK GROUT BY BY THE GONTRAGTOR. 6. THE CONTRACTOR SHALL EXPOSE THE EXISTING FOUNDATION AS IN-PAKT AND SHALL ATTAIN A STRENGTH OF 4,000 P51 IN 1 DAYS. REQUIRED TO DETERMINE THE EXTENT OF NEW UNDERPINNING. 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING COPIES 15. STRUGTURAL STEEL SHALL BE INSPECTED IN THE SHOP DURING OF ALL SOIL BORING LOGS, TEST REPORTS, ETC. TO PROPERLY 55. ALL SLAB ON GRADE AND STRUCTURAL SLAB TEMPERATURE FABRICATION AND IN THE FIELD DURING ERECTION. 1. UNDERPINNING PLANS, DETAILS AND CONSTRUCTION 5EQUENGE ESTIMATE THE LIMITS OF 501L REMOVAL, BAGKFILL REQUIREMENTS REINFORCEMENT TO BE FIBERMESH CONCRETE REINFORCEMENT AS SHALL BE PREPARED BY A LIGENSED PROFESSIONAL ENGINEER AND GOMPAGTION REQUIREMENTS TO INSURE ALL 5LAB5 AND MANUFAGTURED BY FIBERMESH CO. OR APPROVED EQUAL. MIXING I6. ALL WELDERS SHALL BE CURRENTLY CERTIFIED. THE FOLLOWING AND SUBMITTED TO THE ENGINEER OF RECORD FOR REVIEW PRIOR FOOTINGS ARE CAST ON SUITABLE MATERIAL. AND PLACEMENT SHALL BE IN AGGORDANGE TO MANUFAGTURER'S GERTIFIGATION5 ARE AGGEPTABLE: NEW YORK STATE, NEW YORK TO GON5TRUCTION. SPEGIFIGATIONS. CITY DEPT. OF BUILDINGS, OR TESTING LABORATORY g. SPECIAL INSPECTION OF ALL UNDERPINNING SHALL BE PERFORMED GERTIFIGATION TO THE AWS GODS. 2. LICENSED SOILS ENGINEER SHALL BE RETAINED 155UE SITE BY A LIGENSED PROFESSIONAL ENGINEER RETAINED BY THE 34. FLOOR 5LA55 SHALL BE POURED IN STRIPS. GONSTRUGTION OR SPECIFIC SPEGIFIGATIONS AND PROCEDURES REGARDING GONTROL JOINTS SHALL HAVE A MAXIMUM 5PAGING OF 30' -O" IN I7. THE INSPEGTOR SHALL PERFORM INSPECTION OF BOLTING IN CONTRACTOR AND APPROVED BY THE OWNER. ALL INSPECTIONS MATERIAL AND PLACEMENT AS REQUIRED TO INSURE ALL EITHER DIREGTION. MAXIMUM AREA OF POUR SHALL BE 2100 5F. AGGORDANGEG WITH AIS "SPEGIFIGATION FOR 5TRUGTURAL JOINTS AND REPORTS SHALL BE PERFORMED AND PREPARED AS HEREIN.ADE MEETS OR EXCEEDS THE BEARING VALUE CITED USING ASTM A325 OR A4g0 BOLTS." AT LEAST TEN PERGENT OF REQUIRED BY THE NEW YORK STATE BUILDING GODS. HEREI THE BOLTS WILL BE TORQUE INSPECTED WITH A MINIMUM OF ONE BOLT FROM EAGH JOINT TESTED. q. THE GONTRAGTOR SHALL PROVIDE ALL TEMPORARY SHORING, 3. THE SOILS ENGINEER SHALL PERFORM ON 51TE IN5PEGTION5 AND BRAGIN6 AND SHEETING REQUIRED DURING UNDERPINNING TO ISSUE FINAL 51GNOFF OF GOMPLIANGE WITH SOIL BEARING 15. THE WELDING INSPECTOR 15 TO BE ON THE JOB WHEN WELDING 15 INSURE THE SAFETY AND STABILITY OF ALL ADJACENT REQUIREMENTS PRIOR TO THE PLACEMENT OF ANY FOUNDATION OR PERFORMED. IN5PEGTION "AFTER THE FACT" 15 NOT ALLOWED. STRUGTURE5. 5LA55 ON GROUND. THE INSPEGTOR WILL GENERALLY USE 5EGTION5 3, 4, 6 AND 6 4. ALL SOIL TESTING, GLASSIFIGATION, AND BEARING DESIGN FROM THE MOST CURRENT EDITION OF AWS DI.1, "STRUGTURAL 10. UNDERPINNING DEPTHS IN EXCESS OF 5'-0" SHALL REQUIRE GAPAGITIES FOR FOOTING AND FOUNDATION DESIGN SHALL BE IN WELDING CODE-STEEL" AS THE BA515 FOR THE INSPEGTION. ALTERNATE DESIGN PREPARED BY A LICENSED FOUNDATION ENGINEER TO ADEQUATELY RESIST LATERAL LOADS AND AGCORDANGE WITH 5G-NY5 GHAPTER 18, "SOILS AND ICI. MASONRY ANGHOR5 AND TIES GONNEGTIN6 MASONRY TO DEFLEGTIONS FROM EXISTING 5UB6RADE BELOW EXISTING FOUNDATIONS". STRUCTURAL STEEL BEAMS AND GOLUMNS SHALL BE PROVIDED AT BUILDING TO BE UNDERPINNED. A MAXIMUM 5PAGIN6 OF 52" ON CENTER, UNLE55 OTHERWISE NOTED. S REVISIONS/SUBMISSIONS: DRAWING TIRE: W A0 DATE DESCRIPTION: STRUCTURAL NOTES F -1 N� 9p86 P� EI -t CAD FILE NAME: CONSULTANT: FLOOR PL N NORTH PROJECT TITLE: DATE: NSA PROJECT x: Nemschick Silverman Architects P.C. PROP. ALTERATIONS TO 8/24/06 05-1194 ".. .[he huenass ofARCHITECTUREl CAPANO AND PARKER ENGINEERS, P.c, 17 EXIST'G LIBRARY Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUTCHOGUE, NEW YORK AS L NOTED AWING NO: Phone : 631-734-7007 Fax : 631-734-7347 516) 421-0439 Fax (516) 421 0563 http://www.ns-arch.com DISTRICT: SECTION BLOCK: LOT: DRAWN BY: = .cowacxr mos Ieucxrx aveexnx nncxrecrs ra N 0 TH M JR u LEVEL 1 SPECIAL INSPECTION OF MASONRY CONSTRUCTION - TABLE 1704 . 5 . 1 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION - TABLE 1704.3 REFERENCED BC,-NYS FREQUENGY OF INSPECTION REFERENCE FOR CRITERIA VERIFICATION AND INSPECTION CONTINUOUS PERIODIC STANDARD REFERENCE 1. MATERIAL VERIFICATION OF HI6H-5TRENGTH BOLTS, NUTS, X APPLICABLE ASTM CONTINUOUS PERIODICALLY Br,-NY5 SECTION AGI 530 AGI 530.1 AND WASHERS. MATERIAL SPECIFICATIONS; INSPECTION TASK DURING TASK DURING TASK _ _ LISTED LISTED a. IDENTIFICATION MARKINGS TO CONFORM TO ASTM AISG A5D, SECTION A3.4; STANDARDS SPECIFIED IN THE APPROVED AISG LRFD, 1. AS MASONRY BEGINS, THE FOLLOWING SHALL CON5TRUGTION DOCUMENTS SECTION A3.3 BE VERIFIED TO ENSURE COMPLIANCE: b. MANUFACTURER'S GERTIFIGATE OF COMPLIANCE REQUIRED a. PROPORTIONS OF SITE PREPARED MORTAR X Art. 2.6A b. CONSTRUCTION OF MORTAR JOINTS X Art. 3.313 2. INSPECTION OF HIGH STRENGHT BOLTING: AISG LRFD SECTION 1104.3.3 c. LOCATION OF REINFORCEMENT AND CONNECTORS X Art. 5.4 a. BEARING TYPE CONNECTORS X M2.5 b. SLIP-GRITIGAL GONNEGTION5 X X 2. THE INSPECTION PROGRAM SHALL VERIFY: a. 5IZE AND LOCATION OF STRUCTURAL ELEMENTS X 3.30 3. MATERIAL VERIFICATION OF STRUCTURAL STEEL: 1108.4 b. TYPE, 5IZE AND LOCATION OF ANCHORS, INCLUDING X Sec. 1.15.4, 2.1.2 OTHER DETAILS OF ANCHORAGE OF MASONRY TO a. IDENTIFICATION MARKING5 TO CONFORM TO A5TM A5TM A 6 or STRUCTURAL MEMBERS FRAMES OF OTHER 5TANDARD5 SPECIFIED IN THE APPROVED A5TM A 568 CONSTRUCTION CONSTRUCTION DOCUMENTS c. SPECIFIED SIZE, GRADE AND TYPE OF X Sec. 2I05A.2.11 Sec. 1.12 Art. 2.4, 5.4 - - ASTM A 6 or b. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REINFORCEMENT REQUIRED A5TM A 568 d. WELDING OF REINFORCING BARS X ITEM 2 Sec. 8.53 AND 8512 e. PROTECTION OF MASONRY DURING GOLD WEATHER X Sec. 2104.3, 2104.4 Art. 1.8 (TEMPERATURE BELOW 40 DEGREES F) OR HOT 4, MATERIAL VERIFICATION OF WELD FILLER MATERIALS: AI5G, ASP, SECTION WEATHER (TEMPERATURE ABOVE 90 DEGREES F) a. IDENTIFICATION MARKIN05 TO CONFORM TO ASTM A3.6; AISG LRFD, STANDARDS SPECIFIED IN THE APPROVED SECTION A3.5 3, PRIOR TO GROUTING, THE FOLLOWING SHALL BE VERIFIED CONSTRUCTION DOCUMENTS TO ENSURE GOMPLIANGE: b. MANUFACTURER'5 CERTIFICATE OF GOMPLIANGE - - - a. GROUT SPACE 15 GLEAN X Art. 3.2D REQUIRED b. PLACEMENT OF REINFORGMENT AND CONNECTORS - X - Sec. 1.12 Art. 3.4 c. PROPORTIONS 05 51TE-PREPARED GROUT X Art. 2.65 5. INSPECTION OF WELDING: AWS DI.I 1104.5.1 d. CONSTRUCTION OF MORTAR JOINTS X Art. 5.35 a. 5TRUGTURAL STEEL X I. COMPLETE AND PARTIAL PENETRATION X 4, GROUT PLAGEMENT SHALL BE VERIFIED TO ENSURE Art. 3.5 GROOVE WELDS COMPLIANCE WITH CODE AND CONSTRUCTION X 2. MULTI-PASS FILLET WEL05 X DOCUMENT PROVISION5 3. SINGLE-PASS FILLET WELDS > 5/16" X 4. SINGLE-PASS FILLET HELPS < 5/16" X 5. PREPARATION OF ANY REQUIRED GROUT SPECIMENS, - 2105.3, 2105.4 - Art. 1.4 5. FLOOR AND DECK HELPS X AWS DI.3 MORTAR SPECIMENS AND/OR PRISMS SHALL BE OBSERVED X 2105.5 b. REINFORCING STEEL AW5 DIA 1903.5.2 I. VERIFICATION OF WELDABILITY OF AGI 316: 3.5.2 REINFORCING STEEL OTHER THAN ASTM X 6. COMPLIANCE WITH REQUIRED INSPECTION PROV1510N5 - X - - Art. 1.5 A 106 OF THE CONSTRUCTION DOCUMENTS AND THE APPROVED 2. REINFORGING 5TEEL-RESISTING FLEXURAL X SUBMITTALS SHALL BE VERIFIED AND AXIAL FORGES IN INTERMEDIATE AND SPECIAL MOMENT FRAMES, AND BOUNDRY ELEMENTS OF SPACIAL REINFORCED CONCRETE SHEAR WALLS, AND SHEAR REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION - TABLE 1704. 4 REI 3. SHEAARR RMENT REINFORCEMENT X 4. OTHER REINFORGING STEEL X REFERENCED BG-NY5 VERIFICATION AND INSPECTION CONTINUOUS PERIODIC STANDARD REFERENCE 6. INSPECTION OF STEEL FRAME JOINT DETAIL FOR X 1104.3.2 COMPLIANCE WITH APPROVED CONSTRUCTION DOCUMENTS: 1, INSPECTION OF REINFORGING STEEL INGLUDING, - X AGI 316. 3.5, 1.1-1.7 1903.51 19O1.I1 a. DETAILS SUCH A5 BRACING AND STIFFENING - - PRE5TRE551NG TENDONS, AND PLACEMENT 1901.1, 1914.4 b. MEMBER LOCATIONS c. APPLICATION OF JOINT DETAILS AT EACH 2, INSPECTION OF REINFORCING STEEL WELDING IN - - AWS 01.4 CONNECTION AGGORDANGE WITH TABLE 1104.5, ITEM 55 AGI 318: 5.5.2 1903.5.2 3, INSPECT BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING PLACEMENT OF CONCRETE WHERE X - - 1912.5 ALL TESTS SHALL BE PERFORMED BY AN ALLOWABLE LOAD5 HAVE BEEN INCREASED INDEPENDENT TESTING LAB. ALL TEST RESULTS SHALL BE TURNED OVER TO THE ARCHITECT FOR REVIEW DURING THE PROJECT. WHEN PROJECT 15 GOMPLETE, SPECIAL INSPECTION REQUIREMENTS 4. VERIFYING USE OF REQUIRED DESIGN MIX - X AGI 315: Gh. 4, 5.2-5.4 1904, 1905.2-Ig05.4, INDEPENDENT TESTING LAB SHALL PROVIDE THE 1914.2, Ig14.3 OWNER W/ A 3 RING BINDER W/ ALL TEST RESULTS. THE CONTRACTOR SHALL INCLUDE IN HIS BID A LINE ITEM FOR THE SPECIAL INSPECTION REQUIREMENT5 CITED HEREIN. THE LICENSED PROFESSIONAL ENGINEER RETAINED FOR THESE SPECIAL INSPECTION SERVICES SHALL BE 5. 5AMPLIN0 FRESH CONCRETE AND PERFORMING SLUMP, APPROVED BY THE OWNER AND THE ENGINEER OF REGORD PRIOR TO START AIR CONTENT AND DETERMINING THE TEMPERATURE OF X ASTM C 112 OF GON5TRU6TION. AN OUTLINE OF THE SCOPE OF 5ERVIGE5 TO BE A5TM G 31 1905.6, 1914.10 PERFORMED BY THE IN5PEGTING ENGINEER 15 TO BE SUBMITTED PRIOR TO FRESH CONCRETE AT THE TIME OF MAKING SPECIMENS AGI 316: 5.6, 5.8 START OF CONSTRUCTION. FOR 5TRENGTH TESTS I. IN ACCORPANGE WITH SECTION 1104 OF THE NEW YORK STATE BUILDING CODE, 2002 EDITION, PERIODIC AND/OR CONTINUOUS INSPECTIONS OF THE GONSTRUGTION PROGRESS SHALL BE MADE BY AN INDEPENDENT APPROVED 6. INSPECTION OF CONCRETE AND 5HOTGRETE X AGI 518: 5.9, 5.10 1905.9, 1905.10, AGENGY IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS; PLACEMENT FOR PROPER APPLICATION TEGHNIQUE5 1914.6, 1914.1, STEEL CONSTRUCTION TABLE 1104.3 1914.8 CONCRETE CONSTRUCTION TABLE 1104.4 MASONRY CONSTRUCTION TABLE 1104.5.1 $ 1-104.5.3 1. INSPECTION FOR MAINTENANGE OF SPECIFIED GURING - X AGI 318: 5.11-5.13 IcIO5.11, 1905.I3, STRUCTURAL OBSERVATIONS TEMPERATURE AND TECHNIQUES 1114A I. STRUCTURAL OBSERVATIONS SHALL BE PROVIDED BY A REGISTERED DESIGN PROFE55IONAL OTHER THAN THE ENGINEER OF RECORD. THE _ DESIGNATED PROFESSIONAL SHALL PERFORM V15UAL OBSERVATIONS OF THE STRUCTURAL SYSTEM AT SIGNIFIGANT CONSTRUCTION 5TAGE5 AND AT THE 8. INSPECTION OF PRESTRESSED CONCRETE: COMPLETION OF THE STRUCTURAL. SYSTEM FOR GENERAL CONFORMANCE TO - a. APPLICATION OF PRE5TE551NG FORGES. X AGI: 515: 1e0b - THE APPROVED CONSTRUCTION DOCUMENTS. ANY OBSERVED DEFI6IENGIE5 b. GROUTING OF BONDED PRESTRESSING TENDONS X - AGI 318: I5.16.4 SHALL BE REPORTED IN WRITING TO THE OWNER, THE CODE ENFORGEMENT OFFICIAL, AND THE ENGINEER OF RECORD. IN THE 5EI5MIG-FORGE-RE5I5TING SYSTEM. 2. AT THE CONCLUSION OF THE WORK, THE DESIGNATED PROFESSIONAL SHALL SUBMIT A WRITTEN STATEMENT TO THE CODE ENFORCEMENT OFFICIAL, 9. ERECTION OF PRECAST CONCRETE MEMBERS - X AGI 316. Gh.'I6 - INDICATING ALL NECESSARY 51TE VISITS HAVE BEEN MADE AND THAT ANY REPORTED DEFIGIENGIE5 HAVE BEEN RE50LVED TO THE BEST OF HI5 KNOWLEDGE. 3. PRIOR TO THE START OF CONSTRUCTION, THE DESIGNATED INSPECTION 10. VERIFICATION OF IN-SITU CONCRETE STRENGTH, PRIOR AGENCY SHALL SUBMIT A PROP05ED INSPECTION AND TESTING SCHEDULE TO THE ARCHITECT AND ENGINEER OF RECORD FOR REVIEW AND APPROVAL. TO 5TRE551N6 OF TENDONS IN P05TTEN51ONED _ X AGI 318: 6.2 1906.2 GONGRETE AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS SEAL:,' A REVISIONS/SUBMSSIONS: DRAWNG TIRE: 4E Si DATE: DESCRPTION: T 5TRUCTURAL * INSPECTION NOTES Nl' N 79666 Q� qrF D _ J, ,tl'�� CAD FILE NAME: PROJECT TITLE DATE NSA PROJECT «' CONSULTANT FLOOR PL N NORTH Neschick Silverman Architects P.C. PROP. ALTERATIONS TO 8/24/06 05-1194 EXIST'G LIBRARY m .the business ofARCHRECTURE." CAPANO AND PARKER ENGINEERS, P.0 SCALE: DRAWING NO.: Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, New York - ROUTE 25 Phone : 631-734-7007 Fax : 631-734-7347 CUTCHOGUE, NEW PORK AS NOTED (516) 421-0499 Fax (516) 421-0569 DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com I El- .ca cxr wos aDa s<vanuN�extxTs rc N O TH M JR II ----- -- --- COLUMN SCHEDULE ir 1 2 3 4 5 6 1 S 9 10 11 12 13 14 15 16 11 18 19 2(l 21 22 23 24 25 26 21 28 29 30 31 32 32 33 34 35 36 36 31 38 39 4040 41 42 43 44 45 46 46 4141 48 48 49 49 50 50 51 51 52 52 53 53 54 55 5656 57 51 5858 59 59roo6m 61 61 62 62 63 6364656 6"( 686910 T � a z F� L HL � L H L H L H L H L H L H L H L H L HLLNLNL +� L14L14LHL GAP PLATE SIZE i+ m m5 m� m5 m m5 m m m mN m m m m m m m m m m m m m m m A '^ A A '^ v� a p � m m m m m m m m m m m m m m m m m m m m m m m m m m m m m� mz z K x x� x x� x� x� x X x x X x X X x x x X x x '� x '� x x " x x x xug '� x x x x x� x x� x x x x x x X x x x x X x X x x x x x x x xz xpz `� o L_`I 1\_`1 C 'G - - a r rvF N '7 V ~ 'V �F- C�~J V fV fV IV fV (V (V N cV 'P 'V cV N (V N I N I I I X X X X . e 9 Q V- *HL .O .p .D i11 7 7 V (V X�II xUl LWu N V It ,n u� ,n W m X X X x to m .o .o m — a .o m m m m N .o m X w m Si u� �j LLLL11 X X X X X v x x X X X X X x x x X X X X X X X X I X X X X I X X X X X X X x x x N N N X X X X X X _ _ - _ I _ I - I - I - - - N (V rvp Np rvp cvp N x x x x _ _ _ _ _ I _ I _ _ X x x X x x _ _ X X X X X X _ — � '� � Ilya, Yv ry �n II}�. � t=THIGHNE55 _o Li N = S n. D_ a a 3 � N N U1 N \ N N m m m m TOP OF NEW SECOND FLOOR 5LAB AT ELEVATION(+/-) +IO'-2° WFI2 y.(pl2 WFI2 WFI21"IF8 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 2 TOP OF NEW SECOND FLOOR Nrlu SLAB AT ELEVATION(+/-) +B'-9° WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WFI2 WW WF8 WF8 11B7��B WF8 I lWWB LLWI 0. 4 0. 0. a N 111 �1 N N N �! N �—! L_Y '_(\Y W W 'C N N N !\V 1�`I N !\V N N N N N W m m m m m m m m 3 X X X X 00.LL X X X X X X X X X 0. 0. X X X X X X X X X X X X X 1 E CL E E d 0. X X X X X X X X 0. 0.. E E E N E 0. X V V V X V V X X X V X X X X 3 N N Ul N N N Ul X X X X X X X X N Ul U1 N N N 111 N N X X X X t11 N X X X X X X i 1 X X X Jl N X X X X X X X X X X X X X N m N N m N N Y d d 7 N ry 7 7 d 7 d d t 7 7 N N t d 7 '-I d d V V d d 7 7 d N N N N N N LV N j- j- Ul 111 F 1- in N N N N N N N N N N N N N N m m m m m m "' $ ' ' ' ' ' m m m m m m m m m `� '� `� ' m "' ' ' _ '� "' "' 1 m TOP OF EXISTING FIRST AT DATUM ELEVATION O'-O" WF8 WF8 WFIb WF8 WF8 WF8 WF8 WFB WF8 WFIb WFIb WFIb WFIb WFIb WFI6 WFIb WFIb WFIb WFI6 WFIb WFI6 WFIb WFIb WFIb WFIb FI WFIb FI WF8 WF8 L.Ip12 WF8 WFH WF8 WFH WF8 WF8 WF8 WF8 WF8 WF8 WF8 WF8 WF8 WF8 WF8 WFB h.IP12 WFI2 WF8 WF8 WF8 WF8 WF8 WF8 WF8 WFH WF8 WF8 WF8 WF8 WF8 WF8 WF8 WF8 WFI2 FI 1D 19 .9 19 ZD 19 19 �9 19 19 �9 Q 10 `0 10 I I N A A A A A A A A A A A A A A A A tuu A A A A x 4 R 4 X X X X _ X X X X X X X X X X X X X X X X a a a v v a v v v v v It 3 3 X X X X X X X X X X X X X X X X X X X X lf1 111 1f1 N �N�nn NNN NNN 2 � � � 2 � 2 2 2 1 y y 2 2 2 TOP OF EXI5TING BA5EMENT SLAB AT ELEV.(+/-) -11'-0 1/2" BO OM OF AEE PL E P. BASE PLATE 5IZE g Kg XQ X� xQ x4 xQ m A m m m m m A X m m X m m`Il] X m m X mW m m m m m m m m X xQQ m X m X m Xq X mpp m XQ m Xz Xz Xz xz XQ XQ XQ m and x x .6 X X X X X X X X X X X x� XS3 X X x X X X X X X X X i'v rW X X ry X rvw xN X �J X X X 9 O O O u1 N = = N x X I (Y cV X N x (V N tL � (N fV N (V fV fV tV (V fV _ x - xW I x I x� I x�y xu� XUU X x x x x x — X N :r v X X - X X X Ty N r}N µ N N U1 _ N N X t(1 X :r X X X _ �IL�JI ICJ N U1 'd I 'd' I lµ�, Q • �D �N N X X X 'Q X X - _ Ul N 'Q I 7 I V U D `Ll X X X X X X X X N1 N N N X X X X X N N NN I N N X X X x X X - m - m . Ii I t - N V V 7 O N b X X x �� t=THIGHNESS j� _F 7 'd N O O O W O O N O O O = 6� ap 6% _ = m .n U �9 N :� `fl ry GL, COL., PIER 4 FTC. GL. COL., PIER 4 FTC. (p, 0 OR WF COL. 0 OR WF COL. BPL SIZE SEE PLAN BPL 5IZE SEE PLAN f Z OR GOL. SGHEDULE z OR COL. SCHEDULE J _ I/2" ALL AROUND 114" LEVELING PL. J FILL SOLID W/ GONG. p D- (TMP) 1 OR OUT NON-SHRINK IL I/2" ALL AROUND - V (TYPO 4{ (TYP) J I/2" EXP. JT. (TYP.) < W (4) 3/4" ANCHOR BOLTS I/2" EXP. JT. (TYP) �.j J y �j W/ IO" EMBEDMENT E % d — 0000a o000000 000000a o 0 0 0 0 0 0 0 0= 3" (TYPO g V 4-3/4" ANCHOR BOLTS ,•, I/4" LEVELING PL. -� • N 2'-O" FILL W/ GONG. AFTER - d w J „ W/ 10" EMBEDMENT � PIER SIZE K � .. •. MIN. COL. 15 IN PLACE OR NON-SHRINK • e - SEE PLAN Q 3" (TYP.) GROUT (TYP) — 4-#5 VERT. (TYP) N _ — • �(2) #4 ALL AROUND SLEEVE (TYP) • 4-#5 VERT. (TYP) • J _ — fe #3 0 ® 10" O.G. (TYP) x _ �D .. OR #3 © O 10" O.G. (TYP) V R Q "•,d ` . -� PIER 5IZE %3 0 ® 10" O.G. (TYP.) ryT = — . 4 e. �D P- SEE PLAN . � OR #3 © ® 10" O.G. (TYP.) FOOTING SIZE 4 REINF. — F FOOTING 5IZE 4 REINF. SEE PLAN OR SCHEDULE SEE PLAN OR SCHEDULE e ^ (3")' •• ° • d'• Vl� Q� R .1 ,. (TYPO • a• _ BOTTOM OF FOOTING I _b TYp m BOTTOM OF FOOTING JJ rollTYP.ELEV. SEE PLAN � O' TYP_ � p 2'-0" TYP. 4 ' IFa ELEV. SEE PLAN rn 4-#5 DOWEL5 W/ MIN. in 4-#5 DOWELS W/ I'-O" BEND (TYP.) PIER FOOTING DET I L COLUMN PIER FOOTING D DETAIL STEP FOOTING DETAIL POCIGET REINFORCEMENT DETAIL PIPE SLEEVE RE I NFORCEIMENT DETA IL COLUMN NOTES: I) COLUMN DETAIL SAME ® FOOTING WITHOUT PIER NOTES: 1) COLUMN DETAIL SAME ® FOOTING WITHOUT PIER 2) PIER REINF. SAME ® EXTERIOR PIER U.N.O. 2) PIER REINF. SAME ® EXTERIOR PIER U.N.O. d 4: . (✓- � . p Q 1'-0" TYP. J d ; CORNER BARS IN OUTSIDE CORNERS TO MATCH HORIZ. BARS e CORNER BAR DETAIL EO ARC N� REVISIONS/SUBMISSIONS: DRAWING TITLE: DATE. DESCRIPTION COLUMN SCHEDULE AND sr oet STRUCTURAL DETAILS F NEB CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT +: FLOOR PL N NORTH PROP. ALTERATIONS TO 8/24/06 05-1194 CONSULTANT: Nemschick Silverman Architects P.C. EXIST'G LIBRARY SCALE: DRAWING NO: ...the business of ARCHITECTURE.' QAPPARKER ENGINEERS, P.c. CUTCHOGUE, NEW YORK AS NOTED ROUTE 25 NO AND P Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High 5kreet, Huntington, New York Fax 516) 421-orbs DISTRICT: SECTION: BLOCK: LOT DRAWN BY: o caP'rasNr M rauurJc MveM.r ru�cx�ECTs rc N 0 TH MJR Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-04ea http://www.ns-arch.com l EX15TINO WOOD BEARING WALL TO REMAIN EXISTING WOOD BEARING 5 I/2" X 5" X 3/6" PLATE WALL TO REMAIN AT EVERY THIRD STUD 5 IAT E E X THIRD PLATE WITH 3" VERT. SLOTTED IT EVERY THIRD STUD NEW COLUMN BEYOND HOLE. WITH 3" VERT. SLOTTED 5/4" DIA. BOLT HAND HOLE, L 9"X4"XINE L.L.H. GONT. L q"X4"XI/2" L.L.H. GONT. EXISTING WOOD BEARING EXISTING WOOD BEARING 3/4" DIA. BOLT HAND (TYP. AT NEW CONCRETE TIGHT. � WALL TO REMAIN TIGHT. FLOOR ADJACENT TO N EXISTING GONT. WOOD (TYP, AT NEW CONCRETE N EXISTING WOOD FJ'S WALL TO REMAIN EXISTING WOOD FJ'S EXISTING WOOD FLOOR ADJAGENT TO EXISTING G( TO REMAIN. 5/6" DIA. EXPANSION EXISTING WOOD BEARING V PLATE TO REMAIN. EXI5TING WOOD BEARING `� PLATE TO REMAIN. EXISTING GONT. WOOD TO REMAIN. 61RDER TO REMAIN. BOLTS AT 52" O.G. (TYP.) WALL) 12" GMU BOND BEAM W/ WALL) PLATED REMAIN. 12" GMU BOND BEAM W/ 12" GMU BOND BEAM M. EXISTING GONT. WOOD ° ° (2) #5 GONT BOTTOM. ° ° (2) #5 GONT BOTTOM. PLATE TO REMAIN. (TYP. ALL AROUND NEW ° (TYP. ALL AROUND NEW (2) #5 GONT BOTTOM. 12" GMU BOND BEAM W/ 7 4" LEDGE FOUNDATION 4" LEDGE FOUNDATION) (TYP. ALL AROUND NEW (2) #5 GONT BOTTOM. 71 FOUNDATION (TYP. ALL AROUND NEW • i 0 , 0 W6 + PLATE GONT. • ' FOUNDATION 0. WI6 BOTTOM a 12" GMU FILLED SOLID W/ WI6 MASONRY FILLED GROUT. ( W Hb WI6 BEYOND GRADE N W6 WI6 BEYOND Q� WI6 BEYOND GRADE NEW DUCT OPENING. W6 + PLATE CONT. 3/4" THRU BOLTS AT WI4 TI # 5 HAL WI4 (1) # 5 GONT. GRADE BOTTOM 24" O.G. ALL AROUND NEW — # 5 ® 13" O.G. HORIZ. — TSB OF WALL. NEW COLUMN BEYOND —T4B OF WALL. FOUNDATION) — # 5 ® 13" O.G. HORIZ. # 4 06" O.G. (TYP) (TYP.) FACE OF CONCRETE GRADE •° NEW COLUMN BEYOND NEW 12" WIDE X (+13E 14 I-V WALL BEYOND # 4 ® b" O.C. NEW W6 GIRDER ON BOTH # 4 ® 32" O.G. (TYPJ f DEEP CONCRETE BEAM W/ ° (3) #5 BOTTOM AND (2) #5 SIDES OF EXISTING WOOD GIRDER. PROVIDE GONT. TOP. RUN BOTTOM BARS 2. _ ° 10" TOP 2X6 WOOD PLATE FOR I I/2" GLR # 5 ® 13" O.G. HORIZ, # 4 ® 16" O.G. BEYOND OPENING MINIMUM. # 4 ® 16" O.G. z # 5 ® 13" O.G. HORIZ. NAILER OF EXISTING FJ'S. TYP. TOP BARS ARE GONT. WALL # 5 ® 12" O.C, FRAME INTO WI6 BEYOND. ° 1 1/2" GLR # 5 ® 12" O.G. 1 1/2" OLR TYP. HORIZ. TOP BARS. HORIZ. D- TYP. z_ O d �j H ° NEW COLUMN BEYOND /T2' P Y LR II- I/2" GLR Q a O O P. TYP. 0 4 AL EXP. JT. (TYP. 10° q (DO R. RUNDIBIONAL EYONDAT I/2" GLR a 01/2" EXP. JT. (TYP. ALL AROUND) ° O DOOR 2'-O" MINIMUM. ,�+_, 2X4 KEYWAY (TYP.) ALL AROUND) 2X4 KEYWAY (TYPJ a 1/2" EXP. JT. (TYP. I/2" EXP. JT. (TYP. (2) # 5 GONT. 3" GLR (2) # 5 GONT. 1/2" EXP. JT. (TYP. r �-'T4B OF WALL. T4B OF WALL. p� TYP. (TYP.) ALL AROUND) U ALL AROUND) m ALL AROUND) g # 4 ® I6" O.G. N 2X4 KEYWAY (TYP) # 4 ® 6" O.G. roll � � \� ut 2X4 KEYWAY (TYP.) N N a (TYP) U `r # 4 ® 16" O.G. N ro� a u v d T a� ° m ° ° t (2) # 5 GONT. ° (2) 5 GONT. ° a ° tti ° V T4B OF WALL. a. T4B OF WALL. 4'_O" fD (T'(P.) d, ° NEW COLUMN FOOTING (TYPJ BEYOND (2) # 5 GONT. ~• 12) # 5 GONT. ° ° NEW COLUMN FOOTING BOT. OF FTC. e BEYOND SOT. OF FTC. 4 be N ad (TYP) d °# 5 ® IB" O.G. HORIZ. ry ° # 5 ® 13" O.G, HORIZ. K4 - (TYPE 3'-5° �_O�� 2'-4" K Ka tt� 6" FF bn �_O�� �_O�� 2,_4-- TYP. � TYP. 6 SECTION A m SECTION B m TYP TYP SCALE: I/2"=1'-O" S-6 SECTION G SECTION D 5GALE: 1/2"=1'-O° 5-8 SCALE: I/2"=1'-O" S-6 SCALE: I/2"=1'-O" EXISTING WOOD BEARING z WALL TO REMAIN �a5 1/2" X 5" X 3/5" PLATE AT EVERY THIRD STUD EXISTING STUD WITH 3" VERT. SLOTTED N WALL TO V HOLE. EXISTIN. FJ On 5/4" DIA. BOLT HAND `I' REMAIN. V O TIGHT. TO REMAIN. EXISTING FJ p EXISTING GONT. WOOD d TO REMAIN. d PLATE TO REMAIN. OrQ 1 5'-4 1/2" 14_6 z • ' I IV- 0C- T TOP OF WI6 GRADE NEW 4" SLAB 0"'..3S33SS ry� ______________ CONCRETE WI6 BEYOND WALL BEYOND e ° SPACE. 