Loading...
HomeMy WebLinkAboutMATTITUCK INLET LAUNCHING RAMP � i" ijf COG FRANK A. KUJAWSKI, JR., President o TELEPHONE ALBERT J. KRUPSKI, JR., Vice-President t`�� (516) 165-1892 JOHN M. BREDEMEYER, III JOHN L. BEDNOSKI, JR. HENRY P. SMITH BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Town Hall, 53095 Main Road P.O. Box 728 Southold, New York 11971 March 1, 1989 Thomas M. Creamer Chief , Operations Division Dep't. of the Army N.Y. Dist. , Corps of Engineers Jacobs Javits Bldg. New York, N.Y. 10278-0090 Re: Mattituck Harbor Federal Navigation Project: Dear Mr. Creamer: Your letter of December 6, 1988 to Supervisor Frank Murphy concerning maintenance dredging of Mattituck Harbor was referred to my office for a response. The Trustees and the Town of Southold are very interested in the commencement of maintenance operations as soon as is possible. At the present time, navigation is seriously imperiled because of the reduction in channel depth and size. It is not uncommon for fishing vessels to run -aground at low tide at the present time. In addition, the Town is working in cooperation with the State of New York Parks, Recreat,ion .and, Historic Preservation Office, to purchase the Carey Tank Farm. Part of this project involves -a boat-.._ launching ramp at this site. For safety, access and ability to navigate, we would like thorough maintenance dredging in this area of the inlet. Very truly yours, . T , 7 ' Frank A. Kujawski, Jr. � President Board of Trustees FAK:j as i DEPARTMENT OF THE ARMY NEW YORK DISTRICT, CORPS OF ENGINEERS JACOB K. JAVITS FEDERAL BUILDING NEW YORK. N.Y. 10278-0090 wcr�r ro December 6, 1988 . � AMPSTwho. Operations Division Navigation Branch ��� Mr. Francis J. Murphy Zt Supervisor Town of Southold ;;.; ;;; ^�• Main Road 2�-Z-1 I-'' Southold, N.Y. 11971 SUBJECT: Mattituck Harbor, A Federal Navigation Project Dear Mr. . Murphy: This is to inform you that this office is currently evaluating the feasibility and necessity for maintenance dredging of the Federal Navigation Channel at Mattituck Harbor, New York, Tf our engineering and design study results show that there is a need for maintenance dredging, commencement of the dredging operation will begin as soon as environmental clearances and budgetary approvals are obtained. To assist in our evaluation of this project, please provide this office with any relevant information or reasons why maintenance dredging is needed in the federally authorized navigation channel of Mattituck Harbor, New York. If you- have any questions concerning this proposed project, please contact Dr. Billy Tam of my staff at Telephone No. (212) 264-9032 . Sincerely, THOMAS M. CREAMER Chief, Operations Division o��FFot��D FRANK A. KUJAWSKI, JR., President TELEPHONE ALBERT J. KRUPSKI, JR., Vice-President (516)765-1892 JOHN M. BREDEMEYER, III JOHN L. BEDNOSKI, JR. HENRY P. SMITH BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Town Hall, 53095 Main Road P.O. Box 728 - Southold, New York 11971 March 1, 1989 Thomas M. Creamer Chief Operations Division Dep't. of the Army N.Y. DIst. , Corps of Engineers Jacobs Javits Bldg. New York, N.Y. 10278-0090 Re: Mattituck Harbor Federal Navigation Project: Dear Mr. Creamer: i Your letter of December 6, 1988 to Supervisor Frank Murphy concerning maintenance dredging of Mattituck Harbor was referred to my office for a response. The Trustees and the Town of Southold are very interested in the commencement of maintenance operations as soon as is possible. At the present time, n vigation is serious y imperiled. because of the reduction in channe depth and size. L is not uncommon for fishing vessels to run agrou d at low tide a the present time. In addition, the wn is proc eding forward with the purchase, in cooperation with the EC, of e' Carey Tank Farm. Part of this project involves a State rant ich includes a boat launching ramp at this site. For safety, acc ss and ability to navigate, we would like thorough maintenance a ging in this area of the inlet. Very truly yours, Frank A. Kujawski, Jr. resident Board of Trustees FAK:jas