Loading...
HomeMy WebLinkAboutHARBORVIEW f ENVIRONMENTAL ASSESSMENT FORM HARBORVIEW LANDING SUBDIVISION AND CHANGE OF ZONE SOUTHOLD, NEW YORK ADDITIONAL INFORMATION This Environmental Assessment From (EAF) is submitted for the proposed action to subdivide 24 . 959 acres from a 83 . 117-acre parcel to enable the construction of 40 clustered townhouse units . A change of zone for the subdivided 24 . 959 acres from the current "Residential A" to "M-1 " would be required to permit construction of the attached townhouse units . The remaining 58 . 157 acres, representing 70% of the site , would be preserved and dedicated to the Nature Conservancy or a similar organiza- tion to be held in trust as forever wild. The site, approximately 83 acres , is located east of Main Road (Route 25) , north of Tarpon Drive and north of Southold Bay in the Town of Southold. The site is designated on the Suffolk County Tax Map as Section 53 , Block 5 , Lots 12 . 3 and 12 . 4 and is owned by Harborview Realty Co . with offices at 300 Rabro Drive in Hauppauge, New York. The property is currently zoned "Residential-A" and contains 31 substandard, non-conforming cottages . The proposed action would remove the cottages and construct a well-designed, upscale, low-density residential development . A rezone to "M-1" is requested on the development portion of the site ( 24 . 959 acres ) in order to construct the proposed project . The proposed project would conform, in all areas, with the M-1 Multiple Residence District except for the necessity of a variance for the separation between principal buildings . „ 6 ,FS.'Approvals Required: Submittal Type Date Cft�, Town, VTI#age board lxlYes DNo Zoning_Change Pending Crtf, Town, V+Jfage Planning Board 0Yes 17.1No Subdivision/Site Plan Approval ERy, Town Zoning Board of Appeals JMy0s f 1Nc., Variance Eity, County Health Department Eyes ❑No Sewage and water Other Local Agencies RYes ❑No Greenport Water District Other Regional Agencies Dyes f-1No State Agencies DEC 21Yes ❑No Wetlands Permit Federal Agencies ❑Yes GJNo Town Trustees [@ Yes Wetlands C. Zoning and Planning Information 1 . Does proposed action involve a planning or zoning decision? tac]Yes ❑No If Yes, indicate decision required: ®zoning amendment ❑zoning variance LJspecial use permit i ISUbdivision Llsite plan ❑new/revision of master plan ❑resource management plan ❑other 2. What is the zoning classification(s)of the site? Residential A 3. What is the maximum potential development of the site if developed as permitted by the present zoning? 31 units existing 4. What is the proposed zoning of the site? M-1 General Multiple - Residence District 5. What is the maximum potential development of the site if developed as permitted by the proposed zoning? 40 units 6. Is the proposed action consistent with the recommended uses in adopted local land use plans? ®RYes ❑No 7 What are the predominant land use(s) and zoning classifications within a '/, mile radius of proposed action? Res. A Land use is rimaril single-family residential on average lot size of 10,000 sq.ft. and commercial marina use 8. Is the proposed action compatible with adjoining/surrounding land uses within a 1/4 mile? ®Yes ❑No 9. If the proposed action is the subdivision of land, how many lots are proposed? 2 sections:58.157 -acres orevex-wild a. What is the minimum lot size proposed?24.959 acres for 40 unit townhouse development 10. Will proposed action require any authorization(s) for the formation of sewer or water districts? Dyes K N o 11 . Will the proposed action create a demand for any community provided services (recreation, education, police. fire protection)? 0Yes ❑No a. If yes, is existing capacity sufficient to handle ;projected demand? 2yes ❑No 12. Will the proposed action result in the generation of traffic significantly above present levels? Dyes 1ANo a. If yes, is the existing road network adequate to handle the additional traffic? Dyes ❑No D. Informational Details Attach any additional information as may be needed to ,clarify your project. If there are or may be any adverse impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or avoid them. E. Verification I certify that the information provided above is true to the best of my knowlc:clbe. Applican onso N J P nnin orp._for Harborview Realty Co. February_ 11, 1988 - Date _ Signature_ 'ride Jean A. Cel nder, Pres 'dent If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form bet nJ proceeding with this assessment. 6 /' ENVIRONMENTAL ASSESSMENT FORM ADDITIONAL INFORMATION (CONT'D ) The clustering of the buildings reduces the impacts on the natural features of the site and reduces the amount of imper- vious surfaces necessary for road and walkways . It also allows the new structures to remain in the area currently occupied by. the unconforming cottages . This project would consist of 40 townhouse units which would be clustered in 10 buildings ( 4 units per building) along the southern half and the point of the eastern most portion of the property. (See attached site plan. ) This configuration follows , in essence, that of the existing 31 substandard cottages and, therefore, would reduce the impact to the site ' s sensitive natural features . Among the amenities providead for the development would be 40 boat slips, a dock house for storage and 2 tennis courts , all of which would be available for residents only. A total of 90 parking spaces would be provided, 40 of which would be in two 20-car garages. The additional parking would be provided proxi- mate to each townhouse cluster except for 8 spaces , which would be located at the tennis court area. An interior roadway/walkway system would be constructed within the subdivided 24 . 959 acres . This system would be designed as a private road with ac.ress controlled at a gate house at the entrance to the development . Access would be maintained to Main Road, through the dedicated portion of the 7 ENVIRONMENTAL ASSESSMENT FORM ADDITIONAL INFORMATION (CONT 'D. ) property, using the existing roadway. This roadway will remain as-is with only minor repairs necessary for safe use (such as pothole repair) . In addition to concentrating the development in the area of the property that contains the existing structures, the site plan will maintain the integrity of wetland areas by observing 75-foot setbacks for all components of the development . The existing bulkhead in the eastern portion of the site along Southold Bay (approximately 375 feet) was severely damaged by Hurricane Gloria (September 27 , 1985 ) . The bulkhead will be restored with similar materials to original condition under an existing Army Corps of Engineers permit . A permit granted by the Town Trustees of October 21 , 1985 lapsed and a request for its reissuance has been submitted. A previous application for a subdivision entitled "Sage Property, Section 1 , " was determined not to have a significant effect on the environment (Negative Declaration) and was granted approval by the Southold Planning Board on March 4 , 1985 . This application was amended on November 6 , 1985 and included, in brief , the following modifications : 1 . single-phased project 2 . 23 cluster lots as opposecl. to 31 lots in two sections 3 . removal of non-conforming cottages 4 . removal of docks on east side of lagoon and replacement with a floating 18-slip dock on the west side of the lagoon and a smaller 5-slip dock 5 . Preservation of 32 . 61 acres of open space . 8 ENVIRONMENTAL ASSESSMENT FORM ADDITIONAL INFORMATION (CONT 'D. ) The current plan represents a further• improvement in design and protection of environmental features with a significant increase in land area which will be undeveloped and kept forever wild. Although there is a slight increase in the number of units, there are benefits to clustered multi-family units when compared to single-family lots . Water district records and Census figures have shown that condominium units have a reduced number of persons per unit and that water use is substantially less compared to single family homes . Attached homes are energy efficient and land held in common is maintained in a more environmentally responsible and professional manner in terms of landscaping and maintenance. The following information is supplied to further clarify responses to the EAF. The numbered notes refer to the item numbers on the EAF. ( Item Al2 ) Unique Land Forms In addition to the 1 . 566+ acre island at Conkling Point , which will be kept forever wild, an additional 56 . 591 acres would remain undeveloped. This acreage includes the, 11 . 551 acres of underwater land. 9 ENVIRONMENTAL ASSESSMENT FORM ADDITIONAL INFORMATION (CONT - D . ) ( Item B13 ) Sewage The project site is located in Hydrogeologic Zone IV, which is outside of the deep recharge area of Hydrogeologic Zone III as defined in the "208 study. " According to Suffolk County Health Department regula- tions , a conventional sub-surface sewage disposal system may be approved when the equivalent wastewater flow of 600 gallons per day per acre in Zone IV is not exceeded as long as there is a public water supply available and the soils and groundwater condi- tions are conducive to the proper operation of a sub-surface sewage disposal system. At maximum, each cluster of the proposed development would have a design flow requirement of 1 , 200 gallons per. day ( 4 units x 300 gallons per unit) . For the total 10 clusters , design flow would equal 12 ,000 gallons/day which is well within the 14 ,975 gallon per day equivalent wastewater flow ( 24 . 959 acres x 600 gpd) . 10 ENVIRONMENTAL ASSESSMENT FORM ADDITIONAL INFORMATION (CONT'D. ) Test hole data collected in 1985 indicated that soils on-site are capable of supporting sub-surface septic tanks and cesspools . The proposed action would eliminate the present old sub-surface systems which .service the existing cottages. ( Item B23) Water Use Public water by the Greenport Water District is available on-site via an existing water main along Sage Road. New connections will be provided to the water main for each of the new residences . Suffi- cient supply of potable water is available to service this development , which is projected to have an maximum water use of 12 , 000 gallons per day for the summer. months . In accordance with 6 NYCRR Part 617 (State Environmental Quality Review Act Regulations) , the applicant sets forth as indicated by the insignificant effects noted above, that the proposed action will not have a significant effect on the environment and should be issued a Notice of Non-Significance (Negative Declaration) by the Lead Agency. b 11 i T ship.�1�r�:�'::''//� t� 4'�i - 1 J "./,\\ a.:.y.�b v.o•:v �_ i �y.��a'\\ice �_�``l/ •_� '2� � '.' � - - \ � \\ X. W. ...,L.•r ��'$:. � .l \•'t •c �+ ,� ��'�\� ^ram \ \ i \ X. I �� ,t,.-•• `II\,I T \:i� \ �" •:�i�.�/�ji�r -r��r'1 r -�r •i - y\� , 4 I� � ��J� \ - - �,� I t .. I •1�- �`\v �.\\,/�\� \ .^` �' _-_ i'.; I�J.L,i. � L'�'..J, `',li,..'tiv,,H. � 1•-/ �- \\ _ Vi �t ..•J ``�r r-t7 n i'���r f' `�(�"_ :I �••.''';�•-� �_�I. •� w....eae• � _ \\{ r '•r j I PROJECT DATA' \\ ` Total, Site Area 83.117 acres \ \ I �. \\ Project Development Area- '24.959 acres,(307. of site) \ * \ Balance to be left"as a, T�p 157 acres (707 Forever Vild 58 of site ) \� SOUTHOL D- BAY 40 Townhouse Units 10 Cluster Buildings (4 units in each /\• \` \.