HomeMy WebLinkAboutTR-4436 GF F
Wl
— - — - _ .. '
�i •.,_�___1 .�=, .a._%f-"�' i.'? i''�.r"',�.� r'•,.J.�.��t'-s �"""�.}�" I
1 Board Of n• ;9� Southold Tow Trustees
} SOUTHOLD, NEW YORK k
L 3 � ►F
.. PERMIT NO. ...... ....... :. . .. .. .... DATE: .....4./27./9.a.........
s ISSUED TO ..........DUNE..DUFFNER...............................................................................
��.
,•. x,,• 11 AIL_ s
Pursuant to the provisions of Chapter 615 of the Laws of
the State of New York, 1893; and Chapter 404 of the Laws of the :
State of New York 1952; and the Southold Town Ordinance en- ! .
titled REGULATING AND THE PLACING OF OBSTRUCTIONS
IN AND ON TOWN WATERS AND PUBLIC LANDS and the .fw�
REMOVAL OF SAND, GRAVEL OR OTHER MATERIALS FROM F
\ <<
LANDS UNDER TOWN WATERS;" and in accordance with the I�� � -�:��•
Resolution of The Board adopted at a meeting held on ....4./.2.7../.9.5..... ;'• '
19....9.5..., and in consideration of the sum of $..1.50...00 ....... paid by ..
.....Glen...Just...for...JUNE..D.UFFN.ER...........................................................................
'
Mattituck Terms and Conditions listed on �}'N. Y. and subject to the
he reverse side hereof,
of Southold Town Trustees authorizes and permits the following: «'
Grandfather Permit to remove and replace 3' X 34' fixed doc1�,=
reconstr. exist. 3' X 12' ramo and-Install exist. 6' X 20' float
o
and to -upgrade the height of dock to current standards. =`;J
all in accordance with the detailed'specifications as presented in
the originating application. .
IN WITNESS WHEREOF, The said Board of Trustees
here-by causes its Corporate Seal to be affixed, and these presents to j;_
be subscribed by a majority of the said Board as of this date. fr _,
• ^
...:........ ...
....... .... -
1 Z .. ...... ..... .. .. .................. j
:Y-
- � �y W
a.,v...
..✓.............
rustees ,.
,f�,.dm�-��.::� .e ..e-'. T .a �. - �A a d�i��>^r•v„s:..s_It �.s .r �`�i3 t• �:- �•.'.�fw_ci at �.:r� a�3: �
011411
Albert J. Krupski, President Town Hall
John Holzapfel, Vice President 53095 Main Road�� ���' '-� 5� ��
William G. Albertson ; �" P.O. Box 1179
" Southold, New York 11971
Martin H. Garrell
Peter Wenczel �f�' f'�`'°' , ,,���� Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Office Use Only a V
Coastal Erosion Permit Application
Wetland Permit Application APR 1 9 I996
Grandfather Permit Application
Trustee Lands Permit Application
Waiver Ut SOUTHOLD
k/Received Applicatio :
Clerical Review: Y (q
Completed Application !,
Incomplete
SEQRA Classification:
Type I Type II Unlisted
Coordination: (date s nt
CAC Referral Sent: S'
Date of Inspection: 9f
Receipt of CAC Report: (date)- Q_r
Lead Agency Determination:
Technical Review: (date)
Public Hearing: (date) ? Q
Decision: Approved (Y/ ) ((date)
Application Fee:$
Name of Applicant June Duffner
Address 915 Bungalow Lane , Mattituck N . Y. 11952
Phone Number: ( c/c� 477-2807
Suffolk County Tax Map Number: 1000
Property Location:
915 Bungalow Lane , Mattituck
(provide LILCO Pole #, distance to cross streets, and location)
Agent: Glenn E. Just/ J .M. O. Consulting
( If applicable)
Address: P . O . Box 447 , Quogue , N . Y . 11959-0447
Phone653-0607
1
—�3rd of Trustees Applicatii_,__ ! '1
GENERAL DATA
Land Area (in square feet) : approx. 15 , 000
Area Zoning: unknown
Previous use of property: Single family dwelling with dock
Intended use of. property: same
Prior permits/approvals for site improvements:
Agency bate
xxi�o prior permits/approvals for site improvements.
Has any permit/approval ever been revoked or suspended by a
governmental agency? xxx
No Yes
If yes, provide explanation:
Project Description (use attachments if necessary) :
Applicant roposes to remove dilapidated -32"x34 ' fixed dock , replace
with 3' x ' fixed dock, ramp reconstruct existing 3 ' x12 ' ramp and
reinstall existing 6 ' x20' float .
2
Lard of Trustees Applicatii___
WETLAND/TRUSTEE LANDS APPLICATION DATA
Purpose of the proposed operations: Reconstruction of private
recreational dock
Area of wetlands on lot: n/a square feet
n/a
Percent coverage of lot: o
Closest distance between nearest existing structure and upland
edge of wetlands: n/a feet
Closest distance between nearest proposed structure and upland
edge of wetlands: n/a feet
Does the project involve excavation or filling?
xxx No Yes
n/a
If yes, how much material will be excavated? cubic yards
How much material will be filled? n/a cubic yards
n/a
Depth of which material will be removed or deposited:
feet
Proposed slope throughout the area of operations: n/a
Manner in which material will be removed or deposited: n/a
Statement of the effect, if any, on the wetlands and tidal
waters of the town that may result by reason os such proposed
operations (use attachments if appropriate) :
As proposed , this project should have no impact on wetlands .