1J _ H1 ' , WI4 __---------------___� m IN CRAWL • .Q EXISTIN6 GRADE # 4 ® 16" O.G. —d GIRDER • NEW COLUMN BEYOND ° BEYOND TO ° • e ° REMAIN. m ° • ° ° EXISTING Z 5 ® 12 # 4 ® 16" O.G. FOUNDATION pIIJ # 4 ® 6" O.G. Z O. . HORIZ. WALL TO # 5 ® I " O.G. REMAIN. F HORIZ. aa # 4 ® 16" O.G. # 4012" • —EXISTING PIER # 4 ® 16" O.G. Z ° # 5 ® 12" O,G, O,C. HORIZ. r'' BEYOND TO # 5 ® 12" O.G. HORIZ. REMAIN. O • # 4 ® 12" O,G. Q HORIZ. ° ° # 5 ® 13" O.G. HORIZ. # 4 NOSING O 10 � �' BAR (TYPJ • # ° 10" O ° 4 ® 9" O.G. 6�� 3,_O„ `q O NEW CHANNEL d O • # 4 e 16" O.G. FRAME ALL d # 5 ® 12" O,G. AROUND NEW # 5 ® 13" O.G. HORIZ. �+- Q • 2X4 KEYWAY (TYP) ° ° OPENING THRU ° # 4 ® 8" O.G. � '° HORIZ. ° ° EXISTING 1/2" EXP. -IT. (TYP. ALL AROUND) 2X4 KEYWAY A AROUND)EXP. JT, (TYP. XP. JT. (TYP. �O FOUNDATION ALL AROUND) a AL N (TYPO A N � • 2X4 KEYWAY WALL. ;# 7 N • 10" 5'-2" ►�O" (TYP) 1Ul ro • a o ° Lj ° - =AL(2 (2) # 5 GONT. ° (2) # 5 GONT, d a 4 ° tt1 T4B OF WALL. T4B OF WALL. a (2) # 5 GONT.°, (TYPJ a EXISTING FOOTING TONEW COLUMN FOOTING (TYPJ ° ° O TSB OF TY.LPLJ BEYOND - GO T. a 2 GO T.SOT. OF FTC. BOT. OF FTC. (2) # 5 GONT. NEW UNERPINNING TO# 5 ® 13" O.G. HORIZ. TYPO ° (TYp) BOT. OF FTC. ° ° c a 3'-0" BELOW GRADE MIN. - U (TYP)m bl' TYP. mr TYP. TYP. TYP. TYP. 6' 6° SECTION E SECTION F SECTION G SECTION H SCALE: I/2"=1'-O" 5-6 5GALE: /2"=1'-O" 5-8 5GALE: I/2"=1'-O" S-8 SCALE: I/2"=1'-O" Nl EX15TINO STUD NEW COLUMN DOWN WALL TO TO EXISTING CONCRETE EXISTING FJ FOUNDATION WALL. TO REMAIN. EXISTING FJ EXISTING STUD TO REMAIN. WALL TO REMAIN. 6" GMU 6" GMU WALL #4 AT 46" O.G. (TYP. (2) 3/4" EXPANSION GRADE ° s \ BEYOND ALL AROUND BOLTS HITH d EMBEDMENT. (" AT/ a ELEVATOR FULL IIQ�� N HEIGHT) N ALL NEW COLUMNS TO NEW 4" SLAB 1/2" EXP. JT. (TYP. ° EXISTING CONCRETE ° IN CRAWL / \ `t ALL AROUND) `r EXISTING FOUNDATION WALLS) SPACE. STEEL BRACE ° GRADE m BEAM TO EXISTING FND. °Q \ REMAIN. ma WALL TO REMAIN. 4 ® 12" O.G. ° EXISTING (TYP. AT 14 FOOTING TO e ° ° . 3 -1 N EELLE-`'S)IT �_WALLITO REMAIN. REMAIN. {f d # 4 ® 15" O.G. # 5 ® 14" O.G. a ° d ° o # 5 ® 12" O.G. U HORIZ. (TYP. AT HORIZ. m ° 2 O ELEV. PIT NEW COMBINED BPL WALLS) FOR NEW AND ° e ° EXISTING COLUMNS. ° a 3/4" GROUT MIN. UNDERPINNING ° 12" REPLACE EXISTING SLAB THAT IS ° TO 3'-0" BELOW d 3„ DAMAGED OR UNDERMINED GRADE MIN. I/2" EXP. JT. (TYP. N NEW COLUMN DURING CONSTRUCTION WITH NEW a ALL AROUND) GROUND.REI FORCMENT PROVIDE EXI5TIN6 COLUMN TO FIBERMESH TEMP ° ° REMAIN IN NEW SLAB.-4 d ry� cV EXISTING SLAB TO EXISTING SLAB TO EXISTING SLAB TO 4 `r REMAIN. REMAIN. REMAIN. a ° m d ° T 4_2n 6�� '° ° p I/ EXISTING FOOTING TO REMAIN, NEW FOOTING L a ° a ° d TYP. TYP. SECTION J SECTION rK SECTION L SECTION M SGALE: I/2"=1'-O" 5_6 SCALE. 1/2"=1'-O" 5-6 SCALE, 1/2"=1'-O" 5'6 SCALE; I/2"=1'-O" 5'6 SEA AR REVISIONS/SUBMISSIONS. DRAWING TITLE: tEPEW.N oy� CAE: oEscRProN STRUCTURAL 5ECTION5 6` o-rcx waw,-xmn¢aronucmx V,G �nf n� wox ramraeo � 6 h r CAD HLE NAME: CONSULTANT: FLOOR PL N NORTH PROP. ALTERATIONS T PROJECT TITLE: DATE: NSA PROJECT x: O Nemschick Silverman Architects P.C. EXIST'G LIBRARY SCALE 6 05-1194 .. .the business ffARCHITECTIIRE." CAPANO AND PARKER ENGINEERS, P.C. ROUTE 25 SCALE: DRAWNG 0 Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 � 20 High Street, Huntington, New York Phone : 631-734-7007 Fax : 631-734-7347 (2 (SIb) 421-048q Fax (516) 421 0563 CUTCHOGUE, NEW YORK AS NOTED http://www.ns-arch.com DISTRICT: SECTION BLOCK: LOT: DRAWN BY: MJR corrRcxr fooe IBA9CI17(avaatiw Axcx�c*�Pc. N 0 TH EXISTING WOOD W EXISTING OOD RR'S TO REMAIN RR'S TO REMAIN 51MP50N NEW 2X6 BEARING H2 HURRICANE WALL DOWN TO EXISTING WOOD EXISTING WOOD CLIP a EACH EXISTING GIRDER. EXISTING WOOD EXISTING TO REMAIN EX15 TO REMAIN STUD/RR (TYP.) (TYP.) RR'S TO REMAIN SIMP50N NEW 2X6 BEARING NE WALL DOWNING NG WALL DOWN TO NEH 2X6 ING H2 HURRICANE WALL DOWN TO EXISTING GIRDER. EXISTING GIRDER. GLIP a EACH EXISTING GIRDER. PROVIDE STEEL SIDE STUD/RR (TYP.) (TYP') PLATE AND SEAT (TYP) NEW 2X12 RR'S SIMP50N NEW /pR2XI RR'S NEW 2XIO RR'S CONNECTION FOR NEW NEW 2XI2 RR'5 H2 HURRICANE WOOD GIRDER TO CLIP a EACH EXISTING WOOD EXISTING WOOD P05T 51MP50N EXISTING WOOD EXISTING WOOD STUD/RR (TYP.) G-IS TO REMAIN CONNECTION. H2 URRIGANE GJ'S TO REMAIN NEW 2X6 BEARING G EX TO REMAIN NEW 2X6 BEARING NEW I/2" DIA. LAG EXISTING WOOD EW 2X6 BEARING G IF a EACH EX15TING WOOD WALL DOWN TO EXISTING WOOD WALL DOWN TO BOLTS ® EVERY GIRDER TO REMAIN WALL DOWN TO STU /RR (TYp) GIRDER TO REMAIN NEW GIRDER. (TYP) GIRDER TO REMAIN NEW GIRDER. (TYP) OTHER STUD EXISTING WOOD NEW WOOD NEW GIRDER. (TYPJ EXISTING WOOD NEW 2X6 BEARING (2) 2X6 STUDS AT EXISTING WOOD NEW 2X6 BEARING SPACING (TYP.) GIRDER TO REMAIN GIRDER BEYOND. NEW 2 BEARING GIRDER TO REMAIN GIRDER TO REMAIN PROVIDE STEEL SIDE WALL DOWN TO WAL DOWN TO WALL DOWN TO 5X12 RR (TYP.) PLATE AND SEAT 6" Y'-II" EXISTING WOOD 'I'-II" 6" NEW GI ER. (TYP) EXISTING WOOD EXISTING WOOD NEW GIRDER. (TYP) CONNECTION FOR NEW NEW GIRDER. (TYP.) HOLD POST TO REMAIN HOLD POST TO REMAIN CONNECT NEW POST TO REMAIN WOOD GIRDER TO CONNECT NEW NEW MIGRO-LAM NEW MICRO-LAM GO NEGT NEW p9 `QD GIRDER. BEAM BEARIN WALL TO �O Fx BEARING WALL TO EXISTING WOOD POST BEARING WALL TO NEW 6X6 WOOD NEW 6X6 WOOD N 5EGON6 NEW SECOND CONNECTION, NEW 5EGOND FLOOR FRAMING. FLOOR FRAMING. FLOG FRAMING. /51M. TO SECTION POST DOWN TO POST DOWN TO RIM. TO SECTION NEW 2XI2 RR'S NEW SECOND SECOND FLOOR NEW SECOND NEW 2XI2 RR'S 51M. SECTION SECOND FLOOR FLOOR FRAMING. FLOOR FRAMING. 'A" ON 5-8 (TYP) "A" ON 5-8 (TYP.) SECOND FLOOR "A" ON 5-8 (TYP.) NEW W8 BEAM NEW WI2 BEAM NEW W12 BEAM PROVIDE DOUBLE NEW WI2 GIRDER PROVIDE DOUBLE NEW W8 GIRDER NEW WI2 GIRDER NEW W8 GIRDER NEW W8 GIRDER NEW WI2 GIRDER NEW W8 GIRDER ANGLE ANGLE 51MP50N NEW H55 COLUMN NEW PLYWOOD SIMPSON NEW PLYWOOD NEW H55 COLUMN NEW PLYWOOD CONNECTION FOR NEW HS5 COLUMN CONNECTION FOR G5 GOI STRAP H2 HURRICANE SHEATHING TO EXISTING WOOD SHEATHING TO EXISTING WOOD SHEATHING TO CLIP a EACH NEW 6X6 WOOD EXISTING WOOD NEW 6X6 WOOD EACH 5TUD/STUD EXTEND 2'-0" MIN. P05T TO REMAIN EXTEND 2'1 MIN. N POST TO REMAIN EXTEND 2'-0" MIN. STUD/RR (TYP.) POST TO NEW POST TO REMAIN P05T TO NEW �� (TYP) BELOW NEW WALL NEW H55 COLUMN BELOW NEW WALL ' 90 NEW HS5 COLUMN BELOW NEW WALL SECOND FLOOR NEW H55 COLUMN SECOND FLOOR O2 TO EXISTING WALL TO EXISTING WALL x FRAMING FRAMING — O TO EXISTING WALL FRAMING CONNECTION. CONNECTION. JOINT. (TYP. ALL JOINT. (TYP. ALL JOINT. (TYP. ALL AROUND BUILDING) EX15TINO WOOD AROUND BUILDING) EXISTING WOOD AROUND BUILDING) EXISTING WOOD NEW HS5 COLUMN FJ'S TO REMAIN NEW H55 COLUMN NEW HS5 COLUMN FJ'S TO REMAIN NEW HSS COLUMN NEW H55 COLUMN FJ'S TO REMAIN NEW H55 COLUMN FIR FIRST FLOOR FIRST FLOOR T FLOOR EXI5TING W8 BEAM EXISTING W8 BEAM EXISTING W8 BEAM EXISTING W8 BEAM EXISTING W8 BEAM EXISTING W8 BEAM EXISTING W8 BEAM EXISTING W8 BEAM EXISTING WI2 EXISTING W12 EXISTING WI2 EXISTING WI2 EXISTING WI2 EXISTING WI2 GIRDER GIRDER GIRDER GIRDER GIRDER GIRDER NEW H55 COLUMN NEW H55 COLUMN NEW H55 COLUMN NEW H55 COLUMN NEW HS5 GOLUMN NEW HIS COLUMN NEW HS5 COLUMN EXISTING STEEL EXISTING STEEL EXISTING EXISTING STEEL EXISTING STEEL EXISTING STEEL EXISTING EXISTING EXISTING STEEL EXISTING STEEL EXISTING EXISTING COLUMN TO REMAIN COLUMN TO REMAIN COLUMN TO REMAIN FOUNDATION WALL FOUNDA ION WALL COLUMN TO REMAIN COLUMN TO REMAIN FOUNDATION WALL FOUNDATION WALL COLUMN TO REMAIN COLUMN TO REMAIN FOUNDATION WALL NEW H55 COLUMN NEW H55 COLUMN TO REMAIN. TO REMAIN. NEW HS5 COLUMN NEW H55 COLUMN TO REMAIN. NEW HS5 COLUMN NEW HS5 COLUMN TO REMAIN. REMAIN. EXISTING SLAB ON EXISTING SLAB ON EXISTING SLAB ON EX15TING SLAB ON EXISTING SLAB ON GROUND TO GROUND TO BASEMENT GROUND TO GROUND TO BASEMENT GROUND TO BASEMENT REMAIN. REMAIN. REMAIN. REMAIN. REMAIN. REPLAGE EXISTING SLAB REPLACE EXISTING SLAB REPLAGE EXISTING SLAB REPLACE EXISTING SLAB ' EXISTING FOOTING THAT 15 DAMAGED OR EXISTING FOOTING NEW CONCRETE NEW CONCRETE THAT IS DAMAGED OR EXISTING FOOTING EXISTING FOOTING THAT IS DAMAGED OR NEW CONCRETE THAT IS DAMAGED OR EXISTING FOOTING UNDERMINED DURING TO REMAIN. PIER. PIER. UNDERMINED DURING TO REMAIN. TO REMAIN. UNDERMINED DURING PIER. UNDERMINED DURING TO REMAIN. TO REMAIN. NEW CONCRETE CONSTRUCTION WITH NEW 4" GON5TRUGTION WITH NEW 4" CONSTRUCTION WITH NEW 4" CONSTRUCTION WITH NEW 4" FOOTING. SLAB ON GROUND. SLAB ON GROUND. SLAB ON GROUND. SLAB ON GROUND. NEW CONCRETE NEW CONCRETE NEW CONCRETE NEW GONGRETE PROVIDE FIBERME5H TEMP. FOOTING. FOOTING. PROVIDE EMENTFIDERMESHN TEMP. PROVIDE FI CE MET TEMP. FOOTING, PROVIDE F113ERMESHN N TEMP. FOOTING. REINFORCEMENT IN NEW NEW CONCRETE REINFORCEMENT IN NEW REINFORCEMENT IN NEW NEW CONCRETE REINFORCEMENT IN NEW 5LAB. (TYPJ FOOTING. SLAB. (TYPJ SLAB. (TYPJ FOOTING. SLAB. (TYP) 12'1 !+/-) 13'-2" (+/-) 12'-11" (+/-) 6° (+/-) 6" !+/-J 12'-II" !+/-) 13'_2" (+/-) 12'-II" !+/-) 12'1 (+/-) 15'1 (+/-) 12'1 SECTION A SECTION B SECTION G SCALE: I/4"=1'-0" 5-9 SCALE: I/4"=1'-O" 5-9 SCALE: I/4"=1'-O" 5-q 5IMP50N LSTA-36 a EACH RAFTER NEW (2) 2XI2 TYp RIDGE NEW 2XIO RR'S NEW 2XIO RR'S EXISTING WOOD RR'S TO REMAIN PROVIDE STEEL SIDE PLATE SIMP50N HL53PG a AND SEAT GONNECTION FOR EACH RAFTER NEW WOOD GIRDER TO �P) EXISTING WOOD P05T CONNECTION. (TYP) NEW WOOD GIRDER NEW WOOD GIRDER EXISTING WOOD EXISTING WOOD EXISTING WOOD EXISTING WOOD P05T BEYOND TO POST BEYOND TO F05T BEYOND TO TRU55E5 TO REMAIN REMAIN REMAIN REMAIN CONNECT NEW BEARING WALL TO NEW SECOND NEW 2XI2 RR'S FLOOR FRAMING. SIM. TO SECTION SECOND FLOOR "A" ON 5-8 (TYP.) SECOND FLOOR NEW NO BEAM EXISTING WOOD NEW WI2 GIRDER P05T TO REMAIN EXISTING WOOD EXISTING WOOD EXISTING WOOD NEW PLYWOOD NEW W6 BEAM NEW HI POST TO REMAIN P05T TO REMAIN POST TO REMAIN SHEATHING TO EXISTING COLUMN EXTEND 2'-O" MIN. TO REMAIN. NEW WI2 GIRDER BEAM BELOW NEW WALL EXISTING COLUMN BEYOND NEW H55 COLUMN TO EXISTING WALL pN EXISTING COLUMN TO BE NEW H55 COLUMN JOINT. (TYP. ALL TO BE EXTENDED RESUPPORTED BY CONNECT HEW AROUND BUILDING) DOWN TO NEW \ NEW STEEL. NEW HSS COLUMN NEW HS5 COLUMN BEARING WALL TO EXISTING WOOD FOUNDATION WALL. EXISTING WOOD BEYOND BEYOND NEW 5EGOND NEW H55 COLUMN NEW H55 COLUMN FJ'S TO REMAIN NEW H55 COLUMN NEW H55 COLUMN SUBMIT PROPOSED FJ'S TO REMAIN FLOOR FRAMING. DETAIL WITH STEEL 51M. TO SECTION FIRST FLOOR SHOP DRAWING5. FIRST FLOOR "A" ON 5-8 (TYP) NEW W8 GIRDER NEW WIb BEAM EXISTING W12 EXISTING WI2 EXISTING WI2 EXISTING WI2 EXISTING WI2 GIRDER GIRDER GIRDER GIRDER GIRDER EXISTING NO BEAM EXISTING W8 BEAM EXISTING WB BEAM EXISTING W8 BEAM EXISTING EXI5TIN6 NEW HS5 COLUMN NEW HISS COLUMN NEW H55 COLUMN NEW H55 COLUMN FOUNDATION WALL NEW HS5 COLUMN NEW H55 COLUMN NEW HS5 COLUMN FOUNDATION WALL TO REMAIN. TO REMAIN. NEW SLAB ON EXISTING SLAB ON I GROUND. GROUND TO BASEMENT REMAIN. EXISTING FOOTING EXISTING FOOTING G TO REMAIN. NEW CONCRETE NEW CONCRETE NEW CONCRETE NEW CONCRETE TO REMAIN. NEW CONCRETE NEW NGRETE NEW CONCRETE NEW CONCRETE FOOTING. FOOTING. FOOTING. FOOTING. FOOTING. SEE FOOT1 G. FOOTING. FOOTING. BLOWUP SECTIONS FOR INFORMATION NOT 5HOWN HERE. III-Oil (+/-) 12'_O° (+/-) 12'-0" (+/-) 12'1 SECTION D SECTION E SCALE: /4"=1'-O" 5-9 5GALE4 1/4"=1'-O" S-q SEER : �EpED A REVISIONS/SUBMSSIONS: DRAWING TITLE: DATE: le-sew DESCRIPTION:-se STRUCTURAL 5ECT IONS 290 9TP of NEVI T CAD FILE NAME: PROJECT TITLE: DATE NSA PROJECT is CONSULTANT: FLOOR PL N NORTH Nemschick Silverman Architects P.C. EXISPROP. ALTERATIONS TO gALE, D5-1194 -...the business aFARCHITECTURE." CAPAND AND PARKER ENGINEERS, P.C. ROUTE LIBRARY Design and Consulting Services ROUTE 25 SCALE: DRAWING NO: 735 Deerfoot Path, Cutchogue, New York 11935 20 High street, Huntington, New York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 fill (516) 421-0499 Fax (516) 421-0565 DISTRICT: SECTION BLOCK: LOT: DRAWN BY: http://www.ns-arch.com .corvacxr zoa raucxoc zvawt nro�cre rc N 0 TH MJR EXISTING W D EXISTING WOO TRU55E5 T TRU55ES TO REMAIN REMAIN EXIST NO WOOD SECOND FLOOR FJ'S REMAIN SECOND FLOOR N W H6 BEAM NEW H12 GIRDER NEW 146 BEA NEW HI2 GIRDER NEW H55 COLUMN EXI5TI 6 GOLUMN EXISTING COLUMN NEW H55 GOLUMN O REMAIN. TO REMAIN. b" BRG. (TYPJ EXISTING COLUMN EXISTING COLUMN TO BE TO BE N�� RESUP ORTED BY RESUPPORTED BY EW STEEL. NEW STEEL. SIMP50N H2 HURRICANE NEW H5 GAPER NEW WI6 GIR R GLIP a EACH (TYP) BEYOND (TYP.0 5TUD/RR (TYP.) NEW H55 G LUMN 3/4" PIA. TH NEW H55 COLUMN NEW H55 GOLU N W H55 COLUMN NEW RR'5. (SEE PLAN BOLTS AT 24' O.G, FOR SIZE AND AND MAX. 12' 5PAGING) TOP COURSE OF GMU FROM EAGH END • •, • • TO BE FILLED SOLID OF HOOD GIRDER, W/ MASONRY GROUT. (TYR) (TYP. ALL EXISTING AO CD ° ELEVATOR F� ° GIRDER TO NEW SLAB ON ° REMAIN. (TYP. NEW SLAB ON NEW b"Xb" GMU BOND NEW H55 COLUMN GROUND. GROUND. ° BEAM H/ (2) #4 GONT. e NEW 2 X 12 RR'S BOTTOM. (TYP. ALL ° SHAFT THIS ELEVJ ° #4 AT 48" O.G. MAX, NEI,4 CONCRETE NEW GONG ETE NEW GONG E NEW GONGRETE NEW CONCRETE NEW G NGRETE NEW GON RETE NEW CONCRETE NEW 2X6 WOOD BRG (TYP. ALL AROUND ELEVATOR SHAFT) ° FOOTING. SEE FOOTING. FOOTING. FOOTING, SEE FOOTING. SEE FOOTING. FOOTING. FOOTING, SEE HALL. (5PAGING OF SEE PLAN FOR BLOWUP 5EGTION5 BLOWUP 5EGTIONS BLOWUP SECTIONS BLOWUP 5EGTION5 STUDS TO MATCH RR LAYOUT. FORINFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION 5PAGING) • e NO SHOWN HERE. NOT 5HOWN HERE. NOT SHOWN HERE. NOT 5HOHN HERE. NEW SLOPING ° .'VI 9-.11 (-/+) ..b-.01 z/I E-111 JI-z .11-z (-/+) MIGRO-LAM HEADER 7 .91/I b-,9 (-/+) .I-.I (-/+) BELOW NEW WOOD • • e ..b/I 9'.S (-/+) ..9-.L (-/+ ..S-.OI (-/+) ..b/9 I'.9 (-/+) ..9 (-/+) ..I'.I (-/+) ..91/1 b-,9 (-/+) ,.9/L L-.LI (-/+) BRG WALL ABOVE. ° NEW &"X8" GMU BOND SECTION A SECTION B BEAM WBOTTOM. FUN SCALE: 1/4"=1'-O" 5-10 SCALE 1/4"=1'-O° 5-10 BEYOND DOOR OPENING I6' MIN. (TYP AT ELEVATOR DOOR M.O.) GMU HALL BEYOND 5ECT1 ON 6 SCALE: 3/4"=1'-O" 5-10 EXISTING WOOD POST TO REMAIN. 3/16" PLATE GONT. REMOVE TOP 1 I/2" GMU WALL BEYOND OF 4" VERT. LEG. (TYP. U.N.0) Ui p ° NEW 4"X4"X5/I6" J PIECE OF CLOSURE ANGLE ALL N IN L6"X4'X5/I6" L.L.H. AROUND (TYP. U.N.0) 'd' ry GONT. (TYP. U.N.0) ° PAINT FACE OF v LE BI-ACK ( ° TOGNSTALLATION.IOR - a (TYP. U.N.OJ - • NEW 8"X GMU BOND • " BEAM W/ (2) #4 GONT. BOTTOM. (TYP. ALL ° v MASONRY ANCHORS AROUND ELEVATOR SHAFT TH15 ELEV.) NEW W6 BEAM NEW W8 BEAM NEW W6 BEAM (TYP) DEPTH TO BE NEW W8 BEAM VERIFIED IN FIELD. MASONRY ANCHORS NEW 12 GIRDER NEW WI2 GIRDER NEW WI2 GIRDER NEW WI2 GIRDER NEW WI2 BEAM • #4 AT 45" O,G. MAX. ° (TYP) NEW WI2 GIRDER NEW COLUMN (TYP. ALL AROUND NEW H8 BEAM NEW WI2 BEAM BEYOND. • •, ELEVATOR SHAFT) a EXISTING WOOD POST EXISTING WOOD STUD SEE PLAN FOR ° TO REMAIN. WALL TO REMAIN. LAYOUT. NEW W GMU BOND NEW COLUMN BEAM W/ (2) #4 GONT. e v NEW COLUMN BOTTOM. RUN BEYOND DOOR OPENING 16" MIN. (TYP D AT ELEVATOR OOR M.O.) GMU WALL BEYOND SECTION D SECTION H SECTION F SCALE 3/4"=1'-O" 5-10 SCALE: 3/4" O =1'-O" 5-10 SCALE: 3/4"=I'- " 5-10 EXISTING HOOD P05T TO REMAIN. GMU HALL BEYOND NEW GOLUMN NEW FJ TO BE NEW FJ TO BE TMP' NEW COLUMN ADDED, 51ZE TO ADDED. SIZE TO (2) 3/4" DIA. THRU MATCH EXISTING. ° MATCH EXISTING. EXISTING FJ TO BOLTS TO CONNECT EXISTING FJ TO ° EXISTING F TO REMAIN. REMAIN. REMAIN. NEW H55 COLUMNS TO EXISTING WOOD POST. (TYP) a ' >' EXISTING COLUMN • • _ GAP PLATE TO BE ---- OUT B BEAM W/ (2) #4 GONT. BACK TO ALLOW NEW W GMU BOND - ----- - FOR NEW COLUMN INSTALLATION. BOTTOM. (TYP. ALL • • REMOVE EXISTING AROUND ELEVATOR ANGLES AND BOLTS ° SHAFT THI5 ELEV) e THAT CONNECT ° DEPTH TO BE EXISTING WOOD POST VERIFIED IN FIELD. TO EXISTING GAP e NEW 8"X8" GMU BOND PLATE. (TYP.) ° BEAM W/ (2) #4 GONT. BOTTOM. (TYP. ALL EXISTING W8 BRACE 7-�EXISTING W8 BRACE EXISTING H& BRACE AROUND ELEVATOR ° MA50NRY ANCHORS EXISTING H& BRAGE BEAM TO REMAIN. BEAM TO REMAIN. BEAM TO REMAIN. • SHAFT THIS ELEVJ , (TYPJ BEAM TO REMAIN. NP, E015TINO V 112 GIRDER MASONRY ANGHTMRS #4 AT 4&" O.G. MAX, e NEW WI2 BEAM • • (TYP. ALL AROUND NEW COLUMN NEW H12 BEAM ELEVATOR SHAFT) ° EXISTING COLUMN TO NEW 8"X8" GMU BOND SEE PLAN FOR REMAIN. BEAM W/ (2) #4 CONT. LAYOUT, ° NEW GOLUMN BOTTOM. RUN BEYOND DOOR OPENING 16' MIN. (TYP AT ELEVATOR DOOR M.O.) GMU WALL BEYOND SECTION G SECTION E SCALE: 3/4"=1'-O" 5-10 SCALE: 3/4"=1'-O SEAL: pE0 Aq� REVISIONS/SUBMISSIONS: DRAWING TITLE; DATE: DESCRIPTION. STRUCTURAL SECTIONS DATE: �a.emI amecmx i �O O� .i.iea euns>wm C * �r OF E.tt y CAD FILE NAME: PROJECT TITLE DATE' NSA PROJECT CONSULTANT: FLOOR PL N NORTH Nemschick Silverman Architects P.C. PROP. ALTERATIONS TO 8/24/06 05-1194 ...the business of ARCHITECTURE.- CAP De ign PARKER ENGINEERS, P.C. ROUEXISTE LIBRARY SCALE: DRAWING NO.: Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 HISh street, Huntington, New York — ROUTE 25 Phone : 631-734-7007 Fax : 631-734-7347 (Z5- TR TCHOSECT NEW YORK AS NOTED (516) 421-0439 Fax (516) 421-0565 DISTRICT: SECTOR BLOCK. LOT: DRAWN BY: http://www.ns-arch.com .c�racllr sea raucx�averti.N ulan�cTs cc N 0 TH MJR I 48XI1 THRU FNDN WALL UP TO 0005ENEGK ABOVE GRADE. PROVIDE GALVANIZED AREAWAY WALL SUPPLY AIR DUCT UP THROUGH FLOOR/ROOF 30XLI INLET REFURBISH EXISTING LOUVRE WITH 50% BATHROOM EXHAUST RETURN OR EXHAUST DUCT UP ROUTE THRU GMU WALL FREE AREA. AREAWAY FAN 5 REQUIRED. THROUGH F 00 00 ABOVE GRADE 24X5 UP TO FLOOR RE6I5TER5 (TYP) 38XI6 UP IN ET LOUVRE RAINPROOF THROUGH FPPLY RLOOR/ROOF DUCT N 36X20 RA DUCT TIGHT INLET LOUVRE W/50% TO FLOOR ABOVE FREE AREA ❑ RETURN OR EXHAUST DUCT DOWN UO THROUGH FLOOR/ROOF O ® ® ® ® ® ® ACOUSTICAL LINING 7 O 20XIO N :01 ❑p F-2 B-I 2 X T �- RETURN AIR 50X8 I FP El 14X6 FREE AREA.LOUVRE 50% 8X8 OX24 MOD ® FOUR WAY DIFFUSER 1 AH-I ® THREE WAY DIFFUSER I Fp 24X30 UPS 48X12 ISTRIBUTION o� U 5L-1 200 GFM 5L-1 200 GFM 5L-I 200 GFM 5L-I 200 GFM X BOX S TURNING - ICI ® TWO WAY DIFFUSER 36XI8 VANE 12XI2 RA x OPENING WITH X MOD "' I50 GFM RETURN AIR GRILLE .d.. SCREEN �p X `,� - m PD V N N T p p p❑ Moo 0 RETURN AIR GRILLE 20X6 N N BP-1BP-1O N N TO 24X8 24X12 32X16 250 GFM Fp PLENUM ABOVE SOFFIT I p I SMOKE DETECTOR IN S.A..A. DUCT AH-3 O N IOX6 AH 2 Xµ ----0 MOTOR OPERATED DAMPER _ � 40X2O FROM I FD Lt�-- UNDERCUT O IFD 3 X12 4 6XI0 UP ABOVE 7 I VOLUME DAMPER LE Fp 10 GFM DIRECTION OF FLOW 12X12 UP TO FLOOR gg 100 GFM z REGISTERS ABOVE (TYP) DQ GATE VALVE Q 0 7==, —,0. N CHECK VALVE MOD m oOo p `r O O (NO FLOW TO THE RIGHT) O �_ N I €� Fp AH 2Q I� CHECK VALVE IN N 5L-I 20o GFM 5L-1 200 GFM SL-I 200 GFM 5L-I 200 GFM (NO FLOW TO THE LEFT) OPENING WITH F-I Fp X 14X6 ACTIVE FINNED TUBE SCREEN I O 14X8 14X6 18X8 ® NEW CONNECTION O O IOXB — 14X4 AFF ABOVE FIN15HED FLOOR X 100 GFM 150 GFM MOD ® ® 20XIO ® ® O AH AIR HANDLING UNIT Q a O 150 GFM BDD BAGKDRAFT DAMPER a N GO CEILING DIFFUSER PLENUM BOX IOX6 UP O 100 GFM GR GEILING REGISTER OX6 14X4 EF-I O � ODTR DOUBLE DEFLECTION TOP REGISTER IOX6 RA FROM 100 GFM ON DOWN ABOVE EF EXHAUST FAN 38XIb FROM ABOYE 24XI2 RA TRANSFER DUCT IOX6 UP X FAI FRESH AIR INTAKE W/FD THRU WALL ABOVE O 8'-O"X4'-O" RAINPROOF SOFFIT (TYP) 14X4 FG FLEX CONNECTION INLET LOUVRE W/50% FREE AREA loX4 Fp FIRE DAMPER W/AG6E55 DOOR 8X8 UP 8X8 UP 14X4 150 GFM FD/5D GOM15INATION FIRE/5MOKE DAMPER VN ON GOOSENECK FIELD LOGATE ALL DUCT RISERS BETWEEN EXISTING 150 GFM N LL FLOOR JOISTS (TYP) X NG NEW CONNECTION OA OUTSIDE AIR RA RETURN AIR BASEMENT FLOOR FLAN RAG RETURN AIR GRILLE SCALE. 