�' 90 Parking Spaces Provided (40 garaged)' sHErcN stAN PREPARED FOR -• 40 Boat Slips pRENDOLPH CORPORATIDN - i- 17 2 .Tennis Courts SAGE PROPERTY ' 1- Dock House (Storage) .rmre+:o.i,rw+v:m,ao,,wsaac. ..: 1 Gate House Roadway/Walkway Network (private scale) HAPSORVIEW LANDING FRENDOLP.. CORPORATION 1 � _ i•. .w. SEO R µ617.21 Appendix E State Environmental Quality Review POSITIVE DECLARATION Notice of Intent to Prepare a Draft EIS Determination of Significance " Project Number 'Petition No. 286 Date April 19, 1988 This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State Environmental Quality Review Act) of the Environmental Conservation Law. The Southold Tnwn Rnarrl as lead agency, - has determined that the proposed action described below may have a significant effect on the environment and that a Draft Environmental Impact Statement will be prepared. Name of Action: Harborview Realty Change of Zone SEAR Status: Type I ❑ i Unlisted Description of Action: Proposal is for a change ofzone on 24 .959 acres from A-R Acrricultural- Residential District to M-1 General Multiple Residence District, to provide for the development of 40 homes in 10 buildings. Location: (Include street address and the name of the municipality/county. A location map of appropriate scale is also recommended.) Proposal is located at Main Road and Sage Boulevard, Greenport; Suffolk County Tax Map' No. .1000-53-5-12. 3 and 12.4; See also location map. • SEOR Positive Declaration Page 2 ' Reasons Supporting This Determination: I A) See Part II and Part III attached, and B) The proposed zone change is requested on 24.959 acres of land and would constitute a TvDe I action if it were proposed for -25 acres of land. This ;is interpreted as contrivance 'to avoid an automatic Type I classification. For Further Information: Contact Person: Judith T. Terry, Town Clerk Address:-Town Hall, 53095 Main Road, Southold, NY 11971 Telephone Number. 516-765-1801 A Copy of this Notice Sent to: Commissioner, Department of Environmental Conservation, 50 Wolf Road,Albany, New York 12233-0001 Appropriate Regional Office of the Department of Environmental Conservation (Stony Brook,NY) Office of the Chief Executive Officer of the political subdivision in which the action will be principally located. Applicant (if any) Other involved agencies (if any) ! Southold Town Building Department Southold Town Planning Board Town Clerk's Bulletin Board Jeffrey D. Forchelli, Esq. , for Harborview Realty Co. Suffolk County Department of Planning Suffolk County Department of Health Services B. Water Resources 1. Groundwater items a-b 2. Surface water items a-d The surface water to be discussed includes the water to the East of the existing access road and the water quality within the Bay. D. Terrestrial and Aquatic Ecology items 1-3 E. Agricultural Resources - are not required to be addressed. Human Resources A. Transportation 1. Transportation items a-b. Traffic counts are required for Main Road (Rt. 25) and Sage Blvd. , Kerwin and Main Road (Rt. 25) and August Acres road intersection with Kerwin. It was noted that the spur road from the August Acres subdivision road will be the main access into the site and the access from Sage Blvd. to Main Road will be secondary. The traffic for the traffic count should be weekend, seasonal traffic. Consideration of existing traffic conditions from the cottages may also be taken into account. It was noted that the marina continues use over the existing right-of-way which they have and will not be allowed to use the proposed right-of-way. There is no right-of-way passage over the existing right-of-way for the existing cottages since they are only seasonal rental units. B. Land Use and Zoning Items- 1-3 It was noted that the wetlands in close proximity to the proposed access road should be flagged, however, it would not be necessary to flag the entire site. A mechanism to preserve the "forever wild" land is to be included. The existing land use, adopted master plan, and proposed zoning should be indicated. A public benefit for the change of zone should also be indicated. The project description should show the layout. Community Services 2. Police Protection 3. Fire Protection 8. Public Water Supply 10. Sewage Treatment Facilities SZEPATOWSKI ASSOCIATES INC. ENVIRONMENTAL CONSULTANTS SAN These services should be described to the degree that an impact is anticipated. The above four should be discussed in depth and to a lesser degree the following: education facilities, health care facilities, social services, recreational facilities, utilities and solid waste disposal. Demography - there should be a general discussion of this. Cultural Resources 1. Visual Resources items a-c any elevations of the buildings should be included. 2. Historic and Archaeological Resources items a-b. The archaeological resources should include a statement from a recognized source. V. Significant Environmental Impacts - The following should be discussed: - Construction in a flood zone - Dredging - It was noted that there may be dredging to deepen the dock area. - Documentation for Suffolk County Department of Health Services and Village of Greenport. It was agreed that there could be a parallel review of the DEIS and Health Department review. - Rare and endangered species - areas that may be disturbed should be reviewed and discussed. VI. Mitigation Measures to Minimize Environmental Impact should be discussed. VII. Adverse Environmental Effects should be discussed. VIII. Alternatives Items C-F This should also include a discussion on the existing and proposed zoning, the present application, no action, continuing the existing use, and R-40 zoning. Construction staging and time is not an important consideration. X. Irreversible and Irretrievable Commitment of Resources should be discussed. Aq SZEPATOWSKI ASSOCIATES INC. ENVIRONMENIAL CONSULTANTS PART III HARBORVIEW LANDING SAGE PROPERTY Access road will be constructed within 75 feet of freshwater ) wetlands quite possibly within wetlands. !!l Proposed buildings will be within a flood zone 40 boat slips are proposed in conjunction with proposal which will have an impact on water quality, drainage and parking. Proposal would need approval from the Suffolk County Department of Health Services for sewage disposal systems as well as for the water hookup. Without documentation, it is difficult to assess if the soil would support subsurface septic tanks and cesspools since the area conatins clay. Approval would also . be needed from the Village of Greenport for the water hook-up. As assessment would also be needed to determine the presence of rare, threatened and endangered species on the site and whether there would be any adverse impact. ,There would be a major reduction in aesthetic resources which are important to the community, although, there will be a preservation of open space, it may not mitigate the impact of the construction, especially the view from the water. There should be some public access provided and the impact of none should be discussed particularly with regard to the LWRP. W. The roadway access to the site is questionable since it is right-of-way which does not provide adequate width for new development. The 40 dwelling units proposed is twice the number that the Planning Board would ordinarily allow using a single access of adequate width. There should be a dedication of open space and proof that this will be left in fact "forever wild" AL 14 \ _ � � - - '\ eo � • m .� - ' jay iij% ri ' _ten/ ' + 11 ,-- _ \•\ N.•or.il.• t �\'— � �/ �•.1 ��1 "V.��/U��11 CY.//////�r� -, ' . \�. �ri�'• 1 i -7' '1'j-- /. ' �' ,ll� TJ,+�^• �� .ice-1-iJ'��,'� - r'.� `�. ,,; :-•„-.• � �,:• /�.,,-�• �. '- _ ,�' .;.;.fit, �-�- ��`�"<•:-_ - W. . o i' /•./. r 1 1. �— �.,,. i .-• \` -■. SKETCH RAN - 1 PREPAREO FOR-, �FRENOOLPH CORPORATION ',�JP- '. •'I J ,' ' - SAGE PROPERTY . -, : .. ,. „—�•.,�•�i _ ,P�M pPIVE 1t GII.IQI,IW.V Sw11.0.0.WI4.CMI.,.I /i �1r7- FRENOOLPH CORPORATION [, � ■wo Irerewwn■ tiieww.v Auwwwuoe.N.V. ola •Ion.r.eoo O Q 0 1 yaw SOUL Q ;,,:,FICULTURpL ZONING USE DISTRICT p RESIDENTIAL - 02 �� \ ` p}ZOpOSiED 1d b l G NERA. '; _TcLE P r RESIAENCE \ ut G� QG�� 8 ENO CA ir + -a Q \PV b J s \O�NC 1.ON\NG �y o vs Q / �. �w i? LOCATION MAP c� SCALE:1 =600' z X Z r Q 0 - Try s FRANK A. KUJAWSKI, JR., President Z TELEPHONE ALBERT J. KRUPSKI, JR., Vice-President (516) 765-1892 JOHN M. BREDEMEYER, III �y JOHN L. BEDNOSKI, JR. HENRY P. SMITH BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Town Hall, 53095 Main Road P.O. Box 728 Southold, New York 11971 To: Trustees From: Ilene Pfifferling, Clerk Re: Harborview Realty Company Date: June 28, 1988 Please review the- attached information and advise this office if there are any additional items that you wish to have addressed in the D.E.I.S. as soon as possible so that the Town Clerk can notify the applicant to furnish the information. The map will be reviewed on the 14 of July. Thank you. Au ff-1 0 y C' Town Hall, 53095 Main Road py • O� P.O. Box 1179 Southold, New York 11971 JUDITH T. TERRY TELEPHONE TOWN CLERK (516)765-1801 REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD June 27, 1988 ILENE: am forwarding herewith six copies of the change of zone petition with respect to Harb.orview Realty Co. , as well as the Positive Declaration, and Checklist and notes from Dave Emilita's Scoping Session. The formal maps are on file in my office should the Trustees wish to review them. SA SZEPATOWSKI ASSOCIATES INC. ENVIRONMENTAL CONSULTANTS & PLANNERS 41.0 RR COVED June 14, 1988 Mrs. Judith T. Terry Town Clerk Town of Southold Town Hall 53095 Main Road Southold, NY 11971 Re: Harborview Landing Change of Zone Application Dear Judy, Please find enclosed., for your records, a copy of the. scoping checklist and notes from the May 26th scoping session for the above mentioned proposal. We will forward a copy of each to Jean Celender as well. Ms. Celender will be preparing the DEIS. Please do not hesistate to contact me if you have any further questions-. Sincerely, ZEPATOWSKI ASSQCIATE INC. David J.S. Emilita, AICP Principal Planner DJSE:mt Enclosure cc: Jean Celender i 23 Narragansett Ave. Jamestown, RI 02835 (401) 423-0430 f J Scoping Session Harborview Landing Change of Zone May 26, 1988 Present were David Emilita, Diane Schultze, Lisa Marino and Barbara Szepatowski of Szepatowski Associates, Inc. (SAI) , Jean Celender for the applicant and staff member from her office, the applicant., and Melissa Spiro, Planner from the Town of Southold Planning Board. The purpose of this meeting was to advise the applicant what would be required in the DEIS for the proposed change of zone. Mr. Emilita advised that the following would need to be included in the DEIS from the scoping checklist: I. Cover Sheet II. Table of Contents and Summary III. Description of the Proposed Action A. -Project Purpose, Need and Benefits 1-4 B. -Location Items 1-4 C. -Design and Layout Items 1-4 D. -Construction and Operation Items 1-2 F. -Approvals Items 1-2 It was noted that depending on approvals, construction would be not more than I construction season, however, if it were more there would be concern about layover. IV. Environmental Setting A. Geology 2. Surface items a-e 3. Topography a 2" interval is acceptable` ' SZEPATOWSKI ASSOCIATES INC. ENVIRONMENTAL CONSULTANTS • C1+ANGE -OF- BONE SEQR Appendix D Zb �_J State Environmental Quality Review Scoping Checklist The following checklist of topics is intended B. Name or other descriptive title of the as a starting point for developing a detailed scope project for a project-specific Draft Environmental Impact C. Location(county and town,village or city) Statement. Typically, no one project will require of the project a discussion of all the topic areas contained in this D. Name and address of the lead agency document. Through the scoping process, the list which required preparation of the state- of topics should be refined to reflect issues unique ment and the name and telephone number to the proposed project. Topic areas may be de- of a person at the agency to be contacted leted, added or elaborated upon, to arrive at the for further information final scoping document. E. Name and address of the preparers of any The purpose of the checklist format is to iden- portion of the statement