6
1%1-16.4(T187)—Text 12 '
PROJECT I.D. NUMBER 617.21 SEAR
Appendix C
. State Enrironmental.0uallty Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART I—PROJECT INFORMATION (To be completed by Applicant or Project sponsor)
1. APPLICANT/SPONSOR 2. PROJECT NAME
June Duffner F- Propoi sed dock reconstruction
3. PROJECT LOCATION:
Municipality Mattituck County Suffolk
4. PRECISE LOCATION jStreet address and road Intersections,prominent landmarks,etc.,or provide map)
915 Bungalow Lane, Mattituck
S.C.T.M.No.
Location Map Enclosed
5. IS PROPOSED ACTION:
KNew ❑Expansion ❑Modlficationlalteratlon
6. DESCRIBE PROJECT BRIEFLY:
Applicant proposes to remove 32" x 34 ' fixed dock, replace with a
Aix 34 ' fixed dock, reconstruct existing 3 ' x 12 ' ramp and reinstall
isting 6 ' x 20 ' float.
7. AMOUNT OF LAND AFFECTED:
Initially "e acres Ultimately acres
8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
A Yes ❑No If No,describe briefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
®Residential ❑Industrial ❑Commercial ❑Agriculture ❑Park/ForesVOpen space ❑Other
Describe:
10. DOES ACTION INVOLVE A PERMIT APPROVAL,OR FUNDING,NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY(FEDERAL,
STATE�OR LOCAL)?
I:J Yes ❑No If yes, list agency(s)and permlVapprovals
Southold Town Trustees, N.Y.S.D.O.S. & U.S.,D.O.A.
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
❑Yes Gd No If yes,list agency name and permltlapproval
12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMITIAPPROVAL REQUIRE MODIFICATION?
❑Yes ®No
I CERTIFY TWTEI pRMATI N PRO I ED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGEApplicant/sponsor name: G !. Ju t ag t —9Iq
Date:
Signature:
If the action Is In the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
1
Bc _ _ 1 of Trustees Application
AUTHORIZATION
(where the applicant is not the owner)
/�/' ��� residing at�0,� r/z
LI �r/
. print owner of property) (mailing.�ddress)
• ivy//���/a���/�!� //�-��
do hereby authorize
(Agent)
Glenn E. Just/J.M. O. Consulting to apply for permit(s) from the
Southold Board of Town Trustees on my behalf.
/j (Owner s signat x#o
4
L
-� B�___d of Trustees Application_
.S-
County of Suffolk
State of New York
J LJN E Ly A rJ b U F F N F-P_ BEING DULY SWORN
DEPOSES AND AFFIRMS THAT /SHE IS THE APPLICANT FOR THE ABOVE
DESCRIBED PERMITS) AND THAT ALL STATEMENTS- CONTAINED HEREIN ARE
TRUE TO THE BEST OF H=IS/HER KNOWLEDGE AND BELIEF, AND THAT ALL
WORK WILL BE DONE 'IN THE MANNER SET FORTH IN THIS APPLICATION
AND- AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES.
THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN
TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS
ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S) , IF GRANTED. IN
COMPLETING THIS APPLICATION, I HEREBY .aUTTTORI?E THE TRUSTEES;
THEIR AGENT(S) OR REPRESENTATIVES(S) , TO ENTER ONTO MY PROPERTY
TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS
APPLICATION.
S"gnature
SWORN TO BEFORE ME THIS 1 Fh DAY OF APR ) L , 19 �5
Notary Public
GERTRUDE SCHWEIGER
Notary Public,State of New York
No.01 SC5031496
Qualified in Queens County
Commission Expires Aug.8, 1996
3
SEC, I VN •r
� v S C�A L
15rl
0
0 5 10
C7 \
o
C
Z PROP 3X34 FIXED DOCK
3XIZ RAMP
C .—
7�.v Y
WALL tq
6X 2CSFLOAT
AHW t10
st
C I � BOTTOM
. o
� ' 1 INTERTIDAL Mfi�RSH SPARTIN-A ALTER-N- .I FLORA
T -
m
m
� m
w
f IJ
MAP-OF HAQQATC0J.(A ------�—�— ._
INTH S fig' WUN fr�--
U
APR. g .
300
C� m l7rRr '�• �.1f.L.F.LNCE, GAL-.
t.5T02Y
_
tv
- L i 210:00fCyr
} ;
ZY
.�15
1 s
ttthDn..od : A Cr 4dv21Qfl a
�to this survey is a VRE5sn c �v� {
I Section 7208 of the Near York States t !
r / Lducatlon Law.
){ f I Copies of b.:3 sur, y rmu m-frazlig -
t / the f r;d eurveyors ink-W ce j cr
2 emb med=0 short not fa= ldared
• to 4e a vaUd trio copy, y+ _ f ,
/4 t�.'�� ' PROPERTY
{tom., -. _ Gu2r'�fiiG85 iridfCe�€Sf,i:urF:Ar,sft it rJn A�C' ,� t
�• {A`' -OP
b�, . ice. li:0 2 to p ren for va om
tt - Nr=�'�-,-1 F��Cn ti ;4ON j 1
'�' [r f� tltf Cif ,L , S 24-h y and �.- - .
11 SV k/F, , K '�«.- - IGr� if .Gt,u7e� / b tlnF a.�
to t` �� x`tic-i i .
ice' t, ,,•� t- /
GUAQAti'�'F£D �� a
aka r�-4 s t »��'G t� Sti��t,di15 AN,
�
MAT" I l +cC
Im
Cll
500
- - - t K•ti4 , Y ,..
--I i _
I
Meeting' of 4/20/95
r
The CAC recommends disapproval because it is an ill conceived plan of that
location and the cesspools are a problem. The CAC is concerned with the
pollution from an inadequate septic system. +
Vote of Council: Ayes: All
Motion carried.
