HomeMy WebLinkAboutTR-8152A John M. Bredemeyer III,President ��0,��0� O�ry� Town Hall Annex
Michael J. Domino,Vice-President ��� '`� 0 : 54375 Main Road
■
P.O.Box 1179
James F. King,Trustee ; Southold, New York 11971-0959
Dave Bergen,Trustee ; G Q
Charles J.Sanders, :Trustee .4%4 . d' Telephone(631) 765 1892
ly A Fax(631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
# 0982C Date: May 21, 2014
THIS CERTIFIES that the construction of a 748sq.ft. garage; a 480sq.ft. work shop; an
800sq.ft. swimming pool; a 2,120sq.ft. terrace; pool fence; subsurface drainage structures
At 522 Town Creek Lane, Southold,New York
Suffolk County Tax Map #64-1-14.7 & 14.8
Conforms to the application for a Trustees Permit heretofore filed in this office
Dated March 12, 2013 pursuant to which Trustees Administrative Permit#8152A Dated
April 17, 2013,was issued and conforms to all of the requirements and conditions of the
applicable provisions of law. The project for which this certificate is being issued is
for the construction of a 748sq.ft. garage; a 480sq.ft. work shop; an 800sq.ft. swimming
pool; a 2,120sq.ft. terrace; pool fence; subsurface drainage structures.
The certificate is issued to DAVID C. ESSEKS & KATHRYN R. STOKES owners of
the aforesaid property.
'- '"" & 0
Authorized Signature
0 to
James F.King,President ,�''����f F
g �, �gUFFO( � Town Hall,53095 Main Rd.
0�,. "Co
Bob Ghosio,Jr.,Vice-President .4y, Gy t` P.O. Box 1 179
Dave Bergen y at y Southold,NY 11971 at s
John Bredemeyer •O, ■
�' A„'1) Telephone(631)765-1892
Michael J. Domino 4( s -t-,.,'� Fax(631)765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE F INSPECTION: i� . /y Iv i V
Ch. 275 Ch. 111
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt curtain
1st day of construction
% constructed
Project complete, compliance inspection.
INSPECTED BY: `)1A ( cr 4)
COMMENTS:
O--k— ZA.4—te-t—titioiet"—&--/1.4--E—G-21,4....../ Oil I 1/ 117 i y-
CERTIFICATE OF COMPLIANCE:
• •
Al?1
S A M U E L S &
S T E E L M A N
t
May 13, 2014
MAY 13 2014
Southold Town Board of Trustees i —
Town Hall Annex . •r{
Main Road
Southold, NY 11971
RE: NEW ACCESSORY STRUCTURES FOR THE ESSEKS/STOKES RESIDENCE
522 Town Creek Lane, Southold, NY 11971
SCTM# 1000-64-01-14.7&14.8
Trustees Permit#8152A
Attn: Elizabeth
Enclosed please find a SITE PLAN for the above referenced project, showing the location of all
sub-surface drainage structures, AS BUILT. It also shows the removal of a tree, which was
diseased and dying, at the circle in the driveway.
You will also find the sign-off of the Town Engineer, who reviewed the as built SITE PLAN to
ensure compliance with original drainage design.
Please forward your Certificate of Compliance to the Building Dept., which is finalizing its review
for the Certificate of Occupancy.
Please call us with any questions or concerns.
Sincerely,
SAMUELS & STEELMAN ARCHITECTS
J
Thomas C. Samuels, Architect
enc.
ARCHITECTS
25235 MAIN ROAD
CUTCHOCUE, NEW YORK 11935
(631)734-6405
FAX(6 31)734-6407
•
,',,,�,,,,,,,,,,
,,.6 °sup- •', �T(0)RMWA\T)ER
Scott A. Russell ;:„,��
SUPERVISOR
Z MANAGEMENT
SOUTHOLD TOWN HALL-P.O.Box 1179
�'' Town of Southold
53095 Main Road-SOUTHOLD,NEW YORK 11971 �' rO ,�:
CHAPTER 236 - STORMWATER MANAGEMENT WORK SHEET
( TO BE COMPLETED BY THE APPLICANT )
DOES THIS PROJECT INVOLVE ANY OF THE FOLLOWING:
Yes No (CHECK ALL THAT APPLY)
❑❑ A. Clearing, grubbing, grading or stripping of land which affects more
than 5,000 square feet of ground surface.
❑❑ B. Excavation or filling involving more than 200 cubic yards of material
within any parcel or any contiguous area.
00 C. Site preparation on slopes which exceed 10 feet vertical rise to
100 feet of horizontal distance.
❑❑ D. Site preparation within 100 feet of wetlands, beach, bluff or coastal
erosion hazard area.
❑❑ E. Site preparation within the one-hundred-year floodplain as depicted
on FIRM Map of any watercourse.
❑❑ F. Installation of new or resurfaced impervious surfaces of 1,000 square
feet or more, unless prior approval of a Stormwater Management
Control Plan was received by the Town and the proposal includes
in-kind replacement of impervious surfaces.
* If you answered NO to all of the questions above, STOP! Complete the Applicant section below with your Name,
Signature, Contact Information, Date & County Tax Map Number! Chapter 236 does not apply to your project.
* If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan
and a completed Check List Form to the Building Department with your Building Permit Application.
APPLICANT: (Property Owner,Design Professional,Agent,Contractor,Other) S.C.T.M. #: 1000 Date
s()���/� (� District
NAME 94,04'CC a �� l 01 t�.�'� s-1604-
o Section Block Lot
sen,rura
Contact Information: ✓
- Got Os- ****FOR BUILDING DEPARTMENT USE ONLY****
Crelephone Numbed
Reviewed By:
Date:
Property Address/Location of Construction Work:
Thim/(„ /, G ❑ Approved for processing Building Permit.