and a contact tify the basic topic areas'of the Draft EIS. This is name and telephone number accomplished by reviewing the list and placing a F. Date of acceptance of the Draft EIS check in the box located to the left of these topics G. In the case of a Draft EIS, the deadline which should be discussed. The model scoping date by which comments are due should checklist can also be used as a worksheet, be indicated including comments, suggestions and identifica- tion of the particular example(s)that are relevant to a detailed discussion of the topic or issue that I. Table of Contents and Summary has been checked. Conversely,those topics which A table of contents and a brief summary are re- are not checked,are issues not associated with the quired for Draft and Final EIS's. project and may be eliminated from discussion in The summary should include: the Draft EIS. A. Brief description of the action The next step is to expand the list to include B. Significant, beneficial and adverse im- or elaborate on those topics unique to the pro- pacts, (issues of controversy must be posed project.A blank sheet is included at the end specified) of the checklist for such additional information. C. Mitigation measures proposed The scoping process involves several steps in D. Alternatives considered addition to compiling a list of topics.Scoping also E. Matters to be decided(permits, approvals, includes discussions on the quantity and quality funding) of informaton required and the methods of obtain- ing that data. NOTE: This check list was designed to be III. Description of the Proposed Action used in conjunction with the section on scoping Place a check in the box to the left of those contained in SEQR Guideline-Draft and Final topics to be included in the draft EIS. • EIS's. It is also important to emphasize that this ❑ A. PROJECT PURPOSE, NEED AND checklist should serve only as a model to assist in BENEFITS the scoping of a Draft EIS. It should not be used 1 .Background and history as a substitute for actively scoping Draft EIS for 2.Public need for the project, and a specific project. municipality objectives based on ad- opted community developments plans 3.Objectives of the project sponsor 1. Cover Sheet 4.Benefits of the proposed action All EIS's (Draft or Final) shall begin with a a.) social cover sheet that includes: b.) econorq.ic A. Whether it is a draft or final statement . 1 r A L B. LOCATION 1.Establish geographic boundaries of a.) composition and thickness of the project (use of regional and local subsurface material scale maps is recommended) examples: 2.Description of access to site —depth to, and nature of, bedrock 3.Description of existing zoning of formations and impermeable layers proposed site —occurrence of an extractive 4.Other: mineral resource C. DESIGN AND LAYOUT —usefulness as construction 1 .Total site area material a.) proposed impervious surface area b.) earthquake potential (roofs, parking lots, roads) 2.Surface b.) amount of land to be cleared a.) List of soil types c.) open space b.) discussion of soil characteristics 2.Structures examples: a.) gross leaseable area (GLA), if —physical properties (indication applicable of soils hydrological (infiltration) b.) layout of buidings (attached, capabilities) enclosed, separate) —engineering properties (soil c.) site plans and profile view bearing capacity) d.) material storage —agricultural properties (soil e.) drainage plans profile characteristics) when agri- f.) above/underground pipelines cultural land resources are involved g.) staging area for material handling c.) distribution of soil types at project 3.Parking site a.) pavement area d.) suitability for use b.) number of spaces and layout examples: 4.Other: —agriculture —recreation CAD. CONSTRUCTION AND OPERATION —construction 1 .Construction —mining a.) total construction period anticipated e.) other: b.) schedule of construction E�r3.Topography c.) future potential development, on a.) description of topography at project site or on adjoining properties site d.) other: examples: 2.Operation —slopes a.) type of operation —prominent or unique features b.) schedule of operation b.) description of topography of sur- c.) other: rounding area W B. WATER RESOURCES (for projects of planned limited life such as 1 .Groundwater landfills) a.) location and description of aquifers [S t-. APPROVALS and recharge areas 1 .Required changes or variances to the examples: zoning regulations —depth of water table 2.Other permit approval or funding —seasonal variation reguirements —quality —quantity IV,. Environmental Setting —flow Place a check in the box to the left of those b.) identification of present uses and topics to be included in the Draft EIS. level of use of groundwater gxamples: Natural Resource —location of existing wells T A. GEOLOGY —public/private water supply —industrial uses —agricultural uses 2 2.Surface water —species presence and abundance a.) location and decription of surface —age waters located on project site or —size those that may be influenced by the —distribution project —dominance examples: —community types —seasonal variation —unique, rare and endangered —quantity species —classification according to New —value as habitat for wildlife York State Department of Health —productivity b.) identification of uses and level of ❑ 2.Fish, Shellfish and Wildlife use of all surface waters a.) list of fish, shellfish and wildlife examples: species on the project site and —public/private water supply within surrounding area, including —industrial uses migatory and resident species —agricultural uses b.) discussion of fish, shellfish and —recreational wildlife population characteristics c.) description of existing drainage examples: areas, patterns and channels —species presence and abundance d. discussion of potential for flooding, —distribution siltation, erosion and eutro- —dominance phication of water supply —unique, rare and endangered species ❑ 1 .Climate —productivity a.) discussion of seasonal variations ❑ 3.Wetlands and extremes a.) list wetland areas within or contiguous examples: to the project site —temperature b.) discuss wetland characteristics —humidity examples: —precipitation —acreage —wind —vegetative cover ❑ 2.Air quality —classification a.) description of existing air quality —benefits of wetland such as flood levels and erosion control, recreation examples: —list the National and State Air 1 .Soils Quality Standards for the project a.) list soils by name, slope and soil area and the compliance status group ranking within NYS Land for each standard Classification System b.) identification of existing sources (1 NYCRR 370) or pollutants-fixed or mobile b.) number of acres within each group c.) identification of any sensitive c.) location of site on soil survey map recepters in project area examples: ❑ 2•Agricultural land management —hospitals, schools, nursing system(s) homes, parks a.) inventory of existing erosion d.) description of existing monitoring control and drainage systems program (if applicable) examples: D. TERRESTRAL AND AQUATIC ECOLOGY: —subsurface drain lines—outlet/diversion ditches 1 .Vegetation + —strip cropping P a.) list vegetation types on the project —diversion terraces site and within the surrounding area b.) relationship of proposed action to b.) discussion of site vegetation existing soil and water conservation characteristics plans (if applicable) examples: 3 ❑ 3.Associated operations c.) description of any affected agri- a.) number and types of farm cultural district or other farmland . operations on and adjacent to site retention program boundary in and examples: surrounding the site —dairy ❑ 2.Land use plans —grain a.) description of any land use plans —orchard or master plans which include b.) type and proximity of farm project site and surrounding area related facilities b.) discussion of future development examples: trends or pressures —storage units/barns —sorting/packing houses El 3.Other; —refrigeration units ❑ C. COMMUNITY SERVICE (for this section —roadside markets include a list of existing facilities and a c.) access to cropland (including discussion of existing levels of usage and �. detached fields) projected future needs) d.) access for farm equipment to ❑ 1 .Educational facilities public roads 0 2.Police protection Human Resources 0' 3.Fire protection ❑El A. TRANSPORTATION 4.Health care facilities El 5.Social services ❑ 1 .Transportation services El 6.Recreational facilities a.) description of the size, capacity and condition of services ❑ 7.Utilities examples: CY 8.Public water supply —roads, canals, railroads, bridges ❑ 9.Solid waste disposal —parking facilities R� 10.Sewage treatment facilities —traffic control ❑ 11 .Other: —access/egress from site b.) description of current level of use PD. DEMOGRAPHY of services ❑ 1 .Population characteristics examples: a.) discussion of existing population —a.m. and p.m. peak hour traffic parameters flow examples: —vehicle mix —distribution —source of existing traffic. —density —household size and composition a.) description of the current avail- b.) discussion of projections for popu- ability of service lation growth b.) description of present level of use ❑ 2.Other: OE. CULTURAL RESOURCES . 1 .Visual resources ❑ B. LAND USE AND ZONING a.) description of the physical char- El 1 .Existing land use and zoning acter of the community a.) description of the existing land examples: use of the project site and the —urban vs. rural surrounding area b.) description of natural areas of examples: significant scenic value —commercial c.) identification of structures of —residential / significant architectural design —agricultural 2.Historic and archaeological resources —business a.) location and description of historic —retail areas or structures listed on State —industrial or National Register or designated —vacant by the community, or included on b.) description of existing zoning of Statewide Inventory site and surrounding area 4 b.) identification of sites having c.) institute a program for monitoring potential sinr-ificant archaeological water quality in adjacent wells value include results of cultural d.) require secondary or tertiary con- resource survey, if conducted tainment of products/wastes e.) contingency plans for accidental a.) identification of existing level of spills noise in the community f.) other: b.) identification of major sources of 2.Surface water noise a.) ensure use of soil erosion control examples techniques during construction and —airports operation to avoid siltation —major highways examples: —industrial/commercial facilities —hay bales • ❑ 4.Other: —temporary restoration of vege- tation to disturbed areas V. Significant Environmental impacts —landscaping eaQ b.) design adequate stormwater Identify those aspects of the environmental setting in Section IV that may be adversely or control system • beneficially affected by the proposed action and c.) construct/modify sewage treatment require discussion. facilities VI. Mitigation Measures to Minimize Environ- d.) restrict use of salt or sand for road mental Impact. and parking area snow removal Describe measures to reduce or avoid poten- e,) avoid direct discharges to surface tial adverse impacts identified in Section V. The water resources following is a brief listing of typical measures used f.) require secondary or tertiary for some of the major areas of impact. containment of products/wastes g.) contingency plans for accidental Natural Resource spills ❑ A. GEOLOGY h.) other: 1 .Subsurface ❑ C. AIR RESOURCES a.) use excavated material for land reclamation 1 .Air quality b.) use facility wastes(ash, sludge)for a.) assure proper construction land reclamation practices c.) other: examples: 2.Surface —fugitive dust control a:)_ use topsoil stockpiled during —proper operation and