No. 1258
Moved by Robert Keith, seconded by Bruce Loucka, it was
RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL
WITH CONDITIONS of the Wetland Application of JOHN F. PETERSEN
31-12-5.2 to enlarge second floor of house for more, living space.
970 Trumans Path, East Marion
The CAC approvals provided the applicant use hay bales and silt fence during
construction.
Vote of Council: Ayes: All
Motion carried.
RECOMMENDATION OF GRANDFATHER PERMITS
GF-1
Moved by Stephen Angell, seconded by Bruce Loucka, it was
RESOLVED to recommend to the Southold . Town Board of Trustees
DISAPPROVAL of the request for a Grandfather Permit by SUSAN NORRIS
123-9-1 to-reconstruct jetties and dock structures. Existed prior to 4/6/76.
2790 New Suffolk Avenue, Mattituck
The CAC recommends disapproval because it is a substantial project with
additional new work included. A Wetland Permit should be required and the
application should include plans for the dock.
Vote of Council: Ayes: All
Motion carried.
GF-2
Moved by Stephen Angell, seconded by Bruce Loucka, it was
RESOLVED to recommend to the Southold Town Board of Trustees
DISAPPROVAL of the request for a Grandfather Permit by JUNE DUFFNER
123-3-11.1 to remove a dilapidated 32" x 34' fixed dock, replace with a 3' x
34' fixed dock, reconstruct existing 3' x 12' ramp and reinstall existing 6' x
20' float.
915 Bungalow Lane, Mattituck
The CAC recommends disapproval of the Grandfather Permit request. The
Council feels this project warrants a Wetland Permit and would approve as
follows:
No. 1259
Moved by Stephen Angell, seconded by Bruce Loucka, it was
RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL
AS SUBMITTED the Wetland .Application of JUNE DUFFNER 123-3-11.1 to
Page 7
Meeting of 4/20/95
remove a dilapidated 32" x 34' fixed dock and replace with 3' x 34' fixed dock,
reconstruct existing 3' x 12' ramp and reinstall existing 6' x 20' float.
915 Bungalow Lane, Mattituck `
Vote of Council: Ayes: All
Motion carried.
Page 8
05 Apr 1995 NEW YORK DISTRICT, CORPS OF ENGINEERS Page: 2
Final Actions
Between 03/01/1995 and 03/31/1995
APPL-NO TYPE DATE APPLICANT WORK DESCRIPTION CITY/TOWN COUNTY ST
......... .... ........... ................................... ................. ..,.....r....... ............... .��==...00.��. .m
199500320 FLP 28 Mar 1995 Quinn, Paul PIER ASSEMBLY Southampton Suffolk NY
199500330 FLP 09 Mar 1995 Warden, John PIER ASSEMBLY Southampton Suffolk NY
199500430 FLP 22 Mar 1995 Duffner, June PIER ASSEMBLY Southold Suffolk NY
199500970 FLP 08 Mar 1995 Madonia, Nicholas BOAT LIFT Hempstead Nassau NY
199501060 FLP 30 Mar 1995 Shulman, Barnet FLOAT(S) Hempstead Nassau NY
BOAT LIFT
1995:11460 FLP 22 Mar 1995 Port Authority of NY & NJ FLOAT(S) Flushing New York NY
BOAT LIFT
000920049 FNW 02 Mar 1995 Gregory, Wayne DAM REPLACEMENT Otego Otsego NY
-� MISCELLANEOUS
�-199400420 FNW 30 Mar 1995 Thomas J. Farone & Son, Inc. UTILITY LINE Wilton Saratoga NY
199400490 FNW 28 Mar 1995 NY State Dept. of Transportation BRIDGE REPLACEMENT Exeter Otsego NY
199401200 FNW 16 Mar 1995 Blooming Grove Operating Company FILL IN WETLAND New Windsor Orange NY
199405740 FNW 06 Mar 1995 Kudlack, Richard FILL IN WETLAND Guilderland Albany NY
199408310 FNW 03 Mar 1995 Baisi, John and Margaret RAMP Douglaston Queens NY
FLOAT(S)
199410820 FNW 30 Mar 1995 Town of Marlborough FILL IN WETLAND Marlborough Ulster NY
199411980 FNW 24 Mar 1995 Westchester County DPW RIPRAP Rye Westchester NY
199412120 FNW 08 Mar 1995 Schwartz, Paul BULKHEAD Hempstead Nassau NY
PIER ASSEMBLY
199412300 FNW 14 Mar 1995 City Gas Corporation BULKHEAD Rockaway Beach Queens NY
PILINGS)
199500070 FNW 16 Mar 1995 Borough of Red Bank BULKHEAD Red Bank Monmouth NJ
FILL
199500280 FNW 31 Mar 1995 Transcontinental Gas Pipeline Corp. RIPRAP Somerset Mercer PA
199500400 FNW 07 Mar 1995 Town of Hempstead DPR BULKHEAD Hempstead Nassau NY
DREDGE WITH UPLAND DISPOSAL
199530490 FNW 03 Mar 1995 City of Glens Falls COFFERDAM(S) Queensbury Warren NY
UTILITY LINE -
199500880 FNW 02 Mar 1995 Sullivan County DPW FILL IN WETLAND Thompson Sullivan NY
199501350 FNW 07 Mar 1995 General Electric Corporation FILL Hudson Falls Washington NY
199501590 FNW 30 Mar 1995 Grist Mill Restaurant FILL Warrensburg Warren NY
199501670 FNW 21 Mar 1995 NYC Dept. of Env. Protection MISCELLANEOUS Brooklyn Kings NY
199501710 FNW 21 Mar 1995 NYC Dept. of Env. Protection MISCELLANEOUS Bronx Bronx NY
199501720 FNW 21 Mar 1995 NYC Dept. of Env. Protection MISCELLANEOUS East Elmhurst Queens NY
199501750 FNW 21 Mar 1995 NYC Dept. of Env. Protection MISCELLANEOUS Bronx Bronx NY
