Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
32592-Z
FORM NO. 4 TOWN OF SOUTHOLD BUILDING DEPARTMENT Office of the Building Inspector Town Hall Southold, N.Y. CERTIFICATE OF OCCUPANCY No: Z-33227 Date: 08/18/08 THIS CERTIFIES that the building ADDITIONS/ALTERATIONS Location of Property: 480 SUNSET PATH SOUTHOLD (HOUSE NO. ) (STREET) (HAMLET) County Tax Map No. 473889 Section 54 Block 1 Lot 17 Subdivision Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated DECEMBER 14, 2006 pursuant to which Building Permit No. 32592-Z dated DECEMBER 22, 2006 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is ADDITIONS AND ALTERATIONS TO AN EXISTING SINGLE FAMILY DWELLING AS APPLIED FOR. The certificate is issued to JANIE CRAWFORD REEVE TRUST (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL N/A ELECTRICAL CERTIFICATE NO. 3017509 05/08/08 PLUMBERS CERTIFICATION DATED 06/16/08 GISMONDI PLUMBING th riz Signature Rev. 1/81 Form No.6 ' TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 s APPLICATION FOR CERTIFICATE OF OCCUPANCY I; This application must be filled in by typewriter or ink and submitted to the Building Departmen�with;the following:_j A. For new building or new use: _ 1. Final survey of property with accurate location of all buildings,property lines, streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead. 5. Commercial building, industrial building,multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planing Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957) non-conforming uses, or buildings and "pre-existing"land uses: 1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied, the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$25.00,Additions to dwelling$25.00, Alterations to dwelling$25.00, Swimming pool$25.00, Accessory building$25.00, Additions to accessory building$25.00, Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential $15.00, Commercial$15.00 Date. 7—15—u New Construction: Old or Pre-existing Building: (check one) Location of Property: '48C) >A-T4 House No.— Street Hamlet Owner or Owners of Property �� Suffolk County Tax Map No 1000, Section �s 6- Block ®j Lot f °� Subdivision Filed Map. Lot: Permit No. Date of Pen-nit. i Z—rL7_--0(, Applicant: Health Dept. Approval: �j j sa Underwriters Approval:�0/xfQ,� Planning Board Approval: Request for: Temporary Certificate Final Certificate: (check one) U� Fee Submitted: $ Ca Z ,3 )A7 Applicant Signature FORM NO. 3 TOWN OF SOUTHOLD BUILDING DEPARTMENT Town Hall Southold, N.Y. BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) PERMIT NO. 32592 Z Date DECEMBER 22 , 2006 Permission is hereby granted to: RONALD D & WF REEVE 15214 MC COMB MANOR CT CHARLOTTE NC, 28277 for ADDITIONS AND ALTERATIONS TO AN EXISTING SINGLE FAMILY DWELLING AS APPLIED FOR at premises located at 480 SUNSET PATH SOUTHOLD County Tax Map No. 473889 Section 054 Block 0001 Lot No. 017 pursuant to application dated DECEMBER 14, 2006 and approved by the Building Inspector to expire on JUNE 22 , 2008 . Fee $ 150 . 00 2zuth-b-1:' zgnature ORIGINAL Rev. 5/8/02 L3rL3rL3rL3r J�[1[iWLLnc3eT[,' [1 I[1�[1arL3r3rL3 13rL3r3rL3r rL3PL�[J@1�'E [.(CP[. R[PLrL3 L3rL3rL3r1L3 1[1�[.([ 5 BY THIS CERTIFICATE OF COMPLIANCE THE 5 5 NEW YORK BOARD OF FIRE UNDERWRITERS 5 5 5 BUREAU OF ELECTRICITY 5 40 FULTON STREET — NEW YORK, NY 10038 5 5 CERTIFIES THAT 35 5 5 5 Upon the application of upon premises owned by 5 5 5 STEPHEN O'CONNOR RON REEVE 5 S�j 1195 SHIPS DR 15214 McCOMB MANOR CT e5 SOUTHOLD, NY 11971 CHARLOTTE, NC 28277 5 S 5 5 Located at 80 SUNSET PATH SOUTHOLD, NY 11971 5 5 Application Number: 3017509 Certificate Number: 3017509 5 5 5 5 Section: Block: Lot: Building Permit: BDC: ns11 5 5 5 5 Described as a occupancy, wherein the premises electrical system consisting of CCj 5 electrical devices and wiring, described below, located in/on the premises at: 5 jBasement,First Floor,Outside, 5 5 5 5 A visual inspection of the premises electrical system, limited to electrical devices and wiring to the extent detailed 5 5 herein, was conducted in accordance with the requirements of the applicable code and/or standard 5 promulgated by the State of New York, Department of State Code Enforcement and Administration, or other 5 5 authority having jurisdiction, and found to be in compliance therewith on the 8th Day of May,2008. 5 Name OTY Rate Rating Circuit Type CeU 5 Paddle Fan 3 0 5 5 Receptacle 1 0 20a Laundry 5 SReceptacle 1 0 30a Dryer 5 5 Disconnect 1 0 60a Air Conditioner 5 GFCI Circuit Breaker 1, 0 5 5 Receptacle 4 0 GFCI 5 5 Service 5 1 Phase 3 W Service Rating 200 Amperes 5 Service Disconnect: 1 200 cb 5 5 Meters: I 5 5 5 5 5 5 . 5 55 5 seal 5 5 S 2 of 2 5 5 � 5 5 This certificate may not be altered in any way and is validated only by the presence of a raised seal at the location indicated. 5 5 o LrLI�Lr�n�n��.n�nLrLr�nLrL LrLrLr��L Lt�Lr�n�nLrLl�LrLrLI��L��nLrLr�LrLrLr�n�nLr�n� 2rLrLrLrLrLrLI�LrEnLrLrL�LIpLI�LrjLI��Lrp�.n o J�[.PLrL3 G1[.f[J�Llffi[17rJ�r�111'''1 ([J0203[1123PROINU[ 10030 (9) 5 BY THIS CERTIFICATE OF COMPLIANCE THE 5 NEW YORK BOARD OF FIRE UNDERWRITERS 5 5 5 BUREAU OF ELECTRICITY 5 r5j 40 FULTON STREET - NEW YORK, NY 10038 0 5 5 5 CERTIFIES THAT 5 5 5 5 Upon the application of upon premises owned by 5 5 5 5 STEPHEN 'C NNOR RON REEVE SO 5 SHIPS, NY 11971 15214 McCOMB MANOR CT 5 CHARLOTTE, NC 28277 5 5 S 5 Located at 80 SUNSET PATH SOUTHOLD, NY 11971 5 5 5 Application Number: 3017509 Certificate Number: 3017509 5 5 S 5 Section: Block: Lot: Building Permit: BDC: ns11 5 5 -7sa5ga 5 5 Described as a occupancy, wherein the premises electrical system consisting of 5 5 electrical devices and wiring, described below, located in/on the premises at: 5 5 Basement,First Floor,Outside, 5 5 A visual inspection of the premises electrical system, limited to electrical devices and wiring to the extent detailed 5 5 herein, was conducted in accordance with the requirements of the applicable code and/or standard 5 promulgated by the State of New York, Department of State Code Enforcement and Administration, or other 5 authority having jurisdiction, and found to be in compliance therewith on the 8th Day of May,2008. 5 5 Name QTY Rate Rating Circuit Tyne 5 5 Alarm and Emergency Equipment 5 5 Sensor 1 0 Carbon Monoxide 5 5 Sensor 4 0 Smoke 5 SAppliances and Accessories 5 5 Range 1 0 40 Amps 5 5 Dish Washer 1 0 1.2 KW 5 5 Disposal 1 0 F.H.P. 5 5 Exhaust Fan 3 0 F.H.P. 5 Furnace 1 0 Gas 5 Air Conditioner 1 0 30 Amps 5 5 Wiring and Devices 5 5 Outlet 38 0 Fixture 5 5 Fixture 34 0 Incandescent 5 Fixture 4 0 Flourescent 5 5 Outlet 55 0 General Purpose S 5 Receptacle 33 0 General Purpose 5 5 Switch 21 0 General Purpose seal 5 Dimmers 15 05 ,C]5 Continued on Next Page 1 of 2 5 5 5 M. This certificate may not be altered in any way and is validated only by the presence of a raised seal at the location indicated. 5 5 o ���� �����������������������LLPLrLr ���������������� o � ' Fax(516) 765-e V23 Tows Mall,53095 Main Road � T,j phone(5t6) 7665-i aO2 o0. Box 11,79 15 Southclxt, New YOM 11971 OFFICE OF THE BUILDING INSPECTOR TOWN OF SOUTHOLD E: :A — Building Permit No. Owner�20"AL_;r�o TmBe (Please print? Plumber; G 15 ��� C Ira �� �— L J►fC 1 p ease p -Lnt I certify that the solder used in the water Supply syst-er► contains less than 2/10 of 1% zead. t Plumber Signature l JANTET V. STFMART �'°r to before tie NOTARY PUBLICi State of New York No. 52-46633485 � ___�__ v�OP Gualfed in Suffolk County Commission Expires Nov.30,20 f lqa to ry Public, & IL G€ t3nz v James F. King,President �QF Sol/Ty Town Hall Jill A Doherty,Vice-President ��� Ol0 53095 Route 25 P.O. Box 1179 Peggy A.Dickerson Southold,New York 11971-0959 Dave Bergen G '� • �Q Telephone(631)765-1892 Bob Ghosio,Jr. �OI�,C�U Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD December 12, 2006 Mr. Thomas Ludlow 105 Ole Jule Lane Mattituck, NY 11952 RE: RON REEVE 480 SUNSET PATH, SOUTHOLD SCTM#54-1-17 Dear Mr. Ludlow: The Southold Town-Board of Trustees reviewed the survey prepared by Anthony Lewandowski last dated November 1, 2000 and determined the proposed addition and renovation to the existing dwelling to be out of the Wetland jurisdiction under Chapter 275 of the Town Wetland Code and Chapter 111 of the Town Code. Therefore, in accordance with the current Tidal Wetlands Code (Chapter 275) and the Coastal Erosion Hazard Area (Chapter 111) no permit is required. Please be advised, however, that no construction, sedimentation, or disturbance of any kind may take place seaward of the tidal wetlands jurisdictional boundary or seaward ot,,the coastal erosion hazard area as indicated above, or within 100' landward from the top of the bluff, without further authorization from the Southold Town Board of Trustees pursuant to Chapter 275 and/or Chapter 111 of the Town Code. It is your responsibility to ensure that all necessary precautions are taken to prevent any sedimentation or other alteration or disturbance to the ground surface or vegetation within Tidal Wetlands jurisdiction and Coastal Erosion Hazard Area, which may result from your project. Such precautions may include maintaining adequate work area between the tidal wetland jurisdictional boundary and the,coastal erosion hazard area and your project or erecting a temporary fence, barrier, or hay bale berm. This determination is not a determination from any other agency. 2 If you have any further questions, please do not hesitate to call. Sincerely, 9 Jame King, Preside.. Board of Trustees JFK:Ims ertal Co N6w York State Department of Environmental Conservation o i, Division of Environmental Permits, Region One Building 40 - SUNY, Stony Brook, New York 11790-2356 co Phone: (631) 444-0365 • FAX: (631) 444-0360 YeARs Website: www.dec.state.ny.us John P.Cahill Commissioner LETTER OF NON-JURISDICTIOI\- TIDAL WETLANDS Ronald D. Reeve December 4. 2000 400 Cherokee Rd. Charlotte, N.C. 28207 RE: 1-4738-02786 /00001 Ronald Reeve Property Southeast Side of Sunset Path Approximately 300' East of Horton Lane Town of Southold SCTNI 9 1000-54-1-17 Dear Mr. Reeve: The Department of Environmental Conservation has completed a rcriCXV of%-our recent jurisdictional inquiry under the Tidal Wetlands Act for a proposal to winterize and renovate an existing single family dwelling on the referenced property as shown on the enclosed sun-ey by Anthony LeNyandowski L.S.. dated - September 18. 2000, last revised November 1. 2000. Based on the information you have submitted; we have determined that the parcel is located landward of the ten-foot above mean sea level elevation contour as shown on the referenced survey and is therefore outside the area regulated by this Department under the Tidal Wetlands Act and the Tidal Wetlands Land Use Regulations (6 NYCRR Part 661). Therefore. in accordance with Part 661, no permit is required under the Tidal Wc1lands Act for the project depicted on the referenced plan. Please be advised, however, that no construction. sedimentation or disturbance of any kind may take place seaward of the tidal wetlands jurisdictional boundan- (the tcn-foot elevation contour) Without a permit. It is your responsibility to ensure that all nccessan precautions arc taken to prevent any sedimentation or other alteration or disturbance to the ground surface or ycgetatiort within Tidal Wetlands jurisdiction which may result from your project. Such precautions may include maintaining an adequate\york area between the tidal wetland jurisdictional boundary and your project (i.e., a 15'to 20'wide constnuction area) or erecting a temporaty fence, barrier or hay bale berm. Please be further advised that this letter does not relieve you of the responsibility of obtaining any necessary permits or approvals from other agencies. I can be reached at (631) 444-0371 if you have any questions or need to discuss this determination. • Ronald Reeve December 4, 2000 Page 2 Very Truly Yours, George W. Hammarth Deputy Regional Permit Administrator cc: BMHP File �. OF SOl/jb • ho co u tml,�`� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] I LATION [ ] FRAMING / STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: DATE INSPECTOR pF SOil:oa Ujyolo 44011 �cou I TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSU ION [ ] FRAMING /STRAPPING [ INAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: L� 0") 1l)eWLn7-'- J�l , A-Jb � —Z 0� �Z`' DATE Y INSPECTOR `�tJ OF SO(/T�o o � o N O i TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] RO GH PLBG. [ ] FOUNDATION 2ND [ ' INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION f , REMARKS: /J�l o ?DATE / INSPECTO i t c3 zf so eourm,��' TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FODNDATION 1ST [ ] ROUGH PL13G. U [ 7FRMAMING UNDATION 2ND [ ] INSULATION [V /STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS. eyx /zc1ss' CZ4u DATE ( INSPECTOR OF SO(/lyO�o 3 P-5-7 P-- ,-z- courm,��' TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ROUGH PL13G. [ ] FOUNDATION 2ND [ ] NSULATION PORAMING 6TRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: 0 r DATE , �� INSPECTOR ��'YOOUfViV,�� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] F NDATION 2ND [ ] INSULATION [ FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION �1 r REMARKS: CC �'`J��� G 1 �✓�i � � ` s I S DATE ro d INSPECTOR yOF SOUIyO .� o • ao co u Nomri TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] OUNDATION 1 ST [ ] ROUGH PLOG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: G DATE ® -7 INSPECTOR 1 OF SOUjy�lo . TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 -INSPECTION [ FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION REMARKS: �j DATE INSPECTOR FIELD IiNSPECTION REPORT DATE I COMMENTS FOUNDATION-(IST) 5) ------------------------------------- 17 FOUNDATION(2ND) }- I � z H ROUGH FRAMING& - - PLUMBING INSULATION PER N.Y. y STATE ENERGY CODE r9k, ' � X 4 4—' FINAL '- {ec— -� `CS' ` )ffiDITIONAL COMMENTS `6 LUA- O Am G H off, O C �J b H TOWN OF fiOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD,NY 11971 4-sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 r, Survey www.northfork.net/Southold/ PERMIT NO. 0�5`1 0 7:Z-- Check Septic Form N.Y.S.D.E.C. 12- Trustees Examined Z Z ,20 Contact: Approved 120—f--0 Mailto: -rbFi LVDL(W Disapproved a/c iO'j Q LLB SiLe LaJ, MA rr1rur 1L— � Phone: aq 2��®� CA Expiration ,20`d� nsp d ctor APPLICATION FOR BUILDING PERMIT Date 1 I — 15 , 200'6 INSTRUCTIONS a.This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale.Fee according to schedule. b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c.The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit'to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall.expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months.Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws, ordinances,building code,housing code,and regulations, and o a authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name,if a corporation) I o,5 oLF LTULT LW , KA-y (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder Name of owner of premises7ZONA LA') (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location of land on which proposed work will be done: suw5-t �—A> 1A (3yry RC3CL*—s House Number Street Hamlet Count Tax Ma No. 1000 Section Block Y P � f Subdivision Filed Map No. Lot (Name) 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction a. Existing use and occupancy '2S i N GILL:— TA" M k�-`{�F I bV-N[1I b. Intended use and occupancy f �A M 1 3. Nature of work(check which applicable): New Building Addition V/ Alteration Repair Removal Demolition Other Work (Description) 4. Estimated Cost- V%0 Fee (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. 7. Dimensions of existing structures, if any: Front 5�21 " Rear 4 Rear Z t Depth Height Number of Stories Dimensions of s� A structure with alteratiorvs o additions: Front 1 Rear S Depth Height I ` Number of Stories I 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories d 9. Size of lot: Front j —50 Rear Depth 10. Date of Purchase I ? Name of Former Owner 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NOV// 13. Will lot be re-graded? YES NO /ill excess fill be removed from premises? YES NOS/ Cr, 14.Names of Owner of premises�c 15 - Address Ck A �T� NC Z Z7�hone No. �tCS4— —-7 Name of Architect Address Phone No Name of Contractor—Mb, Lu 0 Lcw,� Address Phone No._2_q r33_5U U'0 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES ✓ NO * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. STATE OF NEW YORK) SS: COUNTY OOF" ) 1 j <j1''XA ► �V �i�J being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)He is the �--� (Contractor,Agent, Corporate Officer, etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and V make and file this application; that all statements contained in this application are true to the best of his knowledge and belie , d that the work will be performed in the manner set forth in the application filed therewith. Sworro before me this day f cYf 20Qo� 01ary Public Signature of Appli nt BONNIE J.DOROSIq Notary Public,State Of New York No.O1D06095328,Suffolk C unty Term Expires July 7,2011 .. r Permit# Permit Date REScheck Software VeM�on 3.7.3 Compliance Certificate Project Title: Reeve Building Addition Report Date:09/21/06 Data filename:C-lProgram Files\CheckIREScheckUudlow-reeve-2.rck Energy Code: New York State Energy Conservation Construction Code Location: Suffolk County,New York Construction Type: Detached 1 or 2 Family Heating Type: Non-Electric Glazing Area Percentage: 250/6 Heating Degree Days: 5750 Construction Site: Owner/Agent Designer/Contractor. Reeve John Condon Condon Engineering,P.C. 1755 Sigsbee Road Mattituck,NY 11952 631-298-1986 e o 0 • a o • -. e � - - o B o 0 Ceiling 1:Flat Ceiling or Scissor Truss: 392 30.0 0.5 14 Wall 1:Wood Frame,16"o.c.: 194 13.0 3.6 12 Window 1:Wood Frame:Double Pane with Low-E 25 0.300 8 Wall 2:Wood Frame,16®o.c.: 97 13.0 3.6 5 Window 2:Wood Frame:Double Pane with Low-E: 21 0.300 6 Wall 3:Wood Frame,16"o_c.: 55 13.0 3.6 1 Window 3:Wood Frame:Double Pane with Low-E 14 0.300 4 Door 1:Glass: 28 0.300 8 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space: 392 19.0 0.6 18 The proposed building represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed systems have been designed to meet the New York State Energy Conservation Construction Code requ' ts.When a Registered Design Professional has stamped and signed this page,they are attesting that to th est of edge,belief,and professional judgment,such plans or specifications are in compliance with this Code. eN IS Pc B " igner Company Name Da e Reeve Building AdditionV����x�__ � page 1 of 4 t" RESc eck Sofhyare Verson 3.7.3 Inspection Checklist Date:09/21/06 Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-30.0 cavity+R-0.5 continuous insulation Comments- Above-Grade Walls: ❑Wall 1:Wood Frame,16"o.c.,R-13.0 cavity+R-3.6 continuous insulation Comments: ❑Wall 2 Wood Frame,16"o.c.,R-13.0 cavity+R-3.6 continuous insulation Comments: - [3 Wall 3:Wood Frame,16"o.c.,R-13.0 cavity+R-3.6 continuous insulation Comments: Windows: ❑Window 1:Wood Frame:Double Pane with Low-E,U-factor.0.300 For windows without labeled L-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑Window 2:Wood Frame:Double Pane with Low-E,U-factor.0.300 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: ❑Window 3:Wood Frame:Double Pane with Low-E,U-factor.0.300 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: --- Doors: ❑ Door 1:Glass,I.-factor.0.300 Comments: Floors: ❑ Floor 1:All-Wood JoisUrruss:Over Unconditioned Space,R-19.0 cavity+R-0.6 continuous insulation Comments: Air Leakage: ❑ Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage must be sealed. ❑ Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly with a 0.5"clearance from combustible materials.If non-IC rated,the facture must be installed with a 3"clearance from insulation. Vapor Retarder. ❑ Required on the wamrin-winter side of all non-vented framed ceilings,walls,and floors. Materials Identification: ❑ Materials and equipment must be installed in accordance with the manufacturer's installation instructions. ❑ Materials and equipment must be identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. Reeve Building Addition ���^T��� �____ ���Page 2 of 4 ❑ Insulation R-values and glazing U-factors must be clearly marked on the building plans or specifications. Duct Insulation: ❑ Supply ducts in unconditioned attics or outside the building must be insulated to R-8. ❑ Return ducts in unconditioned attics or outside the building must be insulated to R-4. ❑ Supply ducts in unconditioned spaces must be insulated to.R-8. ❑ Return duds in unconditioned spaces(except basements)must be insulated to R- ❑ Return duds in unconditioned spaces(except basements)must be insulated to R-2. Insulation is not required on return ducts in basements. Duct Construction: ❑All joints,seams,and connections must be securely fastened with welds,gaskets,mastics(adhesives), mastic-plus-embedded-fabric,or tapes.Tapes and mastics must be rated UL 181A or UL 181B. Exception:Continuously welded and locking-type longitudinal joints and seams on duds operating at less than 2 in.w.g.(500 Pa). ❑The HVAC system must provide a means for balancing air and water systems. Temperature Controls: ❑ Each dwelling unit has at lesat one thermostat capable of automatically adjusting the space temperature set point of the largest zone. Electric Systems: ❑Separate electric meters are required for each dwelling uniL Fireplaces: ❑ Fireplaces must be installed with tight fitting non-combustible fireplace doors. ❑ Fireplaces must be provided with a source of combustion air.as required by the Fireplace construction provisions ofthe Building Code of New York State,the Residential Code of New York State or the New York City Building Code.as applicable. Service Water Heating: ❑ Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of a circulating system. ❑ Insulate circulating hot water pipes to the levels in Table 1. Circulating Hot Water Systems: ❑ Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: ❑All heated swimming pools must have an ontoff heater switch and require a cover unless over 20%of the heating energy is from non-depletable sources.Pool pumps require a time dock. Heating and Cooling Piping insulation: ❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F must be insulated to the levels in Table 2. Reeve Building Addition �_ Page 3 of 4 Table I.Minimum►nsuladon Thickness for Circulating Hot Water Pipes Insulation Thickness in Inches by Pipe Sizes Non-Circulating Runouts Circulating Mains and Runouts Heated Water Temperature("F) Up to 1" Up to 125" 1.5"to 2.0" Over 2" 170-180 0.5 1.0 1.5 2.0 140-169 0.5 0.5 1.0 1.5 100-139 0.5 0.5 0.5 1.0 Table 2 Minimum Insulation Thickness for HVAC Pipes Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range(°F) 2"Runouts 1"and Less 1.25"to 2.0" 2.5"to 4" Heating Systems Low Pressure/Temperature 201 250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1.0 1.5 Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water.Refrigerant and 40-55 0.5 0.5 0.75 1.0 Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD:(Building Department Use Only) Reeve Building Addition Page 4 of 4 Condon Engineering, P.C. New York State Licensed Professional Engineers 1755 Sigsbee Road 631-298-1986 Mattituck, New York 11952 Fax 631-298-2651 www.condonengineering.com November 14, 2006 Michael Verity-Chief Building Inspector Building Department Southold Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971 RE: Reeve Property—480 Sunset Path, Southold, NY Dear Mr. Verity: A site inspection was made of the existing sanitary system at the above referenced property on November 14, 2006. The system components were found to be in acceptable condition and are adequately sized to support the existing and planned addition to the building. Please call me if you have any questions. Yours truly, oh . Condon, P.E. ����i I cep�® Job Truss Truss Type Qty Ply T3Job VE ADDITION B0701863 T01 COMMON 1 Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:16 2007 Page 1 5-0-3 8-11-8 12-10-13 17-11-0 � � r 5-0-3 3-11-5 3-11-5 5-0-3 Scale=1:28. Camber=118I 4x6 II 3 4.00 12 3x6 3x6 2 4 W1 W2 W2 1 5 81 B2 10 11 9 8 12 7 13 14 6 15 16 5x14 7x12 MT18H WB= 1ox10= 3x8 11 5x14 a 3x8 II 5-0-3 8-11-8 12-10-13 17-11-0 5-0-3 3-11-5 3-11-5 5-0-3 Plate Offsets X,Y: 1:Ed a 0-3-0 5:Ed a 0-3-0 LOAOING(psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 35.5 States increase 1.15 TC 0.97 Vert(LL) -0.26 7-9 >798 240 MT20 244/190 (Roof Snow=35.5) Lumber Increase 1.15 BC 0.75 Vert(TL) -0.36 7-9 >578 180 MT18H 244/190 TCDL 7.0 Rep Stress Incr NO WB 0.58 Horz(fL) 0.08 5 n/a We BCLL 0.0 Cade IBC2000/ANS195 (Matrix) Weight:269lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 3-1-9 cc pudins. BOT CHORD 2 X 6 SYP DSS BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing. WEBS 2 X 4 SYP No.3"Except` W1 2 X 4 SYP No.2 REACTIONS (lb/size) 1=8692/1-2-3,5=12618/1-2-3 Max Horcl=-96(LC 8) Max Upliftl=-3610(LC 5),5=-5266(LC 6) Max Gravl=8945(LC 2),5=12771(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=-20163/8242,2-3=-14499/5999,3-4=-14498/6000,4-5=-20135/8232 BOT CHORD 1-10=-7755/18888,10-11=-7755/18888,9-1 1=-7 7 5 5/1 88 8 8,8-9=-7755/18888,8-1 2=7 7 5 5/1 88 8 8,7-12=-7755/18888,7-13=-7675/18861,13-14=-7675/18861,6-14=-7675/18861, 6-1 5=-767 5/1 8 8 61,1 5-1 6=-7 67 5/1 8 861,5-16=-7675/18861 WEBS 2-9=-1578/4039,2-7=-5772/2378,3-7=-3525/8670,4-7=-5743/2368,4 6=-1573/4023 NOTES (12-13) 1)3-ply truss to be connected together with 10d(0.131"x3")nails as follows: Top chords connected as follows:2 X 4-1 row at 0-9-0 cc. Bottom chords connected as follows:2 X 6-3 rows at 04-0 cc. Webs connected as follows:2 X 4-1 raw at 0-9-0 cc. 2)All loads are considered equally applied to all plies,except if noted as front(F)or back(8)face in the LOAD CASE(S)section.Ply to ply connections have been provided to distribute only loads noted as(F)or(B),unless otherwise indicated. 3)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 4)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 5)Unbalanced snow loads have been considered for this design. 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcument with any other live loads. 7)All plates are MT20 plates unless otherwise indicated. 8)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 3610 lb uplift at joint 1 and 5266 lb uplift at joint 5. 9)Use USP THD26(With 16d nails into Girder&NA9D nails into Truss)or equivalent spaced at 2-0-0 cc max.starting at 1-104 from the left end to 17-7-0 to connect truss(es)T03(1 ply 2 X 4 SYP) to front face of bottom chord. 10)Fill all nail hales where hanger is in contact with lumber. 11)Hanger(s)or other connection device(s)shall be provided sufficient to support concentrated load(s)2174 lb down and 939 lb up at 17-11-12 on bottom chord. The design/selection of such connection device(s)is the responsibility of others. 12)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 13)ACCEPTED BY: DATE: LOAD CASE(S)Standard 1)Snow:Lumber Increase=1.15,Plate Increase=1.15 Uniform Loads(plf) Vert:1-3=-85,3-5=-85,1-5=-20 Concentrated Loads(lb) Vert:5=4099(F)8=1925(F)10=-1925(F)11=-1925(F)12=-1925(F)13=-1925(F)14=-1925(F)15=1925(F)16=1925(F) Job Truss Truss Type Qty �1`1=10N B0701863 T02 GABLE 1 (optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:19 2007 Page 1 1-1-6-0, 5-5-12 , 10-8-1 , 16-1-0 , 21-5-15 , 26-8-4 , 32-2-0 ,33-8-0, 1-6-0 5-5-12 5-2-5 5-4-15 5-4-15 5-2-5 5-5-12 1-6-0 Scale=1:56. 