mainten- construction for restoration and ance of construction equipment landscaping b.) design traffic improvements to re- b.) minimize disturbance of non- duce congestion and vehicle delay construction sites c.) install and ensure the proper c.) design and implement soil erosion operation of emission odor control control plan devices. d.) other: d.) initiate a program for monitoring 3.Topography of air quality a.) avoid construction on areas of steep e•) other: slope ❑ D. TERRESTRAL AND AQUATIC ECOLOGY b.) design adequate soil erosion 1 .Vegetation devices to protect areas of steep a.) restrict clearing to only those areas slope necessary c.) other: b.) preserve part of site as a natural ❑ B. WATER RESOURCES area 1 .Groundwater c.) after construction, landscape site a.) design/modify system of treatment with naturally occurring vegetation for stormwater runoff of wastewater d.) purchase open space at another prior to recharge of groundwater location and dedicate to local b.) maintain permeable areas-on the government or conservation site organization 5 2.Fish, Shellfish and Wildlife ❑ B. LAND USE AND ZONING a.) provide adequate habitat (shelter 1.Existing land use and zoning and food) for remaining wildlife a.) design project to comply with species existing land use plans b.) schedule construction to avoid b.) design functional and visually sensitive periods of fish, shellfish appealing facility to set standard and wildlife cycles and precedent for future surround- c.) other: ing land use ❑ E. AGRICULTURAL RESOURCES c.) other: 1 .Soils ❑ C. COMMUNITY SERVICES a.) select/design project to avoid 1 .Police protection viable agricultural land a.) minimize local police protection b.) reclaim disturbed agricultural soil responsibilities by providing private profiles for agricultural purposes security force c.) .schedule activity when crops are off b.) provide security systems, alarms fields and soil is firm for facility d.) other: c.) provide equipment, funds or ser- 2.Agricultural land management systems vices directly to the community a.) re-establish access drives, fence— d.) other: lines and any disturbed land 2.Fire protection management systems a.) use construction materials that b.) re-establish any disturbed erosion minimize fire hazards control and drainage systems b.) incorporate sprinkler and alarm c.) install soil and water management systems into building design practices to restore or enhance c.) provide equipment, funds or ser- soil drainage and stability vices directly to the community d.) preserve open space for agricultural d.) other: use 3.Utilities e.) develop lease back arrangements to a.) install utility services underground allow continued agricultural use on b.) incorporate water saving fixtures all or portion of site into facility design f.) other: c.) incorporate energy-saving Human Resources measures into facility design ❑ A. TRANSPORTATION d.) other: 1 .Transportation ❑ D. CULTURAL RESOURCES a.)*design adequate and safe access 1 .Visual resources to project site to handle projected a.) design exterior of structure to traffic flow physically blend with existing b.) install adequate traffic control surroundings devices b.) minimize visual impact through c.) optimize use of parking areas thoughtful and innovative design d.) encourage car pooling and oper- of lighting and signs (consider: ation of facility during non-peak height, size, intensity, glare and traffic times hours of lighting operation) e.) design special routing and c.) design landscaping to be visually restricted hours for delivery truck pleasing and to serve as a buffer traffic between surrounding land uses, f.) other: parking areas, operational equip- 2.Public transportation ment and facilities a.) adjust public transportation routes d.) other: and schedules to service the facility 2.Historic and archaeological resources b.) encourage use of public transpor- a.) Prepare a plan, including measures tation by using incentive programs to mitigate impacts to historic/ for employees or by selling tickets archaeological resources through in facility data recovery, avoidance and/or c.) other: restriction of project activities 6 y , o _ b.) develop measures to convey cul- ❑ tural information to the community 1 .Limiting factors (e.g. through scientific/popular a.) availability of land reports, displays) b.) suitability of alternative site to c.) preserve architecturally signifi- accomodate design requirements cant structures and make an c.) 'availability of utilities adequate permanent photographic d.) suitable market area and statistical record of those that e.) compatibility with local zoning and must be destroyed master plan d.) other: f.) compatibility with certified agri- 3.Noise cultural districts a.) schedule construction/operation g.) compatibility with regional to occur during "normal business" objectives hours minimizing noise impact h.) accessibility of site to transporta- during sensitive times(early morn- tion routes and service population ing, night) El C. ALTERNATIVE SIZE _ b.) assure adherence to construction noise standards 1 .Increase or decrease project size to c.) design berms and landscaping to minimize possible impacts block and absorb noise 2.Increase or decrease project size to d.) other: correspond to market and community needs VII. Adverse Environmental Effects that Cannot ❑ D. .ALTERNATIVE CONSTRUCTION/ be Avoided if the Project is Implemented OPERATION SCHEDULING Identify those adverse environmental effects 1 .Commence construction at a different in Section V that can be expected to occur regard- time less of the mitigation measures considered in 2.Phase construction/operation Section VI. 3.Restrict construction/operation work Vlli. Alternatives schedule El E. ALTERNATIVE LAND USEThis section contains categories of alterna- 1 .Suitability of site for other uses tives with examples. Discussion of each alternative au other types e commercial uses should be at,a level sufficient to permit a compara- b.) other types of industry tive assessment of costs, benefits and environmen- c.) different types housing tal risks for each alternative. It is not acceptable d.) agricultural use to make simple assertions that a particular alter- e.) other: native is or is not feasible.Identify those categories of alternatives which should be included in the EIS ❑ F. NO ACTION by placing a check in the box located to the left 1 .Impacts of no action of the topic. a,) effect on public need ❑ A. ALTERNATIVE DESIGN AND b.) effect on private developers' need TECHNOLOGIES c.) beneficial or adverse environmental l .Site layout impacts a.) density and location of structures ❑ G. OTHER: b.) location of access routes, parking and utility routes IX. Irreversible and Irretrievable Commitment of 2.Orientation Resources P{dfov a.) compatibility with slope and Identify those natural and human resources drainage patterns listed in Section IV that will be consumed, convert- b.) site size and set back requirements ed or made unavailable for future use. Q�I� 2.Technology ' NO � a.) pollution control equipmentueinU-A-spects 'f applicable) b.) innovative vs. proven technologies Describe in this section the potential growth 4.Mix of activities aspects the proposed project may have. Listed on a) addition of businesses which would the next page are examples of topics that are typi- affect the operational nature of the cally affected by the growth induced by a project. facility 7 � r v ❑ A. POPULATION c.) efficient layout 1 .Increases in business and resident examples: population due to the creation or —orientation of structures in relocation of business relation to summer and winter 2.Increases in resident population due to sunlight the construction of housing —clustering of structures to maximize common walls El B. SUPPORT FACILITIES —shortening of utility runs 1 .business created to serve the increased —shared insulation and heating population 2.Indirect energy benefits 2.Service industries created to supply a.) location and design of facility to new facility accomodate mass transit ❑ C. DEVELOPMENT POTENTIAL b.) use of shuttle buses 1 .Introduction or improvement of infra- c.) location of facility to minimize structure(roads,waste disposal,sewers, travel distance water) to service proposed project ❑ E.OTHER: 2. Creation of further growth potential by construction of improved infra- structure XII. Assessment of Unavailable Information In certain situations involving major develop- El D. OTHER: ments (such as an oil supertanker port, a liquid propane/natural gas storage facility, a resource of recovery facility or a hazarduous waste treatment, Energy Resources (if applicable) storage or disposal facility), information regarding Identify the energy sources to be used, reasonably foreseeable catastrophic impacts to the anticipated levels of consumption and ways to environment may not be available. Such informa- reduce energy consumption.The examples listed tion may be unavailable because the means to ob- below are typical issues to be considered when ad- tain it are unknown or the cost of obtaining it is dressing this topic. exhorbitant,or because there is uncertainty about ❑ A.PROPOSED ENERGY SOURCES AND its validity. If such information is essential to an ALTERNATIVES agency's SEQR finding, the EIS must: A. Identify the nature and relevance of such ❑ B.ANTICIPATED SHORT-TERM/LONG- unavailable or uncertain information; and TERM LEVELS OF ENERGY B. Provide a summary of existing credible CONSUMPTION scientific evidence , if available; and ❑ C.INDIRECT EFFECTS ON ENERGY C. Assess the likelihood of occurrence and CONSUMPTION consequences of the potential impact, even if the probability is low, using the- use 1 .Increased dependence on automobile oretical approaches or research methods 2.Increased levels of traffic due to generally accepted in the scientific community. proposed project D.ENERGY CONSERVATION MEASURES This assessment should be applied only where ❑ reasonably foreseeable catastrophic impacts to the 1 .Design methods to reduce fuel use for environment are possible and it is not intended to heating, cooling and lighting be applied in the review of such actions as shop- a.) conventional technology ping malls, residential subdivisions and commer- examples: cial facilities even though the size and scale of —insulation some such projects may be extensive. —thermopane windows —use of low wattage lights XIII. Appendices b.) innovative technology Following is a list of materials typically used examples: in support of the EIS. —heat pumps —solar panels A. List of underlying :studies, reports and —wind energy information considered and relied on in preparing —use of waste heat from an statement `' industrial plant B. List all federal, state, regional, or local —use of recycled materials agencies, organizations, consultants and private 8 persons consulted in preparing the statement C. Technical exhibits(if any)at a legible scale D. Relevent correspondence regarding the projects may be included (required in the Final EIS) Additional Draft EIS Scoping Topics Indicate any additional topics for discussion in the Draft EIS. Attach additional sheets if necessary. 