199501870 FNW 30 Mar 1995 NY State Dept. of Transportation BRIDGE REPLACEMENT Rosendale Ulster NY
199501920 FNW 31 Mar 1995 Transcontinental Gas Pipeline Corp. PIPELINE Kearny Hudson NJ
199502020 FNW 27 Mar 1995 McNeil, Sandra RETAINING WALL Islip Suffolk NY
FILL
199502090 FNW 01 Mar 1995 Tanzer, Ira RAMP Southampton Suffolk NY
FLOAT(S)
199502180 FNW 30 Mar 1995 Eagle Crest Plantation FILL IN WETLAND Clifton Park Saratoga NY
199502200 FNW 16 Mar 1995 Town of Wallkill ROAD - Wallkill Orange NY
BANK STABILIZATION
199502330 FNW 09 Mar 1995 Aliffi, Carmine BULKHEAD Hempstead Nassau NY
FILL
199502390 FNW 09 Mar 1995 Village of Amityville '' BULKHEAD Babylon Suffolk NY
199502530 FNW 13 Mar 1995 Esposito, Al BULKHEAD Oyster Bay Nassau NY
DREDGE WITH UPLAND DISPOSAL
199502550 FNW 13 Mar 1995 Claps, Tom and Mary BUL)HEAD Babylon Suffolk NY
DREDGE WITH UPLAND DISPOSAL
199502750 FNW 17 Mar 1995 Incorporated Village of Saltaire BULKHEAD Islip Suffolk NY
FILL
199502760 FNW 17 Mar 1995 Flynn'a Marra PIER Brookhaven Suffolk NY
BULKHEAD
199502780 FNW 20 Mar 1995 Town of Southold ROAD Southold Suffolk NY
199502960 FNW 22 Mar 1995 Cresente, Alex & Mary Jane BULKHEAD Southampton Suffolk NY
FILL
199502990 FNW 22 Mar 1995 Haimes, Burton BULKHEAD Southampton Suffolk NY
POEtac go-TICE
1 1
US Army Corps
of Engineers In replylim refer to
New York District Public Notice Number: CENAN-OP-R
Jacob K. Javits Federal Building Issue Date: 19 April 1995
New York, N.Y. 10278-0090 Expiration Date: N/A
ATTN: Regulatory Branch
To Whom It May Concern:
Enclosed please find a listing of permit decisions made by
the New York District, Corps of Engineers during the past month.
To facilitate your review, this is an explanation of the .
three-letter code denoting the type of permit issued:
FAI -- issued after-the-fact permit
FGP -- issued regional/state program general permit
FLP -- issued letter of permission
FIX -- issued modified permit
PIP -- issued individual permit
FNW -- confirmed applicability of nationwide general permits)
For information concerning projects authorized in New Jersey,
New York City, Westchester and Rockland Counties and on Long
Island, please contact the Eastern Permits Section at (212) 264-
6731. For information concerning projects authorized in other
areas of New York State, please contact the Western Permits Section
at ' (212) 264-0185.
FOR THE DISTRICT ENGINEER:
`/yam
4Cfph J. Seebode
, Regulatory Branch
DEPARTMENT OF THE ARMY
NEW YORK DISTRICT, CORPS OF ENGINEERS
JACOB K. JAVITS FEDERAL BUILDING
\ NEW YORK. N.Y. 10278-0090
REGIY TO March 22. 1995 a
ATTENTION OF 7
Eastern Permits Section
SUBJECT: Department of the Army Permit Number 95-00430
Ms. June Duffner
c/o JMO Consulting
P.O. Box 447
Quogue, New York 11959-0447
Dear Ms. Duffner: i
We have completed our review of Application No. 95-00430-L2.
Pursuant to Section 10 of the Rivers and Harbors Act of 1899
(33 USC 403) , you are hereby authorized by the Secretary of the
Army:
ACTIVITY: To replace an existing fixed pier with a 4 foot by
34 foot fixed pier; elevated a minimum of 4 feet
above the grade of the intertidal marsh, and
reinstall an existing 3 foot by 12 foot hinged
ramp and 6 foot by 20 foot float.
WATERWAY: Deep Hole Creek, Great Peconic Bay
LOCATION: Mattituck, Town of Southold, Suffolk County, NY
Kindly display the enclosed notice of authorization sign at
the project site.
The activity authorized herein must be completed within
three years of the date of .this permit. This authorization is r�
subject to the enclosed conditions. Please find enclosed two
forms to be used to submit to this office, as required, the dates
of commencement and completion for the authorized activity.
The authorized activity must be performed in accordance with
the enclosed plans. If any material changes in the location or
plans of the subject work are found necessary, revised plans
should be submitted to the •District Engineer. These plans must
receive the approval required by law before work begins.
Notice is hereby given that the permittee should recognize
that a possibility exists that the structures permitted herein
may be subject to wavewash from passing vessels. The issuance, of
this permit does not relieve the permittee from taking all proper
steps to insure the integrity of the structures permitted herein
and the safety of boats moored thereto from damage by wavewash
and the permittee shall not hold the United States liable for any
such damage.
If any questions should arise concerning this matter, please
contact Sophie Ettinger, of my staff, at (212) 264-3912.
Sincerely,
1W
1 {.c�1
`lPo and in behalf of
(�hbmas A. York
61onel, Corps of Engineers.