1/4" = 1'-0" RN ROOFTOP UNIT DEMOLITION NOTES 14X4 14X4 SA SUPPLY AIR 1. CONTRACTOR SHALL REMOVE ALL EXISTING AIR HANDLERS, PIPING, 150 GFM 150 GFM SD SPLITTER DAMPER DUCT, DIFFUSERS, ETC UNLESS OTHERWISE INDICATED. VD VOLUME DAMPER 2. EXHAUST FANS AND DUCT SERVING EXISTING BATHROOMS SHALL REMAIN. GONTRACTOR SHALL INSPECT AND REFURBISH AS REQUIRED TO RESTORE 30XIO HWBB HOT WATER B S BO TO GOOD OPERATING CONDITION. HWR HOT WATER RETURN 3. REMOVE EXISTING BOILER FLUE PIPE, CONTROLS ETC. HW5 HOT WATER SUPPLY 4. REMOVE EXTERIOR GONDEN5ER AND HEAT PUMP UNITS AND ALL ASSOCIATED PIPING, WIRING, CONTROLS, ETC. 77 LF LINEAR FEET 5. REMOVE EXISTING HOT WATER SUPPLY AND RETURN PIPING, PUMPS, CONTROLS, 24XI0 UF'VTO 2ND FLOOR UON UNLESS OTHERH15E NOTED ETC. TO EXISTING HEATING UNITS. 24XIO UPVTO 2ND FLOOR GORE COMPLIANCE CERTIFICATION LINEAR DIFFUSER SCHEDULE BRANCH DUCT SCHEDULE SUFFLY DIFFUSER SCHEDULE THE HVAG SYSTEMS INDICATED ON THESE PLANS HAVE BEEN DESIGNED BY A LICENSED PROFESSIONAL ENGINEER AND ARE IN COMPLIANCE WITH THE REQUIREMENTS OF SECTION 503 TOTAL # OF HEIGHT SLOT MAX THROW GFM RANGE MANUFAGTURER TYPE MODEL NG NECK SIZE OF THE ENERGY CONSERVATION CONSTRUCTION CODE OF NEW YORK STATE 2002 EDITION MARK NO.OF MODEL SERIES TYPE LENOTH(FT) SLOTS (IN) SIZE(IN) GFM/LF p 50 FPM (FT) NC DUCT SIZE GFM RANGE IN ACCORDANCE WITH 803.2.6, THE REQUIREMENT FOR ECONOMIZERS HAS BEEN ELIMINATED SUPPLY BASED ON AIR HANDLER/GONDENSER SYSTEM EER = 12.1. SL SIDEWALL -1 CARNES TRIMAIRE GWRB 4'-0" - 4 1/2 '75 15 < 20 14 X 4 UP TO 200 O - 125 GARNES SQUARE STEEL SERIES S PB 20 6 X 6 THE HVAG DESIGN HAS BEEN PREPARED IN AGGORDANGE WITH THE PROVISIONS OF THE SUPPLY CURRENT NEW YORK STATE MEGHANIGAL GODE, 2002 EDITION WITH THE FOLLOWING DESIGN SL-2 GARNES TRIMAIRE GTKB FLOOR 1'-0. - 12 1/4 260 20 < 20 14 X 6205 TO 400 125 - 280 GARNES SQUARE STEEL S R 24 9 X 9 CRITERIA; SUPPLY 250 - 500 GARNES SQUARE STEEL SERIES SKPB 24 12 X 12 I. SUMMER DESIGN CONDITION: 8q DB T3 NB 5L-3 GARNES TRIMAIRE GTKB FLOOR 4-0 - 4 I/4 "10 15 < 20 16 X 6 405 TO 450 2. WINTER DESIGN CONDITION: II DB SUPPLY CALCULATED COOLING LOAD: 48 TONS SL-4 GARNES TRIMAIRE GTKB FLOOR 8 - 8 I/4 200 1-1 < 20 18 X 6 455 TO 525 O - 125 GARNES SQUARE STEEL SERIES, 20 6 X 6 PROVIDED COOLING GAPAGITY: 46 TONS SUPPLY 5L-5 GARNES TRIMAIRE GTKB FLOOR 4 I/4 100 IS < 20 16 X 8 530 TO 625 125 - 280 GARNES SQUARE STEEL SERIES K 24 q X q CALCULATED HEATING LOAD: 400 MBH RETURN PROVIDED HEATING GAPAGITY� q00 MBH RL-4 GARNES TRIMAIRE GTKB FLOOR 8 - 8 I/4 200 - < 20 20 X q 625 TO 1000 280 - 500 GARNES SQUARE STEEL 5 R 2-f 12 X 12 NOTE. ALL BRANCH DUCTS SHALL BE PROVIDED WITH MANUAL VOLUME DAMPERS THROW VALUES BASED ON 50 FPM AIR VELOCITY 1) ALL DIFFUSERS WITHIN THE SAME ROOM SHALL BE THE SAME SIZE, INCREASING THE SMALLER DIFFUSERS TO THE PROVIDE CORD OPERATED DAMPERS IN INACCESSIBLE AREAS LARGEST DIFFUSER IN THE ROOM. 2) PROVIDE SUPPLY DIFFUSERS AND RETURN GRILLES WITH EDGE TYPE APPROPRIATE FOR CEILINGS. 3) USE PLAQUE FACE DIFFUSERS ON BANKING FLOOR AND IN AREAS DESIGNATED BY ARCHITECT. 4) USE SERIES K DIFFUSERS IN ALL OTHER AREAS, UNLE55 DIRECTED OTHERWISE BY ARCHITECT. OCCUF I ED AREA VENTILATION SCHEDULE BYPASS TERMINAL BOX SCHEDULE 5) COORDINATE FINAL DIFFUSER SELECTION, COLOR, ETC WITH ARCHITECT PRIOR TO ORDERING AND INSTALLING. LOGATION AREA GLASSIFIGATION OGGUPANT COUNT ROD OA PROVIDED OA MARK NO. MANUFAGTURER MODEL INLET MINIMUM MAXIMUM D15GHAR6E REMARKS SIZE GFM GFM NG IST FLOOR 5100 SF LIBRARY 16 PEOPLE 1440 GFM 1(920 GPM BP-I KRUEGER KLB 10 O &00 20 2ND FLOOR 3600 5F LIBRARY T2 PEOPLE 1100 GFM 1620 GFM I) DAMPER RANGE SHALL BE FACTORY SET TO LIMITS INDICATED. I. OCCUPANCY CLASSIFICATION, OGUPANGY COUNT AND REQUIRED VENTILATION 15 IN AGGORDANGE WITH TABLE 405.5 IN MG-NYS. 2) DISCHARGE NG VALUES BASED ON PRF55URE DROP ACROSS TERMINAL BOX. 3) PROVIDE ELECTRIC ROOM SENSOR, 24V TRANSFORMER, AND ACTUATOR To MAINTAIN SPACE TEMPERATURE. SEAL gD Aq REVISIONS/SUBMSSIONS: DRAWING TITLE �fF CY A7@ DESCRIPTION: o y ^� BA5EMENT H1/AG PLAN Na 929Wfi >• CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT •: CONSULTANT JFLOOR PL N NORTH PROP. ALTERATIONS TO 8/24/06 05-1194 Nemschick Silverman Architects P.c. EXISTNG LIBRARY the business of ARCHITECTURE' W(5,16) NO AND PARKER ENGINEERS P.C. SCALE; DRAWING NO., Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 Hlgh Street, Huntington, NoA York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 421-04511 Fax (516) 421-0563 M DISTRICT: SECTKJIJ: BLOCK: LOT: DRAWN BY: http://wvvw.ns-arch.com .coa a aaos eesarx zv R N 0 TH �I UP FROM SPILL FAN BELOW GU-I O O GU-4 GU 2 ® ® ® ® ® ® 5L-2 ®5 GFM g SL-2 245 GFM v u � N REFURBISH EX15TING� r BATHROOM EXHAUST N N J FAN AS REQUIRED. N N to J N u- 0 U O O ❑O O❑ ®ry p N8WX2A LRAO J N J 4OX20 RA DOWN N 5OX24 UP FROM SPILL FAN IN N BASEMENT. CONTINUE UP TO u N 6005ENEGK ABOVE ROOF dam' og N N J U N 7 J 6X10 UP N ®� N N N N i 0 O ❑o ❑° BERKO MODEL ASL3 p U ELECTRIC BASEBOARD, 250W PER LF, 208-1-60, W/INT T5TAT J N 0 p 48XI2 WALL RAG ) N ® ® N SL-5 160 GFM U ai N In 8X8 BTWN JOISTS UP TO 12X48 WALL RAO (12 LOGS) N N J ®ry FLOOR REGISTER (TYP) N N N (V J OX6 z IOX6 UP FROM V p BELOW TO GL6 7HI SOFFIT Q N O IOX6 RA DOWN p J 8X6 BETWEEN J r JOISTS GU-3 N °M ® N N® N J N 8X8 UP FROM BELOW TO 8X4 DUCT THRU ss WALL WITH WALL U VENT GAP (TYP-2 LOGS) N 0 EE]n c N kL 0 0 J N 7 ® ry N N (j J J N N 51--2 24 GFM 5L-2 245 GFM SL-2 24 GFM FIRST FLOOR PLAN C24XIO UP FROM BELOW 24XIO UP FROM BELOW SCALE: I/4" = P-O" LINEAR DIFFUSER 5GHEDULE MARK NO. MANUFACTURER MODEL SERIES TYPE TOTAL # OF HEIGHT SLOT MAX THROW NG LENOTH(FT) SLOTS (IN) SIZE(IN) GFM/LF ® 50 FPM (FT) SUPPLY 5L-I GARNES TRIMAIRE CWRB 51PEWALL 4-0 - 4 I/2 TS I5 < 20 5L-2 GARNES TRIMAIRE GTKB SUPPLYFLOOR -O - 12 I/4 260 20 < 20 SL-5 GARNES TRIMAIRE GTKB FLOOR SUPPLY 4'-0" - 4 1/4 -10 15 < 20 SUPPLY 5L-4 GARNES TRIMAIRE GTKB FLOOR all - 8 I/4 200 ICI < 20 SUPPLY 5L-5 GARNES TRIMAIRE GTKB FLOOR 2-0 - 4 1/4 100 15 < 20 RL-4 GARNES TRIMAIRE GTKB RETURNFLOOR all - 8 I/4 200 - < 20 THROW VALUES BASED ON 50 FPM AIR VELOCITY PROVIDE CORD OPERATED DAMPERS IN INACCESSIBLE AREAS 5RANGH DUCT SCHEDULE DUGT SIZE GFM RANGE 14 X 4 UP TO 200 14 X 6 205 TO 400 16 X 6 405 TO 450 18 X 6 455 TO 525 16 X 8 550 TO 625 20 X q 625 TO 1000 NOTE: ALL BRANCH DUGT5 SHALL BE PROVIDED WITH MANUAL VOLUME DAMPERS SEAL: AqC REVISIONS/SUBMISSIONS: DRAWING < W, DATE: DESCRPTION: P I RST FLOOR * H1/A0 PLAN 9r 1 CAD FILE NAME: N PROJECT TITLE: DATE NSA PROJECT •: CONSULTANT: FLOOR PL N NORTH Nemschick Silverman Architects P.c. EXISPROP. ALTERATIONS TO g�p4�06 05-1194 '.. .the business of ARCHITECTURE.' CAPANO AND PARKER ENGINEERS, P.C. ROUTE LIBRARY SCALE: DRAWING NO: Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 Hlgh 5}reet, Huntington, New York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7D07 Fax : 631-734-7347 (516) 421-0459 Fax (516) 421-0565 DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com .CCPVRser 6taacNat APCNIKTs P.0 NO TH u O PROVIDE 3/4" UNDERCUT AT ALL 48XI0 UP FROM BELOW ROOM DOORS FOR RETURN AIR (TYP) r ° - - - - - - - - - - - - - - - - - - - - - � 300 GFM X I&XIO 2e a a a 24X30 UP THRU ROOF TO IOX4 BTWN m m m �0 0005ENEGK ABOVE ROOF JOISTS SL-I 215 GFM r SL-I 2-15 GFM 5L-I 215 GFM SL-I 2l5 GFM I50 GFM IOX4 BTWN - - - — � � - - — - - - - - #I— — O 450 GFM I50 GFM Qy 0 I 40XI0 ry IOX4 BTWN IIII X T — — — \ - — — — — - - - - - - � L - - - - - � - - - - - - �I - 4T � 150 GFM X II II o IIji II II I - - - - - - — — -1-I— - 40X20 RA DOWN TO N X —1 _ — -TI _ _ _ _ BASEMENT II II m I II II I II I I II II II _ II —. �T J — - - - _ � � - - - - - � - - - - - - � - - - - � 450 GFM i ROUTE DUCT ABOVE 0 CEILING �—BERKO MODEL A51_3 ELECTRIC BASEBOARD, 250W PER LF, 20B-I-60, — - - - - - - — - - - - - - — W/INTT5TAT — #/ - - - - � � - - - - - - - - - - - � SL-I 215 GFM SL-I 215 GFM SL-I 215 GFM SL-I 2l5 GFM -I�- - 14X6__Lj ,wa a ,me e PROVIDE VOLUME DAMPER 300 GFM QS AH-3 8XI0 // ON DROP (TYP) - - - - - - - 5L-4 ®O GFM SL-4 15 GFM 450 OFM III IOX6 RA DOWN WALL — — IOXb RAG IN WALL MOUNT — — — — AT LANDING LEVEL 1 II I II II 1 II II SECOND FLOOR PLAN 2'-0" LF 500W 2'-0" LF 500W YU SCALE: I/4" = 1'-O" II PROVIDE GONTINUOUS Q 450 GFM �gII ENGL05URE (TYP) ® II BERKO MODEL A5L3 dd 88 ELECTRIC BASEBOARD, — — — 250W PER LF, 208-I-60, W/INT TSTAT (TYP) I II I I II I II I 24XIO UP FROM BELOW II 1 I II I450 GFM III L_ — INCLINED 24XIO DUCT IN LINED 24XIO DUGT FLAT SECTION OF DUCT WITH 36XI2 RISER THRU CLG LINEAR DIFFUSER SCHEDULE SUPPLY DIFFUSER SCHEDULE TOTAL # OF HEIGHT SLOT MAX THROW GFM RANGE MANUFACTURER TYPE MODEL NG NEGK 51ZE MARK No. MANUFACTURER MODEL SERIES TYPE TOTAL SLOTS (IN) 51ZE(IN) GFM/LF p 50 FPM (FT) NG SUPPLY O - 125 GARNES SQUARE STEEL SERIES 5KP5 20 6 X b 5L-I GARNES TRIMAIRE GWRB 51DEWALL 4'-0" - 4 I/2 15 15 < 20 SUPPLY 125 - 280 GARNES SQUARE STEEL SERIES 5KP13 24 q X Cl SL-2 GARNES TRIMAIRE GTKB FLOOR I'-0' - 12 I/4 260 20 < 20 SUPPLY 280 - 500 GARNE5 SQUARE STEEL SERIES 5KPB 24 12 X 12 5L-5 GARNES TRIMAIRE GTKB FLOOR 4'-0" - 4 I/4 10 15 < 20 SUPPLY 0 - I25 GARNES SQUARE STEEL SERIES K 20 6 X 6 SL-4 GARNES TRIMAIRE GTKB FLOOR 8" - 8 I/4 200 Iq < 20 SUPPLY 125 - 280 GARNES SQUARE STEEL SERIES K 24 q X q 5L-5 GARNES TRIMAIRE GTKB FLOOR 2-0 - 4 I/4 100 15 < 20 RETURN 250 - 500 GARNES SQUARE STEEL SERIES K 21 12 X 12 RL-4 GARNES TRIMAIRE GTKB FLOOR 511 - 8 I/4 200 - < 20 I) ALL DIFFUSERS WITHIN THE SAME ROOM SHALL BE THE SAME SIZE, INGREA5ING THE SMALLER DIFFUSERS TO THE THROW VALUES BASED ON 50 FPM AIR VELOCITY LARGEST DIFFUSER IN THE ROOM. PROVIDE CORD OPERATED DAMPERS IN INAGGE551BLE AREAS 2) PROVIDE SUPPLY DIFFUSERS AND RETURN GRILLES WITH EDGE TYPE APPROPRIATE FOR GEILIN(55. 3) USE PLAQUE FACE DIFFUSERS ON BANKING FLOOR AND IN AREAS DESIGNATED BY ARCHITECT. 4) USE SERIES K DIFFUSERS IN ALL OTHER AREAS, UNLE55 DIRECTED OTHERWISE BY ARCHITECT. 5) GOORDINATE FINAL DIFFUSER 5ELEGTION, COLOR, ETC WITH ARCHITECT PRIOR TO ORDERING AND IN5TALLING. SEAL' REVISIONS/SUBMSSIONS DRAWING TITLE _ \ytERE DATE DESORPTION. SECOND FLOOR HVAG PLAN f y o,02909' N R �;O O<' CAD FILE NAME: rd� ' CONSULTANT: PROJECT TITLE: DATE NSA PROJECT x Nemschick Silverman Architects P.c. FLOOR PL N NORTH PROP. ALTERATIONS TO g/24/06 05-1194 ".. .the business ofARCHITECTURE' CAPANO AND PARKER ENGINEERS, P.C' EX ST'G LIBRARY ROUTE 25 SCALE DRAWING NO: Design and Consulting Services 735 De: rfoot 631- Path, Cutchogue, New York -7347 20 High Skreak, Huntington, New York CUTCHOGUE, NEW YORK Phone : 631-734-7007 Fax : 631-734-7347 AS NOTED (510) 421-045-1 Fax (510) 421-0565 http://www.ns-arch.com DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: .co wRa aaos ea+cx x s<vsaw 'acxm Ts rc N 0 TH I �1 3/+'GONDEN5ATE WITH CONDENSATE PUMP. PIPE THRU WALL ADOVE GRADE. AS PI.IA 2 4z" Hwy � O ❑ ❑ o J 2 El&' HWR O PZ2 AH-I 1 Y2' HWR 2" HW5 , oC o Y2' HW5 2" HWR Ul 2 Y2" HWR �n AH-4 N PPZAINNDENSATE 3 3 O O 00 2 y2" HWR COO _ ❑O x x - T N N O AH-3 Y," HWS PIPE TO SERVIGE SIINKPUMP. ® AH-2 O O 0 ❑00 ❑O❑ p p O o O a O O �o BASEMENT PIPING PLAN 5GALE: 1/4" 1'-0" 0 0 SEAL: REVISIONS/SUBMISSIONS DRAWING TITLE: D As? DATE: DESCRPTION: W BA5EMENT PIPING PLAN I a� o 029ass O� CAD FILE NAME: 9T 4 P Oi NEB PROJECT TITLE: DATE NSA PROJECT ♦: CONSULTANT Nemschick Silverman Architects P.C. FLOOR PL N NORTHPROP. ALTERATIONS TO SCALE 6 05-1194 EXIST'G LIBRARY ...the business of ARCHITECTURE." CAPANO AND PARKER ENGINEERS, P.C. SCALE DRAWING NO.: Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUTCHOGUE, NEW PORK AS NOTED BLOCK: LOT: DRAWN BY: Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0499 Fax (516) 421-0569 M DISTRICT: SECTION: http://www.ns-arch.com .cwvRaxr sons reacxac averx+N AxxtccTs rc N 0 TH V AIR HANDLING UNIT SCHEDULE MULTI-PURPOSE VALVE FOR BALANCING AND SHUT-OFF 1;c OLING GAPAGITY ENTERING TEMP HEATING IFM O.A. AUTOMATIC AIR VENT AH NO. AREA SERVED MANUFAGTURER MODEL NO. GFM ESPTAL SENS EAT DB EAT WB CAPACITY HWS VOLTAGE (HP) (GFM) WEIGHT REMARKS BH) (MBH) (°F) (°F) (MBH) (GPM) AH-I NORTH BASEMENT TRANE BGVO54E2 I600 1.00" 52.1 40.1 80 61 100 10 205-3-60 3/4 500 300 SUPPLY FLOOR MOUNTING RAILS W/ ISOLATORS COMBINATION PRF55URE-TEMPERATURE GAUGE H/GAUGE COCK AH-2 SOUTH BASEMENT TRANE 5GVO54E2 1600 1.00" 52.1 40.1 80 61 100 10 208-3-60 5/4 520 300 SUPPLY FLOOR MOUNTING RAILS W/ ISOLATORS 3 WAY MODULATING VALVE �� J- UNION OR FLANGED CONNECTION MAX PRESSURE DROP 2 P51 ® RATED UNION (TYP) AH-3 NORTH -ALL FLOORS TRANE LPGAGIID 6800 1.00" 223 Il0 80 (2-1(2-1355 36 208-3-60 5.0 1300 I100 SUPPLY FLOOR MOUNTING RAILS W/ ISOLATORS O FLOW ECCENTRIC REDUCER (TYP AH-4 SOUTH 15T42ND FLOOR TRANE LPGAGIID b200 1.00" 223 110 80 6-1355 36 205-3-60 1 I1.5 1300 00 SUPPLY FLOOR MOUNTING RAIL5 W/ ISOLATORS THERMOMETE SHUT-OFF VALVE I IN-LINE PUMP (TYP) Jr. I. PROVIDE RETURN AIR MIXING BOX FOP, ALL UNITS. 2. PROVIDE ENTHALPY CONTROLLED ECONOMIZER PAGKA6E FOR AH-3 AND AH-4. B R 3. PROVIDE SMOKE DETEGTOR IN SUPPLY DUCT IN AH-3 AND AH-4. INTERFACE WITH FIRE HOT WATER SUPPLY AND ALARM SYSTEM TO SHUT DOWN UNITS UPON ALARM. I RETURN FOR SIZES SEE COMBINATION PRESSURE PLAN i TEMPERATURE GAUGE W/6AUOE GOGK H05E BIBB PLUGGED BLOWOUT CONNECTION (TYP) AIR-COOLED CONDENSING UNIT SCHEDULE PRESSURE GAUGE (TYP) STRAINER W/BLOW DOWN STRAINER (TYP BALANCING COCK (TYP) VALVE GOOLING GAPAGITY GATE VALVE G.U. NO. AREA SERVED MANUFAGTURER MODEL NO. (OTA AMBIENT SUCTION VOLTAGE MCA MOGP MAEER TGHHED REMARKS HOT WATER HE,4T I NG COIL. GU-1 NORTH BASEMENT TRANE 2TTA304B 48 95 45 208-3-60 I6 20 MOUNT ON CONCRETE PAD PIPING SCHEMATIC NOT TO SCALE GU-2 SOUTH BASEMENT TRANE 2TTA3048 48 95 45 208-3-60 16 20 MOUNT ON CONCRETE PAD GU-3 NORTH ALL FLOORS TRANE TTA2405300 238 q5 45 208-3-60 88 I00 9.T MOUNT ON CONCRETE PAD IN-LINE PUMP GU-4 DET,41 L SOUTH 15T 4 2NO FLOOR TRANE T-FA240B300 236 95 45 208-3-60 88 100 9.1 MOUNT ON CONCRETE PAD NOT TO SCALE I. PROVIDE LOW AMBIENT PACKAGE FOR ALL UNITS ROUTE IN EXI5TING CHIMNEY FLUE RETURN/SPILL FAN SCHEDULE TAG NO. UNIT SERVED MODEL TYPE GFM S.P. VOLTAGE RPM HP WEIGHT REMARKS DIAMETER GPVG IN AIR PIPE 4" DIAMETER H16H TEMPERATURE 5TAINLES5 IN STEEL EXHAUST PIPE PER MANUFACTURER'S MOUNT ON 4 6ONGRETIf PAD. PROVIDEGG DOOR, HEAVY REQUIREMENTS F-I ,4H_3 TWIN GITY BELT/GLASS 1 6800 IS" 206-3-60 550 1 500 DUTY 5HUTfER, VIBRATION ISOLATORS, SPRING RAILS, DISCONNECT 300 BGV 5WITGH. MOUNT TGF MOTOR, VARIABLE SPEED V-BELT DRIVE 1.2 SF MOUNT ON 4" CONCRETE PAD. PROVIDE ACCESS DOOR, HEAVY TWIN GITY BELT/GLASS 1 5,200 IS" 208-3-60 550 1 &00 DUTY SHUTTER, VIBRATION ISOLATORS, 5PRING RAILS, DISCONNECT F-2 AH-4 500 BGV 5WITGH. MOUNT TGF MOTOR, VARIABLE SPEED V-BELT DRIVE 1.2 5F NOTE: THE OVERALL WEIGHTED SOUND POWER LEVEL (LWA) SHALL NOT EXCEED lb dBA FOR EACH DUGTED FAN SYSTEM. 3/4" GOND DRAIN B-I BO 1 LER SCHEDULE 4" H5KPG. PAD GR055 GAS BURNER MOTOR OPERATING TAG NO. AREA SERVED MANUFAGTURER MODEL NO. UTPU INPUT (GFH) EN NEIOHT REMARKS F) HP VOLTAGE MGA CONDENSATE PUMP WITH 120-1-60 15 1'100 MOUNT ON 4" HOUSEKEEPING PAD DRAIN TO SERVICE SINK B-I LIBRARY FULTON PWH-1400 1200 1400 160 180 I/40 BO 1 LER VENTING SCHEMAT I O 1. PROVIDE HOT WATER RESET CONTROLLER WITH BOILER B-I TO PROVIDE VARIABLE SUPPLY WATER TEMPERATURE BASED ON NOT TO SCALE OUTSIDE AIR TEMPERATURE. 2. PROVIDE CONDENSATE PUMP AND PIPE TO NEARE54;Z SERVICE SINK. P-2 SUBSTITUTIONS: PUMP SCHEDULE ALL EQUIPMENT SHALL BE AS SPEGIFIED OR AND APPROVED EQUAL. P-2A ALL SUBSTITUTIONS SHALL BE ITEMIZED IN THE GONTRACTOR'S BID. TAG NO. SERVIGE MANUFAGTURER MODEL GPM TDH VOLTAGE RPM HP REMARKS WHEN THE SUBSTITUTED EQUIPMENT 15 DIMENSIONALLY, ELEGTRIGALLY P OR MEGHANIGALLY DISSIMILAR TO THE SPEGIFIED EQUIPMENT THE P-I, P-IA AH-I AND AH-3 TACO 1635 46 Ib 120-1-60 I160 1/2 IN LINE HVAG GONTRAGTOR SHALL INGLUDE IN HIS BID ALL ADDITIONAL GO5TS HAMMOND #95511 BRONZE FROM THE ELEGTRIGAL, PLUMBING AND GENERAL GONTRACTOR5 NEEDED BALL VALVE P-2, P-2A AH-2 AND AH-4 TACO 1635 46 16 120-1-60 1"I60 1/2 IN LINE TO AGGOMMODATE THE SUBSTITUTION. GHARGES INGURRED DURING PRESSURE REDUGING VALVE 0-50 P51 PRESSURE GAUGE P-IA GONSTRUGTION WILL BE THE RESPONSIBILITY OF THE HVAG TACO 5350 W/HEAVY DUTY GAUGE GOGK GONTRAGTOR AND WILL BE BACK GHARGED TO HVAG GONTRAGTOR'S VACUUM BREAKER REQUEST FOR PAYMENTS. THE GONTRAGTOR SHALL SUBMIT, WITH THE HAMMOND IB 423 GLOBE VALVE SHOP DRAWINGS, DETAILED LAYOUT DRAWINGS DRAWN TO SCALE THAT INDIGATE THE PROP05ED METHOD OF INSTALLATION. THE DRAWING SHALL GLEARLY INDICATE MODIFIGATIONS REQUIRED TO DUGTWORK, PIPING, BUILDING STRUCTURE AND THE ELEGTRIGAL INSTALLATION. 3/4" MAKE-UP WATER LOCATE IN FIELD 5/4" BYPASS 3„ TACO AIR VENT NO.426 AIR 1 DIRT SEPARATOR EXHAUST FAN SCHEDULE GAAGE GOGK (TYPICAL) TACO 4103AD 9" MULTI-ANGLE THERMOMETER 3" SUPPLY HEADER 3" RETURN HEADER TWIN CITY MARK AREA SERVED MODEL NO. TYPE GFM S.P. VOLTAGE WATTS REMARKS ASME SAFETY RELIEF VALVE (TYP) AUTOMATIC BRA55 AIR EF-I BATHROOM TISOL INLINE 125 3/8" 120-I-bo 100 CONTROLLED BY WALL 5WITGH = VENTING CHAMBER AS 3" T5 FURNISHED WITH 4g08 HORIZONTAL AD EF-2 BATHROOM T150L INLINE 125 3/8" 120-1-60 100 CONTROLLED BY HALL 5WIT6H HORIZONTAL EF-3 EMIR, T300L INLINE 215 5/8" 120-1-60 212 CONTROLLED BY T-5TAT LOW WATER GUT-OFF - FURNISHED HORIZONTAL BY FULTON, FIELD INSTALLED I-I/4" HAMMOND 8501 THRE5HHOLD BRONZE BALL VALVE (TYPICAL) 1. PROVIDE EACH FAN WITH BAGKDRAFT DAMPER B— 1J BLADDER-TYPE EXPANSION TANK TACO PAX-130 9" MULTI-ANGLE v THERMOMETER [I 4" H5KPG. PAD HEATING PIPING SCHEMATIC NOT TO SCALE *AL: REVISIONS/SUBWSSION& DRAWNG TITLE: AA DATE: DESCRIPTION HVAG SCHEDULES C g�E W.N h�l o-a+on w,en�-xara.m,macvi W� t°nA ae°w remrareo AND DETA I L5 s9 s e �oQ CAD FILE NAME: PF PROJECT TITLE: DATE NSA PROJECT w: CONSULTANT FLO&NO NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.c. SCALE: s 05-1194 EXIST'G LIBRARY SCALE: DRAWING NO: ...the business of ARCHITECTURE." CIIPADe Design PARKER ENGINEERSr.c. ROUTE 25 Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 CUTCHOGUE, NEW YORK AS NOTED 20 Hlgh Street, Huntington, New York Phone : rfoot Path, Cu Fax : w York 11935 (516) High 5tr Fax ngto , NvA or DISTRCT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com .eorruc�rt mos IB.�surx a.vaexw acxrEcm ne H d FRAME STANDARD DUCT MADE WATER TIGHT I/2" X I/2" SCREEN STIFFENERS MAY BE INSIDE PROVIDE VOLUME DAMPER PROVIDE BALANGING IN MAIN DUCT WHEN THERE DAMPER IN EACH ARE NO FURTHER BRANCH BRANCH DUCT TAKE-OFF ANGLE RIVETED OR SPOT t, WELDED FULL RADIUS ELBOW Q.. N N T ror �. / �S& d COUNTER FLASHING 2 " 3/8" SQUARE ROD WITH PROVIDE FOR 0 DAMPER R=W/2 MAX. WASHER AT EACH END END 4" x 4" x 20 GAUGE SUPPORTS RIVETED TO DUCT .