4x12= 4x12= 6 4.00 12 4 smi In 3x4 3x4 3 7 I I v W3 2xa II W3 TI I II 8 11 RI 2 r ' 9 Io axe= 18 17 16 15 14 13 12 11 10 Us= 2x4 II 6x8= 3x4= 4xl2= 3x4= 2x4 11 3x4= 5-5-12 10-8-1 16-1-0 21-5-15 26-8-4 32-2-0 r r i 5-5-12 5-2-5 5-4-15 5-4-15 5-2-5 5-5-12 Plate Offsets X Y: 2:0-0-3 0-0-11 4:0-7-8 0-2-0 6:0-7-8 0-2-0 8:0-0-3,0-1-3, 15:0-3-8 0-3-0 LOADING(psf) SPACING 2-0-0 CSI DEFL in (Ice) I/deft L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.67 Vert(LL) -0.15 10-11 >999 240 MT20 244/190 (Roof Snow=35.5) Lumber Increase 1.15 SC 0.70 Vert(TL) -0.20 10-11 >999 180 TCDL 7.0 Rep Stress Incr YES WB 0.90 Horz(TL) 0.04 8 n/a n/a BCLL 0.0 BCDL 10.0 Code IBC2000/ANSI95 (Matrix) Weight:186lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 3-3-1 oc purins,except BOT CHORD 2 X 4 SYP No.2 2-0-0 oc purins(6-0-0 max.):4-0. WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 5-3-4 oc bracing. OTHERS 2 X 4 SYP No.3 REACTIONS (lb/size) 2=257/11-1-8,17=47/11-1-8,15=2096/11-1-8,16=33/11-1-8,18=112/11-1-8,8=1086/0-3-8 Max Horz2=-142(LC 8) Max Uplift2=-251(L:7),17=-534(LC 3),16=1042(LC 6),18=-l(LC 6),8=-666(LC 6) Max Grav2=465(LC 2),17=365(LC 2).15=2762(LC 3).16=87(LC 4),18=140(LC 4),8=1596(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/38,2-3=-136/461,3-4=-373/1376,4-5=-746/416,5-0=-746/416,6-7=-1837/721,7-8=2916/1017,8-9=0/38 BOT CHORD 2-18=-425/230,17-18=-4251230,16-17=-425/230,15-16=-425/230,14-15=-1372/648,13-14=-1372/648,12-13=-437/1659,11-12=-437/1659,10-11=-836/2611,8-10=-e36/2611 WEBS 3-17=-360/568,3-15=-918/409,4-15=-2312/930,4-13=-919/2580,5-13=-754/359,6-13=-1113/403,6-11=-116/486,7-11=-1039/462,7-10=0/223 NOTES (13-14) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.0psf;Category 11;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind(normal to the face),see MiTek"Standard Gable End Detail' 3)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 4)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 6)Provide adequate drainage to prevent water pending. 7)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8)All plates are 1x3 MT20 unless otherwise indicated. 9)Gable studs spaced at 2-0-0 or. 10)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 251 lb uplift at joint 2,534 lb uplift at joint 17,1042 lb uplift at joint 15 and 1 lb uplift at joint 18. 11)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)B. 12)Design assumes 4x2(flat orientation)purlins at oc spacing indicated,fastened to truss TIC w/2-10d nails. 13)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 14)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Oty Ply REEVE ADDITION B0701863 T02A HIP 5 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:21 2007 Page 1 ,-1-6-0, 5-5-12 , 10-8-1 16-1-0 21-5-15 26-8-4 32-2-0 33-8-0, 1-6-0 5-5-12 5-2-5 5-4-15 5-4-15 5-2-5 5-5-12 1-6-0 Scat:=1:56. Camber 118 i 4x8= 1x3 II 48= 4 5 6 4.00 12 3x4 3x4 zzz 3 7 W3 W3 2 8 ' 9 Ia 5x14 5 16 15 14 13 12 11 10 5x14 1x3 11 3x4= 4x6= 3x8=4x6= 3x4= 1x3 II 5-5-12 10-8-1 16-1-0 21-5-15 26-8-4 32-2-0 5-5-12 5-2-5 5-4-15 5-4-15 5-2-5 5-5-12 Plate Offsets X,Y: 2:0-0-12 0-2-4 4:0-5-4,0-2-0, 6:0-54 0-2-0 8:0-0-12,0-24 LOADING(psf) SPACING 2-0-0 CSI DEFL in (loc) I/defl L/d PLATES GRIP TCLL 35.5 Plates Increase 1,15 TC 0.93 Vert(LL) -0.39 13 >990 240 MT20 244/190 (Roof Snow=35.5) Lumber Increase 1.15 BC 0.93 Vert(TL) -0.54 13-15 >705 180 TCDL 7.0 Rep Stress Incr YES WB 0.50 Horz(TL) 0.17 8 n/a n/a BCLL 0.0 Code IBC2000/ANSI95 (Simplified) Weight:164lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.1*Except* TOP CHORD Sheathed or 1-11-3 oc pudins,except T2 2 X 4 SYP DSS 2-0-0 oc puriins(2-5-10 max.):4-0. BOT CHORD 2 X 4 SYP No.1'Except* BOT CHORD Rigid ceiling directly applied or 4-9-11 oc bracing. B2 2 X 4 SYP No.2 WEBS 2 X 4 SYP No.3 WEDGE Left:2 X 6 SYP No.2,Right:2 X 6 SYP No.2 REACTIONS (lb/size) 2=181310-3-13(input: 0-3-8),8=1813/0-3-13(input: 0-3-8) Max Horz2=-142(LC 8) Max Uplift2=-998(LC 5),8=-998(LC 6) Max Grav2=2440(LC 2),8=2440(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-5101/l945,3-4=-4170/1689,4-5=-4261/1819,5-6=-4261/1819,6-7=-4170/1689,7-8=-5101/1945,8-9=0/19 BOT CHORD 2-16=-1819/4766,15-16=-1819/4766,14-15=-1467/3971,13-14=-1467/3971,12-13=-1360/3971,11-12=-1360/3971,10-11=-1712/4766,6-10=-1712/4766 WEBS 3-16=0/213,3-15=-868/415,4-15=-94/415,4-13=-343/1073,5-13=-710/353,6-13=-343/1073,6-11=-94/415,7-11=-868/415,7-10=0/213 NOTES (10-11) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=S.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 p'sf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7)WARNING:Required bearing size at joint(s)2,8 greater than input bearing size. 8)Two RT7A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 8. 9)Design assumes 4x2(flat orientation)puriins at oc spacing indicated,fastened to truss TC w/2-10d nails. 10)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 11)ACCEPTED BY: DATE: LOAD CASE(S)Standard 5a��� Job as Truss Type Oty Ply REEVE ADDITION B0701863 T03 HIP 9 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. rue Sep 04 14:17.23 2007 Page 1 -1-6-0 5-5-12 10-8-1 16-1-0 21-5-15 26-8-4 31-11-0 1-6-0 5-5-12 5-2-5 5-4-15 5-4-15 5-2-5 5-2-12 Scale=1:54. Camber=USl 4x8= 1x3 II 4x8= 4 6 4.00 12 3x4 5� 3x4 3 IV W2 IV IV7 Wd W3 I8 2 9 11 EN T �dllilk 412 ld 5x14 0 16 15 14 13 12 11 10 5x14= 1x3 II 3x4= 5x6 W6= 3x8= 3x4= 1x3 II 4x6= 5-5-12 10-8-1 16-1-0 21-5-15 26-SA 31-11-0 5-5-12 5-2-5 5-4-15 5-4-15 5-2-5 5-2-12 Plate Offsets X,Y: 2:0-0-12 0-2-4, 4:0-5-4 0-2-0 6:0-5-4 0-2-0, 9:0-04,0-2-12 LOADING(psf) TCLL 355 SPACING 2-0-0 CSI DEFL in (lac) I/deft Ud PLATES GRIP (Roof Snow=35.5) Plates Increase 1.15 TC 0.92 Vert(LL) -0.39 13 >978 240 MT20 244/190 TCDL 7.0 Lumber Increase 1.15 BC 0.93 Vert(TL) -0.54 13-15 >700 180 BCLL 0.0 Rep Stress Incr YES WB 0.50 Horz(TL) 0.17 9 n/a n/a BCDL 10.0 Code IBC2000/ANSI95 (Simplified) Weight:161lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.1*Except* TOP CHORD Sheathed or 1-11-5 oc purlins,except T2 2 X 4 SYP DSS 2-0-0 oc purlins(2-5-12 max.):4-6. BOT CHORD 2 X 4 SYP No.1'Except* BOT CHORD Rigid ceiling directly applied or 4-9-10 oc bracing. B2 2 X 4 SYP No.2 WEBS 2 X 4 SYP No.3 WEDGE Left:2 X 6 SYP No.2 SLIDER Right 2 X 4 SYP Nc.3 2-7-15 REACTIONS (lb/size) 9=1667/Mechanical,2=1807/0-3-13(input: 0-3-8) Max Horz2=151(LC 7) Max Uplift9=-837(LC 6),2=-995(LC 5) Max Grav9=2212(LC 3),2=2434(LC 2) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-5085/1937,3-4=-4154/1681,4-5=-4238/1808,5-6=-4238/1808,6-7=-4119/1670,7-8=-5004/1912,8-9=-5004/1912 BOT CHORD 2-16=-1824/4752,15-16=-1824/4752,14-15=-1472/3956,13-14=-1472/3956,12-13=1372/3922,11-12=-1372/3922,10-11=-1699/4653, 9-10=-1699/4653 WEBS 3-16=0/213,3-15=-869/415,4-15=-95/415,4-13=-337/1058,5-13=-710/353,6-13=-348/1083,6-11=-87/390,7-11=-798/394,7-10=0/211 NOTES (12-13) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live (cads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7)WARNING:Required bearing size atjoint(s)2 greater than input bearing size. 8)Refer to girder(s)for truss to truss connections. 9)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 837 lb uplift at joint 9. 10)Two RT7A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2. 11)Design assumes 4x2(flat orientation)purlins at oc spacing indicated,fastened to truss TC w/2-1 Od nails. 12)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 13)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T04 COMMON 4 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:24 2007 Page 1 i -1-6-0 , 5-5-11 10-8-0 15-10-5 21-4-0 22-10-0 1-6-0 5-5-11 5-2-5 5-2-5 5-5-11 1-6-0 Scale=1:38. Camber=1/81 04= 4 4.00 F12 2x4 O 2x4 3 w 1 5 2 6 02 ' I 4x6= 10 9 8 4x6= 3x4= 3x4= 3x4= 7-2-7 14-1-9 21-4-0 7-2-7 6-11-1 7-2-7 LOADING(psf) SPACING 2-0-0 CSI DEFL in (]cc) I/deft L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.77 Vert(LL) -0.12 10 >999 240 MT20 244/190 (Roof Snow=35.5) Lumber Increase 1.15 BC 0.70 Vert(TL) -0.23 8-10 >999 180 TCDL 7.0 Rep Stress Incr YES WB 0.28 Horz(fL) 0.06 6 n/a n/a BCLL 0.0 BCDL 10.0 Code IBC2000/ANS195 (Simplified) Weight:92lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 3-1-13 cc purlins. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 6-1-15 cc bracing. WEBS 2 X 4 SYP No.3 REACTIONS (lb/size) 2=1245/0-3-8,6=1245/0-3-8 Max Horz2=-142(LC 8) Max Uplifl2=-673(LC 5),6=-673(LC 6) Max Grav2=1509(LC 2),6=1509(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=2454/1064,34=-19851939,4-5=1985/939,5.6=2454/1064,6-7=0/19 BOT CHORD 2-10=-99712292,9-10=577/1513,8-9=-577/1513,6-8=890/2292 WEBS 3-10=-6091361,4-1 0=-2 657797,4-8=-265f797,5-8=-609/361 NOTES (7-8) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.0psf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 6. 7)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 8)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Oty Ply REEVE ADDITION B0701863 T05 HIP 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:25 2007 Page 1 -1-6-0 , 4-5-11 8-8-0 1278-0 16-10-5 21-4-0 22-10-0 1-6-0 4-5-11 4-2-5 4-0-0 4-2-5 4-5-1 1 1-6-0 Scale=1:38. Camber=1/8 i 04= 08= 4 5 4.00 V2 2x4� W 2x4 3 6 2 7 8 ld 4x6= 11 10 9 4x6= 3x8= 3x6= 3x4= 8-8-0 12-8-0 21-4-0 8-8-0 4-0-0 8-8-0 Plate Offsets X,Y: 2:0-0-3 0-1-3, 5:0-5-4,0-2-0, :0-0-3,0-1-3 LOATCLL G(psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TOLL 35.5 Plates Increase 1.15 TC 0.63 Vert(LL) -0.15 7-9 >999 240 MT20 244/190 (Roof Snow=35.5) Lumber Increase 1.15 BC 0.82 Vert(TL) -0.32 7-9 >793 180 TCDL 7.0 Rep Stress Incr YES WB 0.26 Horz(TL) 0.06 7 n/a n/a BCLL 0.0 Code IBC2000/ANSI95 (Simplified) Weight:98lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 3-3-13 oc pudins,except BOT CHORD 2 X 4 SYP No.2 2-0-0 oc purlins(3-7-0 max.):4-5. WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 5-8-2 oc bracing. REACTIONS (lb/size) 2=1245/0-3-8,7=1245/0-3-8 Max Horz2=-120(LC 8) Max Uplift2=-096(LC 5),7=-096(LC 6) Max Grav2=1616(LC 2),7=1616(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-2830/1219,34=-2159/936,4-5=-2053/943,5-0=-2159/936,6-7=-2830/1219,7-8=0/19 BOT CHORD 2-11=-1135/2632,10-11=-718/2063,9-10=-718/2063,7-9=-1044/2632 WEBS 3-11=-620/402,4-11=-63/305,5-11=-326/326,5-9=-73/331,6-9=-620/402 NOTES (9-10) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category ll;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chard live load nonconcurrent with any other live loads. 7)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift atjt(s)2 and 7. 8)Design assumes 4x2(flat orientation)purlins at oc spacing indicated,fastened to truss TC w/2-1 Od nails. 9)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 10)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qly Piy REEVE ADDITION B0701863 T06 HIP 1 1 Jab Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:26 2007 Page 1 -1-6-0 3-5-1 1 6-8-0 10-8-0 14-8-0 17-10-5 21-4-0 22-10-0 1-6-0 3-5-11 3-2-5 4-0-0 4-0-0 3-2-5 3-5-11 1-6-0 Scale=1:38, Camber=1/8 t 4x4= 3x4= 4x4= 4.00 V2 4 6 2x4 a 2x4 3 w 1 7 2 e 9 ld 4x6= 12 11 10 4x6= 3x8= 3x4= 3x8= 6-8-0 14-8-0 - 21-4-0 6-8-0 8-0-0 6-8-0 Plate Offsets X Y: 2:0-0-3 0-1-3, 8:0-0-3 0-1-3 LOADING(psf) SPACING 2-0-0 CSI DEFL in (too) Weft L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.64 Vert(LL) -0.17 12 >999 240 MT20 244/190 (Roof Snow-35.5) Lumber Increase 1.15 BC 0.84 Vert(TL) -0.30 10-12 >828 180 TCDL 7.0 Rep Stress Incr YES WB 0.28 Horz(TL) 0.08 8 n/a n/a BCLL 0.0 Code ISC2000/ANS195 (Simplified) Weight:99lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 3-4-0 oc pudins,except BOT CHORD 2 X 4 SYP No.2 2-0-0 oc purtins(3-2-6 max.):4-6. WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 5-7-11 oc bracing. REACTIONS (lb/size) 2=1245/0-3-8,8=1245/0-3-8 Max Horz2=-99(LC 8) Max Uplift2=-715(LC 5),8=-715(LC 6) Max Grav2=1701(LC 2),8=1701(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=3158/1277,3-4=-2779/1113,4-5=-2658/1105,5-6=2658/1105,6-7=-2779/1113,7-8=-3158/1277,8-9=0/19 BOT CHORD 2-12=-1178/2916,11-12=-1133/2884,10-11=-1133/2884,8-10=-1102/2916 WEBS 3-12=-299/268,4-12=-124/463,5-12=715/295,5-10=-715/295,6-1 0=-1 24/463,7-10=-299/268 NOTES (9-10) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category Il;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 limes flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7)One RT16A USP connectors recommended to conned truss to bearing walls due to uplift at jt(s)2 and 8. 8)Design assumes 4x2(flat orientation)purtins at cc spacing indicated,fastened to truss TC w/2-10d nails. 9)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 10)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T07 HIP 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:27 2007 Page 1 -1-6-0 4-8-0 8-8-0 12-8-0 16-8-0 21-4-0 22-10-0 1-6-0 4-8-0 4-0-0 4-0-0 4-0-0 4-8-0 1-6-0 Scale=1:38. Camber=Ile I 4x4= 3x4= 3x4= 4x4= 4.00 12 3 4 5 6 1 2 7 6 I 4x8= 12 „ 10 9 4x6= 3x4= 5x6 WB= 3x4= 3x4= 4-8-0 10-8-0 16-8-0 21-4-0 4-8-0 6-0-0 6-0-0 4-8-0 Plate Offsets X Y: 2:0-0-3 0-1-3 :0-0-3 0-1-3 LOATCLL G(ps3 SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 75.5.0 Plates Increase 1.15 TC 0.87 Vert(LL) -0.31 10 >810 240 MT20 244/190 (Roof Snow=3 Lumber Increase 1.15 BC 0.99 Vert(TL) -0.41 10 >616 180 TCLL .0 Rep Stress]nor YES WB 0.54 Horz(TL) 0.10 7 n/a n/a BCDL 10.0 BCLL 0'0 Code IBC2000/ANSI95 (Simplified) Weight:93lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-"oc purlins,except BOT CHORD 2 X 4 SYP No.2*Except* 2-0-0 oc pudins(2-4-14 max.):3-6. B2 2 X 4 SYP No.1 BOT CHORD Rigid ceiling directly applied or 4-11-6 oc bracing. WEBS 2 X 4 SYP Nc.3 REACTIONS (lb/size) 2=1245/0-3-8,7=1245/0-3-8 Max Horz2=-78(LC 8) Max Uplift2=-729(LC 5),7=-729(LC 6) Max Grav2=1763(LC 2),7=1763(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-3298/1230,3-4=-3124/1225,4-5=-4274/1654,5.6=3124/1225,6-7=-3298/1230,7-8=0/19 BOT CHORD 2-12=-1110/3072,11-12=-1601/4273,10-11=-1601/4273,9-10=-1571/4273,7-9=-1050/3072 WEBS 3-12=-193f750,4-12=-1540/588,4-10=0/177,5-10=0/177,5-9=-1540/588,6-9=193f750 NOTES (9-10) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=S.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chard live load nonconcurrenl with any other live loads. 7)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 7. 8)Design assumes 4x2(flat orientation)pur]ins at oc spacing indicated,fastened to truss TC w/2-1 Od nails. 