District Engineer
Enclosures
2
0) O y N f W (roD 1-3
t�rJ
N M I C (D (D O frt rr rt ril
O R1 'd rt p 'U )-j i
FJ- )-h Iv (D rt hj I-' (D p
a rt 9 � � P) � b
((D 0 LQ ° rt � � n
a (11 o K (� rtme x a
rt (A H _
FS R� (D U] � (D W
(D G G N- n rt
rt
o (D (D a, m w rr
rh H " o (D z
m
' G A) 0
o o R' rtrd � ocoo
N n rrt� m0Zm
rt ns G' (D M W 7K y
� e
(D
Th I I notice ofauthorizationbe
conspicuously displayed at the siteofwork.
United States Army Corps of Engineers
March 22, 1 9 95
A permit to replace a fixed pier and reinstall a ramp and float
IN: Deep Hole Creek, Great Peconic Bay
d
at : Mattituck, Town of Southold, Suffolk County, New York
rt
has been issued to June Duffner on March 22, 1995
Address of Permittee 915 Bungalow Lane, Mattituck, New York 11952
Permit Number Thomas A. York
Colonel, Corps of Engineers
95-00430 District Commander
ENG FORM 4336 , Jul 81 (33 CFR 320-330) EDITION OF JUL 70 MAY BE USED (Proponent: CECWO)
PERMIT CONDITIONS:
NOTE: The term "you" and its derivatives, as used in this permit,
means the permittee or any future transferee. The term "this office"
refers to the appropriate district or division office 'of the Corps of
Engineers having jurisdiction over the permitted activity or
appropriate official of that office acting under the authority of the
commanding officer.
GENERAL CONDITIONS:
1. The time limit for completing the work authorized ends within three
years of the date of this permit. If 'you find that you need more time
to complete the authorized activity, submit your request for a time
extension to this office for consideration at least four months before
the date is reached.
2. You must maintain the activity authorized by. this permit in good
condition and in conformance with the terms and conditions of this
permit. You are not relieved of this requirement if you abandon the
permitted activity, although you may make a good faith transfer 'to a
third party upon written notification to this office. Should you wish
to cease to maintain the authorized activity or should you desire to
abandon it without a good faith transfer, you must obtain a
modification of this permit from this office; which may require
restoration of the area.
3 . If you discover any previously unknown historic or archeological
remains while accomplishing the activity authorized by this permit, you
must immediately notify this office of*what you have found. We will
initiate the Federal and state coordination required to determine of
the remains warrant a recovery effort or if the site is eligible for
listing in the National Register of Historic Places.
4. You must allow representatives from 'this office to inspect the
authorized activity at any time deemed necessary to ensure that it is
being or has -been accomplished in accordance with the terms and
conditions of your permit.
Special conditions:
Further Information:
1. Limits of authorization.
a. This permit does not obviate the need to obtain other Federal,
state, or local authorizations required by law.
b. This permit does not grant any property rights or exclusive
privileges.
c. This permit does not authorize any injury to .the property or
rights of others.
_1_ ;
d. This permit does not authorize interference with any existing
or proposed Federal project.
2. Limits to Federal Liability. In issuing this permit, the Federal
Government does not assume any liability for the following:
a. Damages to the permitted project or uses thereof as a result
of other permitted or unpermitted activities or from natural causes.
b. Damages to the permitted project or uses thereof as result of
current or future activities undertaken by or on behalf of the United
States in the public interest.
c. . Damages to persons, property, or to other permitted or
unpermitted activities or structures caused by the activity authorized
by this permit.
d. Design or construction deficiencies associated with the
permitted work.
e. Damage claims associated with any future modification,
suspension, or revocation of this permit.
3 . Reliance on Applicant's Data: The determination of this office
that issuance of this permit is not contrary to the public interest was
made in reliance on the formation you. provided.
4. Reevaluation of Permit Decision: This office may reevaluate its
decision on this permit at any time the circumstances warrant.
Circumstances that could require a reevaluation include, but are not
'limited to, .the 'following:
a. You fail to comply with 'the terms and conditions of the
permit.
b. The information provided by you in support of your permit
application proves to have been false, incomplete, or inaccurate (See 3 ,
above) .
C. Significant new information surfaces which this office did not
consider in reaching the original public interest decision.
Such a reevaluation may result in a determination that it is
appropriate to use the suspension, modification, and revocation
procedures contained in 33 CFR 325.7 or enforcement procedures such as
those contained in 33 CFR 326.4. and- 326.5. The referenced enforcement
procedures provide for the issuance of an administrative -order
requiring you to comply with the terms and -conditions of your permit
and for the initiation of legal action where appropriate. You will be
required. to pay for any corrective measures ordered by this office, and
if you fail to comply with such directive; this office may in certain
situations (such as those specified in 33 CFR 209.170) accomplish the
corrective measures by contract- or otherwise and bill you for the cost.
5. Extensions. General condition 1 establishes a time limit for the
completion of the activity authorized by ,this permit. Unless there are
circumstances requiring either a prompt completion of the authorized
activity or a reevaluation . of the public interest decision, .the Corps
will normally give favorable consideration to a request for an
extension of this time limit.
-2-
1
New York. State Department of Environmental Conservation
Building 40—SUNY, Stony Brook, New York 11790-2356
Telephone (516) 444-0365
Facsimile (516) 444-0373 via
Langdon Marsh
Commissioner
March 30, 1995
Ms. June Duffner
915 Bungalow Lane
Mattituck, NY 11952
RE: 1-4738-01048/00001-0
Dear Permittee:
In conformance with the requirements of the State Uniform
Procedures Act (Article 70, ECL) and its implementing regulations
(6NYCRR, Part 621) we are enclosing your permit. Please read all
conditions carefully. If you are unable to comply with any
conditions, please contact us at the above address.