�, FLASHING 20° f MAX. _ NAILER TURNING VANES �p PROVIDE BEARIN65 AT CURBPREFABRICATED ROOF I" SOUND LINING BOTH ENDS (GRIND - SPECIFIED CURB LOGKIN6 LUG AIR FLOW AIR FLOW ROD ROUND) TRAN51TION TO FULL MO GAUGE QUADRANT DUCT SIZE BRANCH DUCT 51ZE MOUNTING BRACKET ON ((..y ROOF Q VANED ELBOW BEFORE ELBOW INSULATED DUCT ONLY I. LOGKIN6 LU55 INTER6RAL WITH VANE DAMPER ROD CLIP FLASH INTO ROOF BY ry GENERAL CONTRACTOR 2. MAXIMUM UNSUPPORTED VANE LENGTH 48" ° 200A DAMPER EDGE 3. FRAMES-BOLTED OR RIVETED TO TEE CRIMPED 1/2"xl/2" 4 4. VANES AND FRAMES TO BE SAME GAUGE AS TEE NO1�5, DAMPER REGULATOR AS SHOWN //2" R (MINIMUM 20 GAUGE) WITH LOCKING TYPE SEE PLANS FOR DUCT SIZES BAGKDRAFT DAMPER INDICATOR QUADRANT 2. SEE BALANGING DAMPER CONSTRUCTION DETAIL TURNING VANE DETAIL OF NECK CONNEGT 1 ON FIVE P I EGE TEE DETAIL W I TH VOLUME 12AMPER5 LOW PRE55URE BALANCING DAMPER 50050E2K PETAL L NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE HOOK STRAP AROUND REINFORCEMENT AND USE BOLTED FLANGE BOLT THRU CLAMP FOR BEAM AND EXISTING REINFORCING STEEL JOIST CONNECTION FRAME STANDARD WEIGHT STEE FIRE RATED WALL PIPE SLEEVE SIZED TO PROVIDE A MAXIMUM OF 1/2" INTERUPT PIPE INSULATION (//� GLEARENGE AROUND SERVICE. AT SURFACE OF WALL, PATCH EXISTING SURLFFAC MATCH 3/0" BOLTS �V N m TERMINATE SLEEVE FLUSH INSULATION VOLUME DAMPER WITH SCISSORS TYPE GRAB HOOKS LOG KING LUG WITH WALL SURFACE. END BEARING w LOGKING TYPE FOR CONCRETE T INDICATOR QUADRANT CONSTRUCTION ONLY r � 16 U556 GALV DUCT HANGER CENTERLINE O (SEE SCHEDULE) METAL 5GREH5(TYP) \\b, PIPE AND SLEEVE DUCT L — _ _ BRANCH DUCT--,,, 3/8" SQUARE ROD SERVIGE PIPE I/3 WIDE, 5" MINIMUM HANGER DETAIL FOR 4 DUGT5 OVER 48' WIDE HANGER DETAIL FOR DUCTS OVER 45" WIDE MAIN DUCT 45' IN CINDER CONCRETE SLABS OR IN REPUBLIG ARCH GONGRETE ESCUTCGLOSS FITTING METAL BEAMS USE APPROVED SCISSOR TYPE HANGER HOOK SECURED VANED ELBOW TURNING VANE INSULATION. TO FIT AROUND TO REINFORCING RODS, PACK CLEARANCE BETWE INSULATION. BOTH 51bE5 OF THE WALL. SUPPLY I. LOCKING LU65 INTERGRAL WITH VANE PIPE AND SLEEVE T AIR FLOW 2. MAXIMUM UNSUPPORTED VANE LENGTH 45" MINERAL WOOL ROPE LL DUCT 51ZE HANGER 51ZE MAX 5PAGING EQUIVALENT PACKING ALL NOTES: 3. FRAMES-BOLTED OR RIVETED TO ELBOW AROUND THE PIPE SLEEVE. DETAIL FOR NON-INSULATED 4. VANES AND FRAMES TO BE SAME GAUGE AS ELBOW PIPE SIMILAR, EXCEPT THAT RE TURN/EXAU5T UP TO 2 50. FT. I" X 1/16" 8'-0" - (MINIMUM 2O GAUGE) ESCUTCHEON I E PIPE. TT D AIR FLOW 2 roe 5Q. Fr. I,, x i/a" e'-o° 5. SQUARE ELBOWS TO USED ONLY WHEN SPECIFICALLY AROUND SERVICE INDIGATED ON DRAWINGS. OVER 8 50. FT. I" X 1/8" 4'-0" DOUBLE TH I CKNE55 TURNING TYPICAL DUCT TAP DETAIL DUCTWORK SUPPORT DETAIL VANES FOR SQUARE ELBOW DETAIL OF PIPE THROUGH RATED WALL NOT TO SCALE NOT TO 5GALE NOT TO SCALE NOT TO SCALE FIRE DAMPER NOTES SPIN-IN COLLAR MANUAL BALANCE DAMPER 1. ALL FIRE DAMPERS SHALL BE RATED TO MAINTAIN THE RATING OF EXPANSION SHIELD—, THE FIRE SEPARATION. THEY SHALL BE APPROVED AND LABELED STRUCTURAL LINTEL BY G.G. PROVIDE I/8" GLEARANGE PLUS 1/8" METAL DECK DRAW BRANDS BY UNDERWRITER'S LABORATORIES (U.L) AND BOARD OF PER FOOT OF DUCT ALL AROUND FOR FLEXIBLE SUPPLY STANDARDS AND APPEALS (B.5.A.). THE IN5TALLATI0N SHALL WALL OR PARTITION DAMPER EXPANSION. SEAL GLEARANGE AIR DUCT WIRE BE IN ACCORDANCE WITH MANUFACTURER'S (U.L) APPROVED WITH FIBEROLA55 CAULKING. REINFORCED INSTRUCTIONS. DAMPERS SHALL BE AS MANUFACTURED BY AIR MOUNTING ANGLE ALL FOUR 51PES I BALANCE INC., AIR DAMPER MFG. CORP., AIRSTREAM PRODUCTS, WIDTH ANGLE SIZE ING. OR APPROVED EQUAL. PLAIN TYPE S" CLIP UP TO 50" 1" X I" X 1/8" 2. ALL DUGT-GOLLAR CONNECTIONS SHALL COMPLY WITH ASHRAE d CONNECTION 31" TO 64" 1 1/2" X 1 1/2" X 1/6" SUPPORT NUT 5MAGNA. 55" TO 120" 3" X 2" X 3/I6" TAB XTRANSITION A5 REG 3. CONNECTIONS BETWEEN COLLAR AND DUGTWORK SHALL BE HANGER ROD 51ZE TP NECK BREAKAWAY TYPE SUCH AS "5" SLIP, CRIMP, OR OTHER SLIP DRAW BANDS SIZE TYPE IN AGGORDANGE WITH 5MAGNA FIRE DAMPER GUIDE. ::::A SUPPLY DUCT — 12" LOCKING NUT DIFFUSER 4. FIRE DAMPER SLEEVE SHALL BE SAME GAUGE AS DUCTWORK WITH A FUSIBLE LINK LOCKING NUT MINIMUM OF 16 GAUGE FOR HIGH VELOCITY AND 16 GAUGE FOR REGTANGULAR DUCTWORK UP TO 36" WIDE OR 24" HIGH. ElCLEVI5 HAN6E DUGTWORK ABOVE 36" WIDE SHALL BE 14 GAUGE. 5. AFTER THE INSTALLATION AT DAMPERS THE CONTRACTOR SHALL HUNG CEILING SEAL AND TAPE ALL JOINTS FOR AIR TIGHTNESS. SEALANTS USED SHALL BE 3M COMPANY NO. 600, MIRACLE ADHESIVE USED 9 1 �&CORPORATION, OR AS APPROVED AND GREY VINYL DUCT TAPE AS SLEEVE ACCESS DOOR MANUFACTURED BY NASHUA CORPORATION OR AS APPROVED. HEIGHT I" SMALLER THAN SUPPLY D 1 FFU C SER WITH FLEX D T 6. TO ALLOW FOR EXPANSION, DAMPERS SHALL HAVE A TOP DUCT HEIGHT - 12" MINIMUM NOT TO 50ALE GLEARANGE EQUIVALENT TO 1/8" FOR EACH FOOT OF DAMPER HEIGHT. THE SIDE CLEARANCE SHALL BE I/8" FOR EACH FOOT OF DAMPER WIDTH DIVIDED EQUALLY TO THE RIGHT AND LEFT OF 16 GA. SLEEVE UP TO 36" X 24" DUCT SIZE FIRE DAMPER NOTES, I. LENGTH OF FLEX DUCT TO BE NO LONGER THAN 6'-O" THE COLLAR. THE MAXIMUM CLEARANCE FOR THE TOP AND THE TOTAL OF BOTH SIDES SHALL BE 1/2" EACH. THE RETAINING 14 GA. FOR LARGER DUCT 2. ALL FLEX DUCT TO HAVE I" INTEGRAL INSULATION WNAPOR BARRIER ANGLES SHALL BE 1 1/2" X 1 1/2" X 14 GAUGE BENT ANGLE 50 THAT THERE WILL BE A MINIMUM OF I" OF OVERLAP ON THE FIRE MOUNTING ANGLE AROUND ENTIRE 16 GAGE ZINC SEPARATION. PERIMETER - BOTH SIDES OF PARTITION GOATED STEEL (GALVANIZED STEEL) SADLE T. DAMPER SHALL BE SECURED TO COLLAR WITH EITHER I/2" TACKHELD5 NO. 10 SHEET METAL SGREW5, 1/4" DIA. NUTS AND BOLTS, OR 3/16" POP RIVETS, ALL ON 8" CENTER. 6" VARIES 6" a. RETAINING ANGLES SHALL BE SECURED TO COLLAR, SLEEVES OR PLATE WITH EITHER 1/2: TACK HELPS, NO. 10 5HEETMETAL SCREWS, 14" PIA. NUTS AND BOLTS, OR 3/16" POP RIVETS, ALL ACCESS DOORS SHALL BE LOCATED SO THAT THERE WILL NOT BE 5" ON CENTER. ANY INTERFERENCES FOR MAINTENA14GE AND INSPECTION OF DAMPER 9. WHERE THE HUNG CEILING, DOES NOT HAVE REMOVABLE TILES AN ACCESS DOOR (FIRE RATED WHERE REQUIRED) SHALL BE FIRE DAMPER DETAIL PIPE HANGING DETA I L FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED IN GEILING NEAR LOCATION OF FIRE DAMPER. NOT TO SCALE NOT TO SCALE SEAL` O A REVISIONS/SUBMISSIONS: DRAWING TIRE: H�a DATE DESCRIPTION: to * DETAILS N 0 029086 CPS r y CAD FILE NAME: Jr PROJECT TITLE DATE NSA PROJECT +: CONSULTANT: FLOOR PL N NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.c. SCALE. 6 05-1194 the business of ARCHITECTURE.' CAPANO AND PARKER ENGINEERS, P.C. ROUTE 25 T'G LIBRARY SCALE. DRAWING NO.: Design and Consulting Services _ 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUTCHOGUE, NEW PORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Fax (516) 421-0563 DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com .corrTaGxr mos trDnecxac rt:,srxw.acxlccTe rc N 0 TH 0 H\/A C 5PEG I F I GAIT I ON5 I. GENERAL A. ALL DESIGN AND CONSTRUCTION SHALL BE IN GOMPLIANGE 9. HYDRONIG STEAM AND CONDENSATE PIPING b. FLUES 18. BALANCING A. FIRE PAMFF WITH THE NEW YORK STATE MEGHANIGAL CODE PROVISIONS A. ALL HOT WATER SUPPLY AND RETURN PIPING SHALL BE COPPER A. ALL FLUES SHALL BE DESIGNED, FABRIGATED AND INSTALLED A. ALL SYSTEMS SHALL BE ADJUSTED AND BALANGED TO A. FIRE DAMPERS INSTALLED IN LESS THAN 3 HOUR FIRE RESISTANT (MG-NY5), NEW YORK STATE FUEL GAS CODE PROVISIONS (Fr,-NY5), TUBING TYPE "L" IN ACCORDANCE WITH THE PROVISIONS OF CHAPTER 9, IN MG-NY5. 5PEGIFIED VALUES BY AN INDEPENDENT BALANGING FIRM FIRE RATED A55EMBLIES SHALL BE FAGTORY MANUFAGTURED, 11/2 NEW YORK STATE PLUMBING GODS PROVISIONS (PG-NY5), AND NEW SPECIALIZING IN THIS WORK AND A REPORT SHALL BE SUBMITTED HOUR, UL LISTED, CURTAIN TYPE, OUT OF AIR STREAM WITH YORK STATE ENERGY GON5ERVATION CONSTRUCTION CODE A. PIPING 2" AND SMALLER SHALL BE BLAGK STEEL PIPE, B. ALL FLUES SHALL BE DOUBLE WALL, PREFABRICATED SECTIONAL TO ARCHITECT FOR APPROVAL. RECESSED FRAME SIMILAR TO BUSKIN MODEL IBD2-5TYLE. PROVISIONS (EC-NY5). SCHEDULE 40, GLASS 154, CAST IRON FITTINGS WITH THREADED TYPE "B", OF ALUMINUM CONSTRUCTION DESIGNED TO HANDLE RESISTANT FIRE RATED ASSEMBLIES JOINTS. COMBUSTION PRODUCT5 OF FUEL BEING USED. PROVIDE WITH 1-1. AGOUSTIGS B. FIRE DAMPERS INSTALLED BLIES SHALL BE FACTORY IN 5 HOUR OR GREATER FIRE B. ALL MEGHANIGAL SYSTEMS AND EQUIPMENT SHALL COMPLY INSPECTION GAP AS REQUIRED BY LOGAL GODE, ROOF FLASHING, WITH MINIMUM PERFORMANCE CRITERIA AS 5PE6IFIED IN SECTION B. PIPING 2 1/2" AND LARGER SHALL BE BLACK STEEL PIPE, AND GLEAN-OUT. A. THE GONTRAGTOR SHALL PROVIDE AN INSTALLATION THAT DOES MANUFACTURED,STREAM WITH RECESSED HOUR, UL LISTED, CURTAIN TYPE, OUT FRAME SIMILAR TO BUSKIN MODEL AIR 505 OF EG-NY5. GAS FIRED EQUIPMENT SHALL CONFORM TO THE SCHEDULE 40, WROUGHT STEEL BUTTWELDING FITTINGS WITH WELDED NOT EXGEED NC, 35 IN OCCUPIED 5PAGE5 AND ING 40 IN SERVICE REQUIREMENTS OF EG-NY5. TESTING SHALL BE IN ACCORDANCE WITH JOINTS. G. NO VERTICAL FLUE SHALL HAVE AN AREA OF LE55 THAN 12 1/2 AREAS ULE55 NOTED OTHERWISE ON PLANS. IBD2-STYLE. FG-NY5 5EGTION 400. SQ. INCHES (4 INCHES IN DIAMETER). G. PRIOR TO SUBMISSION OF A BID, THI5 CONTRAGTOR SHALL S. INSTALL DIRECTION PIPING WITH I/32" PER FOOT (I/2%) UPWARD B. ALL EQUIPMENT SHALL BE ISOLATED FROM THE BUILDING O AS A. AUTOMATIC TEMPERATURE CONTROLS SLOPE IN DIRECTION OF FLOW. D. IN NO CASE SHALL VENT GONNEGTOR BE SMALLER THAN OUTLET NOT TO IMPART VIBRATION ON THE STRUCTURE, WALLS, DUCTWORK V151T THE JOB SITE TO ASCERTAIN THE AGTUAL FIELD GONDITION5 COLLAR PROVIDED BY MANUFACTURER. AND PIPING. A. THE AUTOMATIC CONTROL SYSTEM SHALL EN COMPLETE WITH AS THEY RELATE TO THE WORK AS INDICATED ON THE DRAWINGS D. ALLOW ADEQUATE FLEXIBILITY IN PIPING CONFIGURATION FOR ALL NECESSARY SOURCES OF ELEGTR NSF SENSORS, AND DESCRIBED HEREIN. DI5GREPANGIE5, IF ANY, SHALL BE THERMAL EXPANSION OF PIPING AND COMPONENT5. E. HORIZONTAL FLUE GONNEGTORS SHALL BE DOUBLE WALL. G. SUPPLY DUCT SHALL BE UNIT AND 10 LINED FOR L DISTANCE CONTROLLERS, RELAYS, 5TO COS, TRANSFORMERS AND BROUGHT TO THE ARGHITEGT5 AND ENGINEER5 ATTENTION OF 25 FEET FROM THE HVAG UNIT AND 10 FEET FROM ALL VAV ACCORDANCE N CE WITH WIRING a CONTROL THE SYSTEM IN PRIOR TO SUBMISSION OF THE BID, AND IF NOT RESOLVED TO HI5 E. CONNECT HYDRONIG BRANCH-FEED PIPING TO MAINS AT F. FITTINGS SHALL BE PREFABRICATED DOUBLE WALL. BOXES. ACCORDANCE WITH THE SEQUENCES SPECIFIED. THE CONTROLS SHALL BE ELECTRIC. 5AT15FAGTION, SHALL BE A WRITTEN QUALIFIGATION OF HIS BID. HORIZONTAL GENTER LINE OF MAINS, CONNECT RUN-OUT PIPING TO BRANCHES AT HORIZONTAL CENTER LINE OF BRANCHES G. APPROVED FLUE MANUFAGTURER5 ARE AMERI-VENT, DURA- D. RETURN DUCT SHALL BE ACOUSTICALLY LINED FOR THE ENTIRE VENT, METALBESTO5 AND METAL-FAB, ING. LENGTH, OR A5 NOTED ON DRAWIN65. B. INSTALL CONTROLS 50 THAT ADJUSTMENTS AND CALIBRATION D. PRIOR TO SUBMISSION OF HIS FORMAL BID, THIS CONTRACTOR CAN BE READILY MADE. SHALL REVIEW ALL DRAWINGS OF THE ENTIRE PROJEGT INCLUDING F. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER, SPACED GENERAL GONSTRUCTON, DEMOLITION, ELECTRICAL, MEGHANIGAL, TO PERMIT EXPANSION APPLYING FULL INSULATION AND SERVIGING H. VENT GAPS SHALL BE NON-BAGKDRAFT TYPE FOR INSTALLATION E. APPLY LINING WITH FACED 5URFAGE EXPOSED TO THE AIR PLUMBING, AND SPRINKLER AND HE SHALL NOTIFY THE GENERAL OF VALVES. ON TOP OF FLUE, ALUMINUM GON5TRUGTION, STREAM. C. MOUNT SURFACE MOUNTED CONTROL DEVICES ON BRACKETS TO CLEAR THE FINAL FINISHED SURFACE OF INSTALLATION. CONTRACTOR OF WORK REQUIRED IN HI5 BID WHIGH 15 INDICATED OR IMPLIED IN OTHER 5ECTION5 OF THE WORK. 6. INSTALL SEGTION VALVES ON EAGH BRANCH AND RISER, CLOSE I. APPROVED VENT GAP MANUFACTURERS SHALL BE AGME F. ACOUSTIC, LINING SHALL BE MAT-FACED FIBERGLASS, I" MINIMUM TO MAIN, WHERE BRANCH OR RI5ER SERVES TWO OR MORE MA5TERVENT TYPE MVR, AMERI-GAP, BREIDERT TYPE "L" AND THIGKNE55, 1 1/2 LB✓GU. FT. MINIMUM DENSITY FACING MEETING D. CONGEAL CONTROL WIRING IN ALL SPACES EXCEPT IN THE E. INSTALL WORK IN A NEAT WORKMANLIKE MANNER READILY TERMINALS OR EQUIPMENT GONNEGTION5, AND ELSEWHERE AS METAL-FAB, ING. REQUIREMENTS OF NFPA-90A, SUITABLE FOR VELOGITY OF 4,000 MEGHANIGAL EQUIPMENT ROOMS AND IN UNFINISHED SPACE. AGGESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIR. INDIGATED. FPM. ADHESIVE SHALL BE BENJAMIN FOSTER 85-20, OR AS E. ROOM HEIGHT OF FLUE ABOVE ROOF SHALL BE VI ABOVE THE APPROVED, THERMOSUNL5 SHALL BE CONGEALED ADJUSTMENT TYPE J. F. DRAWINGS ARE DIAGRAMMATIC, AND INDICATE GENERAL H. INSTALL SHUTOFF VALVES ON INLET AND OUTLET OF EAGH HIGHEST POINT OF THE ROOF WITHIN 10'-0" OF THE FLUE. WITH INDICATORS. UNLESS OTHERWISE NOTED, INSTALL WALL ARRANGEMENT OF WORK AND APPROXIMATE LOCATION OF MECHANICAL EQUIPMENT ITEM, AND ON INLET OF EACH PIN TERMINAL, G. FASTEN INSULATION P INTERIOR OF DUCTS AND CASING WITH MOUNTED THERMOSTATS AND SWITCHES NST ABOVE THE FLOOR W EQUIPMENT. REFER TO ARCHITECTURAL DRAWINGS FOR ALL AND ELSEWHERE AS INDIGATED. K. EVERY PORTION OF FLUE GONNEGTOR SHALL HAVE RISE OF ONE ADHESIVE AND WELDED PN OR CLIP FASTENERS SPACED A MEASURED TO THE GENTER LINE OF THE INSTRUMENT. DIMENSIONS AND COORDINATE FINAL LOCATIONS OF DIFFUSERS AND INCH PER FT. MINIMUM FROM APPLIANGE TO VERTICAL FLUE. MAXIMUM OF 16" ON CENTERS. CAULKED BUTTING EDGES EXPOSED. F. ALL THERMOSTATS SHALL BE PROGRAMMABLE ELEGTRONIG REGISTERS WITH REFLECTED GEILING PLANS. ALL WORK SHALL BE I. INSTALL DRAIN VALVES ON EAGH MEGHANIGAL EQUIPMENT ITEM TRANSITION FROM LINED STANDARD DUCT WITH SHEET METAL COORDINATED WITH OTHER TRADES TO AVOID CONFLICT. LOCATED TO GOMPLETELY DRAIN EQUIPMENT FOR SERVIGE OR L. WHEN TWO OR MORE FLUE GONNEGTIONS ENTER COMMON NOSING. THERMOSTAT WHICH PROVIDE HEATING SETBACK AND COOLING G. THE "GENERAL CONDITIONS OF THE CONTRACT FOR REPAIR, INSTALL AT BASE OF EACH RISER, OR DROP IN PIPING VERTICAL FLUE, SMALLER FLUE CONNECTOR SHALL ENTER AT SETUP WITH SEVEN CT) DAY PROGR,4MMING CAPABILITY. CONSTRUCTION". THE " NTER AIA DOCUMENT A201 AND THE ARGHITEGT'S SYSTEM, AND ELSEWHERE WHERE INDICATED OR REQUIRED TO HIGHER LEVEL. DO NOT ENTER FLUE GONNEGTOR5 IN SAME 20. CONDENSATE PUMPS COMPLETELY DRAIN PIPING SYSTEM. HORIZONTAL PLANE. G. ALL THERMOSTATS SHALL BE PROVIDED WITH TAMPER PROOF A. CONDENSATE PUMP SHALL BE IN-LINE PUMP SIMILAR COVERS. INSTALL WALL MOUNTED THERMOSTATS AND SWITCHES SPECIFICATIONS, AS APPLICABLE, ARE PART OF THI5 GONT RACT. LITTLE M. EVERY OAS APPLIANCE FLUE SHALL HAVE A "BAGKDRAFT LITTLE GIANT TYPE 553191-VG-20UL. PUMP SHALL BE GAF ABLE OF 4'-6" ABOVE THE FLOOR. D 2. SCOPE OF WORK 10. GONDENSATE RAIN PIPING PREVENTER" INSTALLED AT TOP OF FLUE. OPERATION WITH 120 VOLTS SINGLE PHASE, 60HZ, POWER. PUMP A. PROVIDE ALL LABOR, MATERIALS , EQUIPMENT, AND A. CONDENSATE DRAIN PIPING SHALL BE WROUGHT COPPER TYPE SHALL BE RATED AT 1.2 GPM ® 15FT. HEAD WITH 1/20 HP MOTOR. H. ELECTRIC CONTROLS SHALL BE LOW VOLTAGE TYPE. CONTROL GONTR 'S AGTOR SERVICES NECESSARY FOR COMPLETE AND SAFE "L", FITTINGS SHALL BE WROUGHT COPPER WITH q5/5 SOLDERED Y. DIFFUSERS OF A CORD AND PLUG. GRILLES AND REGISTERS PUMP SHALL HAVE A SINGLE POINT ELEGTRIGAL CONNECTION IN LIEU WIRING SHALL BE STRANDED COPPER MINIMUM NO. 1EP IN INSTALLATION OF ALL WORK IN FULL CONFORMITY WITH JOINTS. PIPE SHALL E PITCHED DOWN /5" PER FOOT IN DIRECTION TERMINATED IN AN APPROPRIATE LUG AND INSTALLED IN CONDUIT. REQUIREMENTS OF LOCAL ELECTRICAL AND BUILDING CODES AND OF FLOW. A. RECTANGULAR GEILING DIFFUSERS: I. ALL CONTROL WIRING INSTALLED IN RETURN AIR PLENUM CEILINGS OF ALL AUTHORITIES HAVING JURISDICTION. 11. REFRIGERANT PIPING 21. SEQUENCE OF OPERATION SHALL BE UL PLENUM RATED OR INSTALLED IN CONDUIT. I. GEILING DIFFUSERS SHALL BE GARNES SQUARE STAMPED B. SECURE CERTIFICATES AND TRADE PERMITS, PAY ALL FEES AND A. INSTALL PIPING OF A 51ZE REQUIRED BY THE EQUIPMENT LOWERED DIFFUSERS WITH ROUND NECK, MODEL SFTB, OR A. INDOOR FAN UNIT SHALL RUN GONTINUOU5LY DURING OCCUPIED J. SUBMIT SHOP DRAWINGS AS PREPARED BY AUTOMATIC GHARGE5 FOR ALL WORK INSTALLED, GERTIFYING GOMPLIANGE WITH MANUFACTURER BASED ON THE AGTUAL FIELD INSTALLED LENGTH APPROVED EQUIVALENT, WITH SIZES AS INDICATED ON THE HOURS. TEMPERATURE CONTROL MANUFACTURER. LOGAL CODES AND GOVERNING AUTHORITIES. CONTRACTOR TO OF PIPING INCLUDING BUT NOT LIMITED TO THE FOLLOWING: DRAWINGS. D CONTROLLED INSPEGTION. DELIVER B. AIR CONDITIONING UNITS SHALL BE CONTROLLED BY A K. INSTALL SMOKE DETECTOR IN SUPPLY AIR DUCT OF ALL PERFORM REQUIRE CERTIFICATES TO OWNER BEFORE FILING. 1. INSTALL "GATGHALL" FILTER DRIER REFRIGERANT VALVES, 2. GEILING DIFFUSERS SHALL BE STEEL AND SHALL COATED WITH START-STOP THERMOSTATS LOCATED ON DRAWINGS. ROOFTOP UNITS (PRIOR I ANY TAKE-OFFS) AUTOMATICALLY WHITE ELEGTROGOAT AGRYLIG BAKED-ON ENAMEL FINISH. SHUT OFF AIR CONDITIONING UNIT UPON DETECTION OF SMOKE AND SIGHT GLA55 GLO5E TO AND AHEAD O�- EXPANSION VALVE. G. AUTOMATIC LOUVER DAMPERS SHALL OPEN WHEN UNIT 15 G. THE FOLLOWING 15 A GENERAL LISTING, NOT NEGE55ARILY COMPLETE, OF THE WORK TO BE PROVIDED REEZE DETECTION THERMOSTAT IN ABLE AND INSTALLED BY THE 2. AFTER COMPRESSOR, PROVIDE DROP AND BEND TO FORM 3. THE DIFFUSERS SHALL BE OF THE FIXED LOUVERED VANE DESIGN. STARTED AND CLOSE WHEN UNIT IS SHUT-DO HVAG GONTRAGTOR. AN OIL LOOP SEAL. RISE UP AND THEN PITCH DOWN TO L. INSTALL ADJUSTABLE F CONDENSER. 4. DIFFUSERS SHALL COME EQUIPPED WITH AN ADJUST SUPPLY AIR DUCT DOWNSTREAM OF HOT WATER GOIL WITH 5ETPOINT OPPOSED BLADE DAMPER THAT SHALL BE AGGE55ED THROUGH THE 22. MOTORIZED DAMPERS OF 40 DEGREES F. WHEN TEMPERATURE DROPS BELOW SETPOINT I. AIR-GOOLED AIR CONDITIONING EQUIPMENT PAGE. T-5TAT SHALL AUTOMATICALLY SHUT OFF AG UNIT. 2. STEAM HOT WATER COILS 3. INSTALL MANUAL VENT AT HIGH POINT TO CONDENSER (VENT A. CONSTRUCTED OF MULTIPLE OPPOSED BLADES OF EXTRUDED 3. PIPING AND SPECIALTIES OUT NON-60NDEN51BLE5). ALUMINUM 16 GAUGE STEEL CRIMPED AT THE EDGE OF DOUBLED 4. AIR GURTAINS 5. DIFFUSER SHALL HAVE A 24" X 24" NOMINAL LOUVERED FACE 2-!. GAS PIPING SUITABLE FOR LAY-IN TO A 24" X 24" GEILING GRID. GAUGE STEEL, FORMED AND SPOT WELDED FOR FITNESS OR OF AIR 5. FIRE DAMPERS 4. PROVIDE 12 INCH LONG LIQUID LEG OUT OF CONDENSER AND FOIL SHAPED ALUMINUM. LIMIT BLADE WIDTH TO 10". A. INSTALL 6A5 PIPING IN AGGORDANGE WITH AGA STANDARDS. 6. DUCTWORK THEN RUN PIPING TO LOGATIONS REQUIRED. T. CONTROLS B. GEILING EXHAUST REGISTERS (IN AREAS WITH TILED 6EILIN65), B. GALVANIZE OR ZING PLATE ALL STEEL PARTS. FINISH WITH e,. GRILLES AND REGISTERS 5. PROVIDE MUFFLER AT COMPRESSORS. ALUMINUM PAINT. U D I NOT INSTALL DS WHICH GAS PIPING S FITTINGS. DO NOT I. CEILING EXHAUST REGISTERS SHALL BE GARNES MODEL RTLA, USE PIPE WITH THREADS WHICH ARE CHIPPED, STRIPPED OR 9. EXHAUST FANS OR APPROVED EQUIVALENT, WITH SIZES AS INDICATED ON THE DAMAGED. 10. BALANGING 6. PROVIDE LIQUID LINE SOLENOID VALVES. C. DAMPER BLADES AND FRAME SHALL HAVE BUTYL OR NEOPRENE 11. COMPLIANCE WITH DRAWINGS AND SPEGIFICATIONS DRAWINGS. MECHANICALLY FASTENED TO INSURE AIRTIGHT SEAL WHEN CLOSED. C. PLUG EACH GAS OUTLET, INCLUDING VALVES, WITH THREADED 12. TRADE PERMITS AND BUILDING DEPARTMENT FILING B. PRIOR TO INITIAL OPERATION, GLEAN AND TEST, REFRIGERANT PIPING IN AGGORDANGE WITH AN51 G31.5, REFRIGERATION PIPING. 2. GEILING EXHAUST REGISTERS SHALL BE STEEL, COATED WITH D. DAMPER ARRANGEMENT SHALL BE EQUAL PERCENTAGE PLUG GAP IMMEDIATELY AFTER INSTALLATION OR GA5 PIPING WHITE ELEGTROGOAT ACRYLIC BAKED-ON ENAMEL FINISH, AND AND SHALL MAATCHTCH THE DAMPER OPERATOR. AND RETAIN AIN UNTIL CONTINUING PIPING, OR EQUIPMENT GONNEGTIONS 3. SHOP DRAWINGS SAMPLE5 AND APFROVAL5 G. REFRIGERANT PIPING SHALL BE GOPPER TYPE K, WROUGHT SHALL BE FURNISHED WITH A SPONGE RUBBER GASKET. ARE COMPLETED. A. SUBMIT A SEPIA AND TWO PRINTS OF SHEET METAL AND/OR COPPER FITTINGS, SILVER SOLDERED. 3. REGISTERS SHALL COME EQUIPPED WITH AN ADJUSTABLE E. JOHN50N 0-1500, PROPORTIONAIRE, HONEYWELL MODUFLOW, ARROW LOUVER-AIRFOIL, OR APPROVED EQUAL. D. GROUND GAS PIPING ELEGTRIGALLY AND CONTINUOUSLY WITHIN PIPING SHOP DRAWINGS, GERTIFIED BY ALL TRADES THAT D. THE CONTRACTOR SHALL USE ONLY QUALIFIED REFRIGERATION OPPOSED BLADE DAMPER THAT SHALL BE AGGE55ED THROUGH THE PROJECT, AND BOND TIGHTLY TO GROUNDING CONNECTION. GOORDINATION HAS BEEN ESTABLISHED. SUBMIT CERTIFIED MEGHANIGS, EXPERIENCED IN THE INSTALLATION OF REFRIGERANT FACE OF THE REGISTER. EQUIPMENT 6UT5 WITH GON5TRUCTION WIRING DIAGRAMS AND PIPING DUE TO THE COMPLEXITY OF THE DESIGN. 23. EXTERIOR LOUVERS E. INSTALL OAS PIPING WITH I/64" PER FOOT (I/8%) DOWNWARD AUTOMATIC, TEMPERATURE CONTROL SHOP DRAWINGS. SUBMIT FOUR 4. ALL REGISTERS SHALL BE 21 3/4" X 21 3/4" NECK SUITABLE FOR SLOPE IN DIRECTION OF FLOW. (4) BOOKBOUND OPERATING AND SERVIGE MANUALS WHICH SHALL A DETAILED SHOP DRAWING OF THE PIPE ROUTINGS, FITTINGS AND LAY-IN TO A 24 X 24 CEILING GRID. A. WEATHERPROOF, NO LE55 THAN 50% FREE AREA, GONSTRUGTION INCLUDE COPIES OF ALL SHOP DRAWINGS. 5UBMITTAL5 SHALL APPURTENANCES SHALL BE SUBMITTED FOR APPROVAL BEFORE SPECIALTIES OR ARROW LOUVER. F. INSTALL GAS PIPING PARALLEL TO OTHER PIPING, BUT MAINTAIN INGLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: ANY INSTALLATION IS TO PROCEED. G. CEILING EXHAUST REGISTERS (IN AREAS WITHOUT CEILINGS OR MINIMUM OF 12" GLEARANGE BETWEEN GAS PIPING AND STEAM OR DUCTWORK WITH SHEETROGK CEILINGS): B. EXTRUDED ALUMINUM, 12 B 6 5 GAUGE, 6063-TS ALLOY BLADES HYDRONIG PIPING ABOVE 200 DEGREES F (93 DEGREES G). - PIPING LAYOUT AND APPURTENANCES 12. AIR DISTRIBUTION AND FRAME, STAINLES5 STEEL OR ALUMINUM FASTENERS. - CERTIFIED BALANCING REPORT I. CEILING EXHAUST REGISTERS SHALL BE GARNES MODEL RTDA, - DIFFUSERS, REGISTERS, GRILLE5 A. DUCT 5Y5TEM5 AND PLENUMS SHALL BE DESIGNED, OR APPROVED EQUIVALENT, WITH SIZES AS INDICATED ON THE G. MITER FRAMES AND TRIM AT CORNERS AND REINFORCE WITH G. INSULATE GAS PIPING EXPOSED TO FREEZING TEMPERATURES. - EXHAUST FANS G0N5TRUGTED AND INSTALLED IN ACCORDANCE WITH THE DRAWINGS. GORNER BRACKETS. H. INSPECT, TEST AND PURGE NATURAL OAS SYSTEMS IN - FIRE DAMPERS PROVISIONS OF CHAPTER 6, SECTIONS 602 $ 605 IN M6-NY5 AND AGGORDANGE WITH NFPA 54, AND LOCAL UTILITY REQUIREMENTS. - AUTOMATIC, TEMPERATURE CONTROL DIAGRAMS ALL APPLICABLE REFERENGE STANDARDS. 