9 2—rKUJtV I I11r PAU I j ANU Clrl MAU141 I UUG r Responsibility of Lead Age�� General Information (Read Carefully) • In completing the form the reviewer should be guided by the question: Have my responses and determinations beer reasonable? The reviewer is not expected to be an expert environmental analyst. • Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant. Any large impact must be evaluated'in PART 3 to determine significance. Identifying an impact in column 2 simpl\ asks that it be looked at further. • The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold o magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State anc for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropriate for a Potential Large Impact response, thus requiring evaluation in Part 3. • The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative an( have been offered as guidance.They do not constitute an exhaustive list of impacts and thresholds to answer each question • The number of examples per question does not indicate the importance of each question. • In identifying impacts, consider long term, short term and cumlative effects. Instructions (Read carefully) a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact. b. Maybe answers should be considered as Yes answers. c. If answering Yes to a question then check the appropriate box (column 1 or.2) to indicate the potential size of th( impact. If impact threshold equals or exceeds any example provided,check column 2. If impact will occur but thresholc is lower than example, check column 1. d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART e. If a potentially large impact checked in column 2 can be mitigated by change(s) in the project to a small to moderat impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. Thi must be explained in Part 3. 1 2 3 Small to Potential Can Impact Be Moderate Large Mitigated By IMPACT ON LAND Impact Impact Project Change 1. Will the proposed action result in a physical change to the project site? ONO EYES Examples that would apply to column 2 • Any construction on slopes of 15% or greater, (15 foot rise per 100 ❑ ❑ ❑Yes []No foot of length), or where the general slopes in the project area exceed 10%. • Construction on land where the depth to the water table is less than ® ❑ ®Yes ❑No 3 feet. • 'Construction of paved parking area for 1,000 or more vehicles. Q ❑ ❑Yes ❑No • Construction on land where bedrock is exposed or generally within ❑ ❑ ❑Yes ❑No 3 feet of existing ground surface. • Construction that will continue for more than 1.year or involve more ❑ ❑ ❑Yes ❑No than one phase or stage. • Excavation for mining purposes that would remove more than 1,000 ❑ ❑ ❑Yes ❑No tons of natural material (i.e., rock or soil) per year. • Construction or expansion of a sanitary landfill. ❑ ❑ ❑Yes ❑No • Construction in a designated floodway. ❑ ® (RYes ❑No • Other impacts ❑ ❑ ❑Yes ❑No D Will there be an effect V. ...iy un-que or unusual land forms found on the site? (i.e., cliffs, dunes, geological formations, etc.)ONO OYES • Specific land forms: Wetlands ❑ ® ®Yes ❑No 6 1C 1 2 IMPACT ON WATER Small to Potential Can Impact E 3. Will proposed action affect any water body designated as protected? Moderate Large Mitigated B, (Under Articles 15,24, 25 of the Environmental Conservation Law, ECL) Impact Impact Project Chan ONO IXYES Examples that would apply to column 2 J• Developable area of site contains a protected water body. ❑ ® Eyes ❑N • Dredging more than 100 cubic yards of material from channel of a ❑ ❑ ❑Yes ❑N protected stream. • Extension of utility distribution facilities through a protected water body. ❑ ❑ Dyes ❑N • Construction in a designated freshwater or tidal wetland. ❑ ® ®Yes ❑ ' • Other impacts: Read Cnnstrnrti nn wit-bin 75 ❑ [ Yes .. ❑N feet of freshwater wetland 4. Will proposed action affect any non-protected existing or new body of water? ®NO OYES Examples that would apply to column 2 • A 10% increase or decrease in the surface area of any body of water ❑ ❑ []Yes ❑N or more than a 10 acre increase or decrease. • Construction of a body of water that exceeds 10 acres of surface area. Cl ❑ El Yes ❑N • Other impacts: ❑ ❑ Dyes El 5. Will Proposed Action affect surface or groundwater quality or quantity? ONO ®YES Examples that would apply to column 2 • Proposed Action will require a discharge permit. ❑ ® ®Yes ❑N • Proposed Action requires use of a source of water that does not 0 ® []Yes ❑N have approval to serve proposed (project) action. • Proposed Action requires water supply from wells with greater than 45 ❑ ❑ Dyes ❑N gallons per minute pumping capacity. • Construction or operation causing any contamination of a water ❑ ❑ Dyes El supply system. • Proposed 6,ction will adverse°v affect groundwater. ❑ Eyes ❑N • Liquid effluent will be convey•-{•'off the site to facilities which presently ® ❑ Eyes ❑N do. not exist or have inadequate capacity. (septage) • Proposed Action would use water in excess of 20,000 gallons per ❑ ❑ ❑Yes ❑N day. • Proposed A.ction will likely c..u«• siltation or other discharge into an ❑ ❑ CRYes ❑N existing body of water.tc, rr a pxte,r that there will be an obvious visual contrast -o naturai conditions. Slip construction • Proposed Action will require the storage of petroleum or chemical Cl Cl []Yes ❑N products greater than 1,100 gallons. • Proposed Action will allow residential uses in areas without water ❑Yes ❑N and/or sewer services. • Proposed Action locates commercial and/or industrial uses which may ❑ ❑ Dyes ❑IN require new or expansion of existing waste treatment and/or storage facilities. • Other impacts__ `"' ❑ ❑ Eyes rr 6 Will proposed action alter drainage f:ow or patterns, or surface warPr runoff? `:NO KYES Exe-iples tr.at would apply to column 2 • Prc pr sea Action would change flood wdrer flows r XYes C` 7 2 3 Small to Potential Can Impact Be Moderate Large Mitigated By Impact Impact Project Change • Proposed Action may cause substantial erosion. ❑ ❑ ❑Yes ❑No • Proposed Action is incompatible with existing drainage patterns. ® ❑ ❑Yes ❑No • Proposed Action will allow development in a designated floodway. ® ❑ ❑Yes ❑No • Other impacts: ❑ ❑ ❑Yes ❑No IMPACT ON AIR 7. Will proposed action affect air quality? ONO OYES Examples that would apply to column 2 • Proposed Action will induce 1,000 or more vehicle trips in any given ❑ ❑ ❑Yes []No hour. • Proposed Action will result in the incineration of more than 1 ton of ❑ ❑ ❑Yes ❑No refuse per hour. • Ernission rate of total contaminants will exceed 5 lbs. per hour or a ❑ ❑ ❑Yes ❑No heat source producing more than 10 million BTU's per hour. • Proposed action will allow an increase in the amount of land committed ❑ ❑ ❑Yes []No to industrial use. • Proposed action will allow an increase in the density of industrial ❑ ❑ ❑Yes ❑No development within existing industrial areas. • Other impacts: ❑ ❑ []Yes ❑No IMPACT ON PLANTS AND ANIMALS 8. Will Proposed Action affect any threatened or endangered species? ONO 5)YES Examples that would apply to column 2 • Reduction of one or more species listed on the New York or Federal ❑ ❑ Dyes ❑No list, using the site, over or near site or found on the site. • Remova' of any portion of a critical or significant Wildlife habitat. ❑ ❑ ❑Yes ❑No • Application of-pesticide or herbicide more than twice a year, other ❑ ❑ ❑Yes ❑No than for 1igricultural purposes. • Other impacts: Endangered species may possibly ❑ ® LRYes ❑No live on the site, a study would be needed. 9 Will Proposed Action substantially affect non-threatened or non-endangered species? ONO DYES Examples that would apply to column 2 • Proposed Action would substantially interfere with any resident or ® ❑ ❑Yes ❑No migratory fish, shellfish or wildlife species. • Proposed Action requires the removal of more than 10 acres ❑ ❑ ❑Yes ❑No of mature forest (over 100 years of age) or other locally important vegetation IMPACT ON AGRICULTURAL LAND RESOURCES 10 Will the Proposed Action affect agricultural land resources? �?N0 ❑YES Examples that would apply to column 2 • The proposed action would Sever, cross or lima access to agricultural C ❑ Eyes uNo land (includes cropland. hayfields. pasture. vineyard, orchard, etc.) 8 _ Small to Potential Can Impact B Moderate Large Mitigated By Impact Impact Project Chang • Construction activity would excavate or compact the soil profile of ❑ ❑ ❑Yes ❑Nc agricultural land. • The proposed action would irreversibly convert more than 10 acres ❑ ❑ ❑Yes ❑Nc of agricultural land or, if located in an Agricultutal District, more than 2.5 acres of agricultural land. • The proposed action would disrupt or prevent installation of agricultural ❑ ❑ ❑Yes ❑No lard management systems (e.g., subsurface drain lines, outlet ditches, strip cropping); or create a need for such measures (e.g. cause a farm field to drain poorly due to increased runoff) • Other impacts: ❑ ❑ ❑Yes ❑No IMPACT ON AESTHETIC RESOURCES 11 . Will proposed action affect aesthetic resources? ONO MYES (if necessary, use the Visual EAF Addendum in Section 617.21, Appendix B.) Examples that would apply to column 2 • Proposed land uses, or project components obviously different from ® ❑ []Yes ❑No or in sharp contrast to current surrounding land use patterns, whether man-made or natural. • Proposed land uses, or project components visible to users of Cl ❑ ❑Yes ❑No aesthetic resources which will eliminate or significantly reduce their enjoyment of the aesthetic qualities of that resource. • Project components that will result in the elimination or significant ® ❑ ❑Yes ❑No screening of scenic views known to be important to the area. • Other impacts: ❑ ❑ []Yes ❑No IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES 12. Will Proposed Action impact any site or structure of historic, pre- historic or paleontological importance? IRNO DYES Examples that would apply to column 2 • Proposed Action occurring wholly or partially within or substantially ❑ ❑ ❑Yes ❑No contiguous to any facility or site listed on the State or National Register of historic places. • Any impact to an archaeological site or fossil bed located within the ❑ ❑ Eyes ❑"40 project site. • Proposed Action will occur in an area designated as sensitive for ❑ ❑ ❑Yes ❑No archaeological sites on the NYS Site Inventory. • Other impacts: Cl Cl ❑Yes ❑No IMPACT ON OPEN SPACE AND RECREATION 13 will Proposed Action affect the quantity or quality of existing or future open spaces or recreational opportunities? Examples that %%ould apply to Column 2 ONO igYES • The permanent foreclosure of a future recreational opportunity. ❑ ❑ []Yes ❑No • A major reduction of an open space important to the community. ❑ ❑ ❑Yes []No • Other impacts Preserve undevelopable open 13 ❑ El Yes []No space. 9 IMPACT ON TRANSPORTATION Small to Potential Can Impact B, 14. Will there be an effect to existing transportation systems?' Moderate Large Mitigated By ONO DYES Impact Impact Project Chang Examples that would apply to column 2 • Alteration of present patterns of movement of people and/or goods. ❑ ❑ ❑Yes ❑Nc • Proposed Action will result in major traffic problems. (2 ❑ ❑Yes ❑Nc • Other impacts: ❑ ❑ ❑Yes ❑Nc IMPACT ON ENERGY 15. Will proposed action affect the community's sources of fuel or energy supply? INNO OYES Examples that would apply to column 2 • Proposed Action will cause a greater than 5% increase in the use of 71 ❑ ❑Yes ❑Nc any form of energy in the municipality. • Proposed Action will require the creation or extension of an energy ❑ Cl [--]yes ❑Nc transmission or supply system to serve more than 50 single or two family residences or to serve a major commercial or industrial use. • Other impacts: ❑ ❑ ❑Yes. ❑Nc NOISE AND ODOR IMPACTS 16. Will there be objectionable odors, noise, or.vibration as a result of the Proposed Action? ®NO DYES Examples that would apply to column 2 • Blasting within 1,500 feet of a hospital, school or other sensitive ❑ ❑ ❑Yes ❑Nc facility. " • Odors will occur routinely (more than one hour per day). ❑ ❑ ❑Yes ❑Nc • Proposed Action will produce operating noise exceeding the local Cl ❑ ❑Yes ❑Nc ambient noise levels for noise outside of structures. • Proposed Action will remove natural barriers that would act as a ❑ ❑ Dyes ❑Nc noise screen. • Other impacts: ❑ ❑ ❑Yes ❑Nc IMPACT ON PUBLIC HEALTH 17. Will Proposed Action affect public health and safety? ONO DYES Examples that would apply to column 2 • Proposed Action may cause a risk of explosion or release of hazardous ❑ ❑ Dyes ❑Nc substances(i.e. oil, pesticides, chemicals, radiation, etc.)in