Also enclosed is a permit sign which is to be conspicuously
posted at the project site and protected from the weather. r ,
Very truly yours,
Marga.2t M. Rorke
EnCon Program Aide
MMR:cg
enclosure
i�printed on recycled paper
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
DEC PERMIT NUMBER EFFECTIVE DATE
l-4,13y-,0100 00 0/-0 4Rd9 4.� /99S
FACILITY/PROGRAM NUMBERS) PERMIT EXPIRATION DATECS)
(TWS P I Under the Envi rarmentaL / ^e-e g J/ /pD p
Conservation Law
70
TYPE OF PERMIT ®. New ❑ Renewal ❑ Modification ❑ Permit' to Construct ❑ Permit to Operate
e Article 15, Title 5: Protection a 6NYCRR 608: Water Quality ❑ Article 27, Title 7; 6NYCRR 360:
of Waters Certification Solid Waste Management
❑ Article 15, Title 15: Water ❑ Article 17, Titles 7, 8: SPDES ❑ Article 27, Title 9; 6NYCRR 373:
Supaly . _ Hazardous Waste Management
Article 19: Air Pollution
❑ Article 15, Title 15: Water Control ❑ Article 34: Coastal Erosion
Transport Management
❑ Article 23, Title 27: Mined Land
�. ❑ Article 15, Title 15: Long Reclamation ❑ Article 36: Floodplain
�•' Island Wells Management
^u Article 24: Freshwater'WetLands
❑ Article 15, Title 27: Wild, 1 ❑ Articles 1, 3, 17, 19, 27, 37;
Scenic and Recreational Rivers a Article 25: Tidal Wetlands 6NYCRR 386: Radiation Control
❑ Other:
PERMIT ISSUED TO TELEPHONE NUMBER
�unlE Jc(FFn!EPam. (sly) 411 ='2Lo
ADDRESS OF PERMITTEE
q1,5 +,BU� ALQW eAnlE` MArnrueK NY 165-z'
CONTACT PERSON FOR PERMITTED WORK SM.0. e04s111-77AlQ TELEPHONE NUMBER
qL CAI 4 9 . -:J t(5 Po. 6c))( 441 GJuocUE ail y� /19S9- dL14-7 (,sip 653 060 7
NAME AND ADDRESS OF PROJECT/FACILITY
• �AmE As PEkm�rrE�
LOCATION OF PROJECT/FACILITY
COUNTY :Ax, "rOLtiAJ WATERCOURSE NYTM COORDINATES
SUFFOLfe- .SouTNOLQ >EEP l/vLE okiecK. E: H:
DESCRIPTION OF AUTHORIZED ACTIVITY
Construct, reconstruct, replace or repair open pile catwalks or docks having a maximum surface width of 4 feet; and
install or re lace floating docks and ramps. ALL 1I0KK Ta 6600,46 M 46CDRDAAJL-C id irg APPRan)
t,IbDec PI-An -
NOTE: Additional activities described on page (3) are also approved under this permit if the adjoining box is checked
and the proposed work is shown on the approved plan.
By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the
Environmental Conservation Law (ECL), all applicable regulations, the General Conditions specified (see page 2) and all
applicable Special Conditions included as part of this permit.
PERMIT ADMINISTRATOR: • ADDRESS
Eo/�� L+1 ffAnlmA.eTN Bldg. 40, SUNY, Stony Brook, New York 11790-2356
AUTHORIZED SIGNATTU/RE DATE 7/0?,
� /�-S Page 1 of 6
GENERAL CONDITIONS
*'Instructions
1. The permitted site or facility, including relevant records, is subject to in-
spection at reasonable hours and intervals by an authorized representative of
the Department of Environmental Conservation (the Department) to determine
whether the permittee is complying with this permit and the ECL. Such represen-
tative may order the work suspended pursuant , to ECL 71-0301 and SAPA 401(3) . A
copy of this permit, including all referenced maps, drawings and special
conditions, must be available for inspection by the Department at all times at
the project site. Failure to produce a copy of the permit upon request by a
Department representative is a violation of this permit.
Permit Changes and Renewals
2. The Department reserves the right to modify, suspend or revoke this permit when:
a) the scope of the permitted activity is exceeded or. a violation of any
condition of the permit or provisions of the ECL and pertinent regula-
tions is found;
b) the permit was obtained by misrepresentation or failure to disclose
relevant facts;
c) new material information is discovered; or
d) environmental conditions, relevant technology, or _applicable law' or
regulation have materially changed since the permit was issued.
3. The permittee must submit a separate written application to the Department for
renewal , modification or transfer of this permit. Such application must include
any forms, fees or supplemental information the Department requires. Any
renewal , modification or transfer granted by the Department must be in writing.
4. The permittee must submit a renewal application at least:
a) 180 days before expiration of permits for State Pollutant Discharge
Elimination System (SPDES) , Hazardous Waste Management Facilities
(HWMF), major Air Pollution Control (APC) and Solid Waste Management
Facilities (SWMF) ; and
.b) 30 days before expiration of all other permit types.
5. Unless expressly provided for by the Department, issuance of this permit does
not modify, supersede or rescind any order or determination perviously issued by
the Department or any of the terms, conditions or requirements contained in such
order or determination.
Other Legal Obligations of Permittee
6. The permittee has accepted expressly,. by the execution of the application, the
full legal responsibility for all damages, direct or indirect, of whatever
nature and by whomever suffered, arising out of the project described in this
permit and has agreed to indemnify and save harmless the State from suits,
actions, damages and costs of every name and description resulting from this
project.
7. This permit does not convey to the permittee any right to trespass upon the
lands or interfere with the riparian rights of others in order to perform the
permitted work nor does it authorize the impairment of any rights, title, or
interest in real or personal property held or vested in a person not a party to
the permit.
8. The permittee is responsible for obtaining any other permits, approvals, lands,
easements and rights-of-way that may be required for this project.