2. CEILING EXHAUST REGISTERS SHALL BE STEEL, COATED WITH D. PROVIDE REMOVABLE 3/4" X 3/4" ALUMINUM BIRD SCREEN IN AN WHITE ELEGTROGOAT AGRYLIG BAKED-ON ENAMEL FINISH, AND ALUMINUM FRAME. B. AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET SHALL BE FURNISHED WITH A SPONGE RUBBER GASKET. II. BOILERS - EQUIPMENT 4. ELIMINATION OF NOISE AND VIBRATION METAL IN ACCORDANGE WITH SMAGNA STANDARDS AND SHALL BE E. REMOVE EXISTING WINDOW FRAME COMPLETELY WITH GLASS INSULATED AND SEALED IN ACCORDANCE WITH SECTION 503.3.3.3 IN 3. REGISTERS SHALL COME EQUIPPED WITH AN ADJUSTABLE WITHOUT DAMAGE AND DELIVER TO OWNER TO 13E STORED AS A. BOILERS SHALL BE DESIGNED, FABRIGATED AND INSTALLED IN ACCORDANCE WITH THE PROVISIONS OF CHAPTER 10 IN MG-NY5, A. ALL EQUIPMENT AND ACCESSORIES SHALL OPERATE WITHOUT EG-NY5. OPPOSED BLADE DAMPER THAT SHALL BE ACCESSED THROUGH THE DIRECTED. OBJECTIONABLE N015E OR VIBRATION. SHOULD OPERATION OF ANY FAGE OF THE REGISTER. ONE OR MORE OF THE SYSTEMS PRODUCE N015E OR VIBRATION, C. DUCT SIZES INDICATE MINIMUM IN51DE DUCT DIMEN51ON5 AND 12. NEW EQUIPMENT. IN ALL BOILERS SHALL BE OF THE TYPE, SIZE AND PROVIPERFODE IN WHICH 15, IN THE OPINION OF THE ARGHITEGT, OBJECTIONABLE, THE SHALL BE INCREASED TO AOGOUNT FOR DUGT LINER AND FIRE D. CEILING EXHAUST RE0I5TER5 (IN SHOWER AREAS): INDICATED ON THE DRAWINGS. WHERE INDICATED, PROVIDE ASME A. ALL NEW HEATING AND COOLING EQUIPMENT SHALL BE IN RATED FACTORY ASSEMBLED AND INSULATED DOMESTIC HOT EQUIPMENT AND AL ALL WORK NECESSARY TO ELIMINATE THE 1. CEILING EXHAUST REGISTERS SH BE GARNES MODEL RM5A, GOMPLIANGE WITH MG-NYS , EG-NY5, AND FG-NY5 AND ALL WATER HEAT EXCHANGER. CONTRACTOR SHALL, AT HIS OWN EXPENSE, MAKE CHANGES IN DAMPERS. ALL OBJECTIONABLE NOISE V4 VIBRATION. D. PROVIDE SHEET METAL ACCESS DOORS AS REQUIRED FOR OR APPROVED EQUIVALENT, WITH SIZES AS INDICATED ON THE APPLICABLE REFERENCE STANDARDS. G. MANUFACTURER SHALL PROVIDE AN ASME PRESSURE RELIEF PROPER AGCES5 TO THE EQUIPMENT. ACGE55 DOORS SHALL BE DRAWIN65. PROVIDED ON EACH 51DE OF EACH COIL AND FILTER BANK, INLET B. MEGHANIGAL EQUIPMENT TESTING AND LABELING SHALL VALVE WITH M CAPACITY REQUIRED FOR THE BOILER'S GRO55 5. THERMAL INSULATION TO EACH FAN, AND WHEREVER ELSE SHOWN. 2. GEILING EXHAUST REGISTERS SHALL BE STAINLESS STEEL AND CONFORM TO MG-NYS IOl.2 AND 501.5 AND 501.6. OUTPUT, A TER, AND A DRAFT TOO INDICATOR, A DRAIN VALVE, A SHALL BE FURNISHED WITH A SPONGE RUBBER GASKET. VENT DAMPER, AND A DRAFT HOOD FOR EACH BOILER. A. BURIED STEAM AND CONDENSATE PIPING SHALL BE INSULATED E. DUCT SIZING, GONSTRIJGTION AND INSTALLATION SHALL BE IN G. GAS FIRED EQUIPMENT SHALL COMPLY WITH THE PROVISIONS D. CONTRACTOR SHALL SUPPLY AND FIELD INSTALL SPILL WITH PITTSBURGH CORNING "FOAM6LA5" CELLULAR GLA55 AGGORDANGE WITH SECTION 603 IN THE MG-NYS. PROVIDE 3. REGISTERS SHALLCOME EQUIPPED WITH AN ADJUSTABLE OF FG-NYS. INSULATION WITH "PITTRAP' SELF-SEALING JACKETING. SUPPORTS AND FASTENINGS ADEQUATE TO INSURE PERMANENT OPPOSED BLADE DAMPER THAT SHALL BE AGGE55ED THROUGH THE SWITCHES ON ALL BOILERS. B. INSULATE HOT WATER SUPPLY AND RETURN PIPING AND LOW STABILITY AND TO EFFEGTIVELY RE515T ALL APPLIED LOADS. FACE OF THE REGISTER. P. -HEATING AND COOLING EQUIPMENT SHALL COMPLY WITH EG-NY5 E. ALL BOILERS SHALL BE EQUIPPED WITH A MANUAL RESET B. IN5URE STEAM AND CONDENSATE PIPING WITH ING AND LOW bOI FOR INSULATION, DUCTS AND SEALING. CONTROLS SHALL BE HI-LIMIT LOW WATER GUT-OFF. INSULATION IN ACCORDANCE WITH TABLE So3.3.3.1 IN EG-NYS A5 F. FLEXIBLE DUCTWORK SHALL BE PRE-INSULATED GHLOROPRENE E. SIDEWALL SUPPLY RE615TER5: IN ACGORDANCE WITH EG-NY5 &03.3.3. EFFGIENGY LIMITS SHALL FOLLOWS; RUBBER COATED, GLA55 FABRIC, SIMILAR TO WIRE MOLD 5-1K OR G,OMPLY WITH EG-NY5 505.5.2, 8O3.2b AND TABLES 505.22 (1 THRU RUNOUTS TO 2" lY�" INSULATION ZING GOATED METAL FLEXIBLE DUGTIN6, DAYGON DUCT 5TIO3, OR I. 51DEWALL SUPPLY REGISTERS SHALL BE GARNES MODEL RTDA 6) AND TABLE 5032.6. F. HEADERS SHALL BE SUPPLIED BY THE MANUFACTURER AND 2" AND LE55 Ida" INSULATION AS APPROVED. FLEXIBLE DUCTWORK SHALL BE USED FOR FINAL WITH 1/2" VERTICAL FRONT BLADE SPACING. SHALL BE INCLUDED FOR THE BATTERY OF MODULES WITH 2)�" AND LARGER 2" INSULATION GONNEGTIONS TO TERMINALS ONLY AND WILL NOT BE PERMITTED AT E. STRUCTURAL 5UPPORTS FOR ALL EQUIPMENT AND PIPING SHALL SELF-ALIGNING COUPLINGS, PIPE NIPPLES AND UNIONS FOR CHANGES IN DIREGTION, NOT TO EXCEED 6'-0" IN LENGTH. 2. ALL REGISTERS SHALL BE STEEL, DOUBLE DEFLECTION WITH AN GOMPLY WITH THE REQUIREMENTS OF MG-NY5 AND FG-NYS CHAPTER GONNEG , SE TO MODULES.COUPLINGS, AND SHALL SUPPLY ALL PIPE OPPOSED BLACK DAMPER. 5 AND AS INDICATED ON PLANS. FITTINGS, SEL NNEGTINC, COUPLINGS, AND " IER TO TS" REQUIRED FOR FIELD GONNEGTING THE HEAT EXCHANGER TO THE BOILER C. INSULATE VALVES, FLANGES, UNION, AND FITTINGS BY WRAPPING G. FLEXIBLE GONNECTION5 AT FANS SHALL BE NEOPRENE COATED WITH BLANKET INSULATION. COVER BLANKETS TO THE SAME DEPTH GLA55 FABRIG, 30 OZ/SQ. YD. WITH SEWED AND GEMENTED SEAMS, F. REGISTERS IN 5HOWER/LOCKER ROOM AREAS SHALL BE F. CHIMNEYS AND FLUES SHALL COMPLY WITH MG-NY5 CHAPTER 8. MODULES FOR GRAVITY GIRGULATION BETWEEN THESE COMPONENTS. AS THE PIPE INSULATION WITH INSULATING CEMENT, TROWEL SMOOTH. SIMILAR TO VENT FABRIGS ING. STAINLESS STEEL. GAS VENTS SHALL GOMPLY WITH FG-NYS GHAPTER 5. G. CONTROLS D. DUGT INSULATION SHALL CONFORM TO THE PROV15IONS OF H. AIR DISTRIBUTION SYSTEMS SHALL BE EQUIPPED WITH SMOKE 8. ROOFTOP AIR CONDITIONING EQUIPMENT 9. AIR HANDLING UNITS 1. THE BOILER MANUFACTURER SHALL FURNISH ALL BOILER MG-NY5 5EGTION 604 AND EG-NY5. DETEGTOR5 APPROVED FOR INSTALLATION IN AIR DISTRIBUTION SYSTEMS IN AGGORDANGE WITH SECTION 606 IN MG-NYG. CONTROLS. E. IN UNCONDITIONED SPACE (GEILING PLENUM, ATTIC, CRAWL SPACE, IN INSTALL AND START-UP ROOFTOP HEATING AND GOOSING UNITS A. INSTALL AIR HANDLING UNITS WHERE INDICATED, IN ETG) INSULATE ALL SUPPLY DUGTWORK WITH Z" THICK, ONE I. DUGT PENETRATIONS AND AIR TRANSFER OPENINGS SHALL BE IN ACGORDTNGE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL AION WITH EQUIPMENT MANUFACTURER'S PUBLISHED 2. THE CONTROL PANEL SHALL BE CAPABLE OF AUTOMATIC LB./SQ.FT. UL RATED, GLASS FIBER INSULATION WITH REINFORGED PROTECTED BY APPROVED FIRE DAMPER ASSEMBLIES IN INSTALL UNITS PLUMB AND LEVEL, FIRMLY ANCHORED IN LOCATIONS INSTALLATION INSTRUCTIONS, AND WITH RECOGNIZED INDUSTRY HOT WATER TEMPERATURE RESET V5 OUTDOOR AIR ALUMINUM FOIL FACING. APPLY TO PROVIDE A GONTINUOUS VAPOR ACCORDANCE WITH SECTION 60-1 OF MG-NY5 AND SEGTION -111 OF AN SERVE IN INDICATED AND MAINTAIN MANUFACTURER'S RECOMMENDED D , ENSURE THAT UNITS COMPLY WITH REQUIREMENTS TEMPERATURE. THIS SETTING SHALL BE FIELD GLEARANGES. AND SERVE INTENDED PURPOSES. ADJUSTABLE. BARRIER. INSULATE ALL RETURN DUCTWORK WITH V2" THICK, ONE BG-NY5. LB✓50.FT. UL RATED, GLA55 FIBER INSULATION WITH REINFORGED B. INSTALL UNITS ON ROOF CURB, IN ACCORDANCE WITH NATIONAL B. MOUNT AIR HANDLING UNITS ON VIBRATION ISOLATORS IN ALUMINUM FOIL FAGING. APPLY TO PROVIDE A CONTINUOUS VAPOR ROOFING GONTRAGTOR'5 A550GIATION (NGRA) INSTALLATION AGGORDANGE WITH MANUFACTURER'S INSTRUCTIONS. H. CLEARANCES SHALL BE MAINTAINED AROUND BOILERS, TANKS, BARRIER. R VALUES FOR DUCT SUPPLY AND RETURN INSULATION REGOMMENDATION5. AND RELATED EQUIPMENT 50 AS TO PERMIT INSPECTION, SERVICING, SHALL BE IN AGGORDANGE WITH TABLE 503.3.5.5 IN EG-NY5. G. PROVIDE POSITIVE EQUIPMENT GROUND FOR AIR HANDLING UNIT REPAIR, AND MAINTENANCE. PASSAGEWAYS ON ALL SIDES OF G. ALL NEW HVAG EQUIPMENT SUPPORT5 SHALL BE APPROVED BY COMPONENTS. BOILERS SHALL HAVE AN UNO55TRUGTED WIDTH OF 15". F. INSULATE REFRIGERANT PIPING WITH I" FIBERGLASS INSULATION A STRUCTURAL ENGINEER. FOR PIPING UP TO I" IN DIAMETER AND 1-1/2 FOR PIPING EXCEEDING D. INSTALL FLOOR-MOUNTED AIR HANDLING UNITS ON 4" HIGH I. BOILER ROOMS AND ENCLOSURES SHALL COMPLY WITH THE I" IN DIAMETER IN ACCORDANCE WITH TABLE 503.53.1 IN Er,-NY5. D. ALL ROOFTOP UNITS WITH A COOLING GAPAGIT( IN EXCESS 65 GONGRETE PAD, 4" LARGER ON EACH SIDE THAN UNIT BASE. PROVISIONS OF CHAPTER 3 IN BG-NYS. ALPY G. INSULATE BOILER BREEGHING WITH 2" MINERAL FIBER BLANKET MBH SHALL BE PROVIDED WITH AN AUTOMATIC ENT ECTIO CONTROLLED ECONOMIZER I AAN AUTOMATIC, WITH SECTION 801 E. INSTALL ROOF-MOUNTED AIR HANDLING UNITS ON STRUCTURAL J. SUPPLY WATER TO THE BOILER SHALL COMPLY WITH THE INSULATION, 1400 DEGREE F. SERVICE TEMPERATURE, EAGLE IN EG-NY5.. STEEL MEGHANIGAL STAND. ANCHOR TO STAND WITH REMOVABLE PROVISIONS OF PG-NY5. PITGHER OR EQUIVALENT COVER WITH 18 GAUGE, I" MESH FASTENERS. AND GALVANIZED WIRE, APPLY 1/2 INSULATING CEMENT, TROWEL SMOOTH AND FINISH WITH H OZ. CANVAS JAGKET APPLIED WITH FIRE K. BOILER SAFETY AND WITH THE RELIEF VALVES RETARDANT LAGGING ADHESIVE, OR FINISH OVER GALVANIZED D. EACH AIR HANDLING UNIT SHALL RECEIVE TRAPPED CONDENSATE CONTROLS SHALL COMPLY WITH THE PROVISIONS OF SECTION 1006 WIRE WITH GLASS CLOTH SAND VINYL ACRYLIC, MASTIC, GOATING DRAIN FULL SIZE OF UNIT CONFLEX O EQUAL. INSULATE FULL LENGTH T IN MG-NY5. WITH DRY FILM THIGKNE55 OF 1/I6". DRAIN PIPING WITH FLOOR DRAIN, , R EQUAL. TERMINATE DRAIN AT NEAREST HUB OR FLOOR DRAIN, ROUTING TO BE DETERMINED AT L. UPON COMPLETION OF ASSEMBLY AND INSTALLATION, JOB SITE. AGGEPTANGE TESTS SHALL BE GONDUGTED BY A CERTIFIED TESTING AGENCY IN AGGORDANGE WITH THE REQUIREMENTS OF (5. ALL SPLIT SYSTEM UNITS WITH A COOLING GAPAGITY IN EXGE55 SECTION 1011 IN MG-NYS. 65 MBH SHALL BE PROVIDED WITH AN AUTOMATIC ENTHALPY GONTROLLED EGONOMIZER IN AGCORDANCE WITH 5EGTION 505.2.6 IN EG-NYS. D AqC FC REVISIONS/SUBMISSIONS DRAWNG TITLE: DATE: DESCWTION 14 --Weo te ��. . �� HVAG ,a Ne ,aQ� 5PEOIFIOATION5 FINEB CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT »: CONSULTANT: FLOOR PL N NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.c. 8 LE 06 05-1194 EXIST'G LIBRARY SCALE: DRAWWG NO.: . . .the business ofARCHITECTURE.- Q16) ANO AND PARKER ENGINEERS, P.C. Oestgn and Consult/ng Services RO 735 Deerfoot Path, Cutchogue, New York 11935 20 HII Street, Huntington, New York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 421-043-1 Fax (516) 421-0565 DISTPoCT: SECTION BLOCK: LOT: DRAWN BY: hftp://www.ns-arch.com •cavm�ctlr mos IaECR7c a.ssatw�rs rc N 0 T II I EXISTING TOILET TO BE REMOVED, SEE PLUMBING ❑ DEMOLITION NOTES. I-T—I— T- II �I EXISTING SINK TO BE I I \J II (��)1 JI REMOVED, SEE PLUMBING 11 11 11 BATH DEMOLITION NOTES. V ' Ly - ll �� � EXIST'G -- h ��ji DIR. OFFICE --- 1 HALL LL JI 11 0 11111 O�O/A\ j TF====�7 � I III / I I I ell LL�OOC E GHILDR N'S GENERAL STacKs ROOM EXIST'E� FLUME 1 NO DEMOLITION NOTES �� �� GIRGULATION I. PLUMBING CONTRACTOR TO REMOVE EXISTING PLUMBING FIXTURES AND DISGARD. ALL SUPPLY AND WASTE LINES NOT BEING RE-U5ED SHALL BE GAPPED AT THE NEAREST AGGE551131-E HIDDEN LOGATION. EXISTING LINES TO BE RE-USED SHALL BE GAPPED AT LOGATION A0GE551BLE \ �----------- -- FOR RE-USE. 2. THE GONTRAGTOR SHALL PROPERLY DISPOSE OF ALL ITEMS REMOVED � ❑ DURING DEMOLITION. 111 ---------- 3. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH THE ELEGTRIGAL CONTRACTOR SUCH THAT THE ELEGTRIGAL GONTRAGTOR 1111 GAN TERMINATE ELEGTRIGAL 5ERVIGE TO EQUIPMENT PRIOR TO ITS' II REMOVAL. 4. CONTRACTOR SHALL GOORDINATE ALL DEMOLITION WORK WITH THE GENERAL CONTRACTOR SUCH THAT THE GENERAL GONTRAGTOR GAN PATGH ALL HOLES IN 96LL5, ROOF DEGK, FLOORS, ETG. (A5 LEFT BY EQUIPMENT THAT WAS REMOVED) IN A TIMELY FASHION. 5. GONTRAGTOR SHALL NOTIFY THE OWNER AT LEAST 24 HOURS IN ADVANCE BEFORE PERFORMING ANY WORK. COORDINATE DEMOLITION WORK WITH OWNER SUCH THAT WORK HAS THE LEAST POSSIBLE ��\\ �� /b 11 INTERFERENCE WITH THE NORMAL OPERATION OF THE FACILITY. I I `�i ❑ ❑ COPYO M VEST. G EXIST FLUMEING LEGEND 11 STAIR EXISTING WASTE LINE EXISTING HASTE VENT LINE IL—_ —-— EXISTING GOLD HATER LINE EXISTING HOT HATER LINE EXI5TING PIPING TO BE REMOVED NEW WASTE LINE — — — NEW WASTE VENT LINE M --- NEW GOLD WATER SUPPLY (GW) ❑ ❑ ---- NEW HOT HATER SUPPLY (HH) —G— NEW GAS SUPPLY (G) Q• GLEANOUT DEGK PLATE (G.O.D.P) G.O. GLEANOUT I>< GATE VALVE VT GHEGK VALVE BALL VALVE i GAS GOGK >I GA5 SHUT-OFF VALVE NG NEW GONNEGTION GW GOLD HATER HW HOT HATE HWR HOT WATER REGIRG. V VENT F EXISTING SANITARY IRST FLOOR FLAN PIPING BELOW SLAB TO BE REMOVED BACK TO 56ALE: 1/4" = 1'-0" Ll HERE. O OUT❑p AGK EX15TINC,ABOVE WASTE SLAB B O O / O i EXISTING DOMESTIC 000 0 0 HATER 5ERVIGE PIPING TO BE REMOVED BAGK TO HERE. 0 EXISTING DOMESTIC WATER SUPPLY PIPING / UP FROM SLAB EXISTING DOMESTIC HATER BELOW SLAB / � 0 D00 o 0 0 EXISTING DOMESTIC WATER 5ERVIGE PIPING RELOCATE EXISTING WELL WATER TO BE REMOVED BAGK PRE55URIZING TANK. FIELD VERIFY TO HERE. LOGATION AND PIPING p O EXISTING SANITARY PIPING BELOW SLAB TO BE GUT O BAGK AND REMOVED A5 SHOWN TO FAGILITATE 5TRUGTURAL WORK, FIELD VERIFY L06ATION5 AND SIZES. EXISTING DOMESTIC HATER LINE NOTE, TO BE GUT AND MODIFIED AS REMOVE AND REPLACE EXISTING EXISTING DOMESTIC WATER SERVICE PIPIN6 SHOWN, FIELD VERIFY LOGATION SANITARY LINE BELOW GRADE A5 TO BE REMOVED BAGK PRIOR TO THE START OF WORK REQUIRED FOR THE INSTALLATION OF TO HERE. ARCHITENFH CT 5TTRUG ION, GOORVINATE WITH TURAL PLANS EXISTING DOME5TIG / HATER 5ERVIGE EXISTING SANITARY PIPING BELOW SLAB TO / BE REMOVED BAGK TO HERE. BASEMENT FLOOR FLAN EXISTING HOUSE TRAP AND FRESH AIR INTAKE, 5GALE: 1/4" = 1'-0" FIELD VERIFY PRIOR TO THE START OF WORK. SEA ' ED ARC,, REVISIONS/SUBMISSIONS: DRAWING TITLE: • .N �j� DATE: DESCRI TION: • PLUMBING DEMOLITION PLAN r Q T o oes yO CAD FILE NAME: P OF NE PROJECT TITLE: DATE: NSA PROJECT « FLOOR PL N NORTH PROP. ALTERATIONS TO 8/24/06 05-1194 CONSULTANT: Nemschick Silverman Architects P.c. ROUTE LIBRARY '...the business ofARCHRECTLIRE." Q116) ANO AND PARKER ENGINEERS, P.C. ROUTE 25 SCALE: DRAWING NO.: Design and Consulting ENGINEE Services CUTCHOGUE, NEW YORK AS NOTED 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York Phone : 631-734-7007 Fax : 631-734-7347 421-045q Fax (516) 421-0563 DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: .corraexr wa�esa¢n ave«w+�warrtcTn Pc N 0 TH ICPL http://www.ns-a rch.com u EXISTING WASTE PIPING BELOW SLAB TO BE REMOVED BACK TO HERE. ❑ O 4 NG o O ❑ 0 ❑O OFFSET WASTE RISER AS SHOWN BATH TO FACILITATE NEW FOUNDATION EW PIPING TO MATCH EXISTIN FIELD VERIFY 2" El O LOGATI N AND SIZES FD-I _ -I/2_ _ BREAK RM. CRAWL NEW I ECH. dull SPACE 0 0 00 ❑ ❑ ❑o CONNECT NEW 1-1/2" VENT TO EXISTING VENT STACK THRU ROOF, FIELD VERIFY 51ZE AND ° LOCATION PRIOR TO THE START STORAGE OF WORK FD-1 3" VENT UP THRU NEW 4" WASTE LINE 2 FIR5T AND BELOW SLAB — SECOND FLOOR - FILES I ELEV. MEGH. I NI HLAV_I I N NI NEW 2" WASTE FROM ®C 12 N FIR5T FLOOR DOWN FD-1 PIPING BELOW SLAB STOR. I TO BELOW SLAB, 5AWGUT EXISTING O O V NI O SLAB AS REQUIRED, _ ❑O❑ ❑O❑ E_I O COORDINATE WITH in 4" V.T.R. 2" ARGHITEGT (TYP) L — 2 2„ 2" 4" 4" 411 El G.O.D.P. — — — — — — — — — — — O 55 — I NEW 2" VENT UP FROM SLAB UP GOATS rn TO FIRST FLOOR 2" O =1 (V 7r— HLAV_I 2 HG„ FD-I GOATS O °® STOR. BATH HWG-I woRK III 5PAGE II CPU 5ASEMENT FLOOR PLAN NEW 4" WASTE LINE BELOW SLAB SGALE: 1/4" = 1'-0" EXISTING WASTE PIPING BELOW SLAB TO BE J� REMOVED BACK TO HERE. SECOND FLOOR PART-PLAN # 1 NGt/// SGALE: 1/4" = 1'-0" EXISTING HOUSE TRAP AND FRESH AIR INTAKE, FIELD VERIFY PRIOR TO THE START OF WORK • • I-I/2" ❑ GONNEGT NEW WASTE TO HWG-I I-1/2, EXISTING WA5TE LINE BELOW 4" HLAV- FLOOR CHILDREN'S LIBRARIAN I NG NG DROP ING WASTE LINE HALL ry YOUNG ADULTS HG YA DIREGTOR EXISTING PIPING CONNECT NEW 2" VENT TO I BATH BELOW FLOOR EXISTING VENT STACK THRU ROOF, FIELD VERIFY SIZE TL AND LOCATION PRIOR TO THE START OF WORK N GL CONNECT NEW WASTE TO O O ❑O ❑ l EXISTING WA5TE LINE BELOW FLOOR EWG-I GHILDREN'S GIRGULATION o ROOM PROGRAMNI I N6 O . P=2 ELEVRATOR COMPUTER TERMINAL a" SEE PART PLAN #2 FOR CONTINUATION O 2" WASTE DOWN TO O QO ❑O BASEMENT I NEW 2" VENT FROM ° SECOND FLOOR TO G.O. 211 ABOVE FIRST FLOOR UP 2" CEILING 4" V.T.R. 3" V. .R — — I - I L-] ryI N ry 2" VENT UP THRU 5EGOND FLOOR SEE PART PLAN COMPUTER #2 FOR CONTINUATION AREA �11 — GENERAL MEDIA I & FICTION I 2" V. UP TO ABOVE GEILING ° VEST. COPY ROOM (0 SECOND FLOOR PART-PLAN #2 FIRST FLOOR PLAN SGALE: 1/4" = 1'-0" SCALE: 1/4" = I'-O" MUSIC :01 ° ALTERNATE PROVIDE AND INSTALL FEDERAL "MA5TER-FLU5H" DUPLEX SEWAGE EJECTOR PUMP, 3/4" H.P., 50 GPM ® 20 TDH, 115-1-60. ALTERNATE SHALL INGLUDE ANY AND ALL PIPING MODIFICATIONS REQUIRED FOR COMPLETE INSTALLATION OF EJEGTOR PUMP IN BASIN REGE55ED IN SLAB. LOCATION TO BE DETERMINED BY OWNER AND ARCHITECT, COORDINATE WITH ALL TRADES. BE REVISIONS/SUBMISSIONS: DRAWING TITLE: nfmCO� DATE: DESCRIPTION; PLUMBING WASTE 029086 AND VENT PLANS 'e CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT Nem CONSULTCONSULTANT: FLOOR PI-M NORTH schick Silverman Architects P.C. PROP. ALTERATIONS TO 8/24/06 05-1194 ".. .the business of ARCHITECTURE.' CAPANO AND PARKER ENGINEERS, P.C. EXIST'G LIBRARY SCALE: DRAWING Ni Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York — ROUTE Z5 IN TCUTCHOGUE, NEW YORK AS NOTED ##�� Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-o4aa Fax (516) 421-0563 DISTRICT: SECTION BLOCK: LOT: DRAWN BY: hftp://www.ns-arch.00m .corvaexr moc Ia•cxac sw vea.I.N nxwlrcTs rc N 0 TH CP L II tl EXISTING ELECTRIC HOT EXISTING ELECTRIC HOT WATER HEATER TO REMAIN WATER HEATER TO REMAIN 0 o� 0 o BATH NEW MEGH. (1400 FH) GRAWL REROUTE EXISTING DOME5TIG PLUMB 1 NG FIXTURE SCHEDULE O SPACE WATER LINE TO FACILITATE NEW CONSTRUCTION. SIZE TO BREAK RM. MARK FIXTURE WASTE TRAP VENT HW GW MATCH EXISTING. N N KOHLER HIGHLINE PRESSURE LITE TOILET III���III MODEL K-3544, ELONGATED, FLOOR OUTLET, CONNECT NEW DOMESTIC HI MOUNTING HEIGHT 1-1 1/2". PROVIDE WITH 4" INT 2" - 1/2" PIPING TO EXISTING CACHET TOILET SEAT ELONGATED MODEL K-4688 O O OD 1100 ❑O lV KOHLER KIN65TON WALL MTD. EXISTING DOMESTIC STORAGE LAVATORY, MODEL K-2005, PROVIDE WATER SUPPLY PIPING HLAV-I WITH KOHLER MODEL K-1443-K FAUCET -I/2" I- /2" -I/2" I/2" I/2" O UP FROM SLAB — — GONNEGT NEW I" W/K-16012-4 HANDLES AND OFFSET PROVIDE EEMAX GW SUPPLY TO DRAIN MODEL K-13685 "SINGLE POINT" 1/2" GW MODIFIED WATER WATER HEATER DOWN SUPPLY. KOHLER TOGGATA COUNTERTOP SELF STOR. MODEL 5P3512 � RIMMING STAINLESS STEEL SINK MODEL 3.5KW 120-1-60, K-3344-2. PROVIDE WITH KOHLER REVIVAL 2" INT 2" - I" MOUNT BELOW ELEV. O FILES FAUCET MODEL K-16112-4A SINK MEGH. ELKAY A.D.A. COMPLIANT ELECTRIC WATER 3/4" GW I HEWG-I COOLER MODEL EZ5B WHEELGHAIR 1-1/2" 1-1/2" 1-1/2" - 1/2" DOWNT ACCESSIBLE DRINKING FOUNTAIN. PROVIDE EEMAX "SINGLE _ _ _ _ _ _ _ JI C J.R. SMITH CAST IRON FLOOR DRAIN MODEL POINT" WATER HEATER V N FD-I 2005YO2(5) FURNISHED WITH FLASHING 2" 2" - - - MODEL SPTER 3.5KW O O �} EXISTING O COLLAR AND ADJUSTABLE STRAINER HEAD. 120-1-60, MOUNT BELOW 51NK tj DOMESTIC WATER DOD SOD NOTE. PROVIDE OFFSET INSULATED DRAIN5 AT ALL WHEELCHAIR ACCESSIBLE p BELOW SLAB SINKS. COORDINATE WITH ARCHITECT. 