HomeMy WebLinkAboutMATTITUCK INLET LAUNCHING RAMP � i" ijf COG
FRANK A. KUJAWSKI, JR., President o TELEPHONE
ALBERT J. KRUPSKI, JR., Vice-President t`�� (516) 165-1892
JOHN M. BREDEMEYER, III
JOHN L. BEDNOSKI, JR.
HENRY P. SMITH
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall, 53095 Main Road
P.O. Box 728
Southold, New York 11971
March 1, 1989
Thomas M. Creamer
Chief , Operations Division
Dep't. of the Army
N.Y. Dist. , Corps of Engineers
Jacobs Javits Bldg.
New York, N.Y. 10278-0090
Re: Mattituck Harbor Federal Navigation Project:
Dear Mr. Creamer:
Your letter of December 6, 1988 to Supervisor Frank Murphy
concerning maintenance dredging of Mattituck Harbor was referred to
my office for a response.
The Trustees and the Town of Southold are very interested in the
commencement of maintenance operations as soon as is possible. At
the present time, navigation is seriously imperiled because of the
reduction in channel depth and size. It is not uncommon for fishing
vessels to run -aground at low tide at the present time.
In addition, the Town is working in cooperation with the State
of New York Parks, Recreat,ion .and, Historic Preservation Office, to
purchase the Carey Tank Farm. Part of this project involves -a boat-.._
launching ramp at this site. For safety, access and ability to
navigate, we would like thorough maintenance dredging in this area of
the inlet.
Very truly yours, .
T , 7 '
Frank A. Kujawski, Jr. �
President
Board of Trustees
FAK:j as
i
DEPARTMENT OF THE ARMY
NEW YORK DISTRICT, CORPS OF ENGINEERS
JACOB K. JAVITS FEDERAL BUILDING
NEW YORK. N.Y. 10278-0090
wcr�r ro December 6, 1988 .
�
AMPSTwho.
Operations Division
Navigation Branch ���
Mr. Francis J. Murphy Zt
Supervisor
Town of Southold ;;.; ;;; ^�•
Main Road 2�-Z-1 I-''
Southold, N.Y. 11971
SUBJECT: Mattituck Harbor, A Federal Navigation Project
Dear Mr. . Murphy:
This is to inform you that this office is currently evaluating
the feasibility and necessity for maintenance dredging of the Federal
Navigation Channel at Mattituck Harbor, New York, Tf our engineering
and design study results show that there is a need for maintenance
dredging, commencement of the dredging operation will begin as soon as
environmental clearances and budgetary approvals are obtained.
To assist in our evaluation of this project, please provide this
office with any relevant information or reasons why maintenance
dredging is needed in the federally authorized navigation channel of
Mattituck Harbor, New York.
If you- have any questions concerning this proposed project, please
contact Dr. Billy Tam of my staff at Telephone No. (212) 264-9032 .
Sincerely,
THOMAS M. CREAMER
Chief, Operations Division
o��FFot��D
FRANK A. KUJAWSKI, JR., President
TELEPHONE
ALBERT J. KRUPSKI, JR., Vice-President (516)765-1892
JOHN M. BREDEMEYER, III
JOHN L. BEDNOSKI, JR.
HENRY P. SMITH
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall, 53095 Main Road
P.O. Box 728 -
Southold, New York 11971
March 1, 1989
Thomas M. Creamer
Chief Operations Division
Dep't. of the Army
N.Y. DIst. , Corps of Engineers
Jacobs Javits Bldg.
New York, N.Y. 10278-0090
Re: Mattituck Harbor Federal Navigation Project:
Dear Mr. Creamer:
i
Your letter of December 6, 1988 to Supervisor Frank Murphy
concerning maintenance dredging of Mattituck Harbor was referred to
my office for a response.
The Trustees and the Town of Southold are very interested in the
commencement of maintenance operations as soon as is possible. At
the present time, n vigation is serious y imperiled. because of the
reduction in channe depth and size. L is not uncommon for fishing
vessels to run agrou d at low tide a the present time.
In addition, the wn is proc eding forward with the purchase,
in cooperation with the EC, of e' Carey Tank Farm. Part of this
project involves a State rant ich includes a boat launching ramp
at this site. For safety, acc ss and ability to navigate, we would
like thorough maintenance a ging in this area of the inlet.
Very truly yours,
Frank A. Kujawski, Jr.
resident
Board of Trustees
FAK:jas