9)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 10)ACCEPTED BY: DATE: LOAD CASE(S)Standard J 80701863 T08 717' 1ob Truss ype 1 y Ply REEVE ADDITION ` 2 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:28 2007 Page 1 -1-6-0 , 2-0-12 $-B-Q 8-0-9 13-3-7 18-8-0 119-3- 21-4-0 , 22-1 0-0 r 1-6-0 2-0-12 0-7-4 5-4-9 5-2-13 5-4-9 0-7-4 2-0-12 1-6-0 Scale=1:38. Camber=118 i 5x8= 1x3 II 4.00 12 1x3 II 1x3 II 4xB= 5x6= 4 7 3 T2 8 2 9 101 1 3x6= 17 16 18 15 19 14 20 21 13 22 23 24 12 11 3x6= 3x6 II 6x6= 6x8= 2x4 II 8x8=3x4= 3x4= 2-0-12 �-B-Q 8-0-9 13-3-7 18-8-0 19-3 4 21-4-0 2-0-12 0-7-4 5-4-9 5-2-13 5-4-9 0-7-4 2-0-12 Plate Offsets X Y: 4:0-5-8,0-2-0, 12:0-3-8 0-4-0 LOADING(psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.97 Vert 7.0 (LL) -0.63 13-14 >402 240 MT20 244/190 (Roof Snow 3 Lumber Increase 1.15 BC 0.85 Vert(TL) -0.78 13-14 >324 180 TCDL 7 0 Rep Stress Incr NO WB 0.81 Horz(TL) 0.07 9 n/a n/a BCLL 0.0 Code IBC2000/ANSI95 (Matrix) Weight:233lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 5-8-7 oc purlins,except BOT CHORD 2 X 6 SYP No.2*Except` 2-0-0 oc purins(2-7-9 max.):4-7. B2 2 X 6 SYP DSS BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing, Except: WEBS 2 X 4 SYP No.3 8-3-6 oc bracing:13-14 8-5-0 oc bracing:12-13. REACTIONS (lb/size) 2=2076/0-3-8,9=2125/0-3-8 Max Horz2=60(LC 7) Max Uplift2=-1239(LC 5),9=-1265(LC 6) Max Grav2=2642(LC 2),9=2691(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/49,2-3=-4877/2138,3-4=-4412/1966,4-5=-10864/4688,5-6=-1 0864/46 8 8,6-7=-6248/2745,7-8=-4532/2022,8-9=-4966/2181,9-10=0/49 BOT CHORD 2-17=-1892/4417,16-17=-2603/6075,16-18=2732/6385,15-18=-2732/6385,15-19=-2732/6385,14-19=-2732/6385,14-20=-4933/11563,20-21=-4933/11563,13-21=-4933/11563, 13-22=-4933/11563,22-23=-4933/11563,23-24=-4933/11563,12-24=-4933/11563,11-12=-2522/5864,9-11=-1958/4499 WEBS 4-16=-905/2191,4-14=-1923/4654,5-14=-612/310,6-14=-765/320,6-13=-165/501,6-12=-5501/2303,7-12=-1113/2699,3-17=-521/1225,4-17=-3248/1394,B-11=-484/1148,7-11=-2673/1134 NOTES (14-15) 1)2-ply truss to be connected together with 10d(0.131"x3")nails as follows: Top chords connected as follows:2 X 4-1 row at 0-9-0 oc. Bottom chords connected as follows:2 X 6-2 rows at 0-7-0 cc. Webs connected as follows:2 X 4-1 raw at 0-9-0 oc. 2)All loads are considered equally applied to all plies,except if noted as front(F)or back(B)face in the LOAD CASE(S)section.Ply to ply connections have been provided to distribute only loads noted as(F)or(B),unless otherwise indicated. 3)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 4)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 5)Unbalanced snow loads have been considered for this design. 6)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 7)Provide adequate drainage to prevent water ponding. 8)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9)MUGT15/PHD2 USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 9. 10)Design assumes 42(flat orientation)purlins at oc spacing indicated,fastened to truss TC w/2-10d nails. 11)Use USP JUS26(With 10d nails into Girder 8 10d nails into Truss)or equivalent spaced at 2-0-0 oc max.starting at 2-0-12 from the left end to 19-3-4 to connect truss(es)T09(1 ply 2 X 6 SYP),T09(1 ply 2 X 4 SYP),T09(1 ply 2 X 6 SYP) to back face of bottom chord. 12)Fill all nail holes where hanger is in contact with lumber. 13)MUGT15 Wood Installation:Minimum 2 ply stud required beneath truss. Additional anchorage to wall stud designed by others.Install minimum of 6-10d nails into truss face and minimum 4-10d nails into the truss top Moisture barrier plate may be required. 14)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 15)ACCEPTED BY: DATE: LOAD CASE(S)Standard 1)Snow.Lumber Increase=1.15,Plate Increase=1.15 Uniform Loads(plf) Vert:1-4=-85,4-7=-85,7-10=-85,2-9=-20 Concentrated Loads(lb) Vert:14=-164(B)17=-200(B)11=-200(B)18=-164(B)19=-164(B)20=-164(B)21=-164(B)22=-164(B)23=-164(B)24=-164(B) 31D-5'1�D--� Job Truss Truss Type Oty Ply REEVE ADDITION 80701863 T09 MONO HIP 2 1 Job Reference(optional) 4x4= P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:29 2007 Page 1 4 -1-6-0 2-0-0 3 2-8-0 2x4 II � r 1-6-0 2-0-0 0-8-0 Scale=1:6. T2 4.00 12 W 2 B1 1 3x4= 2x4 4x4= 6 7 5 1-6-15 2-8-0 1-6-15 1-1-1 LOADING(psf) SPACING 2-M CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.28 Vert(LL) -0.00 6 >999 240 MT20 244/190 (Roof Snow-35.5) Lumber Increase 1.15 BC 0.08 Vert(TL) -0.00 6 >999 180 TCDL 7.0 Rep Stress Incr NO WB 0.03 Horz(TL) -0.00 5 n/a n/a BCLL 0.0 Code IBC2000/ANSI95 (Matrix) Weight:15lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-8-0 oc purlins, except end verticals,and 2-0-0 cc purlins:3-4. BOT CHORD 2 X 6 SYP No.2 BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. WEBS 2 X 4 SYP No.3 JOINTS 1 Brace at Jt(s):4 REACTIONS (lb/size) 5=220/Mechanical,2=353/0-3-8 _ Max Horz2=80(LC 4) Max Uplift5=-158(LC 4),2=-309(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/31,2-3=-173/78,3-4=-12/16,4-5=-22/17 BOT CHORD 2-6=85/109,6-7=-50/46,5-7=-50/46 WEBS 3-6=59/100,3-5=-84/69 NOTES (13-14) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=S.Opsf;Category ll;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 4)Provide adequate drainage to prevent water ponding. 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)Refer to girder(s)for truss to truss connections. 7)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 158 lb uplift at joint 5. 8)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at it(s)2. 9)Design assumes 4x2(flat orientation)purlins at oc spacing indicated,fastened to truss TC w/2-10d nails. 10)Use USP HJC26(With 16d nails into Girder&10d nails into Truss)or equivalent at 2-0-6 from the left end to connect truss(es)T12(1 ply 2 X 4 SYP),T11(1 ply 2 X 4 SYP) to front face of bottom chord. 11)Fill all nail holes where hanger is In contact with lumber. 12)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F)or back(B). 13)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 14)ACCEPTED BY: DATE: LOAD CASE(S)Standard 1)Snow.Lumber Increase=1.15,Plate Increase=1.15 Uniform Loads(pin Vert:1-3=-85,3-4=-85,2-5=-20 Concentrated Loads(lb) Vert:7=184(F) Job Truss Truss Type Oly Ply REEVE ADDITION B0701863 T10 JACK 8 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:30 2007 Page 1 1x3 II -1-6-0 2-8-0 3 1-6-0 2-8-0 Cale=1:7.1 4.00 12 W1 2 T1 1 B1 4 �3xi 2-8-0 txa�l� 2-8-0 LOADING(psf) SPACING 2-00 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.35 Vert(LL) -0.00 2-4 >999 240 MT20 197/144 TCLL 0. (Roof Snow 3 7.0 Lumber Increase 1.15 BC 0.05 Vert(TL) -0.00 2-4 >999 180 Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 4 n/a n/a BC Code IBC20001ANS195 BCD 0.0 L 10.0 (Simplified) Weight:111b LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-8-0 oc pudins, except end verticals. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2 X 3 SPF Stud REACTIONS (lb/size) 4=127/Mechanical,2=267/0-3-8 Max Horz2=97(LC 6) Max Uplift4=-75(LC 5),2=-216(LC 5) Max Grav4=184(LC 2),2=402(LC 2) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=47/O,3-4=-160/87 BOT CHORD 2-4=-16/21 NOTES (9-10) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category Il;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)Refer to girder(s)for truss to truss connections. 7)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 75 lb uplift at joint 4. 8)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2. 9)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 10)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T11 JACK 2 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:30 2007 Page 1 -2-1-7 2-8-7 2-1-7 2-8-7 3 scIY2jll:7. 2.83 12 2 T1 1 131 4 3x4= 1x3 II i 2-8-7 2-8-7 LOADING(psT) SPACING 2-0-0 CS1 DEFL in (tor) I/deft L/d PLATES GRIP TOLL 35.5 Plates Increase 1.15 TC 0.45 Vert(LL) -0.00 2-4 >999 240 MT20 197/144 (Roof Snowr--35.5) Lumber Increase 1.15 BC 0.05 Vert(TL) -0.00 2-4 >999 180 TCDL 7.0 Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 4 n/a n/a BCLL 0.0 Code IBC20001ANS195 (Simplified) Weight:12Ito BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-8-7 oc pudins, except end verticals. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2 X 3 SPF Stud REACTIONS (lb/size) 4=126/Mechanical,2=323/0-4-15 Max Horz2=74(LC 4) Max Uplift4=-72(LC 3),2=-283(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/12,2-3=-34/0,3-4=-102/83 BOT CHORD 2-4=-12/16 NOTES (8-9) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category Il;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 limes flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)Refer to girder(s)for truss to truss connections. 6)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 72lb uplift at joint 4. 7)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2. 8)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 9)ACCEPTED BY: DATE: LOAD CASE(S)Standard 73DL5 d� Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T12 JACK 2 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:31 2007 Page 1 -1-6-0 2-0-0 3 1x3 II 1-6-0 2-0-0 Scale=1:6. 4.00 12 2 W7 T1 1 B1 4 2-0-0 2-0-0 G(ps TCLL 35.5 SPACING 2-0-0 CSI DEFL in ([cc) I/defl L/d PLATES GRIP TCLL 0 Plates Increase 1.15 TC 0.20 Vert(LL) -0.00 2 >999 240 MT20 197/144 (Roof Snow=35. Lumber Increase 1.15 BC 0.02 Vert(TL) -0.00 2 >999 180 TCLL 7. Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 4 n/a rile BCDL 10.0 BC 0.0 Code IBC2000/ANSI95 (Simplified) Weight:9lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-0-0 oc pudins, except end verticals. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 cc bracing. WEBS 2 X 3 SPF Stud REACTIONS (lb/size) 4=98/Mechanical,2=228/0-3-8 Max Horz2=79(LC 4) Max Uplift4=-59(LC 3),2=-191(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/12,2-3=-37/0,3-4=-79/68 BOT CHORD 24=13/16 NOTES (8-9) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category ll;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)Refer to girder(s)for truss to truss connections. 6)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 59lb uplift at joint 4. 7)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2. 8)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 9)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qly Ply REEVE ADDITION B0701863 T15 HIP 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:32 2007 Page 1 -1-6-01 5-2-3 10-1-0 , 14-1-0 , 18-1-0 , 22-1-0 26-11-13 , 32-2-0 ,33-8-0, 1-6-0 5-2-3 4-10-13 4-0-0 4-0-0 4-0-0 4-10-13 5-2-3 1-6-0 Seale=1:56. Camber=3/16I 4x6 3x4= 3x4= 4x6= 4.00 12 4 5 6 7 3x4 5r 3x4 3 IVI1 WIVI 8 W4 :;Wj4 IV 2 9 10/ 5x14 17 16 15 14 13 12 11 5x14 a 1 1x3 11 3x8= 5x6 WB= 3x4= 3x8= 1x3 II 5x6 WB= 5-2-3 10-1-0 16-1-0 22-1-0 26-11-13 32-2-0 5-2-3 4-10-13 6-0-0 6-0-0 4-10-13 5-2-3 Plate Offsets X,Y: 2:0-0-12,0-2-4, 9:0-0-12 0-2-4 LOADING(psf) SPACING 2-0-0 CSI DEFL in (loc) I/deft Ud PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.88 Vert(LL) -0.43 14 >886 240 MT20 244/190 7.0(Roof Snow 3 Lumber Increase 1.15 BC 0.88 Vert(TL) -0.60 12-14 >640 180 BCDL 7.0 Rep Stress Incr YES WB 0.57 Horz(fL) 0.18 9 n/a n/a BCLL 0.0 Code IBC2000/ANSI95 BCDL 10,0 (Simplified) Weight:1651b LUMBER BRACING TOP CHORD 2 X 4 SYP No.1*Except* TOP CHORD Sheathed or 2-1-9 oc pudins,except T2 2 X 4 SYP No.2 2-0-0 oc pudins(2-3-7 max:):4-7. BOT CHORD 2 X 4 SYP No.1 BOT CHORD Rigid ceiling directly applied or 4-9-4 oc bracing. WEBS 2 X 4 SYP No.3 WEDGE Left:2 X 6 SYP No.2,Right:2 X 6 SYP No.2 REACTIONS (lb/size) 2=1813/0-3-14(input: 0-3-8),9=1813/0-3-14(input: 0-3-8) Max Horz2=135(LC 7) Max Uplift2=-1003(LC 5),9=-1003(LC 6) Max Grav2=2462(LC 2),9=2462(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-5193/1969,3-4=-4351/1742,4-5=-4159/1723,5-6=-4521/1889,6-7=-4159/1723,7-8=4351/1742,8-9=5193/1969,9-10=0/19 BOT CHORD 2-17=-1839/4848,16-17=-1839/4848,15-16=-1735/4591,14-15=1736/4591,13-14=1690/4591,12-13=-1690/4591,11-12=-1736/4848,9-11=-1736/4848 WEBS 3-17=0/202,3-16=773/381,4-16=-277/875,5-16=-1129/401,5-14=-143/277,6-14=-143/277,6-12=-1129/401,7-12=-277/875,8-12=-773/381,8-11=0/202 NOTES (10-11) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.O psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chard live load nonconcurrent with any other live loads. 7)WARNING:Required bearing size atjoint(s)2,9 greater than input bearing size. 8)Two RT7A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 9. 9)Design assumes 4x2(flat orientation)purlins at oc spacing indicated,fastened to truss TC w/2-10d nails. 10)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 11)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qty Ply REEVE ADDITION 80701863 T16 HIP 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:33 2007 Page 1 ,-1-6-01 4-2-3 8-1-0 13-5-9 18-8-7 24-1-0 27-11-13 1 32-2-0 33-8-01 1-6-0 4-2-3 3-10-1 3 5-4-9 5-2-13 5-4-9 3-10-13 4-2-3 1-6-0 Scale=1:56. Camber=3116 t 4x12= 1x3 II 3x8= 4x6= 4.00 12 q 5 6 7 3x4 3x4 3 W, W1 8 W3 W3 2 9 ,Dib d ld 5x14 5 18 17 16 15 14 13 12 11 SX8= 1x3 II 3x4= 5x6 W6= 7x12 MT18H WB= 1x3 II 3x8= tx3 II 3x10= 4-2-3 8-1-0 13-5-9 18-8-7 24-1-0 27-1 1-13 32-2-0 4-2-3 3-10-13 5-4-9 5-2-13 5-4-9 3-10-13 4-2-3 Plate Offsets X Y: 2:0-0-12,0-2-4, 4:0-84 0-2-4, 9:0-0-3 0-1-7 LOATCLL G(psf) SPACING 2-0-0 CSI DEFL in (too) I/deft Ud PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.99 Vert(LL) -0.55 15 >700 240 MT20 244/190 (Roof Snow=35.5) Lumber Increase 1.15 BC 0.89 Vert(TL) -0.74 13-15 >519 180 MT18H 2441190 TCDL 7.0 Rep Stress Incr YES WB 0.68 Horz(TL) 0.20 9 n/a n/a BCLL D.0 Cade IBC2000/ANSI95 (Simplified) Weight:162lb BCDL 10.0 LUMBER BRACING TOP CHORD 2 X 4 SYP No.2*Except* TOP CHORD Sheathed or 2-2-2 oc pudins,except T2 2 X 4 SYP 2400F 2.0E 2-0-0 oc purlins(2-1-10 max.):4-7. BOT CHORD 2 X 4 SYP DSS*Except* BOT CHORD Rigid ceiling directly applied or 4-8-9 oc bracing. B1 2 X 4 SYP No.1 WEBS 1 Row at midpt 6-12 WEBS 2 X 4 SYP No.3 WEDGE Left:2 X 6 SYP No.2,Right:2 X 3 SPF Stud REACTIONS (lb/size) 2=1813/0-3-15.(input: 0-3-8),9=1813/0-3-15(input: 0-3-8) Max Horz2=114(LC 7) Max Uplift2=-1017(LC 5),9=-1017(LC 6) Max Grav2=2529(LC 2),9=2529(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-5437/2031,3-4=-4907/1903,4-5=-5938/2352,5-6=-5938/2352,6-7=4701/1868,7-8=-4907/1903,8-9=-5438/2031,9-10=0/19 BOT CHORD 2-18=-1885/5055,17-18=-1885/5055,16-17=-1696/4666,15-16=-1696/4666,14-15=-2146/5938,13-14=-2146/5938,12-1.3=-2146/5938,11-12=-1798/5055,9-11=-1798/5055 WEBS 3-18=0/162,3-17=431/266,4-17=-51/252,4-15=-676/1937,5-15=-098/347,6-15=-241/241,6-13=0/209,6-12=-1897/662,7-12=-301/959,8-12=-431/266,8-11=0/162 NOTES (11-12) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chard live load nonconcument with any other live loads. 