1/2" GINUP TO SINK ON — — I/2 GW — — — — �/4" GW I" GW — — I" GW — — EXISTING WELL WATER PRESSURIZING TANK. CONTRACTOR TO MODIFY ALL FIRST FLOOR, ROUTE 3 PIPING IN NEW WALL 0 EXISTING DOMESTIC WATER EXISTING PIPING FEEDING THE CONSTRUCTION 1/2'. GW 0 LINE TO BE GUT BACK ANDNEW PIPINO AS N MODIFIED A5 SHOWN, FIELD REQUIRED SIZES MATGH EX STING. p � _ p DOWN — VERIFY LOCATION PRIOR TO I GOATS THE START OF WORK O N HLAV-1 T PROVIDE EEMAX XI N NG 'SINGLE POINT" WATER HEATER '� HG I/2" GN 711, MODEL 5P3512 m BATH .5DOWN 3KW120-1-60, MOUNT BELOW GOATS O SINK CONNECT NEW DOMESTICNEW OAS SUPPLY CONNECT NEW DOMESTIC PIPING TO EXISTING BELOW HWG-I ABOVE GEIL NG HOLD G, PIPING TO EXISTING BELOW G'R'4DE I STOR. TIGHT TO STRUCTURE GRADE 3/4" GW NG I DOWN _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — — _ _ _ _ —_ — — — _ _ _ _ J G 7EXISTING DOMESTIC KATER/ BELOW S EE REROUTE EX15TINO DOMESTIC WATER WORK � SERVICE TO FACILITATE RENOVATION, SPACE o SIZE TO MATCH EXISTING. N ®O PO T N UPGRADE EXISTING 6A5 SERVIGE. NEW 6A5 METER AND REGULATOR IN AGGORDANGE CG t� WITH KEYSPAN. COORDINATE ALL WORK WITH RESTORATION NOTE: KEYSPAN PRIOR TO BID AND INCLUDE ALL THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE PIPING, HEADERS, METERS, REGULATORS, CONCRETE PADS AND ALL ELSE REQUIRED BY RESTORATION OUT5IDE THE LIMITS OF CONSTRUCTION. KEYSPAN. GAS SUPPLY DOWN TO ABOVE BASEMENT GEILIN6 CONNECT NEW SINK TO EXI5TING BASEMENT FLOOR PLAN AW, FIELD VERIFY LOCATION ANDD SIZES PRIOR TO THE START SCALE: 1/4" = 1'-0" OF WORK CONNECT NEW TOILET TO 4 EXISTING CW, FIELD VERIFY LOCATION AND SIZES PRIOR CONNECT NEW GA5 METER TO THE START OF WORK TO EXISTING SERVIGE PER EXISTING GAS SERVICE KEYSPAN Q IREMENT5 BELOW GRADE 0 OHLAV-I HALL HWG-I YA DIREGTOR YOUNG ADULTS HG BATH o O ❑p GHILDREN'S PROGRAMMING ROOM PROP. COMPUTER TERMINAL GIRGULATION ELEVATOR O O ❑O O❑ PO 1/2" GW UP TO 1/2" GW ABOVE FIRST PROVIDE EEMAX "SINGLE FLOOR CEILING POINT" WATER HEATER MODEL 5P5512 3.5KW GENERAL MEDIA 120-1-60, MOUNT BELOW G SINK OI-IPUTER S FICTION I AREA 1/2" GW DOWN TO o O BELOW COUNTER VEST. GOP), ROOM MU51 G o o F- FIRST FLOOR FLAN SEAL:" qc / REVISIONS/SUBMISSIONS. DRAWING TITLE: SCALE: 1/4" = P-O" �aaus,-wr,aewcwenx DATE: DESCfBTION. 4A . ��w PLUMBING WATER 5UPPLY PLANS No Afi P� F CAD FILE NAME: PROJECT TITLE: DATE NSA PROJECT x: Nem CONSULTANT:schick Silverman Architects P.c. FLOOR PL N NORTH PROP. ALTERATIONS TO 8/24/06 05-1194 '.. .the business&ARCHITECTURE.' CAPANO AND PARKER ENOINEERE, P.C. EXIST'G LIBRARY SCALE: DRAWNG NO.: Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 Hlgh Street, Huntington, NeN York CUTCHOGUE, NEW YORK JAS NOTED Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Fax (516) 421-0565 DISTRICT: SECTOR BLOCK: LOT: DRAWN BY: � = http://www.ns-arch.com dd .corvlreNr zoos tassxac SLNHlMN AxcxrECTs Pc N 0 TH CP L I III d E-2 EH GONGRETE SURFACE OR FLOOR 2" V. UP 3" V. UP COVERING AS REQUIRED ROOF A 4 V.T.R. AL 4" V.T.R. GLEANOUT COVER GSK 5GREW 2" GLEANOUT PLUG FINISHED FLOOR CEILING I 'a 1 1 GAULKING FERRULE 1 1 2�� 511 1 1 EXISTING VENT STACK, 1 HELD VERIFY LOGAT1' N AND SIZE PRIOR TO BID SECOND FLOOR N:� FLOW _ NC 2" — - �" J r 3 J - - - 11/2_ — � - - 2„ r — — � GEILIN6 1 r -T I I I GLEANOUT DECK PLATE I I 1 1 NOT TO SCALE I 1 1 1 I 1 12" 1 1-I/2" 13 EXISTING VENT STACK, I FIELD VERIFY LOCATION I/2" 12" 1 I-1/2" 1 I I AND 51ZE PRIOR TO BID I I I 5-1 1 I I-1/2" — — — — I=1/2- - - - - - - - - - - - - - - - - 51, 5" J H� I I H1_AV-I I 3�� 3�� HWG-I I 1 1 I r - - - ?1_ F - - T — T_ 2" - - - - - - - -r 2" J r - - - - NG FIRST FLOOR I 1 1 I I I I I 1 /2" 2 PIPEMP ABOUT OP NEATLY DOWN INTO TOP OF VENT 2' 1 4" LI-1/2' G.O. 1 2 I -I/2" 11-I/2" 12" 13" 11-1/2" I-1/21, 11-1/2" I 1 1 I 1 OFFSET 4" HASTESTE I I 1 I 1GONNEGT 1 I TO EXISTING I 1 PROVIDE FLASHING I I MIN. 24" EXISTIN6 4" WASTE I 5 I I 1 1 HLAY_I I WASTE STACK HLA�C1 1 1 LINE BELOW SLAB I I 2" I I I I LINE 1 CONNECT NEW 4" CONNECT NEW 1-1/2" I HWG-I HWG-I I NG I WASTE TO EXI5TING WASTE TO EXISTING I FP1 1 G.O.D.P. FD-I I I I E� I FP1 I WASTE LINE WASTE LINE BASEMENT ROOFING — 2" 2" 2" 4" 4" 4" 4" I 2" ROOFING MATERIAL 4 4 4 4 4 4 ROOF GONSTRUGTION PROVIDE SLEEVE ANCHOR PIPE TO FRAMING OR 4„ AS NECESSARY JOIST W/ U-BOLT AROUND PIPE R AS IRON CONNECTED OR NG NG PROVIDE PIPE INCREASER 5EGURED TO FRAMING OR JOIST. MIN. 3" VENT THRU ROOF EXISTING WASTE LINE NEW 4" WASTE LINE EXISTING WASTE LINE BELOW SLAB CONNECT NEW 4" WASTE BELOW SLAB GONNEGT NEW 4" BELOW SLAB - CONHUBNECTORS T-55 R5 ON PLUMB I NCG HASTE 4 VENT RISER TO EXISTING WASTE LINE HASTE LI EXI5TIN6 WASTE LINE GI PIPE SCHEMATIC REFER TO PLANS FOR VTR PIPE SIZES h LOGAT 0 5. LOCATE VTR 10 FEET HORIZONTAL OR 3 FEET VERTICAL ABOVE ANY BLDG. OPENING OR FRESH AIR INTAKE, OR I FOOT FROM ANY VERTICAL SURFACE. REFER TO 5EGIFIGATIONS. VENT THROUGH ROOF DETAIL NOT TO 5GALE PUGO CAST IRON BODY ROOF WITH 4" WIDE FLANGE, ADJUSTABLE NICKEL BRONZE TOP AND SECONDARY FLASHING FLANGE. FLOOR DRAIN STRAINER GEILIN6 FINISHED *DRAIN IC TILE AND FLOORG BED SURFACE SLO SHUT-OFF VALVE TYPICAL a 'NEW GAS METER AND REGULATOR '0IN ACCORDANCE WITH LOCAL GIMI UTILITY ROMTS. DRETE FLOOR SLAB MP PAN TIGHTLY FIRST FLOORNEOPRENE G DRAIN COLLAR INC GRADE G GEILIN6 TT FLOOR DRY I N IN OPEN AREA `EXISTIN6 OAS SERVICE NOT TO SCALE BELOW GRADE B-I (1400 GFH) BASEMENT &AS SUPPLY RISER 5CHEMATIG F SEA t A.9 REVISIONS/SUBMISSIONS' DRAWING TFLE: °5 wy% DATE: SET : PLUMBING RISER ?� °2 M1` o-a+m waver-x+rraeramacw � ao-m gnaw ' D I A&RAM5 4 DETA I L5 No g 10 CAD FILE NAME: rd E`N PROJECT TITLE. DATE NSA PROJECT w CONSULTANT: FLOOR PM NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.C. SALE: 05-1194 '...the business ofARCHITECTURE:' CAPANO AND PARKER ENOINEERE, P.C. ROUTE LIBRARY SCALE: DRAWING NO.: Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 Design Hig streak,Consulting Huntingto New York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Pax (516) 421-0565 F DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com COP RG If R p6 BA9CHIX S4&1MN�AURECTe PG N O TH CP L Y PLUMBING SPEC. I F I CATIONS I. GENERAL 8. PIPING 15. AGGESS DOORS Iq. INSTALLATION OF NATURAL GAS PIPING A. ALL DESIGN AND GONSTRUGTION SHALL BE IN COMPLIANCE WITH A. ABOVE GROUND SOIL, WASTE AND VENT PIPING 10" AND A. ACCESS DOOR SHALL BE PROVIDED AND INSTALLED BY THE A. USE SEALANTS ON METAL GAS PIPING THREADS WHIGH ARE THE NEW YORK STATE PLUMBING CODE PROVISIONS (PG-NYS), SMALLER, SHALL BE HUBLESS CAST-IRON SOIL PIPE; GENERAL CONTRACTOR. CHEMICALLY RESISTANT TO NATURAL GAS. USE SEALANTS SERVICE WEIGHT; HUBLESS CAST-IRON SOIL PIPE FITTINGS, SPARINGLY, AND APPLY TO ONLY MALE THREADS OF METAL NEW YORK STATE FUEL GAS CODE PROVISIONS (FG-NYS), AND NEW YORK STATE ENERGY CONSERVATION CONSTRUCTION HUBLESS JOINTS. JOINTS. 14. HOT WATER CIRCULATING PUMP CODE PROVISIONS (EG-NYS). B. UNDERGROUND BUILDING DRAIN PIPING, 15" AND SMALLER B. REMOVE GUTTING AND THREADING BURRS BEFORE ASSEMBLING B. PRIOR TO SUBMISSION OF HIS BID, THIS CONTRACTOR SHALL SHALL BE GAST-IRON HUB-AND-SPIGOT SOIL PIPE; SERVICE A. PUMP TO BE ALL BRONZE, IN LINE TYPE, 51MILAR TO BELL PIPING. VISIT THE JOB SITE TO ASCERTAIN THE ACTUAL FIELD WEIGHT; CAST-IRON HUB-AND-SPIGOT PIPE FITTING; LEAD $ GOSSETT LR-20B WITH 115V, 60 HZ SINGLE PHASE, 1/20 AND OAKUM JOINTS. HP MOTOR. G. DO NOT INSTALL DEFECTIVE PIPING OR FITTINGS. DO NOT CONDITIONS AS THEY RELATE TO THE WORK AS INDICATED ON USE PIPE WITH THREADS WHIGH ARE CHIPPED, STRIPPED OR THE DRAWINGS AND DESCRIBED HEREIN. DISCREPANCIES, IF 15. PLUMBING FIXTURES AND AGGE55ORIE5 DAMAGED. ANY, SHALL BE BROUGHT TO THE ARCHITECTS AND ENGINEERS G. EXTERIOR SOIL AND WASTE PIPING, FROM FIVE FEET ATTENTION PRIOR TO SUBMISSION OF HIS BID, AND IF NOT OUTSIDE THE BUILDING, SHALL BE DUCTILE IRON PIPE AND A. UNLESS OTHERWISE INDICATED ON DRAWINGS ALL FIXTURES D. PLUG EACH GAS OUTLET, INCLUDING VALVES, WITH THREADED RESOLVED TO HIS SATISFACTION, SHALL BE A WRITTEN FITTINGS. SHALL BE AMERICAN STANDARD WATER SAVER TYPE. THE QUALIFIGATION OF HIS BID. EQUIVALENT FIXTURES OF OTHER MANUFACTURERS SUCH AS PLUG OR GAP IMMEDIATELY AFTER INSTALLATION AND RETAIN UNTIL CONTINUING PIPING, OR EQUIPMENT CONNECTIONS ARE D. INTERIOR WATER PIPING, 2 AND SMALLER, SHALL BE CRANE, KOHLER, ELDER, ETC., MAY BE USED. COLOR SHALL G. PRIOR TO SUBMISSION OF HIS FORMAL BID, THI5 COPPER TUBE; TYPE L, HARD DRAWN TEMPER; WROUGHT- BE SELECTED BY THE ARCHITECT. ALL FIXTURES SHALL BE COMPLETED. CONTRACTOR SHALL REVIEW ALL DRAWIN65 OF THE ENTIRE COPPER FITTINGS, SOLDER-JOINTS. PIPING RUN BELOW SUPPLIED COMPLETE WITH ALL REQUIRED ACCESSORIES SUCH PROJECT INGLUDIN6 GENERAL CONSTRUCTION, DEMOLITION, SLAB5 ON GRADE SHALL BE COPPER TUBE, TYPE K WITH NO AS TRAPS, TAILPIECES, ETC. PROVIDE STOPS IN HOT AND E. GROUND GAS PIPING ELECTRICALLY AND CONTINUOUSLY WITHIN PROJECT, AND BOND TIGHTLY TO GROUNDING ELECTRICAL, MECHANICAL, PLUMBING, AND SPRINKLER AND JOINTS BELOW GRADE. GOLD WATER SUPPLY TO EACH FIXTURE. CONNECTION. HE SHALL NOTIFY THE GENERAL CONTRACTOR OF WORK REQUIRED IN HIS BID WHIGH 15 INDICATED OR IMPLIED IN E. EXTERIOR WATER PIPING, 3/4" AND SMALLER SHALL BE B ALL FIXTURE AND FITTINGS SHALL BE IN ACCORDANCE WITH F. ARRANGE WITH UTILITY COMPANY TO PROVIDE GAS SERVICE OTHER SECTIONS OF THE WORK. COPPER TUBE; TYPE K, SOFT-ANNEALED TEMPER; GA5T- CHAPTER 4 IN PG- NYS. . COPPER FLARED TUBE FITTINGS; I " THRU 2" SHALL BE TO INDICATED LOCATION WITH SHUTOFF AT TERMINUS. D. INSTALL WORK IN A NEAT WORKMANLIKE MANNER READILY COPPER TUBE; TYPE K, SOFT ANNEALED TEMPER ; WROUGHT 16. TRENCHING AND BAGKFILLING CONSULT WITH UTILITY ACCESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIR. COPPER FITTINGS, SOLDER-JOINTS; 3" AND LARGER SHALL COSTS, FEES AND PERMITS INVOLVED. PAY SUCH COSTS AND AS TO EXTENT OF IT'S WORK, BE DUGTILE-IRON PIPE, WITH GEMENT-MORTAR LINING, A. DIG TRENCHES STRAIGHT AND TRUE TO LINE AND GRADE, FEES; OBTAIN PERMITS. E. DRAWINGS ARE DIAGRAMMATIC AND INDICATES GENERAL SCHEDULE 150; DUGTILE-IRON FITTINGS, WITH RUBBER- WITH BOTTOM OF TRENCH FREE FROM ROCK POINTS AND WITH G. PROVIDE GAS COCK AT CONNECTION TO GAS TRAIN FOR EACH ARRANGEMENT OF WORK AND APPROXIMATE LOCATION OF GASKET JOINTS; 4" THROUGH 12" SHALL BE POLYVINYL PIPE CUSHION CONSISTING OF EITHER UNDISTURBED NATURAL GAS-FIRED EQUIPMENT ITEM; AND ON RISERS AND BRANCHES EQUIPMENT. REFER TO ARCHITECTURAL DRAWINGS FOR ALL CHLORIDE (PVG) WATER PIPE, GLASS 100; GAST-IRON OR SOIL OR COMPACTED FINE SAND. WHERE INDICATED. DIMENSIONS AND COORDINATE FINAL LOCATIONS OF DUCTILE-IRON FITTINGS; MECHANICAL JOINTS. DIFFUSERS, AND REGISTERS WITH REFLECTED CEILING B. PROVIDE A MINIMUM TRENCH WIDTH OF 16 INCHES FOR MAIN PLANS. ALL WORK SHALL BE COORDINATED WITH OTHER F. GAS PIPING 2" AND SMALLER SHALL BE BLACK STEEL PIPE; SOIL AND DRAINAGE PIPE, AND A MINIMUM OF 24 INCHES H. INSTALL, INSPECT, TEST AND PURGE NATURAL GAS SYSTEMS TRADES TO AVOID CONFLICT. SCHEDULE 40, MALLEABLE IRON THREADED FITTINGS. COVER BELOW FINISHED GRAD WHEREVER CONDITIONS WILL IN ACCORDANCE WITH NFPA 54, AND LOCAL UTILITY PERMIT. REQUIREMENTS. F. THE PLUMBING CONTRACTOR SHALL BE A LICENSED INSTALLER 0. GAS PIPING 2 1/2 AND LARGER SHALL BE BLACK STEEL OF PLUMBING SYSTEMS IN THE STATE OF NEW YORK. PIPE, SGHEDULE 40, WROUGHT STEEL BUTT WELDED G. WHERE FIELD CONDITIONS REQUIRE VARIANCE FROM THESE I. PROVIDE GAS SERVICE, PRESSURE REGULATING VALVE AND FITTINGS. MINIMUMS, SECURE THE ARGHITEGT'S APPROVAL BEFORE GAS METER IN ACCORDANCE WITH LOCAL GAS COMPANY G. WORK IN CEILING OF TENANT SPADE ON FLOOR BELOW MUST PROGEEDING WITH THE VARIANCE. PERFORM ALL SUCH REQUIREMENTS. TAKE PLACE BEFORE OR AFTER TENANT'S NORMAL BU51NE55 GI. VALVES VARIANCES AT NO ADDITIONAL COST TO THE OWNER. J. GAS 5Y5TEMS,PIPING, VENTING, AND EQUIPMENT REQUIREMENTS HOURS AND SHALL BE CONSIDERED OVERTIME WORK. ALL A. STOP VALVES, EXCEPT FIXTURE STOPS, ON HOT AND GOLD D. BAGKFILL UPON RECEIPT OF ALL NECESSARY APPROVALS, SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE CEILINGS DAMAGED MUST BE RESTORED TO ORIGINAL WATER LINERS 2" AND SMALLER SHALL BE FULL PORT 400LB. USING STOCKPILED MATERIAL D EXCAVATED FROM THE WITH THE PROVISIONS OF FG-NYS. PIPE SIZING SHALL BE IN CONDITION. ACCORDANCE WITH THE REQUIRMENTS OF TABLE 402.3(6) IN NON-SHOCK BRONZE BALL VALVES, NIBGO T5g5-Y FOR TRENCH, OR USING OTHER MATERIAL APPROVED BY THE H. THE GENERAL CONDITIONS OF THE CONTRACT FOR THREADED CONNECTIONS, AND NIBGO 5-5q5-1' FOR COPPER ARCHITECT. FG-NYS. CONSTRUCTION AIA DOCUMENT A201 AND THE ARCHITECT'S TO COPPER, OR APPROVED OTHER. SPEGIFIGATIONS, AS APPLICABLE, ARE PART OF THIS E. ALL BAGKFILL MATERIAL SHALL BE FREE FROM ROCKS, LARGE 20. PLUMBING DEMOLITION CONTRACT. B. GLOBE VALVES UP TO AND INCLUDING 3" SHALL BE SGREW- CLODS ROOTS, AND OTHER FOREIGN MATTER, AND SHALL BE OVER BONNET, COMPOSITION DI56, BRASS, NIBGO T-211 FOR COMPACTED IN SIX INCH LAYERS TO A MINIMUM OF q5% A. CONTRACTOR SHALL REMOVE ALL EXISTING PLUMBING THREADED CONNECTIONS AND 5-211 FOR SOLDER CONNECTION, COMPACTION. FIXTURES AND GAP ASSOCIATED HOT WATER, GOLD WATER, 2. SCOPE OF WORK OR APPROVED OTHER. RECIRCULATING, WASTE AND VENT PIPING ABOVE THE F. JETTING OF BAGKFILL WILL NOT BE PERMITTED. GEILIN6 OR BELOW THE FLOOR. THE FOLLOWING IS A GENERAL LISTING, NOT NECESSARILY G. CHECK VALVES SHALL BE OF THE SWING-TYPE, SIZES UP TO COMPLETE, OF THE W FIXTURES AND ASSOCIATED HOT, GOLD, RECIRCULATING, CONTRACTOR WORK TO BE PROVIDED AND INSTALLED BY THE AND INGLUDIN6 3" SHALL BE ALL BRASS, 125LB. S.W.P., 6. PROMPTLY REMOVE ALL EXCESS EXCAVATED MATERIAL FROM B. GOT SHALL REMOVE ALL EXISTING PLUMBING PLUMBING GONTRAGTOR; NIBGO T-415 FOR THREADED CONNECTIONS AND NIBGO 5-413 THE SITE. U FOR SOLDER CONNECTIONS, OR APPROVED OTHER. WASTE AND VENT PIPING BACK TO EXISTING WATER SERVICE A. HOT AND GOLD WATER PIPING 1-7. INSTALLATION OF UNDERGROUND PIPING AND EXISTING MAIN WASTE LINE. B. DRAINAGE AND VENT PIPING D. GAS COCKS 2" AND SMALLER SHALL BE 150 PSI NON-SHOCK G. HOT WATER HEATERS W06, BRONZE STRAIGHTWAY COCK, FLAT OR SQUARE HEAD, A. INSTALL EXTERIOR WATER SERVICE PIPING IN COMPLIANCE G. CONTRACTOR SHALL REMOVE ALL EXISTING GAS PIPING BACK D. FIXTURES THREADED ENDS. WITH LOCAL GOVERNING REGULATIONS. TO GAS METER. E. GAS PIPING F. ALL WORK SHOWN ON DRAWINGS E. GAS COCKS 2 1/2" AND LARGER SHALL BE 125 P51 NON- B. ALL PIPE FITTIN65 AND ACCESSORIES SHALL BE FREE FROM D. CONTRACTOR SHALL PROPERLY DISPOSE OF ALL ITEMS SHOCK WOG, IRON BODY BRONZE MOUNTED, STRAIGHTWAY DAMAGE AND DEFECTS. EXTREME CARE SHALL BE TAKEN TO REMOVED DURING DEMOLITION 3. SHOP DRAWINGS SAMPLES AND APPROVALS COCK, SQUARE HEAD, FLANGED ENDS. KEEP THE PIPE GLEAN BEFORE AND AFTER LAYING. ENDS OF PIPE SHALL BE CLOSED WHEN LAYING IS NOT IN PROGRESS. E. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH A. SUBMIT A SEPIA AND TWO PRINTS OF SHEET METAL AND/OR 10. BIBBS AND FAUCETS THE ELECTRICAL CONTRACTOR SUCH THAT THE ELECTRICAL PIPING SHOP DRAWINGS, CERTIFIED BY ALL TRADES THAT G. THRUST BLOCKS OR TIE RODS SHALL BE PROVIDED AT BENDS, CONTRACTOR GAN TERMINATE ELEGTRICAL SERVICE TO MIT CERTIFIED A. HOSE BIBBS SHALL BE THREADED END, BRONZE BODY TEES AND ACCESSORIES IN ACCORDANCE WITH NEPA 24. EQUIPMENT PRIOR TO ITS' REMOVAL. COORDINATION HAS BEEN ESTABLISHED. SUB EQUIPMENT GUTS WITH CONSTRUCTION WIRING MIT CERTIFIED AND RENEWABLE COMPOSITION DI5G. TEE HANDLE, 3/4" NPT CONCRETE SHALL HAVE A MINIMUM GOMPRE551VE STRENGTH OF AUTOMATIC TEMPERATURE CONTROL SHOP DRAWINGS. SUBMIT INLET, 5/4" HOSE OUTLET. 2,000 PSI AT SEVEN DAYS. THIGKNESS OF BLOCKS SHALL F. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK WITH BE AT LEAST EQUAL TO THE PIPE DIAMETER. GENERAL CONTRACTOR SUCH THAT THE GENERAL CONTRACTOR FOUR (4) BOOKBOUND OPERATING AND SERVICE MANUALS HALL INCLUDE COPIES OF ALL SHOP DRAWIN65. B. SILL FAUCETS SHALL BE THREADED END; BRONZE BODY, GAN PATCH ALL HOLES, LEFT BY EQUIPMENT THAT 5 WHIGH S SUBMIT HA SHALL INCLUDE, BUT NOT BE LIMITED NI THE RENEWABLE COMPOSITION DISC, WHEEL HANDLE, 3/4" NPT 18. INSTALLATION OF VALVES REMOVED, IN WALLS, ROOF DECK, FLOORS, ETG. IN A FOLLOWING: INLET, 3/4" HOSE OUTLET. TIMELY FASHION. A. INSTALL SECTIONAL VALVES ON EACH BRANCH AND RISER, G. CONTRACTOR SHALL NOTIFY THE OWNER AT LEAST 24 HOURS - PLUMBING FIXTURES AND EQUIPMENT. II. GLEANOUTS CLOSE TO MAIN, WHERE BRANCH OR RISER SERVES 2 OR MORE IN ADVANCE BEFORE PERFORMING WORK. COORDINATE - VALVES PLUMBING FIXTURES OR EQUIPMENT CONNECTIONS, AND DEMOLITION WORK WITH OWNER SUCH THAT WORK HAS THE LEAST POSSIBLE INTERFERENCE WITH THE NORMAL OPERATION PIPE AND FITTINGS A. IN ALL AREAS WITH CERAMIC TILE OR CARPETED FINISHES: ELSEWHERE AS INDICATED. OF THE FACILITY. - HANGERS J. R. SMITH FIG. 4040/4051 WITH SQUARE, ADJUSTABLE, B. INSTALL SHUTOFF VALVES ON INLET G EACH PLUMBING - INSULATION NICKEL BRONZE TOP. - VACUUM BREAKERS EQUIPMENT ITEM AND ON INLET OF EAGH FIXTURE, AND AS 21 . DISINFECTION - PIPING LAYOUTS B. IN ALL AREAS WITH TILE OR SHEET FLOORING: J.R. ELSEWHERE INDICATE. SMITH FIG. 4160/41-11 WITH SQUARE, ADJUSTABLE NICKEL A. THE POTABLE WATER SYSTEM SHALL BE DISINFECTED PRIOR 4. AS-BUILT DRAWINGS BRONZE TOP WITH TILE RECESS. G. INSTALL DRAIN VALVES ON EACH PLUMB .q PLUMBING EQUIPMENT ITEM TO USE BY A METHOD OF DISINFECTION IN ACCOR WITH THE NEW PORK STATE BUILDING CODE IO . THE POTABLE A. PREPARE AND SUBMIT "A5-BUILT" DRAWINGS AT THE LOCATED TO GOMPLETELI' DRAIN EQUIPMENT FOR SERVICE OR WATER PURITY TEST RESULT FROM A NEW YORK STATE COMPLETION OF THE PROJECT. G. WALL GLEANOUTS SHALL BE "TEE" FITTING WITH J.R. REPAIR. INSTALL AT BASE OF EACH RISER OR DROP IN CERTIFIED TESTER SHALL BE SUBMITTED FOR ENGINEER'S SMITH NUMBER 4531 OR 4551 AND CHROME PLATED ACCESS PIPING SYSTEM AND ELSEWHERE AS REQUIRED TO COMPLETELY REVIEW AND APPROVAL. 5. TESTS COVER NO. 4422. - DRAIN POTABLE WATER SYSTEM. D. INSTALL CHECK VALVES ON DISCHARGE SIDE OF EACH PUMP 22. WARRRANTY A. THE PLUMBING SYSTEMS SHALL BE INSPECTED AND TESTED IN AND ELSEWHERE AS INDICATED. ACCORDANCE WITH REQUIREMENTS OF SECTION 511 OF THE NEW 12. INSULATION YORK STATE PLUMBING CODE (PG-NYS), HEALTH DEPARTMENT E. INSTALL BALANCE COCKS IN EACH HOT WATER RECIRCULATING A. THIS YEAR FROM SHALL GUARANTEE FOR A PERIOD , ONE ANDLOGAL AUTHORITIES HAVING JURISDICTION. A. INSULATION SHALL BE INSTALLED IN ACCORDANCE WITH THE (U YEAR FROM DATE OF ACCEPTANCE BY THE OWNERS, ALL PROVISIONS OF EG-NYS SECTION 504. LOOP, AND ELSEWHERE AS INDICATED. MATERIALS, APPARATUS AND WORKMANSHIP WHETHER 6. VERMIN CONTROL F. INSTALL HOSE BIBBS ON EXPOSED PIPING WHERE INDICATED, FURNISHED BY HIMSELF OR BY HIS 5UBGONTRAGTORS AND HE WITH VACUUM BREAKER. SHALL REPLACE OR REPAIR IN A MANNER APPROVED BY THE B. ALL DOMESTIG GOLD WATER PIPING SHALL BE INSULATED ARCHITECTS, WITHOUT COST TO THE OWNER, ANY PARTS OR A. ALL PIPING, ETC., PASSING THROUGH WALLS, FLOORS, WITH 6USTIN-BACON "SNAP-ON" GLASS FIBER (1/2") PIPE PARTS OF THE WORK WHIGH MAY PROVE DEFECTIVE OR GEILING AND/OR SOLID CONSTRUCTION, SHALL BE SEALED TO INSULATION WITH FACTORY APPLIED FIRE RETARDANT G. INSTALL SILL FAUCETS ON CONGEALED PIPING WHERE UNSATISFAGTORY WITHIN THE PERIOD OF THE GUARANTEE. PREVENT THE PASSAGE OF VERMIN. JACKET. ALL SEAMS SHALL BE SEALED WITH MINNE50TA INDICATED WITH VACUUM BREAKER. MINING ED 1128 VAPOR BARRIER ADHESIVE, AND FURTHER H. INSTALL HYDRANTS WHERE INDICATED, IN ACCORDANCE WITH B. WHERE SPECIAL GUARANTEES COVERING INSTALLATION, B. SEALS SHALL BE MADE BY MEANS OF ROCK WOOL OR OTHER SECURED WITH ALUMINUM STRAPS. ALL FITTIN65 SHALL BE MANUFACTURER INSTALLATION INSTRUCTIONS. OPERATION OR PERFORMANGE OF ANY SYSTEMS OR APPLIANCES APPROVED INERT MATERIAL, PACKED SLEEVES OR OTHER INSULATED WITH PREMOLDED OLA55 FIBER FITTIN65 AND FURNISHED UNDER THIS CONTRACTOR ARE REQUIRED, THE APPROVED CONSTRUCTION. WRAPPED WITH OPEN MESH GLASS FABRIC TAPE AND COATED FULL RESPONSIBILITY FOR THE FULFILLMENT OF SUCH WITH BENJAMIN FOSTER 60-25. 1. INSTALL BAGKFLOW PREVENTER5 WHERE INDICATED IN GUARANTEES MUST BE ASSUMED BY THE CONTRACTOR, WHO 7. EXCAVATION BAGKFILLING AND CONSTRUCTION ACCORDANCE WITH REQUIREMENTS OF LOCAL WATER AUTHORITY SHALL OBTAIN WRITTEN GUARANTEES, IN TRIPLICATE, WHIGH G. ALL DOMESTIG HOT WATER AND HOT WATER RETURN PIPING AND HEALTH DEPARTMENT. SHALL BE FILED WITH THE ARCHITECT BEFORE FINAL A. ALL EXCAVATION, BAGKFILLING, GUTTING, PATGHIN6 AND SHALL BE INSULATED WITH 6U5TIN-BACON "SNAP-ON" GLASS J. INSTALL PRESSURE REGULATING VALVES WHERE INDICATED. AGGEPTANGE. CONCRETE AND MASONRY CONSTRUCTION BOTH INTERIOR AND FIBER PIPE, 5/4" FOR PIPING I " AND SMALLER, AND I " PROVIDES INLET PRESSURE GAGE ON VALVE OUTLET. EXTERIOR, REQUIRED FOR THE PURPOSE OF COMPLETING ALL FOR PIPING 1 1/4" THRU 4" PASTED AND BONDED IN PLACE G. CONTRACTOR WILL BE RESPONSIBLE FOR ALL LEAKS IN ALL OF WORK GALLED FOR UNDER THIS SPECIFICATION SHALL BE WITH BENJAMIN-FOSTER LAFGAS 81-42W. ALL FITTIN65 PIPES FOR A PERIOD OF ONE YEAR FROM THE DATE RA INCLUDED AS PART OF EACH CONTRACT. SHALL BE INSULATED WITH PREMOLDED GLASS FIBER COMPLETION OF WORK UNDER THIS CONTRACT. GONTGTOR FITTINGS AND FINISHED WITH 4 OZ. CANVAS JACKETS. SHALL REPAIR AT NO G05T TO THE OWNER, ALL SUCH LEAKS WHIGH OCCUR AFTER COMPLETION OF THIS CONTRACT UPON 24 D. FIRE HAZARD RATING FOR INSULATION, FASTENER AND HOURS NOTICE THEREOF BY THE CONSTRUCTION JACKETING MATERIALS SHALL NOT EXCEED 25 FOR FLAME MANAGER/GENERAL CONTRACTOR. LEAKS WHIGH OCCUR PRIOR SPREAD, 50 FOR FUEL CONTRIBUTED, AND 50 FOR SMOKE TO THE COMPLETION OF THIS CONTRACT SHALL BE REPAIRED DEVELOPED. AT ONCE. CONTRACTOR 15 RESPONSIBLE FOR ANY DAMAGE CAUSED BY SUCH LEAKS AND THE REPAIR THEREOF AND WILL REIMBURSE THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR FOR ALL EXPENSE INCURRED THEREBY. SEAL: PEp REVISIONS/SUBMSSIONS: DRAWING TITLE: e „ cNa DATE: DESCRIPT PLUMBING cy c o-acx xx,en,-xasawmacmx , n x,o-aa rammxm � 5PEG I F I C ATI ON5 yT o 0"90'6 � e ^ _ CAD FILE NAME: PROJECT TITLE DATE: NSA PROJECT x: CONSULTANT: FLOOR PL M NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.C. S LE 06 05-1194 EXIST'G LIBRARY SCALE: DRAWWG NO: .. .the business of ARCHITECTURE.