Page 2 of (o
AW
115.20•0a(7 1�21I-2Sc
ADDITIONAL GENERAL CONDITIONS FOR ARTICLES 15 (Title 51, 24, 25, 34 and 6 NYCRR Part 608 ( )
9 That if future operations by the State of New York require an al- other environmentally deleterious materials associated with the
teration in the position of the structure or work herein authorized,or protect.
if, in the opinion of the Department of Environmental Conservation 13 Any material dredged in the prosecution of the work herein permitted
it shall cause unreasonable obstruction to the free navigation of said shall be removed eveniv,without leaving large refuse piles,ridges across
waters or flood flows or endanger the health• safety or «elfare of the bed of a watenyav or floodplain or deep holes that may have a
the people of the State, or cause loss or destruction of the natural tendency to cause damage to navigable channels or to the banks of
resources of the State;the owner may be ordered by the Department to a waterway.
remove or'after the structural work, obstructions, or hazards caused
thereby without expense to the State, and if, upon the expiration or 14 There shall be no unreasonable interference with navigation by the work
revocation of this permit, the structure, fill• excavation, or other herein authorized. _
modification of the watercourse hereby authorized shall not be com- 15. It upon the expiration or revocation of this permit,the project herebv
pleted, the owners, shall, without expense to the State, and to such authorized has not been-completed•the applicant shall.%%ithout expense
extent and in such time and manner as the Department of Environmental to the State. and to such extent and in such time and manner as the
Conservation may require,remove all or anv portion of the uncompleted Department of Environmental Conservation may require,remove all or
structure or fill and restore to its former condition the navigable any portion of the uncompleted structure or fill and restore the site
and flood capacity of the watercourse.No claim shall be made against -fo its former condition. No claim shall be made against the State of
the State of New York on account of am such removal or alteration. New fork on account of anv such removal or alteration.
10 That the State of New York shall in no case be liable for any damage 16 If granted under 6 NYCRR Part 608, the N1•S Department of Environ-
�.._ or injury to the structure or work herein authorized which may be caused mental Conservation hereby certifies that the subject project will not .
by or result from future operations undertaken by the State for the contravene effluent limitations or other limitations or standards under
conservation.or improvement of navigation,or for other purposes,and Sections 301. 302, 303. 306 and 307 of the Clean Water Act of 1977
no claim or right to compensation shall accrue from anv such damage. (PL 95-217)provided that all of the conditions listed herein are met.
11 Granting of this permit does not relieve the applicant of the respon5i- 17. All activities authorized by this permit must be in strict conformance
bility of obtaining any other permission. consent or approval from with the approved plans submitted by the applicant or his agent as part
the U.S. Army Corps of Engineers. U.S Coast Guard, New fork State of the permit application.
Office of General Services or local government which may be required.
12. All necessary precautions shall be taken to preclude contamination Such approved plans were prepared by
of anv wetland or waterwav by suspended solids, sediments, fuels. l rd.o. (20r4 s 11 LT/,JCS on -7.2 7
solvents, lubricants,epoxy coatings•paints,concrete, leachate or anv
SPECIAL CONDITIONS
Additional APproved A tivities if box is checked I
❑ Install up to four (4Afootpa
s (see special conditions 8
and 9) .
I
❑ Construct a boat lift
❑ Construct a board walup to four (4) feet in width
to access the dock (sditions 10 and 11) .
I
Important: Refer to Special Conditions on the following pages which
apply specifically to any additional activities checked.
i
nIC PERMIT NUmBI-R
I
PRCGR.A.M FACILITY NU,NIBER i
Tic1 S / Page 3 of 6
1
%20-6f(671-25e NEW YO ATE DEPARTMENT OF ENVIRONMENTAL CONSERVAI 9b
SPECIAL CONDITIONS
For Article d6 ( Tl-DAL uIE7-1_RAJPS
1. The use of wood treated with pentachorophenol in the constructio
of structures that will be in contact with tidal waters is
strictly prohibited.
2 . Those portions of docks, catwalks and ramps which extend over
`. vegetated tidal wetlands shall have a maximum surface width of 4
feet and .shall be a minimum of 3 1/2 feet above grade, as *
measured from the ground surface to the bottom of the planking.
Floating docks shall not rest on vegetated tidal wetlands at any
tidal stage:
3 . Docks and floats shall not: (a) extend laterally beyond propert
lines, (b) be placed so that docked boats extend over adjacent
property lines, (c) interfere with navigation, (d) interfere
with other landowners ' riparian rights.
4. Dock reconstruction or replacement or seasonal installation shal
not involve expansion or substantial modification of existing
structures or facilities.
5. Installation of additional docks at marinas, boat basins, or
other commercial facilities is not authorized by this permit.
6. No dredging, excavating or other alteration of shoreline or
underwater areas is authorized by this permit, nor shall issuanc
of this permit be construed to suggest that the Department will
issue a permit for such activities in the future.
7. Any debris or excess materials from clearing or construction
activities performed under this permit must be immediately and
completely removed from the wetland adjacent area and disposed o
at an upland site. Disposed of-debris in tidal wetlands is prohibit id.
DEC PERMIT NUMBER
FACILITY ID NUMBER PROGRAM NUMBER
Tu1S P � Page � or 6
�_..
95r20.6i(7187)-25c `EW YC fA7E DEPARTMENT OF ENVIRONMENTAL CONSERYJ lie
SPECIAL CONDITIONS
For Article
Mooring Piles (if approved, see page ) -
8: No structures are to be on ructed on pilings without further
authorization of the Depa went.