the event of accident or upset conditions, or there may be a chronic low level discharge or emission. • Proposed Action may result in the burial of "hazardous wastes" in any Cl ❑ ❑Yes ❑Nc form (i.e. toxic, poisonous, highly reactive, radioactive, irritating, infectious, etc.) • Storage facilities for one million or more gallons Z?,liquified natural Cl ❑ El Yes ❑Nc gas or other flammable liquids. • Proposed action may result in the excavation or other disturbance ❑ ❑ ❑Yes ❑NC within 2.000 feet of a site used for the disposal of solid or hazardous waste. • Other impacts: ❑ ❑ ❑Yes ❑tic 10 IMPACT ON GROWTH AND CHARACTER Small to Potential Can impact Be � OF COMMUNITY OR NEIGHBORHOOD Moderate Large Mitigated By 18. Will proposed action affect the character of the existing community? Impact Impact Project Change ONO OYES Examples that would apply to column 2 • The permanent population of the city, town or village in which the ❑ ❑ ❑Yes []No project is located is likely to grow by more than 5%. • The municipal budget for capital expenditures or operating services ❑ ❑ ❑Yes ❑'No will increase by more than 5% per year as a result of this project. • Proposed action will conflict with officially adopted plans or goals. ❑ ❑Yes El No • Proposed action will cause a change in the density of land use. ❑ ® ❑Yes ❑No • Proposed Action will replace or eliminate existing facilities, structures Cl ❑ ❑Yes ❑No or areas of historic importance to the community. • Development will create a demand for additional community services ❑ ® []Yes ❑No (e.g. schools, police and fire, etc.) • Proposed Action will set an important precedent for future projects. Cl ® ❑Yes. []No • Proposed Action will create or eliminate employment. ❑ ❑ ❑Yes ❑No • Other impacts: ❑ ❑ ❑Yes ❑No 19. Is there, or is there likely to be, public controversy related to potential adverse environmental impacts? ONO [RYES If Any Action in Part 2 Is Identified as a Potential Large Impact or If You Cannot Determine the Magnitude of Impact, Proceed to Part 3 Part 3—EVALUATION OF THE IMPORTANCE OF IMPACTS Responsibility of Lead Agency Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be mitigated. Instructions Discuss the following for each impact identified in Column 2 of Part 2: 1 . Briefly describe the impact. 2. Describe(if applicable)how the impact could be mitigated or reduced to a small to moderate impact by project change(s) 3. Based on the information available, decide if it is reasonable to conclude that this impact is important. To answer the question of importance, consider: • The probability of the impact occurring • The duration of the impact • Its irreversibility, including permanently lost resources of value • Whether the impact can or will be controlled • The regional consequence of the impact • Its potential divergence from local needsund goals • Whether known objections to the project-relate to this impact. (Continue on attachments) 11 // 7f?`tri�,'Sn{ Trx4+•r1 ��.I .i'lt CASE NO: .���2.......... STATE CF NEW YORK PETITION TOWN OF SOUTHOLD IN THE bIATTER OF THE PETITION OF HARBORVIEW REALTY CO. FOR A CI-D1NGE, MODIFICATION OR AbIEND_lIE.�'T OF THE BUILDING Z0:1E OF OF THE TOWN OF SOUTHOLD, SUFFOLK COUNTY, NEW YORK. .. ....................... ...................................................... TO THE TOWN BOARD OF THE TOWN OF SOUTHOLD: 1. X; .•.Harborview__RealtX Co _ residingat 3 0 0 Rab•�•Q•.Dr v�•�. (insert name, of petitioner) Hauppauge, NY 11787 Suffolk County, New York, the undersigned, am the owner of certain real property situated at Greenport, Town of Southold, Suffolk County, New York .••................•.•-••...---••••••••....................... and more particuIarlS bounded and described as follows: SEE ATTACHED 2. I do hereby petition the Town Board of the Town of Southold to change, modify and amend the Building Zone Ordinance of the Town of Southold, Suffolk County, New York, including the Building Zone 'Kaps heretofore made a part thereof, as follows: Change of zoning designation of the above described parcel from "A" Residential-Agricultural Zoning Use District to M-1 General Multiple Residence District. i 3. Such request is made for the following reasons: The zoning change sought is limited to 24 . 95± acres of an 83 . 00 ± acre parcel owned by the applicant. The application, accordingly, is limited to the easterly end of the parcel which is presently improved with 31 existing cottages . The remaining 58± acres are proposed for dedication to nature, forever wild. The action proposed would constitute good planning & zoning in the best in- terest of the Town of Southold and its residents . :HARE VIEW REALT (L. S.) ... ... .......... BY�- C iffor Rudolph, General Partner STATE OF NEW YORK, ) SS:— COUNTY OF SUFFOLK, ) ,GT,Z:IFFQRD RUDOLPH BT'I\G ]�UL�' SWORN, deposes an• d says that •a�General Partner iri��Ia'rbo'rview Rea ty Co. lie is/the petitioner in the within action; that lie has read the foregoing Petition and knows the contents thereof; that the same is true to his (Iier) own knowledge, except as to the matters therein stated to be aIIeaed on informatics and relief, and that as to those matters he believes it to be true. (L. S.) . .. ... .. ... Sworn to before me thin/!. day;of Abruaxy.. .. . . .. 19. 8$ A �'... .,. . . ... .. .r .. ....h'otar..Puriic. y PAUL H. McDANIEL KOTARY PUBLIC, State of New York No. 30.4519646 Qualified in Nh q nu Cmunty I/ Commission Ern;.--- - :^• 19 f i BEGINNING at a point in the southwesterly line of the land now or formerly of Posillico Construction Co. , Inc. ,. which point is the following courses and distances from point of intersection of the southeasterly line of the land of the Long Island Rail Road with the southwesterly line of the land of James Posillico: 1. S. 450 21 ' 46" E. 205.42 feet to a point in the south- westerly line of the land of James Posillico, 2. S. 5511 49' 26" E. 1875.99 feet along the southwesterly lines of the lands of James Pisillico and of Posillico Construction Co.; Inc. , and running thence from said point of beginning S. 550 49' 26" E. along the southwesterly line of the land of Posillico Construction Co. , Inc. 859.77 feet to the land now or formerly of Anesthesia Group; thence S. 3911 35'. 10" E. along the southwesterly lines of the lands of now or formerly of Anesthesia Group and of now or formerly of William_J. 5:hneider 1559.41 feet to a point in the approximate mean high watermark. of Shelter Island Sound; thence generally westerly, northeasterly, northwesterly, southwesterly and again northwesterly along approximate high water marks and along a 'wooden bulkhead of Shelter Island Sound and of a "basin" off Shelter Island Sound to a point in the easterly line of land now or formerly of Howard and Dorothy Zehner, said point being the following courses and distances as measured along aforesaid approximate high water mark and along a bulkhead the following courses and distances: 1. S. 810 29' 38 .W. 21.81 feet, 2. N. 740 33' 18" W. 51.30 feet, 3. N. 66" 24' 48" W. 47.68 feet, 4. N. 700 42' 04" W. 96.13 feet, 5. S. 890 20' 28" W. 70.96 feet, i 6. S. 310 18' 45" W. 11.31 feet, 7. . N. 640 40' 01" W. 197.34 feet, 8. N. 640 37' 42" W. 380.06 feet, 9. N. 640 32' 31" W. 289.24 feet, 10. S. 76" 09' 50" W. 43.85 feet, 11. N. 640 27' 27" W. 220.43 feet, 12. N. 170 10' 37" W. 36.68 feet, 13. N. .680 17' 05" W. 308.25 feet, 14. N. 350 02' 49" E. :43.24.'feet . 15. N. 690 08' 00" E. 37.16 feet 16. N. 830 44' 07" E. 22.45 feet, 17. N. 450 28' 13" E. 22.99 feet, 18. N. 10 13' 46" E. 54.52 feet, 19. N. 180 28' 55" W. 178.54 feet, i 20. N. 310 30' 56" W. 40.19 feet, 21. N. 670 19' 26" W. 36.31 feet, 22. S. 700 40' 38" W. 37.59 feet, 23. S. 270 53' 33" W. ': 29.58 feet, 24. S. 00 16' 23" W 73.63 feet, 25. S. 40 51 ' 27" W. 146.85 feet, 26. S. 30 07' 36" W. 168.58 feet, 27. S. 360 26' 28" E. 25.57 f eet;A 28. S. 70 04' 51" W. 109.75 feet, 29. N. 490 171 .24" W. 40.93 feet, 30. N. 20 15' 32" E. 31 .60 feet, 31 . N. 480 14' 49" W. 61 .23 feet, 32. N. 570 36' 28" W. 32.07 feet; A _ thence N. 4° 11 '. 12" E. along the easterly line of the land now or formerly of Howard and Dorothy Zehner 771.06 feet to the land 'of Harbor- view Landing Realty Co. ; thence N. 4° 11 ' 12" E. through the land of Harborview Landing Realty Co. 361.44 feet to the point or place of beginning, containing an area of 25.0 acres, more or less.. .1r4-1-8-2-(2,1871—7c `" r 617.21 SEQR ' Appendix A State Environmental Quality Review FULL ENVIRONMENTAL ASSESSMENT FORM Purpose: The full EAF is designed to help applicants and agencies determine., in an orderly manner, whether a project or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequent- ly, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine significance may have little or no formal knowledge of the environment or may be technically expert in environmental analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting the question of significance. The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action. Full EAF Components: The full EAF is comprised of three parts: . Part 1: Provides objective data and information about a given project and its site. By identifying basic project data, it assists a reviewer in the analysis that takes place in Parts 2 and 3. Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentially- large impact. The form also identifies whether an impact can be mitigated or reduced. Part 3: If any impact in Part 2 is identified as potentiallv-large, then Part 3 is used to evaluate whether or not the impact is actually important. DETERMINATION OF SIGNIFICANCE—Type 1 and Unlisted Actions Identify the Portions of EAF completed for this project: 5-] Part 1 ❑ Part 2 ❑Part 3 Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting information, and considering both the magitude and importance of each impact, it is reasonably determined by the lead agency that: ❑ A. The project will not result in any large and important impact(s) and, therefore, is one which will not have a significant impact on the environment, therefore a negative declaration will be prepared. ❑ B. Although the project could have a significant effect on the environment, there will not be a significant effect for this.Unlisted Action because the mitigation measures described in PART 3 have been required, therefore a ONDITIONED negative declaration will be prepared.* ❑ C. The project may result in one or more large and important impacts that may have a significant impact on the environment, therefore a positive declaration will be prepared. A Conditioned Negative Declaration is only valid for Unlisted Actions Harborview Landing Name of Action Southold Town Planning Board Name of Lead Agency Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer(If different frorn responsible officer) Date - _J 1 P _. ,r PROJECT INFORMATION `..�r• Prepared by Project Sponsor ` NOTICE: This document is designed to assist in determining whether the action proposed may have a significant effect on the environment. Please complete the entire form, Parts A through E. Answers to these questions will be considered as part of the application for approval and maybe subject to further verification and public review. Provide any additional information you believe will be needed to complete Parts 2 and 3. It is expected that completion of the full EAF will be dependent on information currently available and will not involve new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify each instance. NAME OF ACTION Harborview Landing LOCATION OF ACTION(Include Street Address, Municipality and County) Sage Road, Town of Southold, Suffolk County NAME OF APPLICANT/SPONSOR BUSINESS TELEPHONE r Harborview Realty Co. (516 ) 234-3340 ' ADDRESS 300 Rabro Drive CITY/PO STATE ZIP CODE Hauppauge NY 11787 NAME OF OWNER(If different) BUSINESS TELEPHONE Harborview Realty Co. _j (516 ) 23_4-3340 ADDRESS 300 Rabro Drive _—. CITY/PO STATE ZIP CODE Hauppauge NY 11787 ' DESCRIPTION OF ACTION Subdivision of a portion (24.959acres) of 83.117 acres to provide for townhouse development of 40 homes clustered in 10 buildings. The development would require a rezone to M-1. The remaining 58.157 acres would remain undeveloped and be dedi- cated to the Nature Conservancy or a like organization which would keep the land in trust and forever wild. Please Complete Each Question—Indicate N.A. if not applicable A. Site Description Physical setting of overall project, both,developed and undeveloped areas. 