{�a,,(d J�f K Stormwater Management Control Plan Not Required.
5V `L t '`'y «col * Stormwater Management Control Plan is Required.
(Forward to Engineering Department for Review.)
FORM # SMCP-TOS MAY 2014
— _ S V
APPLICANT: �■ CHAPTER 236\S.C.T.M.# 1000 t 4 n
(Property Owner, r sign Professional, gent,Contractor,Other) :'bpi-
• 71 %--7_,\_. Stormwater Management Control Plan CHECK LIST
c,�u T Section Block Lot
NAME: �7/��,UE4S1 �"EMA _ S M C P -Plan Requirements: Provide ONE copy of the ildipon:
Please Print
Date:J r ! The applicant must provide a Complete Explanation and/or eason for not providin
�� '� all Information that has been Required by the following CF,ecklist!.
signature IepM1one umber. // - , ,
BtD_G.DEPT.
1. A Site Plan drawn to scale Not Less that 60'to the inch MUST If You answered No or NA to any Item,Please P-Feide ' ' ' sub i_u
show all of the following items: YES NO NA If you need additional room for explanations, Please Provide additional Paper.
a. Location & Description of Property Boundaries
b. Total Site Acreage. �I 45.. ) (Li' ikotoD1 Nr b S L7 e Y i
c. Existing-Natural & Man Made Features within 500 L.F. �%
of the Site Boundary as required by§236-17(CX2). S , 4 R v/C(•()
d
•
. Test Hole Data Indicating Soil Characteristics&Depth to Ground Water. I
e. Limits of Clearing& Area of Proposed Land Disturbance.
f. Existing & Proposed Contours of the Site (Minimum 2 Intervals) I I
APPROVAL OF STnRMWATER MANAGLMENT
g. Location of all existing& proposed structures,roads,
I
driveways, sidewalks, drainage improvements& utilities. f
h. Spot Grades & Finish Floor Elevations for all existing& CONTROL tAly -Town Cody Chapter 236
proposed structures. Date:__
I. Location of proposed Swimming Pool and discharge ring. Appravad by: '
j. Location of proposed Soil Stockpile Area(s). �[, —
k. Location of proposed Construction Entrance/Staging Area(s). I I
1. Location of proposed concrete washout area(s). LI. EROSION&SEDIMENT CONTROLS
m. Location of all proposed erosion&sediment control measures. = Shall.include but not be limited to:
2. Stormwater Management Control Plan must include Calculations showing A well maintained Construction Entrance,
that the stormwater improvements are sized to capture,store,and infiltrate
on-site the run-off from all impervious surfaces generated by a two(2")inch I I Wire Backed Silt Fencing,stabilization&
rainfall/storm event. Seeding of exposed and/or inat.Live SOilk.
•
3. Details&Sectional Drawings for stormwater practices are required for approval.
Items requiring details shall include but not be limited to: DRAINAGE INSPECTIONS ARE REQUIRED
a. Erosion & Sediment Controls. Contact TOS Engineering at 765-1560 before '
b. Construction Entrance&Site Access. Backfill,OR Provide Engineer's Certification -
c. Inlet Drainage Structures (e.g.catch basins,trench drains,etc.) IETI that the drainage has been installed to Code.
d. Leaching Structures (e.g.infiltration basins,swales,etc.) I III
**** FOR ENGINEERI►1 EPA' USE ONLY***•
I Additional Information is Required.
Reviewed& ■ Stormwater Management Control Plan is Not Complete.w - 03:1 Approved By: '/;, 4 a,♦, -
Stormwater Management Control Plan is Complete.
Date: 5/11111f SMCP has been approved by the Engineering Department.
FORM # SWCP heck List -TOS MAY 2014
•
leiS■
S A M U E L S &
S T E E L M A N
April 23, 2014
APR 242014
Southold Town Board of Trustees
Town Hall Annex
Main Road .
; ar; __
Southold, NY 11971
RE: NEW ACCESSORY STRUCTURES FOR THE ESSEKS/STOKES RESIDENCE
522 Town Creek Lane, Southold, NY 11971
SCTM# 1000-64-01-14.7&14.8
Trustees Permit#8152A
Attn: Elizabeth
Enclosed please find a SITE PLAN for the above referenced project, showing the location of all
sub-surface drainage structures, AS BUILT. Some of the approved structures were installed in
locations other than originally approved, in order to accommodate underground utilities and
other considerations. The total capacity of the drainage system has not been changed for that
approved.
Please note that the drainage originally shown on a separate parcel, SCTM #1000-64-01-14.8,
was not installed. Underground water and natural gas are located under the drive in this very
restricted area, making it impossible to install the approved 8x4 foot leaching pools in
accordance with SCDHS regulations, which require an eight foot separation between leaching
pools and public water lines. In our opinion, and that of the excavator on the job, TKF
Excavating and Demolition, excavation in this area would be very risky to the shared
underground utilities. No work was done on this parcel.
Please schedule a final inspection of this site, and forward your approval to the Building Dept.,
which is finalizing its review for the Certificate of Occupancy.
Please call us with any questions or concerns.
Sincerely,
SAMUELS & STEELMAN ARCHITECTS
41'
Thomas C. Samuels, Architect
enc.
ARCHITECTS
25235 MAIN ROAD
CUTCHOGUE, NEW YORK 11935
(631)734-6405
FAX(631)734-6407