9. Pilings shall not: (a ext d beyond property lines, (b) be
placed so that docke oats tend over property lines, (c)
interfere with navi ation, ( interfere with riparian rights. other landowners'
Access paths, boardwalks .(if approved, see page 3)
10. The ground area cleared for construction of a path or boardwalk
is limited to a maximum width of six (6) feet. The path or
boardwalk itself is limited to a maximum width of four (4) feet.
11. Cover material- used for footpath 'is 'limited to natural wood/bark
chips, stone, gravel or sand.
DEC PERMIT NUMBER
FACILITY ID NUMBER PROGRAM NUMBER
Page S of 6
r
SUPPL NTARY SPECIAL CONDITION!
The following conditions apply to all Tidal Wetlands; Freshwater
Wetlands; Coastal Erosion Management; and Wild, Scenic, and
Recreational Rivers Permits:
A. A copy of this permit, including all conditions and
approved plans, shall be available at the project site,
whenever authorized work is in progress. The permit
sign enclosed with the permit shall be .protected from
the weather and posted in a conspicuous location at the
work site until all authorized work has been completed.
B. The permittee shall require that any contractor,
project engineer, or other person responsible for the
` overall supervision of this project reads, understands,
and complies with this permit and all its general,
special, and supplementary special conditions. Any
failure to comply precisely with all of the terms and
conditions of this permit, unless authorized in
writing, shall be treated as a violation of the
Environmental Conservation Law. If any of the permit
conditions are unclear, the permitt'ee shall contact the
Division of Regulatory Affairs at the address on page
one or telephone (516) 444-0365 .
C. If project design modifications become necessary after
permit issuance, the permittee shall submit the
appropriate plan changes for approval by the Regional
Permit Administrator prior to undertaking any such
modifications. The permittee is advised that
substantial modification may require submission of a
new application for permit.
D. At least 48 hours prior to commencement of the project,
the permittee and contractor shall sign and return the
top portion of the enclosed notification form
certifying that they are fully aware of and understand
all terms and conditions of this permit. Within 3o
days of completion of the permitted work, the bottom
portion of that form shall also be signed and returned,
along with photographs of the completed work and, if
required, a survey.
E. For projects involving activities to be undertaken in
phases over a period of more than one year, the
permittee shal' notify the Regional Permit
Administrator in writing at least 48 hours prior to
reccmmencing wcrk in subsequent years .
F. The granting of this permit does not relieve the permittee
of the respcns'_ ility . of obtaining a grant, easement, or
other necessary amuroval from the Division of Land
Lti_ization, 0==ice of General Ser-z ces, Tower Building,
MIOire State Plaza, Albany, N'' 12242 (516) 474-2195, which
may be regu'_rzc for any encroacament upon State-owned lands
underwater.,
DEC Permit No. �1049110000/-0 Page l of 6
I
J
95-20-1 (8187)-9d
New York State
Department of Environmental Conservation
oboeNOTICE
The Department of Environmental Conservation (DEC) has issued
permit(s) pursuant to the Environmental Conservation Law
for work being conducted at this site. For further information
regarding the nature and extent of work approved_ an-d any
Departmental conditions on it, contact the Regional Permit
Administrator listed below. Please refer to the permit number
shown when contacting the DEC.
Regional Permit Administrator
Permit Number 'X .3F-47 DDOD�(, ���� A. GR"NE
Expiration Date
NOTE: This notice is NOT a permit
:
a gym;;
STATE OF NEW YORK
i
DEPARTMENT OF STATE
ALBANY. NY 12231-0001
ALEXANDER F. TREADWELL -
SECRETARY OF STATE
March 2, 1995
Mr. Glenn E. Just
J.M.O. Consulting
P.O. Box 447
Quogue, NY 11959-0447
Re: F-95-026
U.S. Army Corps of Engineers/New York
District Permit Application #95-00430-L2
June Duffner
Town of Southold, Suffolk County
Letter of Permission Issuance
Dear Mr. Just:
The Department of State has reviewed the information received on February 10, 1995
describing the above proposed project.
Based upon the information submitted, the Department of State has no objection to the
authorization of this proposed project by Letter of Permission. No further review is
required by the Department of State.
We appreciate your referring this information to the Department of State for review.
The U.S. Army Corps of Engineers. is being notified of'this decision by copy of this letter.
Sincerely,.
' J,
William F: Barton
Chief, Consistency Review
and Analysis, Bureau rv-,
Division of Coastal Resources
and Waterfront.Revitalization
WFB/WM/jtb
cc: COE/New York District - Sophie Ettinger
DEC/Region 1 - Robert Greene . .
LJ printed on recycled.paper
` 1
l O
' O
Q�39 �
Q yob
N h
J
O ^
v F OL
9
o
pWPrw
x O
CK ' d w
DEEP HOLE CREEK h Stu, ° 0
FLOOD Egi�-� roc}' N "
WIDTH ry 250"
K Mat
GX20rFLOAT
-3' Suffolk Cou
nnty
ScHagaler1" 300 25
_2'
q� X 12 RA P
AHIy �•V �, y P-� ROB X34-" F1 XED DOCK
DLKD, `N
N
ISTY Applicant proposes to remove
existing 32"x34 ' fixed dock,
SFD construct 'x34 ' fixed dock,
reconstruct existing 3 'x12 '
ramp and reinstall existing
6 'x20 ' float . At Deep Hole
Creek Mattituck Town of
Southold Suffolk County N.Y.
P Applicant : June Duffner
= Purpose : Private recreation-
< F_ al docking
�h `r — Datum: Mean Low Water
L Locus : �2' 39 ' /40' 59 '
z U_ Project location :
Z 915 Bungalow Lane
Mattituck
S.C . T.M.No . .
ISTY
SFD
w
L�
off SCALE
�v I-, �
40
0 20 40
SHEET 2 OF 3
JMO CONSULTING QUOGUE) NY 516-653-066