7)All plates are MT20 plates unless otherwise indicated. 8)WARNING:Required bearing size atjoint(s)2,9 greater than input bearing size. 9)Two RT7A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 9. 10)Design assumes 4x2(flat orientation)pur ins at oc spacing indicated,fastened to truss TC w/2-10d nails. 11)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 12)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T17 HIP 1 1 Job Reference o tional P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:35 2007 Page 1 -1-6-0 3-2-3 6-1-0 11-1-14 16-1-0 21-0-2 26-1-0 28-11-13 1 32-2-0 33-8-0 1-6-0 3-2-3 2-10-13 5-0-14 4-11-2 4-11-2 5-0-14 2-10-13 3-2-3 1-6-0 Scale=1:56. Camber=1141 _ 3x10 4.0012 = Us 3x10= 2x4 11 4x6= 6x8= 4 5 6 7 8 rRI 2x4 2x4 G 3 IV 10 2 11 �I1 12r i 3 5x8= 19 18 17 16 15 14 13 5x8= l� 3x10= 1x3 11 7x12 MT18H VVB= 1x3 11 3x10= 3x8= 7x12 MT16H WB= 6-1-0 11-1-14 16-1-0 21-0-2 26-1-0 32-2-0 6-1-0 5-0-14 4-11-2 4-11-2 5-0-14 6-1-0 Plate Offsets X Y: 2:0-0-3 0-1-7 4:0-4-0 0-2-6, 9:0-4-0 0-2-0 11:0-0-3,0-1-7 TOADING(Ps 35.5 SPACING 2-0-0 CSI DEFL in (loc) I/dell L/d PLATES GRIP CILL(Roof Snow 35.5 Plates Increase 1.15 TC 0.91 Vert(LL) -0.84 16 >457 240 MT20 244/190 7.0 Lumber Increase 1.15 BC 0.85 Vert(TL) -1.10 16 >349 180 MT18H 244/190 TCDL BCDL .0 Rep Stress Incr YES WB 0.78 Horz(TL) 0.25 11 n/a We BCDL 10.0 Code IBC2000/ANSI95 (Simplified) Weight:172lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2*Except* TOP CHORD Sheathed or 2-5-0 oc purlins,except T2 2 X 6 SYP Nc.2,T3 2 X 6 SYP Nc.2 2-0-0 oc purins(2-2-1 max.):4-9. BOT CHORD 2 X 4 SYP DSS BOT CHORD Rigid ceiling directly applied or 4-0-15 oc bracing. WEBS 2 X 4 SYP No.3 WEBS 1 Row at midpt 5-19,8-13 WEDGE Left:2 X 3 SPF Stud,Right:2 X 3 SPF Stud REACTIONS (lb/size) 2=1813/04-1(input: 0-3-8),11=1813/04-1(input: 0-3-8) Max Horz2=92(LC 7) Max Uplift2=-1029(LC 5),11=1029(LC 6) Max Grav2=2580(LC 2),11=2580(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/19,2-3=-5421/2076,3-4=-5426/2055,4-5=-5242/2017,5-0=-8482/3246,6-7=-8482/3246,7-8=8482/3246,8-9=-5242/2018,9-10=-5426/2055,10-11=-5421/2076,11-12=0/19 BOT CHORD 2-19=-1907/4991,18-19=-2847/7774,17-18=-284711774,16-17=-284717774,15-16=277917774,14-15=-277917774,13-14=-2779/7774,11-13=-1837/4991 WEBS 3-19=-54/579,4-19=-375/1158,5-19=-3080/1109,5-18=01197,5-16=-379/1099,6-16=-652/323,8-16=-379/1099,8-14=0/197,8-13=3080/1109,9-13=375/1158,10-13=-54/579 NOTES (11-12) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf,BCDL=5.0psf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psi on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7)All plates are MT20 plates unless otherwise indicated. 8)WARNING:Required bearing size atjoint(s)2,11 greater than input bearing size. 9)Two RT7A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 11. 10)Design assumes 4x2(flat orientation)purlins at oc spacing indicated,fastened to truss TC w/2-10d nails. 11)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 12)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T18 HIP 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:40 2007 Page 1 ,-1-6-0„ 4-1-0 8-11-1 0 13-8-9 18-5-7 23-2-6 28-1-0 32-2-0 133-8-0, 1-6-0 4-1-0 4-10-10 4-8-14 4-8-14 4-8-14 4-10-10 4-1-0 1-6-0 Scale=1:56. Camber=7/16 i 7x12 MT18H= 4.00 12 2x4 11 4x8= 2x4 11 5x6= 7x12 MT1 BH= 6x8= 3 4 5 6 7 8 9 II 1 2 7�i 10 11-1; 4x12= 19 18 17 16 15 14 13 12 4x12= 2x4 II 7xl2 MT18H= 7xl7.5 MT16 WB= 7x17.5 MT16 WB=4x12= 2x4 11 7x12 MT1BH= 2x4 II 4-1-0 8-11-1 0 13-8-9 18-5-7 23-2-6 28-1-0 32-2-0 4-1-0 4-10-10 4-8-14 4-8-14 4-8-14 4-10-10 4-1-0 Plate Offsets X Y: 3:0-7-0 0-3-8 12:0-3-8 0-3-8 LOADING(psf)TCLL 35.5 SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TCLL Plates Increase 1.15 TC 0.98 Vert(LL) -1.37 16 >280 240 MT20 244/190 (Roof Snow=3 7.0 Lumber Increase 1.15 BC 0.95 Vert(TL) -1.77 16 >216 lea MT18H 244/190 TCLL BCDL 10.0.0 0 0. Rep Stress Incr YES WB 0.88 Horz(TL) 0.23 10 n/a n/a MT16 171/147 BC Code IBC20001ANS195 (Simplified) Weight:202lb LUMBER BRACING TOP CHORD 2 X 6 SYP No.2*Except* TOP CHORD Sheathed or 2-10-14 oc purlins,except T2 2 X 6 SYP DSS,T3 2 X 6 SYP DSS 2-0-0 oc pudins(2-0-5 max.):3-9. BOT CHORD 2 X 6'SYP DSS BOT CHORD Rigid ceiling directly applied or 3-11-9 oc bracing. WEBS 2 X 4 SYP No.3*Except* WEBS 1 Row at midpt 8-12 W1 2 X 4 SYP No.1,W1 2 X 4 SYP No.1,W1 2 X 4 SYP No.1,W1 2 X 4 SYP No.1 W1 2 X 4 SYP No.1 REACTIONS (lb/size) 2=1813/0-4-2(input: 0-3-8),10=181310-4-2(input: 0-3-8) Max Horz2=79(LC 7) Max Uplift2=-1037(LC 5).10=-1037(LC 6) Max Grav2=2617(LC 2),10=2617(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/30,2-3=-6230/2292,3-4=-1 0 824/4 0 3 2,4-5=-1 0 8 24/40 32,M=-13159/4899,6-7=-13159/4899,7-8=-1 31 59/4 8 9 9,8-9=-6049/2269,9-10=-6255/2301,10-11=0/30 BOT CHORD 2-19=-2120/5866,18-19=-2116/5875,17-18=-4809/13159,1 6-1 7=-4 809/1 31 5 9,1 5-1 6=-4 8 0 9/1 31 5 9,1 4-1 5=-4 8 0 9/1 31 5 9,13-14=-3879/10824,12-13=-3879/10824,10-12=-2067/5892 WEBS 3-19=0/177,3-18=-1947/5358,4-18=f37/316;5-18=-2639/950,5-16=0/190,5-14=-101/101,6-14=-627/311,8-14=-950/2639,8-13=0/190,8-12=-5185/1884,9-12=-495/1573 NOTES (11-12) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category 11;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp.;L=60-0-0 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 5)Provide adequate drainage to prevent water ponding. 6)This truss has been designed fora 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7)All plates are MT20 plates unless otherwise indicated. 8)WARNING:Required bearing size at joint(s)2,10 greater than input bearing size. 9)Two RT7A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2 and 10. 10)Design assumes 4x2(flat orientation)pur ins at oc spacing indicated,fastened to truss TC w/2-10d nails. 11)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 12)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type Oty Ply REEVE ADDITION 80701863 T19 HIP 1 3 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:42 2007 Page 1 ,-1-61-6-0�i 2-1-0 , 6-10-3 11-5-9 16-1-0 20-8-7 25-3-13 30-1-0 32-2-0 ,33-8-0, 1-6-0 2-1-0 4-9-3 4-7-7 4-7-7 4-7-7 4-7-7 4-9-3 2-1-0 1-6-0 Scale=1:56. Camber =9/16 i 4.00 12 5x8= 1x3 II 4x8= 1x3 II 46= 4x8= 1x3 II SxB= 3 4 5 6 7 8 9 10 2 11 I 82 ,2T I 3x6= 21 22 23 20 24 25 19 26 27 18 17 16 28 15 29 30 14 31 32 13 3x6 2x4 II 6x8= 2x4 II 7x12 MT18H WB= 2x4 11 6x8= 2x4 II 4x8=7x12 MT18H WB= 2-1-0 6-10-3 , 11-5-9 16-1-0 , 20-8-7 25-3-13 30-1-0 32-2-0 , 2-1-0 4-9-3 4-7-7 4-7-7 4-7-7 4-7-7 4-9-3 2-1-0 Plate Offsets X,Y: 3:0-5-6 0-2-0, 7:0-3-0 Edge], 10:0-5-8 0-2-0 LOADING(psf) SPACING 2-0-0 CSI DEFL in (]cc) I/deft Ltd PLATES GRIP TOLL 35.5 Plates Increase 1.15 TC 0.52 Vert(LL) 1.55 17 >247 240 MT20 244/190 BCDL 0. (Roof Snow-35.5)7.0 Lumber Increase 1.15 BC 0.72. Vert(TL) -1.99 17 >192 180 MT18H 244/190 Rep Stress Incr NO WB 0.80 Horz(TL) 0.11 11 n/a n/a BCLL 0.0 BCDL 10.0 Code IBC2000/ANSI95 (Matrix) Weight:515lb LUMBER BRACING TOP CHORD 2 X 4 SYP DSS TOP CHORD Sheathed or 6-0-0 cc pudins,except BOT CHORD 2 X 6 SYP DSS 2-0-0 cc purlins(5-4-12 max.):3-10. WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 9.6-0 cc bracing. REACTIONS (lb/size) 2=2496/0-3-8,11=249810-3-8 Max Horz2=54(LC 5) Max Uplift2=-1640(LC 3),11=-1642(LC 4) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/31,2-3=3653/4173,3-4=-13123/8249,4-5=-1 31 2 3/824 9,5-6=-19972/12531,6-7=-1 9 97 2/1 2 531,7-8=-1 9 9 7 2/1 2 5 31,8-9=-13127/8254,9-1 0=1 31 2 7/825 4,10-11=-6657/4173, 11-12=0/31 BOT CHORD 2-21=-3795/6147,21-22=-3892/6310,22-23=-3892/6310,20-23=-3892/6310,20-24=12046/19290,24-25=-12046/19290,1 9-2 5=-1 20 46/1 92 9 0,1 9-26=-1 2 04 6/1 929 0,26-27=-12046/19290, 18-27=-12046/19290,17-18=-12046/19290,16-17=-12063/19294,16-28=-12063/19294,15-28=-12063/19294,15-29=-12063/19294,29-30=-12063/19294,14-30=12063/19294, 14-31=-3936/6315,31-32=3936/6315,13-32=-3936/6315,11-13=-3838/6151 WEBS 3-21=-566/940,3-20=-,34516914,4-20=-2901241,5-20=3265/3939,5-19=-277/526,5-17=-4341693,6-17=-309/251,8-17=-427/689,8-15=277/527,B-14=-6264/3943,9-14=-290/241, 10-1 4=-4341/6914,10-13=-566/942 NOTES (15-16) 1)3-ply truss to be connected together with 10d(0.131"x3")nails as follows: Tap chords connected as follows:2 X 4-1 row at 0-9-0 cc. Bottom chords connected as follows:2 X 6-2 rows at 0-9-0 cc. Webs connected as follows:2 X 4-1 row at 0-9-0 cc. 2)All loads are considered equally applied to all plies,except if noted as front(F)or back(B)face in the LOAD CASE(S)section.Ply to ply connections have been provided to distribute only loads noted as(F)or(B),unless otherwise indicated. 3)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category 11;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 4)TCLL:ASCE 7-9B;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp.;L=60-0-0 5)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 6)Provide adequate drainage to prevent water ponding. 7)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8)All plates are MT20 plates unless otherwise indicated. 9)MUGT15/PHD2 USP connectors recommended to connect truss to bearing walls due to uplift atjt(s)2 and 11. 10)Design assumes 4x2(flat orientation)purlins at cc spacing indicated,fastened to truss TC w/2-10d nails. 11)Use USP HJC26(With 16d nails into Girder 8 1nd nails into Truss)or equivalent spaced at 28-0-0 cc max.starting at 2-1-2 from the left end to 30-1-2 to connect truss(es)T20(1 ply 2 X 4 SYP),T21(1 ply 2 X 4 SYP),T20(1 ply 2 X 4 SYP),T21(1 ply 2 X 4 SYP) to front face of bottom chord. 12)Use USP JUS26(With 10d nails into Girder 8 10d nails into Truss)or equivalent spaced at 2-0-0 cc max.starting at 4-14 from the left end to 28-1-4 to connect truss(es)T20(1 ply 2 X 4 SYP) to front face of bottom chord. 13)Fill all nail holes where hanger is in contact with lumber. 14)MUGT15 Wood Installation:Minimum 2 ply stud required beneath truss. Additional anchorage to wall stud designed by others.Install minimum of 6-10d nails into truss face and minimum 4-10d nails into the truss top Moisture barrier plate may be required. 15)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 16)ACCEPTED BY: DATE: LOAD CASE(S)Standard 1)Snow.Lumber Increase=1.15,Plate Increase=1.15 Uniform Loads(plf) Vert:1-3=-85,3-10=-85,10-12=-85,2-11=-20 Continued on page 2 Job Truss Truss Type ply Ply REEVE ADDITION B0701863 T19 HIP 1 3 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MITek Industries,Inc. Tue Sep 04 14:17:42 2007 Page 2 LOAD CASE(S)Standard Concentrated Loads(Ib) Vert:21=-188(F)17=-76(F)13=-188(F)16=-76(F)22=-76(F)23=76(1`)24=-76(F)25=-76(F)26=-76(F)27=-76(F)28=-76(F)29=76(F)30=-76(F)31=76(F)32=-76(F) Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T20 JACK 15 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:43 2007 Page 1 r -1-6-0 , 2-1-0 3 1x3 II 1-6-0 2-1-0 Scale=1:6. 4.00 rF2 2 W1 T1 1 B1 4 2-1-0 xJ 2-1-0 LOADING(psf)TCLL 35.5 SPACING 2-0-0 CSI DEFL in (too) I/deg L/d PLATES GRIP TCLL Plates Increase 1.15 TC 0.23 Vert(LL) -0.00 2 >999 240 MT20 1971144 TCLL 0. (Roof Snow 3 7.0 Lumber Increase 1.15 BC 0.03 Vert(TL) -0.00 2 >999 180 Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 4 n/a n/a BCLL 0.0 BCDL 10.0 Code IBC2000/ANSI95 (Simplified) Weight:9lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-1-0 oc purtins, except end verticals. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2 X 3 SPF Stud REACTIONS (lb/size) 4=96/Mechanical,2=236/0-3-8 Max Horz2=82(LC 4) Max Uplift4=-58(LC 3),2=-201(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/12,2-3=39/0,3-4=78/67 BOT CHORD 24=-13/17 NOTES (8-9) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.0psf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)Refer to girder(s)for truss to truss connections. 6)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 58lb uplift at joint 4. 7)One RT16A USP connectors recommended to connect truss to bearing walls due to uplift at jt(s)2. 8)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 9)ACCEPTED BY: DATE: LOAD CASE(S)Standard _Z's-qa Job Truss Truss Type Qty Ply REEVE ADDITION B0701863 T21 JACK 2 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER-,N.Y.,Taft Ketchum 7.000 s May 29 2007 MITek Industries,Inc. Tue Sep 04 14:17:43 2007 Page 1 -2-1-7 2-9-14 2-1-7 2-9-14 3 ScWJII:7. 2.83 V2 2 Wt T1 131 4 3x4= 1x3 II 2-9-14 2-9-14 LOADING(psf)TCLL 35.5 SPACING 2-0-0 CSI DEFL In (loc) I/defl Ud PLATES GRIP TCLL plates Increase 1.15 TC 0.45 Vert(LL) -0.00 2-4 >999 240 MT20 197/144 TCLL 0. (Roof Snow 37.0 Lumber Increase 1.15 BC 0.05 Vert(TL) -0.00 2-4 >999 180 Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 4 n/a n/a BCLL 0.0 BCDL 10.0 Code IBC20001ANSI95 (Simplified) Weight:12Ito LUMBER BRACING TOP CHORD 2 X 4 SYP No.2 TOP CHORD Sheathed or 2-9-14 oc pudins, except end verticals. BOT CHORD 2 X 4 SYP No.2 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. WEBS 2 X 3 SPF Stud REACTIONS (lb/size) 4=132/Mechanical,2=330/0-4-15 Max Horz2=77(LC 4) Max Uplift4=-75(LC 3),2=-287(LC 3) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=0/12,2-3=35/0,3-4=107/87 BOT CHORD 24=-13/17 NOTES (8-9) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.0psf;Category II;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for greater of min roof live load of 20.0 psf or 1.00 times flat roof load of 35.5 psf on overhangs non-concurrent with other live loads. 4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)Refer to girder(s)for truss to truss connections. 6)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 75 lb uplift at joint 4. 7)One RT16A USP connectors recommended to conned truss to bearing walls due to uplift at jt(s)2. 8)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 9)ACCEPTED BY: DATE: LOAD CASE(S)Standard Job Truss Truss Type ply Ply REEVE ADDITION B0701863 T22 VALLEY 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc.Tue Sep 04 14:17:44 2007 Page 1 6-6-8 13-1-0 6-6-8 6-6-8 Scale=1:20. 