* ANO AND PARKER ENGINEERS, P.C. � Deslgn and Consulting Services ROUTE 2 CAP 735DeerfootPath, Cutchogue, NewYork11935 CUTCHOGUE, NEW PORK AS NOTED 70 Hlgh 5kreek, Huntington, New York Phone : 631-734-7007 Fax : 631-734-7347 ($Ib) 1419h 5tr Fax ngto , Novi DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: CPL http://Vmw.ns-arch.com .coamcxr moe taa�x avmaaux nnc�nrtm ac. OPT �I NEW MDP KWH THI5 AREA EXISTING KRPG LEGEND UTILITY POLE 800 SYMBOL DESCRIPTION NEW PAD MOUNTED A -� GONDUIT/GONDUGTOR RUN ABOVE CEILINGS OR TRANSFORMER - CONGEALED BEHIND WALLS MEW NOTE b NOTE 8 _ CONDUIT/GONDUGTOR RUN BELOW GRADE I I f B5 B5 55 B5 B5 55 55 B5 111/ HASH MARKS INDICATE NUMBER OF GONDUCTOR5 FRN FRN FRN FRN FRN FRN FRN FRN �tIT IF IN EXCESS OF TWO, EXCLUDING GROUND 400 200 200 100 100 100 40 125BRANGH GIRGUIT HOME RUN G DPI/2,4 HOME RUN TO PANEL PI, CIRCUITS 2 4 4 NOTE12INDICATES CIRCUIT ON TIMER. TIMER LOCATED NEAR PANEL NEW UTILIiI' AGP PI P2 PANEL IQ 3� PANEL D POLE NOTE II NO ELEV LIGHTING FIXTURE, LETTER INDICATES TYPE (a .1� PROPERTY LINE BOX O NOTE 14 LONER CASE a:15 UMBER INDICATES CIRCUIT FIXTURE CONTROLLINGLETTER INDICATES 5 ON SWITCH. OD 25 BE INDICATES FIXTURE WITH EMERGENCY BACKUP I I EL V EXIT LIGHT. ARROW INDICATES DIRECTION EMERGENCY LIGHT-WALL MOUNTED SINGLE LINE DIAGRAM EMER6ENGY LIGHT-GL6 MOUNTED NOT TO SCALE SWITCH TO BE REMOVED EXISTING ® S WALL MOUNTED SWITCH UTILITY POLE - NOTES S3 THREE WAY SWITCH S. LOWER CASE LETTER INDICATES CONTROLLED FIXTURE F. NEW UTILITY POLE ON EAST 51DE OF MAIN ROAD. POLE +0. PROVIDE AND INSTALL NEW PANELS INDICATED. ALL PANELS OCCUPANCY SENSOR SWITCH PROVIDED AND INSTALLED BY LIPA. COORDINATE EXACT SHALL HAVE ALL COPPER BUS, BOLT ON BREAKERS AND DOOR IN So LOCATION WITH LIPA. BRING PRIMARY CONDUCTOR5 FROM NEW DOOR HINGED CONSTRUCTION. SEE PANEL SCHEDULES FOR SIZE, UTILITY POLE ON EAST SIDE OF MAIN ROAD. BRANGH GIRGUIT AND MOUNTING REQUIREMENTS FOR EACH PANEL. MOTOR, NUMBER INDICATES HORSEPOWER NOTE SPLIT BU5 CONSTRUCTION WITH CONTACTOR/RELAY CONTROL 2. PROVIDE 4 INSTALL PRIMARY RISER UP UTILITY POLE 4 B36 REQUIRED FOR PANEL PI. p EXISTING RECEPTACLE TO BE REMOVED PROPERTY LINE BOX PER LIPA REQUIREMENTS. NOTE EXISTENCE OF CONCRETE SIDEWALKS 4 RETAINING WALL UNDER WHICH II. PROVIDE AND INSTALL MG6 SURGE PROTECTION DEVICE "SPA" AS PRIMARY CONDUCTORS MUST TRAVERSE. INDICATED. DEVICE WILL BE INSTALLED WITH 3 POLE 5WITGH OE EXISTING REGEPTAGLE TO REMAIN ADJACENT TO PANEL BEING SERVED. DEVICE SHALL BE MCG S 3. PRIMARY CONDUCTORS # 2XLPE TO BE DIRECT BURIED FROM WEST 5ERIE5 402XT. DUPLEX RECEPTACLE SIDE OF SIDEWALK TO NEW UTILITY POLE 4 IN 4" CONDUIT EVERYWHERE ELSE. COORDINATE ROUTING OF PRIMARY 12. UPON ACTIVATION OF SIGNAL FROM ELEVATOR SHAFT SMOKE CONDUCTORS WITH EXISTING FIELD CONDITIONS. DETECTOR, FIRE ALARM CONTROL PANEL SHALL RETURN ELEVATOR 6FI DUPLEX RECEPTACLE TO FLOOR, AND SEND SIGNAL TO GONTAGTORS SHUTTING OFF ALL \ / 4. NEW LIPA PAD MOUNTED TRANSFORMER. LOGATE MINIMUM 25' POWER TO ELEVATOR MOTOR AND ANCILLARY EQUIPMENT IN �' QUADRUPLEX RECEPTACLE FROM STRUCTURE 4 1O' FROM RETAINING WALL. GOORDINATE ELEVATOR SHAFT AND ELEVATOR MACHINE ROOM. PROVIDE AND EXACT LOCATION WITH LIPA 4 ARCHITECT PRIOR TO INSTALL NORMALLY GLO5ED GONTAGTOR5 WITH 24 VOLT INPUT INSTALLATION. SIGNAL TO OPEN UPON ACTIVATION OF 516NAL FROM FIRE ALARM O FLOOR RECEPTACLE PANEL. PROVIDE AND INSTALL ALL ENCLOSURES, CONTROLS, 5. RUN SECONDARY CONDUCTORS FROM TRANSFORMER TO NEW MOP. WIRING AND DEVICES AS NECESSARY FOR SAID OPERATION. ® FLOOR PHONE RECEPTACLE COORDINATE ROUTING OF SECONDARY CONDUCTORS WITH EXISTING FIELD CONDITIONS. 15. VERIFY PANEL 51ZES FOR EXISTING I(P PANEL AND EXISTING ONE RECEPTACLE WITH 3/4" CONDUIT 30 PANEL PRIOR TO ORDERING BREAKER 51ZES IN NEW MDP. d' RUN TELEPHONE ABOVE HUNG GEILING. (5. PROVIDE AND INSTALL A MULTI SECTION MDP RATED 120/208 REFEED AS NECESSARY. VOLT, 3 PHASE, 4 WIRE bOOA. MDP SHALL GON515T OF MAIN FUSED 5WITGH WITH ALL COPPER BUG WITH A WITHSTAND RATING 14. PROVIDE AND INSTALL LOCAL 200A NON FUSED DISCONNECT A' DATA REGEPTAGLE OF IOOKA. SECTION I SHALL HAVE UTILITY METERING AND THE 5WITGH FOR ELEVATOR EQUIPMENT. MAIN 5WITGH, SECTION 2 SHALL BE A FUSED DISTRIBUTION ® JUNGTION BOX SECTION. MAIN FUSES SHALL BE BU5SMAN KRPG SERIES. ALL 15. PROVIDE AND INSTALL NORMALLY OPEN AUXILIARY CONTACT FOR SECTION 2 FU5E5 SHALL BE BU55MAN FRN SERIES. INCLUDE IN ANTI-ENTRAPMENT BATTERY LOWERING DEVICE A55OGIATED WITH BID OUTDOOR METER IF REQUIRED BY LIPA. ELEVATOR. ❑P DI5GONNEGT SWITCH 'I. PROVIDE AND INSTALL 6" CONCRETE BASE FOR ALL NEW FLOOR I6. INDICATES CIRCUIT BREAKERS TO HAVE 6FI PROTECTION. WEATHERPROOF DISGONNEGT 5WITGH MOUNTED ELECTRICAL EQUIPMENT LOCATED IN BASEMENT. LOP 1-1. SEE SPEGIFIGATION SECTION Ib-3.7 FOR TEMPORARY POWER 8. PROVIDE AND INSTALL A NEW GROUNDING SYSTEM FOR BUILDING. REQUIREMENTS TO BE PROVIDED BY THE ELECTRICAL ® FUSE UTILIZE 2/0 COPPER TO BOND NEW GROUND RODS, BUILDING CONTRACTOR. UTILIZE THE EXISTING ELECTRICAL SERVICE STEEL AND WELL WATER SERVICE TOGETHER. WHERE POSSIBLE AS A MEANS FOR TEMPORARY ELECTRICAL mil_ CIRCUIT BREAKER SERVICE, PROVIDE ALTERNATE MEANS (GENERATOR, TEMP 9. ALL ELECTRICAL 51TE WORK ON THIS PLAN, INCLUDING SERVICE) WHEN THE EXI5TIN6 SERVICE 15 NOT AVAILABLE. KWH ELECTRIC METER TRENCHING, BAGKFILLING, POLE BASES, ETC. SHALL BE BY THE ELECTRICAL CONTRACTOR, COORDINATE ALL EXCAVATION AND 18. ALL UTILITY COMPANY FEES, PERMITS, ETC. REQUIRED ARE TO PAVING WITH GENERAL CONTRACTOR. BE BY THE ELECTRICAL CONTRACTOR. CT COUNTER TOP MOUNTING HEIGHT ti ELECTR I OAL SITE PLAN AFF ABOVE FINISHED FLOOR �Lo111=201-011 RT ROOF TOP ti HP WEATHER PROOF PANEL SOHEDULE NFDS NON FUSED DI5GONNEGT 5WITGH PANEL LOCATION MAIN NEMPiLENGL05URE FACP 1 FIRE ALARM CONTROL PANEL DEMOLITION NOTES ELEV BASEMENT LEVEL BREAKER=AMP=POLE MOUNTING❑ FLUSH - - LU65 60 AMP-3—POLE 171 SURFACE FA_N_Nj FIRE ALARM REMOTE ANNUNCIATOR DI. REMOVE SECONDARY CONDUCTORS BACK TO EX15TINO POLE 120 / 208 VOLT CHASE 4 WIRE MINIMUM A.I.G. -KA MAX No. OF POLES 24 _ MOUNTED TRANSFORMER. 0- DUCT SMOKE DETECTOR MIN GIRGUIT PHASE LEGS GIRGUIT MIN D2. REMOVE EXISTING UTILITY METER, WIRE VOLT VOLT WIRE No. DESCRIPTION 51ZE AMP OLE AMPS A B G AMPS OLE AMP 51ZE DESCRIPTION No. O SMOKE DETECTOR D3. REMOVE EXISTING 400A MAIN GIRGUIT BREAKER. 6FI I ELEV LTS 12 20 1 • SPACE 2 D4. EXISTING I(P PANEL 4 30 PANEL TO BE REMOVED 4 OH HEAT DETECTOR RELOCATED TO MAKE ROOM FOR HVAG EQUIPMENT. ALL EXISTING '' • 4 TO REMAIN BRANGH 6IRGUIT5 FROM THESE PANELS SHALL BE RE- 6FI 5 ELEV REG 12 20 1 - • 6 ❑F FIRE ALARM PULL STATION ROUTED TO NEW PANEL LOGATION5. PROVIDE AND INSTALL JUNGTION BOXES, TROUGHS 4 BRANGH GIRGUIT WIRING AS T WALL MOUNTED FIRE ALARM NECESSARY FOR RELOCATING GIRGUIT5. - AUDIO1VI5UAL DEVICE GFI Cl PIT LT5 4 REG 12 20 1 - • 10 � D5. IO0A-2P GIRGUIT BREAKER FEEDING NORTH BASEMENT SU II 12 B-PANEL - t'l:J CEILING MOUNTED FIRE ALARM (NC5P) TO BE REMOVED. NG5P TO BE RE-FED FROM NEW MOP. - • AUDION15UAL DEVICE D6. NG5P TO BE REMOVED AND RELOCATED TO NEW BASEMENT WALL. NOTE 16 - 6FI 13 AUX POWER 12 20 1 - • 14 ALL EXISTING TO REMAIN BRANGH CIRCUITS FROM THIS PANEL 15 - • 16 FIRE ALARM V15UAL DEVICE SHALL BE RE-ROUTED TO NEW PANEL LOCATION. PROVIDE AND INSTALL JUNCTION BOXES, TROUGHS 4 BRANGH GIRGUIT WIRING IT • 18 RAL REMOTE ALARM INDICATOR AS NECESSARY FOR RELOGATIN6 GIRGUIT5. 19 • 20 Dl. EXISTING BUILDING WILL BE LIFTED FROM PRESENT FOUNDATION IN PREPARATION FOR THE NEW WORK. THE LIFT AND ANY 21 • 22 ELECTRICAL WORK REQUIRED FOR THE LIFT WILL BE BY OTHERS. INCLUDE IN BID PROVIDING TWO TYPEWRITTEN REPORTS FOR THE 23 • 24 CONDITION OF THE ELECTRICAL GIRGUIT5. ONE REPORT FOR TOTALS - - - CONDITIONS BEFORE AND REPOT FOR AFTER THE LIFT. ALL FX15TINO GIRGUIT5 INSIDE AND OUT5IDE OF THE BUILDING TOTAL VA - AT 208 VOLTS 3 PHASE - AMPS WILL BE TESTED FOR THE REPORT. TESTING INCLUDES, BUT IS NOT LIMITED TO LIGHTS, SWITGHE5, RECEPTACLES, HVAG EQUIPMENT, FIRE ALARM, PUMPS, MOTORS, ETC. CONDUIT/CONDUCTOR SCHEDULE NUMBER NOMINAL CONDUCTOR EQUIPMENT SYMBOL SETS 51ZE MDGhes) NUMBER SIZE TYPE CONDUCTOR NOTE I A 2 4 4 500 kcmll THHN I/O B 1 4 4 500 kcmll THHN # 3 w C 1 2 4 4/0 THHN # 6 o 1 p D 1 1.5 4 # I THHN # 6 0. NOTE DI NOTE D2 - KWH d 1 NOTE 4 E 1 1.25 4 # 2 THHN # 8 L n J F I I 4 # 8 THHN # 10 91 5 NOTE 2 1 1 NOTE 3 NOTE 5 MAIN MAIN XMER ROAD ROAD 1 FIRST FIRST — — ——————— -- - - - - - - --- - -- -- I I I- -1 F_ -1 F- -1 F -1 F- PANELF - OOA r - PANEL- -�400A - PANEL PANEL PANEL PANEL P NEL PANEL PANEL PANEL LOCAL NGSP I GB 13R GB I I� NGSP KWH n n PI P2 AGP IA 3� ELEV NFDS CODE COMPLIANCE CERTIFICATION L � J LTJ LTJ LTI LTJ I} I} I} I} r, THE ELECTRICAL SYSTEMS INDICATED ON THESE PLANS HAVE BEEND NOTE Ob NOTE 05 NOTE 04 NOTE D3 NOTE 04 ELEV ESIGNED BY A LICENSED PROFESSIONAL ENGINEER AND ARE IN COMPLIANCE WITH THE REQUIREMENTS OF SECTION 805 OF THE ENERGY BASEMEN MOP n NOTE -I 26 CONSERVATION CONSTRUCTION CODE OF NEW YORK STATE, 2002 EDITION BASEMEN ELECTRICAL RISER DIAGRAM ELECTRICAL RISER DIAORAM e" F REVISIONS/SUBMISSIONS. DRAWING TITLE: NOT TO SCALE v { o ELECTRICAL SITE PLAN NOT TO SCALE DATE: DESCRIPTOR* �! . visa remwam r 4 RISER DIAGRAMS v ozs y T F NEB CAD FILE NAME: CONSULTANT: PROJECT TITLE: DATE NSA PROJECT w Nemschick Silverman Architects P.C. FLOOR PL N NORTH PROP. ALTERATIONS TO 8/24/06 05-1194 ".. .the business oFARCHITECTURE." CAPANO AND PARKER ENGINEERS, P.C. EXIST'G LIBRARY SCALE: DRAWING NO.: Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUOTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 (516) High Street, Fax Huntington, , NeA or http://www.ns-arch.com 65 DISTRICT�_JSEC"M_ LOT: DRAWN BY: R S L .cavvacxr zoos raw�nl slveexw ucxlscm as N 0 TH - I YI d NOTE II 1 TYP.LFF Z ❑ I r 1_� - y I F _j TT F_I 1 77 II ( ^ )F_ I I E n n ° �� � � t I I I I � L11 1 I � I � llll al D 1 D 1 O a I1 0 1 t IF - - -11 L 111 1 1 1 1 1 L L L — _j u u 1111 pti r - - r --77 D NOTE 4 E E D — D � TYP. � D - " L p� pL L -1 L -1 L -1 1Y Zp� Zp� NOTE 13 r r TYP. - Z r r am, Z r A' r NOTE, ALL EXISTING REMAIN IN THIS TO \ � � � REMAIN IN THIS AREA. AD I r AD \ \ \ AD 0 p p� E E \ \ n r _ r L L r — r T — r — —� ❑ El �p l III 1 1 D 1 1 D I 1 D 1 ❑ E n FTAr L - L L � L -1 1 � 1 � L< L l< NOTE II D� :vy D p TYP. Z r ° E E - - - - I \\ r D ❑ ❑ E UPPER LEVEL FLAN FIRST FLOOR DEMOLITION PLAN SCALE: 1/4" = I'DO" SCALE, 1/4" r � r � r � r ❑ ❑ ISENERAL NOTES - THE DEMOLITION PLAN 15 A GENERAL REPRESENTATION OF THE - ALL DEMOLITION WORK SHALL BE COORDINATED WITH OTHER DEMOLITION WORK REQUIRED FOR THI5 PROJECT. IT 15 NOT TRADES. THE ELEGTRIGAL CONTRACTOR5 SHALL DI5GONNEGT NOTE 12 INTENDED TO 5HOH ALL EQUIPMENT, SYSTEMS, DEVIGE5, ETG. POWER TO EX15TINO HVAG AND PLUMBING EQUIPMENT PRIOR TO E T rF. E THAT ARE TO BE REMOVED. EQUIPMENT REQUIRING REMOVAL BUT ITS REMOVAL BY OTHERS. NOT SHOWN HERE INCLUDE BUT 15 NOT LIMITED TO THE FIRE ALARM SYSTEM, THE PUBLIC, ADDRE55 SYSTEM, HVAG EQUIPMENT - THE ELECTRICAL GONTRAGTOR SHALL PATGH AND/OR REPAIR ALL 'V p` D� AND PLUMBING EQUIPMENT. ROOF PENETRATIONS, STRUGTURAL FLAW5, IMPERFEGTION5 AND AD r Z r -\ DEFECTS LEFT BY ELECTRICAL DEMOLITION. - WHERE EQUIPMENT IS TO BE REMOVED, REMOVAL SHALL INCLUDE BUT NOT BE LIMITED TO ALL BOXES, FITTINGS, HANGERS, - MAINTAIN WIRING FOR EQUIPMENT NOT INTENDED TO BE PART OF SUPPORTS, CONDUIT, CONDUCTORS, ETC,., AS IT RELATES TO THE DEMOLITION, PROVIDE AND INSTALL NEW BRANCH GIRGUIT THAT EQUIPMENT. WIRING TO EQUIPMENT AS INDICATED ON POWER PLANS. - ALL DEMOLITION WORK SHALL BE FIELD VERIFIED WITH A SITE - ALL UNUSED ELECTRICAL EQUIPMENT INGLUDING CONDUIT, VISIT PRIOR To BIDDING TO DETERMINE THE EXTENT OF WORK CONDUCTORS, BOXES, FITTING, ETC SHALL BE REMOVED, IT REQUIRED. THE DEMOLITION PLAN SHOULD BE U5ED AS A GUIDE SHALL BE THE ELEGTRIGAL GONTRAGTORS RESPONSIBILITY TO ONLY TO DETERMINE WHAT IS EXISTING TO REMAIN. EXTRAS IDENTIFY ALL UNUSED ELEGTRIGAL EQUIPMENT. WILL NOT BE ENTERTAINED FOR DEMOLITION WORK REQUIRED THAT 15 NOT SPEGIFIGALLY INDICATED ON THESE PLANS. NOTE I NOTE 3 NOTE 3 L ❑ — — — — — — — — — — — — — — — — — — — - - - - - - O II E c�E NOTE 5 11 11 NOTE b NOTE 2 E� T -1 r T T -1 D — ElY L D —1 L J L J L J E NOTE 7 — �— L. I I O NOTE 14 - - - El NOTES j r 6 EX15TINO 400A 120/205 MAIN SERVICE AND METER TO BE _ 0 L 7 101 D REMOVED. DI L 2. 400A MAIN GIRGUIT BREAKER TO BE REMOVED. r -1 r T 77 3. EXISTING Id PANEL 4 3(0 PANEL TO BE REMOVED d L J L J L -1 C NO�q RELOCATED TO MAKE ROOM FOR HVAG EQUIPMENT, ALL EXISTING TYR TO REMAIN BRANGH GIRGUIT5 FROM THESE PANELS SHALL BE RE- ROUTED TO NEW PANEL LOCATIONS. PROVIDE AND INSTALL / I— D D � — JUNCTION BOXES, TROUGHS d BRANCH GIRGUIT WIRING AS D \ J NEGE55ARY FOR RELOCATIN6 GIRGUIT5. D D 4. NORTH BASEMENT 51)13-PANEL (NGSP) TO BE REMOVED AND _ RELOCATED TO NEW BASEMENT WALL. ALL EXISTING TO REMAIN NOTE 16 BRANCH GIRGUIT5 FROM THI5 PANEL SHALL BE RE-ROUTED TO NEW PANEL LOGATION. PROVIDE AND INSTALL JUNGTION BOXES, L TROUGHS 4 BRANGH CIRCUIT WIRING AS NEGE55ARY FOR 1 RELOGATING GIRGUIT5. 0 C 1 l E 5. TELEPHONE SERVICE d EQUIPMENT TO BE MAINTAINED. RELOCATE L J - - - - O L - - - - - - - A5 NECESSARY TO FACILITATE THE INSTALLATION OF NEW HVAG L J r , r , EQUIPMENT. o L J L r 6. COMBINATION FIRE ALARM 4 5EGURITY PANEL To REMAIN. y -L / NOTE 13 SEGURITY FUNCTION d ALL RELATED SECURITY DEVIGE5 TO p NOTE IS REMAIN. FIRE ALARM FUNCTION 4 ALL RELATED FIRE ALARM DEVIGE5 IN BUILDING TO BE REMOVED. D - h; „ TYP. -1. EXISTING DUMBWAITER MOTOR AND GONTROLS TO BE REMOVED. NOTE 4 8. EXISTING QUAD REGEPTACLE5 TO BE REMOVED AND REPLACED IN J KIND ON NEW COLUMN ENCLOSURES OR WALL. MAINTAIN L -1 EX15TINO CIRGUITRY. 5EE E6 FOR NEW LOCATIONS. L _ L r 1IF 9. INDICATES EXI5TIN6 LIGHT AND RELATED SWITCHING 4 L - _ - _ - - - - - - - - - a -I - - 0 NOTE 8 0 GIRGUITRY TO BE REMOVED. \ // � - � o - 10. INDICATES EXISTING LIGHT AND RELATED 5WITGHING $ GIRGUITRY TO BE REMAIN. TYPICAL. �_ _ — _ D o D C D 11. INDICATES EX15TINO REGEPTAGLE TO BE REMOVED. �- - - J 1 . INDICATES EXISTING RECEPTACLE TO BE REMAIN. 5ASEMENT DEMOLITION FLAN u 13. ALL EXISTING EXIT LIGHTS TO BE REMOVED. SCALE, I/4" = I'DO" 14. PROVIDE AND INSTALL NEW 5WITGH IN NEW OPENING FOR EX15TINO LIGHT TO REMAIN IN GRAWL SPACE. SEE BASEMENT p D D LIGHTING PLAN. 15. ALL EXISTING EXTERIOR LIOHT5 MOUNTED ON BUILDING NEAR EXITS TO BE REMOVED. 16. RELOCATE ALL REGEPTAGLE5 THIS AREA TO NEW GPU ROOM. NOTE 8 1-7. MEGHANIGAL GONTRAGTOR HILL REMOVE ALL EXISTING HVAG EQUIPMENT IN BUILDING EXCLUSIVE OF ELECTRIC HATER HEATER o 0AND TWO EXHAUST FANS EX15TINO TO REMAIN. THE EXISTING D o D 0 D EQUIPMENT TO BE REMOVED 15 NOT SHOWN ON DRAWIN65. THE L L I _ ELEGTRIGAL GONTRAGTOR 15 REQUIRED TO 1?15GONNECT 4 REMOVE J ALL POWER TO EXISTING HVAG EQUIPMENT BEING REMOVED. p _] NOTE 10 _ F_ p �II F p L- TYP. L- J L_ REVISIONS/SUBMISSIONS: DRAWING TITLE: P DATE: DESCWTION: ELECTRICAL E 7 PE * '� * DEMOLITION PLAN5 N o MGM J CAD RLE NAME: NOTE 12 PROJECT TITLE: DATE: NSA PROJECT CONSULTANT: Nemschick Silverman Architects P.C. FLOOR FL N NORTHPROP. ALTERATIONS TO 8/24/06 05-1194 EXIST'G LIBRARY "...the business of ARCHITECTURE" CAPANO AND PARKER ENGINEERS, P.C. SCALE: DRAWING NO.: Design and Consulting Services 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York ROUTE 25 735Phone : 531-7ath, C7 FaxewYok11937 CUTCHOGUE, NEW YORK AS NOTED _ (516) 421-0459 Fax (516) 421-0565 DISTRCT: SECTION BLOCK: LOT: DRAWN BY: RSL http://www.ns-arch.com .covvRr�ir sws IFA4.CH[]f su�.ux urritEcre vc. N 0 TH II 0 6ATH ❑. ❑, re A3 d d d d d B B B 13 B B RS . RS E 25 25 25 25 25 31 31 31 BREAK RM. 29 29 NOTE 3 NOTE Y PI/3 NOTE 2 Lb B A3E NOTE Y 15 RS 25 ❑ 25 [Ell 29 ❑ 25 ❑ 25 EX S P CRAWL H31 F51 B 51 SPACE 31 ASSEh'15LY ELEV/1 MEGH. RMI B NOTE Y H21 R e R e 9FE. .El9 B ELEV. B PROP. H.G FILE RM. MR. ELEVATOR B 51 E A3 d d e' d d Lj/�T�{ R5 ❑R ❑R � - 3T 3T 21 2T 25 25 29 25 25 31 AE / ❑ 13 1 NO� A3 A3 H:24 27 MEGH. ROOM B RS 25 R5 25 ❑ 2-9 ❑ 5PI/2Y Rca 25 3 13 I3 PI/2 29 $ 13 H 3 to S' ✓ NPi OTE ` NOTE b .p, J ©© 29 ©© 29 3 C7 ' SE JIF7 F� SE 13 ! A3 A3 PAT-{ 31 3I L L WELLED A3 A3 EXIT zT zT. ADMINISTRATIVE QE s OFFICE BASEMENT LIGHTING PLAN SCALE: I/4" , I'-o" �2T 21 �2T . A3 A3E A3 NOTE 6 TYP L L L A3 2T A3 2T A3 2T LIGHTING FIXTURE SCHEDULE A3E A5 A5E SYM. MFG. 4 GAT. No. TYPE HATT LAMP TYPE "KAT LAMP MOUNTING/HEIGHT REMARKS P' L SERIES FLUORESCENT 62 F32T8 2-32 REGE55ED - AE LEGION 2 X 2 62 F32T8 2-32 RECESSED WITH -EM SERIES FLUORESCENT EMERGENCY BALLAST 'a`2 LE EIRIES FLUORESGENT 62 F52TB 2-52 REGE55ED - A2E LEGION 2 X 4 62 F32T8 2-32 RECESSED WITH _FM SERIES FLUORESCENT EMERGENCY BALLAST A3 1- SERIES FLUORESCENT 15 F32T8 3-32 RECESSED - A3E LEGION 2 X 4 q5 F32T8 3-32 REGE55ED WITH -EMI SERIES FLUORE5C EMERGENCY BALLAST B 2Y50-232-EBO FLUORESCENT 62 F32T8, 2-32 SURFACE - NOTES FOCAL POINT I X 8 }, ALL EXIT LIGHTS TO BE ON CIRCUIT PI/I. PROVIDE AND G METRO LIGHT FLUORESGENT 240 F54TSH0 4-54 SUSPENDED - NORMAL HOT BALLAST INSTALL BRANCH CIRCUIT WIRING TO EXIT LIGHTS AS D EXISTING FIXTURE NECESSARY. WALL 5WITGH, TO BE REMOVED TIMER OR 2. ALL EMERGENGY LIGHTS TO BE ON CIRCUIT PI/3. PROVIDE AND EX15TINO FIXTURE 5EN50R INSTALL BRANCH CIRCUIT WIRING TO EXIT L16HTS A5 E TO REMAIN NECESSARY. COORDINATE WITH ARCHITECT FOR EXACT LOGATION5 PRIOR TO INSTALLATION. F TRACK LIGHT FLUORESCENT 200 EMERGENCY 3. EACH ROOM WITH a, b 5WITGHE5 AND THREE LAMP FIXTURES BALLAST SHALL BE WIRED WITH 5WITGH "a" GONTROLLIN6 CENTER LAMP 4' AND 5WITGH "b" CON ROLLING OUTER TWO LAMPS. PROVIDE AND F/2 RACK LIGHT FLUORESCENT 100 - - - - INSTALL ALL CONTROL WIRING AS NECESSARY. NEURAL G WALL SCONCE FLUORESCENT Y5 - - - - 4. ALL 5WITGHES SHALL BE 5PEG GRADE COMMERGIAL DUTY, 20 AMP 2YY VOLT RATED. COORDINATE WITH ARCHITECT FOR COLORS, H ELATE G6H-126/42T FLUORESCENT SO 42WTT 1-42 RECESSED - COVER EACH 5WITGHE5, MOUNTING HEI6HT5 AND EXACT LOGATION5 OF THE EMERGENGY BALLAST DOES NOT AFFECT NORMAL FIXTURE JUNO b" DIAM OPERATION. IT REQUIRES AN UN5WITGHED SOURCE OF POWER 5. ALL EXTERIOR BUILDING MOUNTED TYPE "SE" LIGHTS TO BE ON K ELATE CbV-126/32T FLUORESCENT 39 32WTT 1-52 REGE55ED - TO THE EMERGENCY BALLAST. CIRCUIT PI/33 AND CONTROLLED BY TIMER. PROVIDE AND INSTALL TORK KbOOZ FOR CONTROL OF ALL OUTDOOR LIGHTING. L IG43-439HZ-WH LOW VOLTAGE 50 MRI6 1-50 REGE55ED - DET I L I ALL TYPE "SE" LIGHTS HAVE EMERGENCYBALLAST BACKUP. 6. SEE DETAIL I FOR WIRING OF ALL FLUORESCENT LIGHTS WITH M BPOALO VERDES FLUORESCENT Y2 T5CIRG 30" DIAMI-40, 1-22 5URFAGE - NO SCALE EMERGENCY BALLASTS. WIRE EMERGENCY BALLAST SUCH THAT ONLY UPON L055 OF POWER TO CIRCUIT, BALLAST WILL N FOCAL POINT SKYDOME - 165 F24T5HO 6-24 - - ACTIVATE, NOT UPON NORMAL 5WITCHIN5. F5D-33 FLUORESCENT Y. COORDINATE EXACT LOCATION OF ALL LIGHTING FIXTURES IN P EIFL ER 4.5 INCANDESCENT 100 QIOODG 1-100 SURFACE - MECHANICAL ROOMS WITH MECHANICAL GONTRAGTOR. LOCATIONS OF FIXTURES IN THESE AREAS SHALL BE COORDINATED 50 THAT GE GORELITE X 4 62 F32T8 2-32 SURFACE STAIRWAY THERE ARE NO INTERFERENCES WITH EQUIPMENT OR DUCTWORK. AWW13-2T51-E-UNV-04-ER FLUORESCENT EMERGENCY BACKUP 8. 