1. Present land use: ❑Urban ❑Industrial ❑Cornmercial OResidential (suburban) ❑Rural (non-farm) ®Forest ❑Agriculture ®Other Wetlands & 31 exist. substandard residential 2. Total acreage of project area: 83.117 acres, including 11.551 acres underwater cottages APPROXIMATE ACREAGE PRESENTLY AFTER COMPLETION Meadow or Brushland (Non-agricultural) 21.7 _ acres 21 . 3 acres Forested 27 acres ___2_6 acres Agricultural (Includes orchards, cropland, pasture, etc.) 0 acres acres Wetland (Freshwater or tidal as per Articles 24, 25 of FC'L) _..__._12.8 acres ._ 12.8 acres Water Surface Area 4 acres 4 acres Unvegetated (Rock, earth or fill) 0 acres 0 acres Roads, buildings and other paved surfaces 6 acres 7 . 4 acres Other (Indicate type) Underwater _—_ 11.6 acres 11.6 acres 3. What is predominant soil type(s) on project site? Made land 40%, Haven loam 20%, Riverhead Sandy loam 18% aanadice-si t—loam cut filTTO . a. Soil drainage: ❑Well drained — 38 — % of site OModerately we(I drained 62......_ % of site ❑Poorly drained _ % of site b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the itiY=. Land Classification System? 0 _ acres. (See 1 NYCRR 370). 4. Are there bedrock outcroppings on project site? ❑Yes r,�gNo a. What is depth to bedrock? NSA (in feet) 2 ' r 1 r�.,A'pproximate percentage of propos \ ct site with slopes: E._]0 10;b ,0 f11.5% or greater % 6. Is project substantially contiguous to, or contain a building, site, or district, listed on the Slate or the National Registers of Historic Places? ❑Yes ®No 7. Is project substantially contiguous to a site listed on the Register of National Natural Landmarks? 1.-JYes XNo 8. What is the depth of the water table?8' Avg. (in fee!L) Range 5 to 13-feet (Source: 1985 Test Holes) 9. Is site located over a primary, principal, or sole source aquifer? ❑Yes ZNo 10. Do hunting, fishing or shell fishing opportunities presently exist in the project area? 50Ye.s L7No 11. Does project site contain any species of plant or animal life that is identified as threatened or endangered? ❑Yes ®No According to 1973 Endangered Species Act (Fed) _ tdentS£�txeacb=species NYS Environmental Conservation Law Section 11-0535 (St te) 12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations) pYes ❑No Describe 1.566-acre island to be dedicated forever wild. 13. Is the project site presently used by the community or neighborhood as an open space or recreation are.zr? OYes ®No If yes, explain 14. Does the present site include scenic views known to be important to the community? ❑Yes ®No 15. Streams within or contiguous to project area: Wetland Pond Tributary to Southold Bay a. Name of Stream and name of River to which it is tributary - 16. Lakes, ponds, wetland areas within or contiguous to project area: a. Name Hashamomuck Pond b. Sire (In acres) 172 ac. approx. 17. I•: the site served by existingwithin 1/2 mile public utilities. ��Yes L_1No a) if Yes, does sufficient capacity exist to allow connection? RYes ONo b) If Yes, will improvements be necessary to allow c•c>nnt•c liun? Ix'1'r,s f�No 18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA, Section 303 and 304? ❑Yes ❑x No 19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8 of the ECL, and 6 NYCRR 617? OYes Cx1No 20. Has the site ever been used for the disposal of solid or hazardous wastes? ❑Yes KNo B. Project Description 1. Physical dimensions and scale of project (fill in dimensions, as appropriate) a. Total contiguous acreage owned or controlled by project sponsor _83-117 _ acres. b. Project acreage to be developed: 24.959 acres initially; ,acres cres ultinMtely. c. Project acreage to remain undeve!oped 58.157 _ It c res (70%) d. Length of project, in miles: 0.85 _ (If appropriate) e. If the project is an expansion, indicate percent of expansion proposed N/A %; f. Number of off-street parking spaces existing 60 proposed 90 g. Maximum vehicular trips generated per hour 22 (upon completion of project)? P.M. Weekday h. If residential: Number and t g `-°+`` type of housing units: .==�:' Townhouse/ One Family Two Family Multiple Family C:ondorninium Initially 40 Ultimately _ 40 i. Dimensions (in feet) of largest proposed structure 33,' _ height; 52 width; 125 ` length. j. Linear feet of frontage along a public thoroughfare project will occupy is? as-is R. 3 Access to Route 25 (Main Road) as existing Sage Road 2.. How much natural material (i.e., ` earth, etc.) will be removed from the 0 ' tuns/cubic yards' �.. 3. Will disturbed areas be reclaimed? ryes FlNu IXIN/A a. If yes, for what intend.,: purpose is the site being reclaimed? b. Will topsoil be stockpiled for reclamation? ayes [1No c. Will upper subsoil be stockpiled for reclamation? [AYes ❑No 4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? 1.4 acres. 5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project? Dyes ®No 6. If single phase project: Anticipated period of construction 18 months, (including demolition). 7. If multi-phased: a. Total number of phases anticipated N/A (number). b. Anticipated date of commencement phase 1 month year, (including demolition). c. Approximate completion date of final phase month year. d. Is phase 1 functionally dependent on subsequent phases? Dyes ❑No 8. Will blasting occur during construction? Dyes ONo i 9. Number of jobs generated: during construction 15 after project is complete 4 10. Number of jobs eliminated by this project 0 11. Will project require relocation of any projects or facilities? k-1Yes ❑No If yes, explain Relocation of water a'nd electric service, relocate private road on development-portion of site. 12. Is surface liquid waste disposal'involved? Dyes MNo a. If yes, indicate type of waste (sewage, industrial, etc.) and amount N/A b. Name of water body into which effluent will be discharged 13. Is subsurface liquid waste disposal involved? Eyes El No Type Sewage 14. Will surface area of an existing water body increase or decrease by proposal? Dyes ®No Explain _ 15. Is project or any portion of project located in a '100 year flood plain? ®Yes ❑No 16. Will the project generate solid waste? [2Yes ❑No a. If yes, what is the amount per month 7.62_ tons Summer months maximum b. If yes, will an existing solid waste facility be used? R]Yes ❑No c. If yes, give name Private sanitation carters location Town of Southold Landfill _. d. Will any wastes not go into a sewage disposal system or into a sanitary landfill? Dyes i0No e. If Yes, explain 17. Will the project involve the disposal of solid waste? 1-71yes fXNo a. If yes, what is the anticipated rate of disposal? ___NILA_ tons/month. b. If yes, what is the anticipated site life? N/A-_ years. 18. Will project use herbicides or pesticides? ❑Yes FA No 19. Will project routinely produce odors (more than one hour per day)? (Dyes ®No 20. Will project produce operating noise exceeding the local ambient noise levels? Dyes K]No 21. Will project result in an increase in energy use? ®Yes ❑No If yes , indicate type(s) Domestic electric servig'''(minimal) 22. If water supply is from wells, indicate pumping capacity N/A gallons/minute. 23. Total anticipated water usage per day _ 12,000 gallons/day. Summer months maximum Zi 24. Does project involve Local, State or Federal funding? Dyes RNo If Yes, explain 4 • I LIST OF PROPERTY OWNERS Lynn F. Sciora, 407 River Avenue, Beaver, PA 15009 Raymond Ciacia, Greenport, NY 11944 John E. Rempe, 4310 Bayshore Road, Greenport, NY 11944 George L. Penny, Inc. , c/o George L. Penny IV, Main Road, Greenport, NY 11944 Bros. Corazzini, 56240 Main Road, Greenport, NY 11944 Theresa Casamisina, 14 Julia Lane, East Northport, NY 11731 Charles Krepp, 205-01 34th Avenue, Bayside, NY 11361 Frank Carlucci, 157-48 24th Avenue, Whitestone, NY 11357 Michael A. Koscis, 14 Island View Lane, Greenport, NY 11944 Donald F. Jones , 97 Noble Street, Brooklyn, NY 11222 Ethel Dudley, P.O. Box 636 , Greenport, NY 11944 Richard Burkhardt, 321 West 24th Street,- New York, NY 10011 Edwin M. Latson, 1425 Island View Lane, Greenport, NY 11944 William J. Schneider, 20 Gilbert Street, Yonkers, NY 10701 John H. Mulholland, 71 Old Zoar Road, Monroe, Conn. 06468 Derek Morcombe, 725 Island View Lane, Greenport, NY 11944 Madeline Keufner & Katherine Jarres, 64-71 74th Avenue, Glendale, NY 11385 Murray & Selma Jacobs, 5 Diamond Drive, Plainview, NY 11803 Joseph W. Suda, P.O. Box 65 , Greenport, NY 11944 Joseph Knizak, 5 Perigee Drive, Stony Brook, NY 11790 William F. Killan, P.O. Box 186, Greenport, NY 11944 Harold Reese, 855 Sunrise Highway, Lynbrook, NY 11563 I, Thomas F. & Joan F. Gleason, 5 Furwood Drive, East Northport, NY1111731 Seymour & Adelaide Brittman, 14 Leland Street, East Northport, NY� 11731 Willard H. & Claire A. Barry, 166 Roxbury Road, Garden City, NY 11530 Robert & Linda Bracken, 32 Linchfield Road, Port Washington, NY 11050 i Frank A. Santamaria, 220 Colonial Road, North Babylon, NY 11703 Frank M. & In,geborg L. Flynn, P.O. Box 144 , Southold, NY 11971 Charlotte Weisman, Tarpon Drive, Southold, NY 11971 Robert H. Chilton, Beachwood Lane, Southold, NY 11971 Southold Shores Assoc. , Inc. , P.O. Box 263 , Southold, NY 11971 Andrew F. & Carole Cassidy & Others, 1815 Albertson Lane, Greenport, NY 11944 James Melrose, 41 Robinson Road, Greenport, NY 11944 James Posillico, 31 Tennyson Avenue, Westbury, NY 11590 Posillico Construction Company, Inc. , 31 Tennyson Avenue, Westbury, NY ' 11590 Mary Barsczewski, c/o Stanley Bladzinski, Southold, NY 11971 Anesthesia Group P.C. , c/o Bertram S. Holder M.D. , 356 Clinton Avenue, Brooklyn, NY 11238 Joseph' A. - LaColla, c/o Mill Creek Liquors , Southold, NY 11971 Howard Zehner, P.O. Box .250 , Greenport, NY 11944 i i . i i TOWN BOARD,TOWN OF SOUTHOLD In the Matter of the Petition of HARBORVIEW REALTY CO. NOTICE to the Town Board of the Town of Southold. TO: YOU ARE HEREBY GIVEN NOTICE: 1. That it is the intention of the undersigned to petition the Town Board of the Town of Southold to request change of zone on the premises hereinafter described. 2. That the property which is the subject of the Petition is located adjacent to your property and is des- cribed as follows: Suffolk County tax map, district '1000, section 53, block 5, p/o lot 12.3 (commnly known as the "Sage" property) . Subject parcel is bounded by adjacent parcels_ as indicated: LEST: Howard Zehner (Young's Marina) ; NOR`_I'H: Posillico Construction Oorgr y; NORTHEAST: Anesthesia Group P.C. and William J. Schneider; SOUTII: Shelter Island Sound. 3. That the property which is the subject of such Petition is located in the following zoning district: "A" Residential — Agricultural Zoning Use District 4. That by such Petition, the undersigned will request that the above-described property be placed in the following zone district classification: M-1 General Multiple Residence District . The rectuest is limited to the easterly area where the existing cottages are located. 5. That within five days from the date hereof, a written Petition requesting the relief specified above will be filed in the Southold Town Clerk's Office at Main Road, Southold, New York and you may then and there examine the same during regular office hours. 