04= 3 4.00 12 1x3 II 1x3 II 2 4 T1 3T11Fi HU Li T1 5 1 3x4 1x3 II 1x3 II tx3 II 3x4 13-1-0 13-1-0 LOADING(psf) SPACING 2-0-0 CSI DEFL in (loc) Well L/d PLATES GRIP TCLL 35.5 Plates Increase 1.15 TC 0.29 Vert(LL) n/a We 999 MT20 1971144 TCLL 0. (Roof Snow 3 7.0 Lumber Increase 1.15 BC 0.18 Vert(TL) n/a We 999 Rep Stress Incr YES WB 0.13 Horz(fL) 0.00 5 n/a n/a BCD 0L 10.0 BC .0 Cade IBC20001ANSI95 (Matrix) Weight:40lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.3 TOP CHORD Sheathed or 6-0-0 oc pudins. BOT CHORD 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. OTHERS 2 X 3 SPF Stud REACTIONS (lb/size) 1=136/13-1-0,5=136/13-1-0,7=206/13-1-0,6=354/13-1-0,8=354/13-1-0 Max Horzl=60(LC 7) Max Upliftl=-00(LC 5),5=-67(LC 6),7=-51(LC 5),6=-217(LC 8),8=-218(LC 7) Max Gravl=193(LC 2),5=193(LC 3),7=206(LC 1).6=523(LC 3).8=523(LC 2) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=-72/58,2-3=-77/89,3-4=-77/81,4-5=-72/58 BOT CHORD 1-8=0/41,7-8=0/41,6-7=0/41,5-6=0/41 WEBS 3-7=-176/83,4-6=428/229,2-8=-428/230 NOTES (7-8) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category ll;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(Oat roof snow);Exp C;Fully Exp. 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5)Gable requires continuous bottom chord bearing. 6)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 60 lb uplift at joint 1,67 lb uplift at joint 5,51 lb uplift at joint 7,217 lb uplift at joint 6 and 218 lb uplift at joint 8. 7)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 8)ACCEPTED BY: DATE: LOAD CASE(S)Standard 5as--9a- Job Truss Truss Type Oty Ply �REEVEADDITION 80701863 T23 VALLEY 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:45 2007 Page 1 4-6-8 9-1-0 4-6-8 4-6-8 Scale=1:14. 4x4= 1x3 II 3 1x3 II 4 4.00 12 2 T1 ST2 T1 ST1 ST1 5 1 3x4 a 1x3 II 1x3 II 1x3 II 3x4 a 9-1-0 9-1-0 LOADING TCLL 35.5 SPACING 2-0-0 CSI DEFL in (loc) I/deft L/d PLATES GRIP TOLL Plates Increase 1.15 TC 0.22 Vert(LL) n/a - n/a 999 MT20 197/144 BCDL (Roof Snow-3 7.0 Lumber Increase 1.15 BC 0.13 Vert(TL) n/a - n/a 999 BCLL 0.0'0 Rep Stress Incr YES WB 0.11 Horz(TL) 0.00 5 n/a n/a BCDL 10.0 Code IBC20001ANS195 (Matrix) Weight:27lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.3 TOP CHORD Sheathed or 6-0-0 cc pudins. BOT CHORD 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 6-0-0 cc bracing. OTHERS 2 X 3 SPF Stud REACTIONS (lb/size) 1=127/9-1-0,5=127/9-1-0,7=-308/9-1-0,6=410/9-1-0,8=410/9-1-0 Max Horz 1=39(LC 5) Max Upliftl=-63(LC 3),5=-68(LC 4),7=-308(LC 1),6=-222(LC 6).8=-224(LC 5) Max Gravl=127(LC 1),5=127(LC 1).7=132(LC 4),6=410(LC 1),8=410(LC 1) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=-27/56,2-3=-23/61,3-4=-23/70,4-5=-27/56 BOT CHORD 1-8=-11/38,7-8=-11/38,6-7=-11/38,5-0=-11/38 WEBS 3-7=-101/121,4-6=-252/208,2-8=-252/210 NOTES (6-7) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=5.Opsf;Category ll;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf-35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4)Gable requires continuous bottom chord bearing. 5)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 63 lb uplift at joint 1,68 lb uplift at joint 5,308 lb uplift at joint 7,222 lb uplift at joint 6 and 224 Ito uplift at joint 8. 6)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 7)ACCEPTED BY: DATE: LOAD CASE(S)Standard 3 �-- Job Truss Truss Type Oty Ply REEVE ADDITION B0701863 T24 VALLEY 1 1 Job Reference(optional) P.D.J.COMPONENTS INC.,CHESTER,N.Y.,Taft Ketchum 7.000 s May 29 2007 MiTek Industries,Inc. Tue Sep 04 14:17:45 2007 Page 1 2-6-8 5-1-0 2-6-8 2-6-8 scale:1.5'Ll 3x4= 2 4.00 12 T1 T7 3 1 B1 2x4 2x4 c 5-1-0 5-1-0 Plate Offsets X,Y: 2:0-2-0,Ed e G(ps3 TCLL SPACING 2-0-0 CSI DEFL in (too) I/deft L/d PLATES GRIP TCLL 35.5 7.0 Plates Increase 1.15 TC 0.05 Vert(LL) n/a n/a 999 MT20 244/190 (Roof Snow=3 Lumber Increase 1.15 BC 0.09 Vert(TL) n/a - n/a 999 TCLL .0 Rep Stress Incr YES WB 0.00 Horz(TL) 0.00 3 n/a n/a BC BCD L 10.0 0.0 Code IBC2000/ANSI95 (Simplified) Weight:13lb LUMBER BRACING TOP CHORD 2 X 4 SYP No.3 TOP CHORD Sheathed or 5-1-0 oc puriins. BOT CHORD 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied or 10-M oc bracing. REACTIONS (lb/size) 1=173/5-1-0,3=173/5-1-0 Max Horzl=18(LC 5) Max Upliftl=-81(LC 3),3=-81(LC 4) FORCES (lb)-Maximum Compression/Maximum Tension TOP CHORD 1-2=-221/143,2-3=-221/143 BOT CHORD 1-3=-122/209 NOTES (6-7) 1)Wind:ASCE 7-98;120mph;h=25ft;TCDL=4.2psf;BCDL=S.Opsf;Category ll;Exp C;enclosed;MWFRS gable end zone;cantilever left and right exposed;end vertical left and right exposed; Lumber DOL=1.33 plate grip DOL=1.33 Plate metal DOL=1.33. 2)TCLL:ASCE 7-98;Pf=35.5 psf(flat roof snow);Exp C;Fully Exp. 3)This truss has been designed for a 10.0 psf bottom chard live load nonconcurrent with any other live loads. 4)Gable requires continuous bottom chord bearing. 5)Provide mechanical connection(by others)of truss to bearing plate capable of withstanding 81 lb uplift at joint 1 and 81 lb uplift at joint 3. 6)THIS CONFIRMS SPECIFICATIONS ARE ACCURATE AS SHOWN»»PLEASE VERIFY ALL INFORMATION. 7)ACCEPTED BY: DATE: LOAD CASE(S)Standard TOWN OF ' SOUTHOLD PROPERTY RECORD CARD E OWNER STREET VILLAGE DIST. SUB. LOT P64 ` 1 �— FORMER OWNER N �l E R I S. W TYPE OF BUILDING RE S.� O SEAS. VL. FARM COMM. CB. MISC. Mkt. Value LAND IMP. TOTAL DATE REMARKS �J !'�:. b In o ... SAGE fZs-1 7& o ao a AGE BUILDING CONDITION S z 3 e M ,7— �a�_ ,/� P EVd NORMAL BELOW ABOVE' FARM Acre Value Per Value Acre Tillable 1 Tillable 2 Tillable 3 Woodland Swampland FRONTAGE ON WATER Brushland FRONTAGE ON ROAD House.Plot DEPTH BULKHEAD Total - DOCK • •. L■■■■■■ ■■■■■■■■■■■■■■■■■■■■ : ■■■■■■■■■■■■MO■■■■■■MEMO■■■ ME■■E■ 1 WINE■■■■■■M■MMEM■■■ MEMME ■_ ,�1 , i y rt !fs r. 1y ,.��rf Yn'�",.. t't :�r�, • sI�i ■M■■MEMMOMMS ■■ �71i�O[®�Mii■■■■M■M■■■■■■ NONE ME ■■■■lHER■■■E■M■M■■■■■■■ WallsFoundation Basement . �� Fire Place ,. ...r7. J r. i ......... ....... S.x ftiva,q.., sm ..r. ........ 4Wh.r a. T7: do m..P lop ep , . n 7.- o •vzs��a•Qo�� f$o-� � /� �4 J -, 1 �•1$a P Z I c� \ `,9 unauthorized alteration or addition R1 L E W,q� L to this survey Is a violation of .C. v d`� section 7208 of the Now York Stan 2. �O Education Law. Copies of tMe survey m"net bee" O the land VXWM&linked eeaf Of _ o,nboeoed seal shelf not be atxtdderod t to be a valfd Ink espy. guarantees I &AW Mreon sfMM tw my to the poreort for~the survey 9� 3 t3 g is prepared,"an his beftell n fN title company governmental aponcy and lt' P lending Institution lfetod hwW and Or NEW 10. O to d*aesigneee of the lending IMIMpIon. Guarantees are rat traruferebfo to additional Institutions or wboaquent Owners. 0 Q�ov, ��?oPCrie� /[/ �L Oop Z'olJ6'X AMOY ,Qv;w,o uY K/ ®i 2�aoo ii97/ ��eyr�l��.u5,� B,eT^/Gl/,O/9•�9 0 /,2oo p�,beograDi G 3/-7G5- BUILDING PERMIT EXAMINER CHECKLIST *Date Submitted:Q-As /07*Date Reviewe&a/ /07 Applicant: Thom Owner: n,, Architect/ElIghRU: Estimated Cost:4 IM,OCC-) — SCTM# 1000- - I - I Subdivision: Zone: Conforming? &-_)p Property Address: ME) S,0rr_-t_1;t_ City: UQ Pre COS? Building Permits (Open/Expired): BP -Z/C/o Z- Z: BP -Z/C/o Z- ,Info: BP -Z/C/0 Z- ,Info: BP -Z/ . , Z- ,Info: BP -Z/C/o Z- ,Info: Single& Separate Search Required? Y o6beterhiination: REQ. Lot Size: 0/4 ACT. Lot Size: REQ. Lot Cov.76'2- ACT. Lot Cov. REQ. Front* ACT. Front__,,� REQ Side ACT. Side_REQ. Rear �n PROP. Rear_ REQ. Height ACT. Height // _ Pr 'ect Description: .� S �s _ Lj Waterfront r N? n If yes,water body: l_ I Scan,. Panel# Flood Zone: Bulkhead/Bluff Distance: ADDITIONAL APPROVALS REQUIRED Suffolk County HealtlY r N-If yes, *Bed#: *Date: _/ *Permit#: Town Septic: Y or T - If no, certification requiredoor N Received: Y or N By: S NYS DEC: PRE-DEC 9/1/79*r N- Date: _/_/_ Permit#: NJ Lette -Notes: Qs Southold Trustee r N- Date: _/ /_ Permit#: or J Letter Notes: Southold ZBA: Y or®Date: _/ / Permit#: -Notes: Southold Planning: Y or& Date: / /_ Permit#: -Notes: Town Landmark C of A: Y o@TE: / / *NYS CODE Compliance page�_. Y r N Notes Fee Structure: Calculation: Foundation: SF 1. ( ':�VTr SF)- ( SF)= SF X $ =$ First Floor: SF + Initial Fee: $ Second Floor: SF +Additional Fee ( : $ Other: SF 2. ( SF)- ( SF)= SF X $ =$ Total: rRA SF +Initial Fee: $ +Additional Fee ( ): $ TOTAL: $� 1 NEW YORK STATE CODE COMPLIANCE CHECKLIST CLIMATIC/GEOGRAPHIC DESIGN CRITERIA: Ground Snow Load: 45 Wind Speed: 120MPH Seismic Design Category:B Weathering: Severe •Frost Depth: 36" Termite: M-H' Decay: S-M Design Temp: 11 Ice Shield Underlay:YES Flood Hazards: USE/OCCUPANCY CLASSIFICATION: HEIGHT/FIRE AREA: TYPE OF CONSTRUCTION: DESIGN CRITERIA: ENGINEERED/PRESCRIPTIVE FULL FRAMING DESIGN ELEMENTS: Y/N HEADERS: Y/N WALL STUDS: Y/N GIRDERS: Y/N CEILING JOISTS: Y/N FLOOR JOISTS: Y/N ROOF RAFTERS: Y/N LUMBER SPECIES AND GRADE: Y/N DESIGN LOAD CALCULATIONS: Y/N LIVE: Y/N DEAD: Y/N SNOW: Y/N SEISMIC: Y/N WIND: Y/N WINDOW AND DOOR SCHEDULE: MISSLE TEST REQUIREMENTS: Y/N EGRESS 5.7 S.F.: Y/N ; LIGHT 8%: Y/N VENT 4%: Y/N NAILING/CONSTRUCTION SCHEDULE: Y/N MEANS OF EGRESS: Y/N PLUMBING RISER DIAGRAM: Y/N LOCATION OF FIRE PROTECTION EQUIPMENT: Y/N TRUSS DESIGN: Y/N CERTIFICATION: Y/N ENERGY CALCS: Y/N TOTAL COMPLIENCE? Y/N (RETURN TO PAGE ONE) ;� _ 11 _ . . , ,: 1. : I - :- - .. i ' :: .. i ,. :.. .. - . .. -.. ', . .. :. % � _ i. .- :. .. .. ,.I'l :. 144-11' . .. I -" , :: -- .I�.I.I.1.-�11.,I...i 1 I I-,�1I I..I��.-'.1--.,...��-I�,.,I��1I.1..I�I..11 1.II.:1��I1 I�i I.�II IIIII1..�I'.'1. I 4,II',.,.I1.1l.I��.1 I:�'1�-I��...I.1'i II.I-I.I 1 1�I 1.-I..�:..�I1'l.,�,��.,:�I'I�I.I.�...��,�..II�-.:.�I:.I..-.I:.I�I.I-.1..I,.,I II..�'.�I I.-:.�'1 1.:-'-;-'.I�-:1..'�IIW1�_--..�I1 II�I1 I.-I 1,.I.....1.,I'�I.�..,.,I1I:"I.-I.-�.,!..'1:I.-.'1..I.1..��.,-'.'I I.,I.11I:.��I I'�,I:�I II.',�1.���.�.I,"I.I.I:-.I,.1--.II-'�....'.I��I1 I,�',I�I-'II..I�.,',.I''�.I-�1 I I.I I I I II.I-I.I'I.�.I I I III.1..I I.I II,�I.II-I.I1 I-�I...-.1�:�IIII I...�I".�-I I.1II I-:i�1.�.1�1"%�1 1'.I.I...I:I.I....-I�-11�I.,�I�1.,I.I.1..1 I�..II..I1-l.,j I�..l'...�1 1:III1�I�III 1�.1��.�,1.1..,:�.I 1 I 1'��-1I�14-.�p.'I-�..-I1:1..1.I��.1 1I I I I..I..,I 11..I..:.�'�II.�:1-�""I.�II.-I I��,��1-I.:"I1I II-I�II,�I:..�1.'I:1I..I'.'-.�.-I�I,,-I 1.I-I,..-.�o1 I�.'I�1",-.�I-.I I�1.,L 1-..I��I,'1.',�1�I II�.1..%:,':,..I.1':.I,I-IL,,��:II�,:�,,.I�1-����'.�..I'.I.�..:.I I.1II I I�,II%-'I.�II-1I�.�4�-.��I.I�I 1�'I"I II:..l I.,IJ��-.4-!:�.I,...:.r 1�-l1 i:.��..':.�'.-.I'.i,�..":',�...'��1','��.'II�.I�','�..,.1,l�"-1:...�1I--1-�.1..,,1�-�:1III 1.-m I".',..-:,'e1I�,-...I''.-,.I.�I.l"':�.II..-I.�.:���:1�'....I 1-)--�I��.1.��,.�--I..I�.''I I..�--.-1I.-.-I-;:L�I.�I:I-I 1-II.'-.I.I"I-�'I.-...,-II',t.'...:":-':I.'�:�.,1-I:--.,,.-.I�.��.%1���,I.I-'I 1":.t.II.'I:�l.'�..��I��I,�1,..I-,�l..1,..I.-I.:.,,�--.-.-j.-1I.I..�'.':.�..I�,��.�,'.�,.I.:..�.�...,I'-1I.:'�.....".:II.,I1:,;.:..,'.-'�1 I1.I.�:.p-11I.I.-.I"-....11�I,.:11!I.I 11.',"1I. :1.I1.,�1'.�,I:.'L,."���'.':.1.�7 i.�.'...'�.y1,"-"�:'%..I,��:-..".I I".1:.���,I.'l�I.'�I.�-;,.tI 1-.'l�:.�?.Z:.-�II"I1..,'�I'."..--%�I.II",'.1....;1.:I.,-�,':-:I-",,...'.�.'..'-�I��II..1����.I..��;-I�-I---�'-,I.I.%I.II.I-.l,.I 1:.I'-.I.-,.I�,..'1 II'Il1-.'I:.I I..I.III,'.I 1...�,.,�I 1.��.'�,I�-.�',�11'�I-1.1�I'.-.-..I---I..':.I��II.,-�'....-,,�.'-.�:,I-'.I�.I.,.I�.I I1I.-I'';...,'�-I.I-I..-,'-:�..1..I--,....I-I1,I.1I��I:I I1 11.:I I.I-..-..-�.I.1.I-I 1.."-1 I'.II1 II��l 1,I,1,�:'-I.�"II I�:I---1.I..I1'1i�,1.L�'I�'I.l.-I�'��.'I�I,..I'%1..-I,-:..�-�..�-"I�I...--�.I'I Ir-1L-.'I�'.I I I I1.�,-,.�,.I:.'�.�,.1I,:I"II.I.-..I1.-I-.:-.1..,-.�1.I.1.."-..�1 I1I.'I.I-...:���I I.�..�'...I�..I I.1.-11,>�-�.'I�%:.-II 1�'��,L-I-..:I.I1-,�%�.,.:%..�I..I1.,1'�.--%I4.-��1.-.I�'':I...1.��.�,�.--III:I�.�I I1I�..,-.-��1,..--�.'.,1 I#I,1I:-�--�jI'I�I1'1.'II.�,�.I�II.'I I I.II"-'-.1II�Il-,.�II'...I:�-.,-.I�II.1..I-I I.�.A.I.I�I-... -„ ;I'I.1,'�1.,1-II I1-II 4.I..iI�.II I-.I:.II11IIj�.I I I.�.I."I II-....1.,I L I..I-vI I ji-..,I I I I''..-..IIiIf,I I.-ZIII L I.-.I,-.-I-II,I'.I-II..�,I�-4.."I:1.."-.-.t I.l�'I.�I�-.I�!.,.L�.I-�.I.II I-.II I�I.'-�I....,I I,�II-I-I II I.�.I...""�.II"I."I-.I I�I.�-.I 1'.�"WIIII-I..I.I.I�.-�..I1.,.,�!-1�'L,"11:61 1II�:�III�j.-�.-�II'..I1 II.1'I..I"..".1�,�I.�II"I�I..I1�.11III1;II�%III I I.�j'1I���.�,II1;.::�I:�I�.�I,�II.�I.1'.I..�I.(-.�.��.I I..�1I-�.I*.I1'Ii...-��.�..I.I�III L.�%.I--I I I.I-I.-I�".I II..I...I11I.I-�I.�-�-1�L I II I t..".II I..���I,.;I"-1 I�-I.�.II--��.I1-�"I,-.I'I...I�..�I�'.�II�ImI.1.O II I.I I.I II..-.I..II..'-z.�I.I�I.-1�II II II�.......I-.II..�.1I.�-.;-I-II.I:1�.I�.���I.1�I..�.-.1I.��-.II..I..I 1�-;I'�II�1��.II.1."III.�'.I I I.1 I.I.I III��.I II I.-I I-.-III�I;,1.II..1.��-I I1.-��II I'tI1I.,.%.I-.�..1 I...I..�I.�-�,'"-1I�-,I1:�.��1.I..II"1I..�,�I.,I1.II1Ii1�.'..-.1.�.II,,..1.."II..�4�I�I I.I:.-�%1I.I.I�'I.I.,LLI..',-f.�1I',I I.I:1�-�.�1I I I�I1I-I�.�1I.�II.�1 L,.I I 1..�I:1I.1...I.1I�I.'11I I II'II I I I1,�I-��.�..II�,��I..I I I II I.I I-I��..�a I��f I..�I�I.II I.�I�I...III-1I�I II..�EI II.-..�..I-..1...I I�.�-II'I..I II.,..I I."�II�II.�I..I.I�..I I::.1.I1..I I.II..I-�11 II.-I,�.I-'II*I I-��I I.I I-.I...,�.I1I1-.I1 I,�I..��I.�I�I.A.II�1-I II I.I1 II I 1..�II 1I,I�I-III.I-�1...I.�.�-.I1 I.I.� ,� I?- I.�..LI�.I.II�.�I\1�.1 I I..��I.I�1'I".�I I�..1I�I I-'1�I.._N.,I:I�I-I�I�I..'�.�i.IIII II�...�I11-,1 III,.I._1�1I.II.-'�I.I.I II 1.I I 1�_.-.I I,.1.--"�.I,.��-.I"1I�I��_I.".III I I.I..I�I,-'.II I-i,>�..,-,I ..�.�-,.III 1.I�.I..I I a I�I.1-:.,:'II,..II,-I,O.�I1 1�1.0 r1.�I I..I 1.-1,I%.LI�l.�-...JIII[.-�I�.II---�-II'I..,w-.��I..II�...II I-�.I�R..I-1�fI..1.'��S.I.1l I I1I.I-I..I,�-",-II.�..�.��,II'I�II�--II1I.I-I 1..II,"1I'I'1I..I-.�.1I I.1���...I1'..I....'..1.1-1II�.I�II�I�.1�.1'.I�.I!I�-.I.-I,�,-..l.I.I�lI If.I.I..�1AII I 1 1II I.-I II..,.I.I�-I..I-III-I�-�....--.k 1 I 11.,�.1',,'I1.�I�--1I-II�I.-,..I III,.I-.'.�-...;1:.�-I I1I.I..��.�I'II.II...--�II I-.1,..,-7..II1...-.II.I.I.I 1..�1...I I...�uI.I.I...L..�....I.I.-.-II..II�..-.I.�I'.:.I.I�.I.�,I III..I�.,-.I II.�II��....,....,-.I*I.I.1.IIII�,.1.I1�I-I..I�I�I...�1...I I I�-I..,-�1 I 7II.I.��I.1.I I.�I-.I1I�-I I 1 I�I I...1 III....I.I�-I.1II���.�I�II�-.II.I.II..L I 1��.��.I-.L I.