5WITGH LOCATED ON FIRST FLOOR LEVEL. R FOCAL POINT 2 X 2 104 40W BIAX 2-40 REGE55ED - q. ALL LIGHTING FIXTURES SHALL BE PROVIDED AS SPECIFIED ON LUNA FLUORESCENT THE ARCHITECTS LIGHTING FIXTURE SCHEDULE. THIS SCHEDULE FOCAL POINT 2 X 2 104 40W BIAX 2-40 SURFACE _ 15 TO BE USED AS A GUIDE ONLY FOR DETERMINING FIXTURE IRSLUNA FLUORESCENT WATTAGE. ANY DISGREPANGIES BETHEEN THE SCHEDULE FAIL SAFE IS" DIAM OUTDOOR WITH INDICATED HERE AND THE ARCHITECTS SCHEDULE SHALL BE 5E TREI5-224OT5GL-EM FLUORESGENT Y2 T5GIRG -40, -22 SURFACE EMERGENCY BACKUP BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. EMERGENCY INCANDESCENT 50 151"1 2-25 WALL EMERGENCY BACKUP 10. ALL LIGHTS EXCLUSIVE OF TH05E ON CIRCUITS PIA 3, 13 4 WALL MOUNTED 21 SHALL BE CONTROLLED BY TIMER. TIMER TO ACTIVATE RGENCY CONTACTOR IN SPLIT BUS PANEL PI TO AUTOMATICALLY TURN EME EME MOUNTED INCANDESCENT 50 15W 2-25 WALL EMERGENCY BACKUP 6IRGUIT5 OFF 4 ON. BRANCH CIRCUIT DESIGNATIONS ARE FOR GLOREFERENCE PJRP05E5 ONLY, ACTUAL BRANCH CIRCUITS WILL BE p EXIT LED 8 LED I-H WALL EMERGENCY BACKUP DICTATED BY THE SPLIT BUS PANEL. �7 II. PROVIDE AND INSTALL REMOTE OVERIDE OF TORK K800Z TIMER. EXIT LED 8 LED 2-25 WALL EMERGENCY BACKUP REMOTE 5WITGHE5 SHALL INCLUDE ONE 5WITGH FOR EACH WITH EMER6ENGY LIGHTS CONTROLLED CHANNEL. EACH 5WITGH WILL REQUIRE 2 # 22AW0 FROM TIMER TO 5WITGH. LOCATION OF REMOTE 5WIT6HE5 TO BE NEAR FIRST FLOOR MAIN DESK. COORDINATE WITH ARCHITECT FOR EXACT LOCATION OF OVERIDE 5WITGHES. A NOTE 4 AT ONDESC�Io IONS: DRAWING TRLE: BASEMENT 9 2908 OPt LIGHTING PLAN { OF NEB CAD FILE NAME: PROJECT TITLE: DATE NSA PROJECT w CONSULTANT: Wemschick Silverman Architects P.c. FLOOR PM N NORTHPROP. ALTERATIONS TO 8/24/06 05-1194 .. .the business ofARCHRECTURE." CAPANO AND PARKER ENOINEERB, PC ROUAtV TE LIBRARY SCALE: DRAWING NO_ Design and Consulting Services 25 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York — ROUTE G Phone : 631-734-7007 Fax : 631-734-7347 CUTCHOGUE, NEW PORK AS NOTED (516) 421-045q Fax (516) 42I-0569 DISTRICT: SECTION BLOCK: LOT: DRAWN BY: http://www.n s-a rch.com .coarmaxr spas 1e.�cxuc s<vmux uonscfa vn N 0PTH 1HALL k k k k YA DIRECTOR NOTE 2 Ibbj tom��r to el' AE { t } Is c PARENTING c G GHILDREN'S LIB G 3 a YOUNG ADULTS PIlT G M GDVD / VHS NOTE 3 F/2 BATH NOTE I to ic to 5°eLlm r rP/35 b H n 1T Un nPI/ H S GLO. H H 13 GU7 G 3 toy f eLl K Hm Hm H h to 5 5 5 CHILDREN � CIRCULATION <Fa> J�F PROGRAMMIN10(G K G ONIPUTER TERMINA G I-LNm m h PROP. f H 5 H s H s ELEVATOR K s q q C. q t05` H S H 5 h h h PI/IS PI/-1 toeh to SE `% YI YI YI 3 3 3 G d d d c q F/2 GENERAL / MEDIA s G G G G 4 FIGTION to Sd pp_, GOMPUTER PI/II c M e I5 IS 15 IS — — d c H 11 tVE G II II II �' q WELLED EXIT EXIT 5T. 5E y f d All f d K f FIRST FLOOR L 1 GHTI NG PLAN H I to5x I � 5 5GALE: I/4" = 1'-0" COPY RM sea GE 6 G MUSIC c I UH K f II K f II K 5 I I NOTES F/2 \� K S K 5 M s K f K �/ F/2 6 5WITGHE5 TO BE ARRANGED THI5 AREA USING 5WITGH5ANK5 IN / \ / ARRAN6EMENT5 APPROVED BY OWNER. SUBMIT SHOP DRAWING FOR APPROVAL PRIOR TO INSTALLATION. 2. ALL TRACK LIGHT TO BE CONTROLLED BY DIMMER 5WITGHE5. PROVIDE AND IN5TALL LUTRON NOVA-T SERIE5 DIMMERS FOR CONTROL OF ALL TRACK LIGHTING. 3, PROVIDE AND INSTALL -IUNGTION BOXE5 INDICATED FOR FUTURE U5E. BOXE5 TO BE GIRGUITED WITH ALL OUTDOOR TYPE "5" LIGHTS ON CIRCUIT PI/55. -UNGTION BOXES TO BE MOUNTED REGE55ED IN WALL. 5URFAGE MOUNTED BOXE5 ARE NOT ACCEPTABLE. l cy� REVISIONS/SUBMISSIONS. DRAWNG TITLE: DATE: DESCRIPTION: FIRST FLOOR * LIGHTING PLAN szsoa oar rF or N�`H y CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT x: CONSULTANT: FLOOR PL N NORTH Nemschick Silverman Architects P.C. PROP. ALTERATIONS TO SCALE: 6 05-1194 °.. .the business of ARCHITECTURE." CAPAND AND PARKER ENGINEERS, P.C. ROUEXISTE LIBRARY SCALE: DRAWING NO.: Design and Consulting Services ROUTE 25 735 Deerfoo- Path, Cutchogue, New York -7347 20 High Street, Huntington, New York CUTCHOGUE, NEW YORK E _ 4 Phone : 631-734-7007 Fax : 631-734-7347 (916) 42I-o459 Fax (516) 421-0565 AS NOTED DISTPoCT: SECTION BLOCK: LOT: DRAWN BY: RSL http://wvvw.ns-arch.com .covrPexr a>ob ra�sarx suvenw+naanccTe xe N 0 TH I ll EI IER. EXIT STAIR sE3 UTOR FINANCIAL G21 G21 ST ROOM T'A' yd ya a DIRECTOR K cl H 3 H 3 H 3 ROOF OVER to e' N 3 3 GALLERY/AUDIO 3 FIRST FLOOReTIP ZIP { Kr M N Y19 21 K r K li 17 1'7 17 3 P/2 K K 9 9 PI/23 STUDY / TUTOR 0 ROOM 'B' toy Y�3 K q K s K s l K q K q N 21 LOCAL OPEN TO M a HISTORY BELOW OPEN TO b ROOM BELOW to5q PROP. NOTE I ELEVATOR 21 9 9 9 9 0 PROPOSED toeg ❑ RE ER NGE/ READING NOTE I 2ND FLOG AREA GONNEGTO NO —FI TIOII a toy toy° 3 3 P NOTE I c c c c c c K K li li 17 7 5 K S� 21 a e e � 3 3 LOBBY / H 3 L a H 3 L d H 3 L a NEW SEARGH 3 STAIR toy° M M PI/19 2I 21 pn K K K 9 9 9 a a 5 21 K K 9 b M K a a K S K 19 K 19 SECOND FLOOR L 16HT I NO PLAN DIP,. OFFICE 5GALE: 1/4" = 1'-0" b M 21 OPEN O ` OF TO BEL K a K a OW IEC L J ❑ I K NOTES I K q I b 6 SWITCH LOCATED ON FIRST FLOOR LEVEL I M I K a K a a a G G 21 21 BE `5t xs" �'s REVISIONS/SUBMISSIONS: DRAWING TITLE: cy F DATE: DESCRIPTION. 5EGOND FLOOR LI&HTIN& PLAN y0 OF NE'N CAD FlLE NAME: PROJECT TITLE DATE: NSA PROJECT x: CONSULTANT: FLOOR PL N NORTH PROP. ALTERATIONS TO Wemschick Silverman Architects P.c. 8/24/06 05-1194 '...the business WARCHITECTURE." CAPANO AND PARKER ENGINEERS, P.C. EX STAG LIBRARY FDRA E: DRAWING NO.: �j= Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 �� 20 High Street, Huntington, New York CUTCHOGUE, NEW YORK NOTED hone : 631-734-7007 Fax : 631-734-7347 �J (516) 421-0459 Fax (Sb) 421-0569 DISTRICT: SECTION: BLOCK: LOT: N BY: hftp://www.ns-arch.com .coarasxr zoos ratSalac sveAtx,"acN¢c1a vc N 0 TH I Y NOTES 6 SEE ARGHITEGTURAL DRAWINGS FOR ALL LOCATIONS $ MOUNTING AGP/38 HEIGHTS FOR ALL RECEPTACLES. NOTE 4 no E E E 2. PROVIDE AND INSTALL TWO JELLY JAR INGANDE50ENT LIGHTS AND TWO DUPLEX RECEPTACLES FOR SERVICE IN ELEVATOR PIT. ❑ ❑ NO PTE 3 FE NOTE II LIGHTS TO A CONTROLLED UI LEGAL SWITCH. COORDINATE F2 EWH B1 EXACT LEGATION OF ALL EQUIPMENT WITH ELEVATOR INSTALLER. M� ALL TO BE ON CIRCUIT P2/3Y. AH1 3. PROVIDE AND INSTALL LOCAL NON-FUSED DISCONNECT 5WITGH AGP/13 FOR ELEVATOR MOTOR. SEE NOTE DRAWING MEPI. AGP/1 O O O O O O O O O O O O RELO NEW PANEL AGP/1 4. PROVIDE 120V POWER FOR CONDENSATE PUMP. 0 D PANEL 10 NOTE 6 AH4 RELO 5. EPI, EF2 AND CO ALL CONTROLLING BE ON CIRCUIT AGP/ 2. PROVIDE PANEL AGP/3-1 AND INSTALL CONTROLLING 5WITGH FOR EFI S 2. EF3 7ACP/40 PANEL mCONTROLLED BY T-STASTING . NEW P1MD P1 1 P2MULTI-SECTION6. FIELD VERIFY EXISTING ELECTRIC WATER HEATER POWER MDP PANEL PANEL AGP/35 REQJIREMENTS PRIOR TO SUBMITTING BID. P2 ELEV Y. PROVIDE AND INSTALL JUNCTION BOX AND 120V WIRING TO EACH AGPA3Y MOTORIZED DAMPER (MD). CONNECTION TO MDs AND LOW VOLTAGE AGP/8 TRANSFORMER BY MECHANICAL ALL 000000 000000 8. SEE ARGEQUIRE RAL PLANS FOR ALL TELEPHONE AND DATA P2/12 WIRING REQUIREMENTS. ELEV/13 g. ALL BRANCH CIRCUITS FOR COMPUTER EQUIPMENT WILL HAVE AN AH3 NOTE 12 INSULATED NEUTRAL CONDUCTOR FOR EACH CIRCUIT. THIS -v�nn,� O ELEV/5 TIE INTO AH2 REQUIREMENTS INCLUDES ALL BRANCH GIRGUITS WHERE 0000110 000000 AGP/I RECEPTACLES ARE ADJACENT TO TELEPHONE $ DATA RECEPTACLES. � � O AGP/2q O. PROVIDE 120V POWER FOR BYPASS TERMINAL BOX. AGP/41 MD AGP/2 NOTE 5 ELEV/g 11. MAINTAIN POWER TO EXISTING EXHAUST FAN. m ��� NOTE 2 E 12. PROVIDE AND INSTALL AUXILIARY POWER FOR ELEVATOR GAB TIE INTO 00000 O 0000011 EQUIPMENT. AGP/13 P2/4 13. PANEL PI TO BE SPLIT BUS GONSTRUGTION. TIMER VIA P2/2 A6P/42 CONTACTOR TO CONTROL ALL LIGHTS EXCLUSIVE OF THOSE ON NOTE 14 CIRCUIT5 PIA, 3, 15 R 2-1. PANEL SHALL BE SPLIT WITH 20 P2/10 CIRCUITS CONTROLLED BY GONTAGTOR AND 22 CIRCUITS WITH RELO AGP/31 CONSTANT POWER. THE CONTACTOR IN PI SHALL BE RATED 125A Ft PANEL MINIMUM. MD NCSP 14. ALTERNATE. PROVIDE AND INSTALL POWER TO 120V I(1) 20A " D CIRCUIT FOR SEWAGE EJECTOR PUMP. UTILIZE CIRCUIT AGP/42. O EXACT LOCATION TO BE DETERMINED BY ARCHITECT. P2/6 III P2/8 P2/20 P2/I6 QUAD 1,-_AG-/25 P2/18 F1 5A5EMENT POWER PLAN SCALE: 1/4" = P-O" P2/14 o a P2/26 E E PANEL SCHEDULE PANEL SCHEDULE PANEL SCHEDULE PANEL LOCATION MAIN NEMA ENCLOSURE PANEL LOCATION MAIN NEMA I ENCLOSURE PANEL LOCATION MAIN NEMA I ENCLOSURE PI BASEMENT LEVEL BREAKER - AMP=POLE MOUNTING❑ PLUSH P2 BASEMENT LEVEL BREAKER AMP=POLE MOUNTING❑ PLUSH AGP BASEMENT LEVEL BREAKER=AMP=POLE MOUNTING❑ FLUSH LUGS 200 AMFL 3 POLE O SURFACE LUGS 200 AMP=POLE 0 SURFACE LUGS 00 AMP 3 POLE El SURFACE 120 /_2j2t5_VOLT 3PHASE4WIRE MINIMUM A.I.G. 22 KA MAX No. OF POLE542 120 / 20& VOLT 5PHASE 4 WIRE MINIMUM A.I.G. 22 KA MAX No. OF POLES 42 120 / 209, VOLT 3EHASE 4 WIRE MINIMUM A.I.G. 22 KA MAX No. OF POLE542 MIN CIRCUIT PHASE LE65 GIRGUIT MIN MIN GIRGUIT PHASE LEGS GIRGUIT MIN MIN GIRGUIT -144 PHASE LEGS CIRCUIT MIN WIRE VOLT VOLT WIRE WIRE VOLT VOLT WIRE WIRE VOLT VOLT WIRE No. DESCRIPTION SIZE AMP OLE AMPS A B G AMPS OLE AMP SIZE DESCRIPTION No. No. DESCRIPTION SIZE AMP OLE AMPS A B G AMPSPOLE AMP SIZE DESCRIPTION No. No. DESCRIPTION 51ZE AMP OLE AMPS A B G AMPS POLE AMP SIZE DESCRIPTION No. I LT5 12 20 100 • - 20 - SPARE 2 REG 12 20 - • - 1 20 12 REG 2 1 AHI,2 12 20 3 Y44 • 2004 3 25 10 AH3 2 3 LT5 12 20 1 100 • - 1 20 - SPARE 4 3 REG 12 20 1 - • - 1 20 12 REG 4 3 Y44 • 2004 4 5 LTS 12 20 1400 • - 20 - SPARE 6 5 REG 12 20 - • - 20 12 REG 6 5 Y44 • 2004 6 l LT5 12 20 1540 • - 1 20 - SPARE 8 l REG 12 20 - • - 1 20 12 REG 8 Y EXISTING HWH 10 30 3 2000 • 2904 3 35 8 AH4 8 9 LTS 12 20 1 1440 • - 1 20 - SPARE 10 q REG 12 20 1 - • - 1 20 12 REG 10 g 2000 2904 10 II LTS 12 20 1 1540 • - 1 20 - SPARE 12 II REG 12 20 1 - • - 1 20 12 REG 12 II 2000 2gO4 12 13 LT5 12 20 1 1590 • 1 20 - SPARE 14 13 REG 12 20 1 - • - 1 20 12 REG 14 13 FI,2 12 20 3 q60 • 1g20 3 20 12 GUI 14 15 LT5 12 20 1 1660 • - 1 20 - SPARE 16 15 REG 12 20 1 - • - 1 20 12 REG I6 15 q60 • 1g20 16 IY LTS 12 20 1 17690 • - 1 20 - SPARE 18 1"I REG 12 20 1 - • - 1 20 12 REG 18 Il 960 • I020 18 ICI LTS 12 20 1 12&1 • - 20 - SPARE 20 19 REG 12 20 I - • - 1 20 12 REG 20 Iq ELEG HTR5 12 20 2 1625 • 1g20 3 20 12 CU2 20 21 LTS 12 20 1 1212 • - 1 20 - SPARE 22 21 REG 12 20 - • - 1 20 12 REG 22 21 1625 • IcI20 22 23 LT5 12 20 1 1305 • - 1 20 - SPARE 24 23 REG 12 20 1 - • - 1 20 12 REG 24 23 SPARE - 20 1 - • 1920 24 25 LT5 12 20 1 18Y2 • - 1 20 - SPARE 26 25 REG 12 20 1 - • - 1 20 12 REG 26 25 EWH 8 401 1 3500 • g820 3 100 # 2 GU3 26 2Y LTS 12 20 1 1487 • - 1 20 - SPARE 28 21 REG 12 20 1 - • - 1 20 12 REG 28 2Y REG 12 20 1 - • g820 28 29 LT5 12 20 1 1160 • - 1 20 - SPARE 30 2q REG 12 20 1 - • - 1 20 12 REG 30 2a EWH 8 40 1 5500 • g820 30 31 LT5 12 20 1 1152 • - 1 20 - SPARE 32 31 REG 12 20 1 - • - 1 20 12 REG 32 31 EWH 8 40 1 5500 • g820 3 100 # 2 GU4 32 33 LT5 12 20 1 1200 • - 1 20 - SPARE 34 33 SPARE - 20 1 - • - 1 20 12 REG 34 33 EWH 8 40 1 5500 • 9820 — 34 35 LT5 12 20 600 • - 20 - SPARE 36 35 SPARE - 20 - • - 1 20 - SPARE 36 35 PI, PIA 12 20 1 - • 9820 36 31 SPARE - 20 1 - • - 1 20 - SPARE 38 3Y SPARE - 20 - • - 1 20 - SPARE 38 3l P2, P2A 12 20 1 - • 500 1 20 12 COND PUMP 38 39 SPARE - 20 - • - 2O - SPARE 40 3q SPARE - 20 - • - 20 - SPARE 40 3g BOILER 12 20 1 - • 500 20 12 BPT 40 41 FAGP 12 20 1 300 • - 20 - SPARE 42 41 SPARE - 20 - • - 1 20 - SPARE 42 41 EFI,2,3 12 20 - • 500 20 12 5EP 42 TOTALS - - - TOTALS - - - SEAL'. PE Aqo REVISIONS/SUBMISSIONS: DRAWING TITLE: TOTAL VA - AT 206 VOLTS 3 PHASE - AMPS TOTAL VA - AT 208 VOLTS 3 PHASE - AMP5 TOTAL VA - AT 208 VOLTS 3 PHASE - AMF'S gyp` " s�,y'm DATE: DESCRIPTION "`°' '°"� ."" °"�"•�" BASEMENT \ 'IibW Y9dkRGO POWER PLAN T .0290n0 ��Y� OF iy CAD FILE NAME: PROJECT TITLE' DATE: NSA PROJECT +: CONSULTANT Nemschick Silverman Architects P.C. FLOOR FILM NORTH PROP. ALTERATIONS TO 4/O6 '.. .the business cfARCHITECTURE." CAPANO AND PARKER ENGINEERS, P.C. 05-1194 S/2 ROUTE 25 SCALE; DRAWING NO_ Design and Consulting Services EXIST'G LIBRARY 735 Deerfoct Path, Cutchogue, New York 11935 20 High Street, Huntington, Now York Phone : 631-734-7007 Fax : 631-734-7347 $Ib) 421-0439 Fax (516) 421-0568 CUTCHOGUE, NEW YORK AS NOTED http://www.ns-arch.coRI •COPYRGHf R110S Nit 9LV9MN!MCHIECtB P.C. N O TH DISTRICT; SECTION: BLOCK: LOT: DRAWN BY: RSL III AGP/14 AGP/32 AGP/20 CU1 CU2 CU4 F 0 0 F== P2/11 E P2/q NOTE 3 ELA P2/1 E ❑ ❑ E I ❑ ❑ P2/34 1 1 P2/5 UU"(llla ❑ ❑ E E E ❑ ❑ PI/24 o � � E P2/3 P2/30 P2/22 i P2/1 AGP/35 NOTE _ 1 I �® AGP/27 E( E AGP/Iq 1 NOTE 2 NOTE 4 E � AGP/26 CU3 P2/28 FIRST FLOOR POWER PLAN 5GALE: 1/4" = 1'-0" Lj El El E E LA Lj� NOTES F1 6 REGEPTAGLES THI5 AREA TO BE MOUNTED IN FLOOR. PROVIDE AND INSTALL HIREMOLD SERIES RFBq FLOOR BOX AND COVER. 2. PROVIDE AND INSTALL OUTDOOR HP GFI RATED REGEPTAGLES FOR SERVIGE TO GONDENSING UNITS. ALL TO BE ON GIRGUIT AGP/27. 3. MAINTAIN POHER TO EXISTING EXHAUST FAN. 4. ALL BASEBOARD ELEGTRIG HEATERS THI5 BUILDING TO BE ON GIRGUIT AGP/Iq. ONE TYPICAL FIR5T FLOOR AND FOUR TYPIGAL 5EGOND FLOOR. SE \< h�,, rAT1 NS/SUBMISSIONS: DRAWING TITLE: W� Cy F DESCRIPTION FIRST FLOOR remru,w * POWER PLAN 0290E6 OPT OF NE CAD FILE NAME: CONSULTANT: FLOOR PL N NORTH PROJECT TITLE DATE NSA PROJECT «: Nemschick Silverman Architects P.C. PROP. ALTERATIONS TO 8/24/06 05-1194 ".. .the business of ARCHITECTURE." CAPANO AND PARKER ENGINEER&, P.C. EXIST'G LIBRARY Design and Consulting Services ROUTE 25 SCALE: DRAWING NO.: _ 735 Deerfoot Path, Cutchogue, New York 11935 20 HIgh Street, Huntington, New York CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 $Ib) 421-0439 Fax (516) 421-0565 http://www.ns-arch.com DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: RSL O CCPYIMAlr 2666 t8/SIK]!9LV6S.MN NUnECi6 PC N O TH TIE INTO PI/2<0 P2/2 P2/31 0 P2/32 0 P2/IY `v P2/25 P2/19 G P2/2Y SEOONI7 FLOOR POWER PLAN LL P2/21 P2/23 5GALE: 1/4" = P-O" I I I I I I I I SEAL: .5 Rea yA REVISIONS/SUBMISSIONS: DRAWING TITLE: DATE: DESCRPTIOtt SECOND FLOOR POWER PLAN a N. 029086 TO F Op NEW CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT x: CONSULTANT: FLOOR PL N NORTH PROP. ALTERATIONS TO 8/24/06 05-1194 Nemschick Silverman Architects P.C. EXIST'G LIBRARY the business of ARCHITECTURE." RS CAPANO AND PARKER ENGINEE , -Q SCALE -DRAWING NO.: Design and Consulting SeP rvices ROUTE 25 CUTCHOGUE, NEW PORK AS NOTED 735 Deerfoot Path, Cutchogue, New York 11935 20 High 5treet, Huntington, NeA York _ Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Fax (516) 421-0563 DISTRICT: SECTION: BLOCK: LOT: DRAWN 8Y: RSL h ttp://www.n 5-a rch.com •CCPYRGHf 1(D6 N3ACHq(SLVHiNJI N,CIIIECiS PC III V FEI eA H . F2 Q AH 1 /�_ 0 AH4 2 °� BREAK RI"I. a a z El El O EXIST'6 CRAWL 0 ASSEMBLY 5PAGE MEGH RM F O � O � O PI/41 Oz BATH PROP7H.G ] j FILE RMAH3 2E V AH2 0 � Q El 0 V 0 a 0 MEGH. ROOM ❑ O 0 0 0 . F O F O GPU V 0 WELLED no BATH EXIT Oz ADMINISTRATIVE 0 OFFIGE BASEMENT FIRE ALARM PLAN 5GALE: 1/4" = 1'-0" 0 0 0 NOTES E. AIR HANDLERS AHI, AH2, AH3 AH4 t RETURN FANS FI 6 F2 SHALL BE SHUT DOWN UPON ACTIVATION OF FIRE ALARM SYSTEM. PROVIDE AND INSTALL ALL DEVICES AND WIRING REQUIRED FOR SUCH OPERATION. 2. PRIOR TO A 51ONAL FROM THE ELEVATOR SHAFT SMOKE DETEGTOR, ELEVATOR SHAFT SMOKE DETEGTOR SHALL SEND A SIGNAL TO THE FAGP. THE FAGP SHALL RETURN ELEVATOR TO FLOOR, AND SEND SIGNAL To GONTAGTORS 5HUTTING OFF ALL POWER TO ELEVATOR MOTOR AND ANCILLARY EQUIPMENT IN ELEVATOR SHAFT AND ELEVATOR MAGHINE ROOM. PROVIDE AND INSTALL DEVIGE5 NECESSARY FOR SAID OPERATION. PROVIDE RELAY TO GL05E ELEVATOR SMOKE GURTAIN. 3, PROVIDE AND INSTALL ANNUNGIATOR PANEL AT LOCATION INDICATED. COORDINATE EXACT LOGATION OF MAIN ENTRANCE UNIT WITH FIRE MARSHAL. ANNUNCIATOR TO BE RECESSED OR SEMI-RECE55ED INTO WALL IT 15 MOUNTED IN. 4. THE ELECTRICAL GONTRAGTOR 15 REQUIRED TO PRODUCE FIRE a a V ALARM EQUIPMENT DRAHIN65 516NED $ SEALED BY A NY5 LICENSED ARCHITECT OR ENGINEER FOR REVIEW BY THE FIRE MAXIMUM 10 ANNUNGIATING DEVICE5 MARSHALL. THESE DRAHIN65 ARE TO BE USED AS A GUIDE ONLY. PER ANNUNGIATING CIRCUIT, THE ELECTRICAL CONTRACTOR SHALL INCLUDE IN BID ALL FIELD SURVEYING OF EXISTING CONDITIONS AS REQUIRED To PREPARE SEALED DRAWINGS. 5. DO NOT INSTALL ANY DEVICE PRIOR TO RECEIVING APPROVED DRAWINGS BY THE FIRE MARSHALL. A b. PROVIDE AND INSTALL SIMPLEX SERIES 4010 ADDRESSABLE FIRE ALARM SYSTEM. 2 F 2 H T. THE ADDRESSABLE SYSTEM SHOWN SHALL BE HIRED AS PER MANUFAGTURER5 REQUIREMENTS. ALL WIRING SHALL BE RUN CONGEALED BEHIND HALL5, FLOORS OR CEILINGS. WHERE 5URFAGE RACEWA(5 ARE REQUIRED, RACEWAY 5ELEGTION SHALL BE BY THE ARCHITECT. SUBMIT FOR APPROVAL PRIOR TO INSTALLATION. 8. SEE SPEGIFIGATION5 FOR ADDITIONAL REQUIREMENTS. PI/41 SIMPLEX ANN 4010 FAGP TWO TELEPHONE LINES (PROVIDE TWO RJ-31X ]ACK5) HATERMAIN PIPE GROUND FIRE ALARM RISER D I A69RAM NT5 SEE FLOOR PLAN FOR DEVIGE LOCATIONS S QUANTITIES SEAL: ED A.9 REVISIONS/SUBMISSIONS. DRAWING TITLE: ��\yS RN -1// DATE: �xnraernnia¢ttx � BASEMENT * ; FIRE ALARM PLAN No ORR P� TF OF e.i CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT x CONSULTANT: FLOOR PL N NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.c. a/24/os 05-1194 '._[he business oFARCHITECTIRE." CAPANO AND PARKER ENGINEER&, P.0 EX ST'G LIBRARY SCALE: DRAWING NO.: ^^^ Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York IN T CUTCHOGUE, NEW YORK AS NOTED Phone : 631-734-7007 Fax : 631-734-7347 IIIJJJ [516) 421-o4e9 Fax (516) 421-0569 DISTfdCT: SECTION: BLOCK: LOT: DRAWN BY: http://www.ns-arch.com •COPV9GHr AOb N3.9CHtlf B.Yff}.WN AigP1ECT9 PC N 0 TH d — F -(� 0 YA DIRECTOR 0FE GHIL N'S LID T �L 0 L B T� YOUNG ADULTS z PARENTINO zL O z OO O DVD / VHS ---------------- F � PROGRAMMING CHILDREN GIRGULATION 0 O PROP. MPU E TE MINAL ELEVATOR o All- -�- a F z a O O 6EN L / hIE J . .1 COMPUTER O TIO N F a � � WELLED EXIT COPY ROOM O H � Nluslc VEST. STAIR "A" F — — — —O rF=== 2 FIRST FLOOR FIRE ALARM PLAN 5GALE: 1/4" = P-O" SEAL: ED ARC REVISIONS/SUBMISSIONS. DRAWING TITLE: y<Eaow N sN1� DATE: DESCRPTOR FIRST FLOOR FIRE ALARM PLAN J o pBfi y CI. NEy� CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT a: CONSULTANT. FLOOR PL N NORTH PROP. ALTERATIONS TO Nemschick Silverman Architects P.C. SCALE 6 05-1194 ".. .the business ofARCHITECTUREl" CAPANO AND PARKER ENGINEERS, P.C. ROUTE LIBRARY SCALE DRAWING NO.: Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUTCHOGUE, NEW YORK Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0459 Fax (516) 421-0565 AS NOTED DISTRICT: SECTION: BLOCK: LOT: DRAWN BY: RSL http://www.ns-arch.com .copvaexr auos raENscxuc SLVBlMN usxrtcrs PC N 0 TH 0 EMER. EXIT ❑ STA I P I I l GALLERY/AUDIO O2 Y ROOF OVER O Ili _ I a F FIRST FLOOR '' (V�- -------- -- --- II - ----- I II ;I STUDY TUT OR -I --------- ----I ------ II ROOM 'A' _____ f = __- --- ' - - FINANCIAL III I I I I II III 'III I� II II DIRECTOR I' I I I II O 2 5 � ii _________ ___ ____ I IIIi IIi IIli IIi___�________ __-_____________+I - i \") (yI� STD.A`0 II II III II II II TU TLOCAL TOR HISTORY 1 __ __ ROOM 'B' ------- ,' ----------, QP�-------------+r 2 A/ ROOM ________________ _______ _________—_—___1'_BEtfJW_______—______ii___ __.SS� _ y OPEN TO PROP. i I O �` Oz BELOW ELEVATOR II II II II _ II______________________ }I __________ -r' _y- - t _ T ____ -rl -11 j I 1 1 I � II zll II a I II II II -- ------------ ----- ----------- - -- 1 T I ,' PROPOSED ----------- --------- -------- T----------------------- T. — — 2ND FLOOR I READ N O I I I I I GOhNEGTOOR - ______ - I; I li OAR - z - - O - 2 NON-FICTION z 9NEN I I I I I I LOBBY / 11 ' III ,I �--�I-;--------- --- -- -- ---- - -------- } __ _____ 'F SEARCH __________� „ II I LL III li I\ � 1 1 --------- ----- ----------- ---- DIP. OFFICE - — — r I iI ili 1 i 11 I Y 1 li li i li i li SECOND FLOOR FIRE ALARM PLAN li I lit I 5GALE: 1/4" = 111 I I O i t 1 i Ili 2 I L_ li i li li li i 1 OPEN TO I OPE TO BE OW I BE OW III I I II II I I II IIII III I II I II I 'I 'I I 11 1, , II II II I II I' II 1II II l I II I I , ' I II ,I I I I o II IIII II I I II �'j-, I I Y/L I I I II I II I � III III I II � D A REVISIONS/SUBMISSIONS: DRAWING TITLE: DATE: DESCRIPTION: SECOND FLOOR N No az P" FIRE ALARM PLAN For Ne CAD FILE NAME: PROJECT TITLE: DATE: NSA PROJECT •: CONSULTANT FLOOR PL N NORTH Wemschick Silverman Architects P.c. PROP. ALTERATIONS TO 8/24/06 05-1194 '...the business afARCHITECTURE." CAPANO AND PARKER ENOINEERB, P.a EXST�G LIBRARY SCALE: DRAWING NO.: Design and Consulting Services ROUTE 25 735 Deerfoot Path, Cutchogue, New York 11935 20 High Street, Huntington, New York CUTCHOGUE, NEW YORK AS IN _ Phone : 631-734-7007 Fax : 631-734-7347 (516) 421-0439 Fax (516) 421 0565 http://www.ns-arch.com .cavRcxr sma ticxol a�vlx uaKacTa P.c N O TH DISTPoCT: SECTION: BLOCK: LOT: DRAWN BY: I II