6. That before the relief sought may be granted,a public hearing must be held on the matter by the Town Board;that a notice of such hearing must be published at least ten days prior to the date of such hearing in the Suffolk Times and in the Long Island Travel er-Mattituck Watchman, newspapers published in the Town of Southold and designated for the publication of such notices; that you or your representative have the right to ap- pear and be heard at such hearing. Dated: February 16 , 1988 Harborview Realty Co.' Petitioner Post Office-Address: 100 Rahrn Drive Hauppauge, New York 11787 PROOF OF MAILING dF NOTICE ADDRESS NAME SEE ATTACHED LIST P 437 901 ' 465 p 412 733 618 RECEIPT FOR CERTIFIED MAIL'' R£CE1PT FOR CERTIFIED MAIL. II0 INSURANCE COVERAGE PROVIOED NO INSURANCE COVERAGE PROVIDED NOT FOR INSURANCE COVERA E P fIAiL NOT FOR INTERNATIONAL MAIL - (See RNAT,@ AL (See Reverse) r Sent r A. Koscis Anesthesia Gro o �Mi chael Street and No Street and No. V1ew Drive m c/o Bertram S . Holder MD. y 14 Island T. ,T. Q P O State and ZIP Code P O..Slate and ZIP CrideNY 11944 0 356 Clinton Avenue s Gre_e_n_�ort s v o L? Postage I Di, 'Bsrooklyn, NY 1' 238 I *. Certified Fee k 1 Certified Fee Special Delivery Fee Special Delivery Fee I I Restricted Delivery ee Restricted Delivery Fee Return Receipt sho eli Return Receipt showrn9 to whom and Dale ehvered to whom and Date Delivered u� cO Return Receipt showing to w ont• m Return Receipt snowing to whom, r Date.and Address of Delivery Date.and Address of Delivery d 07 a and Fees" I TOTAL Postage and Fees 5 TOTAL Postag o Postmark or Date o Postmark or Date 00 ro 0 Cq E c o ° U. LL ZL STATE OF NEW YORK ss.: COUNTY OF SUFFOLK: Cheryl Godet residing at 1102 Norbay Street, Franklin Square, New York 11010 , being duly sworn, deposes and says that on the 16th day of February 119 88 deponent mailed a true copy of the Notice set forth on the reverse side hereof, directed to each of the abov .-named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the addresses of said persons as shown on the cur- rent assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at that said Notices were mailed to each of said persons by (certified) (registered) mail. J r C$ERYL GODET / Sworn tome this 16 t-h 4/ day of Fehruary , 19_$$_. Not REGINA NURNBERGER NOTARY PUBLIC,State of New Kork No.4790267 Qualified in Nassau County Commission Expires October 31,192 i i BEACHW000 Rp i 14Y.S. PLANE COORDINATE SYSTEM U-� i C?- TEST HOL ES '1 p h� _ MOp 3 ti�� K or MUD CREAK NO. / NO.2 NO.3 NO..4 NO. 5 - - ' NAL L s ORE, OR , _ _ 00- HALLS CREEK h, h 0.0 0.0 0.0 0.0 0.0 _ - \ LOAM J LOAM LOAM o h 1 LONG APRE�NE G h 010 4.0 3.0 LOAM S.4 4�;39'W /3743' S.2°/B57'!$! /4/.62' 'S26o ti' O. TIE LI pNp/OR SNO crllp . -1 5.0 LOAM 89.02' 6/.03" �8949 $7°l2 27'E. h O ^1 j H'W M' 2�4 03 HOUSE HOUSE SAND 5.5 OW ` 80 59' 2 4 S ° TS �\' 102.1- g 2/SB"lY iJ9.9S' s/o �N �� 4056129E ' 44.21 _- SAND SAND 7.0 � \ sT 4748 , i0/FQ S i /O M/N i WETLAND=I6,000 S.F. + M 2.37' 0�35� j5T55 D s•F} Y S• MORITT -L ,� 8 SAND SAND - ?00 SEPT%C TANK j $ SEPT%C V `M s99 0,ND- ... G FREp G. B ROSEMAR �,ir w lnlr' ANK it /0.0 _ ^\ WETL AND=160o0SF.t , WETL a WETLAND=I4,000S. .± V h h , h01 ' WETLAND=Iq,000S.F.± b WETLAND=IS000 S.F.+ N WETLAND=13,000S.F.+- 39�F 5.12°0DA:m b M - /2.5GW M 4i LOT -- -"�---'... "' ! 00 0.0.50 27 N MIN. 3SYSTE�L Q M/'. 3C£SSP, /3.0 GW �V .32 12• SYSTEM Q 'k _ CREEK ti 49,540 S•F, -�` o 150.00' h z 3 h 3 LOT23 __ N_83 3` 1 15.0 \1) (3PJ /50.00' /50.00' WETLAND=5,200S.F.± LO22 - WATER MAIN 1l0.00 Q ,4i LOT 3/ ' LOT So /50.00' 150.00' 150.00' W 47, 677 S.F. W 50, /// S.F O -_ -- pRIVE I STREET PEEP H, r o h 47,924 S.F. LOT29 LOT28 LOT24 ° (23J h (22J -h AVE. UPLAND=33,540 S.F. ± 1 W 54,280 S.F. 55,352 S,F, Gocusr o' o (3/J o (30J 53 3// S.F. o o �R;4 i83' 1^ h I (29) h t2eJ 49,803 S.F• LOCATION MAP L' 0 (24) k UPLAND=40,677S.F.± m UPLAND=36,111 S.F. 1 TYP/CAL PLOT PLAN OG�'Na D'R'VE h C�' �"'� SCALE /��=600� UPLAND=31,924 S.F.+ ° o h )t5 - N UPLAND=40,280S.F.+_IW n W TEST - f p' UPLAND=40,352 S.F. m HOLE 2 / Ey 8• y UPLAND=40,311 S.F.± N UPLAND=44,603 S.F.± ' ' 0 tq�/'F R.64B/>'\ 01 /Z•OR I� p UpR \ ° s A 3g 1 92.90 r4se NT to y 0 o a 1b �� 69BiT' yQ[ � s ao 5.3p„w �=a � \ �•F ` h „o / ?s �� 3 MA , ��.� 34 t •F �C:�2 LS 6'80' W ti N M 5 9• ��, O'• C7 ►:'o .c� t 6. o \3 of, L: j \ 100 / F/N/SHED GRADE \ l,, h 3 v O'Oat ��,�� ��o, 4`9sq N.19°2S30"E O sS\ m /9i���s'fA\0OZ aPa� /6!ss. N �01�� B 1 A A5 N.4 44'00"E C_ 153.8 {D / M/N. ;0 6So y 15 N. 4°44'00'"E. 20.00 / O 7 R / 1' 2 MAX. o' 2�. 9 AD /So.33' 279 73 4 .. �3 \`/ µ�NpG� h °O ��\ f 320161 0 159' I h /� k 6ti' m T w N COµ BE 1/4" /' - //8' / LOT33 a `�� .�14. so -0. W C°22.95' � �p)� / �� , \ m N s I 46,797S.p b� c \ 1 01415 Q R.=25.00' 10F o_ 0 s e / (33J 3 a 32 A o m h L=30.77' lP / z _ Y o o w LOT 3'Q \ ,N d 1 6 .� 1 0 ?, F• � 6 :� 42,896 S.:F. LOT35 \ \ �,6 Lp 460 S F' �•( 9� �' / DQoyEa // FR�\ -� V�Al'K�A o,168 p 96 93 I` h (34) 3 I 40,624 S/r \ \ �QI �) h ,�y p/ / (ER 25� 5.11°22 J U s I V 1 / } sir o 20 0 o N O o I (35J TEST \ \ (2 AZ l / 931 �/. 5V 2 101�' Sn W N5o4 °� HOLE / \ 5t / // •� Zy �. GpR 365.11122 \ AL� 450•E. SF2 30 N' 0 300 SO. FT. o 2 bi \ \ / 22 / I fR. /k6 A o25 p0 / 1�-6 \ N 8 To3 mI ON 900 GAL. SEPT/C TANK I SIDE WALL AREA 6 20"Lr c 223.9 �� / 30 d V1 \ a, c� �Q -011 �l11/ 0'L a / 6I- (2I) µAR{ S a O tE o o 5 2 .` 11 5 f. Oo�i LEACHING POOL 2 J )` 10 23 �' \ o \ 210 05 3 FNLO p 00 5 \ 1.99 j0 461 1) �� v a0 o u w \' E/ dT 2 (I w I 2 W II h N'0°04'CO£: A:O p4'00'"F. \ 26 y. 0 Q - \ j 0G tp tii ;54.75' 102.90' w1 \ O� ` F NpGI 1" 20 3/ CPO kG O 1 A o 4.61 v ZJ a 01 h 93.0/' >164.64' m \ 73 / ` 00 12 :�a�0 3 033 11' b LOT/8 N w w /cam 31 h to v \ L 8 5- PI P AI 12/ o ' 0 " w a �o LOr,40, 6 \ 5o N\ 4oy (26) It % �' / w 2 N \ N _ 1 3 T 2) 1 V///i �I E p TYPICAL SEWAGE DISPOSAL SYSTEM i I IQ 4/ 895 S.F• 3 z LET 6 g.F \ A N Uo �� 65J0 1339 g / 9p f I ps40 66' ( IAGR m IY {Zh/ ,1 °.4 50 UPLAND= 'AN m o " ' OJ `� m 90 o N o 2 0 3/ z \ v \� s5.4 OFF"'EA7EST 1 s2/ 2T 40,Os2S.f o (4 0 7 ao' (36) o \ o I �'% LOT/9 , \L_ ARE HOLE- _ 0 to c> h o - a0 a 40 p0' LOT 20 _4. _- 0 a \c a_ \ m 0 3 _ ° 3 p_ 10, \ $- 4/ 500 S.F !ai \ _ . p'E• 4NB o ~ c-/off/' s5.l9' Lor/6 '°� l2 EASEMENT \`A \ P°,6 / 39 R.5g78' 42,298 S.F. f o 4 5 i /�� 9 ?i' R=350.00' ` \ �� rn 2 M/N. Y` FOR WATER MAIN L6644 S F m b i 163 (/9J o3 0 e9- oi', s.4 0o'/0"E. w i (201 W 55,639S•F• \ 3d T 296• w T ( 40,552S.F, rn O O o Z D H)DRAN �' GROUND WATER J o' 40' (31) l�'sro \ � R' \ Op h � (/8) S u 230 OO' / j`C n I - - - O ' 6048'30 ►y m N 62e o m9r N. O a � 3 $F ` a' 'o° o 4 E o L L:14 .29�' Z -'R,8102i O J 3J0 N 'q�q ,OB (,� 0 O' I N F/ SEMENT C `sOBO�O y? ,' I �' pOUNOWAEROke o (� 1 43'�3g) N / 36' - / ?3a• /2 r ORA/KAGF EASEMENT -j33 95 • C34 EA T8' / �J j-i \ B'rp' J WET �1 to 1 ° OO' 261. N1 \.� _ - _ -- >---- - L= 21 54/ AG 8• ?T �s ��� 32i/ S"i2° larvD= C' USE l POOL SYSTEM ON LOTS /-4 6 7 20 25-27 30 3/ 33-40 1 v i` / I25• 0° �EME - T- 200.00' %20.l8 �g1.09� N 106% PIN /�/ /T may• C` 60.0 y�/ //1 2?jo„ Spo V� 1 , / > > 1 , , G,-- to°/ 70--00 -_---- - R'` pR ro �� R` .6�/ ? s'F�, p-o- r USE 2 POOL SYSTEM ON LOTS, ,5,B-ll, 18,19,2/-24, 28, 29, 32 i I` 9 - N- 54' E A 3o a. p /g� 390./8' p' i EO / o f 3 F MEN1 / 5yg. 210p5 /AINAGE h 94' s /°44'S0'E. 15�•5 1 z gE FILL vE 4�07 1 437/ USE 3 POOL SYSTEM ON LOTS, 12- l7 L 51QS. m EASE 4 / MA'N N, 2,pR �,)6 - CREEK L= gEi v TO 0 / E 4 WILL lS PROPOSED 6"WATER MAIN O9' ,9�i AREA fBFT'A8 Z /�� G 5 R R,347. i ° MIN 0 p WATER U '/ //�/ �D_ 351'17 �026"(y tl 5 A `=? --- o • yyDRANT39 0./8' a ON 0 42 (3g1 \ pRA1Ni' 13 6, W TE 36r /�' z l \ 4935 N./ 44 50 W. FIRE WELL O L=64.68' ro GRO PRp PpSE j o Ot I �� / 3 ��PS' 4899' t9£.OS D-40,54% S.F. '- �= Ot 14 LOT l5 m vwuf39o0 Z.k61 AiT[RAPtOPI OR ADDIfIl71! u �t rn N / LvE / p S• o O Z UPLAN m F F 9 TN65 51JR'1'E4' IS A kTIOAT,pN I o 00, vP AN o_ 9+ to / a 0° $T F. - T 13 47, 62 S No 56,/90 S. 6 7'. c�F T,.t ntta y of OR 2 7) 0 F TE 74T S• v F• m ut (15J a' t .T ORK STATE /151 NY A,90 7\ ( ", �° ° o' HOLE 3 UPLAND=40t ° r 45 7q4 S' (14) 2OT �bU / EM 21, 'V o 0 c 40. S' ° w_ 3 54I F• v ( F.± 62 S.F, UPLAND :,lt EEA OR 0 / �O� / m\ s2 BST F• + m w L S. 13) + n\ ND=41,190 S.F. c ,, <' Tx:s "SY'Et Aces ITT trFa^-7MG 3 0 / Y, 1\ O v o, _o UPLAN o ' m 4 1 v :3 ,744 w s q0+6 ._ z.-%, . , P± � co,;.5P1rnEo E' T 0/ 00 a, \N v\ �. F• / S. t `"_ LOT' (12 ) w AN0 4 S o LAND r.: A YA,, � 005 3° ►s ENr 0'0� \a� D\ 6j1 N22 u+ a 40 648 S o •F m UPL a UP \. u0t r. 1 \ v / 5.21 /EA5EM p bl a o= 40 ) '/S a+ UPLAND O 46 747 S _ u A �P .1 :R hE:1 Q• - C f (6 tV O'E, Cl. 1 + ,�� ` '".?`f+,•i h.U.R41N AIiNAGto \ILAo \� 00• Q rv� �' i ?Op 'a LOT (11) oo s.,000s ��, O�SF + pS.i.= \ti a i\...:u r+rr 3URYE; 3or td• IQ 0R\ (T1 A0. 5 p Ss3 Pq, - "'- 85 S.F• o W TLAND /0.24 "; PTA. 7,00 ` YlETLAND=1St0 / 0 <. :n: tTM «..,..,, TO n F 0 11 r 5 0 Q /4 � O F4 '1'4 A' , 7 E F._ TL e VE N 21 `y 1 C- " ��� $1 02�Q5 .4/ �41F�T LOT 9 F 1(1()) N 62' ti ?3,j• WETI AND.11,000 W /27.25' 6/.04' /4/.02' C\h `/,,,•, . AN67 ANA r•r.,, age 648 S. , 4§, ° 9'p4 60,77 g.,• .,,.-: ntF 4 w.;;;r' fNSTt. \ R_4 \ Z \ a i 8 47, N oaD s s'.. ✓ N 8 o e 9is" -- - s.ol ° :r. g5.2/ N \,,o-r Op b (� LOT g, p8' e? Lc /B N.0 47%B 20206 �ti ,° ,kw< r,:oT1 , \ \ PQ S•F. H (9) WETLAND° 8 29 / g8. ST• ° 028'49 �!465• 30.55• , i�g o Are() nG , ----- r 5• / W N.2 5006'E.' NtJ TP APPROX. ALONG OR �ueSEQur-M Oro 5,� t ' °'9' fo r ; 0 48,8G✓ , o °' 000S.F.± 5j 69' 035 0� BS O3 APPROX. HW M. 4 (3) / / \ h, ° h (�) � 9, 0 ) AND/OR SHORELINE go a o �, WETLAND= 64. N.O°32 55'E N.2 130.9 E 1ROLL_40.f9' 1 R:5o�°6 ?�' o �� �w 179.34 90.96 C,8 sy( CON a31 5 RP 0.2°�1 L233 \5/ s22oisy`ssso y`0 TOoos.F 98.�i N.10°3425 SEp N1 (2) 2° \ !,• NYDRF 15/ °'� 16.43 WETLAND' 40 SED m 61 PROPfREp1ME ZOo��GC o ' S6 E \\3y• V� TEST (, FED ! NeU��pING PRO ELL $_ 523022 `- v NpLEg 39s89 ??3j 5a o4540V/ w NO.2 44- LOT S•F j p5.35 1B ,ELL �'-0 261.67'. 491348 x I LOT 4 'Cl- (5) pUTFALL joy N.I2°00 591 w 5•8E58,4"E. / 296 S•F ° WASTE 121.78 1 r Q 43 (4) 15' EASEMENT ,4iN /V/A/ OF w Are o=/ A „w 181.00 15' 3 0j N y r _� vva er Sunpl �' moo !I°54 5 O a ^"' ZDO/? VIE i Q HAI rr W LOT i o 02 ,3. v o f P / 478S•F• s / o i 400 AM A. �N 5�' (1) gA5 0_ 'f 11.57 1 8I��DI BER THE WATER SUPPLY AND SEWAGE DISPOSAL FACdL/T/ES FOR ALL LOTS/N THIS DEVELOPMENT A T MA T T/ TUCK �, i� 50' W. , MACOM THIS SUBDIVISION WILL APPEAR /N D/STR/CT /000 ON COMPLY WITH THE STANDARDS AND REOU/REMENTS F THE SUFFOLK COUNTY DEPARTMENT OF HEALTH. o W N.12°4 0, S INC. SECT/ON //5.0//N BLOCK / OF THE SUFFOL K COUNTY TAX MAP. HOusE M°''ER TOWN OF SOU T-HOL D (/2J INDICATES TAX MAP PARCEL NUMBERS ASSIGNED BY 0 5 40 w 276 p/ATTI TUCK _� THE COUNTY OF SUFF`OLK REAL PROPERTY TAX SERVICE AGENCY. HOWARD W. Y, , N.Y.S. S. L/C. NO.45893 N.13 2 ARD 8 MARY REAL PROPERTY TAX SERVICE AGENCY / HEREBY CERTIFY THAT THIS MAP WAS MADE BY US FROM ACTUAL SURVEYS COMPLETED SUFFOL K COUNTY, IV. Y. & HON" EN f DRIVE FE0,97�9�AND THAT ALL CONCRETE MONUMENTS SHOWN THUS® HEREON ACTUALLY Q HENRY F J. f� EXIST AND THEIR POSITIONS ARE CORRECTLY SHOWN A D ALL DIMENSIONAL AND GEODETIC FRERCHS HOLE ; DETAILS ARE CORRECT. HOWARD W. YOUNG, .S. L.S. L/C. NO.45893 OF N , E p fw IDE DUNE /6,/986 5 `Q TOTAL AREA= 49. /40* ACRES APR. 26,1986 y�P�O /. P.f THIS IS TO CER77FY THAT THIS SUBDIVISION PLAN HAS BEEN APPROVED BY THE PLANNIA B04RD MAR. /3,/986 O 0 AVE. THE 7VWN OF SOUTHOLD 9Y RESOLUTION OF APPROVAL DATED �' LOCUST ✓E. JULY 3,/985 � OWNER MATT/TUCK HARBOR ASSOC. 8 FEBAPR. //, 1985 BY�- DArE BAYVIEW VENTURES LTD. 1AN. 27, 1984 CHAIRMAN, PLANNING BOARD C/O AN7HONY CONFORT/,ESO. 739 EAST MAIN STREET so o so /oo YOUNG THE LOT LINES OFSUBD/V/S/ON MAPS AS F/LED CANNOT BE ALTERED WITHOUT PERM/SS/ON FROM RIVERHEAD, N.Y. 1190/ �� 400 OS lVIJ , p1/E HEAD, N.Y. ZI ' SCALE: / _.I00 AL DEN W �� 315 L.S.L/C NO /2845 ESUBD/V/SJON THE PLANNING BOARD, AND LOTS MUST BE SOLO AS SHOWN ON TN MAP. HOWARD YO L.S. LIC. NO. 45893 W.