-..-I.��I I.�II...I I-I:,I I...I'.1-1�'..�I...II"..%II I..I..l.I I..-..I I.�.I.I.�lI 7.I-."-I I�I..I I..�I-..-I,II I I.I-�..I...I.i/I.....I'I.I..I.�--I I II II I II I-I..III I I 1 I I�.I.I.�.�...I.I,II II.I 1II I I�I.�.1�-..I 1�..-'�.....I..I'1.I..I.�-I:III I.I.I II...I,"�.,I..�I 1.�:..I.11,� .'.I 7.I�I.,.`I:-�.I�I..��II I1,.I 1I.I..I.I-..I.�II.I1��...I�-.I I.I.I.I.-....,.....,�I I-II.III�.I�-I�I�:I II I.�.�.I.I...I III�-.II�-.I.*1-..I-.�I��I I.�1I.I�.I I�1.I 1.I 1I 1 I..I.II�I.1�I I�I.%.I II�.I��IIII�.II I..:I.�..1 4.�:��"�I1-.!:1j.,I.1..,,,'�,�?"1��,:�:����L:!I�i,I��.ii;,;.�I�I�II,��".k���I����11Iti�,�Ir'�I��L. 1. ,. '' .,,'.I1 iI.,I..'1v II.I.��',...IL 1q.�. ..�I-�..1��'I',1�'...-'-.-. -.-I I I�--."I�I.I-I.-,I.L�I..I II.".�--I=.�-I-.I I 1.;..�L-�I -. �I'1�)-�I\,%.�')I'1 I-.I,'I-I G�1 I.-.,I'I',1.�.�.I�-I I I.�I I.I..II�F..�1.-... I.-�.I.I I-,I 1I.1"�I.I..-5 I-�'...1.1.�,I..-..."1I-II I.I 1�.".-�I q 1I.I..I I 1I 1 I.I.�p.-...��I..I.I�I.I I--1.-,..�I..�11 11.......I.-.)I-.I..I.-�,..I1I--I.,-'.II..�..I-...l-*.�...-III I II'III-'II�I�--1��1(I.?1'-'.-LI�I..I.�,.I-.II I..�..I.-I-I.-I�L. -.1.I..-�-..1.1 II�1I-.',.I��I.�I itl�..�II Il...�..-.1�-�I.1.4..1I�I...-II..I-�-.,l...l.,II.I.�...�.I-�-..I-..1...�I�1 W I�.".-�I.-.%.'A..I-�III.I�,,�� .I.�,I....�I*I . I tP .1 I I.I-. .��'I-.-.. ..�.I-1 II. -'-I.1I..,�I ..II�."--I7.�-.I-III.�;-1.,.�.1.-1.1.II 1.0'*.1.I--.I. II1 II I�--I�..I II.lI�II-I--.�.,.-I-.I �r� y R ,4 :: q,r _ . rti., f.f^T'� I . - : y I_ . , . is ;� 1 . - I �'�-,,,......-1..1 I 1-i II�,l..:I�1'I,...'I�.I-I1-:.-�d.'I.-:.t.-.I��,-�,"'�;.''7--I�-':�I�:,.:.�..:1'..-4 I,.I.�.1 1.-'...-'I.I.,�.,1",".I.I.-I.11�1.�'I 1' ..��I1.'�'1.�,.I;��:...',.l-.-....�1:.1�-.-��:-�.,--�1'��m..'.';i,I I I'..�.1:".�1:..,.-�I�:l4,,I�-.I;..-�l;'I-.-'-.I.I"-,.,'-',,��1.'.I..,7 I�1.�.."I I1-,1.,'.'.ZI"I II I:.,.".-.1.-11"I. ,.�"-.�.-- . . . • ..II.���I.,II..-....I1:I.I-I�...II1.�..-I,I��".---,".-,.�.,.1.�.�1I.�%I-..-I�..I.II 2�-...,2..I�I'.,:�.I-.�II�,.,''1I."-I-I��..1.,,1"'-�'-...�.II II.1'�. L""--I-�,_I.-0�'Z...1I�0.I..-'lI'.:....-".-'1��\I --I t�-..- . , t s ,, l - +}ra -I-t%I'IL.I I.._I I.I I'1,.I...�.I. Z..IIII.I II . ' t .I I-'I - . -I."-1L.I.-�.1..1I 7��II I. II 1I1.�...II� �II..I..�' -)�.-11�I,I. I,I. mow__...: _.-_ , " U . ti ' . . . . f . -1'..1.I II.�I I--"I�--.�I s�-1.'". . :: . - - - " ti. __ . .. _ '; �. o ' �I ,..�/ 1 . . T _,; .. ._,. .,� . .�.V,...-.,._........T_... __. �w .._._,, .� u -� . ..,..._� ,__ ._� ....._�... _..__ w. _M..�. . r ....._ _.._ �. .r.,....,- . : ��.�. �. .. ,_. .... . n..n..� ., _ v - �. _.:� _. ; ,-_ . :.:.-, m. .a......».,r a w .r- I:c '0.' ¢aX%+a ..arw+eear++^°. - ✓ -xev... .. .+. mow....:. , - _✓ .. . , 4 -. T .. f ., _ .. - 1 ... r�- ._ i t II II I. , . II r _-LI,.I.I D�I1.I.1I GI.II I...Dr.,I..E.I..PI.�I�T�.1�I.I-i��I�.). . 11+R L!N Cs t 'JCL �Z,��' ��-�I.I..I I-I...'l�..I II I�II I1..,.II�.1-...�I..I..,;':..'1.I..,1'I�I I�::I.I�I I:II..�...I'�.I1 I I I..I.-.,'I�l��.'...I:.I.I.'.�I-I�...1.-1�:.I-,I�I.�I..I.II-1-�.-..�...��,-I.I,-'...�1:�'.'I�.�"I.I�-I I.'�.�:l..'�.1I-"..1�1.I...�..I,.I..��.,--I i...1�II-..1.I I'..1 II.I���.�-,.I�I���II--,,.I1:.�.-I�.I�I�1 I-'.'.'.I1.1':.I�'�1�L...I�,.%�.l'I.I.I.I..'-.4...�..,II,I,..'.::.1�'II..�1I.-.�,�:..�..-'1I:I.-%..:�.I..�,I.-.I.�.I'."11.I�.1�"�11.��.I...I�-.I1 1.-'I...4I�.i I.'I 1 1.,I1.:�I I I.,I:.,....,,I1�'�I.�..'..1 IIII.�'.�,.1I��':.I I�..-I,II%I I:,.,.I-.�I II'.,1II.I�,.,I..I:��:1"...I..,�II'.,..I II.�.1%.I:,�.II,.-I1..II i1�.-:'I:�I'.�..:..,I.-,-.I..:1�.I.�..1...�*II:II-I.'�..-I,.III�.1-I.�,..m��..L-�Z�II 1l.'I....-'...-..."�.I.�..,..".�.I1I...1.I',,I'-..�I���1�.�...�q'..,..i�I''.1I1�..-'I-,...1..:,�-I1�.,�..�..�:.'z:.,1.-IIIIII�',�,I.�:,,..,';:��;:�1..-:.-,�1'�:.l.,,.�I1I I:'�II.:1�1:,..'I I%.�...II��I.I'I�..�..I�...I.��.,I�''lI:�.��,.'.:,1 I'i�1'.I'I-�,::.�II.I.1..I,��.�.:I..�.�..-II��11II 1....1�'I1,,',�,1Il-II,.�'..�I,�.�'II.I:�.....�I-'�-':-�I1.-..�.I.-�.��,I I''�-:I 1.1'1I"-.�I I.-��i�I.1:1�II.-...-.-.I:�II:I..�1I1v�.�-..1.I1.�.':I"��.I"..'.�..-I.I���;.1.j.IL.�.?.II�.1�.II::,1-I����1-'-I�w:,.��I..,�-..I.I�..''��I1 I.::.....-�W,f��1..:�'-.I.1.I-.'O.--�)-I-'N.:".�'.�I1I..II-.l.I 1,-..,.."'--�.-'.�t�.';.1.1SI'..I.1.A.1-1O'k j.)I-�.',...,�'I.t.II 1I-��:1.1�...�.I,.'1 I�,o,��I1.I'.I..;-*".I�.1�I I.,I.5--'."���.�1�.,-I..�..�,I.��.".�'z 1..,%I.I:1.. -��.,.1�F;:'�6.:I.I'-,.I�-17I�-.:.'�II'.'I SII.? -,":.'I'I�.�I1,I,'....l.I.k I.,"'!,�.:1�I,.I...l.:-'.-l I-I 1�l.1-1�..,11,.4..,-,1,1�:�,:,-1-,.-:Iz..Ie.I..:..I...I I-I"l'1�,I1 I1.I:w-.I,-I"...,�.01II.AII 1I�II'llI..-..�.-:.?.f.11.,I�III.;.I 1'��--.-1"',.-II,:�-I..,,�1..II�.-I.'I..1�..�:I-,-,.'1 I-I 1--:I-.-�1...�I,I.I-I.l,I?I..:.-.1f p.."..i..":�'1�'�..n II�:,,..',�,,1.-'�I :'..iI--I-.-..-.'1 1-:.';1'1'.%-�..-�'-.-.:.I.z"�.�j.x...I,.:I-I-.,..,�:o O...%,I.-..:.."��-.�.,�..�."..":-.-11,-�.,�.-I.."..'.�1--1.",.�1H,I I.ZI�%.1-.�..�'oI r'.I,�I'''�.I:-i.,�I.�.�',1I'-.".'-...�-I.�1��.--1'--�,..:.I I-',I,..�.'I.;..-":-.I-5,,.-.--.1....�..::.')-.:.��,��I*..'.1.lI[.-'.�-(!...!i1�;'.�,"1�...I.,�.'.-.'-?.-'.-�j-'�. J.*-I'�-I.�I-I��7�.-OII'�*',�I,I�:4.I,�I--..I.,II��'.-.�I-.,/.,1.....I--I I,I�,A-..-1I..,7�---.'-'I�1.I I--),�-.�1 xI-:..1--I1I--.7 II.�-1��'��.0-II-�.-I�.1.I 1�.I.-�..I.II,..I.I,,I-IjI-�I�.1II"I I�-I,1.I..I.-.�.:�1 1 1 I I.-.-I.��II-�1�-.-I..�'='-.1.I1I l=....1I..;I''l I II 1 1 I-�'��I.-�,...�I..:-..I-,%.I'--,.�-�.0..'j.��.-I-.I:..j�-,1,10�i:I 4.;I ...o I I'III�.::.11"-.'I-.I-:I..I 1I..I 1.I'-.-II pI1.-�.,..'�11-.--I�.�I..�T.1.l.I I-lII1�.�:-'.��,-I..�.1I.."*1�..�I,'I I�L;I I I.1.I.'I:I,-1.11���,I,.I1.:I.1 1.II.I,�1I I I I�.:���.I.I.s 1I,.I.II,.,:I 1�.�..I.I I II�:-.I.-II'"1�II I.�.I...-�.1 I.�1..�.�1.1,1I1�I1 1 1..11..I\.�"�1 I..I1:.:1,-.I.I..:.I...I-i.,..II.I.1II..I..I�.��.-,'I 1'�.'.-..I*1�;1 .ii;I;L1II��,-III�II.-I.��'II'.,�-I.l.. I'I--I�'l II.-I�-I-.'I'I.I I I.E��I1--l..'I.,I.I.I'I 111�)....1�,'II'.,f.l�-��1 I-.AI.,.:,.I I I�.�l 1I-I.-�1�.-�-.I�.I..I-.-I.---'�..I l-�-'�I 1I I.'..I..��.I-.-I.I.I�IM..-�I,I�..�1 III I I.I I....�"--I w 1.1I�-.I..'�,.1.�I:1�I.--2.I 411..I.I.-�I.I�-IA�.7��I 1''�.I.I.�.(.,M.".I I.7I,I.�.-.1I.I-I-..�-I.I.�.7 If.I� II.I.2LI.I I.�I.1 I1.�.1 I�7...-#.�...�I.I.I.II...I I I1.I�I'I.1.�..�I�t...--.I-..�II�I.I�T-�I.I�---.I..1,I,.I.-'I)-1-'.I I.1i,...-.II I.�.I-.I-"I.-I�.Ir-I�I- I..�. ..I I III1...1. .I 1. I�I1-�-.p,��t4.f�[;..1..I I*:.I�1.1�.���,�.!�..9'��:z'��:-��I��:��!"1I;.I:��I.-I.�,.�.-: �..I�II�1I.i--."�:a I1 5 FF�.-.�..I.#-r.II I,....-��...I..1..1�.1III11I..i;.I.i.o -�Tz�I,5.II I�iI.I.-NIIa..I.iwI..I'c-1 14I�I.-...I..I-�.,��- .� .�I 1 kI..I I'I I. . AI I..'.2-IIfIIIII.iI. .I...�*I I Ip.-I-� .� 4 I�..I��.:.I.�.IzI.V A AI.-.I'�; i1I--1"I,�-I.�1'-lzI1- '-"-l:-:l�.�1Io5I-I'-.��II1%I,!I,."..'I-".I*�-I�l"�-.��'"�-I"",.I��'�,,l-�"I.I�"'�'�."',I.,1I-�'I-"-''1I I':.I,I.."�I�".,��II.1,. �I-�I II-',.I I.I II--.'I.I�I:fI I.I. .�I)1.I'M1I..I l.�.I.�II-I. I�I9...�-II-�-� '.-I.w R-\-I I--I.I.,.i Ir III--,.-1I-.�' �I.eI:III�I II� I--�)--I-II -\I�'.I-,�"I I-i�I mI.v I-1.�II��--1,\III�I.I.�p II'--Et.-.1�4I II II-��-I-.-(�.,I��,/I-I ;..,...-/,-.-.I.-"A..I C),)-I.. , .� t C t..'t/. L , .�I t r��.\.�...� '... - I : - -.>.�II.f,-'-�.-r,7�.�>..I--...I���.;I s 1..-.5-�1 .1II.-1I,-I r.I I l-I-II.-lTI.-./------I�..-.�... .I�.�.�.-I. I I.�-I..It.-�..--II-.I.-I�I I.-.I...\-I�.I I��- I--�-.�cI1 I 1.. I--I II .I:�--.I II-.. ..I;.'II�I�.�I-I. .: , 1 6 - 1 . -. -- �, ,d _� � ._. �.-_ Lid , 5 �._�._ 1 t t �- , _ . N C)1 { Zo F 1 12. C �C. Ca. _ '` -..•. A LvL tl . _.- __ . Zv 2 C�� C�� . � � 1 .� __....�. _..- _�..__ rhs 11 t _ its ,,E.,�. 1 ., Z�N C.. x fix , t i �c 1 i....woG'�'s '1�S cb t t; .., Cz,�Lk L z _. x O . . i .. ( _ 4 /�, i { S .-:[ { 1 > f .. _ C ` : / , t d'. l,R�t ) 1t �� '��-� i'� "-t/ ;; cJ�„T�j. O W *� O I 1 ; t' t-~ �- I; w EX15 G X xtty . . I t r. 1E•1 CM. :, N . .., y ,R _ 1 I �. �a �. �w�� -� N , i ; ,/� 1./ r . O :: . ... -., . .. _ _ f I 1• i { �[� I t _J 13. _ _L.._ 1 I. i _ _ �'" ._ _ - Y �. , � t : M Ors : vt.. I _ t .�:.:._ _..:..._. w iD . 1 I (J ti i 1 a.. W -rcl 9 a x 3 0 - O I IN I v _, :.: X _C.. f1f- .. :�: \ 6 �. a .(. �: :. �,�, _ s. .. ... ,,,,,, ,..,, .� . �r .,3 �` , N� r , ., c.y , - .. a. . It .., - --> z ,. 1 .�_ _._ ____ a c p 1 . fifltNilae WAwS f:, { : _ �, p �t�l�+ �� i 1 _ t7 . { ', I - . .... aj ;.. -. 5 ��N 5 :. � :�oo. . . _ i Q��/, I - -- - __ cz. S - -- C- . . t ; , . ._ , �` ,, v v� tbP _: _ ' � r' s i91 O �. `''_ ._.... �, p P c, Rp N .. 0, IId5 _ .. f 4`J;� 1 ESS c, _ _ __ _ _._ ii ►i _ , 1 :; ;. APPROVED BY: S "� r SCALE. DRAWN BY 1 f � o. W r c� T 1t OATE 1 ! ,1 r - REVISED Ij,� Z. O'7 -+ � i� (i AUG 1 2 goo ,� . . : .I I1�'"6t I.:IIIIIIIIII0'-I.�I II. .�I ,I.-.-�--I.--.�@.�-.-.I!I I.�;--I....I".I 1 )-.-�. �I'1 i.�..�� III II I , : ;:_ c _ DRAWING NUMBER I T \�iV (�f 5;_l�lTr90LD t1. , .. . I . . . . I�_ - .----- = : - . . , ' 1. ..1. :. E - . . . . I , 1. : .. . . , 1 .-�I;I..-I.I I I,-1-I I.-�1 1.1..:,-�I-�I 1��1-.."I 1..:II1,I.I.I�.,,..�I-1:.I,I.;.I.:":.....-1:I�.�.I.1.1.I��II.II:-.:,i 1I�1..,�1I.,I 1...�I...I.,,�1..,.�....I:II.-,I-�,--1 1I I.':I--.I.�I IIlI...I,.I�I,�-.!.1.,1,,'���..-,.I-�.,-1I-,o�..I.I-.I-..,2 1.�IL...I,1 I1-;1��.',.:,...,.,.-,o.-11I�I..I.�Ie...�1,I.l.I-.1-:..::I.�I,..1I.:I.I�:A.I-II�l 1.A Ii 1.I 1,.I I.I1I-..I,I.,�F�.::.:t.�-.I.-I�I:�:,_�,�.�I��..I.1�p�I-�.,�T:�,a�?�.+,-I,I..I._���.I v�I.1.��l:"1 I:.l..,lI.-,%�1:..-I�..�1:-.I-,,.�.,��.I��,-...I.I1�I.�..I I.I I1,,.I.I�IN-�..,-E.��vII;�roI,1-I�.I�.��II.-,,I.-I�.,.:...Y 1;1III:..I��.�1 1p�I..�I,,.I-.3.:-�:.1�II 1j,1.1I.-:..,,...1.-I L#1-�7�:,,1-1,.1..I.-t,--..1.�..-.,r.�I11.I�m,.-..I W�i.-..:�.,�......w 1�.�I�I�xr�I.,,I,--I1 e 1�.I��.11I,,.I:,1 1X,;-.17:.-�...�..I.�.IIF r:.I,��-I,,.,1�,!'.11,..1:j,11 a1 z,-_I I..w.,e:I 1�.I+,.1..C.-.�,I.,I.,.,.1I�.�",'1:1.-.1�.F.:I,-I,I.�.IE 1�'.�I��11-I�.�.,I.�.,.,.+1z.�1...I�1.1 1.::-,.�-1�.�.1"17 I,1.f.1-�I�I':I.,,-�:,1�.-;.--�I�..I.I.1,.,.r�.�:.:I�L1�.I,..,I�'I.,:LI,-,...1,,.I-:-"1 Nk�III..-I1...1,aI�:p..�IS�::..1......'.-1 I I.�"."..I....I.:-.,-.,..Iz�-.I�-.�..�%-..�I�.'�I��.-�,-.1�I�I�.--,.',,...I1.-1-L;:-II':..':.�-I.I:.1_.-��...I1.II--.k:;-;-.I..,.%.zI.��.-:I I 1-I 1...I...,�1 1-1-�I-.,'.I1.1,,...I�.�.�.,1..,,.,.:.I.1.�--.-t.-I.��.�1.,-2.":II..�.:'II--.-:I:-,1I���.".-,.I,k-��1 1),.:-,I.�.I,.,�II-�1 I,.-�1.-I-;I--I�.�I I���,I II..�-.I...1�:WQ--.,.��,-,o 1..11�,�.�"-ml,�..-1A�r.,p�1:.,-.I,.,1..1-..,.,I k I�1,I,I,.--I.-.I 1-I I,I-,.:�:,ZI.I:.I,1II�1 I�I.,I.,.-.�,,,'I.,..I_�:.-I.,.�...7-.I:.II.1 s,I.1--I. I..:-:.:..�II-I.�.I1.I:I-1.�.r.I..�,-11..%.,..I....:I...1.,I+I)I1 r.1:.:.-:'--II-�..I,_.I.:I1,..1Ie 1..I..II,,.I.;-,I�I��:-..AI,.,1-1��-;:::�:....�..�II,,,-1�1".-11 1.-':I.,..,.I�1...1--I.1�.�.,.,I-I1 I,�"I-.l.�o 1.-I..1I,I,1�,I1:I.,I�..��.,,-1cI+��,,.-I::I�'1�.,.I.I 1.c I.�s-:I 1I�..,fr.I'-....1-:I�1-.-.,I1.I...I'�1...I�I1I 1.I61,,�.�..,I�-.I-F�I:-..�1 1I I'4 1:�'..����L.1.-..:.I-�1�.,I-,1,-,I.'I��-.�I I.t-;:I.;1;�..I..�.I.�.:�...11...I-I.-.�:..-..II1�I1,.,..1I:-1.I�I.,z-I�.,,1 I....I I.-,.�".,I-I.1-_���-,1,�:�I.,,�11I,I_-�.�I I,v.-�...1��pI�--�.-.�.I.I.I'1.::5..1 o,:.�-...I1�..1�,..�-�..II.�1 I..��::1..I��...,I1.1-I...II.'I�11 I.--�,I.1�,I:.,)-..-.1 1,,...I-.Z.I.1:-,,-I.-.�I-�....II,--.�-�.��:':T 1II,-,II.,�,.-1.I.,.,�1.�I..I..:I..I-:.�:."1I.I.�:.�,I,�.11I-��".I.-�.,I-�.�.,--1�o..I:-i..I 1..1."�,I%I%.�I-11--.!I..1..,.,,�.-�.1:1,.,�I�1..I-1 I.I-I.I..-.:1 IIII�..��1..1..I.I 1 I��.��-.,1I I�1.,II:1�.-..1.-�-.,1,I,,...I.;1'1.I.�.�.I�1.:1-,-I1..II�.1-I1�I.....,.��I,.I...,I.1..a�I.�I.��..�..I,����.�1..11 1.--:,�1.i�1,I..I-u.-�,1.I.I1:,I II�I I I-.!.I�1-�1.I.,1 1I-.-.:,;.��.I.��+.,I 1I1I'151..�.�.�11.I 1..I1:..:.,..II,-..I 1'1--�..,.r1 1%-1I-�-.:1-�I.�...A.I,�..,1I 1,,.,,�m.I�.:--1 I.��,,I I.I I...,,�.I..,1.I,:1;..I.�II-1,-I.-.1-..��II�I.,�.,1-�:,--1..,.1�-���.-III.�e�I.II.�-i,�...1"�.I..-�.�I--.1,�,,I:,�.�-.C,II:,�,.-�,1*--1�5.II,.I...�':I I-'o1�,.-I,I,�I�.II�-1�.1,+�...1I.I I-!�.I�1:I��.I-�.�'I111 X:�.1-:1� 1II I.I'-L.1.�II.�.,,��,.-:II.11 I.1,�,-1.:�:�-�1-1...1.-::.1I..1�,..�l�-..,..11-..:�..,I.I1I.-:II 1I1 I I-....I.'1..�,,.1I�I-,�.a-.q I-,.�:.II.I,.�:..,,I I�I�...1��-':�_.,.,..1...--II�:I1'.I I1:�.I,1.,1�1;-�I I.-:I,d._�11I'�'�,1'�1:..,I.1 I�-�--I.-�1-A��,I:I.I.,..I,��:I,;.%.b1�,�,'I,-:...1 I�1.,-I1--.I�.,.I...�.-�1I�--I1.:1.I-,1 I.I 4"1.,,.�,-..:�.,.1,-I-,.,."--..-,-..+.��"1I�l-.1:I I I)I.�,,::.4.,o.�1�.;�.�.:..�'.L-"1 I-�,-1I--,:�:"I:..,.,.,.:.-...I...,�:',-'._.I-.1I1.,-.-Ii.�-�'.I......:r.�,,.:,I 1.I I�-.�I:I 1.1.,�.I',�-.�--,..I.I;-.,.."1�4I,-I..1...'.1I,M.p�.I;.1.,,,I�.�I.-+-..�-II.1IIIw,I 0,.�III..1 1z:�".�....�:I1):I..�.1.1I.I..�...*+.�..,,..I I.�II II'IiI.I I..�.I-,.-..I�.�I II�I I.:.I�..&�,�1.I.._...1 I...-(��I.-I1I�II�I*.+.:.I I--+-I..,.p.,I:I...A�I,r�.r,.I...�-�.�I I.I�.,1-.�.�I'...1....�1:I I1 I...�.I.I,I�1 G.�II:-�.,.�1,�I.II... I-1...�I I(I.I..1I-,'1."I�I,".�q P%.��I,�...I.:.II..1.II�I.I..I�.JI 1.1I).�.-.1,,-1�1 II.I 1I I.I.1-I-..I-.I.A.;.-..II i I I�.1.....�IIII.--.I��I-1 I,.I.�...I,.I..I1 I�.I I....:I 1..I I II..I I....I..I I1.-1...II. 1.--I I-�o,��.I.I�.-.I-.I I.TI I.I\1 I-I:I 1I�.I.v 1-1Im I-1.I..�I�.I,o.I1,.�..�1N..-�.1 I,.III.�..,�I-!�-..-Z.,I-.I.II�..-1 I�I��..-.,.1.II.-II.1 1 I.1 m-I11II.1...4.,I.-.�II.eI�.IZ..I-I.I.,I..--.1..III...�1 o-,-I�1.IIw4 I��I 6-,�I..I I,1 I.I e I�.�.-..1.�+.1 1-i�.I...,.....�z\1-o-..,.'-...�0,�I.�II�--�.-I.1�.-Il�.I II..11.I..I-.1��1...-..I.1.,�..,.1 11...�1II-�m II.�,-�II-Il".1 I4b�I-�...I-I-I.I...II.-�.,.11I...Z.'-I1IIII.I 1�1 I I.I5,p.-�111 I���II..I�-I-,4.II.�I.1 I:.I'.I...-I;I-...m.I..III�.I�(II�I.�".- I.1 I I 1.�I.I II-,I...�.�..I�..1.I--,�-I.�I�1I.�I.I�..,��'...II I�II I I.I I-1IIII�.I.1..I.I.I.I...I...II�.-.I�.-..I�1-1.-�I,�.I.I.�-.I�i.IV.:-I"-.;..t..�I�.I-�.I..I I I I1.I1 I I-opI�I1.".�I�+I�o....T Il..Q I.I I I,I.I-%I.�.I...�.. ....:t.i 1.I..;i!�:II..1i.:�.I;aI.�.1�I 1-i-7.A:I:��I..�iI 1[I..1.. .':...,..!.II1I.I r IN.-r;I,.�I,-.I-.�I"1:1:1I'.II.IX--..1l b.I.I o6*.I..�I�1I 1-I,1I I1.1..�..�,I�....I1.I.�i..�.I!�I,.-�.I I�.��...,I.I�,I1.�%.I,-I II.I-.I�.��I,..���.I�.I...I--�..I�.1.,.I�I�I,�I���..-.I-I.�.I.,,.�1--I I.-",-..---�...I I.�.I�I�..I I. .I...I..I�I 1I.,.=1-..�I,I 1I.I I I I�...�..,,II..I)1�I 1-.�I1 I1I III...1 1.��.I I 11 I1.I..o�I.I.I..1I II,.....I d1�1..I11.-.II 1 I1..II1 I.�I I.�1 1I.I..I I.,...I.I 1�..I..-I 1.I.I I I�....I,��i II,,..I.I�II I-I�1-.��1I.I)I-�I.I�,.�I I��.II.r1..��.1 1 1-�...�..I'.�.�-,.I"I-III.�I�I 1I-..I�.,,..I...-.I 1.....,I I.... .I I)II.�.-�.1�I..1.I..I..II..r��I�I......�11..I�.-..1 1..x.I�,�1 I,1 1.I�..1II:I.i..I...�I I I.lIC.-I.,,-.1 l..1 II.I.�IIi 1I-I...I-1 I �l�1II..I.�I Il......i-�..II-v�II l��I,,I.l.-.-I.i.�.L.I1l...I�.�-.:i,...l,II��1�lI:I I.iI�,:kI.0�Il-I.-I�m.-,.lI.--I�I 3..�I...:..1 I1��I,��I.1 I..I I �I�-.I I�1 1,���..1�..�.I-..I I�I,I.I.�3 I�I�I..1�.I.:I I.-I.1II.�I�,4.I I.�II..I I I..1 L I+I.I,1.I...I..1 I!�I.I.I.1.-I+-.I,1...�...I-I.I.I I I.I.I-+-I I,�I�..I I+..1�I.Ij.;..IiI.I I-III.I..i 1I;.�.I��:�,I.II�I�.�1�I.,,.I III-..�I�.�.�-II...I�.�II.....,...I.�I�11.�II 1,�-I..I.-I.I:I.I-:....1.I II..I I.II.I.I I II..I.-I".-II.--.F1..I I.�-.II�I�.I..�...-1.1..1.-�.� I=�I>..-...,I�I.>I.,1.-, ..- fi . .. , 1 :.nII�1x>I a"--.Z�1I- t� III-I...t I I..�II�I.I.I..I.....��.-1-%..��-�II.�I�.,.-1.I:I I I.I�.III:I�-I1Ii�I.I-I-I.1...I I-...�I.I1I.�.t,1.1 -.I�.�5..�;�,1;:III.I�I.I�-I.. I.-I I II Iil�.-1,.�,- I,,..,7 z�.�.11.,�,-.I..-I.I�,.,--...I\.L.-I-l�.,\I�I N�.-.I I N;I1�i.-.;-.--,�.-!II-II.�II.I I-1�-.\\#,'I�4:.i.I�ta I.-I.... I.-I I*...-.-I I�I...I.I�L-I�:..-I I-I-�.......�.-4I.,I,I-�..11I..I.,II.,I-I I..I...I.�l. .,-II�1 II I�.,I II-I I.I..-..,..1 I...-I� I,)�1I.1...�I 1A II..I.q1�.�.-III o I ]"---.I`P:1,.�A--I.I.-.I I-I----I-!,�..I.R--�1I.zI,.I(I.�-1 �f :I.I=1 1-f,-,�ItI��1w4I:-.I..:--..-.I..I-.I.-\�,.�-.I�I 5.�I,��c�.�w II.I-I.-.II.I.I�.,-(..-.I,-.II-...II 0 I�-�-I-1�*.I--�� .i-..IIII�,I�I I�..I-I.I.��.....:I I I 1 I.I-I-.1-2-�I.,I I- I.,I�..I20.�1.�1..-�I.I. 1..I�I�....I�I...I.I.-II II..�-.3 f I1.I�I,I�1 ��.II% .,"aI..N..I 5.a.4�I.I I.� .I..,1.f�:I..,I..+I.1.7.II�1.I.".I.�1 3.'1,,.-"j�Iv.�..1I�I�1.I.--�=I-I.���K II, .m I..- f t :- '7 . ('"� N�1 N L�.I xIA,..�.r.I I.,t*.I.,-,.�.Jr.�.... __ __----_____.------. .^_ . _-_-__.. .. - _ l./ I. ,_ __._, . _-••_ _ , .: . III 1. I. . - I r . . . . I . . . 1 . . . i , ,.. . , i f ; . • i .� 5 - T c� � 95 2 �-'` h. . a , ~� E �,J ate/ ,�: _ II to I. fi"" 1 %\ �" 0 Cr - ' dam` -. I. I. II : _ _.�.� �v: - _ �. �__ -- j -1 - - ETAI� .Z - 1 tv� _ SS Rt� �3 -i ... tt 0 - .., ram==-° -- d- c._ x�5 itom. ti r -T-R f2 I -s .. x . s) -7 _A �+ c t Fi 'ter �t" t~ a� , .06 „� . .. . "' r $ L r) T-- sr x _- ... f/ �.-r __.. s . r6 -i . ...M_ _._ . - i .. .1 _ "L ',- 1 �� 5 i `I �.. x 1 6 _ ,t i t J ,: A V 1 , i - (', o k t �, N ,� I OL 1 I �i" � 4 f -- y f(, x - ,v , i ' f U , . . .� ,x � I 1. 1 w i c~� 5r L11 E.i. � ' � c. ; • .. �1.t #. ti.c ��) ,�-^'�}-lam , _ r , ► { .� �- X �- - ( ..: .:I {kit ,. r �_ s+ .. t -u _ i ,, ;'- 0 ,ilk _._. A _ � � ,0 j lXj - - _. _ v . , . , .,k f - ii f _._._ _... _; ti } ,�:, �, Z i . l I M Z �- € ...... . .. -. . . -� f _ I, - . . .......:. . -r� _ t_., _�_ ____....-- -- --y _... i4'-`.:ice"' _ f=....___ i V f . . ...... (00 3t5 1/ !� .._. 1 V51+ _ . + _ - -- - - -- x. ,.. _. C� ► N_ _ � ejt ' �'r{ ,, ._ ,. ,:;..�_, ,;,:,_ � .fit,., - I _ I _ _ __ :-- ., 1 t 1 , ) . . . _----.- ... . -Z ,��.�C Z 1 .'- ... , a . , ��. , "'� . L '... ,ff, r t! t .� c • . 1 s 1 t a ate . . i . �. ! . E . a E , y� .., . f- : s r_ \ . , : ,. st4 - 5 i r.' , �GT ► 7 s r _. .�' E. i. _ R1 l~sl I , , , ' -Wr t S f r i .J c..c. @ct;tI rcx,s , ,. I . , . _ .. . -� __ . o z� , o . { Z4 ; ; x : • ; . , : , . tt•o i f � 0 . r~ t: aY E a� - �C : t 5 >+t, 5 ------�. . _ ' c. K , 1 -� . • : , .. - f •... ,( f a ax4� y . ' \ S ). - -� I, , : ,kfo _ _ , . . (o w _ �. __.._ f { / 3 ,.. Z l i x 1 L 11.. ca 2 2�s2t� Z �..� , ��- V f a v i , ,. I . , t -t , , 1 : ; x . I Z 2. t3 r . t� I _ f I .�.-.. 1.,.._ • . _ _ ___ -� ,. 7 -- - -- - _._. _ _ ._ -_ , _-. _ : _ . - 3d k : f , . : . ,1 , . . # 1 , , 1, 7._ L {t 1 sl 1 �,, 111 t © t ... _ _... _ ___ _ . . 7 _ �- . C�N 4 . . k ( r QI y .. '. : . :: , .. .. - y . - '. , k. . .. - ': :. ._ - .. - ,- . t : . C� :; 1912 -,. . y .' 5 -- - _.. I , N�� a o j s , I ,..:.. --M , I _ _ - . .. . . . . . , - . „ y . .. APPR VED BY:, . I SCALE: O DRAWN BY .1 ., . : . ',.�...�.....o »+�..._'. DATE: -+- REVISED .. . . u %11 s I. . - . �„ '; ORA ING NUMBER . . -.-., - - i CEEtTIFICATION OP UNDERWRITEF S CERTIFICATE•, - NAILING & CONNEC TIONS REQ IRED REQUIRED. APPROVED AS NOTE i 4 �, Q o , 2 _ .. 1 BATE: FEE: CONSTRUCTION _ BUILDING DEPARTMENT AT ALL HALL NOTIFY CERTIFICATION G.�c!� s :- - M TO 4 PM FOR THE e� PLUMBER CERTIFIC ass 1Bo2 B A MEET T, ,; �J� IENT OF THE ,�\NG FOLLOWING INSPECTIONS: ON LEAD CONTENT BEFORE CODES OF NEW YORK- TATE CERTIFICATE OF OCCU PANG 1. FOUNDATION:-'TWO REQUIRED FOR POURED 'CONCRETE 1N WATER ( �,. -. FRAMING & PLUMBING SOLDER:USED ( 2. OUGH rd ��C PLY SYSTEM CANNOT; OOD ZONE 1� SU,P 3. I SULATION x1S o ,1 COMPLY » 4.: INAL CONSTRUCTION MUST c� W.. - �'!�►�� � - .. Z.... . / ED 2/10 OF 1/o LEA( I WITH C APTER 46 M SAC► FLOOD DAM E COMPLETE FOR C.O. :, l AGE REVENTION ._. �.i �.. _:: :.. :I6 . rr�.., ab'3 Ub' U Z Z = N SHALL MEET THE �h 846 SOOTHOLD TOW CODE. AL CONSTRUCTIO --- R NT of E CODES OF NEW _ - —_ — E UIREME S TH N Y STATE: -N --R-EgR9?JSIBLE .FOR �c1 Sri I�.r E--W TRUSS CTIRt7F , � L CONSTRUCTION 'ERRORS. (j1 �Ce* ... ,,.. r / DE IGN OR f r >� , I� OCCUPANCY OR LAW FUL L „ x UNLA WrOUT CERTIFICATE ' ......,...___at lEl N NCY CCUPA .... N 7aI;-w-w-L, �fo AC -- I of COM LY WITH ALL CODES OF , ^_ NEW YO K S OWN CODES AS RE UIRED AND CONDITIONS OF O + !1 SOUTHOLD TO�NN ZBA V N 11./ � tJ SOUTHOLD TOV�N PLANNING BOARD 2 -- •# SOUTHOLD TO`JJN TRUSTEES N.Y.S.DEC THE MANUFACTURER TO CERTIFY , � .; . � .� � • Z- 2 i V 0 RETAIN ST RM WATER RUNOFF THAT THE ENGINEERED �- 2.�t.� _ -roc PREFABRICATED ROOF TRUSSES O PUFI AN 5 Q :,' d ` DE. : . + OF !v �0 MEET OR EXCEED THE CUR RENT NYS — +t� M ,� BUILDING CODE`REQUIREMENTS : . FOR Z- x � ,,,r . : ..MINIMUM DESIGN SNOW AND - WIND . LOADING 'REQUIREMENTS. 6x J2_ A Co Dt�E � . : Ov 3. Ink16 it N 0 ` ► -� .o F / . l lt�o C 2 � 14 LVL, � , zx do : 2 M 1 1 r 2 3 3 d4 1 � 1 , 112 $ 17 �o a� i , _ y ■ .. ;. tr .p CO 442 N r !GALE:" A*P110V O MY: ' 4 DRAWN MY • OATE: '. REVISED ' •�. l i�11w11ME IMUIN�LM� - ...war.rn.. - f , , { i VV C k V'> kcuLr . Joint clawriptlon Numberof Nails - Nall Spacing • Rafter to Top Plate (roe-nailed) —C3 Q per rafter Ceiling Joist to Top Plate (Toe-nailed) .� _ per joist Ceiling Joist to Parallel Rafter(Fac"ailed) El L each lop Ceiling Joist Ups ova Partitions (Face•oailed) Collar Tie to Rafter (Face-nailed) eaer fich e Blocking InRafter(Toe-nailed) `--2- each end - Rim Board to Rafter(End-nailed) 2-16d „. each end . :.WALLFRAMING. ''"' Top Plate to Top Plate (Fax-nailed) 2-16d' per foot Top Plates at Intersections (Face-nailed 4-16d joints each side Stud to Stud (Face-nailed) 2-16d 24"o.c. Header to Header(Pace-nailed) 16d 16 O.C6 along edger To or Bolton Plate to P Stud Ltd nailed) 2-16d per 20 stud 3-16d per 2x6 stud 4-16d per 2x8 stud ` Bottom Plate to Floorloisl,Bancloist,Endjoist orBlocking (Face nailed) 2-16d" perfoot 1 ... .: ;:. . .. •.FLCfOit FItAiV11NG Joist to Sill,Top Plate or Girder (Toe-adled) 4-8d Dist Bridging Joist Perj _ B a to st (roe�aeiled) 2-8d each end Blocking b Joist(roe-nailed) d Blocking In Sill or Top Plate(Too- nailed) 2.8 each end 3-16d each block Ledger Strip to Beam(Face-nailed 3-16d each Joist ! Joist on Ledger to Beam(roe-nailed) 3-8d Bend Joist to Jolt(Entkwled) r PefjDist Band Joist to SUI or T Plate oe mil Perjolm Top (r eel) 216d' ' per foot e.i. (' „ 00#kwAtftm Slmctusal Panels ,a am Di onal Bo Ild ( Table 3.8) R; slat Sheathing :�. " "• i x6 or 1 x8« - 2 8d .1"x l0"or wider per support `C".../ .gel. per support LER:JNG SHE�►T Gypsun Wallboard 3d coolers -edgej 10"field ALL SHEATHINo. .. Structural Panels Fiberboard Panels (see Table 3.9) 7116« 25/32" 641 3"edge/6"field ere 6 8d 3"eel / » ' field Gypsum Wallboard 5d coolers 7 edge/10"field Hardboard d " Particleboard P 8 (sea Table 3.9 . /. ands ) , 1 Diagonal Board Sheathing 8d (sea Table 3.9) it 1"x6"or i"x8" 1"x lo" 2•8d or wider per support per support FLbOR.SHEATHDJ ter. I structural Panels ..., . I"orlaa greater then I" 8d 6"edge/12"field Diagonal Board:1Ireathing / lod 6"edge/6"field 1"x6"or 1"x8" Per 2-sa 1"x10"or wider per support Sd 3- suPPort � 'Nailing requirements are based on wall sheathing mailed 6"on-center at the panel eel If wall sheathe to obtain higher shear cities nailing8 a nailed 3"ontenter at the panel edge shall be used b maintain the bad path. iegahiremeab sl<ucYnrel rnernbess shall be doobled,or alternate connectors,such a Sher plate, a pa Whan wall sheathing is conthwous over connected members,the t bar. *Waed number of mils doll be permitted to be reduced to 1-16d nail per A -. •+.�1�—• SCALE: Ar►ROv BY: -.R...- s+.n. DRAWN BY i DATE: REVISED { DRAWING NUMBER I , ; I , I i I i i ORI AliC I\i 1 r. d --�►-�. �=- Lid - I zoN,E �► I OZI, OIt.. � C)1C,ZONE 2, .' I k 3' ZoN d G w.i 1 I i of •, � ...._. ..-. � .,—., �' � c..Mu- c.C*hssr. Zn ION i n+.. —._ ..mot' —.. '••— - i. iin . . _ CRAWL - , vew O 4y 1c V I ., ow III _ 5►.��5 sr. _ y,37 i lf(-?r- IJ sr Z�JNCZG f - -. 0` . — x AG ) • m 7 2 ! r� ,Oo Q ....._..:. �/ 4 1 4 2- o 1 - _ 7� * SCAIE: DRAWN 9Y REVISED t .06 � � . . nt�f► - �d+ 081�11� �► N FESStiO _ t R DRAWING NUMBER s � � 1 _ • 3 1 5 .... f 1 li +s W .C, j G. ! v I- V ' Exi 1tt�1 • "✓�• � � •• M.4r+.MIw�Mr,.iww-.t'M1! �il,Y.vwwwMrr M•Y.�v '..M � �orryn (2) 1-3/4"xt1-7 8" LVL GIR0IER� (4) 5/8 inch galvanized bolts nuts, and washers � 2) 2X12 ACC GIRDER -+- �-• f-- -}� Q Column 30 YER i�j , n , .. ... - .:r•. .. .yJ/yam ,-. ':. C ,,.., -�- 'S X fi Cs�►►l.1� "� , E •t' S S� vcl IA ^�CC' S. i 2.11 OF N �•c -: �- • - -- ._ _ _ ....._ � �Q, ,�,,� oy d a. (4) 5/8 inch galvanized bolts nuts, and washers (3) 2X8 ACQ GIRDER C� IS 6 x 6 ACQ Column 68 2 Ap FE, Sit3� - <._ n i Af'l�Rbv w: � EX SCALE. DRAWN BY DATE: REVISED I Co LA a : DRAWING NUMBER i • I , I A a < .h.ptwASP'4'" ..n.:..,r. .-. 1 .._..... • - ter„--- ,. ... NOTES: General: Framing Notes: Occupancy classification.Residential Group R-3 The contractor is to verify all measurements in the field and any discrepancies are to be brought to the attention of the Engineer prior to construction. g 9 P 2-Type 5-Wood framed construction to be utilized, Wood Framing 3-Building height-1g1 ,fire area- 1,' ,f. 4-The co • ntractor is to verify all measurements in.the field and an 1 -All lumber is to be No.2 or better Douglas Fir Larch(N)with the following Y i discrepances are to be brought to the attention of the �--- _ minimum specifications: 9 e prior to construction. r Fb=825 psi Fv=95 Electrical Notes: P� Fc peril=625 psi E=1,600,000 psi 1-All electrical shall work be installed by the owner or a certified electrician. 2-All straps,connectorsplates,bolts nails etc.are to be galvanized or stainless steel Designated connectors strap etc.on these drawings are made _ g P 9s by 2 All electrical work shall be in accordance with the National Electric Simpson unless indicated otherwise.All connectors,straps etc.are to be Design Loads. PCode. %dam' •: nailed/bolted in accordance with the manufacturer's specific6tions. Roof-Live Load-35.5 P 3-All smo ke detectors shall be install in accordance ' installed with NFPA 72 t -;f Based on ASCE-7 and Pg 45 psf 3 /All floor sheathing is to be AC type Plywood,tongue and groove,with an and local codes. n APA span rating of 48/24.Floor sheathing shall be glued and nailed to the floor per Figure R30)1.2(5) P 9 9 o _ Install Smoke Detectors in: Dead Load 15 psf- All bedrooms - ,- 4 Solid blocking is to be installed every 8 max or mid span of all floor&ceiling -Hallway _ A w -Bedroom -Livs Load-30 psf Joists: -Living rig P i room - :-Dead Load-15 psf 5-Blocking is to be installed at all point load bearing points. - • 9 Po 9 P� i Deck -Live Load-40 psf ' 4=Thadbuilding's� ; 15 etectors are to be wired to the m tri- - : - , ;, •,Dead Load-15 ,, 6-All wall sheathing is to be /2 inch APA Rated Exposure 1 and shall : - main electrical � g .P Phi s . _ service and be equipped with battery back-up. be nailed with 8d common nails 6 OC edges and 12 OC field. eq DPP ery b up. Wind Loads 1120.►t ASCE-7 � araHel 5 The detectors shall be wire MWFRS-Mettthod'�.'� 7-Double Joists are to be installed below p walls. d so that operation of an smoke detector s i Component amd Cladding-Details from hall cause the alarm to sound at the others f Comp g TA LE 3.8'. 8- Walls are to be framed with 2x4 inch studs spaced 16 inches OC unless IJctoWFCM B indicated otherwise. 6-Carbon monoxide dete rs must be installed on each floor of the building in accordance with Suffolk Count specifications. Y P ors. Design Criteria-NYS Residential Code R301..2.1.1 and utilized WINDOW NOTES. the methods and procedures stipulated in Gha ter2 Engineered Design and Chapter 3 Prescriptive Desi n in the American Forest _ • ws and doors are to be wood with double pane high pressure 9 P9 1 Windows '. and Paper Association Wood Frame(Construction Manual for One Performance low-E glass with a max. U value of 0.30. and Two Family Dwelling Units-Highi Wind Addition and ASCE 7. . 2-Windows and doors are to conform with the Allowable Air Infiltration ' iCLIMATIC AND GEOGRAPHIC DESIGN CRITERIA Rates specified in section 502.1.4.1 in the New York State Energy i� Conservation Construction Code, d S Seismic Weathering Frost Line Termite Dec Winter Design Ice Shield Flood Hazard : Ground Snow Load Win peed g ay, � i Depth Temp. Undefl t _ and doors are to be equipped with removable plywood 4. P P aY 3 Windows eq PIS Required panels as shown in detail on sheet 4 or shall meet the requirements of i 45 psf 120 m h B Severe 36 in. Moderate Slight to 11 F Yes the Large Missile Test of ASTM E 1996 for 120 mile per hour wind P P to Heavy Moderate loads. 4-Windows shown are manufactured by Anderson. - free o Windows designated 3046 have penabee area of 5.7 s.f. 6-Contractor to verify rough opening dimensions with manufacture ' I nor to framing. ; i SIMPSON LSTA36 ! STRAP ,i co Typcal Window and DoorH e f- � W r ade co Y G_T�Dr \ lolls ey Strapping Detail Each Corner AI- iGE: 1 M;MOV my: DRAWN SY OAT[: NTS .;.. ._ . ' REV ISEO E5S1 - DRAWING NUMBER , n